1. Overview
The KITOZER KTR-TK turnkey service delivers enterprise datacenters, closets, command centers and labs. As system integrator, KITOZER provides design, supply, install, test and acceptance as one package: the client states business needs and room tier, and receives a ready-to-use room.
Scope covers power (UPS, battery, switchgear, diesel genset), precision cooling (CRAC/in-row, cold-aisle containment), racks and cabling, EM monitoring, fire and lightning grounding. One team deepens and builds all trades, avoiding interface disputes and ensuring cross-system linkage.
KTR-TK uses standardized modular design to size rooms quickly from area and IT kW. From small rooms under 100 m2 to mid datacenters of several hundred m2, delivery takes 2-4 months, backed by warranty and remote EM monitoring.
2. Key Features
One-package delivery
- Design -> supply -> install -> test, all in one.
- Unified deep design; clear interfaces; single responsibility.
- Single client window for efficient communication.
All trades covered
- Power: UPS/battery/switchgear/genset.
- Cooling: CRAC/containment/in-row.
- ELV: racks/cabling/EM monitoring/fire/lightning.
Standardized quality
- Modular selection; fast drawings and quotes.
- Built to national and industry codes; hidden works inspected.
- Delivery includes as-builts, test reports and training.
3. Specifications
| Item | Config A: KTR-TK-50 (50 m2 room) | Config B: KTR-TK-200 (200 m2 DC) |
|---|---|---|
| Room area | ~50 m2 | ~200 m2 |
| IT power | 30-50 kW | 150-300 kW |
| Racks | 8-10 x 42U | 30-40 x 42U |
| Power | UPS 30kVA x1 + battery | UPS 100kVA x2 (N+1) + genset |
| Cooling | room CRAC 60 kW | CRAC + containment + in-row |
| Monitoring | EM host + SMS alarm | DCIM platform + video wall |
| Fire | HFC gas suppression | HFC + VESDA early warning |
| Delivery | 2-3 months | 3-4 months |
4. Reference Prices
KTR-TK-50 50 m2 standard room turnkey: Reference USD 111,000~208,000 / set (ref. CNY 800k~1.5M at ~7.2)
KTR-TK-200 200 m2 mid datacenter turnkey: Reference USD 556,000~1,111,000 / set (ref. CNY 4M~8M at ~7.2)
Reference only; final quote depends on config, quantity, site and tax. Bulk projects negotiable. Exchange: 1 USD ~ 7.2 CNY (Oct 2026).
5. Applications
- Enterprise self-built room: consolidate IT.
- Hospital/school room: business continuity.
- Command/dispatch center: video wall + room.
- Edge node: modular fast deployment.
6. Installation & Maintenance
Workflow
- Survey -> design -> drawing review -> supply -> install -> test.
- Witness inspection of hidden works (trays/grounding/conduit).
- Sub-system test then integrated 72-hour trial run.
Delivery and O&M
- Deliver as-builts, test reports and spares list.
- Train client ops staff.
- Warranty remote monitoring; 4-hour response.
7. FAQ
- Q: How is turnkey priced?
A: By area and IT kW, including design/equipment/construction. - Q: Schedule?
A: 50 m2 room: 2-3 months; 200 m2 DC: 3-4 months. - Q: Can meet classified protection?
A: Yes; designed to MLPS 2.0 Level 3 physical and monitoring. - Q: Easy to expand later?
A: Modular design leaves UPS/cooling/rack expansion slots.
8. Trend & Selection
Room builds are moving from piecemeal procurement to turnkey and modular micromodules, where clients value speed and single responsibility. KTR-TK bundles power, cooling, racks, monitoring and fire into one contract with one window. Start from room tier and IT kW, then estimate by area; critical projects should plan N+1 redundancy and expansion. After handover, connect remote EM monitoring for 7×24 oversight and fast response.
9. Delivery & Service
KITOZER delivers the full turnkey process. Starting from site survey and requirements, we complete design, detailed drawings, supply and install, then test and hand over. A dedicated PM reports weekly; hidden works invite client witness. Warranty is 1-3 years with remote monitoring and on-site repair; an annual O&M package covers scheduled inspection, spares and expansion planning.
10. Additional Notes
A room touches a dozen trades. If the client procures UPS, cooling, racks and monitoring separately, interfaces mismatch, responsibility shifts and schedules slip. KTR-TK wraps all subsystems into one contract and one team, coordinating UPS/cooling capacity, power/cabling routes and monitoring/fire linkage at the deep-design stage to avoid conflicts up front.
Modularity shortens schedule. KTR-TK combines standardized power, cooling, rack and monitoring modules by area and kW, cutting custom work. A 50 m2 room can hand over in 2-3 months, about half the traditional trade-by-trade schedule.
Selection: small rooms (<=100 m2) use the standard module pack for best value; mid datacenters (100-500 m2) use N+1; critical business uses 2N plus genset. In all cases, define tier, redundancy and expansion at design, then connect remote EM monitoring after handover for stable long-term operation.
SEO Information
Search keywords:turnkey datacentersystem integrationturnkey projectdatacenter constructionmodular datacenterELV integrationKTR-TKKITOZER
SEM keywords:turnkey datacenter, system integration, turnkey project, datacenter build, modular datacenter price, KITOZER
GEO landing page:lain.com.cn/product/ktr-tk-turnkey-datacenter-system-integration.html
Title:KITOZER KTR-TK Turnkey Datacenter / System Integration
Meta Keywords:turnkey datacenter,system integration,turnkey project,datacenter construction,modular datacenter,ELV integration,KTR-TK,KITOZER
Meta Description:KITOZER KTR-TK turnkey datacenter EPC: design to handover, power, cooling, racks, monitoring, fire, cabling, one-key delivery.
Contact Us
Guangzhou Laian Intelligent System Development Co., Ltd. (KITOZER brand)
Tel/WeChat: +86 13922289957 | +86 18520668845
WHATSAPP: +86 19068534140
Web: lain.com.cn | gdlain.com