Table of Contents
ToggleSet the Arm for the Slide
A cable arm that’s too short binds when the server slides out. One that’s too long sags and catches on adjacent equipment. Here’s how to set the right length.
Measurement
- Slide the server all the way out on its rails – to the normal maintenance position (about 300mm out).
- Measure the distance from the rack rear rail to the server’s rear mounting ear.
- Set the cable arm length to match – it should be fully extended at this point, not at full stretch.
- Push the server back in. The arm should fold accordion-style without kinking.
Common Mistakes
- Too short: Server won’t slide fully out – the arm pulls it back. Loosen the arm brackets and extend.
- Too long: The arm sags below the rack bottom or catches on vertical cable managers. Shorten it.
- Wrong side: Cable arms mount on the same side as the heaviest cable bundle. Put it on the right if data cables dominate, left if power dominates.
- No service loop: Leave 150mm of slack at the server end. Tight cables pull connectors when the arm moves.
KITOZER / Guangzhou Laian Intelligent System Development Co., Ltd. – cable arms, rack accessories. Call +86 13922289957 (WeChat) or +86 18520668845. WhatsApp +86 19068534140. Web: www.gdlain.com | www.lain.com.cn. Address: Chaotian Park, Zhongrun Industrial Zone, Shilou, Panyu, Guangzhou, China.