KITOZER
KITOZER

Quarterly Rack Maintenance Plan: Every 90 Days

Don’t Wait for a Failure. Maintain Proactively.

A quarterly visit catches problems before they become outages. Here’s the checklist.

KITOZER preventive maintenance schedule cabinet

Every Quarter

Task Check
Visual inspection Doors close, locks work, no rust, no damage
Temperature check Verify sensor reading matches actual temp
Fan test All fans spinning, no abnormal noise
Filter check Dirty filters? Replace if needed
Cable check No loose cables, labels readable, cable arm smooth
Ground check Ground wire tight, no corrosion at lugs
PDU load Verify load under 80%, no breaker issues
UPS test Battery test: simulate outage, verify runtime

Every Year

  • Replace air filters (even if not dirty).
  • Torque all M6 screws.
  • Inspect battery cabinet: swelling, leakage, terminal corrosion.
  • Test alarm system: trigger a simulated alarm, verify alert arrives.

KITOZER / Guangzhou Laian Intelligent System Development Co., Ltd. – maintenance plan, service. Call +86 13922289957 (WeChat) or +86 18520668845. WhatsApp +86 19068534140. Web: www.gdlain.com | www.lain.com.cn. Address: Chaotian Park, Zhongrun Industrial Zone, Shilou, Panyu, Guangzhou, China.

Shopping Cart