Post-Installation Checklist: 20 Items to Verify Before Handover

Don’t Walk Away Until All 20 Are Done

After rack assembly, equipment installation, and cable termination, run through this checklist. Each item takes 30 seconds. Skipping one costs hours later.

  1. Rack is level (front-to-back, left-to-right).
  2. Leveling feet touch the floor; casters are off the ground.
  3. Rack bolted to the floor (where required).
  4. All cage nuts installed and tight.
  5. Equipment mounted with M6 screws, all 4 corners.
  6. Blank panels fill every empty U position.
  7. Cables routed neatly, no pinches or kinks.
  8. Cable arms flex freely.
  9. Labels on both ends of every cable.
  10. PDU mounted securely, load under 80%.
  11. Ground wire connected to PE busbar.
  12. Fan tray running, airflow bottom-to-top.
  13. Temperature sensor reading correct value.
  14. Door closes and locks smoothly.
  15. Side panels installed and clipped.
  16. Top/bottom cable glands sealed.
  17. Power cords plugged into correct PDU outlets.
  18. Network cables punched down correctly.
  19. Equipment LEDs green (no alarms).
  20. Maintenance kit left on-site (spare screws, blanks, labels).