Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd. | Brand: KITOZER | Version: V1.0
Applicable scenarios: park duty stations, construction site offices, outdoor operation stations, emergency command points, scenic area services — 2–3 person office + living use.
Document-Level Disclaimer: The configuration and budget information shown in this document are provided for preliminary design, technical discussion and budgetary reference only. They do not constitute a formal commercial quotation from Guangzhou Lain Intelligent System Development Co., Ltd. Final product selection, quantities, specifications and pricing are subject to the actual project requirements and the company’s formal quotation.
1. Company Introduction
Guangzhou Lain Intelligent System Development Co., Ltd. was established in 2002 and is a high-technology enterprise integrating R&D, production and sales of computer room construction, integrated buildings, intelligent cabinet bodies and environmental monitoring equipment. Its core brand is KITOZER.
With more than two decades of industry experience, the company masters efficient green modular integrated construction technology and provides customized solutions for different scenarios. Products cover modular cold aisles, indoor integrated cabinets, outdoor cabinets, shielding rooms, container computer rooms, intelligent shielding cabinets and integrated stations, widely used in communications, power, construction, municipal, scenic and emergency fields.
Four core strengths:
– Fast delivery: flexible factory prefabrication and standardized module assembly greatly shorten project lead time.
– Quality assurance: full-process quality standard control, traceable key processes, third-party inspection.
– Custom design: personalized solutions per usage scenario, appearance needs and functional configuration, with multiple free design options.
– Quality after-sales: 7×24 professional online service, rapid response, dedicated personnel through the full cycle.
2. Project Overview
2.1 Project Background
As outdoor operations, park management, construction and emergency support needs upgrade, traditional temporary panel houses suffer from long construction periods, poor appearance, weak insulation, single function and high relocation loss. Market demand is growing for integrated, movable, fully functional, comfortable and durable residential-office spaces.
For 2–3 person teams needing combined office, rest and basic washing functions, this project designs a 3m×7m standard residential-office integrated station that strictly matches the reference appearance, achieving factory prefabrication, rapid on-site assembly and immediate use with practicality, economy and durability.
2.2 Project Objectives
– Function: full coverage of office, living, washing, power supply, temperature control and ventilation for 2–3 people.
– Performance: safe structure against wind and earthquake; insulation, waterproofing, fire resistance; compliant electrical system; long service life.
– Appearance: 1:1 match with the reference rendering — blue roof, white-grey walls with waist band, neat and attractive.
– Delivery: modular production and transport; 1–2 day on-site assembly; rapid commissioning.
– O&M: low maintenance cost, universal replaceable parts, responsive after-sales.
2.3 Project Scope
The solution covers the complete product design of the station — main structure, enclosure systems, doors and windows, interior finishing, power and weak-current systems, plumbing, HVAC and furniture — plus full-process services of transport, installation, construction organization, after-sales and training.
3. User Requirement Analysis
3.1 Functional Requirements
– Office: accommodates 2–3 people with desks, file cabinet, power and network for computers, ample lighting.
– Living: sleeping for 2–3 people with beds and storage, basic privacy.
– Washing: washbasin with supply/drainage for daily hygiene.
– Temperature control: summer cooling and winter heating for comfort.
– Ventilation: natural daylight and ventilation plus mechanical exhaust for fresh air.
3.2 Performance Requirements
– Structural safety: firm main structure resisting self-weight, snow and wind loads; seismic intensity 7.
– Insulation: insulated walls and roof — cool in summer, warm in winter, lower air-conditioning energy use.
– Waterproofing: reliable roof, door/window and wall-joint waterproofing with no leakage risk.
– Fire performance: main materials reach the corresponding flame-retardant rating; electrical system has leakage and overload protection.
– Durability: anti-corrosion steel structure and weather-resistant coated steel panels; normal service life ≥15 years.
3.3 Appearance Requirements
– Square flat-roof profile with raised parapet border around the roof, deep blue.
– Two-tone walls: upper milk-white, lower light grey, with a dark grey horizontal waist band.
– White doors and windows; entry door and glazed window on the front, side daylight windows; symmetrical layout.
– Simple and imposing; optional enterprise logo and slogan.
3.4 Usage Scenarios
Industrial parks and factory gate duty with security office and rest; construction and municipal project management temporary office and lodging; outdoor stations, highway maintenance and forestry operation sites; scenic area visitor services and staff duty; emergency rescue, temporary command and temporary facilities.

4. Overall Design Description
4.1 Design Principles
– Safety and reliability: structure, electrical, fire and waterproofing strictly per national codes.
– Economy and practicality: functional configuration matches actual needs, avoiding redundancy.
– Energy saving and environmental: insulated enclosure, energy-saving lamps, inverter AC, eco-friendly materials.
– Modularity: fully modular design, factory prefabrication, on-site bolted/plug-in assembly, no wet work.
– Mobility: integral lifting transport, easy relocation, reusable, minimal second-installation loss.
– Humanization: rational zoning, smooth circulation, good daylight and ventilation, balancing office efficiency and living comfort.
4.2 Overall Dimensions
| Item | Value |
|---|---|
| External length × width | 7000 mm × 3000 mm |
| Total external height (incl. parapet) | 2900 mm |
| Interior clear height | 2700 mm |
| Building area | 21 m² |
| Usable interior area | ≈20 m² |
| Design service life | 15–20 years |
| Seismic intensity | 7 degrees |
| Basic wind pressure | 0.55 kN/m² |
| Roof live load | 0.5 kN/m² |
| Floor uniform live load | 2.0 kN/m² |
4.3 Floor Plan
The station is divided along its length into two functional zones separated by a partition wall:
– Office zone (≈12 m²): near the entry door — 2 office desks, 3 office chairs, 1 steel file cabinet, ample sockets and network ports, 2 LED lights.
– Rest/washing zone (≈9 m²): inner area — 1 double bunk bed (1.2 m), 1 folding spare bed, 1 two-door locker, corner pedestal washbasin with floor drain.
– Partition door: internal door between zones for privacy.
– Doors/windows: 1 entry door + 1 sliding window on the front, 2 sliding windows on the long side for double-sided daylight and cross ventilation.
4.4 Exterior Design
Strictly per the reference rendering:
– Roof: flat with 200 mm high parapet border, sea blue, straight clean lines.
– Walls: three-level horizontal design — lower 1000 mm light grey, middle 150 mm dark grey waist band, upper milk-white.
– Doors/windows: white plastic-steel frames with clear glass, coordinated with walls.
– Corners: all external corners finished with dedicated edge strips — straight, neat, no burrs or gaps.

5. Recommended Configuration and Reference Budget
The following is the recommended configuration for one 3m×7m residential-office integrated station. Quantities, model codes and specifications follow the source document’s standard offering and are provided for preliminary design and budgetary reference only. No official price database is available for this trial; final pricing is confirmed in the company’s formal quotation.
5.1 Main Steel Structure System
| No. | Item | Specification | Qty | Unit |
|---|---|---|---|---|
| 1 | Corner load-bearing columns | 100×100×2.5 mm hot-dip galvanized square tube, 2800 mm | 4 | pcs |
| 2 | Bottom frame longitudinal main beams | 120×60×2.75 mm galvanized square tube, 7000 mm | 2 | pcs |
| 3 | Bottom frame transverse secondary beams | 80×40×2.5 mm galvanized square tube, 3000 mm | 12 | pcs |
| 4 | Top frame longitudinal main beams | 120×60×2.5 mm galvanized square tube, 7000 mm | 2 | pcs |
| 5 | Top frame transverse purlins | 60×40×2.0 mm galvanized square tube, 3000 mm | 10 | pcs |
| 6 | Wall vertical studs | 50×30×1.5 mm galvanized C-section, 2800 mm | 14 | pcs |
| 7 | Wall horizontal studs | 50×30×1.5 mm galvanized C-section | 8 | pcs |
| 8 | Full connection hardware kit | Galvanized bolts, angle brackets, self-tapping screws, expansion bolts | 1 | set |
5.2 Roof Enclosure System
| No. | Item | Specification | Qty | Unit |
|---|---|---|---|---|
| 1 | Roof sandwich panel | 50 mm EPS color steel, sea blue outside / milk-white inside | 21 | m² |
| 2 | Parapet border | Sea blue color steel, 200 mm high | 20 | m |
| 3 | Roof waterproof sealant | Neutral silicone weatherproof, 300 ml | 12 | pcs |
| 4 | PVC drainage gutter | 100 mm finished gutter | 14 | m |
| 5 | PVC downpipe | φ75 mm with rain hopper | 2 | pcs |
| 6 | Roof insulation reinforcement | 20 mm glass wool blanket | 21 | m² |
5.3 Wall Enclosure System
| No. | Item | Specification | Qty | Unit |
|---|---|---|---|---|
| 1 | Lower wall panels | 50 mm EPS sandwich, light grey outside / milk-white inside | 20 | m² |
| 2 | Upper wall panels | 50 mm EPS sandwich, double milk-white | 30 | m² |
| 3 | Decorative waist band | Dark grey color steel, 150 mm wide | 20 | m |
| 4 | Interior partition panels | 50 mm EPS sandwich, double milk-white | 8.4 | m² |
| 5 | Wall edge strips | Color steel corner/edge profiles | 36 | m |
5.4 Door and Window System
| No. | Item | Specification | Qty | Unit |
|---|---|---|---|---|
| 1 | Entry door | Color steel sandwich door with observation window, 900×2100 mm | 1 | set |
| 2 | Double sliding glazed windows | Plastic-steel frame, 5 mm tempered glass, 1200×1200 mm, with screens | 3 | sets |
| 3 | Partition inner door | Color steel simple door, 800×2000 mm | 1 | set |
| 4 | Door/window sealing kit | EPDM strips, sealant, foam | 1 | set |
5.5 Interior Base Finishing
| No. | Item | Specification | Qty | Unit |
|---|---|---|---|---|
| 1 | Floor base board | 18 mm fiber cement pressure board | 21 | m² |
| 2 | Floor finish | 2 mm anti-slip PVC flooring | 21 | m² |
| 3 | Ceiling | Milk-white color steel sandwich ceiling | 21 | m² |
| 4 | Internal corner trims | PVC white | 36 | m |
5.6 Electrical System
| No. | Item | Specification | Qty | Unit |
|---|---|---|---|---|
| 1 | Entry distribution box | 6-circuit surface-mounted, with main RCD | 1 | set |
| 2 | LED ceiling lights | 24 W cool white | 4 | sets |
| 3 | 10A 5-hole sockets | 86-type flush | 8 | pcs |
| 4 | 16A AC sockets | 86-type flush | 2 | pcs |
| 5 | Lighting switches | Single/double | 3 | pcs |
| 6 | Network sockets | Cat5e RJ45 | 4 | pcs |
| 7 | Full wiring kit | BV wire, PVC conduit, boxes, accessories | 1 | set |
| 8 | Outdoor waterproof inlet box | IP65 | 1 | pcs |
5.7 Plumbing System
| No. | Item | Specification | Qty | Unit |
|---|---|---|---|---|
| 1 | Supply pipe | PPR φ20 mm hot/cold | 15 | m |
| 2 | Drain pipe | PVC-U φ50 mm | 10 | m |
| 3 | Pedestal washbasin | Ceramic with hot/cold tap | 1 | set |
| 4 | Main inlet valve | Brass globe valve DN15 | 1 | pcs |
| 5 | Odor trap floor drain | Stainless deep-seal | 1 | pcs |
5.8 Office and Living Furniture
| No. | Item | Specification | Qty | Unit |
|---|---|---|---|---|
| 1 | Double bunk bed | 1.2 m × 2 m steel | 1 | set |
| 2 | Folding single bed | 0.9 m, storable | 1 | set |
| 3 | Office desk | 1.2×0.6 m panel desk | 2 | pcs |
| 4 | Office chair | Mesh task chair | 3 | pcs |
| 5 | Steel file cabinet | 900×1800 mm double door | 1 | pcs |
| 6 | Two-door locker | Steel, lockable | 1 | pcs |
5.9 HVAC and Ventilation System
| No. | Item | Specification | Qty | Unit |
|---|---|---|---|---|
| 1 | Wall-mounted AC | 1.5 HP inverter heat/cool | 1 | unit |
| 2 | Louvre exhaust fan | 10-inch wall type | 2 | pcs |
5.10 Transport, Installation and Auxiliary Materials
| No. | Item | Specification | Qty | Unit |
|---|---|---|---|---|
| 1 | Sealing/fixing accessories | Weatherproof sealant, foam, rivets, screws | 1 | lot |
| 2 | Professional installation labor | Integrated building installation team | 1 | item |
| 3 | Full-truck transport | 4.2 m flatbed incl. loading | 1 | item |
| 4 | Site foundation (standard) | 100 mm C20 concrete slab | 21 | m² |
Pricing disclaimer: The configuration and budget shown in this document are provided for preliminary design, technical discussion and budgetary reference only. They do not constitute a formal commercial quotation from Guangzhou Lain Intelligent System Development Co., Ltd. Final product selection, quantities, specifications and pricing are subject to the actual project requirements and the company’s formal quotation. Any budget references are stated in RMB/CNY only.
6. Detailed Technical Specifications
6.1 Main Steel Structure System
6.1.1 Material Standard — all structural steel is Q235B carbon structural steel per GB/T 700-2006: yield strength ReL ≥235 MPa, tensile strength 375–500 MPa, elongation ≥26%, impact energy ≥27 J at room temperature; S and P ≤0.045% each; good weldability.
6.1.2 Anti-Corrosion Treatment — all steel members hot-dip galvanized per GB/T 13912-2002: average zinc layer ≥85 μm, minimum ≥70 μm; no uncoated, peeling, blistering or cracked areas; neutral salt spray ≥1000 h without red rust; outdoor corrosion life ≥20 years.
6.1.3 Corner Columns — 100×100×2.5 mm galvanized square tube, 2800 mm; Ix≈248.7 cm⁴, Wx≈49.7 cm³; design axial capacity ≥150 kN per column; fully welded to top/bottom frames, weld height ≥6 mm, per GB 50017-2017.
6.1.4 Bottom Longitudinal Main Beams — 120×60×2.75 mm galvanized square tube, 7000 mm; Ix≈316.8 cm⁴; max deflection ≤L/250 under standard load; carries all floor loads to the corner columns.
6.1.5 Bottom Transverse Secondary Beams — 80×40×2.5 mm, 3000 mm, 12 pcs at 600 mm centers, fully welded both ends forming a grid base; floor live load design 2.0 kN/m².
6.1.6 Top Longitudinal Main Beams — 120×60×2.5 mm, 7000 mm, 2 pcs; carry roof and upper wall loads; deflection ≤L/300 under self-weight + 0.5 kN/m² snow load.
6.1.7 Top Transverse Purlins — 60×40×2.0 mm, 3000 mm, 10 pcs at 700 mm centers, angle-bracket bolted; fix roof panels, carry self-weight, snow and negative wind pressure.
6.1.8 Wall Stud System — vertical: 50×30×1.5 mm C-section, 2800 mm, 14 pcs at 500 mm spacing, angle-bracket bolted top and bottom; horizontal: 8 pcs at wall base, waist band and top; verticality ≤3 mm/m, levelness ≤2 mm/m.
6.1.9 Connection Hardware — 8.8-grade galvanized bolts M8/M10 (GB/T 5782-2016); 3 mm galvanized angle brackets; ST5.5 self-tapping screws; M10×100 mm expansion bolts (8 sets) fixing the base to concrete; all anti-corrosion treated.
6.2 Roof Enclosure System
6.2.1 Roof EPS Sandwich Panel — 50 mm tongue-and-groove panel; sea blue polyester-coated steel 0.4 mm upper / milk-white 0.3 mm lower, galvanized base ≥80 g/m² (GB/T 12754-2019); flame-retardant EPS core ≥18 kg/m³, thermal conductivity ≤0.041 W/(m·K), B1 flame rating (GB 8624-2012); effective width 1150 mm; roof heat transfer coefficient K ≤0.8 W/(m²·K); flexural capacity ≥0.5 kN/m²; ≥6 fixings per m², weatherproof sealant on joints.
6.2.2 Parapet Border — sea blue 0.5 mm color steel, CNC formed; 200 mm high, 50 mm fold; 20 m around the roof; riveted at 300 mm spacing, 45° miter joints sealed — water barrier and reference appearance.
6.2.3 Waterproof Sealant — neutral silicone weatherproof sealant per GB/T 14683-2017, 25LM grade, ±20% movement; −40 °C ~ +150 °C; applied to all panel joints, parapet joints, pipe penetrations and corners.
6.2.4 PVC Drainage Gutter — PVC-U 100×75 mm, 2.0 mm wall (GB/T 5836.1-2018); 14 m around the parapet inner edge; 0.5% slope to outlets; UV resistant, life ≥10 years.
6.2.5 PVC Downpipes — φ75 mm, 2.3 mm wall; 2 pcs at 3.0 m, diagonally arranged with rain hoppers, elbows, clamps (≤1.2 m spacing); per Guangzhou rainstorm intensity, each pipe serves 100 m² roof — 2 pipes fully satisfy the 21 m² roof for 50-year storms.
6.2.6 Insulation Reinforcement — centrifugal glass wool blanket (GB/T 13350-2017): 20 mm, 24 kg/m³, thermal conductivity ≤0.038 W/(m·K), Class A non-combustible; laid between purlins, ≥4 fixings per m²; improves summer/winter insulation and sound insulation.
6.3 Wall Enclosure System
6.3.1 External EPS Sandwich Panels — 50 mm tongue-and-groove; flame-retardant EPS ≥18 kg/m³, B1; inner face milk-white 0.3 mm. Lower panels light grey 0.4 mm outer (0–1000 mm height, 20 m²); upper panels milk-white 0.4 mm (waist band to ceiling, ≈1500 mm, 30 m²). Wall: K ≤0.8 W/(m²·K), weighted sound reduction Rw ≥30 dB, surface density ≈10 kg/m²; self-tapping fixed to studs, joint deviation ≤2 mm, corner strips at all corners.
6.3.2 Decorative Waist Band — dark grey 0.5 mm color steel, 150 mm wide with 20 mm folds, U-slot; 20 m at 1000 mm height; clipped to horizontal studs with rivets at 400 mm spacing; creates the two-tone facade and reinforces mid-wall stiffness.
6.3.3 Interior Partition Panels — double milk-white 50 mm EPS sandwich (0.3 mm faces); 3000×2800 mm, 8.4 m²; Rw ≥25 dB; fixed to floor/ceiling studs and outer wall inner faces, door opening reinforced; separates office and rest zones.
6.3.4 Wall Edge Strips — milk-white 0.4 mm color steel: 50×50 mm external corners, 25×25 mm internal corners, 50 mm U-shaped top/bottom closures; 36 m; adhesive + rivets, 45° miter joints; seals gaps against dust and moisture.
6.4 Door and Window System
6.4.1 Entry Door — color steel sandwich swing door with observation window; opening 900×2100 mm; 50 mm leaf, milk-white 0.4 mm faces with EPS core; window 300×600 mm, 5 mm tempered glass, aluminum bead, sealed; white plastic-steel frame 2.0 mm multi-chamber with steel reinforcement; stainless ball handle lock (GB/T 24543-2009), 3 stainless hinges (≥30 kg each), continuous EPDM strip; sound insulation ≥25 dB, waterproof ≥IP54, opening ≥90°.
6.4.2 Double Sliding Glazed Windows — plastic-steel double-track sliding windows with invisible screens; opening 1200×1200 mm; PVC-U profiles per GB/T 8814-2017, 2.0 mm multi-chamber with galvanized steel reinforcement; 5 mm float tempered glass (GB 15763.2-2005), transmittance ≥85%, impact ≥90 kg·cm; nylon double rollers ≥60 kg per sash, ≥10,000 cycles; crescent locks; air-tightness grade 6, water-tightness grade 4, Rw ≥28 dB, K ≤3.0 W/(m²·K) (GB/T 7106-2019); 3 units (2 on the 7 m facade, 1 on the 3 m side).
6.4.3 Partition Inner Door — color steel simple swing door; opening 800×2000 mm; 50 mm leaf with EPS core; stainless handle lock and 2 hinges.
6.4.4 Sealing Kit — EPDM strips (Shore A 60±5, elongation ≥300%, ~25 m); neutral silicone sealant (5 pcs); polyurethane foam (3 pcs) — no air/water/dust leakage around door and window frames.
6.5 Interior Base Finishing
6.5.1 Floor Base Board — asbestos-free fiber cement board (JC/T 412.1-2018), 18 mm, density 1.5 g/cm³; flexural ≥15 MPa; moisture ≤10%; Class A non-combustible; 1220×2440 mm panels laid on bottom beams, self-tapping fixed, 3–5 mm joints filled; 21 m².
6.5.2 Floor Finish — homogeneous PVC flooring (GB/T 11982.1-2015), 2.0 mm through-body; T-class abrasion ≥10,000 cycles; Bf1 flame rating; static friction ≥0.6 (R9); silver-ion antibacterial ≥99%; E0 grade, formaldehyde ≤0.05 mg/m³; full adhesive bonding with welded seams; 21 m².
6.5.3 Ceiling — milk-white color steel sandwich ceiling integrated with roof panels, 50 mm; flatness ≤2 mm/m; light/accessory openings reinforced and sealed; 21 m².
6.5.4 Internal Corner Trims — rigid PVC milk-white 20×20 mm; 36 m at wall-ceiling and wall-floor junctions; adhesive mounted, 45° miter joints.
6.6 Electrical System
6.6.1 Entry Distribution Box — PZ30 6-circuit surface-mounted, 1.0 mm steel shell powder coated, IP30; 2P 32A RCD main (30 mA, ≤0.1 s, per GB 16916.1) + 1P 10A lighting MCB + 2×1P 16A socket MCBs + 1P 20A AC MCB + 1P 16A spare; mounted 1.5 m inside the door; per GB 7251.3-2006.
6.6.2 LED Ceiling Lights — round acrylic LED ceiling lights, 24 W, ≥2160 lm, ≥90 lm/W, 6500K, Ra≥80, AC220V 50 Hz constant-current flicker-free; life ≥30,000 h; IP20; 4 units (2 per zone), average illumination ≥300 lx.
6.6.3 Sockets — 10A 5-hole 86-type with child shutters, tin-phosphor bronze 0.6 mm contacts, ≥10,000 cycles (GB 2099.1-2008), 8 units at 0.3 m; 16A 3-hole AC sockets, 2 units at 2.2 m.
6.6.4 Switches — 86-type rocker, 10A; 2 single + 1 double at 1.3 m; zoned lighting control.
6.6.5 Network Sockets — 86-type with Cat5e UTP module, 100 MHz/100 Mbps (TIA/EIA 568-C.2); 4 units at 0.3 m.
6.6.6 Full Wiring Kit — BV 2.5 mm² lighting/socket circuits (≤7.41 Ω/100 m), BV 4.0 mm² AC circuit (≤4.61 Ω/100 m), BV 6.0 mm² main inlet; ~120 m total, GB-standard copper; Cat5e UTP 4-pair 0.5 mm, ~50 m; flame-retardant PVC conduit φ16/φ20 1.2 mm (GB/T 14823.2-2016, B1), ~80 m; ~15 junction boxes; power and weak current separated ≥300 mm; conduit fill ≤40%; all joints in boxes.
6.6.7 Outdoor Waterproof Inlet Box — ABS IP65, 150×100×70 mm, rear wall at 2.0 m; protects external power entry.
6.7 Plumbing System
6.7.1 Supply Pipes — PPR dn20 (4-fen), 2.8 mm wall, PN2.0 MPa (GB/T 18742-2017); life ≥50 years at 70 °C/1.0 MPa; potable per GB/T 17219-1998; heat-fusion joints at 260±10 °C; 15 m + 10 fittings.
6.7.2 Drain Pipes — PVC-U dn50, 2.0 mm wall (GB/T 5836.1-2018); solvent-welded; 10 m + 8 fittings.
6.7.3 Pedestal Washbasin — high-temperature ceramic, ≈500×400 mm, 800 mm pedestal; full-copper hot/cold tap, ceramic cartridge ≥500,000 cycles, chrome plated; stainless pop-up drain with overflow.
6.7.4 Main Inlet Valve — brass globe valve DN15, PN1.6 MPa.
6.7.5 Odor Trap Floor Drain — 304 stainless panel 100×100 mm, plastic seal core, 50 mm water seal, drainage ≥1.0 L/s.
6.8 Office and Living Furniture
6.8.1 Double Bunk Bed — 1200×2000×1800 mm; 40×40×1.2 mm steel columns, 50×30×1.2 mm rails, 5 support tubes; electrostatic powder coating; 15 mm multi-layer wood boards; upper bunk 300 mm guardrail + ladder; load: upper ≥150 kg, lower ≥200 kg.
6.8.2 Folding Single Bed — 900×2000×400 mm unfolded, folds to 2000×450×100 mm for wall storage; 1.2 mm steel frame; thickened Oxford fabric + 50 mm high-density sponge; load ≥150 kg.
6.8.3 Office Desk — 1200×600×750 mm; 25 mm E1 melamine board; steel 40×40 mm frame with adjustable feet; load ≥50 kg; 2 units.
6.8.4 Office Chair — mesh task chair, 80 mm high-density cushion, ergonomic mesh back, nylon 5-star base with casters, gas lift 100 mm; load ≥120 kg; 3 units.
6.8.5 Steel File Cabinet — 900×400×1800 mm; 0.6 mm cold-rolled steel, powder coated; 4 adjustable shelves ≥40 kg each; central lock with 2 keys.
6.8.6 Two-Door Locker — 900×500×1800 mm; 0.6 mm steel; 2 doors each with hanger rod and shelf; individual locks.
6.9 HVAC and Ventilation System
6.9.1 Wall-Mounted AC — 1.5 HP inverter heat/cool; cooling 3500 W, heating 3850 W (with auxiliary); new tier-3 energy efficiency; airflow 650 m³/h; coverage 15–23 m² (full 21 m²); R32 refrigerant; indoor noise ≤24 dB(A) low / ≤37 dB(A) high, outdoor ≤51 dB(A); per GB/T 7725-2022.
6.9.2 Louvre Exhaust Fans — 10-inch wall type, φ250 mm opening; airflow ≥180 m³/h, 25 W, 1200 rpm, noise ≤45 dB(A); ABS housing with auto-closing louvres, IPX4; 2 units at 0.2 m from ceiling; ≥5 air changes per hour.
6.10 Transport, Installation and Auxiliary System
– Sealing/fixing materials: neutral silicone weatherproof sealant, structural adhesive, polyurethane foam, aluminum blind rivets, self-tapping screws, bolts/washers, anti-rust paint, waterproof tape, insulation tape.
– Professional installation: 1 installation foreman, 3 installers, 1 certified electrician; full tooling; complete assembly, finishing, MEP wiring and commissioning in 1–2 days on site; acceptance per national codes.
– Transport: 4.2 m flatbed full-truck transport with loading/unloading.
– Site foundation (standard): C20 concrete slab, 100 mm thick, 21 m² (100 mm larger than the house each side), flatness ≤5 mm — prevents settlement and ground moisture.

7. Core Advantages and Customer Value
1. Modular integration, fast delivery. All systems are factory-prefabricated and quality-inspected; the site only requires assembly without wet work — installed and in use within 1–2 days, greatly shortening schedule versus traditional panel houses.
2. Movable and reusable, high economy. Bolted construction allows integral lifting relocation or disassembly for re-installation with minimal loss; ideal for short-term sites; unit use cost far below temporary buildings.
3. Comprehensive performance, comfortable and durable. Hot-dip galvanized steel structure resists wind and earthquake with 15–20 year normal life; EPS sandwich enclosure plus insulation reinforcement keeps it warm in winter and cool in summer; multi-layer waterproofing with complete gutter/downpipe drainage; main materials B1 flame rating and above; electrical system with leakage protection.
4. Complete functions, office + living in one. Rational internal zoning for office, rest, washing and storage with full furniture and appliances — truly “move in and use,” suited to 2–3 person teams.
5. Neat appearance, strong customizability. Strictly matches the reference style — blue roof, white walls with waist band; colors, sizes, logo and door/window positions customizable; upgrades available (rock-wool fire panels, private bathroom, AC, etc.).
6. Environmental health, ready on installation. All materials meet environmental standards — no formaldehyde, no odor; usable immediately after installation.
7. Brand assurance, complete after-sales. Produced by a professional integrated building and computer room equipment manufacturer; comprehensive warranty and lifetime maintenance; 24-hour technical response.
8. Technical Q&A
Q1. How many people can this 3×7 m station accommodate?
A: Standard configuration supports 2–3 people for living + office. The rest zone has one 1.2 m double bunk bed for 2 people plus a folding single bed for a third person when needed.
Q2. What are the overall dimensions and weight? Is transport convenient?
A: External 7 m long × 3 m wide × ~2.9 m high, building area 21 m². Total weight approx. 2.5–3 tons; transportable by 4.2 m flatbed truck and liftable by a normal crane — very convenient to relocate.
Q3. Can the dimensions be adjusted?
A: Yes. Besides 3×7 m, custom sizes include 3×6 m, 3×8 m, 4×6 m, and multiple units can be combined into larger spaces.
Q4. What is the main structure material? Will it rust? How long does it last?
A: The load-bearing structure is Q235 carbon steel with hot-dip galvanizing — no rust for 15–20 years in normal outdoor conditions, total life above 20 years. Color steel panels show no significant fading or aging for 10–15 years.
Q5. What is the sandwich panel material? Is it fireproof?
A: Standard EPS color steel sandwich panels with flame-retardant core, B1 (difficult to ignite) flame rating — meeting general temporary building and outdoor station requirements. Class A rock-wool sandwich panels are available as an upgrade for higher fire requirements.
Q6. How good is the insulation? Will it be very hot in summer?
A: Walls and roof use 50 mm insulated sandwich panels plus extra glass wool on the roof; overall heat transfer coefficient ≤0.8 W/(m²·K) — far better than traditional color steel panel houses. In southern summers without AC, indoor temperature is 5–8 °C lower than outside; with AC, cooling is fast and energy-efficient.
Q7. Will the roof leak? How is drainage handled?
A: The roof uses tongue-and-groove panels with weatherproof sealant on all joints, a 200 mm parapet water barrier and internal PVC gutter/downpipe system — a complete waterproof/drainage system that does not leak under normal construction and use. A 3-year waterproof warranty is provided.
Q8. How wind-resistant is it?
A: Designed for a basic wind pressure of 0.55 kN/m², resisting around level-10 winds — meeting outdoor use requirements in most regions of China. Extra reinforcement is available for special strong-wind areas.
Q9. What are the windows made of? Is sound insulation good?
A: White plastic-steel profiles with 5 mm tempered glass and EPDM sealing strips; weighted sound reduction ≥28 dB — effectively blocking most outdoor noise for office and rest needs.
Q10. What is the floor material? Is it waterproof?
A: The base is 18 mm fiber cement board (moisture-proof and waterproof) topped with 2 mm homogeneous PVC flooring — waterproof, anti-slip, wear-resistant and easy to clean; small amounts of water do not seep through, and daily mopping is fine.
Q11. Is there any odor indoors? Can it be occupied immediately after installation?
A: All materials meet environmental standards — color steel panels, PVC flooring and furniture are eco-grade with low formaldehyde release; usable immediately after installation and cleaning, no lengthy airing needed.
Q12. Are the water and electricity pre-wired? Ready to use?
A: Yes. All power/weak-current wiring, sockets, lights and plumbing are factory-prefabricated and site-installed; the user only needs to connect 220V mains and a water supply inlet.
Q13. Is there electrical safety protection?
A: The entry distribution box has a main RCD (30 mA, trips within 0.1 s); each circuit has an independent MCB with overload/short-circuit protection; all cables are GB-standard copper in conduit — compliant with electrical safety codes.
Q14. Is there a bathroom? Can a toilet and shower be added?
A: Standard configuration is basic washing (pedestal washbasin) without a bathroom. A private bathroom can be added with a partition, toilet, shower, electric water heater and sewage lift pump — fully customizable.
Q15. Is the AC standard? What capacity?
A: A 1.5 HP inverter heat/cool AC is standard, covering 15–23 m² — fully adequate for the 21 m² station.
Q16. What do we need to prepare for installation? Is a foundation required?
A: A level, hardened ground foundation is needed — standard is a 100 mm C20 concrete slab. For short-term temporary use, concrete pads or channel steel leveling can be used, depending on the usage period and site conditions.
Q17. How long does installation take? Do you send installers?
A: Full installation service is provided by a professional team — all installation and commissioning completed on site in 1–2 days, with acceptance before handover.
Q18. Can we install it ourselves?
A: With relevant experience, self-installation is possible — detailed drawings and video guidance are provided. Professional installation is recommended for guaranteed quality and waterproofing.
Q19. What is the warranty? How is after-sales assured?
A: Main steel structure 5 years; waterproofing 3 years; electrical, doors/windows and furniture 1 year; AC per the manufacturer’s national warranty. 7×24 response — on-site within 24 h in the Pearl River Delta, 48 h outside the province; free repair/replacement during warranty for non-human damage.
Q20. What happens after the warranty period?
A: Lifetime maintenance service — only parts cost and labor charged; long-term supply of all parts.
Q21. Can it be moved and re-assembled? Is the loss large?
A: Yes. The modular bolt + plug-in construction allows disassembly, relocation and re-installation with almost zero loss to the main structure — only small consumables such as sealant and rivets need replacement.
Q22. Can the exterior color be changed? Can a logo be printed?
A: Yes. Roof, wall and waist band colors are customizable, and company logos, slogans and signage can be printed on the walls.
Q23. Can surveillance, access control or solar power be added?
A: Yes. CCTV cameras, face-recognition access control, solar PV + storage and emergency lighting can be fitted for unattended or smart outdoor stations.
Q24. Can a soundproof or shielded version be made?
A: Yes. With shielding room production qualification, soundproof and electromagnetic-shielded special stations can be customized for special scenarios.
9. Construction Schedule
| Phase | Main Activities | Duration | Remark |
|---|---|---|---|
| 1. Factory prefabrication | Steel cutting, welding, hot-dip galvanizing | 1 day | Parallel production |
| Sandwich panels, doors/windows, accessories production | 2 days | Incl. QC and packing | |
| 2. Transport | Full-truck transport to site | 1 day | Same-day within PRD |
| 3. Site installation | Foundation acceptance, base frame positioning and fixing | 0.5 day | Foundation pre-completed |
| Columns, top frame, studs | 0.5 day | Main frame formed | |
| External wall panels, roof panels, parapet | 0.5 day | Enclosure closed | |
| Doors, windows, partition, edge strips | 0.5 day | Appearance complete | |
| Floor base and flooring | 0.5 day | Interior finishing | |
| MEP wiring, lights, sockets, commissioning | 0.5 day | MEP tests | |
| Furniture, AC, exhaust fans | 0.5 day | Interior complete | |
| 4. Acceptance and handover | Overall cleaning, self-check, rectification | 0.5 day | |
| Joint acceptance, document handover | 0.5 day | Delivery | |
| Total | Factory + transport + installation | ≈7 days | Excl. foundation, which can proceed in parallel |
10. Construction Organization, Quality and Safety Measures
10.1 Organization
1 project manager (overall coordination, schedule, quality, customer liaison); 1 technical lead (disclosure, node workmanship guidance, acceptance); 1 installation foreman (site scheduling, safety); 3 installers (structure, enclosure, finishing); 1 certified electrician (electrical wiring, commissioning, acceptance).
10.2 Preparation
– Technical: drawing review and technical disclosure before work; clear process and quality requirements.
– Materials: all components and accessories per the list, factory-inspected and packed.
– Tools: drills, impact drills, cutters, welder, levels, tape measures, glue guns — checked and ready.
– Site: confirm level foundation, water and power availability.
10.3 Construction Process
Foundation acceptance → base frame assembly and leveling with expansion bolt fixing → corner columns and top frame with verticality correction → wall studs per design spacing → external wall panels bottom-up (lower panels, waist band, upper panels) → roof system (purlins, glass wool, roof panels, parapet, sealant) → gutter and downpipes with correct slope → doors and windows (frames, foam, sealant, sashes, hardware) → interior partition and edge strips → floor base boards and PVC flooring with welded seams → ceiling and light openings → electrical (conduit, wiring, distribution box, sockets, switches, lights, insulation tests) → plumbing (PPR supply, PVC drain, washbasin, tap, floor drain, leak tests) → HVAC and furniture installation → cleaning and self-check → joint acceptance, acceptance signing and document handover.
10.4 Quality Standards
– Steel structure: per GB 50205-2020 — column verticality ≤H/1000, beam deflection ≤L/500.
– Enclosure: wall flatness ≤3 mm/m, even joints, continuous smooth sealant, no leakage.
– Electrical: per GB 50303-2015 — insulation resistance ≥0.5 MΩ, reliable grounding.
– Plumbing: per GB 50242-2002 — pressure test without leakage, smooth drainage.
– Appearance: flat surfaces, uniform color, straight trims, no scratches, deformation or stains.
10.5 Safety and Civilized Construction
– Hard hats mandatory; safety harnesses at height; certified workers.
– Temporary power with RCDs; cables elevated or in conduit; no unauthorized wiring.
– Fire extinguishers on site; hot work clears flammable materials with supervision.
– Materials stacked neatly; construction waste cleared daily.
– Finished doors/windows, flooring and furniture protected from damage.
11. After-Sales Service
11.1 Warranty
– Main steel structure: 5 years.
– Roof waterproofing: 3 years.
– Electrical, doors/windows, furniture: 1 year.
– AC: per the manufacturer’s national warranty policy.
– During warranty, faults not caused by human damage or force majeure are repaired free with free part replacement.
11.2 Response
– 7×24 hotline and technical support; response within 2 hours of a report with a solution.
– Pearl River Delta: engineer on site within 24 hours.
– Outside Guangdong: on-site or remote guidance within 48 hours.
11.3 Maintenance
– Lifetime maintenance service; after warranty only parts cost and labor, no extra service fees.
– Long-term supply of original parts.
– Optional annual maintenance agreements with periodic inspection and servicing.
11.4 Follow-Up Visits
– Telephone follow-ups at 1, 6 and 12 months after delivery.
– Optional annual free on-site inspection of structure, waterproofing and electrical condition.
11.5 Emergency Handling
– Emergency faults (leakage, power failure) are prioritized for the fastest possible on-site service.
– Temporary solutions provided when immediate repair is not possible, with final resolution once parts arrive.
12. Training Plan
12.1 Audience
Customer management, O&M or daily duty personnel.
12.2 Objectives
Enable users to master daily usage, precautions and simple troubleshooting to keep the station safe and running.
12.3 Content
– General usage: structural features and limitations; prohibited actions (overloading, unauthorized modification, open flames).
– Electrical operation: distribution box operation and circuits; correct use of sockets, lights and AC; RCD trip reset.
– Door/window hardware maintenance: correct open/close; track, hinge and lock cleaning and lubrication; gasket care and replacement judgment.
– Plumbing use: main inlet valve location and operation; winter anti-freeze precautions; simple floor drain clearing.
– Common fault handling: lights not working, socket no power; door/window adjustment; minor leakage temporary treatment.
– Safety: electrical and fire safety; typhoon/rainstorm response.
12.4 Method
On-site training at acceptance (≈1 hour, explanation + demonstration); delivery of one paper copy of the Product Usage and Maintenance Manual; free remote refresher training for personnel changes; ongoing hotline support.
13. Anonymous Typical Project Scenarios
*All scenarios below are anonymous, generalized examples for reference. They do not refer to any real customer, project address or testimonial.*

Scenario A — Industrial park gate duty station.
An industrial park deployed 3m×7m residential-office integrated stations for 24-hour security duty, registration, office and rest. Outcome: quick installation, neat appearance, good insulation and comfort in all seasons, with fuller functions than traditional security booths.
Scenario B — Municipal construction site temporary office and lodging.
A municipal construction project used multiple 3m×7m integrated stations for site management office, duty and temporary lodging. Outcome: convenient relocation — units moved directly to the next site after project completion with high reusability; complete internal facilities, move-in ready, greatly saving temporary building costs.
Scenario C — Scenic area service station.
A scenic area deployed custom 3m×6m integrated stations with custom scenic-brand colors for staff duty, visitor rest and convenience services. Outcome: adapted to outdoor mountain conditions — windproof, rainproof, stable structure, appearance coordinated with the scenic environment, low operating and maintenance cost.
Scenario D — Outdoor station O&M site.
An outdoor station operation site deployed a 3m×7m high-spec unit upgraded with rock-wool fire panels, a private bathroom and solar power supply for O&M staff office, duty and lodging. Outcome: high fire rating, complete facilities, good corrosion resistance in a humid coastal environment, supporting unattended plus periodic on-site operation.
14. SEO Optimization
14.1 Keyword Classification
– Core keywords: residential-office integrated station, 3×7 m integrated station, mobile office-lodging unit, outdoor integrated station, container housing.
– Long-tail keywords: 3m×7m container office-lodging price, 2–3 person residential-office station manufacturer, outdoor duty integrated station customization, construction site temporary office-lodging unit, integrated residential-office station quote, movable office-living container.
– Industry keywords: mobile panel house, container house, integrated building, color steel sandwich panel house, mobile duty room, temporary office building.
– Brand keywords: KITOZER station, Guangzhou Lain integrated station.
– Geographic keywords: Guangzhou integrated station manufacturer, Guangdong container housing customization, Panyu mobile panel house manufacturer, Shenzhen construction site temporary office, Dongguan container housing manufacturer.
14.2 SEO Tags
– SEO Title: 3m×7m Residential-Office Integrated Station — 2-3 Person Office + Living Station | Lain KITOZER
– Meta Keywords: residential-office integrated station, 3m×7m integrated station, mobile office-lodging unit, outdoor integrated station, container housing, Guangzhou integrated station manufacturer
– Meta Description: Guangzhou Lain produces 3m×7m residential-office integrated stations for 2–3 person office + living needs — factory prefabricated, rapid installation, insulated and waterproof, structurally safe; ideal for construction sites, industrial parks and outdoor duty stations.
– H1: 3m×7m Residential-Office Integrated Station Technical Design Solution
– H2 structure: Project Overview | User Requirement Analysis | Overall Design Description | Technical Specifications | Core Advantages | Construction Plan | After-Sales Service
14.3 Internal Link Anchor Suggestions
– Core anchors: residential-office integrated station, integrated station.
– Long-tail anchors: 3m×7m office-living unit, outdoor container office.
– Related anchors: container computer room, outdoor cabinet, micro-module cold aisle.
*Note: keywords are placed naturally; no keyword stuffing.*
15. Official Contact Information
– Company: Guangzhou Lain Intelligent System Development Co., Ltd.
– Website: https://gdlain.com
– Phone: +86 139 2228 9957 / +86 185 2066 8845
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, Guangdong, China