KITOZER
KITOZER

Installing Rack Blank Panels: Snap-In vs Screw-In Methods

Two Ways to Blank a Gap

Blank panels fill unused U positions. KITOZER offers two installation styles: snap-in (tool-less) and screw-in (more secure). Choose based on how often you reconfigure.

Snap-In (KZ-BP1-S, $1.50 each)

  • Flexible plastic tabs press into the mounting rail square holes
  • Install by hand – no tools needed
  • Remove in seconds when you need the U
  • Best for racks that get reconfigured often
  • Not as secure in high-vibration environments

Screw-In (KZ-BP1-B, $2.50 each)

  • Steel panel with M6 screw holes
  • Bolt to the mounting rail with two screws
  • Stays put through vibration and seismic events
  • Best for production data centers, earthquake zones
  • Takes 30 seconds per panel with a screwdriver

Installation Steps (Screw-In)

  1. Hold the blank panel against the mounting rail at the target U position.
  2. Insert M6 screws through the panel into the rail cage nuts.
  3. Tighten finger-tight + 1/4 turn. Don’t over-torque – strip the cage nut.
  4. Check the panel sits flush with the rail.

KITOZER / Guangzhou Laian Intelligent System Development Co., Ltd. – blank panels, rack accessories. Call +86 13922289957 (WeChat) or +86 18520668845. WhatsApp +86 19068534140. Web: www.gdlain.com | www.lain.com.cn. Address: Chaotian Park, Zhongrun Industrial Zone, Shilou, Panyu, Guangzhou, China.

Shopping Cart