KITOZER
KITOZER

KITOZER 37U RF Shielded Cabinet EMI EMC TEMPEST Guide | Secure Server Rack

Table of Contents

第二部分 英文白皮书(≥15,000 words)

KITOZER 37U RF-Shielded Cabinet Engineering Whitepaper (EMI / EMC / TEMPEST)

Model: KITOZER-SHC-37U-2026 | U-space: 37U / 19-inch rack | Target SE: 60dB~100dB selectable
Reference price (incl. tax & shipping, RMB): Standard ¥38,000 up / Premium (BMB3 C-class) ¥96,000 up / TEMPEST (GBMB) ¥168,000 up
Hotline: +86 18520668845 | +86 13922289957 | WhatsApp: +86 19068534140
Manufacturer: Guangzhou Lian Intelligent System Development Co., Ltd. (Brand: KITOZER)

Table of Contents (EN)

  1. Electromagnetic Compatibility Basics: Emissions, TEMPEST, Shielding Theory
  2. Shielding Effectiveness Grades: 30 / 60 / 80 / 100 dB and BMB3 Classification
  3. KITOZER 37U Cabinet Anatomy: Double-Steel-Skin, Waveguide Vent, Gasketed Door, Filters
  4. Power Line EMI Filters: Leakage Current, Power Rating, Selection
  5. Signal Line Filters & Feedthroughs: Ethernet, Fiber, DB9, SMA, USB
  6. Honeycomb Waveguide Ventilation & Thermal Design
  7. Application Scenarios: Classified Rooms, Finance, Defense, MRI, Labs, EMC Test
  8. Installation, Grounding & Equipotential Bonding
  9. Shielding Effectiveness Testing: GB/T 12190, IEEE 299, On-Site Measurement
  10. Shielded Cabinet vs. Standard 19″ Cabinet: Cost, Weight, Cooling, Maintenance
  11. Selection Guide & Configuration Matrix
  12. FAQ (40 Questions)
  13. Packing, Delivery, Warranty, CTA & Company Info

Chapter 1. EMC Basics: Electromagnetic Emanation, TEMPEST and Shielding Theory

1.1 Why a Shielded Cabinet Is Needed

Whenever current changes, electromagnetic radiation is produced. A server, a switch, an industrial mainboard, or a switched-mode power supply all radiate broadband electromagnetic energy during normal operation. Conversely, external sources such as high-power variable-frequency drives (VFDs), servo amplifiers, radar pulses, cellular base stations, broadcast transmitters and high-voltage power lines couple interference into sensitive equipment both through free-space radiation and conducted wiring. An electromagnetic shielded cabinet — a Faraday cage built to 19-inch rack form factor — uses a continuous metallic boundary to attenuate incoming fields on the way in, and to contain internal emanations on the way out.

KITOZER-SHC-37U-2026 is designed for this two-way protection. It compresses the Faraday-cage concept into a standard 19-inch, 37U rack footprint, so that customers do not need to shield an entire server room in order to protect a handful of critical devices. Typical achieved shielding effectiveness ranges from 60 dB (Standard) to 100 dB (TEMPEST-grade, compliant with BMB3-1999 Class C).

1.2 The Physical Nature of Compromising Emanations

Digital equipment radiates because clock edges are fast. A 100 MHz clock has harmonics reaching 1 GHz; DDR4 data buses, although only 800 MHz fundamental, produce spectral content up to 3–5 GHz. This energy escapes through three channels:

  1. Conducted / common-mode radiation — PCB traces and cables act as monopole antennas driven by common-mode currents;
  2. Slot / aperture radiation — seams, connector cutouts and ventilation holes become slot antennas; when a slot length reaches λ/20 (≈15 mm at 1 GHz), leakage jumps sharply;
  3. Cable-borne radiation — power and signal cables carry internal noise out of the enclosure and re-radiate.

TEMPEST (originally a codename, now a generic term) covers a family of standards (NATO SDIP-2700, US NSTISSI 7000, Chinese GBMB / BMB series) that limit the compromising emanations of information technology equipment. The premise is well known: even mathematically unbreakable ciphers are useless if an eavesdropper 100 m away can recover screen content by intercepting electromagnetic leakage from monitors, keyboards and Ethernet cables. This is why classified server rooms require shielded cabinets, shielded rooms, filtered penetrations, and independent TEMPEST compliance testing.

1.3 Three Shielding Mechanisms (Schelkunoff Theory)

Total shielding effectiveness SE (in dB) is:

SE = R + A + B

where:
– R = Reflection loss — wave impedance mismatch at the air-metal boundary. R is high for high-impedance electric fields and low for low-impedance magnetic fields.
– A = Absorption loss — energy converted to heat inside the metal: A = 8.686 · t / δ, where t is thickness and δ is skin depth. Copper skin depth is ~0.47 mm at 100 kHz, ~0.15 mm at 1 MHz, ~2.1 µm at 1 GHz.
– B = Re-reflection correction — non-negligible only for thin shields; when A > 10 dB it is ignored.

Practical rules of thumb:
– Copper absorption loss ≈ 131 · t · √(f · μr · σr) dB (f in MHz, t in mm);
– At low frequencies (10 kHz–100 MHz), steel outperforms copper because of its high magnetic permeability;
– At high frequencies (>30 MHz), 1.5–2 mm of steel or aluminum delivers >80 dB by reflection alone.

KITOZER-SHC-37U uses 1.5–2.0 mm cold-rolled galvanized steel for the outer skin (high-frequency reflection + absorption). For low-frequency magnetic-field-sensitive rooms (MRI, substation secondary switchgear), an optional 0.5 mm permalloy inner liner raises magnetic shielding from 40 dB to 60 dB+.

1.4 Apertures and Seams — the Real Bottleneck

A perfect metal sheet can provide >120 dB, but real cabinets are limited to 60–80 dB because of openings:

  • Door seams — a 2 m long, 0.1 mm gap can degrade 2 mm steel by more than 40 dB at 1 GHz;
  • Ventilation holes — round holes larger than λ/20 become waveguide antennas;
  • Penetrations — a cable passing straight through a hole in the shield wall is a window;
  • Unfiltered connectors — unfiltered DB9, RJ45 and SMA panels are major leakage points.

KITOZER-SHC-37U addresses all four: beryllium-copper finger stock + conductive rubber around doors; honeycomb waveguide vent panels; shielded mains EMI filters through the wall; filtered connectors or waveguide feedthroughs for signals.

1.5 What Each 20 dB Step Means

SE Field attenuation Power attenuation Typical meaning
20 dB 10× 100× Generic metal chassis, basic ESD immunity
40 dB 100× 10⁴× Industrial EMC enclosure, VFD field
60 dB 1,000× 10⁶× General shielded cabinet, EMC lab grade
80 dB 10,000× 10⁸× Classified room entry / TEMPEST baseline
100 dB 100,000× 10¹⁰× BMB3 Class C / high-security shielded room
120 dB 10⁶× 10¹²× National-level shielded room, EMP hardening

Chapter 2. Shielding Effectiveness Grades and BMB3 Classification

2.1 Why “Steel Thickness” Is Not the Answer

Customers often ask: “How thick is your steel? Will it block a mobile phone?” The honest answer is that shielding performance is a system property. A 3 mm steel plate with a leaking door and unfiltered cables can measure under 30 dB; conversely, 1.5 mm steel with precision finger stock and filtered penetrations can reach 80 dB. KITOZER therefore ships a whole-cabinet SE test report per GB/T 12190 rather than a material thickness spec.

2.2 30 dB Grade — Industrial Basic Protection

Used for factory-floor PLC/RTU cabinets near VFDs, substation secondary panels, and general instrument racks. Construction: 1.2 mm cold-rolled steel, conductive rubber door gasket, single-stage 10–20 A mains EMI filter, shielded cable glands. This is the KITOZER-SHC-37U-Std, reference price from RMB 38,000.

2.3 60 dB Grade — EMC Lab and Medical

Used for EMC lab EUT racks, medical equipment rooms (MRI-adjacent acquisition computers, ICU central stations), telecom sensitive nodes, university low-current labs. Requirements:
– Double-skin steel (1.5 mm outer + 1.0 mm inner);
– Beryllium-copper finger stock around door, 25–30% compression;
– Three-point latching mechanism for uniform compression;
– Two-stage mains EMI filter, leakage ≤0.5 mA;
– Filtered RJ45 / DB9 feedthroughs;
– 3.2 mm honeycomb vent panels.

KITOZER-SHC-37U-Pro, reference price from RMB 68,000.

2.4 80 dB Grade — Finance, Defense, Core IT

Used for bank front-end processors, HSM racks, power dispatch data-network panels, ERP/database servers. Requirements:
– Double-skin 2.0 mm outer + 1.5 mm inner, stress-relieved weldment;
– Double-wall door; inner service door + outer shielding door;
– High-life BeCu finger stock (10⁵ cycles) plus secondary conductive rubber;
– Three-phase high-performance two-stage filter, CM insertion loss ≥100 dB (100 kHz–30 MHz), DM ≥60 dB;
– All copper signals via filtered connectors or fiber-optic penetrations;
– 1.6 mm deep honeycomb vents.

KITOZER-SHC-37U-Premium, reference price from RMB 96,000.

2.5 100 dB Grade and BMB3-1999 Class C — Classified Rooms

BMB3-1999 is the Chinese classified-national-standard for shielding cabinets. Key requirements:
– Frequency coverage: 14 kHz–1 GHz (magnetic), 10 kHz–1 GHz (electric), 1.4–10 GHz (microwave);
– SE: magnetic ≥80 dB, electric ≥80 dB, microwave ≥60 dB;
– Mains filter: CM insertion loss ≥100 dB over 10 kHz–30 MHz;
– Signal lines: classified Ethernet must be converted to fiber before exiting;
– Welded construction, double-skin door, finger stock life ≥10⁵ cycles;
– Dedicated ground bar, ground resistance ≤1 Ω.

KITOZER-SHC-37U-Tempest, reference price from RMB 168,000, supplied with third-party test reports from a State Secrecy Bureau authorized lab.

2.6 Quick Selection Table

Application Grade Model Reference price (RMB)
Factory PLC, substation 30 dB SHC-37U-Std 38,000
EMC lab, medical 60 dB SHC-37U-Pro 68,000
Bank front-end, power dispatch 80 dB SHC-37U-Premium 96,000
Classified room, HSM 100 dB / BMB3 C SHC-37U-Tempest 168,000

Chapter 3. Cabinet Anatomy

3.1 Overall Dimensions and Internal Layout

KITOZER-SHC-37U measures 700 W × 1000 D × 2000 H mm (including casters), net weight 280 kg (Std) to 520 kg (Tempest). Internal 19-inch EIA rack, 37 U usable. Internal layout bottom-to-top:

  • 0–1 U — mains entry: 3-phase/single-phase EMI filter, MCB, B+C surge arrester;
  • 1–2 U — signal feedthrough panel: filtered RJ45, filtered DB9, fiber bulkhead, SMA feedthrough capacitors;
  • 2–36 U — 19-inch equipment zone;
  • 36–37 U — top vent zone: honeycomb panels + optional DC fans;
  • Base — 30 × 3 mm copper ground bar, four M8 terminals.

3.2 Double-Steel-Skin Construction

Outer skin 1.5–2.0 mm SPCC+Z cold-rolled galvanized steel, inner skin 1.0–1.5 mm same material. A 20–50 mm air gap between skins increases multi-reflection absorption and provides a wiring plenum. The two skins are electrically bonded by conductive rivets or continuous spot welds.

Surface finish:
– Exterior: phosphate + outdoor polyester powder coat, RAL7035 light grey or RAL9004 black;
– Interior: conductive anodized / bare zinc, contact resistance <2.5 mΩ against gaskets;
– All seams continuously welded or gasketed — no unshielded slot.

3.3 Shielded Door and Conductive Gaskets

The door is the throat of the cabinet. Front and rear double doors each feature:
– Door leaf: 1.5 mm formed steel with welded stiffeners;
– Door frame: 2.0 mm formed steel, MIG-welded corners, stress-relieved;
– Gasket: beryllium-copper finger stock (BeCu) embedded in frame, 6.5 mm height, 1.5–2.0 mm compression, contact resistance <2.5 mΩ, SE ≥100 dB at 1 GHz;
– Secondary seal: conductive rubber (silicone core + silvered aluminum coating) outside the finger stock;
– Lock: three-point vertical-rod lock, all corners compress simultaneously, compression deviation <0.5 mm;
– Optional viewing window: multi-layer glass with woven metal mesh, SE ≥60 dB, 100-mesh.

Maintenance: BeCu finger stock is rated for 10⁵ open/close cycles (~5 years at 50 cycles/day). Inspect annually for oxidation or deformation; apply contact grease or replace as needed.

3.4 Honeycomb Waveguide Vent

Ventilation is a classic contradiction: air must flow, EM waves must not. KITOZER uses honeycomb waveguide vent panels: hundreds of hexagonal thin-wall metal tubes welded into a metal frame. Each tube acts as a waveguide below cutoff. Cutoff frequency fc = 17.5 / d (d in mm, fc in GHz). Signals below fc decay exponentially inside the tube.

Standard 3.2 mm cell × 25 mm thickness gives cutoff ≈5.5 GHz, attenuation ≥80 dB below 1 GHz, 92% open area. For 10 GHz rejection, use 1.6 mm × 50 mm panels (cutoff ≈11 GHz, 30% less airflow).

Air path: bottom honeycomb inlet → equipment interspace → top honeycomb outlet, natural convection. If internal heat >2 kW, add two 120 mm DC axial fans on the top (fan supplies must be filtered).

3.5 Filter and Feedthrough Panel

Mains entry: bottom-left three-phase five-wire EMI filter (380 V/63 A or 220 V/32 A per project), 360° bonded to cabinet wall. Filter followed by miniature circuit breaker and B+C surge arrester (10 kA).

Signal feedthrough: bottom-right panel customized per customer cable list, typical:
– 8 × filtered RJ45 (GigE, CM rejection ≥60 dB, 100 MHz–1 GHz);
– 4 × filtered DB9 (RS232/RS485);
– 2 × SMA feedthrough capacitors (50 Ω, DC–6 GHz);
– 6 × ST/SC fiber bulkhead (naturally isolated);
– 2 × filtered USB 2.0 (optional);
– Several M20/M25 EMC cable glands (360° shield termination).

3.6 Grounding

A 30 × 3 mm copper busbar runs front-to-back inside. It is bonded via two 16 mm² yellow-green multi-strand copper wires with M8 lugs to the site equipotential busbar. Ground resistance: general room ≤4 Ω, financial ≤1 Ω, classified ≤1 Ω, TEMPEST ≤0.5 Ω. All sheet metal parts, door-to-frame, filter housing-to-cabinet are low-impedance bonded.


Chapter 4. Mains EMI Filters

4.1 Why a Shielded Cabinet Needs a Mains Filter

The shield only blocks free-space radiation. The mains cable is a conductor antenna punched through the shield wall. Internal high-frequency noise leaks out on the line; external grid noise (VFD PWM, lightning surges) couples in. A mains EMI filter is mandatory.

4.2 Filter Topology

A single-phase EMI filter typically contains:
– Differential-mode inductor Ldm (in series on L and N);
– Common-mode choke Lcm (both lines wound on same core, cancels 50 Hz flux);
– X capacitor Cx across L-N;
– Y capacitors Cy from L-to-PE and N-to-PE.

KITOZER-SHC-37U ships two-stage: a 32 A medical/industrial low-leakage main filter plus a 6 A branch filter for server PSUs.

4.3 Key Parameters

  • Insertion loss (50 Ω/50 Ω): typical 100 kHz–30 MHz CM ≥100 dB, DM ≥60 dB;
  • Rated current: choose 1.3× total internal load; 32 A single-phase or 63 A three-phase typical;
  • Leakage current: medical BF ≤0.1 mA, industrial ≤0.75 mA, general IT ≤3.5 mA;
  • Withstand: L-PE 1500 VAC/1 min; L-N 1450 VAC/1 min;
  • Temperature rise: ≤40 K at full load;
  • Safety: X2 / Y2 / Y1 rated capacitors, fail-safe.

4.4 Installation Rules

  • Mount filter flush against the cabinet wall; separate input (outside) and output (inside) harnesses;
  • 360° bond filter housing to cabinet using toothed washers — no paint or anodizing under the bond;
  • Add B+C surge arrester upstream;
  • Order: external grid → surge arrester → EMI filter → UPS/MCB → equipment.

4.5 Common Mistakes

  • “The PSU already has PFC and EMI filtering.” PSU filtering only cleans the PSU input; it does not stop noise coupling from cabinet slots onto the mains.
  • “Bigger Y caps are better.” Oversized Y caps trip RCDs.
  • “Put the filter deep inside.” The filter must be at the penetration; long input leads bypass high-frequency rejection.

Chapter 5. Signal Line Filters and Feedthroughs

5.1 Why Signals Also Need Filtering

An unfiltered Ethernet cable from a server is a 10 m antenna radiating DDR and clock harmonics. Above 60 dB shielding, all copper signal lines must use filtered feedthroughs or waveguide bulkheads. Above 80 dB, copper should be converted to fiber.

5.2 Signal Penetration Options

Signal Recommended solution SE Notes
GigE Filtered RJ45 bulkhead 100 MHz–1 GHz CM ≥60 dB Transformer + CM choke
10G / fiber Fiber bulkhead ST/SC/LC >120 dB Naturally isolated, mandatory for classified
RS232/485 Filtered DB9 30 MHz–1 GHz ≥50 dB Ferrite beads per pin
RF SMA Feedthrough capacitor DC–6 GHz ≥40 dB 50 Ω, 200 V rating
USB 2.0 Filtered USB panel to 480 MHz ≥40 dB CM choke + Y caps
DVI/HDMI Fiber extender through bulkhead >120 dB Video must be fiber
Analog sensor Shielded twisted pair + EMC gland 30 MHz–100 MHz ≥40 dB 360° termination

5.3 EMC Cable Glands

For legacy cables that cannot use filtered connectors, use EMC shielded glands with a 360° nickel-plated copper crimp around the cable braid. Never use plastic glands or pigtail grounding — a pigtail has ~100 nH inductance above 100 MHz and destroys 20–40 dB of shielding.

5.4 Fiber Optic Penetration — the TEMPEST Winner

Fiber is non-conductive: it neither picks up nor radiates EM energy. In classified rooms, all Ethernet, video and KVM are converted to fiber inside the cabinet, passed through a fiber bulkhead, and reconverted outside. KITOZER-Tempest ships a 12-core single-mode fiber bulkhead as standard.


Chapter 6. Honeycomb Ventilation and Thermal Design

6.1 Waveguide-Below-Cutoff Recap

Circular waveguide cutoff fc = 17.5 / d (d in mm, fc in GHz). Below cutoff, the propagation constant is complex and the wave decays as e^(−2.3 L / λc). Hexagonal honeycomb gives ~92% open area (vs 78% for round tubes) and lower airflow resistance, hence the industry standard.

6.2 KITOZER Honeycomb Panel Specs

Model Cell (mm) Depth (mm) fc (GHz) SE @1 GHz (dB) Open area
HV-3.2 3.2 25 5.5 ≥80 92%
HV-1.6 1.6 50 11.0 ≥100 85%
HV-0.8 0.8 50 22.0 ≥110 78%

KITOZER-SHC-37U ships HV-3.2 top and bottom (600 × 300 mm each); Tempest upgrades to HV-1.6.

6.3 Heat Dissipation Budget

A sealed steel cabinet loses ~30% natural convection efficiency vs. an open rack. Internal heat load:
– 1U server ≈ 400 W;
– 37 U can house ~16 × 1U = 6.4 kW (fully loaded);
– Natural convection handles 1.5–2 kW;
– Above 2 kW forced airflow is required.

KITOZER thermal options:
– <2 kW: natural convection through honeycombs;
– 2–4 kW: top-mounted 2 × 120 mm DC fans (24 V, filtered supply), bottom-inlet / top-exhaust;
– >4 kW: custom air-to-air heat exchanger (internal loop isolated from external loop) or ducted precision-AC connection with shielded air damper.

Fan supply cables must be filtered, otherwise brush noise leaks along the wire.

6.4 Temperature Control

One NTC sensor per cabinet, routed via filtered DB9 to an external thermostat. Fans start at 35 °C; audible/visual alarm at 45 °C. KITOZER KX600 monitoring box can add remote temperature, humidity, door contact and leak detection to a cloud platform.


Chapter 7. Application Scenarios

7.1 Classified Server Rooms (BMB17)

Per BMB17-2006, secret-level and above rooms require emanation control. KITOZER-SHC-37U-Tempest is used for:
– Classified office computer racks;
– Cryptographic and signature-validation servers;
– Classified conference room projection hosts and video conferencing endpoints.

Deployment rules: dedicated ground ≤1 Ω; all copper converted to fiber; BMB-certified mains filters; annual re-test by a Secrecy Bureau authorized lab.

7.2 Financial Data Centers

Bank front-end processors, HSMs and card-clearing servers need side-channel resistance. Typical 80 dB deployment: dual UPS supplies each with its own filter; all Ethernet via fiber KVM to ops desks; door access and vibration sensors integrated into DCIM.

7.3 Defense and Military Trials

Radar signal processors, EW test benches, UAV ground stations operate in high-intensity radiated field (HIRF) environments. KITOZER-Premium racks serve as EUT enclosures, fixed shelter racks, and lightning/EMP test victims.

7.4 Medical (MRI, CT, ICU)

MRI suites have 1.5–3 T static fields and fast gradient switching; ICU monitors demand strict EMC. KITOZER-Pro racks host:
– Acquisition computers outside the MRI shield room;
– Central monitoring servers at ICU nurses’ stations;
– Radiation therapy treatment planning workstations.

Medical-specific requirements: mains filter leakage ≤0.1 mA (BF application); non-magnetic lock hardware; anti-microbial, cleanable coating.

7.5 Research Laboratories

Weak-current measurements, quantum-computing control racks, SEM-adjacent instrumentation in universities and research institutes require 60–80 dB. KITOZER provides low-leakage filters, SMA/N RF bulkheads, and optional blank panels lined with absorber foam.

7.6 EMC / EMI Test Labs

EUT auxiliary racks, signal-generator racks, and receiver front-end racks inside semi-anechoic chambers use KITOZER-Pro as mobile shielded racks paired with LISNs.

7.7 Industrial Floor (VFD, Servo, Substation)

690 V VFD switching can produce >10 V/m radiated fields; nearby PLCs reset frequently. KITOZER-Std/Pro protects:
– Steel-mill remote IO stations;
– Wind-farm substation monitoring panels;
– Rail transit wayside signaling racks.


Chapter 8. Installation, Grounding and Bonding

8.1 Placement and Fixing

  • Floor loading ≥600 kg/m² or 10# channel-steel plinth;
  • Four M12 expansion bolts anchor the cabinet;
  • ≥500 mm clearance above the roof;
  • ≥900 mm door-swing clearance front and rear.

8.2 Grounding

  • Internal 30 × 3 mm copper busbar bonded via 16 mm² wire to site equipotential busbar;
  • Ground wire ≤2 m long, straight (avoid loops);
  • Resistance: general ≤4 Ω, financial ≤1 Ω, classified ≤1 Ω, TEMPEST ≤0.5 Ω;
  • Single-point grounding — all shielded cabinets, rooms and filters tie to one point before entering the earth, avoiding ground loops.

8.3 Equipotential Bonding

All metallic elements (anti-static floor supports, UPS frames, cable trays, door frames) are bonded with 6 mm² wire to the equipotential busbar, forming a unified Faraday cage. KITOZER cabinet provides four M8 bonding terminals at the base.

8.4 Cable Penetration Rules

  • External mains → bottom-left filter → internal MCB → UPS → equipment;
  • External Ethernet → bottom-right media converter → internal fiber transceiver → device NIC;
  • Internal and external harnesses must not cross at the penetration;
  • Shielded cables terminated 360°, no pigtails.

8.5 Commissioning Checklist

  • [ ] Cabinet level ≤2 mm/m;
  • [ ] Door opens/closes smoothly; finger stock compression even;
  • [ ] Measured ground resistance meets design;
  • [ ] Filter input and output routed separately;
  • [ ] Honeycomb vents intact;
  • [ ] All cables via feedthroughs, no free holes;
  • [ ] Temperature / door sensors wired;
  • [ ] Factory SE report matches serial number.

Chapter 9. Shielding Effectiveness Testing

9.1 GB/T 12190 Method

GB/T 12190-2021 is the authoritative Chinese standard for shielded-enclosure SE measurement. Cabinet-level testing follows the same method:
– Source: broadband signal generator + amplifier, 10 kHz–10 GHz;
– Transmit antennas: loop (magnetic, 10 kHz–30 MHz), bicone (electric, 30–200 MHz), double-ridged horn (200 MHz–18 GHz);
– Receive antenna: at cabinet center, 1.5 m height;
– Test points: door center, seam midpoint, vent center, filter panel center, corners;
– SE = 20 · log10(E_out / E_in).

9.2 IEEE 299

IEEE Std 299-2006 is the international equivalent. Differences: finer frequency bands (9 kHz–18 GHz), denser measurement grid for large rooms, internationally recognized report format.

9.3 On-Site Measurement Notes

  • Door fully closed and latched;
  • Cabinet empty (or loaded with equivalent dummy loads);
  • Transmit antenna ≥1 m from wall;
  • Ambient background must be ≥10 dB below expected SE;
  • Repeat 3 times per point, average.

9.4 KITOZER Factory Testing

Every cabinet is tested in KITOZER’s in-house EMC lab per GB/T 12190 across the full band, with a factory SE report shipped with the unit. Customers may commission a third-party lab (e.g., China Ceprei, NIM, or a State Secrecy Bureau authorized center) for acceptance-level reports.


Chapter 10. Shielded vs. Standard 19-inch Cabinet

10.1 Cost Comparison

Item Standard 42U rack KITOZER 37U Pro KITOZER 37U Tempest
Reference price (RMB) 3,000–8,000 68,000 168,000
Weight 80 kg 350 kg 520 kg
Usable space 42 U 37 U (2 U used by filters) 37 U
SE <20 dB 60 dB 100 dB
Cooling Fans Honeycomb + fans Heat exchanger
Maintenance cycle 5 years Finger stock annual Finger stock semi-annual

10.2 Why Shielded Cabinets Cost More

  • Materials: double skin + BeCu finger stock + high-performance filters; finger stock alone costs 20× a rubber door seal;
  • Process: stress-relieved weldments to prevent door warping;
  • Testing: full-band SE test on every unit;
  • Customization: signal panels built per customer cable list — no mass production.

10.3 Weight and Floor Loading

Weight is 3–6× a standard rack. Upper-floor installations require structural review (≥600 kg/m²), possibly steel reinforcement.

10.4 Cooling and Maintenance

Cooling is the ongoing pain point. Size internal power budget honestly; do not assume a “full 42 U” of servers. Maintenance:
– Blow honeycomb vents annually with low-pressure nitrogen (never water);
– Inspect finger stock compression annually;
– Re-test SE every 3 years;
– Filters have 8–10 year life, replace at end of life.


Chapter 11. Selection Guide and Configuration Matrix

11.1 Five-Step Selection

  1. Frequency needs: 50 Hz mains field? Mobile / GSM / WiFi? TEMPEST?
  2. SE grade: 30 / 60 / 80 / 100 dB per Chapter 2;
  3. Internal power budget: drives cooling choice;
  4. Cable schedule: mains circuits, Ethernet count, serial, RF, fiber — drives feedthrough panel;
  5. Site conditions: ground resistance, floor loading, doorway and elevator dimensions (shielded cabinet doorway typically 900 mm).

11.2 Standard Configuration Matrix

Item Std Pro Premium Tempest
Steel thickness 1.5 mm single 1.5+1.0 double 2.0+1.5 double 2.0+1.5 double + permalloy liner
SE 30 dB 60 dB 80 dB 100 dB / BMB3 C
Door seal Conductive rubber BeCu finger stock BeCu + rubber double Double door + double seal
Mains filter Single-stage 16 A Two-stage 32 A Two-stage 63 A 3-phase 3-phase 63 A medical low-leakage
Vent Honeycomb 6.4 mm Honeycomb 3.2 mm Honeycomb 3.2 mm Honeycomb 1.6 mm
Signal feedthrough Glands 4×RJ45 filtered + 2×DB9 8×RJ45 + 4×DB9 + 2×SMA 12-core fiber + all filtered
Cooling Natural 2×DC fans Heat exchanger Heat exchanger + ducted AC
Ground ≤4 Ω ≤4 Ω ≤1 Ω ≤0.5 Ω
Reference price (RMB) 38,000 68,000 96,000 168,000

11.3 Optional Accessories

  • Viewing window (metal-mesh glass): +RMB 4,500;
  • DC fan kit (2×120 mm, filtered): +RMB 2,800;
  • Air-to-air heat exchanger (1.5 kW): +RMB 18,000;
  • Monitoring expansion (temp/humidity/door/leak): +RMB 6,500;
  • Custom RAL color: +RMB 2,000;
  • Third-party SE test report (Ceprei / Secrecy Bureau): +RMB 12,000.

Chapter 12. FAQ (40 Questions)

Q1: Does a shielded cabinet block mobile phones?
A: Above 60 dB, phone signals inside will drop out — this is a quick field verification. Keep the door fully latched.

Q2: Shielded cabinet vs. shielded room?
A: A shielded room is an entire room, large and expensive (hundreds of thousands to millions RMB). A shielded cabinet protects selected racks, flexibly and cheaply.

Q3: Can I put a WiFi router inside?
A: No — the cabinet blocks WiFi by design. For wireless, convert internal devices to fiber and place the AP outside.

Q4: Price difference between 37U and 42U shielded cabinets?
A: Shielded-cabinet price is dominated by structure and filters; each 6 U step is ~10–15% price delta. 37 U is ~RMB 8k–15k cheaper than 42 U.

Q5: How thick a ground wire?
A: ≥16 mm² multi-strand copper, ≤2 m long.

Q6: Does shielding hurt cooling?
A: Yes. Natural convection handles 1.5–2 kW; above that add fans or a heat exchanger.

Q7: Filter leakage current trips RCD. What to do?
A: Switch to a low-leakage medical-grade filter (<0.1 mA) or add an isolation transformer between RCD and filter.

Q8: Server noise inside is loud.
A: The cabinet itself attenuates some noise. Add acoustic foam (does not affect shielding) or use a fully sealed heat exchanger.

Q9: Can the cabinet touch a wall?
A: No — leave ≥800 mm rear clearance for door opening and filter service.

Q10: Can I install it upstairs?
A: Weight 350–520 kg; verify floor loading and doorway / elevator dimensions.

Q11: Do I need a dedicated ground rod?
A: No — bond to the building equipotential busbar. A separate rod creates ground loops.

Q12: Does it block lightning?
A: The cabinet does not directly absorb direct strikes; add B+C surge protection on the mains entry.

Q13: Must Ethernet be fiber?
A: At 60 dB filtered RJ45 is acceptable; at 80 dB+ fiber recommended; at TEMPEST mandatory.

Q14: Design life?
A: Structure 15 years; finger stock 5 years (10⁵ cycles); filters 8–10 years.

Q15: Does SE degrade over time?
A: Yes — gasket oxidation, door warping, filter capacitor aging. Re-test annually.

Q16: Custom colors?
A: RAL7035 / RAL9004 standard; other RAL shades +RMB 2,000.

Q17: Do I need an air conditioner?
A: Above 4 kW internal load, add ducted precision AC or a heat exchanger.

Q18: Can it sit next to a standard rack?
A: Yes, but ground independently — do not share the ground busbar with unshielded racks.

Q19: Can I put a KVM switch inside?
A: Yes, but use a fiber KVM extender, not copper.

Q20: Does it block nuclear EMP?
A: Standard 60 dB units do not. A dedicated EMP-hardened version per MIL-STD-188-125 is quoted separately.

Q21: Do I need third-party testing?
A: Classified projects require a Secrecy-Bureau-authorized lab. Commercial projects can use KITOZER factory reports.

Q22: Where does the UPS go?
A: UPS is a noise source. Place UPS outside, batteries inside, or use DC power feeds.

Q23: Can I mount an LED display?
A: Yes, but the video cable must exit as fiber.

Q24: Can I tape the door seam as a temporary fix?
A: Copper foil tape works as an emergency measure but is not a replacement for finger stock.

Q25: Can I move it after installation?
A: Optional casters available, but recalibrate door seal and ground after moving.

Q26: Does it block 50 Hz magnetic fields?
A: Plain steel is limited at low frequencies; add a permalloy liner for 40 dB+ at 50 Hz.

Q27: Does it block audio surveillance?
A: No — shielding blocks EM, not sound. Acoustic enclosures are a different product.

Q28: Is a shielded cabinet the same as a classified document cabinet?
A: No. A document safe is physical security; a shielded cabinet is EM security.

Q29: Can I store magnetic tape or HDD inside?
A: Yes, but verify low-frequency fields are suppressed first.

Q30: Why such a wide price range?
A: From RMB 38k to 168k, the delta is steel layers, gasket grade, filter performance, and BMB3 certification.

Q31: Lead time?
A: Standard 15 working days; custom panels 25–35; TEMPEST certified 45–60.

Q32: Warranty?
A: 3 years whole unit; 2 years filters; 1 year finger stock (wear part).

Q33: Who installs?
A: KITOZER offers on-site installation (free within Guangdong province; travel cost outside Guangdong) or provides an install manual for customer electricians.

Q34: Can I stack cabinets?
A: No — stacking breaks the bottom seal and grounding continuity.

Q35: Interior lighting?
A: LED strips with filtered supply, or fiber-optic lighting with the light source outside.

Q36: Can I add an electric strike?
A: Possible but the lock wiring must be filtered; the strike itself is a noise source. Mechanical three-point locks are preferred.

Q37: Fire code?
A: Shielded cabinets do not interfere with sprinklers; add gas-suppression detectors inside as required by the room.

Q38: Can I export it?
A: Yes — English nameplate, CE declaration, English install manual, EIA-compatible 19-inch rails.

Q39: Does it integrate with KITOZER KX600 monitoring?
A: Yes — KX600 monitors temp, humidity, door, leak and voltage, and uploads to the cloud.

Q40: Most common selection mistakes?
A: Three: (1) choosing by steel thickness instead of measured SE; (2) forgetting to count cables so the feedthrough panel is undersized; (3) bad grounding that tanks measured SE far below spec.


Chapter 13. Packing, Delivery, Warranty, CTA and Company Info

13.1 Packing

  • Full EPE foam wrap + double bubble film;
  • Export-grade fumigation-free plywood crate with internal timber bracing;
  • Doors and filter panels foam-locked to prevent finger stock deformation in transit;
  • Accessory pack (ground wire, M8 bolts, keys, certificate, test report) in a waterproof bag inside the crate.

13.2 Delivery

  • Standard: 15 working days after PO;
  • Custom: 25–35 working days;
  • TEMPEST certified: 45–60 working days (includes third-party test);
  • Logistics: dedicated truck within Guangdong; insured LTL freight nationwide; FOB/CIF for export.

13.3 Warranty

  • 3 years whole unit (excluding misuse and force majeure);
  • 2 years filters;
  • 1 year finger stock (wear part);
  • Lifetime paid maintenance; 24 h response in Guangzhou, 48 h on-site elsewhere.

13.4 Call to Action

For selection guidance, site survey, sample SE test reports, or BMB3 case studies, contact:

  • Phone / WeChat: +86 18520668845 | +86 13922289957
  • WhatsApp: +86 19068534140
  • Web: www.gdlain.com | www.lain.com.cn
  • Company: Guangzhou Lian Intelligent System Development Co., Ltd. (Brand: KITOZER)
  • Address: Guangzhou, Guangdong, China (full address provided upon business inquiry)

Note: All technical parameters in this whitepaper are design targets. Final values per contract and third-party test reports. Reference prices include tax and shipping in RMB; final quotation based on the confirmed configuration list.

Slug: 37u-rf-shielded-cabinet-emiemc-tempest-guide
SEO Title: KITOZER 37U RF Shielded Cabinet | EMI/EMC/TEMPEST Faraday Cage Guide
Meta Keywords: 37U shielded cabinet, EMI shielded rack, TEMPEST cabinet, Faraday cage server rack, BMB3 shielded enclosure, KITOZER
Meta Description: KITOZER 37U RF-shielded cabinet delivers 60–100 dB EMI/EMC/TEMPEST protection for classified rooms, finance, MRI and EMC labs. Filters, honeycomb vents, fiber feedthroughs. Call +86 18520668845.


附录 B 英文深度技术补充(再扩写 ≥10,000 words)

Appendix A. Engineering Deep Dive (EN)

A.1 Skin Depth Reference Table

Skin depth δ (in mm) is the foundational physical quantity for absorption-loss design. The following table is used directly by KITOZER application engineers:

Frequency Copper Aluminum Low-carbon steel Stainless 430 Permalloy (μr≈10⁴)
50 Hz 9.4 11.9 0.78 0.13 0.0012
10 kHz 0.66 0.84 0.055 0.009 0.000086
100 kHz 0.21 0.27 0.017 0.0028 0.000027
1 MHz 0.066 0.084 0.0055 0.0009 0.0000086
10 MHz 0.021 0.027 0.0017 0.00028 —
100 MHz 0.0066 0.0084 0.00055 — —
1 GHz 0.0021 0.0027 — — —

Three engineering takeaways: (1) at 50 Hz, copper and aluminum offer essentially zero absorption; only high-permeability materials work. (2) Above 10 kHz, 1.5 mm steel is more than enough. (3) Above 100 MHz, even 0.1 mm copper is overkill — the bottleneck is entirely seams and apertures.

A.2 Reflection Loss Quantitative Estimate

For far-field plane waves: R = 168 – 10·log10(μr·f/σr), f in MHz. For copper (μr=1, σr=1): R=168 dB at 1 MHz, 138 dB at 1 GHz. High-frequency plane waves are reflected by copper almost perfectly.

Near-field behavior differs. Near-field electric (high-impedance, high-voltage low-current sources) sees even higher reflection. Near-field magnetic (low-impedance, high-current low-voltage, e.g. VFD output) sees much lower reflection. This is why VFD low-frequency magnetic shielding is hard — low impedance AND low frequency. Engineering response: increase distance, thicken steel, add permalloy liner.

A.3 Three-Skin-Depth Rule

A widely cited rule: shield thickness ≥3δ gives ~26 dB absorption; ≥5δ gives ~43 dB; ≥10δ gives ~87 dB. For copper at 1 MHz (δ=0.066 mm), 3δ=0.2 mm suffices for 26 dB, but structural and corrosion margins push us to 1.5 mm. For 50 Hz, copper δ=9.4 mm — impractical, hence magnetic materials.

A.4 Aperture Leakage Empirics

NBS experimental curves show a slot’s shielding is roughly the inverse of its free-space antenna gain. When L = λ/2, leakage peaks and SE vanishes. When L < λ/10, SE ≈ 20·log10(λ/(2L)) dB. For a 10 mm slot at 1 GHz (λ=300 mm): SE ≈ 23.5 dB. At 100 MHz (λ=3 m): SE ≈ 43.5 dB. This is why door gaskets must close the gap to zero — even a 1 mm gap at 1 GHz can cost 40 dB.

A.5 Waveguide-Below-Cutoff Attenuation

Inside a below-cutoff waveguide: α = (2π/λc)·√(1-(f/fc)²). For f << fc, α ≈ 2π/λc. Engineering shorthand: for a circular tube of diameter d, each 10 mm length gives ~32/d dB attenuation. For d=3.2 mm, L=25 mm: single tube ~25 dB. A honeycomb panel contains hundreds of parallel tubes, each an independent leak channel; measured panel SE at 1 GHz exceeds 80 dB thanks to multi-reflection at the frame.

A.6 Door Gasket Engineering

A.6.1 Beryllium Copper Finger Stock

BeCu (C17200) is the gold standard. Solution-treated and aged to HV380, it retains elasticity through 10⁵ compressions. KITOZER spec:
– Wire 0.25 mm, finger width 1.5 mm, pitch 2.5 mm;
– Free height 6.5 mm, working compression 1.5 mm (~23%);
– Contact resistance <2.5 mΩ;
– SE ≥100 dB, 10 kHz–1 GHz;
– Temperature -55 to +125 °C;
– After 10⁵ cycles contact resistance change <20%.

Why not stainless? Elastic but only 2% of copper conductivity — high-frequency contact resistance poor. Why not conductive rubber? Works for static flanges, but coating wears after 10⁴ closures, compression set high. KITOZER Pro and above use “BeCu primary + conductive rubber secondary” dual seal.

A.6.2 Three-Point Latch Mechanics

Uniform gasket compression requires distributed force. KITOZER three-point vertical-rod lock pushes top, middle, bottom simultaneously. A single-point latch bows the door center 0.5 mm+, causing 20 dB SE loss at mid-door.

Door leaf stiffness: a 1.5 mm flat plate 1 m wide × 2 m tall sags ~2 mm in the middle. KITOZER welds three vertical 20 mm channel stiffeners, controlling deflection to <0.5 mm.

A.6.3 Viewing Window

Metal-mesh laminated glass. Higher mesh count = better shielding but less light. 100-mesh (0.1 mm wire, 0.15 mm aperture) gives 60 dB at 1 GHz with ~70% light transmission. 200-mesh option gives 80 dB at 55% transmission. Window edges sealed with conductive rubber — never plain glass silicone.

A.7 Filter Engineering Deep Dive

A.7.1 50 Ω Lab vs. Real-World Impedance

Datasheet insertion loss is measured at 50 Ω source/load. In the field, grid impedance is a few to tens of ohms; switching-power-supply impedance is hundreds to thousands of ohms at high frequency. Mismatch can degrade real-world IL by 20–40 dB. Mitigations: choose “broadband insensitive” filters; add ferrite beads on the output; leave 20 cm straight lead before and after the filter.

A.7.2 Leakage Current and RCD

I_leak = 2π·f·C·V. For C=4.7 nF at 230 V/50 Hz: 0.34 mA. On a 3-phase system, three Y caps sum to ~1 mA, tripping 30 mA RCDs. KITOZER medical edition drops Y caps to 1 nF for <0.1 mA at a small high-frequency penalty. Industrial sites use 300 mA or time-delayed RCDs.

A.7.3 Three-Phase Common-Mode Choke

If neutral current is unbalanced (many single-phase loads), the common-mode choke saturates and loses effect. KITOZER Premium uses a five-limb CM choke (three phase limbs + center zero-sequence limb) specifically for unbalanced loads.

A.7.4 Filter Failure Modes

Filters rarely short; they age: Y caps lose 2–5% capacitance per year at high temperature. After 10 years, 4.7 nF may drift to 2 nF, losing 7 dB IL. LCR-test Y caps every 5 years.

A.8 Grounding Myths

A.8.1 Single-Point vs. Multi-Point

Low-frequency (<100 kHz) systems use single-point grounding to avoid loops. High-frequency (>10 MHz) systems use multi-point because a 1 m wire has ~1 µH inductance — at 100 MHz that’s 628 Ω, effectively open. Shielded cabinets are mixed: single point to earth, multi-point within the cabinet. All metal panels bond 360° internally; only one busbar goes to the building earth.

A.8.2 Ground-Wire Inductance

A 1 m, 6 mm² copper wire has 3 mΩ DC resistance but ~628 Ω inductive reactance at 100 MHz. High-frequency shielding currents therefore flow on the cabinet skin itself; the ground wire is only for 50 Hz safety and potential equalization. This is why panel-to-panel bonding matters more than wire gauge.

A.8.3 Ground Loops

Two equipment at different earth points with a potential difference form a ground loop. Loop current induces common-mode voltage on signal cables. Shielded rooms tie all cabinets to one equipotential busbar; cable shields are grounded at one end only to avoid loops.

A.8.4 Ground Resistance Testing

Three-pole method: current rod C at 20 m, voltage rod P at 40 m. Test in dry weather; post-rain 48 h readings are artificially low. KITOZER ships the cabinet with a bonded ground bar and recommended wire gauge; on-site testing is the customer’s electrical contractor’s responsibility.

A.9 Thermal Calculations

A.9.1 Natural Convection Budget

For a sealed 2 m cabinet, surface convection h≈5 W/(m²·K), A≈4 m², ΔT=15 K: Q≈300 W by surface alone. But honeycomb vents allow internal-external air exchange, raising practical natural-convection capacity to 1.5–2 kW.

A.9.2 Forced Airflow Requirement

Q_air = P / (ρ·Cp·ΔT_air). For P=3 kW, ρ=1.2, Cp=1005, ΔT=10 K: Q=0.249 m³/s ≈ 15 m³/min. Two 120 mm DC fans deliver ~6 m³/min total — enough for ~1.2 kW. Above that, use four fans or a heat exchanger.

A.9.3 Air-to-Air Heat Exchanger

Plate-type air-to-air HX with ε=0.6–0.7. KITOZER 1.5 kW HX: at 35 °C ambient, internal holds 45 °C; at 40 °C ambient, 52 °C. HX itself occupies 300 mm of top height, reducing usable U-space from 37 to 33 U.

A.9.4 Duct Penetration Shielding

Ducted precision-AC connections require a shielded air damper at the wall — a 200 mm long rectangular waveguide section with internal honeycomb. Otherwise the duct is a giant leak. KITOZER supplies a 315 mm circular shielded damper, SE≥60 dB.

A.10 Case Studies

A.10.1 Provincial Bank Core Room

12 × 1U front-end processors, HSMs, and card-clearing servers previously in a standard 42U rack suffered two clearing outages from external EMI. Two KITOZER-SHC-37U-Premium (80 dB) units deployed: 63 A three-phase two-stage filters, 12-core single-mode fiber bulkheads, fiber KVM to the ops floor, ≤1 Ω ground. No further outages; passed head-office EMC acceptance. Reference: RMB 230,000 for two units including fiber KVM.

A.10.2 Tertiary Hospital MRI Suite

Acquisition computers in the room adjacent to a 1.5 T MRI crashed during scans. KITOZER-SHC-37U-Pro with medical low-leakage filter (<0.1 mA) and non-magnetic lock hardware. No more crashes during scanning. Reference: RMB 68,000.

A.10.3 Defense Research Institute HIRF Trial

Radar signal-processing chassis falsely triggered during HIRF testing. KITOZER-SHC-37U-Premium reinforced with 0.5 mm permalloy inner liner, raising magnetic SE to 60 dB. System stable at 200 V/m field. Reference: RMB 128,000.

A.10.4 Provincial Secrecy Bureau Conference Room

Projection host, video-conference terminal and notebook charging cart required TEMPEST protection. KITOZER-SHC-37U-Tempest (BMB3 Class C), 12-core fiber bulkhead, BMB-certified mains filter. Passed on-site testing by a State Secrecy Bureau authorized lab. Reference: RMB 168,000 including third-party test.

A.10.5 Automotive Weld Shop PLC Remote IO

VFD-driven weld guns at 690 V caused 3–5 PLC resets per shift. KITOZER-SHC-37U-Std (30 dB), conductive rubber door seal, single-stage 16 A filter. Resets dropped to <1/month; line OEE improved 2.3%. Reference: RMB 38,000.

A.11 Maintenance and Troubleshooting

A.11.1 Why SE Degrades in the Field

  1. Door not fully latched — 80% of field failures. Test by clamping an A4 sheet around the perimeter; it should be uniformly gripped and not pull out.
  2. Finger-stock oxidation — measure door-to-frame resistance with a multimeter; >10 mΩ indicates oxidation.
  3. Y-capacitor aging — >50% capacitance loss.
  4. Customer-drilled holes without EMC glands.
  5. Broken or loose ground bond.
  6. Door leaf deformed by forklift impact.

A.11.2 Quick Field Diagnostics

  • Phone test: place a known number inside; if it cannot connect when door is latched, high-frequency shielding is roughly OK.
  • Walkie-talkie test: transmit 1 m outside on a 400 MHz radio; if the radio inside receives nothing, UHF shielding is roughly OK.

These are qualitative only — they do not replace GB/T 12190 quantitative testing.

A.11.3 Maintenance Schedule

Item Interval Method
Door seal check Monthly A4 paper around perimeter
Finger-stock visual Annual Visual + multimeter
Honeycomb cleaning Annual Low-pressure N₂ blow
Ground resistance retest Annual Three-pole
Y-capacitor spot check Every 5 years LCR meter
Whole-cabinet SE retest Every 3 years Third-party lab
Filter replacement Every 8–10 years Full replacement
Finger-stock replacement Every 5 years or when SE drops 10 dB Full strip replacement

A.12 Integration With Other Protection Products

A.12.1 Shielded Cabinet vs. Shielded Room

A shielded room is an entire enclosure, expensive (hundreds of thousands to millions). A shielded cabinet protects selected racks, 10× cheaper. Classified rooms use both: the room as primary, the cabinet as secondary containment inside the room.

A.12.2 UPS Integration

UPS is itself a strong noise source (20–100 kHz IGBT switching). Place the UPS host outside; batteries may go inside. UPS output must pass through the in-cabinet filter. If UPS must be inside, use an online double-conversion model with a second-stage output filter.

A.12.3 Surge Protection

The cabinet does not absorb direct lightning. B-class surge (100 kA) at the building/distribution cabinet, C-class (20 kA) before the in-cabinet filter. Lightning protection depends on surge devices and filters, not steel thickness.

A.12.4 KVM Extenders

Copper KVM breaks shielding. Use fiber KVM extenders: transmitter inside, receiver outside, fiber in between. KITOZER supplies 4K HDMI fiber KVM up to 300 m.

A.13 Standards and Certification Ecosystem

A.13.1 Chinese Standards

  • GB/T 12190-2021 — Shielding effectiveness measurement for shielded enclosures;
  • GB/T 25711-2010 — Shielding material SE measurement;
  • GB 50174-2017 — Data center design (equipotential and grounding);
  • BMB3-1999 — Technical requirements and test methods for shielded cabinets against compromising emanations;
  • BMB17-2006 — Classification protection for classified information systems;
  • GJB 6190-2008 — Military shielded material measurement.

A.13.2 International Standards

  • IEEE Std 299-2006 — SE measurement method;
  • NIST TN 1351 — Shielded room measurement;
  • MIL-STD-188-124A — Fixed/transportable shelters;
  • MIL-STD-188-125 — EMP hardening;
  • EN 50147 — European shielded enclosures;
  • NSA/CSS 94-106 — TEMPEST zones and equipment.

A.13.3 Certification Bodies

Domestic: CEPREI, China Information Technology Security Evaluation Center, State Secrecy Bureau authorized labs, NIM. International: TÜV Rheinland, Intertek, UL, SGS. KITOZER cooperates with whichever lab the customer specifies.

A.14 Cost Breakdown

A KITOZER-SHC-37U-Pro at RMB 68,000 decomposes approximately as:

Item Share Amount (RMB)
Double-sheet steel fabrication 25% 17,000
BeCu finger stock + conductive rubber 12% 8,200
Mains filter (two-stage 32 A) 18% 12,200
Signal filtered feedthrough panel 12% 8,200
Honeycomb vents ×2 6% 4,100
Ground busbar + accessories 3% 2,000
Welding + painting + assembly labor 12% 8,200
Factory test + report 5% 3,400
Packing + shipping 4% 2,700
Margin 3% 2,000

Filters and gaskets together are 30% — the core cost delta vs. a standard rack.

A.15 Common Selection Mistakes

  1. Comparing price without comparing configuration: two “60 dB” cabinets can differ 30% in price and 20 dB in actual SE depending on steel thickness and gasket type. Always inspect configuration list and third-party reports.
  2. Forgetting thermal budget: customers fill 37 U with 6 kW of servers, then hit 60 °C alarms. Calculate heat first.
  3. Undersized ground wire: 4 mm² has too much HF inductance; use ≥16 mm².
  4. Unfiltered Ethernet: cheap RJ45 bulkheads drop SE to 30 dB at 1 GHz.
  5. Door not fully latched by operators.
  6. Customer-drilled holes without glands.
  7. Filter input and output bundled together — HF bypass.
  8. Stacking equipment on top of the cabinet, crushing honeycombs.

Final CTA (Reinforced)

KITOZER 37U shielded cabinets are engineered, manufactured and tested in Guangzhou, China by Guangzhou Lian Intelligent System Development Co., Ltd. Every unit ships with a factory GB/T 12190 test report, and can be tested by any third-party lab the customer designates.

Hotline / WeChat: +86 18520668845 | +86 13922289957
WhatsApp: +86 19068534140
Web: www.gdlain.com | www.lain.com.cn
Slug: 37u-rf-shielded-cabinet-emiemc-tempest-guide

Reference prices are marked at ×2 for budgetary planning, include tax and RMB domestic shipping, and are subject to final configuration quotation. Technical parameters are design targets; contract values and third-party test reports prevail.


附录 D 英文补充:Industry Deep Dive, Standards, Project Workflow (EN)

D.1 Financial Data Center Deep Dive

D.1.1 Why Finance Is Special

Bank clearing transactions complete in milliseconds; a single PSU reset can cause a timed-out transaction and reconciliation exceptions. HSM (Hardware Security Module) electromagnetic emanations can leak keys via side-channel attacks. Financial shielding sits between industrial and classified: 80 dB grade, fiber KVM, dedicated grounding, DCIM integration — but not necessarily BMB3.

D.1.2 Typical Bank Room Layout

A provincial branch core room typically has: two rows of standard 42U racks (10 per row), enclosed hot/cold aisles, a power battery room (UPS + batteries), a network room (core switches, routers, firewalls), and an ops KVM area. KITOZER shielded racks are placed next to the core switch, next to the HSM, and in the front-end processor zone. They sit alongside standard racks but ground independently.

D.1.3 Finance Acceptance Criteria

  • SE ≥80 dB across 10 kHz–1 GHz (third-party lab);
  • Ground resistance ≤1 Ω;
  • Mains filter CM insertion loss ≥100 dB (100 kHz–30 MHz);
  • All Ethernet converted to fiber — no copper exits;
  • Internal temp/humidity/door/leak sensors integrated into DCIM;
  • Dual power feeds, each with its own filter.

D.2 Medical EMC Deep Dive

D.2.1 Medical EMC Standards

YY 0505-2012 (equivalent to IEC 60601-1-2) governs medical electrical equipment. Shielded cabinets are needed in MRI suites, CT rooms, DSA, ICU/NICU, operating theaters, and linac bunkers.

D.2.2 MRI Suite Electromagnetic Environment

A 1.5–3 T MRI produces: static field 0.5 mT at 5 m (ferromagnetic objects become projectiles); gradient switching at 200 T/m/s (induces volts of spikes in nearby electronics); RF pulses at 64–128 MHz at kW levels (induces volts on nearby cables). KITOZER-Pro racks in the adjacent equipment room protect acquisition computers and sequence consoles.

Critical constraints:
– Lock hardware must be non-ferromagnetic (won’t become projectiles);
– No ferromagnetic tools inside;
– Mains filter leakage <0.1 mA (BF application);
– Cabinet ≥5 m from the magnet.

D.2.3 ICU Central Monitoring

ICU central stations receive from 12–24 bedside monitors. The central server must be shielded, but wireless antennas must be routed outside the cabinet — never inside.

D.2.4 Extra Medical Requirements

Anti-microbial, wipeable coating; stainless or aluminum (non-magnetic) locks; <0.1 mA leakage; YY 0505 compliance; audible noise <40 dB(A).

D.3 Defense and Military Deep Dive

D.3.1 HIRF Environment

High Intensity Radiated Fields near radar sites reach 100–500 V/m. KITOZER-Premium racks protect EUTs in HIRF trials: double-skin steel, dual door seals, MIL-STD-188-124A filters, all-fiber penetrations, internal absorber foam.

D.3.2 EMP Hardening

Nuclear EMP has nanosecond rise, DC–100 MHz spectrum, 50 kV/m field. Standard cabinets do not protect against EMP. EMP-hardened build: three skins (copper + steel + permalloy), MIL-STD-188-125 filters with ≥140 dB IL (10 kHz–100 MHz), pF-class feedthrough capacitors, ≤0.1 Ω ground, military gaskets. KITOZER EMP-hardened 37 U priced separately, typically RMB 380k–560k.

D.3.3 Vehicle / Shelter Mounting

KITOZER can custom-build for vehicle and shelter mounting: rubber-spring shock isolators at the base, aluminum skin (lighter at a 10 dB SE penalty), MIL-DTL-38999 circular connectors.

D.4 Industrial Field Deep Dive

D.4.1 VFD Radiation Spectrum

VFD output PWM switches at 2–16 kHz. Harmonic spectrum extends to tens of MHz. Typical interference bands: 2–150 kHz (low-frequency conducted, affects analog sensors); 150 kHz–30 MHz (near-field radiated, affects PLC comms); 30–300 MHz (far-field, affects wireless). KITOZER-Std (30 dB) targets 150 kHz–30 MHz near field; Pro (60 dB) extends to 300 MHz.

D.4.2 Servo Drives

Servo drives switch at 8–32 kHz with high-speed differential encoder feedback (25 Mbps–1 Gbps). KITOZER-Pro racks protect nearby PLCs. Inside the shielded cabinet: separate power and encoder cable runs; shielded twisted encoder cables 360° terminated. Never put the servo drive itself inside — it is the noise source.

D.4.3 Substation Secondary Switchgear

GB/T 14598 (IEC 60255) sets EMC for secondary equipment. KITOZER cabinets host process-layer switches in smart substations, dispatch data-network panels, and GPS/Beidou clock systems. Build: -25 to +70 °C operating, DL/T 721 power-industry filters, ≤0.5 Ω ground.

D.4.4 Rail Transit Wayside

Trackside signal cabinets face thousands-of-amperes traction return currents producing low-frequency magnetic fields. KITOZER can add 0.5 mm silicon-steel inner liner for 50 Hz magnetic shielding; meet GB/T 24338 rail EMC and GB/T 21563 vibration.

D.5 Research Laboratory Deep Dive

D.5.1 Weak-Current Measurement

STM, AFM and photomultiplier outputs are pA–nA level; even 1 mV/m ambient fields induce measurable noise across high-impedance inputs. KITOZER-Pro houses the IV-conversion preamp, data-acquisition card, and low-noise supply. The door stays closed during measurement (operator movement induces magnetic interference); observation window uses mesh glass; remote fiber KVM.

D.5.2 Quantum Computing Control

Dilution-refrigerator qubit control uses room-temperature DAC/ADC/microwave sources connected by coax. Coax is an antenna that picks up ambient noise. KITOZER-Premium racks room-temperature electronics with shielded coax feedthroughs and internal absorber.

D.5.3 5G/6G RF Labs

5G massive-MIMO OTA testing needs shielded auxiliary racks for signal sources and spectrum analyzers.

D.6 Standards Deep Dive

D.6.1 BMB3-1999 Clause Walkthrough

  • Clause 4.1 frequency coverage: magnetic 14 kHz–1 GHz; electric 10 kHz–1 GHz; microwave 1.4–10 GHz;
  • Clause 4.2 grading: A (60 dB), B (70 dB), C (80 dB magnetic + 60 dB microwave);
  • Clause 4.3 mains filter: CM IL 80/90/100 dB across 10 kHz–30 MHz for A/B/C;
  • Clause 4.4 signal interfaces: classified equipment signals must use fiber or Secrecy-Bureau-certified filtered connectors;
  • Clause 5 test method: per GB/T 12190;
  • Clause 6 inspection: factory + type test, every unit ships with a report.

D.6.2 GB/T 12190-2021 Clause Walkthrough

  • Transmit antennas: loop (10 kHz–30 MHz magnetic), bicone (30–300 MHz), double-ridged horn (300 MHz–18 GHz);
  • Receive antenna at enclosure center, 1.5 m height;
  • Transmit antenna 30 cm outside wall;
  • Background must be 10 dB above expected SE;
  • 1/3-octave frequency steps;
  • Report includes setup drawing, antenna positions, frequency data, environment, instrument calibration certs.

D.6.3 IEEE 299 vs. GB/T 12190

IEEE 299 covers 9 kHz–18 GHz; GB/T 12190 covers 9 kHz–10 GHz. IEEE requires denser grid (every 3 m) for large rooms. Reports are mutually recognizable.

D.7 Project Workflow

D.7.1 Pre-sales

  1. Customer provides requirements: protection grade, equipment list, site photos, grounding conditions;
  2. KITOZER issues proposal: configuration, reference price, layout drawing;
  3. Customer confirms and signs contract;
  4. KITOZER detailed design: feedthrough panel per customer cable list;
  5. Production kickoff.

D.7.2 Manufacturing

  1. Sheet metal cutting, bending, welding;
  2. Stress-relief annealing of weldments;
  3. Phosphate + powder coat;
  4. Install finger stock, locks, filters;
  5. Internal wiring and ground busbar;
  6. Factory full-band EMC test;
  7. Issue test report.

D.7.3 Delivery

  1. Plywood crate packing;
  2. Dedicated truck / LTL freight;
  3. Site placement and anchoring;
  4. Ground and cable connections;
  5. Customer acceptance (third-party test if scheduled);
  6. Operator training.

D.7.4 After-sales

  1. 7-day phone follow-up;
  2. 30-day on-site recheck;
  3. Free on-site service within 1-year warranty;
  4. Annual preventive maintenance (per contract);
  5. Lifetime paid maintenance.

D.8 Compliance Notes

All KITOZER marketing materials:
– Avoid absolute superlatives prohibited by advertising law;
– Prices marked as reference / ×2, no lowest-price promises;
– Shielding figures marked as design targets, third-party measurement prevails;
– No customer names or project details;
– No prohibited terminology;
– Comply with PRC Advertising Law, State Secrets Law, and National Security Law.


Extended FAQ Part 2 (Q41–Q80)

Q41: Can KITOZER shielded cabinets be used outdoors?
A: Standard cabinets are indoor only. For outdoor use, order the outdoor stainless-steel IP65 variant (separate product family), which adds weatherproofing but reduces SE to 40 dB.

Q42: Can I install additional ventilation fans on my own?
A: Only if the fan supply passes through a filter. Unfiltered DC fan power will leak brush noise along the cable. KITOZER sells a pre-filtered fan kit.

Q43: What if my site ground resistance is 8 Ω instead of 1 Ω?
A: SE will still work at high frequency (skin effect on cabinet skin), but low-frequency equipotential bonding suffers. KITOZER can recommend a ground-grid upgrade.

Q44: Can I mix KITOZER 37U with other brand cabinets in the same row?
A: Yes, but keep KITOZER’s ground bond independent. Do not daisy-chain ground wires between cabinets.

Q45: Does the cabinet need seismic bracing?
A: In seismic zones, add top cable-tray bracing to the wall. KITOZER provides seismic brackets as an option.

Q46: How do I clean the outside?
A: Damp cloth with neutral detergent. Do not use abrasive pads on the powder coat. Do not pressure-wash the vent panels.

Q47: Can I paint the cabinet a different color after delivery?
A: No — paint on the door sealing surface destroys contact conductivity. If you must paint, mask the gasket contact areas.

Q48: What about rodents?
A: Honeycomb vents are small enough (1.6–3.2 mm) to exclude rodents. Bottom cable glands sealed.

Q49: Can I route fiber through the cabinet without a fiber bulkhead?
A: Fiber itself is fine, but the hole in the cabinet wall must be sealed with a fiber bulkhead plate — an open hole is a slot-antenna leak.

Q50: Does the cabinet have a lock?
A: Yes, three-point vertical rod lock with two keys. Optional electric strike for access control integration.

Q51: What if I need more than 8 filtered RJ45?
A: KITOZER can add a second signal panel (2 U additional) with up to 16 filtered RJ45. Each additional panel ~RMB 4,500.

Q52: Can the cabinet be wall-mounted?
A: No, it is floor-standing. 350–520 kg weight precludes wall mounting.

Q53: Does it come with casters?
A: Optional. Casters are for initial positioning only; anchor the cabinet with the four M12 bolts.

Q54: How wide is the door opening?
A: Door leaf opening is ~600 mm. Standard 19-inch equipment slides in from front or rear.

Q55: Can I remove the doors during equipment loading and reinstall later?
A: Yes. Doors are hinged and removable by pulling the hinge pins. After reinstalling, recheck finger-stock compression.

Q56: What is the cabinet’s IP rating?
A: Not a standard IP-rated product. It is an EMC product, not weatherproof. Internal dust protection is roughly IP20.

Q57: Can I use it in a dusty factory environment?
A: Yes, but clean honeycomb vents quarterly. Add optional dust filter foam on the inlet (does not affect SE if it covers the honeycomb externally).

Q58: Does the cabinet radiate any RF itself?
A: No. It is passive steel. No electronics inside unless customer-loaded equipment radiates.

Q59: Can I put a UPS battery inside?
A: Yes, batteries are passive. But batteries vent hydrogen — ensure ventilation. Do not store flooded lead-acid inside a sealed cabinet; use VRLA.

Q60: What is the lead time for the Tempest version?
A: 45–60 working days including third-party Secrecy Bureau testing. Book early.

Q61: Can KITOZER provide a demo unit?
A: Demo units are available at the Guangzhou factory on site. For remote customers, KITOZER can ship a loaner against a deposit.

Q62: Do you offer training for our staff?
A: Yes — half-day on-site training at delivery covers door handling, gasket care, filter maintenance, SE quick tests.

Q63: What if our SE test fails after installation?
A: KITOZER engineer returns within 48 h (Guangdong) / 72 h (nationwide) to diagnose. Common causes: door not latched, cable pigtail, ground loose.

Q64: Can the cabinet be disassembled for moving through narrow corridors?
A: Doors, side panels, top cover are removable. Base cabinet can be split into two halves for tight corridors (+RMB 3,000 option).

Q65: What about fire suppression inside?
A: KITOZER can pre-drill gas-suppression nozzle penetrations (filtered). VESDA smoke detectors inside are standard option.

Q66: Does the cabinet support 3-phase 400 V 50 Hz or 480 V 60 Hz?
A: Yes. Order the voltage/frequency on the PO. Filters are rated for both.

Q67: What is the overload capacity of the mains filter?
A: 1.5× rated current for 1 hour. Not for continuous overload.

Q68: Can I daisy-chain two shielded cabinets?
A: Yes, with a shielded interconnection channel between them (optional, RMB 8,000). The channel must maintain 360° bonding.

Q69: Does KITOZER provide 19-inch shelves?
A: Yes — fixed shelves, vented shelves, sliding shelves, all in black powder coat, priced RMB 350–1,200 each.

Q70: Can I mount PDU inside?
A: Yes, but PDU power cord must connect to the filtered mains bar inside the cabinet, not to an external wall outlet.

Q71: What if I need N-type RF feedthroughs instead of SMA?
A: KITOZER can specify N-type feedthrough capacitors (DC–12 GHz, 50 Ω) as an option.

Q72: Does the cabinet come with a PDU?
A: No — PDU is ordered separately. KITOZER offers 16A/32A filtered PDU, RMB 1,800–3,500.

Q73: Can I put a monitor inside the cabinet?
A: Yes, but the monitor video cable must exit as fiber. The monitor itself is a strong TEMPEST source — use it only inside the shielded cabinet, not near the door.

Q74: How do I know if my finger stock needs replacement?
A: Visual inspection: if fingers are bent, flattened, or blackened, replace. Multimeter: door-to-frame resistance >10 mΩ. SE test: >10 dB drop from baseline.

Q75: Can I use conductive tape as a temporary gasket?
A: Copper foil tape works for a few days, but it does not have the elasticity of finger stock. It is an emergency fix only.

Q76: Does the cabinet have a ground-fault indicator?
A: Optional. KITOZER KX600 monitoring box can include ground-continuity monitoring.

Q77: What about lightning surges on signal lines?
A: Signal lines (especially outdoor fiber-to-copper converters) need signal-line surge protectors at the external end. KITOZER can add gas-discharge tube-protected feedthroughs.

Q78: Can the cabinet be shipped internationally?
A: Yes. Export-grade plywood crate, English docs, CE declaration. FOB Guangzhou or CIF destination port.

Q79: What is the warranty on the viewing window?
A: 1 year. Glass is a wear item — cracked glass must be replaced, not repaired.

Q80: How do I start a purchase order?
A: Call +86 18520668845 / 13922289957 or WhatsApp +86 19068534140. Send us your equipment list and site photos; we will return a configuration and quote within 2 working days.


End of whitepaper. Slug: 37u-rf-shielded-cabinet-emiemc-tempest-guide. Brand: KITOZER. Manufacturer: Guangzhou Lian Intelligent System Development Co., Ltd.


Appendix F. English Addendum: Installation Walkthrough, Glossary, Configuration Examples

F.1 Step-by-Step Site Installation Guide

This section is a deliverable checklist for the customer’s electrician.

F.1.1 Pre-installation

  1. Receiving inspection: check the packing list against cabinet, accessories, manual, certificate, test report. Visually inspect doors, side panels, honeycomb vents for transport deformation. Photograph any damage and contact KITOZER before installation.
  2. Tools: M12 expansion bolts ×4, 16 mm² yellow-green copper wire (length per site), M8 lugs ×4, multimeter (continuity), ground-resistance tester, spirit level, drill, torque wrench (10 N·m).
  3. Site prep: floor loading ≥600 kg/m²; doorway/elevator dimensions (cabinet 700×1000×2000 mm, packed ~800×1100×2100 mm); equipotential busbar location; equipment and cable list ready.

F.1.2 Placement and Anchoring

  1. Move cabinet with forklift/pallet truck.
  2. Remove transport bolts (if fitted).
  3. Level with spirit level, deviation ≤2 mm/m.
  4. Anchor 4 bottom holes with M12 expansion bolts to floor or channel plinth.
  5. Remove front/rear doors by pulling hinge pins (for internal wiring).
  6. Remove top cover (4× M6 screws) to expose top wiring zone.

F.1.3 Grounding

  1. Pick two spare positions on the site equipotential busbar.
  2. Run two 16 mm² yellow-green wires, one end with M8 lug to internal ground busbar left and right ends.
  3. Other end to site busbar, torque 10 N·m.
  4. Continuity-check with multimeter.
  5. Measure ground resistance with tester; record; escalate if out of spec.

F.1.4 Mains Entry

  1. Run a 5-core copper cable (YJV-5×10 mm² or per load) from external distribution.
  2. Enter through bottom-left filter gland.
  3. Filter housing bonded 360° to cabinet (no paint under bond).
  4. Filter output to internal MCB (32 A/3P), then UPS or PDU.
  5. Separate filter input (outside) and output (inside) harnesses, ≥100 mm apart.
  6. Add B+C surge arrester upstream if the row cabinet does not already have one.

F.1.5 Signal Penetration

  1. Inventory all external Ethernet, serial, RF cables.
  2. Convert Ethernet to fiber outside; fiber enters via bottom-right fiber bulkhead.
  3. Internal fiber transceivers at 1 U; fiber patch cords to device NICs.
  4. Serial via DB9 filtered panel.
  5. RF via SMA feedthrough capacitors.
  6. Cap unused feedthrough holes with metal plugs — no open holes.

F.1.6 Reinstall Doors

  1. Inspect BeCu finger stock for bending/oxidation.
  2. Clean with dry cloth.
  3. Rehang doors, insert hinge pins.
  4. Press handle down; verify uniform perimeter compression.
  5. Clamp an A4 sheet around the perimeter — it should be uniformly gripped.
  6. Cycle door 5 times; no binding.

F.1.7 Acceptance

  1. Phone test: a phone inside, door latched, cannot be called from outside.
  2. Walkie-talkie test: 400 MHz transmission 1 m outside, nothing received inside.
  3. Ground resistance: record on acceptance form.
  4. Power-on: bring up internal equipment one by one; check for alarms.
  5. Sign-off: customer and KITOZER engineer sign acceptance.

F.2 Glossary (EN-CN)

English 中文 Definition
Shielding Effectiveness (SE) 屏蔽效能 Attenuation by a shield, in dB
Faraday Cage 法拉第笼 Continuous conductive enclosure
Reflection Loss 反射损耗 Attenuation by surface reflection
Absorption Loss 吸收损耗 Attenuation by conversion to heat
Skin Depth 集肤深度 1/e penetration depth
Waveguide Below Cutoff 截止波导 Below-cutoff waveguide attenuation
Honeycomb Vent 蜂窝波导窗 Hexagonal tube array vent
BeCu Finger Stock 铍铜指形簧片 Beryllium-copper contact strip
Conductive Rubber 导电橡胶 Silvered silicone gasket
EMI Filter EMI 滤波器 Conducted-noise filter on mains
Common-Mode (CM) 共模 Line-to-earth noise
Differential-Mode (DM) 差模 Line-to-neutral noise
Insertion Loss (IL) 插入损耗 Filter attenuation in dB
Leakage Current 泄漏电流 Y-capacitor current to earth
Feedthrough Capacitor 馈通电容 Feedthrough-mount filter cap
TEMPEST TEMPEST Emanation-security standard family
BMB3 BMB3-1999 Chinese classified cabinet standard
HIRF 高功率辐射场 High-intensity radiated fields
EMP 核电磁脉冲 Electromagnetic pulse
EUT 受试设备 Equipment under test
LISN 线路阻抗稳定网络 Line impedance stabilization network
RCD 漏电保护 Residual current device
VFD 变频器 Variable-frequency drive
HSM 硬件加密机 Hardware security module
KVM KVM 切换器 Keyboard-video-mouse extender
PDU 机柜电源 Power distribution unit
UPS 不间断电源 Uninterruptible power supply
DCIM 数据中心管理 Data center infrastructure management
VRLA 阀控铅酸电池 Valve-regulated lead-acid battery

F.3 Configuration Examples

F.3.1 EMC Lab Baseline

KITOZER-SHC-37U-Pro: double-skin 1.5+1.0 mm, BeCu door, 32 A single-phase two-stage filter, 4×RJ45 filtered + 2×DB9, 3.2 mm honeycomb, 2×120 mm DC fans. Purpose: EMC lab EUT auxiliary rack. Reference: RMB 68,000.

F.3.2 Bank HSM Rack

KITOZER-SHC-37U-Premium: double-skin 2.0+1.5 mm, three-point lock, 63 A three-phase two-stage filter, 8×RJ45 + 4×DB9 + 2×SMA, 1.6 mm honeycomb, 1.5 kW heat exchanger, 12-core fiber bulkhead. Reference: RMB 96,000 + RMB 18,000 HX = RMB 114,000.

F.3.3 Classified Conference Room TEMPEST Rack

KITOZER-SHC-37U-Tempest: double-skin 2.0+1.5 mm + permalloy liner, double shielded door, 63 A three-phase medical low-leakage filter, 12-core single-mode fiber bulkhead, 1.6 mm honeycomb, HX, third-party test. Reference: RMB 168,000 incl. test.

F.3.4 Factory PLC Remote IO

KITOZER-SHC-37U-Std: 1.5 mm single skin, conductive rubber seal, 16 A single-phase single-stage filter, M20 EMC glands ×8, 6.4 mm honeycomb. Purpose: weld-shop PLC remote IO. Reference: RMB 38,000.

F.4 Extended Reading

  1. GB/T 12190-2021;
  2. BMB3-1999;
  3. Henry W. Ott, Electromagnetic Compatibility Engineering, Wiley, 2009;
  4. Clyde R. Paul, Introduction to Electromagnetic Compatibility, Wiley, 2006;
  5. IEEE Std 299-2006;
  6. KITOZER website www.gdlain.com technical documents.

F.5 Full KITOZER Shielded Cabinet Family

Model U Grade Use case Reference (RMB)
SHC-12U-Std 12 30 dB Bench / small instrument 18,000
SHC-18U-Pro 18 60 dB Small lab rack 38,000
SHC-23U-Pro 23 60 dB Workstation shielding 48,000
SHC-37U-Pro 37 60 dB This whitepaper model 68,000
SHC-42U-Premium 42 80 dB Standard 42U shielded 108,000
SHC-47U-Tempest 47 100 dB Large classified rack 198,000
SHC-Custom Any Any Custom build Quoted

F.6 Shipping and Insurance

  • Within Guangdong: dedicated truck, door-to-room delivery.
  • Nationwide: insured LTL freight, customer pickup or paid inside delivery.
  • Export: FOB Guangzhou / CIF destination, fumigation-free plywood crate.
  • Insurance: KITOZER covers in-transit insurance; inspect on arrival, photograph damage and notify within 24 h.

F.7 Warranty and After-sales

  • Whole unit 3 years (non-wear parts).
  • Filters 2 years.
  • BeCu finger stock 1 year.
  • On-site response: Guangzhou 24 h, within province 48 h, nationwide 72 h.
  • Lifetime paid maintenance.

F.8 Company Information

  • Full name: Guangzhou Lian Intelligent System Development Co., Ltd.
  • Brand: KITOZER
  • Products: shielded cabinets, monitoring boxes, distribution cabinets, integrated racks, data-center engineering.
  • Web: www.gdlain.com | www.lain.com.cn
  • Phone / WeChat: +86 18520668845 | +86 13922289957
  • WhatsApp: +86 19068534140
  • Address: Guangzhou, Guangdong, China (full address on request).

Final SEO Block

  • Slug: 37u-rf-shielded-cabinet-emiemc-tempest-guide
  • Title: KITOZER 37U RF Shielded Cabinet | EMI/EMC/TEMPEST Faraday Cage 60–100 dB
  • Meta Keywords: 37U shielded cabinet, EMI shielded rack, TEMPEST cabinet, Faraday cage server rack, BMB3 shielded enclosure, RF shielded 19-inch cabinet, electromagnetic shield cabinet price, KITOZER shielded cabinet
  • Meta Description: KITOZER 37U RF-shielded cabinet delivers 60–100 dB EMI/EMC/TEMPEST protection for classified rooms, finance HSM, MRI, defense HIRF and EMC labs. Double-skin steel, BeCu finger stock, mains filters, honeycomb vents, fiber feedthroughs. Reference from RMB 38,000. Call +86 18520668845.
  • H1: KITOZER 37U Electromagnetic Shielded Cabinet Engineering Whitepaper
  • H2 sections: EMC Basics · Shielding Grades · Cabinet Anatomy · Mains Filters · Signal Feedthroughs · Honeycomb Vents · Applications · Grounding · SE Testing · Comparison · Selection Guide · FAQ · CTA
  • Author: KITOZER Technical Team
  • Source: Guangzhou Lian Intelligent System Development Co., Ltd.
  • Views target: 10,000+ (initial seed 10,000)
  • Attachments: factory SE test report (GB/T 12190), dimension drawing, cable list template, configuration checklist

End of document.


附录 G 中文补充:更多工程案例、故障排查与设计计算

G.1 更多工程案例详解

G.1.1 案例:某省级电力调度数据网屏柜

背景:省级电力调度中心的调度数据网接入屏柜,承担调度数据与生产控制大区之间的纵向加密。屏柜紧邻通信电源室,电源室的高频开关电源(48V/3000A)在通信母线上产生 150kHz~30MHz 共模噪声,导致纵向加密装置偶发数据丢包。

方案:KITOZER-SHC-37U-Premium 一台,80dB 级。柜内放纵向加密认证装置、数据网交换机、光配架。电源从通信电源室独立引一路 220V 直流,经柜内 DC-DC 变换后供电,DC-DC 模块加滤波。网线全部光纤贯通。接地接调度室等电位地网,电阻 ≤0.5Ω。

结果:数据丢包率从 0.3% 降到 0.001% 以下;通过电力调度中心 EMC 验收。
参考价:¥96,000。

G.1.2 案例:某车企智能网联汽车测试场

背景:智能网联汽车测试场的 5G-V2X 路侧单元(RSU)机柜,部署在十字路口旁。测试场附近有雷达测速设备和广播电台发射塔,RSU 接收的 GPS 信号和 PC5 直连通信信号受干扰。

方案:KITOZER-SHC-37U-Pro 室外型(不锈钢 IP55 改造),60dB 级。柜内放 RSU 主机、边缘计算单元、5G CPE。GPS 天线通过 SMA 馈通引出柜顶,5G 天线通过 N 型馈通引出。柜内温度由热交换器控制(户外夏天 50℃ 时柜内 ≤45℃)。

结果:RSU 定位精度从 5m 提升到 1.5m;PC5 通信丢包率从 5% 降到 0.5%。
参考价:¥88,000(含户外改造和热交换器)。

G.1.3 案例:某高校扫描电镜实验室

背景:扫描电子显微镜(SEM)的控制计算机和图像采集卡在 SEM 工作时出现图像噪声条纹。SEM 本身有屏蔽室,但控制计算机在屏蔽室外,数据线穿墙时带入噪声。

方案:KITOZER-SHC-37U-Pro 一台放在 SEM 屏蔽室内,柜内放控制计算机、采集卡、低噪声电源。视频线通过光纤贯通板穿出屏蔽室,到室外显示器。键盘鼠标通过光纤 KVM 延长器引出。

结果:图像条纹消失;分辨率从 1024×768 提升到 4K;通过学校设备处验收。
参考价:¥68,000。

G.1.4 案例:某芯片封装测试厂 ICT 测试工位

背景:芯片封装测试厂的 ICT(In-Circuit Test)测试工位,测试机周边有贴片机、回流焊、AOI 检测设备,电磁环境复杂。测试机偶尔出现误判(把合格品判为不合格)。

方案:KITOZER-SHC-37U-Std 一台,30dB 级,放测试机辅助电子设备(信号调理、开关矩阵)。测试机本体不进屏蔽柜(太大),但其信号调理机箱进屏蔽柜。

结果:误判率从 0.5% 降到 0.02%;每月节省复测成本约 2 万元。
参考价:¥38,000。

G.1.5 案例:某电视台播控机房

背景:电视台播控机房的主播切换台、视频服务器机架,要求绝对不能受外部干扰导致播出事故。附近 200m 处有一个手机基站。

方案:KITOZER-SHC-37U-Premium 一台,80dB 级。柜内放主切换台、视频服务器、字幕机。所有 SDI 视频线通过光纤延长器穿出。音频线通过平衡滤波贯通。

结果:连续 12 个月零播出事故;通过电视台技术部验收。
参考价:¥96,000。

G.2 故障排查手册

G.2.1 现象:柜内手机仍能接通

可能原因:
1. 门没关紧——检查门把手是否压到底;
2. 门缝被线缆卡住——检查门框四周有无异物;
3. 滤波器输入输出线交叉——重新整理;
4. 柜壁有未封堵的开孔——检查所有贯通孔。

G.2.2 现象:柜内设备频繁复位

可能原因:
1. 电源滤波器失效——用 LCR 表测 Y 电容;
2. 接地断开——检查接地母线连接;
3. 外部雷电浪涌——加 B+C 级防雷;
4. UPS 本身问题——单独测试 UPS。

G.2.3 现象:网线不通

可能原因:
1. 滤波 RJ45 损坏——换备用口;
2. 光纤收发器接错——检查 TX/RX 方向;
3. 网线线序不兼容——滤波 RJ45 支持 Auto MDI/MDI-X;
4. 网线过长——超过 100m。

G.2.4 现象:柜内温度过高报警

可能原因:
1. 风扇没启动——检查温控器设定;
2. 风扇电源滤波器坏——换滤波器;
3. 蜂窝窗灰尘堵塞——清洁;
4. 柜内功耗超设计——减少设备或加热交换器。

G.2.5 现象:第三方 SE 测试不达标

可能原因:
1. 门密封不均——重新调门锁;
2. 客户自钻孔未封堵——加屏蔽格兰头;
3. 接地电阻超标——整改接地;
4. 滤波器输入输出线并排——分开布线;
5. 现场环境本底太强——换测试场地或复测。

G.3 设计计算示例

G.3.1 散热计算示例

某客户要在柜内放 4 台 1U 服务器(每台 400W)+ 1 台 2U 交换机(100W),总功耗 1.7kW。环境温度 25℃。

  • 自然对流散热量约 1.5kW~2kW,1.7kW 在临界值;
  • 建议加 2 个 120mm DC 风扇,风量 3m³/min/个,总 6m³/min;
  • 风量计算:Q = 1700/(1.2×1005×10) = 0.14 m³/s = 8.4 m³/min;
  • 6m³/min 略不足,柜内温升约 ΔT = 1700/(1.2×1005×0.1) = 14K,柜内 39℃;
  • 可接受,但建议加第 3 个风扇或选 80CFM 大风量风扇。

G.3.2 接地电阻计算

现场土壤电阻率 ρ=100Ω·m,用 3 根 2.5m 镀锌角钢(∠50×5)垂直打入,间距 5m。单根接地极电阻 R = 0.366·ρ/l·log(4l/d) = 0.366×100/2.5×log(4×2.5/0.05) = 14.64×log(200) = 14.64×2.3 = 33.7Ω。三根并联(利用系数 0.7):R_total = 33.7/(3×0.7) = 16Ω。不满足 ≤1Ω,需要扩建设计或接大楼主接地网。

G.3.3 滤波器功率计算

柜内总功耗 1.7kW,220V 单相,电流 I = 1700/220 = 7.7A。选 16A 滤波器(余量 2 倍),泄漏电流 0.3mA,不触发 30mA RCD。如果选 32A 滤波器,Y 电容更大,泄漏 1mA,需要 100mA RCD。

G.3.4 波导窗衰减计算

3.2mm 孔径蜂窝板,厚度 25mm。截止频率 fc = 17.5/3.2 = 5.5GHz。在 f=1GHz 时,f/fc=0.18,衰减常数 α = (2π/λc)·√(1-0.18²)。λc = c/fc = 54mm。α = 2π/54 × 0.98 ≈ 0.114/mm。L=25mm,衰减 = 8.686×α×L = 8.686×0.114×25 = 24.7dB(单管)。实际蜂窝板因为有数百管并联和框架反射,1GHz 实测 80dB。

G.4 与竞争对手产品的对比思路

KITOZER 不主动贬低同行,但客户在选型时会拿其他品牌对比。建议客户从以下维度横向比较:

比较维度 看什么
屏蔽效能 第三方测试报告,不是厂方标称
钢板厚度 双层还是单层,实际厚度
门密封 铍铜簧片还是导电橡胶,几点锁紧
滤波器 品牌(瑞士夏弗纳/日本TDK/国产)、级数、泄漏电流
通风窗 孔径、厚度、材料
信号贯通 滤波 RJ45 还是普通 RJ45
接地 铜排规格、接地电阻要求
测试报告 是否每台出厂测试
质保 整机几年,簧片几年
参考价 配置是否一致(不能只比价格)

G.5 KITOZER 的差异化优势

  1. 每台出厂全频段测试:不是抽检,是 100% 全检;
  2. 贯通面板定制:按客户线缆清单定制,不凑数;
  3. 本地技术支持:广州工厂 24h 响应;
  4. 全系列覆盖:从 12U 桌面到 47U 机柜,从 30dB 到 100dB;
  5. 配套生态:KX600 监控箱、光纤 KVM、热交换器、PDU 一站式采购;
  6. 价格透明:参考价 ×2 标注,配置清单清晰。

Appendix H. English Addendum: More Case Studies, Troubleshooting, Design Calculations

H.1 More Case Studies

H.1.1 Provincial Power Dispatch Data Network Cabinet

Background: provincial dispatch center’s data-network access cabinet handles vertical encryption between dispatch data and production-control zones. The adjacent telecom power room’s high-frequency 48 V/3000 A switch-mode power produces 150 kHz–30 MHz common-mode noise, causing occasional packet loss on the encryption device.

Solution: KITOZER-SHC-37U-Premium (80 dB). Inside: vertical encryption appliance, data-network switch, optical distribution frame. Power drawn independently as 220 V DC from the telecom power room, filtered DC-DC conversion inside. All Ethernet converted to fiber. Ground to dispatch equipotential grid ≤0.5 Ω.

Result: packet loss dropped from 0.3% to <0.001%. Passed dispatch center EMC acceptance. Reference: RMB 96,000.

H.1.2 Connected-Vehicle Test Field RSU Cabinet

Background: 5G-V2X roadside unit at a smart-vehicle test field, next to a radar speed trap and a broadcast transmitter. RSU GPS and PC5 signals suffered interference.

Solution: KITOZER-SHC-37U-Pro outdoor stainless-steel IP55 variant (60 dB). Inside: RSU host, edge compute unit, 5G CPE. GPS antenna routed through SMA feedthrough to cabinet top; 5G antenna through N-type feedthrough. Internal temperature controlled by heat exchanger (50 °C ambient → ≤45 °C internal).

Result: GPS accuracy improved from 5 m to 1.5 m; PC5 packet loss from 5% to 0.5%. Reference: RMB 88,000 including outdoor conversion and HX.

H.1.3 University SEM Lab

Background: scanning electron microscope control computer and frame grabber showed image noise stripes during SEM operation. The SEM itself has a shielded room, but the control computer was outside, with the data cable entering through a generic wall penetration.

Solution: KITOZER-SHC-37U-Pro (60 dB) placed inside the SEM shielded room, housing the control computer, frame grabber and low-noise supply. Video exits via fiber bulkhead to an external monitor. Keyboard/mouse via fiber KVM extender.

Result: stripes gone; resolution improved from 1024×768 to 4K. Reference: RMB 68,000.

H.1.4 Chip Packaging Test Floor ICT Bench

Background: ICT test benches near SMT mounters, reflow ovens and AOI machines experienced occasional false failures (good parts flagged bad).

Solution: KITOZER-SHC-37U-Std (30 dB) houses the signal-conditioning chassis and switch matrix. The ICT tester itself is too large to fit; only the auxiliary electronics go in.

Result: false-failure rate dropped from 0.5% to 0.02%; monthly retest cost saved ~RMB 20,000. Reference: RMB 38,000.

H.1.5 TV Broadcast Control Room

Background: broadcast switcher, video servers and subtitle machines must never glitch. A cell tower 200 m away was suspected.

Solution: KITOZER-SHC-37U-Premium (80 dB). Main switcher, video server, subtitle machine inside. All SDI video converted to fiber; audio through balanced filtered feedthroughs.

Result: 12 consecutive months zero broadcast incidents. Reference: RMB 96,000.

H.2 Troubleshooting Handbook

H.2.1 Symptom: Phone still connects inside

Causes: door not latched; cable jamming the gasket; filter input/output crossed; unsealed penetrations.

H.2.2 Symptom: Equipment resets frequently

Causes: failed filter (LCR-test Y caps); broken ground bond; lightning surge upstream (add B+C arrestor); faulty UPS.

H.2.3 Symptom: Ethernet down

Causes: filtered RJ45 port failed (switch to spare); fiber transceiver TX/RX reversed; cable >100 m; Auto-MDIX issue.

H.2.4 Symptom: Internal over-temperature alarm

Causes: fan not running (check thermostat); fan supply filter failed; honeycomb clogged; internal power exceeds design (add HX).

H.2.5 Symptom: Third-party SE test fails

Causes: uneven door compression; customer-drilled holes; ground resistance out of spec; filter leads bundled; ambient background too strong.

H.3 Design Calculation Worked Examples

H.3.1 Thermal Example

Customer wants 4×1U servers (400 W each) + 1×2U switch (100 W) = 1.7 kW total. Ambient 25 °C.

Natural convection handles 1.5–2 kW — borderline. Add 2×120 mm DC fans (3 m³/min each, total 6 m³/min). Required airflow Q = 1700/(1.2×1005×10) = 0.14 m³/s ≈ 8.4 m³/min. 6 m³/min is slightly short; internal ΔT ≈ 1700/(1.2×1005×0.1) ≈ 14 K → internal 39 °C. Acceptable, but recommend a third fan or 80 CFM high-flow fans.

H.3.2 Ground Resistance Example

Soil resistivity ρ=100 Ω·m. Three 2.5 m galvanized angle irons (∠50×5) driven vertically, 5 m apart. Single rod R = 0.366·ρ/l·log(4l/d) = 0.366×100/2.5×log(200) ≈ 33.7 Ω. Three rods in parallel (utilization 0.7): R = 33.7/(3×0.7) ≈ 16 Ω. Fails ≤1 Ω — must extend the design or bond to the main building ground grid.

H.3.3 Filter Power Example

Internal load 1.7 kW, 220 V single phase: I = 7.7 A. Choose 16 A filter (2× margin), leakage 0.3 mA — safe on 30 mA RCD. A 32 A filter would have larger Y caps, ~1 mA leakage, requiring a 100 mA RCD.

H.3.4 Waveguide Attenuation Example

3.2 mm cell, 25 mm depth honeycomb. fc = 17.5/3.2 ≈ 5.5 GHz. At f=1 GHz, f/fc=0.18. α = (2π/λc)·√(1-0.18²), λc=54 mm, α≈0.114/mm. L=25 mm: single-tube attenuation = 8.686×0.114×25 ≈ 25 dB. With hundreds of parallel tubes plus frame reflections, measured panel SE at 1 GHz exceeds 80 dB.

H.4 How Customers Should Compare Vendors

KITOZER does not disparage competitors, but customers should compare on:

Dimension What to inspect
SE Third-party test report, not vendor label
Steel Double vs. single skin, actual thickness
Door seal BeCu vs. rubber, number of lock points
Filter Brand (SCHAFFNER / TDK / domestic), stages, leakage
Vent Cell size, depth, material
Signal feedthrough Filtered RJ45 vs. plain
Ground Busbar size, required resistance
Test report Every unit factory-tested?
Warranty Whole-unit years, finger-stock years
Price Like-for-like configuration

H.5 KITOZER Differentiators

  1. Every unit factory full-band tested (100%, not sample);
  2. Custom signal panels built per customer cable list;
  3. Local Guangzhou factory, 24 h response;
  4. Full family from 12 U desktop to 47 U rack, 30 dB to 100 dB;
  5. Ecosystem: KX600 monitoring, fiber KVM, heat exchangers, PDUs;
  6. Transparent pricing (×2 reference, clear BOM).

Closing Statement

This whitepaper has covered the physics, grades, structure, filters, vents, applications, installation, testing, comparison, selection, troubleshooting and commercial terms of the KITOZER 37U RF-shielded cabinet. For any further engineering support, custom configuration, or on-site survey, contact KITOZER at the numbers below.

Hotline / WeChat: +86 18520668845 | +86 13922289957
WhatsApp: +86 19068534140
Web: www.gdlain.com | www.lain.com.cn
Slug: 37u-rf-shielded-cabinet-emiemc-tempest-guide

— End of KITOZER 37U Shielded Cabinet Engineering Whitepaper v2 —


附录 I 中文补充:屏蔽机柜的电磁兼容设计哲学、常见误区深度剖析与未来趋势

I.1 电磁兼容设计哲学

I.1.1 系统思维:屏蔽不是孤立的

电磁兼容(EMC)是一个系统工程,屏蔽机柜只是其中一环。一个完整的 EMC 防护体系包括:
– 设备级:PCB 布局、滤波、屏蔽壳;
– 机柜级:屏蔽机柜、滤波贯通、接地;
– 机房级:屏蔽室、等电位接地、UPS 隔离;
– 系统级:布线分离、接地拓扑、运维规范。

只买屏蔽机柜而不做机房接地、不做线缆滤波,等于买了保险柜却不关门。KITOZER 工程师在项目售前阶段会主动询问客户的机房接地条件、线缆走向、UPS 位置,而不是只报价。

I.1.2 三点原则:屏蔽、滤波、接地

EMC 防护三要素:
1. 屏蔽(Shielding):阻断空间辐射;
2. 滤波(Filtering):阻断导线传导;
3. 接地(Grounding):给干扰电流提供低阻抗回流路径。

三者缺一不可。没有滤波,电源线和信号线就是穿墙天线;没有接地,屏蔽体上的感应电流无处可去,反而二次辐射;没有屏蔽,滤波和接地都无法阻断空间辐射。KITOZER 屏蔽机柜的设计就是把这三者集成在一个产品里。

I.1.3 3dB 法则与木桶效应

屏蔽机柜的系统屏蔽效能由最弱的一环决定。如果钢板 100dB、门缝 60dB、滤波器 80dB、通风窗 70dB,整柜 SE 就是 60dB(门缝决定)。这就是 EMC 的”木桶效应”。KITOZER 的设计目标是让所有环节的 SE 大致相当,避免某一环节成为瓶颈。

I.2 常见误区深度剖析

I.2.1 误区一:屏蔽柜越厚越好

很多客户以为钢板越厚屏蔽越好。实际上:
– 高频(>30MHz):1.5mm 钢板已经提供 100dB 以上反射损耗,再加厚到 3mm 只多 3dB,毫无意义;
– 低频(<100kHz):加厚钢板有一定效果,但不如加坡莫合金衬层;
– 加厚的代价:重量翻倍、价格上涨、散热更差。

正确做法:按频段选材料,高频用薄钢板+精密门缝,低频用高磁导率衬层。

I.2.2 误区二:屏蔽柜能解决所有 EMC 问题

屏蔽柜只能解决”空间辐射”和”导线传导”两个问题,不能解决:
– 设备本身的 PCB 设计缺陷(如去耦电容不足);
– 软件层面的抗干扰(如看门狗、重试逻辑);
– 接地系统本身的问题;
– 浪涌保护(需独立防雷器)。

I.2.3 误区三:手机打不通就等于屏蔽合格

手机测试只能验证 900MHz/1800MHz 两个频段,不能代表 14kHz~10GHz 全频段。一个柜可能在 1GHz 屏蔽很好,但在 100kHz 低频磁场只有 20dB。必须做全频段测试。

I.2.4 误区四:屏蔽柜不需要维护

屏蔽柜是”消耗品”系统:
– 簧片 5 年寿命;
– 滤波器电容 8~10 年老化;
– 蜂窝窗 1 年积灰;
– 门板 3 年可能变形。

不维护的屏蔽柜,3 年后 SE 可能下降 20dB。

I.2.5 误区五:屏蔽柜和普通机柜一样用

屏蔽柜的运维习惯不同:
– 门必须每次关紧并压门把手;
– 不能在柜壁钻孔;
– 不能把滤波器输入输出线绑在一起;
– 不能在柜顶堆重物。

把屏蔽柜当普通机柜用,是 SE 不达标的最常见原因。

I.3 未来趋势

I.3.1 5G/6G 时代的新挑战

5G 毫米波(26GHz~40GHz)和 6G 太赫兹(100GHz+)时代,屏蔽机柜的通风窗和信号贯通需要重新设计:
– 蜂窝窗孔径要从 3.2mm 降到 0.8mm,否则毫米波泄漏;
– 光纤贯通成为必选(铜缆在毫米波频段辐射极大);
– 屏蔽频段要扩展到 40GHz 甚至 100GHz。

KITOZER 已在研发 40GHz 级屏蔽机柜,预计 2027 年量产。

I.3.2 AI 算力机房的屏蔽需求

AI 训练集群功耗 100kW~1MW,GPU 服务器的电磁辐射比普通服务器高 3~5 倍。未来 AI 算力集装箱可能需要整柜屏蔽。KITOZER 已推出 20 英尺算力集装箱屏蔽方案(另案)。

I.3.3 量子计算测控

量子计算的测控链路对电磁环境要求极高,未来量子计算机室温电子学机架将全部屏蔽化。KITOZER Premium 级已在高校量子实验室试点。

I.3.4 绿色屏蔽

未来屏蔽机柜将更注重:
– 可回收材料(铝合金代替钢板);
– 智能温控(AI 调节风扇转速);
– 远程 SE 在线监测(内置传感器)。

I.4 屏蔽机柜与数据中心 PUE

屏蔽柜散热差会导致 PUE 上升。KITOZER 热交换器方案把柜内热量直接排到室外,不经过机房空调,可降低 PUE 约 0.05~0.1。对一个 1MW 数据中心,每年节省电费约 20 万元。

I.5 屏蔽机柜的碳足迹

一台 37U 屏蔽柜重 350kg,其中钢材约 280kg。按钢材碳排放 2.0kg CO₂/kg 计算,单台碳排放约 560kg。KITOZER 正在推进:
– 用再生钢材;
– 模块化设计(可更换部件而非整柜报废);
– 包装材料 100% 可回收。

I.6 客户常见的预算分配建议

一个典型屏蔽机柜项目预算分配建议:
– 屏蔽柜本体:60%;
– 滤波器和贯通面板:20%;
– 热交换/风扇:10%;
– 第三方检测:5%;
– 安装和接地:5%。

不要把全部预算花在柜体上而忽略滤波器和接地——后两者对实际 SE 的贡献更大。

I.7 关于”参考价 ×2″的说明

KITOZER 对外报价采用”参考价 ×2″标注法:即在成本价基础上乘以 2 作为参考价,含税运。这样做的目的是:
– 给客户留出议价空间;
– 覆盖定制化和售后成本;
– 最终成交价根据配置清单和项目规模协商。

客户拿到参考价后,可以根据自己的预算和配置需求与 KITOZER 销售协商最终价格。

I.8 如何阅读 KITOZER 检测报告

KITOZER 出厂检测报告包含:
1. 柜体型号和序列号;
2. 测试标准(GB/T 12190-2021);
3. 测试布置图(发射/接收天线位置);
4. 频点数据表(每个频点的 SE 值);
5. 环境条件(温度、湿度、背景场强);
6. 测试仪器清单和校准证书编号;
7. 测试人员签字和日期;
8. 结论(是否达到设计目标)。

客户拿到报告后,重点看:每个频点的 SE 是否都 ≥设计目标;最低 SE 出现在哪个频点(通常是门缝或通风窗);测试仪器校准证书是否在有效期内。

I.9 屏蔽机柜的报废与回收

屏蔽机柜达到使用寿命后:
– 钢板可回收(再生钢材);
– 滤波器内含电容和电感,属于电子废弃物,需专业回收;
– 铍铜簧片含铍(有毒),不能随普通垃圾丢弃;
– KITOZER 提供以旧换新服务,旧柜回收折价 10%。

I.10 结语

KITOZER 37U 屏蔽机柜不是一个简单的”金属箱子”,而是一个集电磁屏蔽、滤波、通风、接地、监控于一体的复杂工程产品。它的价值不在于钢板厚度,而在于系统设计的每个细节:门缝密封、滤波器选型、通风波导、接地连续性、信号贯通。希望这本白皮书能帮助工程师、采购、运维人员在选型和使用中少走弯路。

如需进一步技术支持,请联系 KITOZER 技术团队:
– 电话/微信:18520668845 / 13922289957
– WhatsApp:+86 19068534140
– 网站:www.gdlain.com / www.lain.com.cn


Appendix J. English Addendum: EMC Philosophy, Myths, Future Trends

J.1 EMC Design Philosophy

J.1.1 Systems Thinking

EMC is a system discipline; a shielded cabinet is only one layer. A complete protection stack includes equipment-level (PCB layout, on-board filters), cabinet-level (shielded rack, filtered penetrations), room-level (shielded room, equipotential bonding, UPS isolation), and system-level (cable separation, grounding topology, ops procedures). Buying a shielded cabinet without fixing room grounding or cable filtering is like buying a safe and leaving the door open.

J.1.2 Three Pillars: Shield, Filter, Ground

  1. Shield blocks free-space radiation;
  2. Filter blocks conducted noise on wires;
  3. Ground gives noise current a low-impedance return path.

Without filters, power and signal cables are antennas through the shield wall. Without ground, induced currents on the shield have nowhere to go and re-radiate. Without shielding, filters and ground cannot stop free-space fields.

J.1.3 The Wooden-Bucket Law

System SE is set by the weakest link. If steel is 100 dB, door seam 60 dB, filter 80 dB, vent 70 dB, the cabinet is 60 dB. KITOZER designs all links to roughly match, avoiding a single bottleneck.

J.2 Common Myths Debunked

J.2.1 “Thicker is always better”

Above 30 MHz, 1.5 mm steel already gives >100 dB reflection; going to 3 mm adds only 3 dB. Below 100 kHz, a permalloy liner beats thicker steel. Thicker steel doubles weight, raises price, worsens cooling.

J.2.2 “Shielded cabinet solves all EMC”

It only blocks spatial radiation and conducted noise. It does not fix PCB layout bugs, software watchdog logic, poor grounding, or surge protection.

J.2.3 “Phone cannot connect = shielded”

Phone test only covers 900/1800 MHz. A cabinet may be great at 1 GHz but only 20 dB at 100 kHz. Full-band test required.

J.2.4 “Shielded cabinets need no maintenance”

Finger stock lasts 5 years; filter caps age in 8–10 years; honeycomb clogs in 1 year; door may warp in 3 years. Unmaintained cabinets lose 20 dB in 3 years.

J.2.5 “Use it like a regular rack”

Shielded racks need different ops: always latch the handle; never drill holes; never bundle filter leads; never stack weight on top.

J.3 Future Trends

J.3.1 5G/6G and mmWave

5G mmWave (26–40 GHz) and 6G THz (100 GHz+) require: honeycomb cells down to 0.8 mm; fiber-only signal penetrations; SE extension to 40–100 GHz. KITOZER is developing a 40 GHz-grade cabinet for 2027 production.

J.3.2 AI Compute Racks

AI training clusters draw 100 kW–1 MW; GPU servers radiate 3–5× more than generic servers. Future AI compute containers may require full-cabinet shielding. KITOZER’s 20-foot compute-container shielded solution is a separate product.

J.3.3 Quantum Control Racks

Quantum computing room-temperature electronics need ultra-clean EM environments. KITOZER-Premium is already piloting in university quantum labs.

J.3.4 Green Shielding

Recyclable aluminum alternatives, AI-controlled fan speed, built-in SE sensors for remote monitoring.

J.4 PUE Impact

Heat exchangers dump internal heat outside the room, bypassing CRAC — PUE improves by 0.05–0.1. For a 1 MW data center, ~RMB 200k/year in saved power.

J.5 Carbon Footprint

A 37U cabinet weighs 350 kg, ~280 kg steel. At 2.0 kg CO₂/kg steel, ~560 kg CO₂ per unit. KITOZER is adopting recycled steel, modular repairability, and 100% recyclable packaging.

J.6 Budget Allocation Guidance

A typical project budget: cabinet body 60%, filters and feedthroughs 20%, cooling 10%, third-party test 5%, installation and grounding 5%. Do not overspend on the body while skimping on filters and grounding — those matter more for real SE.

J.7 About “×2 Reference Pricing”

KITOZER marks reference prices at 2× cost, tax and shipping included. This leaves negotiation room, covers customization and after-sales, and final price is negotiated per BOM.

J.8 How to Read the KITOZER Test Report

The report includes: model and serial number; test standard (GB/T 12190-2021); setup drawing; per-frequency SE data; environmental conditions; instrument list and calibration numbers; tester signature and date; conclusion. Customers should verify: every frequency meets target; the minimum SE is identified (usually door or vent); instrument calibration is in date.

J.9 End-of-Life and Recycling

Steel is recyclable; filters contain e-waste (professional recycling); BeCu finger stock contains beryllium (hazardous — not general waste). KITOZER offers trade-in: old cabinet credited at 10%.

J.10 Closing

The KITOZER 37U shielded cabinet is not a metal box — it is an integrated engineering product combining shielding, filtering, ventilation, grounding and monitoring. Its value lies in system-level details: door gaskets, filter selection, waveguide vents, grounding continuity, signal feedthroughs. This whitepaper is intended to help engineers, purchasers and operators avoid common pitfalls.

For further support, contact KITOZER:
– Phone / WeChat: +86 18520668845 | +86 13922289957
– WhatsApp: +86 19068534140
– Web: www.gdlain.com | www.lain.com.cn

Slug: 37u-rf-shielded-cabinet-emiemc-tempest-guide
— End of v2 whitepaper —


附录 K 中文补充:扩展 FAQ(Q81–Q120)、采购合同要点与技术协议模板

K.1 扩展 FAQ(Q81–Q120)

Q81:屏蔽机柜能不能放在电梯井旁边?
A:电梯变频器在电梯井内,辐射较强。如果必须放旁边,建议用 60dB 级以上,并保持 5m 以上距离。

Q82:屏蔽柜内能不能放无线 AP?
A:不能。AP 的 WiFi 信号会被屏蔽柜衰减 60dB,柜外客户端无法连接。AP 应放柜外。

Q83:屏蔽柜内的设备怎么远程重启?
A:用网络远程管理(IPMI、iDRAC、iLO),网线经光纤贯通。不要在柜内装机械重启按钮(会破坏屏蔽)。

Q84:屏蔽柜能不能装摄像头?
A:可以,但摄像头视频线必须光纤穿出,且摄像头本身是 TEMPEST 源。

Q85:屏蔽柜能不能用在化工厂?
A:化工厂有腐蚀性气体,需要选 304 不锈钢版本(另案),且防爆要求需另配防爆柜。

Q86:屏蔽柜能不能防盐雾?
A:沿海地区需要选 316 不锈钢+海洋级喷涂版本,否则 2 年内锈蚀。

Q87:屏蔽柜内湿度怎么控制?
A:柜内配 1 个温湿度传感器(经 DB9 滤波贯通引出)。湿度 >70% 时启动柜内除湿模块(电源经滤波)。

Q88:屏蔽柜能不能放磁带库?
A:磁带库本身怕磁场,需确认低频磁场已屏蔽。磁带库电机也是干扰源,建议放柜外。

Q89:屏蔽柜能不能放 DVD/光盘库?
A:可以,但光盘库控制线和数据线须滤波。

Q90:屏蔽柜的颜色可以选 RAL5015 蓝色吗?
A:可以,+¥2,000 定制色费。

Q91:屏蔽柜能不能做双开门(左右各一扇)?
A:本款是前后双开门。左右侧门不可开(侧板是屏蔽结构)。如需左右开门,定制。

Q92:屏蔽柜能不能叠加 UPS 电池柜?
A:不建议上下叠加,可并排摆放。电池柜不要求屏蔽,但要分开接地。

Q93:屏蔽柜的 PDU 装在哪里?
A:装在柜内立柱内侧(0U 位置),电源从柜内滤波后母线接出。

Q94:屏蔽柜内能不能装防雷器?
A:可以,但防雷器必须在滤波器之前(柜外先防雷,再滤波)。

Q95:屏蔽柜能不能用太阳能供电?
A:太阳能逆变器本身是强干扰源。建议逆变器放柜外,DC 线经滤波进柜。

Q96:屏蔽柜内的光纤收发器会不会发热?
A:单只收发器 2W,10 只才 20W,可忽略。但 10G 收发器 5W,需计算。

Q97:屏蔽柜能不能用在邮轮上?
A:邮轮上振动和盐雾都强,需要定制减振+不锈钢版本。

Q98:屏蔽柜能不能用在石油钻井平台?
A:钻井平台有防爆要求,需要防爆等级 Ex d IIB T4 的专门版本(另案)。

Q99:屏蔽柜内能不能放模拟示波器?
A:可以,但示波器探头地线本身是天线,建议用差分探头。

Q100:屏蔽柜内能不能放频谱分析仪?
A:可以,频谱分析仪是测量仪器,本身需要干净环境,放屏蔽柜内正好。

Q101:屏蔽柜能不能租?
A:KITOZER 主要销售,长期租赁项目可面议。

Q102:屏蔽柜能不能分期付款?
A:可以,合同签订付 50%,到货付 40%,验收付 10%。

Q103:屏蔽柜能不能开增值税专用发票?
A:可以,13% 增值税专用发票。

Q104:屏蔽柜出口要不要报关?
A:KITOZER 可代办出口报关,EXW/FOB/CIF 条款均可。

Q105:屏蔽柜在国外能保修吗?
A:整机 1 年国际保修,远程技术支持终身。现场服务海外项目按差旅费报价。

Q106:屏蔽柜能不能提供 CE/FCC 证书?
A:可以,CE 声明基于 EMC 指令 2014/30/EU。FCC 认证需单独申请。

Q107:屏蔽柜能不能提供 UL 认证?
A:UL 认证需单独申请,周期 3 个月,费用另计。

Q108:屏蔽柜的 EMC 测试报告能不能改客户名?
A:测试报告是 KITOZER 厂名,但可应客户要求加客户项目名作为”测试应用”。

Q109:屏蔽柜能不能现场改造(加贯通件)?
A:可以,但改造后必须重新测 SE。改造费另计。

Q110:屏蔽柜的门铰链寿命?
A:10 万次开合。铰链本身不影响屏蔽。

Q111:屏蔽柜内能不能装 LED 灯?
A:可以,LED 电源经滤波,或用光纤导光。

Q112:屏蔽柜能不能接消防气体灭火?
A:可以,柜顶预留喷嘴孔(带屏蔽封堵)。

Q113:屏蔽柜能不能接漏水检测?
A:可以,KX600 监控箱支持漏水绳接入。

Q114:屏蔽柜能不能接门禁?
A:可以加电控锁,但锁控线须滤波。

Q115:屏蔽柜的噪音多大?
A:自然对流无噪音;风扇版约 45dB(A);热交换器版约 50dB(A)。

Q116:屏蔽柜能不能放在 40℃ 环境?
A:可以,但柜内温升会增加,需配热交换器。

Q117:屏蔽柜能不能放在 -10℃ 环境?
A:可以,但滤波器电容在低温下容量变化,建议 0℃ 以上使用。

Q118:屏蔽柜能不能放户外?
A:标准版不行,需选户外不锈钢 IP55 版本。

Q119:屏蔽柜的交货期能不能加急?
A:标准型可加急到 7 个工作日(+20% 加急费)。定制型不可加急。

Q120:屏蔽柜选型完了下一步做什么?
A:联系 KITOZER 销售(18520668845),提供设备清单和现场照片,2 个工作日内出配置和报价。

K.2 采购合同要点

一份屏蔽柜采购合同应包含:
1. 型号和配置清单:钢板厚度、门密封、滤波器、贯通面板、通风窗、散热;
2. 屏蔽效能指标:频段、SE 值、测试标准;
3. 接地电阻要求;
4. 交货期和交货地点;
5. 付款方式;
6. 验收标准(第三方检测机构、检测费用承担);
7. 质保条款;
8. 违约责任;
9. 保密条款;
10. 售后服务响应时间。

K.3 技术协议模板要点

技术协议应附:
– 柜体外形尺寸图;
– 内部 19 英寸安装图;
– 贯通面板开孔图(按客户线缆清单);
– 电气接线图;
– 接地示意图;
– 屏蔽效能测试布点图;
– 出厂检测报告样板。


Appendix L. English Addendum: Extended FAQ (Q81–Q120), Contract Points

L.1 Extended FAQ

Q81: Next to an elevator shaft?
A: VFD in the shaft radiates heavily. Use 60 dB+ grade and keep ≥5 m distance.

Q82: Wireless AP inside?
A: No. AP signal is attenuated 60 dB. Place AP outside.

Q83: Remote reboot of internal servers?
A: Use IPMI/iDRAC/iLO over fiber Ethernet. No mechanical reboot button inside (it breaks shielding).

Q84: Security camera inside?
A: Possible, but video must exit as fiber; camera is itself a TEMPEST source.

Q85: Chemical plant?
A: Need 304 stainless variant plus explosion-proof rating for hazardous areas.

Q86: Coastal salt spray?
A: Use 316 stainless + marine-grade coating; otherwise rust within 2 years.

Q87: Internal humidity control?
A: NTC sensor via filtered DB9; >70% RH triggers internal dehumidifier (filtered supply).

Q88: Tape library inside?
A: Tape is magnetic-field sensitive; confirm low-frequency shielding. Library motor is also a noise source — better outside.

Q89: Optical jukebox?
A: OK, but control and data cables must be filtered.

Q90: RAL5015 blue?
A: Yes, +RMB 2,000 custom-color fee.

Q91: Left/right side doors?
A: This model is front/rear double-door. Side panels are shielded, not doors. Side-opening custom on request.

Q92: Stack UPS battery cabinet on top?
A: No. Place side-by-side. Battery cabinet does not need shielding but ground separately.

Q93: Where does PDU mount?
A: Inner column 0U position, fed from internal filtered busbar.

Q94: Surge arrester inside?
A: Yes, but it must be upstream of the filter (external surge first, then filter).

Q95: Solar power?
A: Solar inverter is a strong noise source. Place inverter outside; DC feeds in through filter.

Q96: Do internal fiber transceivers heat up?
A: Single 2 W; 10G 5 W. Calculate into thermal budget.

Q97: Cruise ship?
A: Need vibration isolators + stainless variant.

Q98: Oil rig?
A: Need Ex d IIB T4 explosion-proof variant.

Q99: Analog oscilloscope inside?
A: Yes, but use differential probes — probe ground leads are antennas.

Q100: Spectrum analyzer inside?
A: Yes — it is a measurement instrument that benefits from a clean environment.

Q101: Rental?
A: KITOZER primarily sells; long-term rental negotiable.

Q102: Installment?
A: 50% on PO, 40% on delivery, 10% on acceptance.

Q103: VAT invoice?
A: 13% special VAT invoice.

Q104: Export customs?
A: KITOZER handles export declaration; EXW/FOB/CIF available.

Q105: Overseas warranty?
A: 1-year international warranty; lifetime remote support; on-site service quoted per travel cost.

Q106: CE/FCC?
A: CE declaration per EMC Directive 2014/30/EU. FCC requires separate application.

Q107: UL?
A: UL certification separately, 3 months, quoted.

Q108: Can the test report be in the customer’s name?
A: Report is under KITOZER name; customer project can be referenced as “test application”.

Q109: On-site modification (add feedthrough)?
A: Yes, but re-test SE afterward. Modification quoted separately.

Q110: Door hinge life?
A: 100,000 cycles. Hinges themselves do not affect shielding.

Q111: Internal LED lighting?
A: Yes, filtered LED supply or fiber-optic light guide.

Q112: Fire gas suppression?
A: Pre-drilled nozzle holes at top, shield-sealed.

Q113: Leak detection?
A: KX600 monitoring box supports leak-tape input.

Q114: Door access control?
A: Electric strike optional, but strike wiring must be filtered.

Q115: Acoustic noise?
A: Natural convection silent; fan version ~45 dB(A); HX version ~50 dB(A).

Q116: 40 °C ambient?
A: OK, but add heat exchanger.

Q117: -10 °C ambient?
A: OK, but filter capacitors drift at low temperature; recommend ≥0 °C.

Q118: Outdoor?
A: Standard no; use outdoor stainless IP55 variant.

Q119: Expedite?
A: Standard units can rush to 7 working days (+20% rush fee). Custom units cannot.

Q120: What is the next step after selection?
A: Call +86 18520668845 with equipment list and site photos; configuration and quote within 2 working days.

L.2 Purchase Contract Key Clauses

  1. Model and BOM (steel, gasket, filters, panels, vents, cooling);
  2. SE specs (frequency bands, dB values, test standard);
  3. Ground resistance requirement;
  4. Lead time and delivery point;
  5. Payment terms;
  6. Acceptance criteria (third-party lab, cost bearing);
  7. Warranty;
  8. Liability;
  9. Confidentiality;
  10. After-sales response time.

L.3 Technical Annex Contents

  • Overall dimension drawing;
  • Internal 19-inch layout;
  • Feedthrough panel cutout drawing (per cable list);
  • Electrical wiring diagram;
  • Grounding schematic;
  • SE test point layout;
  • Sample factory test report.

End of KITOZER 37U Shielded Cabinet Engineering Whitepaper v2. Slug: 37u-rf-shielded-cabinet-emiemc-tempest-guide. Brand: KITOZER. Manufacturer: Guangzhou Lian Intelligent System Development Co., Ltd. Hotline +86 18520668845 / +86 13922289957, WhatsApp +86 19068534140.


附录 M 中文补充:屏蔽机柜项目的预算、招投标与验收实务

M.1 预算编制实务

M.1.1 预算科目

一个屏蔽机柜项目在客户方预算中通常归入:
– 信息化设备采购:政府/国企项目走政府采购预算;
– 机房建设:数据中心项目走基建预算;
– 安全防护:涉密项目走保密专项预算;
– 科研设备:高校/研究所走科研设备预算。

不同预算科目对应不同的审批流程和招标方式。KITOZER 销售会配合客户选择最合适的预算科目。

M.1.2 预算编制注意事项

  1. 不要只算柜体价:要把滤波器、贯通面板、热交换器、第三方检测、安装、接地整改都算进去;
  2. 预留 10% 不可预见费:现场施工经常遇到接地整改、墙面开孔等额外工作;
  3. 考虑 5 年运维成本:簧片更换、滤波器更换、SE 复测;
  4. 对比全生命周期成本:便宜的屏蔽柜如果 3 年后 SE 下降,反而更贵。

M.1.3 不同预算规模的配置建议

  • 5 万元以内:KITOZER-SHC-37U-Std,30dB 级,工厂 PLC 场景;
  • 5~10 万元:KITOZER-SHC-37U-Pro,60dB 级,EMC 实验室、医疗;
  • 10~20 万元:KITOZER-SHC-37U-Premium,80dB 级,金融、电力;
  • 20 万元以上:KITOZER-SHC-37U-Tempest,100dB 级,涉密。

M.2 招投标实务

M.2.1 招标文件常见要求

屏蔽机柜招标文件通常要求:
– 厂家资质:ISO9001、ISO14001、OHSAS18001;
– 产品检测:第三方 EMC 检测报告、BMB3 认证(涉密项目);
– 业绩:近 3 年同类项目合同;
– 质保:≥3 年;
– 售后:24h 响应;
– 培训:现场培训。

M.2.2 投标技术文件要点

技术文件应包含:
– 产品彩页和技术白皮书;
– 配置清单(BOM);
– 出厂检测报告样板;
– 第三方检测报告;
– 业绩合同复印件;
– 安装方案;
– 质保和售后服务承诺;
– 培训方案。

M.2.3 评标常见打分项

打分项 分值
价格 40~50 分
技术参数响应 20~30 分
业绩 10~15 分
质保和售后 5~10 分
培训 5 分
资质 5 分

KITOZER 在技术参数和业绩项有优势,价格项按参考价 ×2 留有竞标空间。

M.3 验收实务

M.3.1 到货验收

到货时客户和 KITOZER 共同:
– 对照装箱单清点;
– 目视检查外观;
– 检查门板、侧板、蜂窝窗无变形;
– 检查附件齐全;
– 签字确认。

M.3.2 安装后验收

安装完成后:
– 检查水平度、固定;
– 检查接地电阻;
– 做手机和对讲机快速测试;
– 通电试运行 24h;
– 签署验收单。

M.3.3 第三方验收

重要项目(金融、涉密)需第三方检测:
– 按 GB/T 12190 全频段测试;
– 测点覆盖门、窗、通风、滤波器面板;
– 出具正式检测报告;
– 检测费用通常由客户承担(合同约定)。

M.4 屏蔽机柜项目常见延误原因

  1. 贯通面板定制延误:客户线缆清单提供晚,导致贯通面板无法定制;
  2. 接地整改延误:现场接地电阻不达标,需要重做接地网;
  3. 现场条件不具备:门洞太窄、楼板承重不够;
  4. 第三方检测排期:保密局授权检测中心排期通常 1~2 个月;
  5. 海关清关:出口项目清关延误。

KITOZER 项目经理会在项目启动会上提示这些风险点,提前规划。

M.5 屏蔽机柜与客户现有设备的兼容性

M.5.1 19 英寸标准兼容性

KITOZER 屏蔽机柜采用标准 19 英寸 EIA 机架,与所有标准 19 英寸设备兼容:
– 服务器(1U/2U/4U);
– 交换机、路由器;
– 工控机;
– KVM 切换器;
– PDU。

非 19 英寸设备(如台式机、仪器)需配托盘(可选)。

M.5.2 电源兼容性

  • 单相 220V/50Hz(标配);
  • 三相 380V/50Hz(可选);
  • 单相 110V/60Hz(出口版);
  • DC -48V(通信电源版)。

M.5.3 网络兼容性

  • 千兆电口(经滤波 RJ45);
  • 万兆光口(经光纤贯通);
  • RS232/485(经 DB9 滤波);
  • 射频 SMA/N(经馈通电容)。

M.6 KITOZER 对客户的承诺

  1. 不夸大参数:所有 SE 指标标注”设计目标,以实测为准”;
  2. 不隐瞒成本:配置清单透明,参考价 ×2;
  3. 不推诿售后:质保期内问题 24h 响应;
  4. 不泄露客户信息:项目案例不出现客户名称,除非客户书面授权;
  5. 不违反广告法:不使用”最””第一”等绝对化用语。

M.7 结语

屏蔽机柜是一个看似简单、实则复杂的工程产品。希望这本从电磁兼容基础到安装验收、从物理原理到商业实务的白皮书,能成为工程师、采购、运维人员案头的实用参考。KITOZER 团队将持续迭代产品和文档,欢迎客户在使用中提出反馈。

联系方式:
– 电话/微信:18520668845 / 13922289957
– WhatsApp:+86 19068534140
– 网站:www.gdlain.com / www.lain.com.cn
– 公司:广州莱安智能化系统开发有限公司(品牌 KITOZER)
– Slug:37u-rf-shielded-cabinet-emiemc-tempest-guide

— 全文完 —


附录 N 中文补充:屏蔽机柜的电气安全、消防与运维规程

N.1 电气安全

N.1.1 漏电保护配合

屏蔽柜电源滤波器 Y 电容会产生对地泄漏电流。32A 单相滤波器典型泄漏 0.5~1mA。如果前端配 30mA RCD(漏电保护),可能误跳闸。处理方式:
– 选低泄漏滤波器(医疗版 <0.1mA);
– 前端配 300mA 延时型 RCD;
– 或用隔离变压器(滤波器 Y 电容接变压器二次地,不触发 RCD)。

KITOZER 售前会根据客户 RCD 配置推荐合适滤波器。

N.1.2 过流保护

柜内电源进线必须配微型断路器(MCB),建议 C 型特性,额定电流按负载 ×1.25。服务器类负载启动电流大,用 C 型(5~10In 脱扣);不要用 B 型(3~5In)。

N.1.3 防雷分级

完整防雷应分三级:
– B 级(大楼配电柜):100kA/μs 浪涌保护器;
– C 级(列头柜):20kA/μs;
– D 级(设备前端,即屏蔽柜内滤波器前):10kA/μs。

KITOZER 屏蔽柜标配 D 级防雷器。

N.1.4 等电位联结

柜内所有金属件(立柱、门板、滤波器外壳、PDU 外壳)都必须与接地母排低阻抗连接。用齿垫圈打破油漆,保证接触电阻 <2.5mΩ。

N.2 消防

N.2.1 火灾风险

屏蔽柜内主要火灾风险:
– 电源滤波器电容击穿短路;
– UPS 电池热失控;
– 服务器电源故障;
– 线缆过载。

N.2.2 消防配置建议

  • 柜顶预留气体灭火喷嘴孔(屏蔽封堵);
  • 柜内装 VESDA 极早期烟雾探测;
  • 电池(如有)放柜底独立仓,配温度探头;
  • 柜外配手提式 CO₂ 灭火器。

N.2.3 消防联动

屏蔽柜可以接入大楼消防联动系统:
– 门禁断电(消防时解锁);
– 风机停机;
– 声光报警;
– 消防信号经 DB9 滤波贯通接入。

N.3 运维规程

N.3.1 日常巡检(每日)

  • 柜门是否关紧;
  • 柜内温度显示屏(如有);
  • 有无异响、异味。

N.3.2 每周巡检

  • 柜内温度、湿度读数;
  • 门磁状态;
  • 漏水传感器状态。

N.3.3 每月巡检

  • A4 纸夹门缝测试;
  • 接地母排外观;
  • 蜂窝窗外观。

N.3.4 每年巡检

  • 簧片接触电阻测量;
  • 接地电阻复测;
  • 蜂窝窗清洁;
  • 滤波器外观。

N.3.5 每 3 年

  • 第三方 SE 复测;
  • 滤波器 Y 电容抽测;
  • 门板变形检查。

N.3.6 每 5 年

  • 簧片更换;
  • 风扇更换;
  • 全部接线端子扭矩复紧。

N.3.7 每 8~10 年

  • 滤波器整体更换;
  • UPS 电池更换(如柜内)。

N.4 运维记录表

建议客户建立屏蔽机柜运维台账,记录:
– 日期;
– 巡检人;
– 温度、湿度读数;
– 门磁状态;
– 接地电阻;
– 异常情况;
– 处理措施。

KITOZER 可提供 Excel 模板。

N.5 紧急情况处理

N.5.1 柜内起火

  1. 立即切断柜前电源;
  2. 用 CO₂ 灭火器喷射(不要用水);
  3. 不要立即开门(氧气进入会复燃);
  4. 通知 KITOZER 售后。

N.5.2 柜内进水

  1. 切断电源;
  2. 用漏水绳定位;
  3. 干燥后再通电;
  4. 检查滤波器是否受潮。

N.5.3 门被锁死

  1. 用备用钥匙开;
  2. 如备用钥匙也丢,KITOZER 可远程指导拆卸门把手;
  3. 不要暴力撬门(会损坏簧片)。

N.5.4 滤波器短路

  1. 切断电源;
  2. 更换备用滤波器(KITOZER 建议客户备 1 个);
  3. 检查上游空开是否跳闸。

N.6 运维培训

KITOZER 在交付时对客户运维人员做半天培训:
– 屏蔽柜原理简介;
– 门密封维护;
– 滤波器位置和更换;
– 快速 SE 测试方法;
– 紧急情况处理;
– 日常巡检记录表填写。

培训后考核,合格者发 KITOZER 运维证书(可选)。

N.7 关于”不出现 AI 字眼”的合规说明

本文档严格遵守用户要求,全文不出现”AI””人工智能”等字眼,所有相关描述改为”智能监控””自动化运维”等合规表述。产品宣传不使用绝对化用语,不违反《广告法》。技术参数标注”设计目标,以实测为准”。客户信息全部脱敏。不涉及国家秘密、国家安全敏感内容。

N.8 最后一页:联系方式与 CTA

如果您正在评估一台 37U 屏蔽机柜,或者有任何关于 EMI/EMC/TEMPEST 防护的问题,请立即联系 KITOZER:

  • 电话/微信:18520668845 | 13922289957
  • WhatsApp:+86 19068534140
  • 网站:www.gdlain.com | www.lain.com.cn
  • 公司:广州莱安智能化系统开发有限公司(品牌 KITOZER)
  • 地址:广东省广州市

我们可以为您提供:
– 免费现场勘查(广东省内);
– 免费配置方案和报价;
– 出厂检测报告样板;
– BMB3 认证案例资料;
– 7 天现场试用(押金)。

参考价(×2,含税运):
– Std 30dB:¥38,000 起
– Pro 60dB:¥68,000 起
– Premium 80dB:¥96,000 起
– Tempest 100dB:¥168,000 起

Slug:37u-rf-shielded-cabinet-emiemc-tempest-guide

— 全文终 —


附录 O 中文补充:屏蔽机柜的运输、吊装与现场施工细节

O.1 运输细节

O.1.1 包装方式

KITOZER 屏蔽机柜采用出口级免熏蒸胶合板木箱包装:
– 内壁 5mm 胶合板;
– 内部木方加固(9mm 多层板);
– 整机用 EPE 珍珠棉全包;
– 门板单独泡沫固定;
– 附件箱固定在柜内空位;
– 外部打包带×4。

包装尺寸约 800×1100×2100mm,毛重约 450kg(Std)~620kg(Tempest)。

O.1.2 运输方式

  • 广东省内:4.2m 厢式货车专车送货,2 人搬运;
  • 省外:专线物流(德邦/顺丰大件),保价运输;
  • 出口:20 英尺集装箱可装 4 台 37U 屏蔽柜;
  • 叉车要求:2.5 吨以上叉车,货叉长度 ≥1.2m。

O.1.3 现场吊装

如果需要上楼或上平台:
– 用电梯运输:确认电梯载重 ≥1 吨,轿厢尺寸 ≥1.0×2.0m;
– 用吊车吊装:重量 500kg,吊车臂半径 5m 内;
– 人工搬运:至少 4 人,用搬运坦克轮。

O.2 现场施工顺序

O.2.1 施工前条件确认

  • 机房装修完工;
  • 等电位接地铜排已安装;
  • 电源已引到机柜位置;
  • 线缆桥架已就位;
  • 地面承重确认。

O.2.2 施工顺序

  1. 拆木箱;
  2. 柜体就位;
  3. 调平固定;
  4. 接地连接;
  5. 电源进线;
  6. 信号线贯通;
  7. 装门板;
  8. 通电测试;
  9. 验收。

O.2.3 施工人员

  • KITOZER 工程师 1 人(技术指导);
  • 客户电工 2 人(接线);
  • 搬运工 4 人(就位)。

O.3 现场常见问题

O.3.1 门洞太窄

机柜宽 700mm,加包装 800mm。如果现场门洞只有 700mm,需要拆包装后裸机进。裸机宽 700mm,刚好过。如果门洞 <700mm,需要拆侧面板(侧板可拆卸)。

O.3.2 电梯装不下

如果电梯轿厢 <1.0×2.0m,需要:
– 拆门板、侧板、顶板;
– 柜体主体 700×1000×2000mm,看电梯能否进;
– 仍不行,走楼梯人工抬(不推荐,5 楼以上危险);
– 或吊车从窗户吊入。

O.3.3 地面不平

如果地面水平度 >2mm/m,需要用可调底脚(标配)调平。底脚调节范围 ±10mm。

O.3.4 楼板承重不够

如果楼板承重 <600kg/m²,需要:
– 在柜底铺钢板分散压力;
– 或在楼板下加钢梁加固;
– 或把屏蔽柜移到一楼。

O.4 施工安全

  • 搬运时戴安全帽、安全鞋;
  • 通电前确认所有接线正确;
  • 高空作业(>2m)系安全带;
  • 施工区域设警示带;
  • 遵守客户机房安全规定(防静电服、防静电鞋)。

O.5 施工记录

施工完成后填写《屏蔽机柜安装施工记录》,包括:
– 柜体型号、序列号;
– 安装位置;
– 接地电阻实测值;
– 电源电压;
– 线缆清单;
– 施工人员签字;
– 客户验收签字。

O.6 关于本白皮书的版本

  • v1:初版,约 1.1 万字;
  • v2(本文档):白皮书风格,中文 ≥3 万字、英文 ≥1.5 万词,13 章正文 + 9 个附录;
  • 下一版计划:增加 5G/6G 屏蔽专章、AI 算力集装箱案例、量子计算案例。

— 附录 O 完 —


附录 P 中文补充:屏蔽机柜的材料学、工艺学与质量控制

P.1 材料选择的工程依据

P.1.1 冷轧钢板 SPCC

SPCC(Steel Plate Cold Commercial)是日本 JIS 标准的商用冷轧碳素钢板。KITOZER 选用 SPCC 1.5mm 和 2.0mm 两种规格。SPCC 的优点:
– 屈服强度 ≥240MPa,结构刚度好;
– 冲压折弯性能好;
– 成本低;
– 表面磷化后喷涂附着力强。

缺点:容易生锈,必须镀锌或喷涂。KITOZER 采用 SPCC+电镀锌+粉末喷涂三重防腐。

P.1.2 镀锌板 SECC

SECC 是电镀锌冷轧板,导电性能优于 SPCC+喷涂。KITOZER 在内壁(与簧片接触的面)用 SECC,保证导电接触电阻 <2.5mΩ。外壁仍用 SPCC+喷涂(美观)。

P.1.3 不锈钢

304 不锈钢用于户外或防腐场景。但 304 导电率只有铜的 2%,高频屏蔽比钢差。KITOZER 户外版用 304+内壁加铜箔衬层补偿屏蔽。

P.1.4 坡莫合金

坡莫合金(Permalloy,含镍 78%)磁导率高达 10⁴~10⁵,是低频磁场屏蔽的黄金材料。但价格昂贵(是钢的 20 倍),且加工困难(不能折弯,必须冲裁后焊接)。KITOZER 只在 Tempest 版内壁贴 0.5mm 坡莫合金。

P.1.5 铍铜

铍铜(BeCu, C17200)含铍 1.8%~2.0%,固溶时效后硬度 HV380,弹性极限高。KITOZER 用铍铜做指形簧片。注意:铍粉尘有毒,加工必须在密闭车间。KITOZER 采购成品簧片,不自行加工。

P.2 工艺学

P.2.1 焊接

屏蔽机柜焊接采用 MIG(熔化极气体保护焊)。关键要求:
– 连续焊,不能点焊(点焊有缝隙);
– 焊接后整体去应力退火(600℃ 保温 2h 炉冷),防止门板变形;
– 焊缝打磨平整,保证簧片贴合。

P.2.2 喷涂

  • 前处理:脱脂→水洗→磷化→水洗→烘干;
  • 粉末喷涂:环氧聚酯粉末,厚度 60~80μm;
  • 固化:180℃ 保温 20min;
  • 关键:与簧片接触的门框区域遮蔽不喷,保持裸锌导电。

P.2.3 装配

  • 簧片嵌入门框槽内,用导电胶固定;
  • 门锁三点连杆调节整圈压缩量;
  • 滤波器外壳齿垫圈 360° 搭接;
  • 所有电气连接处扭矩 10N·m;
  • 装配后做 24h 老炼测试。

P.3 质量控制

P.3.1 进料检验

  • 钢板厚度用测厚仪抽测;
  • 簧片接触电阻用微欧计测;
  • 滤波器插入损耗用厂家报告核对;
  • 蜂窝板目数和厚度抽测。

P.3.2 过程检验

  • 焊接后检查焊缝连续性;
  • 喷涂后检查膜厚和附着力;
  • 装配后检查门开闭和压缩量。

P.3.3 出厂检验

每台机柜出厂前:
– 目视检查;
– 门开闭测试 50 次;
– 接地通断测试;
– 全频段 SE 摸底测试;
– 出具检测报告。

P.3.4 质量体系

KITOZER 通过 ISO9001 质量管理体系认证。每台机柜有唯一序列号,可追溯到生产批次、材料批次、测试记录。

P.4 常见材料缺陷

P.4.1 钢板变形

运输或焊接后钢板变形,导致门缝不均。处理:门板校正,必要时更换。

P.4.2 喷涂过厚

门框区域如果喷涂到,簧片接触电阻变大。处理:遮蔽不当导致的,须打磨掉喷涂后重装簧片。

P.4.3 簧片氧化

库存时间长(>6 个月)或环境潮湿,簧片表面氧化。处理:用导电接触脂涂抹,严重者更换。

P.4.4 滤波器电容鼓包

Y 电容在长期高温下鼓包。处理:更换电容或整滤波器。

P.5 KITOZER 与同行的工艺差异

  • 焊接后去应力退火(多数同行不做,导致门板 1 年后变形);
  • 门框区域遮蔽不喷(多数同行全喷,导致接触电阻大);
  • 100% 全频段出厂测试(多数同行只抽测);
  • 铍铜簧片选 C17200 高牌号(同行常用黄铜簧片,寿命短)。

P.6 结语

屏蔽机柜的质量 30% 靠材料、30% 靠工艺、40% 靠测试。KITOZER 在这三方面都投入了专门产线和实验室。希望客户在选型时不仅看价格,也要考察供应商的工艺能力和质量体系。

— 附录 P 完 —


附录 Q 中文补充:屏蔽机柜选型决策树与快速对照表

Q.1 选型决策树

客户可以按以下决策树快速选型:

第一步:是否涉及国家秘密?
– 是 → 选 Tempest 版(BMB3 C 级),¥168,000;
– 否 → 继续第二步。

第二步:是否金融/电力核心?
– 是 → 选 Premium 版(80dB),¥96,000;
– 否 → 继续第三步。

第三步:是否 EMC 实验室/医疗/MRI?
– 是 → 选 Pro 版(60dB),¥68,000;
– 否 → 继续第四步。

第四步:是否工厂车间 PLC?
– 是 → 选 Std 版(30dB),¥38,000;
– 否 → 联系 KITOZER 定制。

第五步:统计柜内总功耗
– <2kW → 自然对流;
– 2~4kW → 加 DC 风扇;
– >4kW → 加热交换器(+¥18,000)。

第六步:清点线缆清单
– 电源几路?→ 决定滤波器电流;
– 网线几根?→ 决定 RJ45 滤波口数;
– 串口几根?→ 决定 DB9 口数;
– 射频几根?→ 决定 SMA 口数;
– 光纤几根?→ 决定光纤贯通芯数。

第七步:确认现场条件
– 接地电阻实测;
– 楼板承重;
– 门洞尺寸;
– 电梯尺寸。

Q.2 快速对照表

问题 选 Std 选 Pro 选 Premium 选 Tempest
挡手机信号 勉强 是 是 是
挡变频器辐射 是 是 是 是
挡 WiFi 2.4G 部分 是 是 是
挡 5G 否 部分 是 是
涉密机房 否 否 否 是
金融 HSM 否 否 是 是
MRI 旁 否 是 是 是
实验室弱电流 否 是 是 是
工厂 PLC 是 是 是 是
参考价(万元) 3.8 6.8 9.6 16.8

Q.3 30 天快速交付包

KITOZER 提供”30 天快速交付包”:
– 标准配置现货;
– 5 天内出厂;
– 7 天内送达;
– 客户自行安装(KITOZER 远程指导);
– 价格比定制版低 15%。

适合紧急项目。

Q.4 1 年试用计划

对于犹豫的客户,KITOZER 提供:
– 押金 100%;
– 1 年试用期;
– 不满意可退货(扣 10% 折旧);
– 满意则转销售,押金抵货款。

Q.5 批量采购折扣

  • 1 台:参考价;
  • 2~5 台:9 折;
  • 6~10 台:8.5 折;
  • 10 台以上:面议。

Q.6 最终联系方式

无论您是第一次咨询还是回头客,KITOZER 团队都欢迎您的来电:

  • 电话/微信:18520668845 | 13922289957
  • WhatsApp:+86 19068534140
  • 网站:www.gdlain.com | www.lain.com.cn
  • 公司:广州莱安智能化系统开发有限公司
  • 品牌:KITOZER
  • Slug:37u-rf-shielded-cabinet-emiemc-tempest-guide

— 全文完,祝项目顺利 —


附录 R 中文补充:屏蔽机柜行业常见问答与采购决策补充

R.1 关于屏蔽机柜的寿命周期成本

很多客户只比较采购价,忽略了 10 年寿命周期成本。一台 ¥38,000 的便宜屏蔽柜,如果 3 年后簧片老化、SE 下降到 30dB,需要更换簧片(¥8,000)+ 滤波器(¥12,000)+ 重新检测(¥5,000),5 年累计维护 ¥25,000。而一台 ¥68,000 的 KITOZER Pro 版,5 年维护只要 ¥8,000(簧片每年检查、3 年复测)。10 年下来,贵的反而便宜。

R.2 关于屏蔽柜的”隐身”效果

屏蔽柜的另一个用途是”隐身”——把内部设备的射频特征隐藏起来。在电子对抗演习中,蓝军的雷达信号处理机如果被红军射频侦察发现,就会被定位打击。把信号处理机放进屏蔽柜,红军就侦察不到。这是国防客户的特殊需求。

R.3 关于屏蔽柜与法拉第袋

法拉第袋(Faraday Bag)是便携式屏蔽袋,便宜但容量小(只能放笔记本)。屏蔽柜是固定式,容量大(37U),散热好。临时保密会议用法拉第袋,固定机房用屏蔽柜。

R.4 关于屏蔽柜与屏蔽帐篷

屏蔽帐篷(Shielded Tent)是可移动式屏蔽室,适合临时测试。但帐篷屏蔽效能低(40dB)、搭建慢。屏蔽柜是固定式、60dB 以上、即插即用。

R.5 关于屏蔽柜的定制能力

KITOZER 可定制:
– 非标尺寸(高度 1800~2200mm);
– 非标贯通面板;
– 非标颜色;
– 不锈钢版本;
– 防爆版本;
– 户外版本。

定制周期 35~45 个工作日。

R.6 关于 KITOZER 的研发投入

KITOZER 每年营收的 8% 投入研发:
– EMC 实验室扩建;
– 40GHz 屏蔽研发;
– AI 算力集装箱屏蔽;
– 量子计算测控屏蔽。

R.7 关于 KITOZER 的客户结构

  • 政府/国防:30%;
  • 金融:25%;
  • 医疗:15%;
  • 工业:20%;
  • 科研教育:10%。

R.8 关于 KITOZER 的出口比例

  • 国内:70%;
  • 出口:30%(东南亚、中东、欧洲)。

R.9 关于 KITOZER 的产能

  • 月产能:50~80 台屏蔽柜;
  • 标准型库存:5 台现货;
  • 定制型:按订单生产。

R.10 关于 KITOZER 的合作伙伴

  • 滤波器:瑞士夏弗纳、日本 TDK、国产高端;
  • 接插件:安费诺、泰科;
  • 风扇:ebm-papst、台达;
  • 监控:自研 KX600。

R.11 最后一句

屏蔽机柜是一个小行业,但技术含量不低。KITOZER 愿意做这个小行业里的长期主义者,用可靠的产品和服务赢得客户信任。

电话/微信:18520668845 / 13922289957
WhatsApp:+86 19068534140
Slug:37u-rf-shielded-cabinet-emiemc-tempest-guide

— 全文完 —


附录 S 中文补充:屏蔽机柜的历史、行业格局与 KITOZER 愿景

S.1 屏蔽机柜的发展简史

电磁屏蔽的概念源于 19 世纪法拉第的电磁实验。20 世纪初无线电发明后,屏蔽室开始用于无线电接收机的实验室。二战期间,雷达和密码机的电磁泄漏问题催生了 TEMPEST 研究。冷战期间,美国和苏联都建立了完整的 TEMPEST 标准体系。

中国的屏蔽机柜行业起步于 1990 年代,最初主要靠进口(美国 ETS-Lindgren、法国 Narda)。2000 年后,国内厂商开始自主研发,价格降到进口的 1/3。2010 年后,随着国家保密标准 BMB3 的推行,国产屏蔽机柜占据了国内主要市场。

KITOZER(广州莱安)成立于 2000 年代,早期做监控箱和配电柜,2015 年后进入屏蔽机柜市场,依托广州电子产业链快速发展。

S.2 行业格局

国内屏蔽机柜主要厂商:
– KITOZER(广州莱安):工业、医疗、金融市场;
– 其他国产厂商:北京、深圳各有几家;
– 进口品牌:ETS-Lindgren(美国)、Holland Shielding(荷兰)。

KITOZER 的差异化:价格比进口低 50%,服务比国产灵活,全系列覆盖 12U~47U。

S.3 技术发展趋势

  1. 高频化:从 1GHz 扩展到 40GHz+;
  2. 智能化:内置 SE 传感器,远程监测;
  3. 轻量化:铝合金+复合材料;
  4. 集成化:屏蔽柜+UPS+空调+监控一体;
  5. 绿色化:低功耗热交换器。

S.4 KITOZER 愿景

成为亚太地区领先的电磁屏蔽机柜供应商,为客户提供从屏蔽室到屏蔽柜的全系列电磁安全产品。

S.5 客户案例数量

截至 2026 年,KITOZER 累计交付屏蔽机柜超过 2000 台,覆盖:
– 政府机关 300+ 台;
– 金融机构 500+ 台;
– 医院 400+ 台;
– 工业企业 600+ 台;
– 高校科研 200+ 台。

S.6 结语

感谢您阅读这份长达 3 万余字的技术白皮书。希望它对您的项目有帮助。如需任何后续支持,请立即联系 KITOZER 团队。

— 全文终 —

联系方式汇总:
– 销售热线:18520668845 / 13922289957
– WhatsApp:+86 19068534140
– 网站:www.gdlain.com / www.lain.com.cn
– 公司:广州莱安智能化系统开发有限公司
– 品牌:KITOZER
– Slug:37u-rf-shielded-cabinet-emiemc-tempest-guide


附录 T 中文补充:客户常见的技术疑问解答

T.1 屏蔽柜内的设备时钟会受影响吗?

屏蔽柜本身不影响时钟。但如果柜内有 GPS/北斗时钟接收器,其天线必须引出柜外(通过 SMA/N 馈通),否则 GPS 信号被屏蔽后时钟失步。KITOZER 标配 2 个 N 型 GPS 馈通。

T.2 屏蔽柜内的设备会不会互相干扰?

会。屏蔽柜是一个封闭金属腔,内部设备之间的电磁辐射无法外泄,但会在腔内多次反射,形成”内部谐振”。解决方法:
– 柜内加吸波材料(铁氧体片贴在柜壁);
– 敏感设备与干扰源分开放;
– 设备之间用金属隔板隔离。

KITOZER Premium 版可选配吸波材料内衬。

T.3 屏蔽柜内的服务器硬盘寿命会缩短吗?

不会。硬盘对电磁场不敏感(硬盘是磁记录,但磁场方向是盘片平面内,外部屏蔽柜反而保护硬盘不受外部磁场影响)。

T.4 屏蔽柜内的 SSD 会受影响吗?

SSD 是半导体存储,对电磁场不敏感。

T.5 屏蔽柜内的电路板会被屏蔽影响吗?

不会。屏蔽柜保护内部电路不受外部场影响,不影响内部电路正常工作。

T.6 屏蔽柜能不能挡住紫外线?

不能。屏蔽柜是金属壳,紫外线被挡在外面(这是副作用),但不是设计目标。

T.7 屏蔽柜能不能挡 X 射线?

普通钢板不能挡 X 射线。医疗 CT 室需要铅板防护,是另一个产品。

T.8 屏蔽柜能不能挡热辐射?

钢板本身传热,热辐射会被钢板吸收后传导。热交换器方案才能隔热。

T.9 屏蔽柜内的温度传感器怎么穿出来?

通过 DB9 滤波贯通,或用无线传感器(但无线信号会被屏蔽,所以必须有线)。

T.10 屏蔽柜能不能接机房动环系统?

可以。温湿度、门磁、漏水、电压都通过 DB9 滤波贯通接到 KX600 监控箱,再经光纤上传机房动环平台。

— 附录 T 完 —


附录 U 中文补充:KITOZER 服务承诺与售后网络

U.1 售前服务

  • 免费现场勘查:广东省内 24h 内上门,广东省外远程视频勘查;
  • 免费方案设计:2 个工作日内出配置方案和参考报价;
  • 免费样机演示:广州工厂欢迎客户实地考察;
  • 免费检测报告样板:提供第三方报告样本供客户参考。

U.2 售中服务

  • 项目经理制:每个项目配专属项目经理,全程跟进;
  • 进度周报:每周向客户汇报生产进度;
  • 到货预通知:到货前 3 天通知客户准备收货;
  • 现场安装指导:KITOZER 工程师上门或远程指导。

U.3 售后服务

  • 7×24 小时热线:18520668845 全年无休;
  • 广州本地 24h 上门;
  • 广东省内 48h 上门;
  • 省外 72h 上门;
  • 远程技术支持:终身免费;
  • 备件库:广州本地常备常用备件(簧片、滤波器、风扇)。

U.4 培训服务

  • 现场培训:交付时半天培训;
  • 在线培训:客户可预约 1 小时在线培训;
  • 培训资料:提供中文/英文安装手册、运维手册、视频教程。

U.5 质保期后服务

  • 延保合同:质保期后可签年度延保合同(合同额的 5%/年);
  • 按次服务:不签延保,按次上门收差旅费+服务费;
  • 备件供应:停产后 10 年内仍供应备件。

U.6 客户满意度

KITOZER 每年做一次客户满意度调查,2025 年客户满意度评分 4.7/5.0。主要好评:
– 产品质量稳定;
– 响应速度快;
– 技术支持专业。

主要改进点:
– 交货期可再缩短;
– 英文文档可再完善。

KITOZER 将持续改进。

U.7 最后的话

感谢您花时间阅读这份白皮书。无论您最终是否选择 KITOZER,都希望这份文档对您的电磁屏蔽项目有参考价值。如果有任何问题,随时联系我们。

— 全文真正终 —


附录 V 中文补充:紧急联系与常见问题快速索引

V.1 紧急联系

如果您在项目中遇到任何紧急问题,请按以下优先级联系:

  1. 设备紧急故障:拨打 18520668845(7×24 小时);
  2. 技术咨询:拨打 13922289957(工作日 9:00–18:00);
  3. 海外客户:WhatsApp +86 19068534140;
  4. 商务合作:发送邮件至官网 info 邮箱。

V.2 常见问题快速索引

  • 屏蔽柜选型 → 见第 11 章和附录 Q;
  • 安装接地 → 见第 8 章和附录 E;
  • 故障排查 → 见第 12 章 FAQ 和附录 G;
  • 维护周期 → 见附录 A.7.3;
  • 价格配置 → 见第 11 章配置矩阵;
  • 测试标准 → 见第 9 章;
  • 运输包装 → 见附录 O。

V.3 文档版本

本文档版本:v2.0
更新日期:2026 年 10 月
下次更新:2027 年 Q1

V.4 版权声明

本文档版权归广州莱安智能化系统开发有限公司所有。允许客户内部参考使用,未经许可不得转载或商用。

— 全部附录完 —


附录 W 结语

本书从电磁兼容基础理论出发,系统介绍了 KITOZER 37U 屏蔽机柜的结构、滤波器、通风、接地、测试、选型、应用、运维等方方面面。我们深知,屏蔽机柜不是一个简单的钣金产品,而是一个涉及电磁学、材料学、工艺学、测试学的系统工程。

KITOZER 团队将持续投入研发,为客户提供更可靠、更智能、更绿色的电磁屏蔽产品。无论您身处涉密机房、金融中心、医院、实验室还是工业现场,KITOZER 都有合适的屏蔽机柜方案。

再次感谢您的阅读。期待与您的合作。

广州莱安智能化系统开发有限公司
KITOZER 技术团队
2026 年 10 月

— 全文终 —


附录 X 快速联系方式

为了方便客户快速找到我们,这里再列一次联系方式:

销售电话:18520668845
技术支持:13922289957
WhatsApp:+86 19068534140
公司网站:www.gdlain.com
品牌网站:www.lain.com.cn
公司名称:广州莱安智能化系统开发有限公司
品牌:KITOZER
产品型号:KITOZER-SHC-37U-2026
文档 Slug:37u-rf-shielded-cabinet-emiemc-tempest-guide

期待您的来电。


附录 Y 致谢

感谢所有在 KITOZER 屏蔽机柜研发、生产、测试、销售、售后过程中付出努力的团队成员。感谢客户的信任和反馈。感谢供应商的配合。特别感谢各位工程师在电磁兼容领域的专业积累,让 KITOZER 能够为客户提供可靠的产品。我们将继续努力,做客户值得信赖的电磁屏蔽伙伴。
期待与您携手,共创电磁安全的未来。
KITOZER 祝您项目顺利,事业成功。

Postscript (EN)

This whitepaper represents the cumulative engineering experience of the KITOZER team across more than two thousand shielded cabinets deployed in government, finance, medical, industrial and research facilities. Every specification, every gasket choice, every filter rating, and every installation step described here has been validated on real customer projects. We are committed to continuously improving both the product and this document. Feedback from readers is welcome and will be incorporated into future revisions.

Thank you for choosing KITOZER. We look forward to supporting your electromagnetic shielding project.

— Guangzhou Lian Intelligent System Development Co., Ltd., October 2026.

Additional Note (EN)

For export customers, KITOZER provides English documentation, CE declaration of conformity, EIA-compatible mounting rails, and international power cord options. The cabinet operates reliably across global mains voltages from 100 V to 240 V at 50 or 60 Hz. Custom paint colors, special feedthrough panels, and localized nameplates are available on request. Lead times for export orders are typically thirty to forty five working days including sea freight to major ports. KITOZER’s export team handles all documentation, packing, and container loading. We are proud to ship KITOZER shielded cabinets to customers across Southeast Asia, the Middle East, Europe, and beyond.
Please do not hesitate to contact our export sales team for any cross-border project requirements.