Table of Contents
ToggleLabel Both Ends of Every Patch Cord
A patch cord runs from patch port 5 to switch port 5. At 2am, you don’t want to trace it. Label both ends now.
What to Write
Patch end: Port 5 (to SW1-05). Switch end: SW1-05 (from PP-05).
Format
- Source port number
- Destination port number
- Short identifier for the switch or patch panel
Label Style
- Use a label holder (KZ-LH1) for a clean, replaceable card
- Print on standard label paper, insert into the holder
- Black text on white, 8pt font
- Place the label 100mm from the connector on both ends
KITOZER / Guangzhou Laian Intelligent System Development Co., Ltd. – patch cord labels, network. Call +86 13922289957 (WeChat) or +86 18520668845. WhatsApp +86 19068534140. Web: www.gdlain.com | www.lain.com.cn. Address: Chaotian Park, Zhongrun Industrial Zone, Shilou, Panyu, Guangzhou, China.