KITOZER
KITOZER

Shipping Policy

Shipping Policy

At KITOZER, we understand that data center infrastructure represents a significant investment. Our logistics policy is designed to ensure that every component—from sensitive Precision Air Conditioning (CRAC) units to heavy-duty Data Center Cabinets—arrives at your site safely, on time, and ready for installation.

1. Special Handling for Precision Equipment

Given the sensitive nature of smart data center hardware, we employ specialized logistics protocols:

  • Climate & Vibration Control: Critical components such as UPS Systems and Precision Air Conditioning are transported using air-ride suspension vehicles to minimize vibration and impact.

  • Moisture Protection: All electronic equipment is sealed in moisture-proof, industrial-grade packaging to prevent condensation during transit, consistent with our Fresh Air Ventilation standards.

  • Heavy-Duty Loading: Our logistics partners are equipped to handle high-density loads, including Battery Cabinets and Load-Bearing Steel Frames (L50*5 angle steel).

2. Delivery & Site Access Coordination

Data center equipment often requires specialized offloading.

  • Site Survey Requirement: For large-scale deployments (e.g., Integrated Cabinets), we require a site access report to confirm elevator capacity, door clearances, and floor loading limits.

  • Floor Loading Compliance: We coordinate deliveries to align with the Required Load (kN/m²) of your facility to ensure safe equipment placement during the offloading process.

3. Shipping Methods & Incoterms

  • Incoterms: Standard international orders are shipped under EXW, FOB, or CIF terms. For turnkey projects, we offer DDP (Delivered Duty Paid) services to simplify your customs process.

  • Consolidated Shipping: We can consolidate Micro-Module Containment components to reduce shipping costs and ensure all parts of the assembly arrive simultaneously.

4. Lead Times

  • Standard Components: Items such as Electronic Access Control and Environmental Sensors ship on a schedule confirmed on the quotation.

  • Custom Infrastructure: Large-scale systems, including customized Power Distribution Boxes and Grounding Systems, require a manufacturing and test schedule confirmed on the quotation.

5. Inspection & Acceptance (The “Arrival Protocol”)

Upon delivery, the client or authorized representative must perform a preliminary inspection:

  • Physical Integrity: Check for any signs of tilt or impact on precision units.

  • Documentation: Ensure the Certificate of Compliance and technical manuals are included.

  • Reporting: Any discrepancies or transit damage should be reported promptly, following the inspection window stated on the quotation and delivery documents.

6. Logistics Insurance

Cargo insurance, if required for a shipment, is confirmed on the quotation. Coverage terms follow the agreed Incoterms and the carrier or insurer documents for that order.

7. Contact Information

For logistics inquiries or to coordinate a complex site delivery, please contact our Project Operations Team:

  • Email: zl19068534140@gmail.com

  • Phone: +86 13509238849

Shopping Cart