Table of Contents
ToggleThe Rack Frame Must Be One Continuous Ground Path
The vertical rails, side panels, doors, and PDU chassis all need to bond to a single grounding bus bar. If any part is isolated (by paint or plastic), it becomes a shock hazard.
Installation Steps
- Mount the copper bus bar vertically on the rear post, near the bottom.
- Connect the rack frame to the bus bar with a 6mm² green-yellow cable.
- Connect the door: a braided grounding strap from the door hinge to the frame (paint prevents metal-to-metal contact).
- Connect side panels: short grounding straps where panels meet the frame.
- Connect the PDU chassis to the bus bar.
- Run a 6-16mm² cable from the bus bar to the building PE (protective earth) busbar.
KITOZER / Guangzhou Laian Intelligent System Development Co., Ltd. – grounding bus bar, safety. Call +86 13922289957 (WeChat) or +86 18520668845. WhatsApp +86 19068534140. Web: www.gdlain.com | www.lain.com.cn. Address: Chaotian Park, Zhongrun Industrial Zone, Shilou, Panyu, Guangzhou, China.