Table of Contents
Toggle1. Cover / Document Information
– Document Title: 40ft Standard High-Cube Container Liquid-Cooled Data Center Technical Design Solution
– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Date: August 2026
– Version: V1.0
– Project Type: Technical design solution for 40ft Standard High-Cube Container Liquid-Cooled Data Center
2. Table of Contents Structure
1. Company Introduction
2. Project Overview
3. User Requirement Analysis
4. Overall Design Description
5. Detailed System Design and Product Technical Parameters
6. Project Quotation and Configuration List
7. Core Solution Advantages
8. Technical Q&A
9. Construction Schedule Plan
10. Construction Organization Plan
11. After-Sales Service System
12. Operation and Maintenance Training Plan
13. Typical Project Cases
14. SEO Optimization System and Website Backend Configuration
15. Contact Information
3. Company Introduction
3.1 Company Development Overview
Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.
After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.
3.2 Core Business System
The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:
– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;
– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;
– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;
– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.
3.3 Brand and Qualification Honors
The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.
3.4 Core Competitive Advantages
1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;
2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;
3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;
4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.
4. Project Background and Objectives
4.1 Project Background
With the rapid development of AI large-model training, high-performance computing and edge computing, the power density of a single server cabinet has jumped from the traditional 5-10kW to 20-50kW. Traditional air cooling can no longer meet high-density heat dissipation needs, and suffers from high energy consumption, high noise and long deployment cycles.
This solution targets high-density computing scenarios: using a 40ft standard high-cube container as the carrier, integrating an indirect liquid cooling heat dissipation system, configuring 8 high-density liquid-cooled cabinets at 30kW each (total heat load 240kW), with CDU (coolant distribution unit) as the core heat exchange node, connecting to external chillers/dry coolers as the heat source, providing stable and efficient liquid cooling for servers.
The solution adopts factory prefabrication: all systems inside the container — cabinets, piping, CDU, power distribution, monitoring and fire protection — are pre-installed and tested in the factory. On site, only water, power and the external heat source need to be connected for rapid commissioning, shortening the construction period by more than 80% versus traditional computer rooms. It is widely applicable to edge computing nodes, temporary computing expansion, outdoor emergency computer rooms and AI training clusters.
4.2 Cooperation Boundary
The default cooperation boundary of this solution is: the client is responsible for the supply and connection of the outdoor-side heat source (chillers, cooling towers, dry coolers, etc.); we provide the complete liquid cooling infrastructure and system integration inside the container. The interface between the two parties is the primary-side heat source quick couplings on the container exterior wall.
4.3 Construction Objectives
– Deliver a 240kW high-density liquid-cooled data center with 8× 30kW cabinets, meeting high-power CPU/GPU server cooling needs;
– Achieve PUE ≤1.1 through efficient indirect liquid cooling architecture, meeting green data center requirements;
– Factory prefabrication with overall delivery cycle ≤45 days, supporting rapid capacity expansion;
– Container form supports outdoor deployment, hoisting, transportation and relocation for flexible business adjustment;
– Full redundancy (CDU 1+1, pump 1+1) ensuring 7×24 uninterrupted operation;
– Full-dimension intelligent monitoring with local + remote dual management.
5. User Requirement Analysis
5.1 Heat Dissipation Performance Requirements
– Single-cabinet rated heat dissipation 30kW, total heat load 240kW, meeting high-power CPU/GPU server cooling needs;
– Secondary-side supply water temperature stably controlled at 15-20℃, return water temperature ≤28℃, server chip temperature controlled within the design threshold;
– Cooling system has redundancy; single component failure does not affect overall heat dissipation, ensuring continuous business operation.
5.2 Deployment and Delivery Requirements
– Standard container form for direct outdoor deployment without additional dedicated computer room buildings;
– Factory prefabricated integration with fast on-site connection, overall delivery cycle ≤45 days;
– Hoistable and relocatable, supporting flexible business adjustment and remote deployment.
5.3 Reliability and Safety Requirements
– Core equipment adopts 1+1 redundant architecture for year-round uninterrupted operation;
– Complete electrical safety, fire protection, leakage detection and lightning protection grounding systems;
– Multiple alarm and protection mechanisms: over-temperature, over-pressure, low liquid level and power failure abnormal scenarios automatically protected.
5.4 Intelligent O&M Requirements
– Full-system parameter real-time collection and monitoring, local + remote dual-mode management;
– Automatic fault location and alarms with linkage control support;
– Data storage and historical traceability, reducing manual O&M intensity.
5.5 Compliance and Adaptation Requirements
– Comply with national data center design, electrical, fire and environmental standards;
– Reserve expansion interfaces supporting future cabinet count and cooling capacity upgrades;
– Adapt to mainstream server cold plate interfaces, compatible with different brands of liquid-cooled servers.
6. Design Principles and Applicable Standards
6.1 Design Basis
This solution strictly follows current national and industry standards and specifications, including but not limited to:
– 《Data Center Design Specification》GB 50174-2017
– 《Code for Fire Protection Design of Buildings》GB 50016-2014 (2018 edition)
– 《Code for Design of Low-Voltage Electrical Installations》GB 50054-2011
– 《Technical Code for Protection of Building Electronic Information Systems Against Lightning》GB 50343-2012
– 《Code for Design of Automatic Fire Alarm Systems》GB 50116-2013
– 《Code for Design of Gas Fire Extinguishing Systems》GB 50370-2005
– 《Technical Requirements for Liquid Cooling of Communication Data Centers》YD/T 3299-2017
– 《General Specification for Computer Field》GB/T 2887-2011
– 《General Specification for Anti-Static Access Floors》GB/T 36340-2018
6.2 Design Principles
– Safety and reliability: system stability as the core, redundant key components, multiple safety protections, meeting 7×24 uninterrupted operation requirements;
– High efficiency and energy saving: liquid cooling high-efficiency heat exchange architecture reduces cooling energy, PUE as low as 1.1, in line with green data center development;
– Rapid deployment: factory prefabricated production, integrated delivery, greatly shortening on-site construction period for fast launch;
– Intelligent O&M: full-dimension environment monitoring, automatic control, remote management, reducing manual intervention and improving O&M efficiency;
– Flexible expansion: modular design with reserved expansion interfaces, supporting smooth upgrades of cooling capacity, power distribution and cabinet count;
– Economical and practical: optimize solution configuration while meeting performance and reliability, controlling overall investment and O&M costs.
7. System Architecture and Working Principle
7.1 Overall System Architecture
This container liquid-cooled data center adopts an indirect liquid cooling architecture of primary-side heat source + CDU heat exchange + secondary-side cabinet liquid cooling, divided into nine major systems:
– Container enclosure system: equipment carrier and protection main body, providing insulation, waterproofing, fire protection and load-bearing foundation;
– IT cabinet system: server installation carrier, integrating liquid cooling manifolds, quick couplings and PDUs;
– CDU coolant distribution system: liquid cooling core, realizing primary/secondary side heat exchange and controlling secondary-side water temperature and flow;
– Piping system: primary/secondary side supply and return pipelines connecting the heat source, CDU and cabinets;
– Water treatment system: coolant preparation, softened make-up water, chemical dosing and water quality monitoring;
– Power supply and distribution system: master distribution, UPS backup power, cabinet distribution and auxiliary distribution;
– Environment and power monitoring system: temperature/pressure/flow/liquid level monitoring, leakage detection, access control, video and centralized management;
– Fire protection and security system: gas fire extinguishing, fire detection, lightning protection grounding and access security;
– Auxiliary supporting system: cold aisle containment, lighting, O&M spare parts and labeling.
In spatial layout, 8 liquid-cooled cabinets are arranged on one side along the container length; the other side houses CDU units, distribution cabinets, UPS and fire cylinders; the middle is the O&M aisle — compact and reasonable, meeting operation and heat dissipation space requirements.
7.2 Working Principle
The primary-side heat source (chiller/cooling tower/dry cooler) supplies chilled water to the CDU at the quick couplings on the container wall. Inside the CDU, the plate heat exchanger transfers cooling capacity from the primary side to the secondary-side coolant (propylene glycol solution). The variable-frequency pump drives the secondary coolant through the supply main, branch manifolds and quick couplings into the server cold plates, absorbing chip heat, then returns through the return piping to the CDU. The CDU PLC precisely controls secondary-side supply temperature (15-20℃) and flow, isolates the two sides (protecting server cold plates from contamination and pressure shock), and automatically switches to the standby CDU on failure. All parameters are collected by the DCIM host for monitoring, alarming and linkage control.
8. Detailed Technical Design
8.1 Container Enclosure and Cabin Infrastructure
#### 8.1.1 40ft High-Cube Container Enclosure
| Parameter | Value |
|---|---|
| External size | 12192 × 2438 × 2896mm; internal ~12032 × 2280 × 2680mm |
| Material | Q235B steel: side/end panels 2.0mm, roof 2.5mm, floor 3mm checkered plate, 12# channel steel base frame, standard ISO cast steel corner fittings |
| Surface | Shot blasting Sa2.5, epoxy zinc-rich primer + epoxy micaceous iron oxide intermediate + acrylic polyurethane topcoat, total ≥120μm, C4 corrosion grade, outdoor life ≥15 years |
| Insulation | 50mm Class A fireproof rock wool in walls/roof/floor, density ≥120kg/m³, λ ≤0.040W/(m·K), GB8624-2012 Class A; 0.5mm galvanized steel inner lining |
| Protection | IP55 (GB4208-2017); EPDM continuous sealing at door gaps and pipe openings |
| Load | Floor uniform ≥1000kg/㎡; cabinet area local reinforcement single-point ≥1500kg; CDU area ≥2000kg/㎡ |
| Wind/seismic | Withstands 12-level typhoon (32.7m/s) per GB50009; seismic intensity 8 per GB50011 |
| Fire resistance | Wall fire resistance ≥2h, Class A fire rating |
| Openings | Pre-reserved primary-side water in/out, power incoming, weak-current communication and ventilation openings with waterproof sealing fittings |
#### 8.1.2 Cabin Load-Bearing Base
– 12# hot-rolled channel steel welded grid frame, 600×600mm grid, 3mm checkered steel plate on top;
– Full hot-dip galvanizing ≥85μm; bolted to container floor, flatness ≤2mm/㎡;
– Uniform load ≥1000kg/㎡, concentrated load ≥5000kg/point.
#### 8.1.3 Anti-Static Access Floor
– 600×600×35mm all-steel frameless, system resistance 10⁶-10⁹Ω per GB/T 36340-2018;
– Uniform load ≥1000kg/㎡, concentrated ≥300kg, ultimate ≥900kg; 1.5mm high-wear PVC anti-static surface, B1 fire rating;
– Galvanized steel pedestals 300mm (±20mm adjustable), galvanized stringers; vented and cable-access panels included, 5% spare panels.
#### 8.1.4 LED Lighting System
– LED flat panel clean lights 40W, CCT 6500K, Ra≥80, illumination ≥300lux, uniformity ≥0.7, ceiling-mounted along the aisle;
– 2 dual-head emergency lights (2×3W per head), Ni-Cd battery, auto-on on power failure, duration ≥90min, GB17945.
#### 8.1.5 Steel Class A Fire Door
– 900×2100mm single door; fire resistance 1.5h, GB12955-2008 Class A, 3C;
– Cold-rolled steel shell with 50mm Class A fireproof perlite fill; fire hinges, closer, escape lock, sealing strips and tempered glass observation window; electrostatic powder coating matte gray.
#### 8.1.6 Residual Pressure Ventilation Device
– 300×300mm mechanical residual pressure valve, opening differential 5-20Pa continuously adjustable;
– Balances internal/external pressure preventing container deformation from negative pressure, blocks external dust; G4 washable dust filter; galvanized steel body, aluminum valve leaves.
#### 8.1.7 Equipotential Grounding System
– Main grounding bar 40×4mm copper along the full perimeter of the container interior;
– Independent grounding terminals for each cabinet, device, tray and pipe; system grounding resistance ≤1Ω per GB50169;
– Stranded yellow-green wires with bolted connections.
8.2 IT Cabinet and Liquid Cooling End System
#### 8.2.1 Liquid-Cooled Server Cabinet
– 600×1200×2000mm, 42U; SPCC steel, posts 2.0mm, side panels 1.5mm, doors 1.2mm;
– Static load ≥1500kg, dynamic ≥1000kg; mesh front/rear doors ≥70% opening for hybrid air-liquid backup cooling;
– 19-inch adjustable mounting rails, 4 pairs of cable managers, bottom liquid pipe fixing brackets, top strong/weak-current cable troughs;
– Independent grounding terminal and internal equipment grounding bus; matte black electrostatic powder coating 60-80μm; leveling casters, support feet and locks.
#### 8.2.2 Liquid Cooling Quick Couplings
– DN20 (3/4″), male + female set; 316L stainless steel body, NBR seals (propylene glycol compatible);
– Rated pressure 1.6MPa, burst ≥6.4MPa; working temperature -20℃~120℃; ferrule connection for φ20 stainless pipe;
– One-way self-sealing valves — automatic seal on disconnect, no leakage; insertion force ≤50N; insertion life ≥10000 cycles; GB/T 3765-2008.
#### 8.2.3 Cabinet Branch Manifold
– 1-in 1-out, DN20 ports; 304 stainless steel one-piece molding, no welds;
– Supply side with manual flow regulating valve (0-100% scale); return side with PT100 and pressure gauge ports;
– Wall-mounted at cabinet rear; pressure loss ≤0.05MPa at rated flow.
#### 8.2.4 Metering Cabinet PDU
– 380V three-phase five-wire, 32A input with IEC309 industrial connector;
– Outputs: 24× C13 (10A) + 8× C19 (16A); metering accuracy voltage ±0.5%, current ±0.5%, power ±1%, energy ±1%;
– LCD display of three-phase voltage/current/active power/energy/temperature; per-branch breakers, overload/short-circuit protection, built-in SPD 10kA (8/20μs);
– RS485 MODBUS-RTU for DCIM; 0U vertical mounting; -10℃~60℃.
8.3 CDU Coolant Distribution Unit System
#### 8.3.1 CDU Unit (KITOZER-CDU-240)
| Parameter | Value |
|---|---|
| Rated cooling capacity | 240kW (primary 12℃ in / 18℃ out; secondary 15℃ in / 22℃ out) |
| Primary side | Rated flow 41.2m³/h, working pressure 1.6MPa, DN80 flange |
| Secondary side | Rated flow 30m³/h, working pressure 1.0MPa, DN100 flange |
| Power | 380V three-phase five-wire 50Hz, total ≤7.5kW |
| Control | PLC full-automatic with 7-inch touch screen |
| Dimensions | 1200×800×1800mm; IP31; noise ≤65dB(A) @1m |
| Materials | Carbon steel sprayed frame, 304/316 stainless wetted parts |
| Redundancy | Main + standby CDU, fault auto-switchover |
#### 8.3.2 Plate Heat Exchanger
– Gasketed plate type, 316L plates 0.5mm, NBR gaskets (propylene glycol compatible), heat exchange area ≥18㎡;
– Heat transfer coefficient ≥3000W/(㎡·K); design pressure 1.6MPa, hydrostatic test 2.4MPa; -20℃~150℃;
– Counter-flow arrangement, wide flow channels anti-clogging; GB16409-1996.
#### 8.3.3 Variable-Frequency Circulating Pumps
– Horizontal inline centrifugal pumps, 304 stainless pump bodies, flow 30m³/h, head 25m;
– VFD speed control matching load; 2 per CDU (1+1 duty/standby), auto switchover.
#### 8.3.4 Diaphragm Expansion Tank
– 100L, butyl rubber diaphragm, constant-pressure make-up; maintains secondary-side pressure stability; per CDU.
#### 8.3.5 Y-Type Precision Strainer
– DN50, 316 stainless steel, 100μm filter mesh, per CDU on primary and secondary sides (4 total).
#### 8.3.6 Electric Proportional Regulating Valve
– DN50, temperature-controlled regulation, 4-20mA control, on primary-side water inlet.
#### 8.3.7 Sensor Kit
– Temperature, pressure, flow and liquid level sensors complete set per CDU (2 sets), feeding the PLC for precise control.
#### 8.3.8 Integrated Control Cabinet
– 7-inch touch screen, PLC control, MODBUS communication, per CDU; includes pump/valve control, alarms and data logging.
#### 8.3.9 Vibration-Damping Base
– Channel steel + rubber damping pads per CDU for noise and vibration reduction.
8.4 Primary/Secondary Side Liquid Cooling Piping System
– Pipes: 304 stainless seamless tubes GB/T 14976-2012 — primary main DN80 (φ89×3mm), secondary main DN100 (φ108×3mm), cabinet branches DN20 (φ25×2mm); internal roughness Ra≤1.6μm; working pressure 1.6MPa; argon arc welding/flange/ferrule connections;
– Manual ball valves: two-piece floating ball, 304 body/ball, PTFE seats, 1.6MPa, -20℃~150℃, handle with open indication; DN50+ flanged, DN20 threaded;
– Flexible damping bellows: 304 corrugated + braided mesh, axial compensation ±20mm, lateral ±10mm; CDU interface 300mm (DN80 flange), cabinet interface 500mm (DN20 ferrule);
– Pipe supports: Q235B hot-dip galvanized channel steel + 304 stainless clamps with rubber pads; horizontal spacing ≤1.5m, vertical ≤2m, extra at turns;
– Insulation: B1 rubber-plastic foam 20mm, λ ≤0.034W/(m·K), closed-cell ≥90%, 0.3mm aluminum foil wrap — prevents condensation and cold loss;
– External heat source quick couplings: DN80, 316 stainless, self-sealing male+female, flange on container side, quick disconnect on heat source side — auto-seal, no leakage.
8.5 Cooling Medium and Water Treatment System
#### 8.5.1 Propylene Glycol Coolant
– Food-grade propylene glycol based, 50% PG + 50% deionized water; freezing point -25℃, boiling point 107℃;
– Thermal conductivity 0.42W/(m·K) @20℃; viscosity 4.2mPa·s; pH 8.0-9.0; resistivity ≥1MΩ·cm;
– Contains corrosion inhibitor, scale inhibitor and biocide — non-corrosive to 304/316 stainless, copper and rubber; SH/T 0521-1999.
#### 8.5.2 Automatic Softener
– 2m³/h capacity, fiberglass-wrapped tank, 001×7 strong-acid cation resin 50L;
– Time-type automatic regeneration (default at night, settable); 100L PE brine tank with level indicator;
– Outlet hardness ≤0.03mmol/L; 0.2-0.6MPa; 220VAC ≤50W — prevents scaling in pipes and heat exchangers.
#### 8.5.3 Precision Make-Up Filter
– 304 stainless housing, flange connection, 20-inch PP melt-blown cartridge, 5μm precision, 2m³/h, 1.0MPa — filters sand and rust particles protecting exchangers, pumps and seals.
#### 8.5.4 Corrosion Inhibitor Dosing Device
– 100L PE tank with level scale, electromagnetic diaphragm metering pump 0-5L/h adjustable, 1.0MPa;
– Automatic timed dosing, neutral composite corrosion/scale inhibitor compatible with stainless pipes and propylene glycol.
#### 8.5.5 Automatic Make-Up Pump
– Diaphragm booster pump, 1m³/h, head 20m, 0.25kW, 304 stainless head, NBR diaphragm;
– Linked with level and pressure switches — auto start at low level, stop at high level; maintains system pressure.
#### 8.5.6 Water Quality Sensors
– Conductivity + pH + temperature all-in-one; conductivity 0-2000μS/cm ±1%FS; pH 0-14 ±0.02; auto temperature compensation 0-60℃;
– 4-20mA + RS485 outputs; insertion type; one set on each of primary and secondary return.
8.6 Power Supply and Distribution System
#### 8.6.1 Master Incoming Distribution Cabinet (KITOZER-PD-250A)
– 800×600×2000mm, 1.5mm cold-rolled steel, electrostatic powder coating, IP30;
– Incoming 250A MCCB with RCD, 35kA breaking capacity;
– Outgoing: 8× 32A/3P cabinet circuits, 2× 63A/3P CDU circuits, 1× 63A/3P UPS circuit, 2× 16A/1P+N auxiliary circuits, 2× 32A/3P spare circuits;
– Three-phase multi-function meter (class 1, RS485); primary SPD 40kA (8/20μs); indicators, terminals, neutral and ground bars.
#### 8.6.2 Online UPS (KITOZER-UPS-20kVA)
– 20kVA/18kW double-conversion online; input 380V three-phase (304-456V, 46-54Hz); output 220V single-phase sine, THD≤3%, ±1%;
– Battery DC192V; backup 15min full load / 30min half load; efficiency ≥94% online, ≥98% ECO;
– RS232/RS485/SNMP for DCIM; overload, short-circuit, over/under-voltage, over-temperature and battery low protection; 0-40℃.
#### 8.6.3 Valve-Regulated Lead-Acid Batteries
– 12V 100Ah AGM VRLA; design life ≥10 years (25℃ float); self-discharge ≤3%/month;
– Tinned copper terminals; ABS V-0 flame-retardant housing; 16 cells in battery cabinet with copper links and insulation.
#### 8.6.4 Power Cables
– Cabinet feed YJV-0.6/1kV 3×6+1×4 flame-retardant C; CDU feed YJV 3×16+1×10; auxiliary BV-2.5mm²; signal RVVP 2×1.0 shielded, RVSP 2×1.0 twisted shielded, Cat5e UTP; GB/T 12706-2020.
8.7 Environment and Power Monitoring and Intelligent Control System
#### 8.7.1 Monitoring Host (KITOZER-EMU-H1)
– ARM Cortex-A9 dual-core 1GHz, 1GB DDR3, 8GB eMMC + SD expansion;
– Interfaces: 8× RS485 (MODBUS-RTU), 16× dry-contact DI, 8× relay DO (5A/250VAC), 8× 4-20mA AI, 2× gigabit Ethernet, 2× USB; Ethernet + optional 4G/WiFi;
– Embedded Linux; full-system data collection and unified management; real-time display, historical storage/query; graded alarms via SMS, sound/light, email and APP push; linkage control strategies; remote WEB; third-party platform integration; 24VDC; -20℃~70℃.
#### 8.7.2 Temperature Sensors
– NTC/PT100, range -20℃~80℃, accuracy ±0.1℃, RS485 MODBUS-RTU; ABS housing IP65; wall/magnet/insertion mounting; 24 points at cabinet inlets/outlets, cabin top/bottom, CDU water in/out.
#### 8.7.3 Pressure Sensors
– Diffused silicon transmitters, 0-1.6MPa, ±0.25%FS, 4-20mA two-wire, 24VDC, 316L diaphragm, 304 housing IP65, G1/2″ thread; 8 units on main supply/return.
#### 8.7.4 Electromagnetic Flow Meters
– DN100, accuracy ±0.5%, RS485 output, on secondary-side total supply/return (2 units).
#### 8.7.5 Liquid Level Sensors
– Capacitive type with high/low level alarms, on CDU expansion tanks (2 units).
#### 8.7.6 Positioning Leakage Detection
– Positioning leakage controller (1 channel, up to 500m sensing cable), 4-core sensing cable with ±1m positioning accuracy, reusable;
– Dry-contact alarm output + RS485; laid in U-shape along CDU bottoms, main pipe bottoms and cabinet bottoms.
#### 8.7.7 Access Control System
– Single-door controller, 10,000 cards, 100,000 records; IC card + PIN; 280kg electromagnetic lock (fail-open per fire code), exit button; RS485/TCP-IP; card/PIN/remote opening, time-zone control, records query, anti-passback; 12VDC.
#### 8.7.8 IR Dome Cameras
– 2MP 1080P, 4mm fixed lens 80° view, IR night vision 30m with Smart IR; H.265+/H.265 encoding; 12VDC/POE; IP66; NVR storage 30 days; 4 units covering all corners.
#### 8.7.9 Local Touch Display
– 10-inch industrial touch screen, 1280×800, Android embedded, capacitive touch, wall-mounted inside the door;
– Local view of all monitoring data, equipment status and alarms; manual device control and parameter setting; Ethernet to monitoring host.
#### 8.7.10 Sound/Light Alarm
– 24V industrial sound/light alarm, red LED strobe, 110dB buzzer, dry-contact triggered; IP65; one inside and one outside the cabin.
8.8 Fire Protection and Safety System
#### 8.8.1 Cabinet-Type Heptafluoropropane Device (GQQ100/2.5)
– Agent heptafluoropropane (HFC-227ea), clean gas, no residue; 100L cylinder, charge 70kg, pressure 2.5MPa (20℃);
– Discharge ≤10s, design concentration 8%; auto / electrical manual / mechanical emergency start modes;
– Protection volume ≤100m³ per unit; 2 units for dual-zone protection; GB50370-2005, 3C; includes cylinder set, container valve, nozzles and pressure feedback device.
#### 8.8.2 Photoelectric Smoke Detector (JTY-GD)
– DC24V, three-level sensitivity, alarm current ≤100mA, red alarm LED; ceiling-mounted; GB4715-2005, 3C; 6 units evenly arranged.
#### 8.8.3 Fixed-Temperature Heat Detector (JTW-ZD)
– 70℃ fixed-temperature alarm, DC24V, alarm current ≤100mA; ceiling-mounted paired with smoke detectors; GB4716-2005, 3C; 6 units.
#### 8.8.4 Emergency Start/Stop Button (J-SAM-GST)
– Manual start/stop of gas system, protective cover, NO+NC contacts, DC24V; one inside and one outside the door.
#### 8.8.5 Discharge Indicator (FQ-1)
– DC24V, red “Gas Discharged — Do Not Enter” indication, mounted above the door outside, lights on discharge.
#### 8.8.6 Fire Emergency Lighting
– Dual-head emergency lights 2×3W LED, Ni-Cd battery, duration ≥90min, charge ≤24h, auto-on on power failure; GB17945-2010, 3C.
#### 8.8.7 Lightning Protection and Grounding
– Primary SPD 40kA at master cabinet, secondary SPD 20kA before UPS; signal SPDs on network and RS485 ports;
– Equipotential grounding copper bar with all metal equipment, cabinets, trays, pipes and the container reliably grounded; combined grounding resistance ≤1Ω.
8.9 Auxiliary Supporting System
#### 8.9.1 Cold Aisle Containment
– Aluminum alloy anodized frame; fixed tempered glass ceiling skylights (5mm, transmittance ≥90%) + fire-linkage flip skylights;
– Double-leaf transparent acrylic end doors 10mm with handles and closers; sealing brushes at door and ceiling gaps, airtightness ≥90%;
– Fire-linkage: skylights auto-open on fire signal for pressure relief; fits 8-cabinet single row, aisle width 1200mm.
#### 8.9.2 Spare Consumables Kit
– 4 sets of spare DN20 quick couplings; O-rings, PTFE tape, sealant; spare fuses, buttons and indicator lamps.
#### 8.9.3 Dedicated Tool Kit
– Torque wrenches, pipe wrenches, screwdrivers; pressure gauges, thermometers, leak detectors for on-site commissioning and daily O&M.
#### 8.9.4 System Labeling
– Pipe labels: flow direction arrows, medium name, pipe diameter; equipment labels: name, number, key parameters; safety signs: electric shock, mechanical injury, no fire, emergency exit; PVC adhesive/aluminum plates per GB7231-2003.
9. Recommended Configuration and Preliminary Budget
9.1 Configuration List
I. Container Enclosure and Cabin Infrastructure
| No. | Item | Specification | Unit | Qty | Note |
|---|---|---|---|---|---|
| 1 | 40ft high-cube container | 12192×2438×2896mm, Q235B, 50mm Class A rock wool, IP55, anti-corrosion coating | unit | 1 | Reinforced load-bearing structure |
| 2 | Cabin load-bearing base | 12# channel steel welded frame + 3mm checkered plate, uniform load ≥1000kg/㎡ | set | 1 | Reinforced cabinet/CDU areas |
| 3 | Anti-static access floor | 600×600mm all-steel, 10⁶-10⁹Ω, ≥1000kg/㎡ | pcs | 80 | With pedestals, stringers, spares |
| 4 | LED lighting | 40W flat panels, ≥300lux, with emergency lights | set | 8 | 2 emergency |
| 5 | Class A fire door | 900×2100mm steel, with closer and escape lock | set | 1 | Single, with observation window |
| 6 | Residual pressure ventilation | Mechanical valve 5-20Pa adjustable, dust filter | pcs | 2 | Inlet + outlet |
| 7 | Equipotential grounding bar | 40×4mm copper around container, with terminals | set | 1 | Resistance ≤1Ω |
II. IT Cabinet and Liquid Cooling End System
| No. | Item | Specification | Unit | Qty | Note |
|---|---|---|---|---|---|
| 1 | Liquid-cooled server cabinet | 600×1200×2000mm, 42U, static ≥1500kg, mesh doors | unit | 8 | 19-inch |
| 2 | Liquid cooling quick coupling | DN20, 316 stainless, self-sealing, 1.6MPa | set | 16 | Supply/return per cabinet |
| 3 | Cabinet branch manifold | 1-in 1-out, manual valve, temp/pressure ports, 304 | set | 8 | Cabinet rear |
| 4 | Blanking panel kit | 1U/2U/4U all-steel, matte black | set | 8 | Full set per cabinet |
| 5 | Metering cabinet PDU | 380V, 24×C13+8×C19, metering, 0U vertical | unit | 8 | One per cabinet |
| 6 | Cold plate accessory kit | Thermal pads, seals, clips | lot | 1 | For 8 cabinets |
III. CDU Coolant Distribution Unit System
| No. | Item | Specification | Unit | Qty | Note |
|---|---|---|---|---|---|
| 1 | Main CDU | 240kW, plate exchange, VFD pump set, PLC control | unit | 1 | 1+1 redundancy |
| 2 | Standby CDU | Identical to main | unit | 1 | Auto switchover |
| 3 | Built-in circulating pump | Centrifugal VFD, 30m³/h, 25m head, 304 | unit | 4 | 1+1 per CDU |
| 4 | Plate heat exchanger | 316L plates, ≥18㎡, 1.6MPa | unit | 2 | One per CDU |
| 5 | Diaphragm expansion tank | 100L, constant pressure make-up | unit | 2 | One per CDU |
| 6 | Y-type precision strainer | DN50, 316, 100μm | pcs | 4 | Primary/secondary per CDU |
| 7 | Electric proportional valve | DN50, temp control, 4-20mA | unit | 2 | Primary inlet |
| 8 | Sensor kit | Temp/pressure/flow/level set | set | 2 | Per CDU |
| 9 | Integrated control cabinet | 7-inch touch, PLC, MODBUS | unit | 2 | Per CDU |
| 10 | Vibration-damping base | Channel steel + rubber pads | set | 2 | Per CDU |
IV. Primary/Secondary Side Liquid Cooling Piping System
| No. | Item | Specification | Unit | Qty | Note |
|---|---|---|---|---|---|
| 1 | Primary supply main | 304 seamless, DN80, wall 3mm | m | 30 | Heat source to CDU |
| 2 | Primary return main | 304 seamless, DN80, wall 3mm | m | 30 | CDU to heat source |
| 3 | Secondary supply main | 304 seamless, DN100, wall 3mm | m | 25 | Cabinet row top |
| 4 | Secondary return main | 304 seamless, DN100, wall 3mm | m | 25 | Cabinet row bottom |
| 5 | Cabinet supply branch | 304 pipe, DN20, wall 2mm | pcs | 8 | Main to manifold |
| 6 | Cabinet return branch | 304 pipe, DN20, wall 2mm | pcs | 8 | Manifold to main |
| 7 | Main ball valves | DN80, 304, flanged, 1.6MPa | pcs | 6 | Master + CDU inlet |
| 8 | Secondary master valves | DN100, 304, flanged | pcs | 4 | Supply/return ×2 |
| 9 | Branch ball valves | DN20, 304, threaded | pcs | 16 | Per cabinet supply/return |
| 10 | CDU flexible bellows | DN80, 304, flanged | pcs | 4 | Per CDU primary/secondary |
| 11 | Cabinet flexible hoses | DN20, 304 braided, ferrule | pcs | 16 | Per cabinet supply/return |
| 12 | Pipe supports | Galvanized channel + 304 clamps | set | 60 | 1.5m spacing |
| 13 | Pipe insulation | B1 rubber-plastic 20mm, aluminum foil | m³ | 1.2 | All piping |
| 14 | External heat source quick couplings | DN80, 316 self-sealing, flanged | set | 2 | Supply/return |
V. Cooling Medium and Water Treatment System
| No. | Item | Specification | Unit | Qty | Note |
|---|---|---|---|---|---|
| 1 | Propylene glycol coolant | 50%, freezing point -25℃, anti-corrosion | ton | 2.5 | Total system volume |
| 2 | Automatic softener | 2m³/h, cation resin, auto regeneration | set | 1 | Make-up softening |
| 3 | Precision make-up filter | 5μm, 304 housing, PP cartridge | unit | 1 | Make-up filtration |
| 4 | Dosing device | Metering pump + 100L tank, timed dosing | set | 1 | Anti-corrosion/scale |
| 5 | Automatic make-up pump | Diaphragm, 1m³/h, 20m head | unit | 1 | Constant pressure make-up |
| 6 | Water quality sensor | Conductivity + pH, temp compensation | set | 2 | Primary/secondary |
VI. Power Supply and Distribution System
| No. | Item | Specification | Unit | Qty | Note |
|---|---|---|---|---|---|
| 1 | Master incoming cabinet | 380V, 250A master, branch breakers, SPD, metering | unit | 1 | Container master |
| 2 | Online UPS | 20kVA, three-in single-out, double conversion | unit | 1 | Monitoring/control power |
| 3 | Lead-acid batteries | 12V/100Ah VRLA AGM | cells | 16 | 15min backup |
| 4 | Battery cabinet | For 16 cells, steel sprayed | unit | 1 | — |
| 5 | Cabinet power circuits | YJV 3×6+1×4 + 32A breaker | cct | 8 | Independent per cabinet |
| 6 | CDU power circuits | YJV 3×16+1×10 + 63A breaker | cct | 2 | Independent per CDU |
| 7 | Auxiliary circuits | BV 2.5mm² + 16A breaker | cct | 4 | Lighting, sockets |
VII. Environment and Power Monitoring and Intelligent Control System
| No. | Item | Specification | Unit | Qty | Note |
|---|---|---|---|---|---|
| 1 | Monitoring host | Industrial embedded, multi-protocol, Ethernet+4G | unit | 1 | Central management |
| 2 | Temperature sensors | PT100/NTC, ±0.1℃, RS485 | pcs | 24 | Pipes, cabinets, cabin |
| 3 | Pressure sensors | 0-1.6MPa, ±0.25%FS, 4-20mA | pcs | 8 | Main supply/return |
| 4 | Electromagnetic flow meters | DN100, ±0.5%, RS485 | pcs | 2 | Secondary total |
| 5 | Liquid level sensors | Capacitive, high/low alarms | pcs | 2 | CDU tanks |
| 6 | Positioning leakage cable | ±1m, along piping | m | 50 | Under piping |
| 7 | Access control | Single door, card+PIN, magnetic lock | set | 1 | Cabin door |
| 8 | IR dome cameras | 2MP, night vision, POE | unit | 4 | Full coverage |
| 9 | Local touch display | 10-inch industrial | unit | 1 | Inside cabin |
| 10 | Sound/light alarms | DC24V, alarm linkage | pcs | 2 | Inside + outside |
| 11 | Signal cables and auxiliaries | Shielded cable, network, terminals, trays | lot | 1 | Full wiring |
VIII. Fire Protection and Safety System
| No. | Item | Specification | Unit | Qty | Note |
|---|---|---|---|---|---|
| 1 | Cabinet-type heptafluoropropane | 100L, non-piped, clean gas | unit | 2 | Dual-zone protection |
| 2 | Photoelectric smoke detectors | 3C, DC24V | pcs | 6 | Evenly arranged |
| 3 | Fixed-temperature heat detectors | 70℃, 3C | pcs | 6 | Paired with smoke |
| 4 | Emergency start/stop buttons | Protective cover, manual | pcs | 2 | Inside + outside |
| 5 | Discharge indicator | DC24V | pcs | 1 | Above door outside |
| 6 | Emergency lighting | Rechargeable, ≥90min | set | 2 | Fire emergency |
IX. Auxiliary Supporting System
| No. | Item | Specification | Unit | Qty | Note |
|---|---|---|---|---|---|
| 1 | Cold aisle containment | Ceiling skylights + acrylic end doors, fire linkage | set | 1 | 8-cabinet row |
| 2 | Spare quick couplings | DN20, 316, male+female | set | 4 | O&M spares |
| 3 | Dedicated tool kit | Leak detector, wrenches, instruments | set | 1 | On-site O&M |
| 4 | System labeling | Flow direction, equipment, safety signs | set | 1 | Standardized |
9.2 Quotation Notes
This configuration list covers the complete material and equipment set of the 40ft container liquid-cooled data center per the design standard. The total cost needs to be confirmed based on the final configuration, customization requirements, transportation distance and on-site conditions. The core cost components include container structure cost, liquid cooling system cost (CDU, piping, coolant), power distribution and UPS cost, monitoring and fire protection cost, factory prefabrication and testing cost, transportation and on-site installation cost, tax and after-sales service cost. If the number of cabinets, cooling capacity, redundancy scheme or function modules change, the list content and quantities can be adjusted accordingly. All reference prices quoted in this solution are in RMB (CNY) only and are for reference purposes; a formal quotation can be issued after configuration confirmation.
10. Technical Specifications
10.1 Overall System Performance
| Item | Specification |
|---|---|
| Container | 40ft high-cube, external 12192×2438×2896mm, IP55, Class A insulation |
| Cabinets | 8× liquid-cooled 42U cabinets, 600×1200×2000mm, static load ≥1500kg |
| IT load | 8× 30kW = 240kW total heat load |
| Cooling architecture | Indirect liquid cooling: primary heat source + CDU + secondary cabinet cooling |
| CDU | 240kW ×2 (1+1), plate heat exchanger ≥18㎡, PLC control |
| Secondary water temp | Supply 15-20℃, return ≤28℃ |
| PUE | ≤1.1 |
| Power supply | 380V three-phase, master 250A, UPS 20kVA (15min backup) |
| Coolant | 50% propylene glycol, freezing point -25℃, 2.5 tons |
| Monitoring | Full-dimension DCIM, local + remote (WEB/4G) |
| Fire protection | Heptafluoropropane 100L ×2, smoke + heat detection |
| Grounding | Equipotential ring, resistance ≤1Ω |
| Deployment | Factory prefabricated, on-site 2-3 days commissioning, delivery ≤45 days |
| Environment | -20℃~50℃, 12-level typhoon, seismic intensity 8 |
10.2 Key Equipment Specification Summary
| Equipment | Key Parameters |
|---|---|
| Quick couplings | DN20 316L, self-sealing, 1.6MPa, life ≥10000 insertions |
| Branch manifold | 304 one-piece, flow regulation 0-100%, ΔP ≤0.05MPa |
| Metering PDU | 380V/32A, 24×C13+8×C19, ±1% metering, RS485 |
| VFD pump | 30m³/h, 25m head, 304, 1+1 per CDU |
| Monitoring host | ARM dual-core, 8×RS485, 16DI/8DO/8AI, Ethernet+4G |
| Flow meter | DN100 electromagnetic, ±0.5% |
| Leakage detection | Positioning ±1m, 50m sensing cable |
| Cameras | 2MP 1080P, IR 30m, POE, 4 units |
| Master cabinet | 250A, 8+2+1+2+2 circuits, SPD 40kA |
| UPS | 20kVA online, ≥94% efficiency, 15min backup |
11. Key Advantages and Customer Value
11.1 High-Density Heat Dissipation for High-Power Computing
The 30kW per cabinet heat dissipation capability far exceeds the traditional air-cooled 5-10kW limit, perfectly adapting to AI training servers, high-performance computing clusters, GPU rendering nodes and other high-power equipment, solving the heat dissipation bottleneck of high-density computing.
11.2 High Efficiency and Energy Saving with Low PUE
The indirect liquid cooling architecture has high heat exchange efficiency, greatly reducing cooling energy consumption; system PUE can be as low as 1.1, far below the traditional data center level of 1.4-1.8. Long-term electricity savings are significant, meeting dual-carbon and green data center requirements.
11.3 Factory Prefabrication for Rapid Deployment
All equipment is pre-installed, wired, pressure-tested and jointly commissioned in the factory; the complete unit is transported to site, and only water, power and the external heat source need connection — operational within 2-3 days, shortening the construction period by more than 80% versus traditional computer rooms and meeting rapid computing expansion needs.
11.4 Redundant Design for High Reliability
Core CDU units are 1+1 redundant, pump sets 1+1 redundant, power circuits independently redundant, with multiple protection mechanisms ensuring 7×24 continuous operation; a single component failure does not affect overall cooling, with zero business interruption.
11.5 Intelligent O&M Reducing Manual Intervention
Full-system temperature, pressure, flow, liquid level, power, fire and security parameters are monitored in real time with local + remote dual management, automatic alarms and linkage control, and historical data traceability — greatly reducing O&M difficulty and labor cost.
11.6 Movable and Replicable for Flexible Deployment
The standard container structure can be hoisted, transported and relocated as a whole, applicable to edge computing nodes, temporary computing centers, outdoor base stations and emergency command scenarios, and can be batch-replicated for rapid scale deployment.
11.7 Full-System Integration with One-Stop Delivery
From container structure, liquid cooling system, power distribution, environment monitoring to fire and security — full-system integrated design and integration by a single supplier, avoiding multi-party coordination risks, with clear delivery responsibility and unified after-sales response.
11.8 Customization Capability for Different Needs
Cabinet count, cooling capacity, power capacity, redundancy scheme and function modules can be adjusted per customer needs; supports 20ft/40ft/custom-size containers and different heat source types for personalized scenarios.
12. Technical Q&A (50+ Items)
12.1 Basics and Deployment Questions
Q1: Can this container liquid-cooled data center be placed outdoors directly?
A: Yes. The container uses outdoor-grade anti-corrosion coating, Class A insulation and IP55 protection, adapting to -20℃~50℃ ambient temperatures, withstanding 12-level typhoons and 8-level seismic intensity. It can be placed directly on level hardened ground without additional computer room buildings.
Q2: How many liquid-cooled cabinets can a 40ft container hold?
A: The standard single-row layout accommodates 8 600mm-wide liquid-cooled cabinets, reserving space for CDU, distribution, fire equipment and the O&M aisle — the optimal configuration balancing density and operability.
Q3: What is the total weight? Floor load requirements?
A: Full-configuration total weight is about 15 tons, averaging about 500kg/㎡ — ordinary hardened concrete ground suffices. For placement on floor slabs or roofs, load-bearing verification is required in advance.
Q4: What conditions are needed for transport and hoisting?
A: Standard 40ft high-cube dimensions allow transport by ordinary container trailers; hoisting requires a crane with rated capacity ≥20 tons; the container top has standard lifting points per ISO container hoisting specifications.
Q5: What is the deployment process on site?
A: Site preparation (level ground, power/water interfaces at the container position) → container placement → power and water connection → heat source quick coupling connection → system commissioning → acceptance. Typically 2-3 days from arrival to operation.
Q6: Can the container be relocated after deployment?
A: Yes. All internal systems are factory-integrated and tested; after disconnecting power, water and the heat source couplings (self-sealing, no leakage), the container can be hoisted and transported to a new site, reconnected and recommissioned — supporting business elasticity.
12.2 Liquid Cooling and CDU Questions
Q7: What is a CDU? What role does it play in the liquid cooling system?
A: CDU (Coolant Distribution Unit) is the core equipment of the indirect liquid cooling system, containing plate heat exchangers, circulating pumps, valves, sensors and a control system. It transfers cooling capacity from the primary-side heat source to the secondary-side coolant while precisely controlling secondary-side supply temperature and pressure, isolating the two sides to protect server cold plates from contamination and pressure shock.
Q8: What do primary and secondary sides mean? Why separate them?
A: The primary side connects the external heat source (chillers, cooling towers, etc.) where water quality is usually poorer and pressure fluctuates; the secondary side connects server cold plates using deionized coolant with high water quality requirements. The CDU plate heat exchanger separates the two — transferring cooling capacity while ensuring secondary-side cleanliness and pressure stability, protecting expensive server equipment.
Q9: Why is the CDU configured 1+1 redundant?
A: The liquid cooling system directly relates to server safety; a single CDU failure causes cooling interruption and server overheating downtime. With 1+1 configuration, the standby CDU automatically cuts in on main CDU failure, keeping cooling uninterrupted and ensuring business continuity for high availability.
Q10: Will the liquid cooling system leak? How is it prevented?
A: Properly built systems use 304/316 stainless piping, quality quick couplings and seals, and factory pressure testing — no leakage in normal operation. Additionally, positioning leakage detection cables are laid along pipe bottoms; any leak is precisely located and alarmed immediately, with linkage to shut relevant valves and equipment, minimizing impact.
Q11: How often is coolant replaced? Daily maintenance?
A: Propylene glycol coolant lasts 3-5 years under normal maintenance. Daily maintenance: periodic water quality checks (pH and conductivity), periodic corrosion/scale inhibitor replenishment, system pressure and liquid level checks, and filter cartridge cleaning.
Q12: Why use propylene glycol instead of pure water?
A: Pure water freezes below 0℃ and can cause pipe and cold plate damage in outdoor environments. The 50% propylene glycol solution has a freezing point of -25℃, preventing freeze damage in winter, and contains corrosion inhibitors and biocides protecting stainless steel, copper and rubber materials while maintaining good thermal conductivity.
Q13: How is the secondary-side water temperature controlled?
A: The CDU PLC reads return/supply temperatures and regulates the electric proportional valve on the primary side and VFD pump speed on the secondary side to maintain supply at 15-20℃. The control loop continuously adjusts to load changes, keeping chip temperatures within design thresholds.
Q14: What happens if the main pump fails?
A: Each CDU has 1+1 duty/standby pumps; on main pump failure the standby pump starts automatically within seconds. If the entire main CDU fails, the standby CDU takes over. The DCIM system alarms the fault and records it for maintenance.
Q15: Is the plate heat exchanger easy to clean?
A: Yes. The gasketed plate heat exchanger is disassemblable — plates can be opened, cleaned and gaskets replaced. With proper water treatment (softening, filtration, dosing), the heat exchanger typically needs no cleaning for years; the Y-type strainers protect it from particles.
12.3 Power and Monitoring Questions
Q16: What power supply capacity does this system need?
A: IT load is 8×30kW = 240kW; adding CDU, monitoring, lighting and auxiliary loads, the total distribution capacity should be ≥315kVA, adjustable per actual server power.
Q17: What does the UPS power? Backup time?
A: The UPS powers the environment monitoring, control system, fire system and emergency lighting, ensuring monitoring and alarms operate after power failure. Standard backup is 15 minutes, extendable on request.
Q18: Can it be monitored remotely? What protocols?
A: Yes — remote WEB access and APP viewing; supports MODBUS-RTU, TCP/IP, SNMP and other standard protocols, integrable with the customer’s existing data center infrastructure management platform.
Q19: How many temperature sensors are there and where?
A: 24 temperature sensors at cabinet air inlets/outlets, cabin top/bottom, and CDU water in/out points, forming a three-dimensional thermal monitoring network. Accuracy ±0.1℃, RS485 output, feeding the DCIM for hot spot detection and alarm.
Q20: What is the positioning leakage detection accuracy?
A: The 4-core sensing cable detects water contact resistance changes and locates the leak within ±1m accuracy along the cable. 50m of cable laid in U-shape under CDUs, main pipes and cabinets provides early warning and precise location for rapid response.
Q21: How is data stored?
A: The monitoring host stores historical data locally (≥1 year by default, expandable via SD card), supports Excel export, and can back up to cloud platforms. Alarm records and operation logs are also stored for traceability.
Q22: What alarm methods are supported?
A: Graded alarms via local sound/light, SMS, email and APP push; alarm escalation for unacknowledged events; linkage control (e.g., over-temperature triggering standby cooling, leakage triggering valve shutoff) is configurable on the platform.
12.4 Fire and Safety Questions
Q23: What fire protection is used in the container? Why not water sprinklers?
A: Cabinet-type heptafluoropropane clean gas extinguishing — fast, residue-free, no secondary damage to electronic equipment. Water sprinklers would damage servers and electrical equipment and are unsuitable for data center scenarios.
Q24: Is heptafluoropropane harmful to people?
A: At design extinguishing concentration, heptafluoropropane is safe and non-toxic for humans and can be used in occupied places; however, personnel should evacuate promptly during discharge to avoid asphyxiation risk.
Q25: How is lightning protection and grounding done? Grounding resistance requirement?
A: The container has grounding points, an internal equipotential grounding copper bar, all equipment/cabinets/pipes reliably grounded, combined grounding resistance ≤1Ω, and surge protectors on power and signal ports, meeting three-level lightning protection requirements.
Q26: Why two fire protection zones?
A: The 100L unit protects up to 100m³; the container volume and layout are divided into two zones for even agent distribution and faster extinguishing, ensuring complete coverage of both the cabinet row and the auxiliary equipment area.
Q27: How is the fire system triggered?
A: Smoke and heat detectors send signals to the gas fire control panel; after a settable delay, the panel closes dampers, stops ventilation, and discharges the agent; the discharge indicator lights and alarms sound. Automatic, electrical manual and mechanical emergency modes are all available.
Q28: Are emergency lighting and escape facilities provided?
A: Yes — dual-head emergency lights (≥90min duration) and the fire door’s escape lock allow safe evacuation on power failure; the discharge indicator outside the door warns personnel not to enter during discharge.
12.5 Cooperation and Delivery Questions
Q29: What is the cooperation model?
A: We provide the complete liquid cooling infrastructure and system integration inside the container (enclosure, cabinets, CDU, piping, distribution, monitoring, fire protection); the client provides the external heat source and on-site power/water interfaces. The interface is the heat source quick couplings and power incoming terminals on the container wall. The division of work can be adjusted per needs.
Q30: What is the delivery cycle?
A: Standard configuration: production about 20 days, factory testing 5 days, transport and on-site installation about 7 days — overall delivery about 30-45 days. Customized solutions are quoted separately.
Q31: What is the warranty period and after-sales response?
A: 2-year overall warranty, 3-year core component warranty, lifetime maintenance. 7×24 technical support, 30-minute phone response, 48-hour on-site response within China.
Q32: Can the container be customized in size?
A: Yes — 20ft, 40ft and custom-size containers are available; cabinet count, cooling capacity, power capacity, redundancy schemes and function modules can all be customized for the specific scenario.
Q33: Is the coolant included in the delivery?
A: Yes — 2.5 tons of 50% propylene glycol coolant is included, filled and commissioned in the factory; the client only needs to provide the external heat source and water/power interfaces.
Q34: What documentation is delivered?
A: Complete documentation: design drawings, configuration lists, equipment manuals and certificates, factory test reports (pressure, leak, electrical, commissioning), transport and installation records, DCIM operation manual, training materials and the after-sales service card.
12.6 Operation and Maintenance Questions
Q35: What daily checks are needed?
A: Daily: DCIM alarm check, supply/return temperature and pressure check, pump status, coolant level. Weekly: leak detection status, filter differential pressure. Monthly: water quality (pH/conductivity), dosing check, camera/access control function. Quarterly: filter cleaning, sensor calibration. Annual: full system inspection and performance verification.
Q36: What if the water quality deteriorates?
A: The water quality sensors continuously monitor conductivity and pH; alarms trigger when out of range. Corrective actions: check dosing, add corrosion/scale inhibitor, partial coolant replacement if needed, and verify filter and softener operation.
Q37: How is the system protected against freezing in winter?
A: The 50% propylene glycol solution has a freezing point of -25℃, so the secondary side will not freeze even in winter. The primary side depends on the external heat source’s antifreeze design (client side); the CDU and piping are insulated with 20mm B1 rubber-plastic foam.
Q38: Can the system operate without the external heat source?
A: No — the primary-side heat source (chiller/cooling tower/dry cooler) is required to reject heat. In free-cooling seasons, dry coolers can operate without chillers for further energy savings; the client-side heat source selection affects overall efficiency.
Q39: How is chip temperature monitored?
A: Server chip temperatures are reported by the server management interfaces (IPMI/redfish); the container’s DCIM monitors cabinet inlet/outlet air and liquid temperatures. Recommended integration: servers report to the client’s management platform, while the container DCIM covers the cooling infrastructure.
Q40: What is the noise level?
A: The container noise mainly comes from CDU pumps and internal fans, ≤65dB(A) at 1m — significantly lower than air-cooled systems with condensers. For noise-sensitive sites, additional acoustic treatment can be provided.
Q41: How often should the quick couplings be checked?
A: Quick couplings are maintenance-free in normal operation (life ≥10000 insertions). During annual inspection, verify sealing performance; the spare coupling kit allows quick replacement if wear is found. Avoid frequent disconnect/connect cycles.
Q42: Can the coolant be topped up easily?
A: Yes — the automatic make-up system (softener + filter + make-up pump) maintains pressure and level automatically; manual top-up is possible via the make-up point. Coolant concentration should be checked periodically and adjusted to maintain the -25℃ freezing point.
12.7 Technical Principle Questions
Q43: Why is liquid cooling more efficient than air cooling?
A: Liquid’s specific heat capacity and thermal conductivity are far higher than air — water carries about 3500 times the heat of the same volume of air. Liquid cooling delivers coolant directly to the chip cold plate, eliminating the air path resistance and allowing higher density with less fan energy, achieving lower PUE and higher chip performance stability.
Q44: What is indirect liquid cooling? Direct vs indirect?
A: Indirect liquid cooling uses a CDU to separate the primary and secondary coolant loops, with heat transferred through a plate heat exchanger — the secondary coolant never touches the external heat source water. Direct cooling connects server loops directly to the external source. Indirect cooling provides better water quality control, pressure isolation and flexibility, protecting server cold plates.
Q45: What cold plate types are compatible?
A: The secondary-side interface is DN20 quick couplings at the cabinet manifold, compatible with mainstream cold plate servers from major manufacturers; the cold plate accessory kit includes thermal pads, seals and clips for standard cold plate installation.
Q46: How does the flow distribute among cabinets?
A: Each cabinet has a branch manifold with a manual flow regulating valve and scale; the CDU VFD pump provides total flow, and branch valves balance flow per cabinet load. The DCIM monitors supply/return temperatures per cabinet to verify adequate cooling.
Q47: What happens during a power failure?
A: The UPS keeps monitoring, control, fire and emergency lighting running for ≥15 minutes; the CDU pumps stop (or run on UPS if extended backup is configured), so cooling stops gradually — servers with thermal mass have some tolerance, and the client’s orderly shutdown procedures should complete within the backup window. Alarms notify operators immediately.
Q48: What are the requirements for the external heat source?
A: Primary-side design conditions: 12℃ supply / 18℃ return, flow 41.2m³/h per CDU, DN80 flanged connection, working pressure 1.6MPa. Chillers, cooling towers or dry coolers meeting these parameters can be used; capacity should match 240kW+ with the client’s redundancy preference.
Q49: How is the system pressure tested?
A: Factory test: hydrostatic pressure test per design pressure 1.6MPa (primary) with holding time and leak check; the secondary side is tested at its design pressure with the coolant filled and circulated. Test records are delivered with the unit.
Q50: What is the expected service life?
A: Container structure ≥15 years (C4 anti-corrosion), stainless piping and CDU heat exchangers ≥15 years, pumps ≥10 years with maintenance, coolant 3-5 years per replacement cycle. With standard O&M, the system provides long-term reliable operation.
Q51: Can the container be connected in parallel for larger scale?
A: Yes — multiple containers can be deployed in parallel, sharing a centralized heat source station; each container operates independently (no single point of failure across units), and the client’s heat source capacity should be sized for the total load. This supports modular scale-out from 240kW to MW levels.
Q52: What training is provided?
A: 2-day training at handover: container and liquid cooling principles, CDU operation, DCIM usage, daily inspection and emergency handling, with hands-on practice and assessment; free repeat training for new personnel; ongoing phone/online technical support.
13. Construction Schedule
13.1 Schedule Overview
| No. | Stage | Work Content | Days | Responsible |
|---|---|---|---|---|
| 1 | Solution design | Deepen design drawings, confirm configuration list, technical disclosure | 3 | Design engineer |
| 2 | Procurement and production | Raw material procurement, container manufacture, equipment production | 15 | Production dept |
| 3 | Pre-assembly integration | Cabinet installation, pipe welding, equipment fixing, wiring | 5 | Installation team |
| 4 | Factory testing | Pressure/leak test, power-on test, system joint commissioning, function verification | 5 | QC engineer |
| 5 | Packaging and transport | Dust/waterproof packaging, logistics transport, on-site unloading | 3 | Logistics |
| 6 | On-site installation | Container placement, external power/water connection, heat source pipe connection | 3 | Construction team |
| 7 | System commissioning | Overall power-on, liquid cooling commissioning, monitoring/fire joint commissioning | 2 | Commissioning engineer |
| 8 | Acceptance and delivery | Completion acceptance, documentation delivery, operation training | 2 | Project manager |
| — | Total | — | 38 | — |
13.2 Schedule Assurance Measures
– Plan management: detailed schedule decomposed by day, daily progress check, timely adjustment;
– Factory-first strategy: most work completed in the factory with parallel production and testing, shortening the on-site critical path;
– Material assurance: advance procurement, core equipment (CDU, pumps, containers) with longest lead times ordered first;
– Coordination assurance: early confirmation of the client’s power/water interfaces and heat source readiness to avoid on-site waiting;
– Contingency plan: standby production capacity and rush-work arrangements to ensure the total delivery cycle.
14. Construction Organization and Quality/Safety Measures
14.1 Organization Structure
– Project manager: overall responsible for progress, quality, cost and safety; coordinates internal and external resources;
– Design engineer: deepens drawings, confirms configurations, technical disclosure;
– Production team: container manufacture and equipment production per plan;
– Installation team: cabinet installation, pipe welding, equipment fixing and wiring;
– QC engineer: incoming inspection, process inspection, factory testing;
– Commissioning engineer: system commissioning and joint testing;
– Logistics specialist: packaging, transport and on-site unloading coordination;
– Safety officer: on-site safety management and inspection.
14.2 Construction Preparation
1. Confirm design drawings and configuration with the client; clarify interface positions (power incoming, water, heat source couplings);
2. Verify container production, CDU, pumps, cabinets and key materials with lead-time plans;
3. Prepare construction tools, testing instruments and safety equipment; verify site conditions (ground levelness, power/water availability);
4. Arrange transport and hoisting (crane ≥20 tons) with the logistics specialist; coordinate site entry procedures.
14.3 Factory Prefabrication Process
1. Container structure completion: welding, surface treatment (shot blasting, three-coat painting), insulation installation, openings reserved;
2. Cabin infrastructure: load-bearing base installation, anti-static floor, lighting, fire door, residual pressure ventilation;
3. Equipment installation: cabinets positioned and fixed, CDU units on damping bases, distribution cabinet and UPS installed;
4. Pipe welding: primary/secondary mains and branches welded with argon arc, valve and flange installation, supports and insulation;
5. Wiring: power, signal and network cables laid and terminated per diagrams;
6. Factory testing: hydrostatic pressure/leak test, insulation and grounding tests, power-on test, liquid cooling circulation and temperature control commissioning, monitoring and fire function verification — all recorded.
14.4 On-Site Installation Process
1. Container placement: crane hoisting to position, leveling, fixing;
2. External connections: power incoming connection, water supply connection, heat source quick couplings;
3. System commissioning: overall power-on, pump start, flow and temperature verification, alarm and linkage tests;
4. Acceptance: joint inspection with the client, documentation handover and training.
14.5 Quality Control
– Material quality: incoming inspection with certificates; unqualified materials prohibited;
– Process control: three-level inspection (self, mutual, handover); key processes — pipe welding, pressure testing, electrical testing — supervised and recorded;
– Factory testing: comprehensive test items with records delivered as part of the as-built documentation;
– Acceptance standards: per design requirements and national codes (GB 50174, GB 50243, GB 50462, etc.).
14.6 Safety Management
– Safety responsibility system with project manager as first responsible person; safety officer daily inspection and pre-shift disclosure;
– Temporary power with leakage protection, locked boxes, no unauthorized wiring;
– Hoisting operations per plan with qualified crane and riggers, warning zones; welding with fire watch and fire extinguishers;
– High-altitude work with harnesses; protective equipment mandatory; emergency plan for accidents (electric shock, fire, injury) with first-aid supplies on site.
14.7 Civilized Construction
– Materials stacked neatly, site kept clean, work-site-clean policy;
– Noise and dust control; protection of existing facilities and the surrounding environment;
– Uniform attire and badges; compliance with site management rules.
14.8 Emergency Plan
– Power failure: UPS covers monitoring/control; check heat source status; follow orderly shutdown procedure if prolonged;
– Leakage: leakage alarm locates the point; isolate valves, collect coolant, repair and refill;
– Fire: fire system auto-discharges; evacuate personnel; call fire department; do not enter until discharge completes;
– Cooling failure: standby CDU/pump auto-switchover; if both fail, reduce load or shut down affected servers orderly;
– Equipment damage: stop power, isolate, replace spare parts from the kit, re-commission and test.
15. After-Sales Service
15.1 Warranty Commitment
The overall project warranty period is 2 years from the date of completion acceptance; core equipment has a 3-year warranty. During the warranty period, all failures and damage caused by product quality or construction process problems are repaired and parts replaced free of charge. After the warranty period, lifetime cost-price maintenance is provided, charging only parts cost and basic labor, ensuring long-term stable system operation.
15.2 After-Sales Response Mechanism
– A 7×24 after-sales hotline receives fault reports and technical consultations at any time;
– Within the urban area: respond within 2 hours, technicians on site within 4 hours;
– Suburban and surrounding areas: respond within 4 hours, personnel on site within 8 hours;
– General faults resolved on the spot; complex faults solved within 24 hours with a solution;
– Emergency faults get a green channel with priority dispatch of personnel and parts.
15.3 Periodic Inspection and Maintenance
During the warranty period, a free on-site inspection is provided every six months, with a comprehensive maintenance inspection annually. Inspection contents include equipment operating status, connection firmness, sealing and rust conditions, filtering/grounding performance and safety devices. After each inspection, a formal inspection report is issued recording equipment status and maintenance content with optimization suggestions.
15.4 Spare Parts Supply Guarantee
A local spare parts warehouse is established, stocking common wearing parts for quick replacement to shorten fault handling time. For uncommon special parts, a fast supply channel with the factory ensures availability within 48 hours. During warranty, non-artificial-damage spare parts are replaced free; after warranty, parts are charged at cost price without markup.
15.5 System Upgrade and Technical Support
– Free lifetime technical consultation services by phone or online at any time;
– If the customer later needs upgrades or expansions, preferential upgrade solutions and construction services are provided;
– Industry new technology and standard information is regularly pushed to customers.
16. Training Plan
16.1 Training Objectives and Audience
Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.
Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.
16.2 Tiered Training Content System
Level 1: Basic operation training (1 day)
– Basic principles: system concepts, structure composition, performance indicators;
– Daily operation standards: correct operation of equipment, control and safety systems;
– Daily inspection contents: daily/weekly/monthly check items;
– Safety precautions: usage prohibitions and emergency handling procedures.
Level 2: Maintenance training (1 day)
– Detailed structure of each subsystem and working principles;
– Daily maintenance methods: cleaning, fastening checks, routine care;
– Common fault identification and simple handling;
– Emergency handling procedures for power failure, fire and equipment faults.
Level 3: Advanced management training (as needed)
– Performance influencing factors and how to avoid degradation;
– Upgrade and expansion knowledge and specification requirements;
– Relevant national standards interpretation.
16.3 Training Methods and Schedule
– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;
– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.
16.4 Training Assessment and Documentation Delivery
– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;
– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.
17. Anonymous Typical Project Scenarios
All project scenarios below are anonymous, generalized examples compiled from typical industry deployments; no real customer names, addresses or confidential information are disclosed.
17.1 Edge Computing Liquid-Cooled Container Project for a Telecom Operator
Project background: an edge computing node in a provincial capital needed rapid deployment of high-density computing power with limited site space and no existing computer room.
Configuration: 2 sets of 40ft liquid-cooled containers, each with 8× 30kW cabinets, total heat load 480kW, with CDU redundancy, environment monitoring and gas fire protection.
Result: delivered and launched within 30 days, stable operation with PUE as low as 1.12, meeting the low-latency, high-reliability needs of edge computing, with high customer recognition.
17.2 Computing Center Liquid Cooling Project for an AI Technology Company
Project background: AI large-model training with single-cabinet power up to 28kW; traditional air cooling could not dissipate the heat and the computer room renovation cycle was long.
Configuration: 4 sets of 40ft liquid-cooled containers, 32 liquid-cooled cabinets total, 960kW total heat load, served by a centralized chilled water station.
Result: server GPU temperatures stably controlled within 65℃, excellent heat dissipation, overall energy consumption 32% lower than traditional air cooling, computing density tripled.
17.3 High-Performance Computing Liquid-Cooled Room for a Research Institute
Project background: supercomputing center upgrade requiring high reliability, low noise and scalability.
Configuration: 1 set of 40ft liquid-cooled container, 8× 30kW cabinets, CDU 1+1 redundancy, UPS backup power, precision environment monitoring.
Result: stable operation with low noise and convenient O&M, meeting the continuous operation needs of scientific computing, with reserved expansion interfaces for future upgrades.
18. SEO Optimization Section
All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.
18.1 Keyword System
– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;
– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;
– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;
– Brand keywords: KITOZER, Guangzhou Lain.
18.2 SEO Tag System
– Title tag: the article title — Guangzhou Lain KITOZER;
– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;
– H1 tag: the article title;
– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.
18.3 Internal Link Anchor Text
– Core anchor text: technical design solution, system construction;
– Long-tail anchor text: configuration list, technical parameters, construction plan;
– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.
19. Official Contact Information
– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Official Website: https://gdlain.com
– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China
For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.