Post-Installation Checklist: 20 Things to Verify

Don’t Walk Away Until You’ve Checked Everything

A new rack install looks done, but small mistakes cause outages later. Run through this 20-point checklist before signing off.

Checklist

  1. Rack is level (front-to-back and side-to-side).
  2. Rack bolted to floor (or wall-mounted bracket secured).
  3. All cage nuts installed, no missing screws.
  4. Equipment mounted at correct U positions, rails aligned.
  5. All screws torqued to 2.5 Nm (finger-tight plus quarter turn).
  6. Power cables plugged into PDU, labeled both ends.
  7. Network cables plugged into correct switch ports, labeled.
  8. Ground wire connected from rack to earth point.
  9. Ground resistance tested (under 1 ohm).
  10. Blank panels fill all empty U-slots.
  11. Cable management: vertical and horizontal managers used.
  12. Cable ties secure but not over-tightened.
  13. Fan units spinning, no unusual noise.
  14. Temperature/humidity sensor installed and reading correctly.
  15. UPS powered on, battery charging, self-test passed.
  16. Door closes and seals properly; lock works.
  17. All labels applied: equipment, ports, U-positions.
  18. Monitoring system sees all devices (SNMP ping OK).
  19. Alert thresholds set (temp high, humidity high, door open).
  20. Documentation updated: rack inventory, cable schedule, IP list.