Table of Contents
ToggleWalk the Rack Before You Declare It Done
A fresh rack installation needs a final inspection. Run through this checklist before handing over to the customer.
Structure
- [ ] Rack is level front-to-back and left-to-right.
- [ ] Rack is anchored to the floor (if required).
- [ ] Door opens, closes, locks smoothly.
- [ ] Side panels are flush and latched.
- [ ] All screws are tightened (no loose hardware).
Power
- [ ] PDU input cable is rated for the load.
- [ ] Ground wire connects rack to PE busbar.
- [ ] No exposed copper or loose connections.
- [ ] Breaker trips test: press test button.
Cooling
- [ ] Fan tray runs (listen, feel airflow).
- [ ] Blank panels fill all empty U positions.
- [ ] Door perforation is not blocked by labels or stickers.
Cables
- [ ] Patch cables are labeled at both ends.
- [ ] Cables are bundled and secured (not hanging loose).
- [ ] Data and power cables are separated.
- [ ] No cable pinches in the door hinge.
Documentation
- [ ] Rack drawing (layout, U positions, equipment list).
- [ ] Cable schedule (port to port mapping).
- [ ] IP address list for managed equipment.
- [ ] Emergency contact sheet inside the door.
KITOZER / Guangzhou Laian Intelligent System Development Co., Ltd. – installation checklist, handover. Call +86 13922289957 (WeChat) or +86 18520668845. WhatsApp +86 19068534140. Web: www.gdlain.com | www.lain.com.cn. Address: Chaotian Park, Zhongrun Industrial Zone, Shilou, Panyu, Guangzhou, China.