Table of Contents
ToggleCables Enter from Above
Overhead cable trays feed cables into the rack top. The top entry must be sealed against hot air recirculation while letting cables pass.
Brush Strip Installation
- Remove the top panel from the rack.
- Peel the adhesive backing on the brush strip.
- Stick the strip around the cable cutout on the top panel.
- Replace the top panel.
- Feed cables through the brush bristles – they seal around the cables.
Gland Plate Installation
- Remove the blank gland plate from the top.
- Pass cables through individual cable glands.
- Tighten the gland nuts to seal around each cable.
- Replace the gland plate.
KITOZER / Guangzhou Laian Intelligent System Development Co., Ltd. – cable entry, rack accessories. Call +86 13922289957 (WeChat) or +86 18520668845. WhatsApp +86 19068534140. Web: www.gdlain.com | www.lain.com.cn. Address: Chaotian Park, Zhongrun Industrial Zone, Shilou, Panyu, Guangzhou, China.