Table of Contents
ToggleTechnical Design Solution
1. Cover / Document Information
– Document Title: 1000kVA European Box-Type Substation for EV Charging Technical Design Solution
– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Version: V1.0
– Date: August 2026
2. Table of Contents Structure
1. Company Introduction
2. Project Overview
3. User Requirement Analysis
4. Overall Design Description
5. Equipment Configuration List and Quotation
6. Technical Parameters of Each System
7. Core Advantages of the Solution
8. Technical Q&A
9. Construction Schedule Plan
10. Construction Organization Plan
11. After-Sales Service System
12. Technical Training Plan
13. Project Cases
14. SEO Keywords and Optimization Tag System
15. Website Backend Configuration Information
Appendix. Contact Information
3. Company Introduction
3.1 Enterprise Overview
Founded in 2002 and headquartered at No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou (Chaotian Park, Zhongrun Industrial Park), Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise focusing on R&D, production, sales and engineering services of intelligent computer rooms, intelligent power distribution and new energy power supply supporting equipment. With more than 20 years of industry experience, relying on independent R&D capability and flexible customized production strength, the company provides one-stop power supply and distribution and computer room overall solutions for data centers, communication base stations, new energy charging stations, industrial plants and other scenarios.
The company owns the core independent brand KITOZER (Pioneer). Products cover integrated data cabinets, micro-module cold aisle systems, outdoor intelligent cabinets, shielded computer room equipment, containerized data centers, intelligent shielding cabinets, box-type substations and other categories, widely used in government, finance, energy, transportation, medical care, education and many other industries. Customers are located throughout the country, and the company has gained wide market recognition for its stable product quality and professional technical services.
3.2 Core Business and Product System
The company’s core business revolves around intelligent electromechanical and power supply/distribution systems, forming an industrial pattern of four business segments developing in coordination:
– Computer room engineering segment: covering IDC data center computer room construction, shielded computer room engineering, micro-module cold aisle construction, integrated computer room deployment and containerized computer room customization, providing full-process services from solution design, production and manufacturing, installation and commissioning to O&M service;
– Intelligent cabinet segment: including indoor integrated cabinets, outdoor waterproof cabinets, electromagnetic shielding cabinets, shielded operation desks, UPS power distribution cabinets, etc., supporting full-parameter customization according to customer on-site environment and functional needs;
– Environmental monitoring segment: including computer room environmental monitoring systems, UPS power monitoring, box-type substation intelligent O&M systems, temperature/humidity and security monitoring, etc., realizing remote visualized management of equipment running status;
– New energy power distribution segment: including box-type substations dedicated to charging piles, outdoor energy storage supporting power distribution equipment, overall charging station power supply solutions, etc., adapting to the rapidly developing market demand of the new energy vehicle industry.
3.3 Enterprise Qualifications and Honors
The company attaches great importance to technology R&D and quality management, and has obtained a number of high-tech product certifications and utility model patents, established a complete ISO9001 quality management system and ISO14001 environmental management system certification. All power supply and distribution products have passed the national compulsory 3C certification and high-voltage equipment type test certification, and shielding products meet the relevant national electromagnetic shielding standards.
With more than 20 years of industry experience, the company has accumulated rich project implementation experience, completed more than a thousand computer room and power supply/distribution engineering projects, established long-term strategic cooperative relationships with many well-known domestic enterprises, and established a “professional, reliable, efficient” brand image in the industry.
3.4 Core Competitive Advantages
#### 3.4.1 Original Factory Customization Capability
The company has its own production base and professional R&D design team with flexible customized production capability, can customize exclusive solutions according to the customer’s on-site environment, load parameters and functional needs, provide three differentiated design solutions free of charge for customer selection, highly match actual project needs, and improve overall project adaptability and brand consistency.
#### 3.4.2 Full-Process Quality Control
The company has established a strict quality standard system. From raw material procurement, production process control to finished product factory inspection, there are clear execution standards. Third-party testing institutions escort product quality throughout, ensuring every factory-delivered device meets national relevant standards and project technical requirements. At the same time, the company has a complete supply chain system and production plan management to guarantee delivery punctuality and meet project schedule requirements.
#### 3.4.3 Professional Technical Service Team
The company has formed an experienced technical service team. Core technical personnel all have more than ten years of industry experience, and can provide customers with full-cycle technical support such as preliminary solution design, technical disclosure, on-site installation guidance, commissioning and acceptance. At the same time, a 24-hour professional online service system has been established to quickly respond and solve customers’ various difficult problems, with dedicated personnel following the whole project process to guarantee after-sales quality.
#### 3.4.4 High Cost-Performance Product System
Relying on large-scale production and supply chain integration capability, the company continuously optimizes product cost structure while guaranteeing product quality, providing customers with high cost-performance products and services. At the same time, full-lifecycle O&M services are provided to reduce customers’ later operation and maintenance costs and maximize project value.
4. Project Background and Objectives

4.1 Project Background
With the rapid development of the global new energy industry, China’s new energy vehicle industry has entered a stage of rapid popularization. The number of electric vehicles continues to grow rapidly, and the supporting electric vehicle charging infrastructure construction has also ushered in explosive growth. As the energy supply node for the operation of new energy vehicles, the reliability, safety and efficiency of the charging station’s power supply system directly determine the operation efficiency and service capability of the charging station.
The traditional civil-construction substation construction mode has disadvantages such as long construction period, large floor area, complex construction process and many on-site environmental constraints, making it difficult to meet the needs of rapid deployment and flexible site selection of charging station projects. As an integrated and modular outdoor power distribution equipment, the European box-type substation integrates high-voltage power receiving, transformer step-down and low-voltage power distribution functions in a closed box body, with advantages such as factory prefabrication, fast on-site installation, small floor area and strong outdoor protection capability, making it the preferred solution for charging station power supply systems.
This project designs and develops a dedicated European box-type substation for the 1000kVA capacity level charging station power supply needs, adapting to the impact and nonlinear characteristics of charging pile loads, meeting outdoor all-weather operation requirements, and equipped with an intelligent O&M system to realize remote and intelligent management of charging station power supply equipment.
4.2 Project Construction Objectives
This solution aims to design a technically advanced, safe, reliable, economical and efficient 1000kVA European box-type substation for EV charging, achieving the following core construction objectives:
– Meet the power supply needs of 8 120kW DC fast charging piles and supporting auxiliary facilities, guaranteeing stable and continuous power supply of the charging station with power supply reliability above 99.99%;
– Aiming at the nonlinear load characteristics of charging piles, configure professional reactive power compensation and harmonic treatment solutions to control power quality within national specification requirements, avoiding harm to the power grid and charging equipment caused by harmonics;
– Adopt full outdoor protection design, adapting to high temperature, high humidity, rain, sand and other harsh outdoor environments, with box protection level reaching IP54 or above, meeting outdoor all-weather operation requirements;
– Equip an intelligent O&M monitoring system to realize remote real-time monitoring of substation operation data, environmental data and security status, reducing O&M costs and improving fault response speed;
– Adopt modular and standardized design to shorten construction period, reduce on-site construction difficulty, and reserve expansion interfaces to meet future charging pile capacity expansion needs;
– Strictly follow relevant national design specifications and safety standards, building a complete lightning protection, grounding, fire protection and security system to guarantee equipment and personnel safety.
4.3 Project Design Scope
The design scope of this solution covers the complete equipment and systems of the 1000kVA European box-type substation for EV charging from high-voltage inlet to low-voltage outlet, specifically including:
– High-voltage power distribution system: design and selection of 10kV high-voltage ring main unit, high-voltage metering, high-voltage protection and high-voltage lightning protection equipment;
– Transformer system: selection and design of 1000kVA power transformer and auxiliary equipment;
– Low-voltage power distribution system: design and equipment selection of low-voltage incoming cabinet, metering cabinet, reactive power compensation cabinet and charging pile outlet cabinet;
– Box structure system: structural design of European box-type substation shell, compartment partitions, ventilation system, base, doors and windows, etc.;
– Auxiliary supporting systems: design of ventilation temperature control, lighting maintenance, lightning protection grounding, fire protection and security systems;
– Intelligent monitoring system: design and selection of substation intelligent monitoring terminal, various sensors and communication systems;
– Supporting services: construction installation solution, commissioning solution, O&M service solution and training solution.
4.4 Design Basis and Execution Standards
This solution strictly follows the current relevant national laws, regulations, design specifications and industry standards, mainly including:
– GB 50052-2009 Code for Design of Electric Power Supply and Distribution Systems
– GB 50053-2013 Code for Design of 10kV and Below Substations
– GB 50054-2011 Code for Design of Low Voltage Electrical Installations
– GB/T 50062-2008 Code for Design of Relaying Protection and Automatic Devices of Electric Power Installations
– GB 50966-2014 Code for Design of Electric Vehicle Charging and Battery Swap Facilities
– GB/T 29316-2012 Technical Requirements for Power Quality of EV Charging and Battery Swap Facilities
– GB/T 14549-1993 Power Quality – Harmonics in Public Supply Network
– GB/T 12326-2008 Power Quality – Voltage Fluctuation and Flicker
– GB 50227-2017 Code for Design of Installation of Shunt Capacitors
– GB/T 17467-2020 High-Voltage/Low-Voltage Prefabricated Substation
– DL/T 5377-2007 High-Voltage/Low-Voltage Prefabricated Substation
– GB/T 50064-2014 Code for Design of Overvoltage Protection and Insulation Coordination for AC Electrical Installations
– GB/T 50065-2011 Code for Design of AC Electrical Installations Earthing
– GB 50057-2010 Code for Design Protection of Structures Against Lightning (2022 edition)
– GB 1094.1-2013 Power Transformers – Part 1: General
– GB/T 6451-2015 Technical Parameters and Requirements for Oil-Immersed Power Transformers
– GB/T 10228-2015 Technical Parameters and Requirements for Dry-Type Power Transformers
– GB/T 15576-2020 Low-Voltage Reactive Power Compensation Devices
– GB 4208-2017 Degrees of Protection Provided by Enclosures (IP Code)
– Actual on-site environmental conditions and technical requirements proposed by the user
4.5 Significance of Project Construction
The construction of this project is of great significance for promoting the upgrade of charging station infrastructure and improving the technical level of new energy supporting power supply equipment:
– Effectively solves the problems of long construction period and inflexible deployment of charging station power supply systems, realizing factory prefabrication and modular installation of charging station power supply systems, greatly shortening the overall construction period of charging stations and accelerating the popularization of new energy charging infrastructure;
– Special optimized design for charging pile load characteristics, effectively treating harmonic pollution generated by charging piles, improving grid power quality, extending charging equipment service life, and guaranteeing the stability and economy of charging station operation;
– Equipped with an intelligent O&M system, promoting the transformation of charging station power supply equipment from “manual inspection” to “intelligent O&M”, reducing labor costs during the charging station operation stage, improving fault warning and handling capability, and reducing power outage losses;
– Adopting high-efficiency energy-saving transformers and optimized power distribution system design to reduce the loss of the power supply system itself, improve energy utilization efficiency, conform to the national “dual carbon” strategy development requirements, and help build green and low-carbon charging stations.
5. User Requirement Analysis
5.1 Basic Power Supply Requirements
This project’s charging station configures 8 120kW DC fast charging piles. Considering auxiliary loads such as lighting, monitoring and air conditioning, the total calculated load is about 800kW. A 1000kVA capacity distribution transformer is required, with 10kV high-voltage inlet and 0.4kV low-voltage outlet, using three-phase four-wire power supply.
The power supply system needs high reliability with complete overload, short-circuit, leakage, overvoltage and undervoltage protection functions. When a single charging pile fails, the protection device can quickly act to cut off the fault without affecting the normal operation of other charging piles. The metering device must meet the trade settlement requirements of the power supply department, with accuracy reaching relevant standards and supporting peak-valley electricity price metering.
5.2 Charging Pile Load Characteristic Requirements
DC charging piles are typical nonlinear rectifier loads. During operation, they generate a large number of odd harmonics such as 5th, 7th, 11th and 13th. Without effective treatment, this will cause a series of problems such as increased transformer loss, rising temperature, capacitor resonance burnout, increased metering device error and protection device misoperation, seriously affecting the safe and stable operation of the power supply system.
At the same time, charging pile loads have obvious impact and fluctuation characteristics. Vehicle charging startup generates large impact current, and the load differs greatly between peak and valley periods. Therefore, the transformer and low-voltage switchgear need sufficient overload capacity and impact resistance to withstand frequent load fluctuations.
5.3 Outdoor Environment Adaptation Requirements
The box-type substation is installed outdoors in the open air and must withstand high temperature, low temperature, rain, snow, sand, condensation and other meteorological conditions. Some areas may also face special environmental tests such as salt spray and corrosion. Therefore, the box shell needs excellent waterproof, dustproof, anti-corrosion, sun-proof and heat insulation capability, with protection level reaching IP54 or above, meeting outdoor all-weather operation requirements.
The transformer room and low-voltage room need complete ventilation and heat dissipation systems, with fans automatically started and stopped according to the temperature inside the compartment, guaranteeing normal equipment operation in summer high-temperature environments and avoiding equipment derating or faults caused by excessive temperature. In winter low-temperature environments, equipment needs good low-temperature adaptability to guarantee normal operation of switches, instruments and other components.
5.4 Power Quality and Harmonic Treatment Requirements
The power quality of the charging station power supply system must meet the “Technical Requirements for Power Quality of EV Charging and Battery Swap Facilities” and public grid relevant standards, with specific requirements:
– Power factor: under normal operating conditions, the low-voltage side power factor is not lower than 0.95, avoiding power factor penalty charges;
– Harmonic voltage: the total harmonic voltage distortion rate THDu at the public grid connection point ≤5%, and the harmonic voltage content of each order conforms to GB/T 14549 standard requirements;
– Voltage deviation: supply voltage deviation controlled within ±7% of nominal voltage;
– Voltage fluctuation and flicker: voltage fluctuation and flicker values conform to GB/T 12326 standard requirements;
– Three-phase unbalance: three-phase voltage unbalance not exceeding 2%, short-term not exceeding 4%.
5.5 Intelligent O&M and Remote Monitoring Requirements
Charging stations usually operate unattended. The power supply system needs remote monitoring and intelligent O&M capability, realizing the following functions:
– Full electrical quantity monitoring: real-time monitoring of voltage, current, power, energy, power factor, harmonics and other electrical parameters of the high-voltage side, low-voltage side and each outlet circuit;
– Environmental monitoring: real-time monitoring of temperature, humidity, water immersion, smoke and other environmental parameters of the transformer room and low-voltage room;
– Status monitoring: monitoring of circuit breaker open/close status, grounding switch status, fan operation status, box door open/close status and other equipment status;
– Alarm function: supporting overvoltage, undervoltage, overcurrent, overtemperature, smoke, door opening, water immersion and other alarms, with alarm information notified to O&M personnel via SMS, platform push and other methods;
– Data statistics and analysis: supporting energy statistics, load curve analysis, fault record query and other functions, providing data support for charging station operation management;
– Remote communication: supporting Ethernet, 4G and other communication methods, with data uploadable to the charging station operation platform for multi-station centralized management.
5.6 Safety Protection and Fire Protection Requirements
The box-type substation is high-voltage electrical equipment and needs a complete safety protection system:
– Electrical safety: complete relay protection, leakage protection and grounding protection functions, with clear safety warning signs; the high-voltage room has electromagnetic interlocking to prevent misoperation;
– Lightning protection safety: surge protection devices configured on both high and low voltage sides, building a complete lightning protection system to prevent lightning overvoltage from damaging equipment;
– Fire protection safety: the transformer room and low-voltage room are equipped with automatic fire extinguishing devices and smoke alarm devices; cable inlets/outlets use fire protection sealing; fire-resistant partitions between compartments prevent fire spread;
– Security safety: all box doors are equipped with anti-theft locks, and door magnetic switches realize illegal door opening alarms, preventing unauthorized personnel from entering and guaranteeing equipment safety.
5.7 Scalability and Upgrade Requirements
The solution design must fully consider future charging station expansion needs. The low-voltage system reserves spare outlet circuits, and the main busbar capacity reserves a certain margin, so later charging pile outlet circuits can be added directly without replacing the main busbar and inlet switch. The intelligent monitoring system adopts a modular design, supporting later addition of monitoring points and function upgrades, adapting to the continuous optimization needs of charging station operation management.
6. Design Principles and Applicable Standards
6.1 Overall Design Principles
This solution follows the overall design principles of “safe and reliable, technically advanced, economically reasonable, energy-saving and environmentally friendly, intelligent O&M, and easy expansion”, with special optimized design combined with charging pile load characteristics and outdoor operating environment:
– Safe and reliable: put power supply safety first, strictly follow relevant national design specifications, select mature and reliable equipment and technical solutions, build a multi-level protection system, and guarantee personnel and equipment safety;
– Technically advanced: adopt current industry advanced energy-saving transformers, intelligent power distribution equipment, reactive power compensation technology and IoT monitoring technology to improve the overall technical level of the system and guarantee the forward-looking nature of the solution;
– Economically reasonable: on the premise of meeting functions and performance, optimize system configuration, control equipment cost and construction cost, while reducing operation loss and O&M cost, achieving optimal full-lifecycle cost;
– Energy-saving and environmentally friendly: select first-grade energy efficiency energy-saving transformers, adopt efficient reactive power compensation technology to reduce line loss; the box adopts heat insulation design and intelligent temperature-controlled ventilation to reduce auxiliary system energy consumption;
– Intelligent O&M: equip a complete intelligent monitoring system to realize comprehensive perception and remote management of equipment running status, improving O&M efficiency and reducing O&M cost;
– Easy expansion: the system design reserves sufficient capacity margin and interfaces, supporting later charging pile quantity expansion and function upgrades, protecting user early investment.
6.2 Applicable Standards
The design, manufacture, testing and installation of this solution strictly follow the national standards and specifications listed in section 4.4, including GB 50052, GB 50053, GB 50054, GB 50966, GB/T 17467, DL/T 5377, GB/T 14549, GB/T 29316, GB 50057 and other applicable codes.
7. System Architecture and Working Principle
7.1 Overall System Architecture
This 1000kVA European box-type substation for EV charging adopts a three-level power distribution architecture of “high-voltage power receiving unit – transformer step-down unit – low-voltage power distribution unit”, with auxiliary systems and intelligent monitoring system. The overall structure is as follows:
– High-voltage power receiving unit: adopts a 10kV ring main unit, realizing high-voltage inlet, metering and transformer outlet protection functions, and is the power input and high-voltage protection link of the whole substation;
– Transformer step-down unit: adopts a 1000kVA energy-saving power transformer, stepping down 10kV high voltage to 0.4kV low voltage, providing suitable supply voltage for charging piles, and is the core energy conversion link of the system;
– Low-voltage power distribution unit: composed of incoming cabinet, metering cabinet, reactive power compensation cabinet and outlet cabinet, realizing low-voltage main switch control, energy metering, reactive power compensation and harmonic treatment, and charging pile branch circuit power distribution, and is the distribution link directly facing charging pile loads;
– Auxiliary supporting unit: including ventilation temperature control, lighting maintenance, lightning protection grounding, safety fire protection and other systems, guaranteeing safe and stable equipment operation in outdoor environments;
– Intelligent monitoring unit: composed of intelligent monitoring terminal, various sensors and communication modules, realizing monitoring, alarming, data upload and remote management of the whole system operation status.
The three power distribution units are independently arranged in three separate compartments – the high-voltage room, transformer room and low-voltage room. Fire-resistant steel plate partitions are used between compartments, ensuring electrical safety distances while facilitating zoned maintenance.
7.2 Working Principle
– Normal power supply flow: 10kV power enters through the high-voltage inlet cable → passes through the inlet three-position load switch → metering unit measures → transformer outlet load switch-fuse combination → S22-1000kVA transformer steps down 10kV to 0.4kV → low-voltage main circuit breaker → busbar → metering cabinet → reactive power compensation cabinet → charging pile outlet circuits → charging piles;
– Reactive power compensation: the intelligent controller detects the system reactive power in real time and automatically switches capacitor banks to maintain the power factor above 0.95;
– Harmonic treatment: the 7% reactance series reactors and capacitor banks form passive filtering circuits that absorb 5th and 7th harmonics and suppress resonance;
– Fault protection: when a fault occurs, the corresponding protection device acts in order (high-voltage fuse → frame circuit breaker → MCCB → residual current protection) to precisely cut off the fault and minimize the power outage range;
– Intelligent monitoring: sensors collect electrical, environmental and status data → intelligent monitoring terminal processes and judges → uploaded to the cloud platform via 4G/Ethernet → O&M personnel monitor and handle alarms remotely.
8. Detailed Technical Design
8.1 High-Voltage Power Supply and Distribution System Design
#### 8.1.1 Power Supply Mode and Main Wiring
The high-voltage side adopts the 10kV voltage level with single-circuit radial power supply, which can also be changed to ring network power supply according to on-site grid conditions. The high-voltage main wiring adopts a three-unit co-box ring main unit scheme of “inlet unit + metering unit + outlet unit”:
– Inlet unit: configures a three-position load switch, realizing isolation, load on/off and grounding functions on the inlet side, with obvious disconnection points to guarantee maintenance safety;
– Metering unit: configures high-precision current transformers and voltage transformers, connected to high-voltage energy metering devices, meeting the trade settlement metering requirements of the power supply department;
– Outlet unit: configures a load switch-fuse combination appliance as the high-voltage side protection of the transformer. When a short-circuit fault occurs inside the transformer, the fuse quickly melts to cut off the fault while linking the load switch to open.
This main wiring scheme has simple structure, convenient operation, high reliability and low maintenance, very suitable for the high-voltage power distribution scenario of box-type substations, and has ring network expansion capability.
#### 8.1.2 High-Voltage Relay Protection Configuration
The high-voltage side configures the following protection functions:
– Short-circuit protection: realized by high-voltage current-limiting fuses with fast melting speed and strong current-limiting capability, cutting off transformer-side short-circuit faults in milliseconds, effectively protecting the transformer;
– Overload protection: realized by the overload characteristics of the load switch-fuse combination; when the load current exceeds the rated value, it acts according to inverse-time characteristics;
– Overvoltage protection: configures zinc oxide gapless arresters to suppress lightning overvoltage and switching overvoltage, protecting transformer and high-voltage switchgear insulation;
– Anti-misoperation interlocking: the ring main unit has complete five-prevention interlocking functions, preventing misoperations such as opening/closing with load, closing grounding switch with power on, and entering live compartments by mistake.
8.2 Transformer System Selection Design
#### 8.2.1 Capacity Verification and Selection
According to the total load calculation of the charging station, a 1000kVA rated capacity power transformer is selected:
– Total equipment capacity: 8 × 120kW + auxiliary load 40kW = 1000kW;
– Calculated active power: 1000kW × 0.8 (simultaneity factor) = 800kW;
– Calculated apparent power: 800kW ÷ 0.95 (power factor after compensation) ≈ 842kVA;
– The selected 1000kVA transformer has a normal load rate of about 84%, in the economical operation range, while reserving more than 15% overload margin, able to withstand the impact load of charging piles and future small expansion needs.
#### 8.2.2 Transformer Type Selection
For outdoor charging pile scenarios, the S22 type oil-immersed power transformer is preferred, mainly based on the following considerations:
– Excellent heat dissipation performance: oil-immersed transformers use oil-immersed self-cooling, with strong heat dissipation and good overload capability, suitable for outdoor high-temperature environments and charging pile impact load scenarios;
– High reliability: oil-immersed transformer technology is mature, with fully sealed structure for moisture and dust protection, strong outdoor environment adaptability, long service life and low maintenance cost;
– Good economy: at the same capacity, oil-immersed transformers are cheaper than dry-type transformers, with lower no-load loss and load loss, and better operation economy;
– Strong protection capability: the oil-immersed transformer body has outdoor protection capability, and combined with box protection, can adapt to various harsh outdoor environments.
If the project is located in indoor, underground or other scenarios with strict fire protection requirements, it can be replaced with an SCB14 type dry-type transformer with temperature controller and cooling fans to meet fire protection requirements.
#### 8.2.3 Connection Group and Voltage Regulation Mode
The transformer adopts the Dyn11 connection group, which has the following advantages compared with Yyn0:
– The delta winding can circulate and cancel 3rd harmonic current, preventing 3rd harmonics from flowing into the high-voltage grid, adapting to charging pile nonlinear load scenarios;
– Large single-phase short-circuit current, conducive to sensitive operation of low-voltage side single-phase grounding protection, improving power supply safety;
– Stronger ability to withstand three-phase unbalanced loads, allowing larger neutral line current, adapting to scenarios with uneven distribution of single-phase auxiliary loads of charging piles.
The transformer adopts no-load (off-circuit) tap changing with a regulation range of ±2×2.5%. The tap changer can be adjusted according to grid voltage conditions to guarantee stable low-voltage side output voltage.
8.3 Low-Voltage Power Distribution System Design
#### 8.3.1 Low-Voltage Main Wiring
The low-voltage side adopts single busbar wiring, with incoming cabinet, metering cabinet, reactive power compensation cabinet and charging pile outlet cabinets connected through horizontal busbars. The low-voltage system rated voltage is 0.4kV, frequency 50Hz, with neutral point directly grounded.
#### 8.3.2 Low-Voltage Incoming Design
The low-voltage incoming configures an air (ACB) circuit breaker with rated current 2000A and rated ultimate breaking capacity 50kA, with four-stage protection of long delay, short delay, instantaneous and ground fault, realizing selective protection so that faults only cut off the faulty circuit without affecting overall power supply.
The circuit breaker adopts an electric energy storage operating mechanism, supporting local operation and remote signal monitoring, realizing automatic fault tripping and remote open/close control. The incoming circuit configures a multifunctional power meter for real-time monitoring of full electrical parameters, with data connected to the intelligent monitoring system.
#### 8.3.3 Low-Voltage Metering Design
An independent low-voltage metering cabinet is set, configuring 0.2S class high-precision current transformers and 0.5S class three-phase four-wire intelligent energy meters, meeting the trade settlement metering requirements of the power supply department. The metering room has lead sealing devices to prevent electricity theft; the metering circuit is independently wired, unaffected by other circuits, guaranteeing metering accuracy.
#### 8.3.4 Charging Pile Outlet Design
8 dedicated charging pile outlet circuits are configured, each with rated current 250A, equipped with MCCBs with residual current protection. Each charging pile corresponds to one outlet circuit for independent control and protection.
The MCCB has rated ultimate breaking capacity 36kA, with overload, short-circuit and leakage protection functions. When a charging pile has leakage, short-circuit or other faults, it quickly cuts off the faulty circuit, guaranteeing personnel and equipment safety. At the same time, 1 400A spare power outlet circuit is reserved to meet later charging pile expansion needs.
8.4 Reactive Power Compensation and Harmonic Treatment System Design
#### 8.4.1 Compensation Capacity Design
According to charging pile load characteristics, the total reactive power compensation capacity is configured at 300kvar, about 30% of the transformer capacity:
– Power factor before compensation calculated at 0.75, target power factor after compensation 0.95;
– At maximum active load of 800kW, the required reactive power compensation capacity is about 320kvar;
– Configure 10 circuits × 30kvar capacitor banks, total capacity 300kvar, meeting compensation requirements under most operating conditions;
– Intelligent dynamic switching is adopted, automatically adjusting the input capacity according to real-time reactive power, avoiding over-compensation and under-compensation, ensuring the power factor remains stable above 0.95.
#### 8.4.2 Harmonic Treatment Solution
Aiming at the harmonic pollution generated by charging piles, the “series reactor + capacitor” passive filtering compensation solution is adopted, with each capacitor in series with a 7% reactance rate reactor. The main functions:
– Suppress harmonic amplification: after series reactors, the resonance frequency of the capacitor branch is lower than the 5th harmonic, avoiding parallel resonance with system impedance and preventing harmonic current amplification from burning capacitors;
– Absorb harmonic current: the filtering circuit composed of reactors and capacitors shows low impedance to main harmonics such as 5th and 7th, absorbing most harmonic current and reducing the harmonic content of the public grid;
– Limit closing inrush current: series reactors effectively limit the closing inrush current of capacitors to within 2 times the rated current, protecting capacitors and switching switches and extending equipment service life.
Through this solution, the harmonic voltage distortion rate at the public grid connection point can be controlled within 5%, meeting national power quality standard requirements.
#### 8.4.3 Controller Functions
A dedicated intelligent reactive power compensation controller is configured with the following core functions:
– Reactive power control mode, automatically switching capacitor banks according to system reactive load;
– Harmonic blocking function: when the system harmonic content exceeds the set threshold, automatically cuts off capacitor banks to protect equipment safety;
– Overvoltage, undervoltage and overtemperature protection functions, automatically exiting the compensation device under abnormal conditions;
– Cyclic switching logic, balancing the use time of each capacitor and contactor, extending overall life.
8.5 Box Structure and Protection Design
#### 8.5.1 Overall Layout and Dimensions
Adopt the European box-type substation “目” (eye) character layout, from left to right: high-voltage room, transformer room and low-voltage room, with three independent compartments, each with an independent maintenance door. The box adopts floor-standing installation, with cable inlet/outlet channels at the bottom, using bottom-in bottom-out wiring.
Box external dimensions approximately: length 3800mm × width 2200mm × height 2500mm, floor area about 8.4㎡, far smaller than a civil-construction substation of the same capacity, suitable for charging station site conditions.
#### 8.5.2 Shell Material and Anti-Corrosion
The box shell uses aluminum-zinc plated steel plate as the base material, with steel plate thickness ≥2mm, and outdoor polyester powder electrostatic spraying treatment on the surface. The corrosion resistance of aluminum-zinc plated steel plate is 3-6 times that of ordinary galvanized steel plate. Combined with the outdoor spraying coating, the anti-corrosion life can reach more than 20 years in normal outdoor environments.
The top cover adopts a double-layer structure filled with centrifugal glass wool insulation layer, effectively blocking solar radiation heat and reducing the temperature inside the compartment in summer. The top cover is a double-slope roof design with its own drainage slope, with drainage grooves and downpipes around to prevent rainwater accumulation and leakage.
#### 8.5.3 Fire Protection and Partition Design
Fire-resistant partitions of cold-rolled steel plate plus fire-resistant rock wool are used between the high-voltage room, transformer room and low-voltage room, with fire resistance limit not less than 1 hour, effectively preventing faults and fires from spreading between compartments. Cable crossing points are sealed with fire-resistant mastic to meet fire isolation requirements.
#### 8.5.4 Maintenance Doors and Observation Windows
Each compartment is equipped with an outward-opening maintenance door: the high-voltage room has a single door, and the transformer room and low-voltage room have double doors, convenient for large equipment entry/exit and maintenance. Maintenance doors are equipped with three-point anti-theft locks and EPDM rubber sealing strips, with waterproof, dustproof and anti-theft functions. Tempered glass observation windows are set on the doors, allowing observation of internal equipment running status without opening the door.
8.6 Auxiliary Supporting System Design
#### 8.6.1 Ventilation Temperature Control System
The transformer room adopts a forced ventilation heat dissipation solution, configuring 2 inlet fans and 2 exhaust fans to form diagonal ventilation airflow, with air exchange rate ≥30 times/hour and high heat dissipation efficiency.
An intelligent temperature controller is configured to monitor transformer oil temperature and compartment temperature in real time, automatically starting and stopping fans according to set temperatures, realizing temperature-controlled energy-saving operation. An overtemperature alarm function is also set: when the temperature exceeds the warning value, sound and light alarm is issued and uploaded to the monitoring platform.
The low-voltage room configures cabinet-top heat dissipation fans to exhaust heat inside the cabinets, guaranteeing low-voltage electrical components operate within the allowable temperature range. All ventilation openings are equipped with rainproof louvers and dustproof insect screens, preventing rainwater, sand and mosquitoes from entering the compartments while ensuring ventilation.
#### 8.6.2 Lighting Maintenance System
Each compartment is equipped with LED three-proof lighting lamps with moisture-proof, dustproof and shockproof characteristics, meeting the lighting needs inside the compartments. Lighting switches are set outside the doors, allowing lighting to be turned on without opening the door, convenient for maintenance operations.
Each compartment is equipped with a 220V maintenance power socket with leakage protection, providing temporary power for maintenance tools.
#### 8.6.3 Lightning Protection Grounding System
Build a complete three-level lightning protection system:
– The high-voltage side configures 10kV zinc oxide arresters as the first-level lightning protection, suppressing lightning overvoltage and switching overvoltage;
– The low-voltage busbar side configures second-level surge protective devices (SPD) with nominal discharge current 40kA, further suppressing low-voltage side lightning overvoltage;
– A ring grounding busbar is set inside the box. All equipment metal shells, cabinets, transformer neutral point, cable armor layers, etc. are reliably grounded, with grounding resistance ≤4Ω, meeting electrical safety and lightning protection grounding requirements.
#### 8.6.4 Safety Fire Protection System
The transformer room and low-voltage room each configure 1 temperature-sensing aerosol automatic fire extinguishing device. When a fire occurs in the compartment and the temperature reaches the activation threshold, the device automatically activates to release aerosol extinguishing agent for rapid fire extinguishing, without the need for piping and power supply, suitable for the fire protection needs of the narrow space of box-type substations.
Smoke alarms are also configured to monitor smoke conditions in the compartments in real time, issuing alarm signals promptly when fire is detected, with alarm information connected to the intelligent monitoring system. Cable inlets/outlets are sealed with fire-resistant sealing materials to prevent flame and smoke spread. Safety warning signs such as high-voltage danger, stop and phase sequence are posted on the box surface, conforming to safety specification requirements.
8.7 Intelligent Monitoring System Design
#### 8.7.1 System Architecture
The intelligent monitoring system adopts a three-level architecture of “perception layer – terminal layer – platform layer”:
– Perception layer: including current transformers, voltage transformers, temperature sensors, humidity sensors, smoke sensors, door magnetic switches, water immersion sensors, etc., collecting electrical and environmental parameters;
– Terminal layer: the substation intelligent monitoring terminal, responsible for collecting all perception data, data processing, logic judgment, alarm output, and data communication with the upper platform;
– Platform layer: the cloud O&M management platform, receiving data uploaded by terminals, realizing multi-station centralized monitoring, data storage, statistical analysis, alarm push and other functions.
#### 8.7.2 Core Functions
– Electrical quantity monitoring: real-time monitoring of voltage, current, active power, reactive power, power factor, energy, harmonic content and other electrical parameters of the high-voltage side, low-voltage busbar and each outlet circuit;
– Environmental quantity monitoring: monitoring of transformer winding temperature, oil temperature, compartment temperature/humidity, water immersion, smoke and other environmental parameters;
– Equipment status monitoring: monitoring of circuit breaker open/close status, grounding switch position, fan operation status, door switch status and other equipment status;
– Alarm management: supporting over-limit alarms, abnormal status alarms, fault alarms and other types, with alarm methods including local sound/light alarm, remote platform alarm and SMS alarm;
– Data statistics and analysis: automatically generating load curves, energy statistics reports and alarm record reports, supporting historical data query and export;
– Remote management: supporting Web and mobile APP access, allowing O&M personnel to view equipment running status anytime, anywhere.
#### 8.7.3 Communication Methods
Supporting Ethernet, 4G and other communication methods, with 4G wireless communication preferred – no cabling needed, flexible deployment, suitable for outdoor charging station scenarios. Data transmission uses encrypted protocols to guarantee data transmission security. The terminal has a built-in backup power supply that can work continuously for more than 2 hours after power failure, ensuring power-failure alarms are uploaded normally.
9. Recommended Configuration and Preliminary Budget
9.1 Compilation Notes
This configuration list is the standard configuration of the 1000kVA European box-type substation for EV charging, adapting to the power supply needs of 8 120kW DC fast charging piles. All equipment is selected from domestic first-line brand quality products, conforming to national relevant standard requirements. The quotation is a reference ex-factory price, excluding transportation, installation, civil works, taxes and other costs, adjustable according to actual configuration and brand selection.
9.2 High-Voltage Room Power Distribution Unit Configuration List
| No. | Equipment | Specification | Unit | Qty | Remarks |
|---|---|---|---|---|---|
| 1 | High-voltage ring main unit cabinet | 12kV three-unit co-box, protection IP3X | panel | 1 | Cold-rolled steel shell, electrostatic spraying |
| 2 | Inlet three-position load switch | 12kV/630A, electric operation, with grounding switch | set | 1 | Close/open/ground three positions |
| 3 | Outlet load switch-fuse combination | 12kV/630A, fuse rating 80A | set | 1 | Transformer short-circuit and overload protection |
| 4 | High-voltage current transformer | 10kV 75/5 0.2S class | pcs | 2 | High-voltage metering |
| 5 | High-voltage voltage transformer | 10/0.1kV 0.5 class Vv connection | pcs | 2 | High-voltage metering |
| 6 | High-voltage live display | 10kV indication type, with electromagnetic interlock | set | 1 | Prevents closing grounding switch with power on |
| 7 | Zinc oxide arrester | 17/45kV gapless | set | 1 | 3 pcs/set, overvoltage protection |
| 8 | VT protection fuse | 10kV 0.5A | pcs | 2 | VT short-circuit protection |
| 9 | High-voltage main busbar | T2 copper 40×4mm, tin-plated | set | 1 | With support insulators, fasteners |
| 10 | Secondary control components | Terminals, indicators, fuses, secondary wiring | set | 1 | Signal and control circuit transition |
9.3 Transformer Room Main Unit Configuration List
| No. | Equipment | Specification | Unit | Qty | Remarks |
|---|---|---|---|---|---|
| 1 | Oil-immersed power transformer | S22-1000kVA, 10±2×2.5%/0.4kV, Dyn11 | set | 1 | First-grade energy efficiency, fully sealed corrugated tank |
| 2 | Buchholz relay | QJ-25 type, light gas alarm, heavy gas trip | pcs | 1 | Transformer internal fault protection |
| 3 | Oil level gauge | Pointer type, with temperature scale | pcs | 1 | Conservator oil level monitoring |
| 4 | Bimetallic thermometer | 0-120°C, with 2 groups of contacts | set | 1 | Top oil temperature monitoring and fan control |
| 5 | Conservator (oil pillow) | For 1000kVA, capsule type | set | 1 | Compensates transformer oil volume change |
| 6 | Silica gel breather | Silica gel desiccant, breathing type | pcs | 1 | Filters air entering conservator |
| 7 | High-voltage connection busbar | T2 copper 40×4mm, tin-plated | set | 1 | HV cabinet to transformer HV terminal |
| 8 | Low-voltage connection busbar | T2 copper 100×10mm, tin-plated | set | 1 | Transformer LV terminal to LV cabinet |
| 9 | Transformer mounting base | No.10 channel steel welded, with damping pads | set | 1 | Fixes transformer, damping and noise reduction |
| 10 | Post insulators | 10kV indoor epoxy resin | pcs | 6 | HV/LV busbar support fixing |
9.4 Low-Voltage Room Power Distribution Unit Configuration List
#### 9.4.1 Low-Voltage Incoming Cabinet
| No. | Equipment | Specification | Unit | Qty | Remarks |
|---|---|---|---|---|---|
| 1 | GCS draw-out cabinet body | 800×1000×2200mm, protection IP40 | panel | 1 | Cold-rolled steel, electrostatic spraying |
| 2 | Air circuit breaker (ACB) | 3P 2000A, 50kA breaking, intelligent trip unit | set | 1 | Electric energy storage, four-stage protection |
| 3 | Incoming current transformer | 2000/5 0.5 class | pcs | 3 | Current measurement and meter sampling |
| 4 | Multifunctional power meter | Three-phase four-wire, full electrical quantity, with 485 communication | pcs | 1 | Voltage, current, power, energy, harmonics |
| 5 | Operation indication components | Open/close buttons, position indicators, transfer switch | set | 1 | Front local operation |
| 6 | Horizontal main busbar | T2 copper 3×(100×10mm), tin-plated | set | 1 | Full low-voltage room horizontal busbar |
| 7 | Secondary auxiliary materials | Terminals, secondary wiring, fuses, wire ducts | set | 1 | Control and signal circuit wiring |
#### 9.4.2 Low-Voltage Metering Cabinet
| No. | Equipment | Specification | Unit | Qty | Remarks |
|---|---|---|---|---|---|
| 1 | GCS metering cabinet body | 800×1000×2200mm, with lead sealing device | panel | 1 | Dedicated metering compartment for power department |
| 2 | Metering current transformer | 1500/5 0.2S class | pcs | 3 | Trade settlement metering |
| 3 | Three-phase four-wire intelligent energy meter | 0.5S class, peak-valley time-of-use metering, with 485 | pcs | 1 | Verified by power supply department |
| 4 | Metering junction box | Three-phase four-wire dedicated, with test terminals | pcs | 1 | Meter calibration/replacement without power interruption |
| 5 | Lead sealing lock | Dedicated anti-theft lead seal | set | 1 | Metering room closed management |
| 6 | Secondary auxiliary materials | Terminals, secondary wiring, wire ducts | set | 1 | Metering circuit wiring |
#### 9.4.3 Reactive Power Compensation Cabinet
| No. | Equipment | Specification | Unit | Qty | Remarks |
|---|---|---|---|---|---|
| 1 | GCS compensation cabinet body | 800×1000×2200mm | panel | 1 | Capacitor and reactor installation |
| 2 | Intelligent reactive power compensation controller | 12 circuits, with harmonic blocking, with 485 communication | set | 1 | Automatic switching control |
| 3 | Low-voltage self-healing capacitor | 0.48kV 30kvar, dry type explosion-proof | pcs | 10 | Total compensation capacity 300kvar |
| 4 | Series reactor | 7% reactance rate, matched with 30kvar | pcs | 10 | Suppress harmonics, limit inrush |
| 5 | Capacitor switching contactor | Current-limiting type, suppress closing inrush | pcs | 10 | Dedicated capacitor switching switch |
| 6 | Capacitor protection fuse | RT type 63A | pcs | 30 | 1 per phase, single capacitor short-circuit protection |
| 7 | Low-voltage arrester | 0.4kV 40kA second level | set | 1 | Low-voltage busbar surge protection |
| 8 | Circuit current transformer | 500/5 0.5 class | pcs | 3 | Compensation circuit current monitoring |
| 9 | Discharge resistors, indicators, auxiliary materials | Matching discharge, indication, wiring | set | 1 | Automatic discharge after power off |
#### 9.4.4 Charging Pile Outlet Cabinets (2 panels total)
| No. | Equipment | Specification | Unit | Qty | Remarks |
|---|---|---|---|---|---|
| 1 | GCS outlet cabinet body | 800×1000×2200mm | panel | 2 | 4 charging pile outlets per cabinet |
| 2 | MCCB | 3P 250A, with residual current protection | set | 8 | Main power switch of single charging pile |
| 3 | Outlet current transformer | 250/5 0.5 class | pcs | 24 | 3 per circuit, current collection |
| 4 | Outlet busbar and terminals | Matching busbar, cable terminals | set | 8 | In-cabinet outlet cable connection |
| 5 | Circuit indication components | Open/close indicators, operating handles | set | 8 | Independent operation indication per circuit |
| 6 | Spare MCCB | 3P 400A | set | 1 | Reserved expansion circuit |
| 7 | Auxiliary lighting breaker | 1P+N 16A with leakage | set | 2 | Lighting and maintenance power switch |
| 8 | Secondary auxiliary materials | Terminals, secondary wiring, wire ducts | set | 2 | Control and signal circuit wiring |
9.5 Box Shell and Structure Unit Configuration List
| No. | Equipment | Specification | Unit | Qty | Remarks |
|---|---|---|---|---|---|
| 1 | Substation shell main body | 3800×2200×2500mm, three-room independent structure | set | 1 | Aluminum-zinc plated steel base material |
| 2 | Outdoor spraying anti-corrosion layer | Outdoor polyester powder electrostatic spraying | set | 1 | UV-resistant, corrosion-resistant |
| 3 | Base frame | No.10 channel steel welded, hot-dip galvanized | set | 1 | Carries overall equipment, connects to civil foundation |
| 4 | Maintenance door assembly | With door frame, sealing strip, anti-theft lock, observation window | leaf | 5 | HV room 1, transformer room 2, LV room 2 |
| 5 | Sloped roof top cover | Double-layer insulation structure, with drainage grooves | set | 1 | Insulation, rainproof, anti-accumulation |
| 6 | Internal fire-resistant partition | Fire-resistant steel plate + rock wool, 1h fire resistance | set | 1 | Physical isolation between three rooms |
| 7 | Cable inlet/outlet interface | Glands, fire-resistant sealing | set | 1 | Bottom-in bottom-out wiring |
9.6 Auxiliary Supporting System Unit Configuration List
#### 9.6.1 Ventilation Temperature Control System
| No. | Equipment | Specification | Unit | Qty | Remarks |
|---|---|---|---|---|---|
| 1 | Transformer room axial fan | 220V rainproof, air volume 2200m³/h | set | 4 | 2 inlet + 2 outlet, forced ventilation |
| 2 | Intelligent temperature controller | Digital display, 2 temperature channels, 2 outputs, with alarm | set | 1 | Automatic fan start/stop control |
| 3 | Ventilation louver | Aluminum alloy, with dustproof insect screen | set | 4 | With inlet/outlet openings |
| 4 | Low-voltage room heat dissipation fan | 220V cabinet-top axial fan | set | 2 | Low-voltage cabinet heat dissipation |
#### 9.6.2 Lighting Maintenance System
| No. | Equipment | Specification | Unit | Qty | Remarks |
|---|---|---|---|---|---|
| 1 | LED three-proof lighting lamp | 220V 18W moisture/dustproof | set | 3 | 1 per compartment |
| 2 | Maintenance power socket | 220V 10A five-hole, with leakage protection | pcs | 3 | 1 per compartment |
| 3 | Lighting control switch | Outside door control, waterproof type | pcs | 3 | 1 per compartment |
#### 9.6.3 Lightning Protection Grounding System
| No. | Equipment | Specification | Unit | Qty | Remarks |
|---|---|---|---|---|---|
| 1 | In-box grounding busbar | 40×4mm T2 copper, tin-plated | m | 20 | Ring grounding busbar in box |
| 2 | Grounding down conductor | 50mm² stranded copper wire | m | 10 | Connects box and external grounding grid |
| 3 | Low-voltage surge protective device | 4P 40kA second level | set | 1 | Low-voltage busbar surge protection |
| 4 | Grounding terminal block | 10-position copper | set | 3 | Equipment grounding transition in each compartment |
#### 9.6.4 Safety Fire Protection System
| No. | Equipment | Specification | Unit | Qty | Remarks |
|---|---|---|---|---|---|
| 1 | Aerosol fire extinguishing device | Temperature-sensing self-start, 500g | set | 2 | 1 each for transformer room and LV room |
| 2 | Smoke alarm | 220V networked type, with output contact | pcs | 3 | 1 per compartment |
| 3 | Fire-resistant sealing material | Organic fire mastic, sealant | set | 1 | Cable inlet/outlet sealing |
| 4 | Safety warning signs | High-voltage danger, stop, phase sequence, grounding, etc. | set | 1 | Compliant safety signs |
#### 9.6.5 Intelligent O&M Monitoring System
| No. | Equipment | Specification | Unit | Qty | Remarks |
|---|---|---|---|---|---|
| 1 | Substation intelligent monitoring terminal | Full electrical quantity collection, 8 AI, 16 DI, 4G communication | set | 1 | Data collection and upload |
| 2 | Temperature sensor | PT100 class A | pcs | 6 | Winding, oil temperature, busbar, compartment temperature |
| 3 | Door magnetic sensor | Normally open type, waterproof | pcs | 3 | Three compartment door status monitoring |
| 4 | Water immersion sensor | Electrode type | pcs | 1 | Box bottom water accumulation monitoring |
| 5 | 4G communication kit | Antenna, SIM card (first year) | set | 1 | Remote data transmission |
9.7 Total Project Quotation Summary
| No. | Item | Amount (CNY) | Remarks |
|---|---|---|---|
| 1 | High-voltage room power distribution unit | – | Equipment ex-factory price |
| 2 | Transformer room main unit | – | Equipment ex-factory price |
| 3 | Low-voltage room power distribution unit | – | Equipment ex-factory price |
| 4 | Box shell and structure unit | – | Equipment ex-factory price |
| 5 | Auxiliary supporting system unit | – | Equipment ex-factory price |
| 6 | Factory commissioning and testing fee | – | Factory test, whole-unit commissioning |
| 7 | Total equipment price (excl. tax) | – | Sum of the above |
Reference estimate note: The configuration list above is provided for engineering planning purposes. The final quotation is a reference estimate in RMB (CNY) and does not constitute a formal commercial quotation from Guangzhou Lain; final pricing depends on actual requirements, quantities and site conditions.
10. Technical Specifications
Reference estimate note: All specifications below are reference estimates in RMB (CNY) and do not constitute a formal commercial quotation from Guangzhou Lain. Final pricing depends on actual requirements, quantity and site conditions.
10.1 High-Voltage Ring Main Unit and Components
#### 10.1.1 High-Voltage Ring Main Unit Cabinet
| Item | Parameter |
|---|---|
| Rated voltage | 12kV |
| Rated frequency | 50Hz |
| Rated current | 630A |
| Rated short-time withstand current (4s) | 20kA |
| Rated peak withstand current | 50kA |
| Rated short-circuit breaking current (fuse) | 50kA |
| Protection level | Shell IP3X, breaker compartment IP2X |
| Mechanical life | Load switch ≥10000 operations |
| Main circuit resistance | ≤100μΩ |
| Power-frequency withstand (1min) | Phase/earth, phase-phase 42kV; isolated gap 48kV |
| Lightning impulse withstand (peak) | Phase/earth, phase-phase 75kV; isolated gap 85kV |
| Structure | Co-box stainless steel gas tank, SF6 insulated, sealed |
| Interlocking | Complete five-prevention interlocking |
| Pressure relief | Top pressure relief channel, automatic opening on arc fault |
| Environment | -25°C ~ +40°C, altitude ≤1000m, seismic intensity 8 |
#### 10.1.2 Three-Position Load Switch
– Rated voltage 12kV; rated current 630A; rated frequency 50Hz;
– Short-time withstand 20kA/4s; peak withstand 50kA;
– Closed-loop breaking 630A; cable charging breaking 10A; no-load transformer breaking 16A;
– Mechanical life ≥10000 operations; full-load current breaking ≥100 times;
– Grounding switch short-time withstand 20kA/4s, peak 50kA;
– Manual operation standard, electric optional; operating torque ≤20N·m; spring energy storage mechanism;
– Power-frequency withstand: main circuit 42kV/1min, isolated gap 48kV/1min, auxiliary circuit 2kV/1min.
#### 10.1.3 Load Switch-Fuse Combination Appliance
– Load switch part: 12kV, 630A, rated transfer current 1700A, short-time withstand 20kA/4s, peak 50kA, mechanical life ≥10000;
– Fuse part: 12kV, 80A, breaking capacity 50kA, cut-off current ≤12kA, full-range current-limiting g-class characteristics, with striker triggering three-phase linked opening of load switch;
– Protection: small overload current – load switch overcurrent trip device opens; large short-circuit current – current-limiting fuse melts rapidly with linked load switch opening.
#### 10.1.4 High-Voltage Current Transformer
– 10kV, 50Hz, ratio 75/5A, accuracy class 0.2S, rated secondary burden 10VA;
– Insulation level 12/42/75kV; reduced polarity;
– Error limits: at 1% rated current ratio error ±0.75%, phase ±30′; at 5% ±0.35%, ±15′; at 20%~120% ±0.2%, ±10′;
– Epoxy resin vacuum casting, fully sealed; high-quality cold-rolled grain-oriented silicon steel core; multi-turn primary winding; busbar installation.
#### 10.1.5 High-Voltage Voltage Transformer
– 10/√3 : 0.1/√3 kV, 50Hz, accuracy 0.5 class, rated secondary burden 30VA, insulation 12/42/75kV;
– Vv connection (two units form three-phase metering);
– Error limits at 80%~120% rated voltage: ratio error ±0.5%, phase ±20′;
– Epoxy resin cast insulation; anti-ferroresonance damping structure; secondary fuse protection.
#### 10.1.6 High-Voltage Live Display
– 10kV, three-phase; starting voltage 15%~40% of rated phase voltage; induction power supply, no external power;
– LED indication per phase; live interlock output forcing grounding switch mechanism lock;
– Self-test button; 1 group NO auxiliary contact; panel IP54, internal IP20; -40°C ~ +70°C.
#### 10.1.7 Zinc Oxide Arrester
– System nominal voltage 10kV; arrester rated voltage 17kV; continuous operating voltage 13.6kV;
– Nominal discharge current 5kA; steep wave residual voltage ≤57.5kV; lightning residual ≤50kV; switching residual ≤42.5kV;
– DC reference voltage (U1mA) ≥24kV; leakage current at 0.75U1mA ≤50μA;
– Square wave withstand 2ms 100A ×20; high current withstand 4/10μs 65kA ×2;
– Silicone rubber housing, gapless zinc oxide, filled with dry nitrogen; vertical installation.
#### 10.1.8 High-Voltage Fuse
– 12kV, 0.5A, breaking 50kA, aM class, cut-off current ≤0.8kA;
– Quartz sand arc-extinguishing; pure silver fuse element; alumina ceramic sleeve; silver-plated copper caps.
#### 10.1.9 High-Voltage Main Busbar
– T2 high-purity copper, copper content ≥99.95%; 40×4mm rectangular busbar; tin-plated; rated current 630A;
– DC resistivity ≤0.017241Ω·mm²/m @20°C; Vickers hardness ≥60HV; straightness ≤1mm/m;
– With post insulators (10kV indoor epoxy, bending strength ≥4kN), grade 8.8 copper bolts, phase sequence heat-shrink tubing (yellow/green/red).
10.2 Power Transformer Technical Parameters
#### 10.2.1 S22 Oil-Immersed Power Transformer Core Parameters
| Item | Parameter |
|---|---|
| Model | S22-1000/10 |
| Rated capacity | 1000kVA |
| Rated voltage | HV 10±2×2.5%kV, LV 0.4kV |
| Connection group | Dyn11 |
| Impedance voltage | 4.5% (tolerance ±10%) |
| No-load loss | ≤910W |
| Load loss (75°C) | ≤7950W |
| No-load current | ≤0.6% |
| Total loss | ≤8860W |
| Energy efficiency | First grade, per GB 20052-2020 |
| Top oil temperature rise | ≤55K |
| Winding average temperature rise (resistance method) | ≤65K |
| Core surface temperature rise | ≤70K |
| Ambient temperature | Max +40°C, min -25°C (outdoor type) |
| HV insulation | Power-frequency 35kV/1min, lightning impulse 75kV (full wave) |
| LV insulation | Power-frequency 5kV/1min, lightning impulse 20kV (full wave) |
| Oil breakdown voltage | ≥35kV (new oil) |
| Cooling | ONAN (oil-immersed self-cooling), forced air cooling interface reserved |
| Tap changing | No-load, ±2×2.5%, 5 positions (105%/102.5%/100%/97.5%/95%) |
| Core | High-permeability grain-oriented silicon steel, 0.23mm, three-phase three-limb, full oblique joints |
| Noise | ≤55dB (measured 1m from tank) |
| Windings | HV high-strength acetal-enameled copper round wire, LV copper foil, class A insulation |
| Tank | Fully sealed corrugated tank, stainless steel corrugated fins, ≥3mm steel plate |
| Coating | Outdoor epoxy primer + polyurethane topcoat, total ≥120μm |
| Altitude | ≤1000m (highland type customizable) |
#### 10.2.2 Buchholz Relay
– Model QJ-25; nominal diameter 25mm; flange connection;
– Light gas action volume 250~300cm³ (adjustable), acts on alarm; heavy gas action velocity 0.7~1.5m/s (adjustable), acts on trip;
– Contact capacity AC220V 0.3A, DC220V 0.1A; 2 NO + 2 NC passive contacts;
– Cast aluminum alloy housing, anodized; tempered glass observation window; IP65; no leakage at 1.5× working pressure.
#### 10.2.3 Pointer Oil Level Gauge
– Model YZF2-200; pointer dial, red/green/yellow three-color indication; accuracy class 2.5;
– 2 groups passive contacts for high/low oil level alarm; contact capacity AC250V 1A;
– Thread M60×2; aluminum alloy die-cast housing; tempered glass; IP65; -40°C ~ +85°C; temperature compensation.
#### 10.2.4 Bimetallic Thermometer
– Model WTZ-288; range 0~120°C; accuracy 1.5 class; probe 150mm; thread M27×2;
– 2 groups electrical contacts (fan start temperature and overtemperature alarm settable); contact capacity AC220V 10VA;
– Dial 100mm; 304 stainless steel housing; IP55; -40°C ~ +70°C; directly inserted into top oil.
#### 10.2.5 Conservator (Oil Pillow)
– Capsule-type sealed conservator; volume about 300L for 1000kVA;
– Cold-rolled steel tank with anti-corrosion; oil-resistant nitrile rubber capsule, life ≥10 years;
– Connected to tank and Buchholz relay via connecting pipes; with oil level gauge, breather, filling/draining and vent interfaces;
– Sealing: no leakage at 0.03MPa for 24h.
#### 10.2.6 Silica Gel Breather
– Model XSⅡ-1.0; DN50; color-changing silica gel (blue → pink when saturated), 1kg filling;
– Oil seal cup at bottom; transparent tempered glass tube + aluminum alloy end caps; IP54; -40°C ~ +80°C.
10.3 Low-Voltage Power Distribution Main Equipment
#### 10.3.1 Air Circuit Breaker (ACB)
| Item | Parameter |
|---|---|
| Frame class rated current | 2000A |
| Rated working voltage | AC400V |
| Rated insulation voltage | AC690V |
| Rated impulse withstand voltage | 8kV |
| Poles | 3P |
| Breaking capacity | Icu 50kA, Ics 50kA |
| Short-time withstand | Icw 50kA/1s |
| Trip unit | Intelligent electronic, three-stage + ground fault |
| Long delay | 0.4~1.0In, inverse-time, ±5% |
| Short delay | 1~10In, definite/inverse time optional, 0.1~0.5s adjustable |
| Instantaneous | 3~12In, action ≤20ms |
| Ground fault | 0.2~1.0In, 0.1~1s adjustable |
| Accuracy | Current ±2%, time ±10% |
| Mechanical life | ≥10000 operations |
| Electrical life | ≥5000 operations |
| Communication | RS485 Modbus-RTU |
| Measurement | Built-in current, voltage, power, energy |
| Event record | Last 100 fault trip events |
| Environment | -25°C ~ +70°C, altitude ≤2000m, pollution degree 3 |
#### 10.3.2 MCCB with Residual Current Protection
– Frame 250A; AC400V; insulation 800V; impulse withstand 6kV; 3P; rated current 250A;
– Thermal-magnetic trip + residual current module; fixed type, front wiring;
– Overload: no action at 1.05In, action within 1h at 1.3In, inverse-time; short-circuit instantaneous 10In±20%, ≤0.1s;
– Residual current: 300mA action value, 150mA non-action; action ≤0.3s, AC type;
– Breaking: Icu 36kA, Ics 25kA; current-limiting factor ≤0.6;
– Mechanical life ≥10000, electrical life ≥4000; operating force ≤25N; wiring 35~120mm²;
– 1 NO + 1 NC auxiliary contact; residual current fault alarm output; handle IP40, body IP20;
– Per GB/T 14048.2, GB/T 14048.1; -25°C ~ +60°C.
#### 10.3.3 Low-Voltage Current Transformers
Metering type (0.2S class): LMK2-0.66; 0.66kV; ratio 1500/5A; accuracy 0.2S; burden 5VA; thermal current 30kA/1s; dynamic 75kA; error at 1% ±0.75%/±30′, 5% ±0.35%/±15′, 20%~120% ±0.2%/±10′; epoxy cast, busbar through-core; ultra-microcrystalline alloy core; class B insulation; IP20.
Measurement type (0.5 class): ratios 250/5A, 500/5A etc.; accuracy 0.5 class; burden 3.75VA; error at 5%~120% ±0.5%/±30′; same structure.
#### 10.3.4 Multifunctional Power Meter
– AC380V/220V three-phase four-wire; current AC5A (expandable via CT); 50Hz;
– Measurement: three-phase voltage/current, zero-sequence current, active/reactive/apparent power, power factor, frequency; forward/reverse active and reactive energy with peak-valley-flat time-of-use; 2~31st harmonic voltage/current and THD;
– Accuracy: voltage ±0.2%, current ±0.2%, active energy 0.5S class, reactive 1 class;
– LCD display, Chinese menu, panel keys with password; 96×96mm;
– 4 DI, 2 relay outputs, optional 4~20mA output; RS485 Modbus-RTU 1200~19200bps;
– Monthly energy freeze, historical extremes, fault event records;
– AC/DC 85~265V wide range; ≤5VA; -20°C ~ +70°C; insulation 2kV/1min.
#### 10.3.5 Three-Phase Four-Wire Intelligent Energy Meter
– Active 0.5S class, reactive 2 class; 3×220/380V; 3×1.5(6)A via CT; 50Hz; starting current 0.001In;
– Forward/reverse active energy, four-quadrant reactive; peak/shoulder/valley/flat multi-rate, up to 14 periods, 4 rates;
– Monthly settlement, 12 months history; maximum demand with sliding/interval calculation;
– RS485 DL/T645-2007; infrared local reading; event records (phase loss, voltage loss, current loss, overvoltage, overcurrent, programming, reset);
– Working voltage 0.8Un~1.15Un, limit 1.9Un; loss ≤1.5W/phase; insulation 4kV/1min; EMC level 4 per GB/T 17215;
– -25°C ~ +60°C, limit -40°C ~ +70°C; design life ≥10 years.
#### 10.3.6 Intelligent Reactive Power Compensation Controller
– AC220V/380V three-phase four-wire; current AC5A; 12 control circuits; cyclic/coded switching;
– Reactive power control mode; power factor accuracy ±0.01; reactive control accuracy ±2%;
– Overvoltage protection 1.05~1.2Un adjustable, delay 1~10s; undervoltage 0.7~0.9Un; harmonic blocking at THD >5% (default); overtemperature and phase-loss protection;
– LCD Chinese menu; RS485 Modbus-RTU; relay output AC250V 5A; switching delay 10~600s;
– AC220V±20%; ≤3VA; -10°C ~ +55°C.
#### 10.3.7 Low-Voltage Self-Healing Shunt Capacitor
– BSMJ series dry-type self-healing; 0.48kV; 30kvar; 50Hz; delta connection;
– Capacitance deviation -5%~+10%, phase difference ≤3%;
– Loss tangent ≤0.002 (100Hz, 20°C); insulation ≥10000MΩ·μF;
– Withstand: between electrodes 2.15Un/10s, electrode-shell 3kV/10s;
– Overvoltage: 1.1Un continuous, 1.15Un 30min/day, 1.2Un 5min; overcurrent 1.3In continuous;
– Discharge to <50V within 3min after power off;
– Polypropylene film, metallized zinc-aluminum coating, self-healing; vegetable oil vacuum impregnated; aluminum shell explosion-proof; built-in overpressure protection; -25°C ~ +55°C; design life ≥100000h.
#### 10.3.8 Series Reactor
– CKSG series dry-type iron-core; 7% reactance rate; 0.48kV; matched with 30kvar capacitor;
– Reactance deviation ±3%; linearity ≤5% change at 1.8× rated current;
– Loss ≤0.3% of rated capacity; noise ≤50dB (1m); winding temperature rise ≤65K, core ≤70K;
– Class F insulation; withstand 3kV/1min to earth;
– Grain-oriented silicon steel core, full oblique joints; H-class enameled copper wire; epoxy potting; cold-rolled steel housing; -25°C ~ +45°C.
#### 10.3.9 Capacitor Switching Contactor
– CJ19 series; AC220V/380V; thermal current 63A; working current 43A (380V); coil AC220V; 120 operations/hour;
– 3 main poles + 1 auxiliary current-limiting pole; built-in current-limiting resistor, inrush ≤2× rated; resistor engagement ≤50ms;
– Mechanical life ≥1 million, electrical life ≥100000; coil: pick-up ≤80VA, hold ≤10VA;
– 1 NO + 1 NC auxiliary; 35mm DIN rail; IP20; -5°C ~ +40°C.
#### 10.3.10 Low-Voltage Surge Protective Device (SPD)
– Second-level power SPD; Un 380V; Uc 420V; In 40kA; Imax 80kA; Up ≤1.8kV; response ≤25ns;
– 4P (3+NPE); zinc oxide varistor; thermal disconnector with failure indication (green OK, red failed);
– Optional dry contact alarm output; 35mm DIN rail; wiring ≤25mm²; UL94-V0 housing; IP20; -40°C ~ +85°C.
10.4 Box Shell and Structure Technical Parameters
| Item | Parameter |
|---|---|
| External dimensions | ≈3800×2200×2500mm |
| Compartments | HV room, transformer room, LV room independent |
| Overall protection | IP54 |
| Design life | ≥20 years |
| Seismic intensity | 8 |
| Wind resistance | Grade 12 typhoon |
| Snow load | 0.5kN/㎡ |
| Live load | Top cover 0.5kN/㎡, floor 2.0kN/㎡ |
| Outer plate | Aluminum-zinc plated steel, ≥2.0mm |
| Inner plate | Cold-rolled steel, ≥1.5mm |
| Insulation layer | Centrifugal glass wool ≥50mm, ≤0.04W/(m·K), class A non-combustible |
| Coating | Outdoor polyester powder electrostatic spraying, 60~80μm |
| Salt spray | ≥1000h no obvious rust, C4 environment |
| Roof | Double-slope, drainage ≥5%, galvanized drainage grooves and downpipes |
| Fire partition | Double cold-rolled steel + class A rock wool ≥50mm, fire resistance ≥1h |
| Doors | HV 1 single, transformer 2 double, LV 2 double; three-point anti-theft locks; EPDM sealing; observation window 300×400mm tempered glass 5mm; opening ≥110°; door grounding via yellow-green wire |
10.5 Auxiliary Supporting System Technical Parameters
#### 10.5.1 Transformer Room Axial Fan
– Low-noise rainproof axial fan; impeller 300mm; AC220V; 120W; air volume ≥2200m³/h; pressure ≥80Pa; 1450r/min;
– Noise ≤58dB(A) (1m); IP54; engineering plastic blades; galvanized steel housing; rainproof louvers with insect screens; wall-mounted flange fixing.
#### 10.5.2 Intelligent Temperature Controller
– Digital display; 2 channels; PT100 sensors; range -50°C ~ +150°C; accuracy ±0.5°C;
– 2 relay outputs (fan control and overtemperature alarm); hysteresis control; LED display; contact AC220V 5A;
– AC220V±15%; ≤3VA; sensor fault self-check; overtemperature sound/light alarm.
#### 10.5.3 LED Three-Proof Lighting Lamp
– AC220V; 18W; luminous flux ≥1800lm; 6000K; Ra≥80; IP65;
– PC diffuser; ABS housing; ceiling mounting; life ≥50000h; -30°C ~ +55°C.
#### 10.5.4 Lightning Protection Grounding Parameters
– Grounding busbar TMY-40×4 copper, tin-plated; down conductor 50mm² yellow-green stranded copper;
– Grounding resistance ≤4Ω; equipotential connection of all metal cabinets, transformer shell, box frame, cable armor;
– Independent grounding terminal blocks per compartment; LV SPD 4P 40kA at LV inlet; 10kV zinc oxide arrester at HV inlet; class II lightning protection building standard.
#### 10.5.5 Temperature-Sensing Aerosol Fire Extinguishing Device
– Non-pressurized hot aerosol; S-type agent; 500g; space ≤3m³;
– Temperature-sensing self-start at 170°C±10°C, electric start optional; extinguishing ≤30s; discharge ≤10s;
– -40°C ~ +90°C; storage life ≥10 years; wall-mounted; ODP=0, no corrosion, no residue.
#### 10.5.6 Smoke Alarm
– Photoelectric scattering type; AC220V; sensitivity class I; local sound/light alarm + passive contact output;
– Alarm volume ≥80dB; monitoring ≤10mA, alarm ≤100mA; -10°C ~ +55°C; ceiling mounting.
10.6 Intelligent O&M Monitoring System Technical Parameters
#### 10.6.1 Substation Intelligent Monitoring Terminal
– Industrial ARM Cortex-A processor; embedded Linux;
– Analog inputs: 8 channels (4~20mA, PT100, 0~5V); digital inputs: 16 passive dry contacts; relay outputs: 8 (AC250V 5A);
– Electrical quantity: 3-channel three-phase voltage/current, full electrical calculation; accuracy voltage/current ±0.5%, temperature ±0.5°C;
– Communication: 2× RS485 Modbus-RTU local; 1× Ethernet + 1× 4G full-network uplink;
– Sampling 1 time/second; local storage ≥1 year (SD expandable); hourly/daily/monthly statistics;
– Alarms: over-limit, status change, fault, configurable thresholds; edge computing with local logic and linkage control;
– Power: AC/DC 85~265V wide range, built-in backup lithium battery ≥2h endurance; ≤10W;
– IP30, DIN rail; -40°C ~ +70°C; industrial level 4 EMC.
#### 10.6.2 PT100 Temperature Sensor
– Class A platinum resistance; -50°C ~ +150°C; accuracy ±(0.15+0.002\|t\|)°C;
– 304 stainless steel probe φ6mm; 2m lead (customizable); three-core shielded wire, three-wire connection; IP65; M8×1 threaded mounting.
#### 10.6.3 Door Magnetic Sensor
– Normally open magnetic switch; DC12~24V; contact AC220V 1A; action distance ≥30mm, reset ≥50mm;
– ABS housing; IP65; life ≥1 million operations.
#### 10.6.4 Water Immersion Sensor
– Electrode type; DC12V; relay passive contact output; water conductivity principle;
– Alarm at ≥1mm water; response ≤1s; stainless steel corrosion-resistant electrodes; IP67; -20°C ~ +60°C.
#### 10.6.5 4G Communication Kit
– Full-network 4G LTE module; LTE-FDD/TDD, backward compatible 3G/2G;
– Downlink ≥10Mbps, uplink ≥5Mbps; TCP/IP, MQTT, HTTP protocols;
– High-gain omnidirectional fiberglass antenna 5dBi; industrial IoT SIM card;
– -40°C ~ +85°C; standby ≤10mA, transmit ≤150mA; DIN-rail module, antenna externally fixed on box top.
11. Key Advantages and Customer Value
11.1 Special Optimization Adapted to Charging Pile Loads
This solution carries out full-link optimization for the nonlinear and impact characteristics of DC charging pile loads. The transformer adopts the Dyn11 connection group, with 3rd harmonics cancelled by circulation in the delta winding, avoiding harmonic injection into the upstream grid; the low-voltage side configures 7% reactance rate series reactors and capacitor banks, realizing dynamic reactive power compensation while effectively absorbing main harmonic currents such as 5th and 7th, controlling the harmonic distortion rate at the public grid connection point within 5%, meeting GB/T 14549 and charging pile-specific power quality requirements.
The outlet circuit breakers use MCCBs with residual current protection, adapting to the leakage protection needs of outdoor charging pile operation, with high breaking capacity and impact resistance, able to withstand the short-term high current at charging pile startup without misoperation or tripping. The low-voltage main busbar is selected at 2000A rated current, reserving more than 15% margin to cope with the peak load of simultaneous fast charging of multiple piles.
11.2 Outdoor All-Weather High-Reliability Protection
The overall box body uses outdoor-grade aluminum-zinc plated steel plate base material with polyester powder electrostatic spraying process, with salt spray anti-corrosion life exceeding 1000 hours, adapting to urban outdoor, highway service area, park and other open-air scenarios. The double-slope top cover plus 50mm insulation cotton double-layer structure effectively blocks summer solar radiation and reduces temperature rise in the compartment.
The transformer room adopts diagonal forced ventilation with intelligent temperature controller for automatic fan start/stop, guaranteeing full-load transformer operation even at 40°C ambient temperature. The IP54 overall protection level, EPDM sealing strips, rainproof louvers and insect screen inlet structure effectively block rain, sand and mosquitoes. The box base uses channel steel welding + hot-dip galvanized anti-corrosion, installed off the ground to prevent ground water backflow, adapting to rainy and humid areas.
11.3 Full-Dimension Safety Protection System
At the electrical safety level, a four-level graded protection architecture of “high-voltage fuse + frame circuit breaker + MCCB + residual current protection” is built, precisely cutting off faults with minimal power outage range; the high-voltage ring main unit has complete five-prevention interlocking functions to eliminate misoperation risks; live displays cooperate with electromagnetic interlocking to prevent closing the grounding switch with power on.
At the fire safety level, the 1-hour fire-resistance partitions between compartments, cable hole fire-resistant sealing, temperature-sensing aerosol automatic fire extinguishing devices and smoke detection alarms form a complete “blocking-detection-extinguishing” fire protection chain. At the lightning protection grounding level, the two-level lightning protection architecture of high-voltage arrester + low-voltage second-level SPD, combined with ring grounding busbar and equipotential connection with grounding resistance ≤4Ω, effectively resists lightning overvoltage and switching overvoltage. At the security level, anti-theft locks, door magnetic opening alarms and remote monitoring linkage realize equipment security in unattended scenarios.
11.4 Intelligent O&M for Cost Reduction and Efficiency Improvement
Equipped with an industrial-grade substation intelligent monitoring terminal, full collection of electrical quantities, environmental quantities and equipment status quantities is realized, with data uploaded to the cloud O&M platform via 4G network. O&M personnel can view substation operation status, load curves and energy statistics anytime, anywhere through Web and mobile APP.
The system supports multi-dimensional alarms of overvoltage, undervoltage, overcurrent, overtemperature, smoke, door opening and water immersion, with alarm information delivered in real time via SMS and APP push, reducing fault response time from hours to minutes. The system automatically generates operation reports and fault records, replacing the traditional manual inspection mode and greatly reducing charging station O&M labor costs. Multi-station centralized management is supported, suitable for large-scale O&M of chain charging stations and highway service area charging stations.
11.5 Modular Rapid Deployment and Flexible Expansion
The substation adopts factory prefabrication and whole-unit delivery. All electrical equipment, wiring and commissioning are completed in the factory. On site, only foundation pouring, box positioning and cable connection are needed to put into operation, reducing the overall construction period by more than 70% compared with traditional civil-construction substations, adapting to the rapid landing needs of charging stations.
The low-voltage system reserves spare outlet circuits and busbar margin. Later charging pile expansion does not require replacing the main switch and busbar – only adding outlet circuits. The intelligent monitoring system adopts a modular architecture, supporting later addition of temperature measurement, smoke detection, video and other monitoring points, with smooth function upgrades, protecting user early investment.
11.6 Energy Saving, Low Carbon and Full-Lifecycle Economy
The first-grade energy efficiency S22 oil-immersed transformer is selected, with no-load loss and load loss reduced by more than 30% compared with traditional S13 type. Based on 8000 hours of annual operation, a single substation saves more than 5000 kWh of electricity per year, saving a large amount of electricity costs throughout the lifecycle.
The intelligent reactive power compensation system stabilizes the power factor above 0.95, avoiding power factor penalty charges while reducing line and transformer losses. The box structure design life exceeds 20 years, and core electrical equipment is from first-line brands with long MTBF and low maintenance cost. The overall solution balances initial construction cost and long-term operation cost, with full-lifecycle comprehensive economy significantly better than traditional power distribution solutions.
12. Technical Q&A (50+ Items)
12.1 High-Voltage System
Q1: Why use a load switch + fuse combination instead of a circuit breaker on the high-voltage side of the 1000kVA charging substation?
A: For terminal-type substations of 1000kVA and below, the load switch + fuse combination is the industry mainstream solution with the best technical economy. First, for transformer internal short-circuit faults, the high-voltage current-limiting fuse can melt and cut off the fault current in milliseconds, far faster than a circuit breaker, protecting the transformer more effectively and avoiding fault expansion; second, the load switch has simple structure, high reliability and low maintenance, suitable for unattended outdoor substations; third, the combined appliance costs far less than a high-voltage circuit breaker solution, greatly reducing overall cost. For scenarios requiring frequent operation, ring network networking and complex relay protection logic, it can also be upgraded to a vacuum circuit breaker solution as needed.
Q2: What are the advantages of Vv-connected voltage transformers for high-voltage metering?
A: Vv connection is composed of two single-phase voltage transformers and is the classic wiring method for 10kV high-voltage metering. First, it saves equipment cost – one less device than the Yyn connection with three transformers; second, the wiring is simple with high reliability, suitable for the compact space of ring main units; third, it can accurately measure three-phase line voltages, meeting the metering requirements of three-phase three-wire energy meters. For 10kV systems with ungrounded neutral point, the metering accuracy fully meets trade settlement requirements. At the same time, the b-phase of the Vv connection secondary side is grounded, and safety conforms to specification requirements.
Q3: What exactly does the “five-prevention interlocking” of the ring main unit refer to?
A: Five-prevention interlocking is a mandatory anti-misoperation function for high-voltage switchgear, specifically including: 1. preventing opening/closing the load switch with load; 2. preventing entering live compartments by mistake; 3. preventing closing the grounding switch with power on; 4. preventing energizing with the grounding switch closed; 5. preventing wrong opening/closing of the load switch. The ring main unit of this solution realizes this through both mechanical interlocking and electrical interlocking, e.g., the load switch cannot close when the grounding switch is closed, the grounding switch cannot be operated when the load switch is closed, and the cabinet door cannot be opened when live, physically eliminating human misoperation and guaranteeing personnel and equipment safety.
Q4: What is the function of the high-voltage live display and electromagnetic interlock?
A: The live display indicates whether the high-voltage line is live through LED indicators. When the line is live, it outputs an interlock signal to force-lock the grounding switch operating mechanism, preventing the grounding switch from being closed with power on. This prevents serious accidents such as grounding with power on and personal injury.
Q5: What are the requirements for high-voltage cable access?
A: High-voltage cables are introduced from the bottom cable holes of the box and connected to the corresponding terminals by phase sequence. Cable ends use cold-pressed or heat-shrink cable terminations, with bolt tightening torque meeting standards and flat, oxide-free contact surfaces. Insulation and withstand tests must be performed before connection. Cable inlets/outlets are sealed with fire mastic and sealant for waterproof, fireproof and rodent-proof purposes.
12.2 Transformer
Q6: Why prefer oil-immersed transformers over dry-type transformers for charging substations?
A: For outdoor charging pile scenarios, oil-immersed transformers are preferred based on four considerations: first, better heat dissipation – oil-immersed transformers rely on transformer oil convection for heat dissipation with strong overload capability and less derating in summer high-temperature environments, better adapting to charging pile peak load impact; second, stronger outdoor adaptability – the sealed structure of the oil-immersed body is moisture-proof and dust-proof, and with box protection it can operate outdoors directly, while dry-type transformers have higher requirements for ambient humidity and dust, with higher outdoor failure rates; third, better economy – oil-immersed transformers are about 30% cheaper than dry-type at the same capacity, with lower losses and more economical operation; fourth, longer life – with normal maintenance, oil-immersed transformer life can reach 30 years, far exceeding dry-type. For indoor, underground and other scenarios with strict fire protection requirements, it can be replaced with SCB14 dry-type transformers.
Q7: What are the benefits of Dyn11 connection compared with Yyn0 for charging pile loads?
A: Dyn11 is the recommended connection group for low-voltage distribution transformers, with particularly obvious advantages for charging pile nonlinear loads. First, the high-voltage side delta winding provides a circulation path for 3rd harmonic current, cancelling 3rd harmonics and preventing harmonic injection into the 10kV public grid; second, the low-voltage side neutral point is directly led out with strong single-phase load supply capability, allowing neutral line current up to 75% of rated current, adapting to single-phase auxiliary loads such as charging station lighting and monitoring; third, larger single-phase short-circuit current gives higher sensitivity of low-voltage side single-phase grounding protection and more reliable fault removal; fourth, stronger ability to withstand three-phase unbalanced loads – the three-phase imbalance caused by time-sharing use of charging piles has less impact on the transformer.
Q8: What are the functions of light gas and heavy gas in the Buchholz relay?
A: The Buchholz relay is the core protection component of oil-immersed transformers. Light gas and heavy gas correspond to different fault types. Light gas reacts to minor internal faults or oil level reduction in the transformer; when minor faults such as partial discharge and insulation aging occur, a small amount of gas accumulates in the relay, and when a certain volume is reached, light gas action is triggered to issue an alarm signal, reminding O&M personnel to inspect. Heavy gas reacts to serious internal short-circuit faults; the fault produces a large amount of gas causing rapid oil flow that impacts the relay baffle, triggering heavy gas action to directly trip the high and low voltage side switches, cutting off power and preventing transformer explosion and fire. In this solution, light gas is connected to the alarm circuit and heavy gas to the trip circuit, with graded protection.
Q9: What is the no-load tap changing range of the transformer?
A: The transformer adopts no-load (off-circuit) tap changing with a range of ±2×2.5%, providing 5 positions (105%, 102.5%, 100%, 97.5%, 95% of rated voltage). The tap changer is adjusted according to grid voltage conditions to guarantee stable low-voltage side output voltage.
Q10: What is the overload capability of the 1000kVA transformer?
A: The oil-immersed transformer has good overload capability: it can continuously operate at 1.05× rated capacity, 1.2× for 2 hours, 1.3× for 1 hour, and 1.5× for 30 minutes under normal operating conditions. Combined with the intelligent temperature-controlled ventilation system, it can handle the short-term impact load of multiple charging piles starting simultaneously.
12.3 Low-Voltage Distribution and Reactive Power Compensation
Q11: Why configure series reactors for charging pile loads? Isn’t installing capacitors alone enough?
A: Charging piles are typical rectifier-type nonlinear loads that generate a large amount of 5th, 7th and other harmonic currents during operation. Installing only capacitors without reactors brings two serious problems. First, parallel resonance risk – the capacitor capacitive reactance and system inductive reactance will resonate in parallel at specific harmonic frequencies, amplifying harmonic current several times or even dozens of times, burning capacitors and breaking down transformer insulation. Second, harmonics accelerate capacitor aging – harmonic current superposition causes capacitor overheating and accelerated insulation aging, greatly shortening life.
After series connection of a 7% reactance rate reactor, the capacitor branch is inductive to 5th and above harmonics, fundamentally avoiding parallel resonance, while absorbing part of the harmonic current, improving power quality, limiting capacitor closing inrush current, protecting switching switches and extending equipment life. Therefore, reactive power compensation in charging pile scenarios must configure matched series reactors.
Q12: Why is the compensation capacity selected at 300kvar? How is it calculated?
A: The reactive power compensation capacity is comprehensively calculated based on transformer capacity and load nature. For the 1000kVA transformer, the natural power factor of charging pile loads is about 0.75~0.8, and the target is compensation to above 0.95. At the maximum active load of 800kW, the reactive power before compensation is about 660kvar, after compensation about 260kvar, and the required compensation capacity is about 400kvar. Considering that the charging pile simultaneity factor and load rate are usually 0.7~0.8, and dynamic switching can be invested as needed, configuring 300kvar can cover most operating conditions, ensuring the power factor stays above 0.95 and avoiding power factor penalty charges. If the number of charging piles increases later and the load rate rises, expansion positions can be reserved for adding compensation circuits later.
Q13: What are the functions of the four-stage protection of the low-voltage incoming frame circuit breaker?
A: The four-stage protection of the intelligent frame circuit breaker is long delay, short delay, instantaneous and ground fault protection, forming a graded protection system. 1. Long delay protection: reacts to overload faults with inverse-time characteristics – the larger the current, the faster the action, used to protect transformer and busbar overload heating, usually set at 0.8~1 times rated current. 2. Short delay protection: reacts to near-end short-circuit faults with definite-time delay, achieving selective coordination with downstream outlet breakers – downstream faults trip downstream first without tripping upstream, reducing the power outage range. 3. Instantaneous protection: reacts to serious short-circuit faults with instantaneous action, quickly cutting off large short-circuit currents and protecting equipment from large current impact damage. 4. Ground fault protection: reacts to single-phase ground faults, sensitively detecting small-current ground faults, preventing personal electric shock and equipment leakage fires, improving power supply safety.
Q14: What is the role of residual current protection in the charging pile outlet MCCB?
A: The residual current protection (leakage protection) of the outlet MCCB detects the vector sum of three-phase currents. When leakage occurs in the charging pile or cable, the residual current exceeds the action value (300mA), and the circuit breaker trips within 0.3s, cutting off the faulty circuit. This protects personnel from electric shock and prevents equipment leakage from causing fires, and is a necessary safety protection for outdoor charging pile operation.
Q15: How is the power factor kept above 0.95?
A: The intelligent reactive power compensation controller detects the system reactive power in real time and automatically switches capacitor banks according to the reactive power control mode, avoiding over-compensation and under-compensation. When the load changes, the controller adjusts the input capacity within seconds to keep the power factor stable above 0.95, avoiding power factor penalty charges and reducing line losses.
Q16: What happens to the compensation system when the harmonic content is high?
A: The controller has a harmonic blocking function. When the system harmonic voltage distortion rate exceeds the set threshold (default 5%), it automatically blocks switching and gradually cuts off capacitor banks, protecting capacitors and reactors from harmonic overload and resonance damage. After the harmonics drop below the threshold, it automatically resumes normal switching.
12.4 Box and Environment
Q17: What is the difference between European and American box-type substations? Which is more suitable for charging pile scenarios?
A: The core difference between European and American box-type substations is structure and layout. European box-type substations use “目” (eye) or “品” (product) character layout, with high-voltage room, transformer room and low-voltage room independently separated, equipment installed separately, convenient maintenance, many low-voltage outlet circuits and flexible function expansion. American box-type substations share one tank for transformer and high-voltage components, with smaller size and lower cost, but fewer low-voltage outlet circuits, inconvenient maintenance and large fault impact range.
Charging pile scenarios prefer European box-type substations: first, charging piles need multiple outlet circuits, and the European low-voltage room can flexibly configure multiple switch cabinets to meet the distribution needs of 8 or even more charging piles; second, maintenance is convenient with independent compartments for zoned maintenance during faults; third, metering, compensation, monitoring and other auxiliary functions are more complete, adapting to charging station operation management needs.
Q18: Will the transformer overheat in summer high-temperature environments? What heat dissipation measures are there?
A: This solution has special heat dissipation design for summer high temperature, and normal operation will not have overheating problems. First, the transformer itself is designed for 40°C ambient temperature with top oil temperature rise limit of 55K, so the top oil temperature does not exceed 95°C under normal operation, leaving sufficient margin. Second, the transformer room configures 4 axial fans with diagonal inlet/exhaust design and air exchange rate over 30 times/hour, forcibly carrying away heat in the compartment. Third, an intelligent temperature controller monitors oil temperature in real time, automatically starting fans at the set temperature (usually 55°C) and stopping them after cooling, with intelligent energy saving. Fourth, the box top cover uses a double-layer insulation structure to block solar radiation heat. Through multiple measures, the transformer can operate at full load stably even in 40°C summer high-temperature weather.
Q19: What is the waterproof level of the substation? Will heavy rain cause water entry?
A: The overall protection level of the substation reaches IP54, where 5 means dustproof – completely preventing foreign object intrusion and blocking dust entry; 4 means splash-proof – withstanding harmful effects of splashing water from any direction. Multiple waterproof designs guarantee heavy rain safety: first, the double-slope roof with drainage slope over 5% quickly drains rainwater without accumulation on the top cover; second, maintenance doors use EPDM sealing strips with full-circle sealing and rainproof eaves, so rainwater cannot seep through door gaps; third, ventilation openings are equipped with rainproof louvers with water-guiding structures; fourth, cable inlet/outlet uses bottom entry with glands and fire-resistant sealing. Conventional heavy rain will not cause water entry, and outdoor use is worry-free.
Q20: What are the ventilation requirements of the low-voltage room?
A: The low-voltage room configures cabinet-top heat dissipation fans to exhaust heat inside the cabinets, guaranteeing low-voltage electrical components operate within the allowable temperature range. All ventilation openings are equipped with rainproof louvers and dustproof insect screens, preventing rain, sand and mosquitoes from entering while ensuring ventilation. The fan operation can be linked with the temperature monitoring of the intelligent monitoring system.
Q21: What is the service life of the box shell?
A: The box shell uses aluminum-zinc plated steel plate with outdoor polyester powder spraying, with corrosion resistance 3-6 times that of ordinary galvanized steel plate. In normal outdoor environments, the anti-corrosion life can reach more than 20 years, and the overall box design life is ≥20 years.
12.5 Intelligent Monitoring and O&M
Q22: What data can the intelligent monitoring system monitor? Can remote control be realized?
A: The intelligent monitoring system of this solution can realize full-dimension status perception, with monitoring contents divided into four categories. First, electrical quantities: including high-voltage side voltage, low-voltage busbar three-phase voltage/current, active/reactive power, power factor, energy and harmonic content, and outlet circuit current and switch status. Second, environmental quantities: including transformer oil temperature, winding temperature, compartment temperature/humidity, water immersion status and smoke status. Third, equipment status: including circuit breaker open/close position, grounding switch position, fan operation status, door switch status and capacitor switching status. Fourth, alarm information: all over-limit, fault and abnormal states generate alarm records.
At the control level, remote parameter viewing, remote alarm threshold configuration and remote alarm reset are supported. For circuit breaker open/close, fan start/stop and other control, remote control permissions can be opened according to needs. It is recommended that local operation be primary and remote secondary to guarantee operation safety.
Q23: If the substation is unattended, how do you know about faults? How fast is the response?
A: The system has multi-channel active alarm capability, discovering faults at the first moment without manual inspection. When faults or abnormalities such as overtemperature, overcurrent, tripping, smoke and door opening occur, the system notifies O&M personnel through three methods simultaneously: cloud O&M platform popup alarm, mobile APP push alarm message, and SMS sending alarm content and location. From fault occurrence to alarm push to the O&M personnel’s phone, the delay does not exceed 30 seconds, truly realizing minute-level fault response. At the same time, the system automatically records the fault time, fault type and electrical parameters at the time of fault for later troubleshooting. Combined with the surrounding O&M team, on-site handling can generally be reached within 2 hours in urban areas.
Q24: What if the monitoring system loses network? Will data be lost?
A: The system has a network-disconnection fault tolerance mechanism. Network disconnection does not affect normal equipment operation or cause data loss. First, the intelligent monitoring terminal has local edge computing capability – all data collection, logic judgment and alarm linkage are executed locally, so even if the network is disconnected, fan control, protection action and local alarms operate normally without affecting the substation’s own power supply safety. Second, the terminal has built-in large-capacity storage that can locally store at least 1 year of historical data; data during network disconnection is automatically saved locally and automatically uploaded to the cloud after network recovery, without data loss. Third, uplink communication supports Ethernet + 4G dual-link backup; if one link is interrupted, it automatically switches to the other, greatly reducing the probability of network disconnection.
Q25: How is the transformer temperature monitored?
A: The transformer top oil temperature is measured by a bimetallic thermometer and PT100 temperature sensors, and the winding temperature is measured by PT100 sensors embedded in the winding. The data is collected by the intelligent monitoring terminal and uploaded to the cloud platform. When the temperature exceeds the set value, fan start/stop control and overtemperature alarms are automatically triggered.
Q26: What alarms does the intelligent monitoring system support?
A: The system supports overvoltage, undervoltage, overcurrent, overtemperature, smoke, door opening, water immersion, phase loss, harmonic over-limit and other alarms. Alarm methods include local sound/light alarm, cloud platform popup, APP push and SMS, with configurable thresholds.
12.6 Installation and After-Sales
Q27: What work is needed for on-site installation of the substation? How long does it take?
A: The substation is a factory-prefabricated whole-unit device with very little on-site installation work, mainly divided into three steps. The first step is civil foundation: pour the concrete foundation according to the substation base dimensions, pre-embed grounding electrodes and flat steel, about 3-5 days, which can be done in parallel with factory production. The second step is box positioning: use a crane to lift the substation onto the foundation, level and fix, connect grounding down conductors, about 1 day. The third step is cable connection and commissioning: connect high-voltage inlet cables and low-voltage outlet cables, check phase sequence, power-on test each device function and overall commissioning, about 2-3 days.
Overall from entry to operation, excluding foundation curing time, can be completed within one week, far faster than traditional civil-construction substations.
Q28: How long is the warranty period of the substation? What does it include?
A: The overall warranty period of the substation is 12 months from factory delivery, with free repair service during the warranty period. The warranty scope includes: quality defects of the equipment itself, component faults, structural faults, control system faults and other faults not caused by human or force majeure. Free repair, accessory replacement and technical guidance are provided during the warranty period. Human misoperation, external force damage, natural disasters and unauthorized modification are not within the warranty scope. After the warranty period, annual maintenance agreements can be signed to provide paid services such as regular inspection, fault repair, accessory replacement and upgrade transformation, guaranteeing long-term stable operation.
Q29: What daily O&M work does the substation need? How often?
A: The substation is a highly maintenance-free device with very little daily O&M work, mainly including: daily patrol (1-2 times/month appearance patrol, checking box damage, door locks, abnormal sounds and smells, can be done remotely through the monitoring system); quarterly inspection (clean ventilation opening dust screens, check grounding connections, check circuit breaker and contactor action); annual overhaul (transformer oil level and color check, fastener tightening, insulation resistance test, protection function verification, cleaning and dust removal); special patrol after bad weather (flood, wind, lightning). Overall O&M cost is far lower than traditional substations.
Q30: What is the delivery cycle of the substation?
A: The standard delivery cycle from contract signing to factory delivery is about 15-20 days, including raw material procurement, cabinet processing, transformer production, component assembly and primary/secondary wiring (about 15 days), plus factory inspection (about 2 days). The civil foundation construction can be carried out in parallel with factory production, so the overall project period from contract to grid connection can be compressed to about 28 days.
Q31: Can the substation be customized?
A: Yes. The following can be customized according to actual needs: transformer capacity and type (oil-immersed/dry-type), number of charging pile outlet circuits, outlet current specifications, compensation capacity, communication methods, box color and logo, special environment adaptation (high altitude, high temperature, salt spray), etc.
Q32: What documents are delivered with the substation?
A: The delivered documents include: factory inspection report, product certificate of conformity, transformer characteristic test report, complete set of completion drawings (primary wiring diagram, secondary wiring diagram, layout drawing), operation manual, maintenance manual, commissioning records and grounding resistance test report, etc.
12.7 Power Quality and Harmonics
Q33: What is the harmonic generation mechanism of charging piles?
A: DC charging piles use AC-DC rectifier circuits. The nonlinearity of the rectifier causes the input current to be non-sinusoidal, generating a large number of odd harmonics such as 5th, 7th, 11th and 13th. The harmonic content is related to the rectifier topology, charging power and control strategy; without filtering, the total current harmonic distortion rate can reach 20%-30%.
Q34: What harm do harmonics cause to the power supply system?
A: Harmonics cause increased transformer loss and temperature rise; capacitor resonance and burnout; metering device error increase; protection device misoperation; neutral line overheating; and interference with communication equipment. Serious harmonics can damage power supply equipment and affect the normal operation of other loads on the same grid.
Q35: How is the harmonic treatment effect verified?
A: After the system is put into operation, a power quality analyzer is used to test the harmonic content at the public grid connection point, verifying that the total harmonic voltage distortion rate THDu ≤5% and each harmonic content meets GB/T 14549 requirements, and the power factor meets the compensation target. The test report can be used as acceptance basis.
Q36: What is the harmonic blocking function of the compensation controller?
A: When the system harmonic voltage distortion rate exceeds the set threshold (default 5%), the controller automatically blocks switching and gradually cuts off capacitor banks, preventing harmonic overload and resonance damage to the capacitors. After the harmonics drop below the threshold, normal switching resumes automatically.
12.8 Safety and Standards
Q37: What safety standards does the substation comply with?
A: The substation strictly complies with GB/T 17467-2020 “High-Voltage/Low-Voltage Prefabricated Substation”, DL/T 5377, GB 50053, GB 50054, GB 50057 and other national standards, with all products passing 3C certification and high-voltage type tests.
Q38: What are the “five-prevention” functions?
A: The five-prevention functions are: preventing opening/closing load switch with load; preventing entering live compartments; preventing closing grounding switch with power on; preventing energizing with grounding switch closed; preventing wrong opening/closing of switches. The ring main unit realizes these through mechanical and electrical interlocking.
Q39: What is the grounding resistance requirement of the substation?
A: The grounding resistance requirement is ≤4Ω. The ring grounding busbar inside the box connects all equipment shells, cabinets, transformer neutral point and cable armor layers for equipotential connection. If the on-site test does not meet the requirement, additional grounding electrodes are installed.
Q40: What fire protection measures does the substation have?
A: The substation has: 1-hour fire-resistance partitions between compartments; temperature-sensing aerosol automatic fire extinguishing devices in the transformer room and low-voltage room; smoke alarms in each compartment; fire-resistant sealing of cable inlets/outlets; and safety warning signs. The fire protection design meets GB 50016 requirements.
12.9 Procurement and Service
Q41: What is the difference between this solution and a traditional civil substation?
A: This solution is factory-prefabricated and modularly installed, with the construction period shortened by more than 70%; the floor area is far smaller (about 8.4㎡); on-site civil work is minimal; it can be relocated; and it has complete outdoor protection capability. The traditional civil substation has a long construction period, large floor area, complex on-site construction and high cost.
Q42: Can the substation be moved after installation?
A: Yes. The substation is a whole-unit device that can be lifted and relocated as a whole by crane after disconnecting the cables. It is suitable for scenarios where the charging station site changes, and can be reused to protect investment.
Q43: What should be noted for the daily operation of the charging station in winter low-temperature environments?
A: The transformer, switchgear and meters are all selected with wide-temperature components adapting to low-temperature environments. In winter, attention should be paid to: keeping the compartment dry and avoiding condensation; checking the transformer oil level (low temperature causes oil level drop); the capacitor and other equipment have low-temperature adaptability; the intelligent monitoring terminal has a backup battery that operates normally at low temperature. The equipment can operate normally in the range of -25°C ~ +40°C.
Q44: How is the electricity bill metered and settled?
A: The high-voltage side configures 0.2S class CTs and Vv-connected VTs connected to the high-voltage energy meter; the low-voltage side has an independent metering cabinet with 0.2S class CTs and 0.5S class intelligent energy meters supporting peak-valley time-of-use metering, meeting the trade settlement requirements of the power supply department, with lead sealing to prevent electricity theft.
Q45: Can the system support charging pile power management?
A: Yes. The intelligent monitoring system can collect the operating status and power of each outlet circuit, and can be connected to the charging station operation platform. Through the platform, charging pile power can be managed by time period, realizing peak-load shifting and reducing electricity costs.
Q46: What is the total power supply capacity of this solution?
A: The 1000kVA transformer can supply a total calculated load of about 800kW, supporting 8 120kW DC fast charging piles plus auxiliary loads. The low-voltage busbar is rated at 2000A with more than 15% margin, and spare outlet circuits are reserved for future expansion.
Q47: What should be done if the charging station needs to expand charging piles later?
A: The low-voltage system reserves spare outlet circuits (including 1 400A spare circuit) and busbar margin. To expand, only new outlet circuits and MCCBs need to be added, without replacing the main switch and busbar. If the transformer capacity becomes insufficient, it can be replaced with a larger capacity transformer (the box structure supports it).
Q48: What are the requirements for the installation site?
A: The site should be flat and well-drained, with sufficient crane space for hoisting; away from flammable and explosive materials; with appropriate distance from buildings; the foundation should be poured according to the box base dimensions; and grounding electrodes should be pre-embedded. The site also needs to consider cable entry direction and maintenance access.
Q49: How is the substation transported?
A: The substation is transported as a whole unit by low-bed truck, with special packaging and fixing to prevent collision and tilting during transport. The transformer oil is fully sealed during transport, and special attention is paid to avoiding violent vibration. On arrival, opening inspection and acceptance are carried out.
Q50: What is the noise level of the substation?
A: The S22 transformer no-load noise is ≤55dB (measured 1m from the tank). For scenarios sensitive to noise, a low-noise transformer type can be selected and sound insulation measures added to the box to reduce operating noise impact.
Q51: Can the substation be connected to the customer’s existing monitoring platform?
A: Yes. The intelligent monitoring terminal supports standard protocols such as Modbus-RTU and MQTT, and data can be uploaded to the customer’s existing platform or our cloud platform. Interface development support can be provided for platform integration.
Q52: How is the training for O&M personnel organized?
A: Standard training is 1 working day (half day theory + half day practice), conducted at the project site by senior commissioning engineers, covering switch operation, daily inspection, monitoring system operation and simple fault handling, with assessment and certificates. Operation manual, O&M manual and training materials are provided free of charge.
Q53: What is the response time for after-sales service?
A: 7×24-hour service hotline; remote response within 10 minutes; on-site arrival within 2 hours in urban areas, 4 hours in suburbs, 8 hours in the province, and 24 hours for out-of-province engineers; general faults repaired within 24 hours on site, major faults with solutions within 48 hours.
Q54: What spare parts are recommended to stock?
A: Recommended spare parts: spare fuses for high-voltage fuses, spare MCCBs, spare contactors and fuses for the compensation cabinet, spare fans, spare indicators and control fuses. A suggested spare parts list can be provided to guide customers in stocking key wearing parts.
Q55: Why choose Guangzhou Lain?
A: Guangzhou Lain is a source factory with more than 20 years of experience in power distribution and computer room industries, with complete qualifications, professional design and service teams, strict quality control and third-party testing, factory prefabrication for fast delivery, 7×24-hour after-sales service, and full-process one-stop services from design, manufacturing, installation to O&M, providing reliable guarantees for charging station projects.
13. Construction Schedule
| Stage No. | Work stage | Main work contents | Duration (days) | Responsible | Deliverables |
|---|---|---|---|---|---|
| 1 | Preliminary preparation | On-site survey, final solution and configuration confirmation, contract signing, drawing review, technical disclosure | 3 | Project manager, design engineer | Construction drawings, technical agreement, construction plan |
| 2 | Factory production | Raw material procurement, cabinet processing, transformer production, component assembly, primary/secondary wiring | 15 | Production supervisor, quality engineer | Substation whole-unit semi-finished product |
| 3 | Factory inspection | HV withstand test, circuit resistance test, transformer characteristic test, LV power-on test, protection function verification, appearance inspection | 2 | Quality engineer, commissioning engineer | Factory inspection report, product certificate |
| 4 | Transport arrival | Whole-unit packaging, logistics transport, on-site unloading, opening inspection, quantity verification | 3 | Logistics specialist, on-site manager | Arrival acceptance form |
| 5 | On-site installation | Foundation verification, box hoisting and positioning, leveling and fixing, grounding connection, HV cable connection, LV cable connection, secondary control wiring | 4 | Construction team leader, electrical installer | Installation records, grounding resistance test report |
| 6 | Power-on commissioning | Insulation resistance test, phase sequence verification, HV power-on, transformer no-load test, LV circuit test, protection setting verification, monitoring system joint commissioning, reactive power compensation switching test | 3 | Commissioning engineer, on-site electrician | Commissioning records, trial operation records |
| 7 | Completion acceptance | 72-hour full-load trial operation, as-built document compilation, Party A acceptance, operation training, handover signing | 2 | Project manager, Party A representative | Completion acceptance report, complete as-built documents |
Note: The above durations are reference durations for standard configuration; customized configurations and special requirements will be adjusted accordingly; civil foundation construction can be carried out in parallel with factory production to further compress the overall project period.
14. Construction Organization and Quality/Safety Measures

14.1 Construction Organization Structure
A special project department is established with a project manager responsibility system, comprehensively coordinating project progress, quality, safety and cost. Core positions and responsibilities:
– Project manager: general project leader, liaising with Party A needs, coordinating the whole process of design, production, construction and acceptance, controlling project progress and quality, responsible for resource allocation and external communication;
– Technical director: responsible for solution design, drawing review and technical disclosure, solving technical problems in construction, reviewing commissioning plans and acceptance standards;
– Construction team leader: general on-site construction executor, responsible for personnel scheduling, construction process arrangement and on-site safety management, implementing the construction progress plan;
– Commissioning engineer: responsible for factory commissioning and on-site power-on commissioning of equipment, verifying protection parameters, joint commissioning of the intelligent monitoring system, troubleshooting;
– Safety officer: responsible for on-site safety management, safety disclosure, safety inspection, supervising the implementation of safety operating procedures, eliminating safety accidents;
– Quality inspector: responsible for incoming material acceptance, process quality inspection, factory inspection and completion inspection, controlling quality at each link.
14.2 Construction Preparation Work
#### 14.2.1 Technical Preparation
Before project start, organize drawing review; the design engineer conducts technical disclosure to construction and commissioning personnel, clarifying design requirements, construction standards and acceptance specifications. Compile special construction plans and commissioning plans, clarifying construction methods and quality control points of each process. Prepare technical documents such as drawings, specifications and record forms to ensure construction personnel are familiar with drawings and process requirements.
#### 14.2.2 Material Preparation
Prepare all equipment, components and auxiliary materials according to the configuration list, conduct quantity counting and appearance inspection before entry, verify model specifications are consistent with drawings, and check product certificates and test reports. Prepare construction tools and testing instruments, including cranes, welding machines, crimping pliers, megger, multimeter and grounding resistance tester, ensuring instruments are within the calibration validity period with accuracy meeting requirements.
#### 14.2.3 On-Site Preparation
Survey on-site construction conditions before entry, confirming that the entry road, hoisting space, temporary power and temporary warehouse meet construction requirements. Clean the construction area, set safety warning signs and enclosures, and divide work areas and non-work areas. Accept the civil foundation, verifying foundation dimensions, elevation and pre-embedded iron part positions meet design requirements, with grounding flat steel reserved in place.
14.3 On-Site Installation Construction Process
#### 14.3.1 Box Positioning and Fixing
Use a truck crane to lift the substation as a whole onto the concrete foundation, using dedicated lifting points during hoisting, keeping the box level and avoiding tilting impact. After positioning, use a level to calibrate the box levelness with deviation not greater than 2mm/m. Fix the base to the foundation pre-embedded iron parts firmly with expansion bolts or welding, ensuring no box shaking. After fixing, check the box verticality to meet specification requirements.
#### 14.3.2 Grounding System Construction
Reliably connect the grounding terminals at the four corners of the substation base to the foundation grounding grid with 50mm² copper stranded wire, with tin-plating treatment at connection parts and contact resistance meeting requirements. The grounding busbar in each compartment, equipment shells, metal components and cable armor layers are equipotentially connected to the main grounding busbar, with clear labels at each grounding point. After construction, measure the grounding resistance with a grounding resistance tester to ensure ≤4Ω; if not met, install additional grounding electrodes.
#### 14.3.3 Primary Cable Connection
High-voltage cables and low-voltage outlet cables are introduced from the bottom cable holes of the box and connected to corresponding terminals by phase sequence. Cable ends use cold-pressed or heat-shrink cable terminations, with bolt tightening torque meeting standards and flat, oxide-free contact surfaces. High-voltage cables must pass insulation and withstand tests before connection. Cable inlets/outlets are sealed with fire mastic and sealant, achieving waterproof, fireproof and rodent-proof.
#### 14.3.4 Secondary Circuit Wiring
Connect monitoring circuits, signal circuits, control circuits and lighting circuits according to the secondary wiring diagram. Secondary wires use multi-strand copper insulated wires with clear wire numbers, neat routing and binding fixing. All terminal connections are firm with good contact, and spare cores reserve sufficient length. Shielded cable shielding layers are single-end grounded to avoid interference. After wiring, verify wire numbers and conduct continuity tests to ensure correct wiring.
14.4 Commissioning and Acceptance Process
#### 14.4.1 Pre-Power-On Inspection
Before power-on, comprehensively inspect all primary circuit wiring for correct phase sequence and firm tightening, with no tools or debris left. Check all switches are in the open position and grounding switches are separated. Measure the insulation resistance of high-voltage and low-voltage circuits to meet specification requirements. Check secondary circuit wiring is correct and the power supply voltage is normal. Check safety warning signs are complete and fire-fighting equipment is in place.
#### 14.4.2 Graded Power-On Commissioning
Follow the principle of “high voltage first, then low voltage; no-load first, then load” for graded power-on. First close the high-voltage inlet switch, check the high-voltage side voltage is normal, the transformer runs at no-load, and listen for abnormal sounds and oil leakage. After 2 hours of no-load operation without abnormality, close the low-voltage inlet main switch and check the low-voltage busbar voltage and phase sequence are correct. Then put into operation the reactive power compensation cabinet and each outlet circuit in sequence, checking each circuit operates normally.
#### 14.4.3 Function Joint Commissioning
Test the open/close functions and protection action functions of each circuit breaker, verify protection settings are accurate, and simulate faults to test protection action reliability. Test the ventilation temperature control system by simulating temperature rise to verify automatic fan start/stop and overtemperature alarm functions. Test the fire protection, lighting and socket auxiliary systems for normal function. Commission the intelligent monitoring system, verifying all data collection is accurate, alarm functions are normal and remote communication is smooth.
#### 14.4.4 Trial Operation and Acceptance
After all commissioning, conduct a 72-hour full-load trial operation, record operation data, and organize completion acceptance after confirming no abnormality. At acceptance, submit the complete set of as-built documents including as-built drawings, factory certificate, inspection reports, commissioning records and grounding resistance test report. After acceptance passes, sign the completion acceptance report and formally deliver for use.
14.5 Construction Quality Control
Strictly implement the current national electrical installation engineering construction specifications and quality acceptance standards. Each process must pass quality personnel inspection before entering the next process. All incoming equipment and materials must have certificates and test reports; unqualified products are strictly prohibited from entry and use.
Key processes implement side-station supervision; high-voltage tests, cable termination production, power-on commissioning and other key processes are supervised on site by the technical director. Implement the “three-inspection system” of team self-inspection, construction team re-inspection and project department final inspection, controlling quality layer by layer. Complete construction records and quality records, making the construction process traceable and quality responsibility implementable.
14.6 Construction Safety Management
Strictly implement the “Safety Work Regulations for Electric Power Industry”. All construction personnel must hold certificates and receive safety education and disclosure before entry. Obvious safety warning signs are set at the construction site, and non-construction personnel are strictly prohibited from entering the work area.
High-altitude operations, hoisting operations and live operations must have special safety measures with dedicated supervision. Strictly implement the work ticket system for power on/off; operations without tickets and agreed-time power on/off are strictly prohibited. Complete fire-fighting equipment and safety protection supplies are equipped, and construction personnel correctly wear safety helmets, insulating shoes and other protective equipment. On-site temporary power is arranged in a standardized manner, distribution boxes are equipped with leakage protectors, and private wiring is eliminated.
14.7 Civilized Construction and Environmental Protection
On-site materials are stacked neatly, tools are placed in order, and the site is kept clean. Construction waste is collected centrally and transported uniformly, without random disposal of waste. Construction time is reasonably arranged to avoid high-noise operations at night, reducing impact on the surrounding environment. After construction, the site is cleaned to achieve “work completed, materials used up, site clean”. Protect the greening and public facilities around the construction site to avoid damage.
15. After-Sales Service
15.1 Warranty Commitment
This project provides 12 months of whole-unit free warranty, calculated from the date of equipment completion acceptance. Within the warranty period, for faults and damage caused by equipment quality problems and manufacturing process defects, our company provides free repair, component replacement and technical support services, without any parts or labor fees.
After the warranty period, lifetime maintenance services are provided. Annual O&M service agreements can be signed according to customer needs, providing inspection, repair, accessory replacement, upgrade and transformation services at favorable prices, guaranteeing long-term stable operation of the equipment.
15.2 Response Time
– Establish a 7×24-hour all-weather service response mechanism with a dedicated service hotline, accepting customer repair reports and consultations at any time;
– Remote response: general technical consultation and fault troubleshooting respond within 10 minutes, guiding customers to solve problems remotely by phone or video;
– On-site response: for faults that cannot be solved remotely, arrive at the site within 2 hours in urban areas, 4 hours in suburbs, 8 hours within the province, and dispatch engineers within 24 hours outside the province;
– Fault handling: general faults repaired within 24 hours on site; major faults with solutions proposed within 48 hours, making every effort to shorten power outage time.
15.3 After-Sales O&M Service Contents
#### 15.3.1 Regular Inspection Service
– Within the warranty period, provide one free on-site inspection service every six months; after the warranty period, inspect according to the frequency agreed in the service agreement;
– Inspection contents include: high-voltage switchgear appearance, operating mechanism and grounding switch inspection; transformer oil level, oil temperature, sound and sealing inspection; low-voltage circuit breaker, contactor, capacitor and reactor appearance and operation status inspection; grounding system connection reliability inspection and grounding resistance re-measurement; ventilation, lighting and fire protection system function inspection; intelligent monitoring system data verification and function verification; inside and outside box cleaning and fastener tightening;
– Issue a formal inspection report with operation evaluation and optimization suggestions.
#### 15.3.2 Fault Repair Service
– Respond at the first moment after receiving the fault report, quickly locate the fault cause, eliminate the fault and restore power supply;
– For damaged components, prioritize replacement with original same-model accessories to ensure consistent equipment performance;
– For faults that cannot be repaired in a short time, spare equipment can be provided for temporary replacement to minimize power outage losses;
– After repair, issue a fault report explaining the fault cause and handling measures.
#### 15.3.3 Technical Consultation Service
– Provide lifetime free technical consultation services, including equipment operation guidance, operation parameter optimization, expansion transformation suggestions and fault troubleshooting guidance;
– Customers can contact the service team at any time for professional answers to any technical problems during use.
#### 15.3.4 Software Upgrade Service
– Intelligent monitoring system software is upgraded free of charge for life, continuously optimizing functions and interface;
– Hardware firmware is iteratively upgraded free of charge according to operation conditions, ensuring system functions are always at the industry advanced level.
15.4 Spare Parts Supply
– Establish a national spare parts warehouse, stocking common components and wearing parts to ensure rapid parts supply during fault repair;
– All components are from mainstream industry brands with smooth market procurement channels, avoiding the risk of supply interruption for niche brand parts;
– Within the warranty period, damaged parts are replaced free of charge; after the warranty period, parts are supplied at cost price without price difference;
– Provide a suggested spare parts list to guide customers in stocking key wearing parts to shorten fault repair time.
15.5 Service Supervision Mechanism
– Establish a service quality return visit system; after each fault repair and inspection service, customer service personnel conduct a telephone return visit to understand service satisfaction;
– Set up a complaint hotline to accept customer complaints and suggestions, with a handling reply within 24 hours;
– Service quality is linked to engineer performance, driving service quality improvement and ensuring customers receive professional, efficient and considerate after-sales service.
16. Training Plan
16.1 Training Objectives
Through systematic technical training, enable customer O&M personnel to independently complete the daily operation, patrol inspection, simple fault troubleshooting and emergency handling of the substation, be familiar with the use of the intelligent monitoring system, and guarantee safe and stable operation of the equipment.
16.2 Training Targets
Electricians and O&M management personnel responsible for charging station O&M at the customer side, with 2-3 people recommended, having basic electrical knowledge and low-voltage operation qualifications.
16.3 Training Contents
#### 16.3.1 Theoretical Knowledge Training
– Overall structure and working principle of the substation: composition and functions of the high-voltage system, transformer system and low-voltage system;
– Main equipment principles and parameters: working principles of ring main unit, transformer, circuit breaker and reactive power compensation device;
– Safety operating procedures: high-voltage safety precautions, power on/off operation process, five-prevention interlocking use specifications;
– Daily O&M knowledge: inspection contents, inspection cycles, methods of judging normal and abnormal states;
– Power quality basics: charging pile load characteristics, reactive power compensation principles, harmonic treatment knowledge;
– Emergency handling process: emergency handling steps for power outage, tripping, fire and water entry.
#### 16.3.2 Practical Skill Training
– High and low voltage switch operation: load switch open/close, grounding switch operation, frame circuit breaker open/close, MCCB operation;
– Daily inspection practice: listening to transformer sound, checking oil level and oil temperature, reading meter readings, checking indicator light status;
– Monitoring system operation: viewing real-time data, querying historical records, viewing alarm information, exporting reports;
– Simple fault handling: reset after tripping, replacing fuses, fan fault troubleshooting, common alarm handling;
– Safety appliance use: correct use of voltage testers, grounding wires, insulating gloves and insulating boots.
16.4 Training Methods and Duration
– Adopt the training method of “theoretical explanation + on-site practice + Q&A assessment”, taught on site by senior commissioning engineers;
– Training duration: standard training is 1 working day, half day theory and half day practice; training duration can be increased according to customer needs;
– Training location: at the project site, combined with actual equipment for intuitive and easy-to-understand training;
– Training materials: equipment operation manual, O&M manual, training courseware and other paper and electronic materials provided free of charge.
16.5 Assessment and Completion
– After training, conduct theory and practice assessment; equipment can only be operated independently after passing;
– Those who fail the assessment receive free secondary training until qualified;
– Issue training completion certificates to customers, establish O&M personnel training files, and provide advanced training services later.
17. Anonymous Typical Project Scenarios
The following cases are anonymous, generalized examples based on typical project implementations; no real customer names or locations are disclosed.
17.1 New Energy Fast Charging Station 1000kVA Substation Project (City A)
Project Overview
The fast charging station is located beside a main urban road, configuring 8 120kW DC fast charging piles and 2 AC slow charging piles to provide charging services for public vehicles. The project required a short construction period, reliable outdoor operation and remote monitoring capability, and finally selected our 1000kVA charging-pile-dedicated European box-type substation solution.
Configuration Plan
– High-voltage side: 10kV ring main unit, three-unit structure, load switch + fuse combination protection;
– Transformer: S22-1000kVA oil-immersed, Dyn11 connection;
– Low-voltage side: incoming cabinet + metering cabinet + reactive power compensation cabinet + dual outlet cabinets, 8 circuits of 250A charging pile outlets with residual current protection;
– Auxiliary systems: intelligent temperature-controlled ventilation, smoke alarm, aerosol fire extinguishing;
– Intelligent system: substation intelligent monitoring terminal, 4G remote transmission, connected to the charging operation platform.
Operation Effect
The project took only 28 days from contract signing to power-on operation, meeting the rapid operation needs of the charging station. Since commissioning, it has operated stably; the maximum transformer oil temperature in summer high-temperature weather was 68°C, far below the limit. The low-voltage side power factor remained stable above 0.96 with no harmonic over-limit problems, passing the power quality inspection of the power supply department. The intelligent monitoring system realized unattended operation, reducing O&M costs by 60%, highly recognized by the customer.
17.2 Highway Service Area Charging Station Substation Project

Project Overview
The highway service area built a charging station in each of the north and south areas, with 6 160kW DC fast charging piles per station, each powered by one 1000kVA European box-type substation. Located beside the highway, the project is in an open-air environment with low temperature in winter and strong sunlight in summer, with high requirements for outdoor adaptability of equipment.
Configuration Plan
– High-altitude high-temperature resistant oil-immersed transformers with wide-temperature components adapting to -30°C~+50°C environments;
– Thickened aluminum-zinc plated plates with reinforced anti-corrosion coating, adapting to highway dust and vehicle exhaust environments;
– 10 low-voltage outlet circuits with expansion space reserved, also covering service area lighting, air conditioning and other auxiliary loads;
– Dual power automatic switching function with spare power interface reserved, guaranteeing power supply to important loads;
– Intelligent monitoring connected to the service area centralized control platform for unified management of multiple stations.
Operation Effect
The equipment has been in operation for more than two years, withstanding harsh weather such as summer high temperature and winter heavy snow, operating stably and reliably without any environment-related faults. The reactive power compensation and harmonic treatment effects are good with no power factor penalty charges. The remote monitoring function greatly reduced the frequency of O&M personnel traveling to and from the highway, significantly improving O&M efficiency.
17.3 Industrial Park Employee Charging Station Power Distribution Project
Project Overview
To meet the charging needs of employees’ electric vehicles, the industrial park built an employee charging station with 20 AC piles and 4 DC fast charging piles, while also supplying some park lighting and supporting facilities. One 1000kVA European box-type substation was adopted as the dedicated power distribution facility.
Configuration Plan
– High-voltage side adopts terminal power supply mode with built-in metering cabinet, meeting the metering requirements of the power supply department;
– Low-noise transformer with sound insulation measures added to the box to reduce operating noise and avoid affecting surrounding offices;
– Low-voltage outlets divided into charging pile dedicated circuits and power/lighting circuits with separate metering for convenient electricity cost accounting;
– Intelligent energy management function can control charging pile power by time period for peak-load shifting and cost reduction;
– Connected to the park smart energy management system for unified energy dispatch.
Operation Effect
After completion, the project effectively solved the problem of difficult charging for park employees, with stable power supply and 100% voltage qualification rate. The separate circuit metering function facilitated the park logistics electricity cost accounting and management, and the peak-load shifting function reduced peak electricity costs. The equipment operated with low noise without affecting the surrounding office environment, receiving unanimous praise from the park management and employees.
18. SEO Optimization Section
18.1 Keyword Classification
Core primary keywords
1000kVA box-type substation, charging pile dedicated substation, European box-type substation, charging station substation
High-conversion long-tail keywords
1000kVA charging pile dedicated European box-type substation, charging station dedicated box-type substation, DC fast charging pile substation, outdoor charging pile substation, 10kV charging pile substation, box-type substation charging pile solution, fast charging station power distribution substation
Industry traffic keywords
box-type substation, European box-type substation, 1000kVA substation, outdoor box-type substation, prefabricated substation, distribution transformer, reactive power compensation cabinet, high-voltage ring main unit, low-voltage switchgear, charging station power supply solution
Brand-specific keywords
KITOZER Pioneer substation, Lain Intelligent substation, Guangzhou Lain box-type substation, Pioneer charging pile substation
Dropdown/related search keywords
1000kVA substation price, what capacity substation for charging piles, European box-type substation manufacturer, charging station substation configuration, box-type substation technical parameters, substation installation construction plan, outdoor substation protection level
18.2 Page Optimization Tags
– Title tag: 1000kVA Charging Pile Dedicated European Box-Type Substation_Technical Solution_Configuration Quotation – Guangzhou Lain Intelligent
– Meta Keywords: 1000kVA substation, charging pile dedicated substation, European box-type substation, charging station substation, substation configuration list, substation technical parameters, charging pile power distribution solution, outdoor substation, Guangzhou substation manufacturer
– Meta Description: Guangzhou Lain Intelligent professionally provides 1000kVA charging pile dedicated European box-type substation solutions, adapted to 8 120kW DC fast charging piles, including high-voltage ring main unit, energy-saving transformer, low-voltage reactive power compensation and intelligent monitoring system; outdoor IP54 protection, factory prefabrication for rapid deployment, one-stop design, production, installation and O&M services.
– H1 tag: 1000kVA Charging Pile Dedicated European Box-Type Substation Technical Design Solution
– H2 tags: Project Overview, User Requirement Analysis, Overall Design Description, Equipment Configuration List, Product Technical Parameters, Solution Advantages, Construction Organization, After-Sales Service, Project Cases
18.3 Internal Link Anchor Text
– Core anchor text: box-type substation, charging pile substation, European box-type substation
– Long-tail anchor text: 1000kVA charging pile substation, charging station dedicated box-type substation, outdoor prefabricated substation
– Related anchor text: micro-module cold aisle, integrated cabinet, outdoor cabinet, shielded computer room, containerized data center
19. Official Contact Information
– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Website: https://gdlain.com
– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China