KITOZER
KITOZER

KITOZER ELV System Integration Complete Manual | Cabling Network Security Conference IBMS

Table of Contents

二、English Article

KITOZER ELV / Low-Voltage System Integration Complete Manual: From Generic Cabling, Network, CCTV, Access Control, PA, Conference to IBMS

Extra Low Voltage (ELV) building systems are the collective term for all building sub-systems that carry information, control signals, audio/video and sensing — as distinct from high-voltage power distribution, lighting and motor circuits. A modern building’s ELV scope includes generic cabling, computer networking, video surveillance, access control &一卡通, public address, conference systems, equipment room engineering, building automation (BA) and the top-level IBMS integration platform. KITOZER (Guangzhou Laian Intelligent System Development Co., Ltd.) has delivered ELV packages for campuses, hospitals, schools, government offices, transport hubs and data centres over more than a decade. This manual walks the reader through each subsystem’s architecture, product selection, cabling practice, linkage logic, cost drivers, project workflow, industry standards, 30 FAQs and warranty terms — a reference document that owners, designers, main contractors and O&M teams can use directly.

1. ELV System Composition: The Building’s Neural Network

1.1 Boundary Between LV and ELV

“Strong current” (HV/LV power) handles energy — 220V/380V distribution, lighting sockets, chillers, elevators. “Weak current” (ELV) handles information — network, CCTV, access, PA, conference, BA. Cabling must be separated: dedicated trays, ≥30 cm parallel spacing, 90-degree crossings, independent earthing that joins the main equipotential bonding bar (MEB).

Typical ELV voltages: DC12V/24V (locks, alarms, lighting relays), AC100V constant-voltage PA, AC220V (front-end power), PoE 48V (cameras, APs, IP speakers). Although below safety-voltage limits, a mid-size campus ELV installation may run 200+ km of cable and hundreds to thousands of points.

1.2 Ten Subsystems

Per GB 50314 and GB 50311, a complete intelligent building comprises:

  1. Generic Cabling System (GCS) — physical layer for all ELV signals
  2. Computer Network — switching, routing, Wi-Fi
  3. Video Surveillance (CCTV/VSS) — capture, storage, wall, analytics
  4. Access Control System (ACS) — doors, elevators, visitor, payroll
  5. Intrusion Alarm (IAS) — perimeter, PIR, panic buttons
  6. Guard Tour — patrol checkpoint scanning
  7. Public Address (PA/BGM) — background music, paging, emergency broadcast
  8. Conference — discussion, voting, interpretation, recording, video conferencing
  9. CATV/SMATV — TV signal distribution
  10. Building Automation (BAS/BA) — HVAC, drainage, lighting, elevator, power metering

Above all these sits IBMS (Intelligent Building Management System), which aggregates data across subsystems for cross-system linkage, unified alarms and unified dashboards. For mid-to-large projects KITOZER also delivers the equipment room (UPS, precision cooling, gas suppression, environment/power monitoring) as the heart of all ELV hardware.

1.3 Four-Layer Architecture

Every ELV system decomposes into four layers:

  • Perception Layer: cameras, card readers, detectors, temperature/humidity, lux, water leak, current transducers
  • Network Layer: switches, PoE, fibre backbones, Wi-Fi APs, RS485/KNX buses
  • Platform Layer: servers, storage, databases, VMS/ACS/BA/IBMS software
  • Application Layer: video wall, operator workstations, mobile apps, web portals
1.4 Typical Investment Share

ELV spend usually accounts for 3%–8% of total construction cost:
– Ordinary office: 3%–4% (RMB 200–400/m²)
– Grade-A office: 5%–6% (RMB 400–600/m²)
– Hospital / data centre / transport hub: 8%–12% (RMB 800–2,000/m²)
– Super high-rise / smart-city demo: 12%+ (RMB 2,000+/m²)

Within that pool, typical shares: cabling 15%–20%, network 10%–15%, CCTV 20%–25%, access 8%–10%, PA 3%–5%, conference 5%–10%, equipment room 10%–15%, BA 8%–12%, IBMS 5%–8%, others 3%–5%.

2. Generic Cabling System (GCS): The Vascular Layer

Generic cabling is the physical foundation of all ELV. Per GB 50311 it is divided into six subsystems:

  1. Work Area: 86-type faceplates, keystone jacks, patch cords, AP panels, TV outlets
  2. Horizontal: Cat6/Cat6a UTP from floor distributor (FD) to faceplate, ≤90 m
  3. Administration: floor cabinets, patch panels, cable managers, patch cords
  4. Backbone: fibre (OS2 single-mode or OM4 multi-mode) between building distributor (BD) and FD; multi-pair copper for voice
  5. Equipment Room: main BD, core switches, ODF, voice 110/PBX
  6. Campus Backbone: inter-building fibre in galvanised conduit or direct-buried/duct
2.1 Cable Categories
  • Cat5e (100 MHz): Gigabit, largely retired
  • Cat6 (250 MHz): Gigabit-to-desk, 10G ≤55 m — mainstream
  • Cat6a (500 MHz): 10G-to-desk ≤100 m — recommended for high-density offices and data centre edge
  • Cat7/F (600/1000 MHz, S/FTP): used only in industrial EMI environments
  • OM3/OM4 multi-mode: 850 nm VCSEL; OM3 10G ≤300 m, OM4 10G ≤550 m / 40G ≤150 m
  • OS2 single-mode: 1310/1550 nm; 10G ≤10 km, 100G ≤80 km for inter-building

KITOZER standard: horizontal Cat6 UTP; backbone dual (OS2 inter-building + OM4 intra-building); high-density office / data centre edge Cat6a; hospital / EMI-prone sites Cat6a S/FTP screened.

2.2 Cabinets and Patch Panels
  • Floor cabinets (FD): 12U/18U/22U wall or floor, per 200–300 data points; 24-port Cat6 patch panels, PoE+ access switches, PDU
  • Main equipment room (BD): 42U 19-inch racks; core switches, aggregation switches, ODF, voice frame
  • Labelling: permanent-link labels at both ends of every cable; numbering by building-floor-room-port
2.3 Testing

KITOZER certifies every permanent link with a Fluke DSX analyser: wire map, length ≤90 m, insertion loss, NEXT, return loss, delay, skew. Fibre is tested with OTDR and power meter at 1310/1550 nm; per-splice ≤0.1 dB, per-connector ≤0.5 dB. Reports are archived as as-built deliverables.

2.4 Physical Separation

KITOZER strongly recommends “physical separation, logical sharing”:
– Office network and OT/IoT network (CCTV, access, alarm) use separate patch panels and switches
– Video traffic (high bandwidth) runs on dedicated Cat6a/fibre to the NVR room
– Access/alarm (low bandwidth, real-time) can share switches with office but isolated by VLAN
– IP PA terminals and APs share PoE switches

3. Computer Network: The Digital Highway

3.1 Topology

KITOZER flat two-tier design: dual core with M-LAG, 10G uplink, Gigabit-to-desk.

  • Core: dual core switches in M-LAG (multi-chassis link aggregation); switch capacity ≥68 Tbps, ≥48 × 10G SFP+, ≥48 × GE, dual 600 W PSU
  • Aggregation: per-building aggregation switch with dual 10G uplink (omitted in small sites)
  • Access: 24-port PoE+ switch per floor, Gigabit-to-desk, 10G SFP+ uplink, PoE budget ≥400 W
  • Edge: next-generation firewall + enterprise router, GE/10G WAN, IPS/IPSec/SSL VPN
  • Wireless: Wi-Fi 6/7 APs managed by AC; employee SSID isolated from guest SSID
3.2 Dual-Network Separation

KITOZER deploys dual-plane networking by default:
– Office network (VLAN 100–199): staff internet, office applications, email
– OT/IoT network (VLAN 200–299): cameras, access, alarm, PA, BA, energy meters
– Firewall between planes: office can reach OT management platforms (HTTP/HTTPS) but not camera/controller management ports; OT cannot initiate internet access
– Separate core switches and edge firewalls for each plane

Rationale: since 2018 ransomware attacks on industrial and security systems have grown exponentially. Physical separation is the last line of defence if office endpoints are compromised.

3.3 PoE
  • 802.3af (PoE): 15.4 W per port
  • 802.3at (PoE+): 30 W per port
  • 802.3bt (PoE++): 60 W / 90 W per port

Typical loads: Wi-Fi 6 AP 30 W; 4G IR PTZ camera 25–30 W; face terminal 20 W; IP speaker 10–15 W; Wi-Fi 7 high-density AP 60–90 W. Total PoE budget must retain 30% headroom.

3.4 Network Management

B/S NMS with auto topology (LLDP), device health (CPU/memory/bandwidth), alarms (email/SMS/app), config backup, wireless heatmap, traffic anomaly detection.

3.5 Security

Edge firewall with IPS, AV, URL filtering, VPN (IPSec for branches, SSL for remote staff), and HA pair.

4. Video Surveillance: From “See” to “Understand”

4.1 Components

Front-end cameras → transport (PoE, fibre, wireless bridges) → storage (NVR/CVR/IPSAN) → platform (VMS, media, AI servers) → decoding & wall (decoder, LCD video wall, keyboard) → clients (workstation, mobile, web).

4.2 Camera Selection
Scene Recommended camera Key parameters
Outdoor perimeter 8 MP smart IR bullet IR ≥80 m, IP67, WDR ≥120 dB
Entrance face capture 2 MP face camera Library ≥50k, capture rate ≥99%
Lobby / corridor 4 MP dome WDR, 0.001 Lux low-light
Plaza / road 4/8 MP PTZ 32× optical, IR ≥200 m
Elevator car 2 MP fisheye dome PoE, elevator-ready
Car park 4 MP bullet full-colour low-light
Equipment room 4 MP fixed dome WDR, PoE
4.3 Storage Calculation

Per-channel daily storage (GB) = bitrate (Mbps) × 3600 × 24 ÷ 8 ÷ 1024. Example: 4 Mbps 1080P ≈ 42 GB/day/channel. For 100 channels × 30 days = 126 TB raw; with RAID 5 provision ~168 TB (e.g. 21 × 8 TB).

KITOZER policy:
– Campus/office: 2–4 Mbps, 30 days
– Hospital/school: 4–6 Mbps, 90 days (police requirement)
– Transport/bank: 6–8 Mbps, 90–180 days; face snapshots retained indefinitely

4.4 AI Analytics

Behaviour analytics server supports:
– Person: face detection/capture/matching, attributes (gender, age, glasses, mask)
– Vehicle: plate, model, colour, attributes
– Behaviour: tripwire, intrusion, loitering, unattended object, fall, crowd
– Compliance: hard hat, hi-vis vest, smoking, phone use
– Fire/smoke: outdoor flame and smoke detection

Two deployment modes: front-end AI (camera NPU outputs structured data, saves bandwidth) vs. back-end AI (GPU server analyses ordinary cameras, algorithm upgrade via software). New builds prefer front-end AI; retrofit projects prefer back-end AI to protect existing camera investment.

4.5 Wall Decoding

Security operations centre typically deploys 46″/55″ LCD tiles with 1.7/0.88/0.44 mm bezel in 3×5/4×4/2×3 layouts, 16-channel 4K decoders (H.265/H.264), and a four-axis touch keyboard. Normal state shows campus map + rotating key views; alarm state pops up the triggering camera full-screen.

5. Access Control &一卡通: Identity, Privilege, Audit

5.1 Components

Front-end readers (IC/CPU/face/QR/fingerprint) → controllers (1/2/4/8-door, offline-capable) → locks (electric strike, maglock, electric bolt, fire panic bar, barrier gate, swing flap) → platform (ACS software, face server, payroll, visitor, consumption) → enrolment (desktop writer, face capture, ID reader) → credentials (M1, CPU, NFC, QR virtual cards).

5.2 Controllers

KITOZER controllers typically store ≥100k cardholders and ≥300k events; TCP/IP with RS485 downstream readers; door contact, request-to-exit, break-glass, fire linkage inputs; lock and auxiliary outputs; anti-passback, interlock, first-card-open, super-coin, holiday schedules; dry-contact fire release.

5.3 Face Terminals

7″/8″ IPS touch, 2 MP binocular liveness (photo/video attack prevention), 1:N ≤0.2 s for 10k library, ≥50k library, IP65, -20 to 60 °C, TCP/IP + optional Wi-Fi.

5.4 Pedestrian Gates
  • Swing gate: wide lane, luggage/wheelchair accessible, 20–60 persons/min — office, metro
  • Flap gate: fast 60–90 persons/min, aesthetic — office, metro, airport
  • Tripod turnstile: one-direction, strongest anti-tailgating, 20–30 persons/min — theme park, construction, residential
  • Speed gate: <0.5 s opening — premium office, hotel

Vehicle lanes use smart barrier gates (straight/curved/fence/advertising) with ANPR cameras, face components and long-range RFID.

5.5一卡通 Modules

One card / one face across: door access, attendance, elevator control (floor authorisation), canteen/shop consumption, visitor management, conference sign-in. Single database; lost card disable propagates to all modules.

5.6 Fire Linkage

Fire alarm panel releases all non-evacuation locks via dry contact; evacuation routes use fire panic bars (latching but auto-release on fire); hard-wired signal (not network-dependent).

6. Public Address: BGM and Emergency Broadcast

6.1 Architecture

IP-based PA: touch PA host (10″, 4-core, dual GE, Linux/Kylin), management software (terminal status, playback, paging, TTS, open API), IP call mic (7″, <100 ms latency), IP speakers (2×20 W digital amp, IPv4/IPv6, priority), traditional mixer-amplifier (120/240/360/500 W, 100 V line), fire interface (≥16 dry-contact inputs, DSP), main/backup amp switcher (6 main + 1 backup, ≥800 W/channel).

6.2 Priority
  1. Emergency broadcast (highest): fire, intrusion, SOS — forced all-zone
  2. Business paging: manual announcements
  3. Background music (lowest): scheduled BGM, interruptible by higher priority
6.3 Zoning

Zones combine floor, function and fire compartment. Office volume 30–45 dB, corridor 45–60 dB, outdoor 60–75 dB. Fire linkage plays the fire floor and adjacent floors first.

6.4 Speaker Selection

Office/hotel room: 3–6 W ceiling; corridor/lobby: 6–10 W ceiling/column; canteen/mall: 10–20 W coaxial ceiling; outdoor: 30–60 W IP66 column/horn; car park: 15–30 W horn; plant room: 6–10 W wall mount.

7. Conference Systems

7.1 Categories
  • Auditorium 300–1000 p: digital discussion, voting, interpretation, recording, LED wall
  • Medium room 20–60 p: hand-in-hand conference, wireless mics, projection/LED, video conferencing
  • Small room 6–20 p: wireless mics, flat display, video conferencing
  • Boardroom 8–16 p: digital units, paperless, 4K display
7.2 Digital Conference

Hand-in-hand daisy chain: chairman unit (priority, free/talk-request), delegate units, main unit (up to 255 units, discussion/voting/interpretation).

7.3 Wireless Conference

UHF handheld/lavalier/gooseneck sets; or 2.4 GHz/DECT digital wireless for anti-interference.

7.4 Video Conferencing

Hardware endpoints (H.323/SIP, 1080P/4K, dual stream); software clients (Tencent/Zoom/Teams/Feishu); 360° mic array (6 m radius); 4K AI-tracking camera.

7.5 Paperless Conference

Rising/fixed tablet terminals; agenda, documents, annotation, voting; automatic wipe of confidential files post-meeting; speaker sync.

7.6 Sound Reinforcement

Main + fill + monitor speakers; DSP amplifier with auto-EQ and feedback suppression; digital mixer with scene presets; background noise ≤NC30; reverberation 1.0–1.2 s (auditorium) / 0.6–0.8 s (small room).

8. Equipment Room: The Heart

8.1 Zones

Main hall (rack rows, hot/cold aisle, precision cooling, UPS), control centre (video wall, operator desk, KVM), battery room (separate fire compartment), power distribution (row PDU, UPS input/output, mains), gas cylinder room.

8.2 Racks and Hot/Cold Aisle

Cold-aisle containment; roof hatches release on fire; front-to-back airflow; under-floor or overhead supply.

8.3 UPS

2N redundancy, online double-conversion, ≥95% efficiency; 20/40/60/120/200 kVA sizes; VRLA or Li-ion batteries; ≥30 min backup (critical rooms ≥2 h); up to 4 units parallel.

8.4 Precision Cooling

22–24 °C (ASHRAE 18–27 °C); 40%–60% RH; ISO 8 cleanliness; under-floor supply. Sized by rack kW × rack count × 1.3 redundancy.

8.5 Environment & Power Monitoring (EPMS)

Mains voltage/current/frequency, UPS state, battery voltage, temperature/humidity, water leak, access, PIR, video, smoke/heat, gas cylinder pressure. Alarms via SMS/phone/app.

8.6 Gas Suppression

HFC-227ea (FM-200) or Novec 1230; double confirmation (smoke + heat); shutdown of AC/fresh air; release within 10 s; independent cylinder room.

8.7 Earthing & Lightning

Bonded earthing ≤1 Ω; MEB for all racks/trays/metalwork; class B mains SPD at room entry, class C at rack PDU, signal SPD; anti-static raised floor 300 mm, surface resistance 10^6–10^9 Ω.

9. Building Automation (BA/BAS)

9.1 Scope

HVAC (chillers, heat exchangers, AHU, PAU, FCU, VAV), drainage (domestic pumps, sump pumps, tank levels), lighting (public, facade, car park), elevators (status only), power distribution (voltage/current/power factor/energy via meters), renewables (PV inverters, storage, charging piles).

9.2 Principle

Distributed DDCs near each device; BACnet/Modbus to central station; trends, alarms, schedules. Typical logic: AHU adjusts chilled-water valve by return air temperature, adjusts fresh-air damper by CO2, schedules on/off, filters differential pressure alarm; chiller plant staging by load saves 15%–25%.

9.3 Sensors and Actuators

NTC/PT1000 temperature; capacitive humidity; differential pressure; electromagnetic flow; NDIR CO2; electrode/ultrasonic level; motorised valves (0–10 V / 4–20 mA); damper actuators; VFD for pumps/fans.

9.4 Linkage

Fire: shut down AHU, start smoke extract, close fire dampers. Lighting: scheduled; forced on during fire. IBMS: energy data for reports.

10. IBMS: Weaving All Subsystems Together

10.1 Value

Without IBMS operators switch between 5–6 software packages. IBMS provides: unified view on electronic map, automated cross-system linkage, cross-system reports.

10.2 Integration Protocols

BACnet/IP (BA), Modbus TCP/RTU (meters, chillers), OPC UA/DA (industrial, energy), SDK/API (VMS, ACS, alarm), RESTful API (modern cloud), MQTT (IoT sensors), dry contacts (fire, gas suppression — most reliable).

10.3 Typical Linkage Scenarios
Trigger Action
Intrusion alarm Nearest camera to wall → PA voice in zone → doors lock → map popup
Fire alarm Emergency PA → doors release → elevators recall → AC off → lighting forced on
Door propped open long Video popup → desk voice prompt → auto-lock on timeout
Video fire/smoke detection Alarm platform → camera to wall → PA alert → fire notification
Outdoor lux low Facade lighting on
Night empty Public lights off → AC night setback
Room over-temperature SMS/app alert → precision AC boost
Perimeter intrusion Floodlights to zone → PTZ rotates → PA deter
10.4 Platform Selection

International (Honeywell EBI, Siemens Desigo CC, Johnson Metasys) — powerful but expensive and hard to customise. Domestic (KITOZER iBMS, SUPCON, Tsinghua Tongfang) — cost-effective, flexible, Chinese-friendly. Open-source lightweight (Node-RED + Grafana + InfluxDB) — small projects or technical owners.

11. Project Implementation Workflow

11.1 Requirements & Preliminary Design (2–4 weeks)

Site survey, point count, preliminary system/topology/point layout, equipment list, cost estimate. Deliverables: SRS, preliminary design, budget estimate.

11.2 Detailed Design (3–6 weeks)

Coordination with decoration, electrical, MEP; construction drawings (plan points, system, rack layout, details); IP/VLAN plan; linkage schedule; precise BOM.

11.3 Factory Pre-Integration (2–4 weeks, parallel with on-site)

Rack servers/switches/decoders/NVR; OS/database/platform install; image licensing; basic function test; FAT report.

11.4 On-Site Construction (4–12 weeks)

Trunking/conduit → cable pulling → termination → front-end install → room equipment placement → cable test. Trunking level ≤2‰ vertical ≤3‰; copper bend radius ≥8× diameter; fibre ≥20×; unique labels both ends; ≤24 jumpers per cable manager.

11.5 Commissioning & Integration (2–4 weeks)

Per-subsystem commissioning (network, CCTV, ACS, PA, BA, conference); linkage per schedule; 72-hour stability run.

11.6 Acceptance & Training (1–2 weeks)

As-built drawings (CAD+PDF), test reports (link, optical, connectivity), operation/maintenance manuals, training records (admin/operator/O&M), signed acceptance report.

12. Selection and Cost

12.1 Cost Drivers

Building size, grade, brand tier, intelligence level, retrofit vs. new build, geography.

12.2 Reference Cost Index (RMB/m², equipment+install+commissioning, excl. tax)
Building type ELV cost (RMB/m²) Notes
Ordinary office 200–400 Network+CCTV+ACS+PA
Grade-A office 400–800 Add IBMS, smart lighting, BA
5-star hotel 600–1200 Add guest room control, AV
Tertiary hospital 800–1500 Add nurse call, infant protection
University 300–600 Exam CCTV, campus一卡通
Data centre 1500–3000 UPS, precision AC, EPMS
Transport hub 1000–2000 Footfall, security screening
12.3 Cost Control

Phased build (backbone first, edge later); domestic substitution for non-critical; racks/trays/conduits sized for future, hardware phased; open-protocol platforms to avoid lock-in; avoid over-engineering (not every corner needs 8 MP).

13. 30 FAQs (English)

Q1 What is ELV voltage? DC12/24 V, AC100 V PA line, PoE 48 V — below safety limits but still requires de-energised work.
Q2 Can ELV and HV share a tray? No; separate trays, ≥30 cm parallel, 90° cross.
Q3 Cat6 vs Cat6a? Cat6 for office, Cat6a for high-density/retrofit.
Q4 30-day storage for 100 cameras? ~126 TB raw, ~168 TB with RAID 5 (21×8 TB).
Q5 What happens on power loss? Standard fail-safe (unlocked) for evacuation; fail-secure for data centres with UPS.
Q6 Can face be spoofed by photo? KITOZER binocular liveness blocks photo/video; 3D mask is a controlled risk.
Q7 Why fire-PA linkage? Voice evacuation is most effective; mandated by GB 50116.
Q8 Do I need IBMS? Below 50k m² and <5 subsystems, marginal; above, reduces O&M headcount.
Q9 UPS backup time? Office 30 min (to generator start); data centre 2 h; emergency centres ≥4 h.
Q10 Why 22–24 °C? ASHRAE range 18–27; optimum 22–24 balances reliability and energy.
Q11 PoE switch sizing? Total load ×1.3 headroom.
Q12 AP density? One per 200–300 m² open office; high-density one per 100 m².
Q13 Why elevator wireless bridge? Travelling cable lacks data pair.
Q14 Reader distance? RS485 ≤1200 m; Wiegand ≤100 m (extender beyond).
Q15 What is WDR? Wide dynamic range; ≥120 dB at doorways/garage entries.
Q16 Dual-network separation? Office and OT planes on separate switches.
Q17 BA vs IBMS? BA is a subsystem of IBMS.
Q18 Why gas suppression in DC? Water damages electronics; gas is non-conductive, residue-free.
Q19 Raised floor? Under-floor cool air distribution and cable routing; anti-static.
Q20 What is M-LAG? Dual-core virtualised as one; no business interruption on single failure.
Q21 1:1 vs 1:N? 1:1 matches card-to-face; 1:N searches a watchlist — heavier compute.
Q22 Smart lighting savings? 30%–60% via scheduling + lux + occupancy.
Q23 PA zoning? Fire compartment + floor + function triple zoning.
Q24 Hand-in-hand conference? Daisy chain saves cabling and expands easily.
Q25 EPMS? Environment & power monitoring for UPS, AC, temperature, water, fire, access.
Q26 Warranty? Standard 2 years (equipment+install); extendable to 3–5.
Q27 Retrofit vs new build? Retrofit costs 30%–50% more (breaking, restoration, night work).
Q28 How to accept? Per contract drawings, GB 50311/GB 50348, link tests, function tests, 72-hour stability.
Q29 KITOZER vs international brands? 30%–50% lower cost, faster Chinese-language response, flexible customisation, open protocols.
Q30 Export capability? CE/FCC/RoHS; English platform; 110/220 V 50/60 Hz; shipped to SE Asia, Middle East, Africa, South America.

14. Standards

GB 50311 (cabling design), GB/T 50312 (cabling acceptance), GB 50314 (intelligent building), GB 50348 (security), GB 50343 (ELV lightning), GB 50116 (fire alarm), GB 50016 (fire safety), GB 50174 (data centre), GB 50057 (lightning protection), GB 50034 (lighting), GB 50189 (energy efficiency), GA/T 367 (CCTV), GA/T 394 (ACS), GB 50526 (PA). KITOZER designs, constructs and accepts projects to these standards.

15. Packaging, Delivery, Warranty, Contact

15.1 Packaging

Servers/switches: wooden crate + foam, moisture-barrier. Cameras/terminals: ESD bag + carton. Cabinets/consoles: steel frame + foam corners, overall crate. Cable: wooden reels with model/lot/date. Docs: COC, manual, test report, packing list.

15.2 Delivery

Standard 4–6 weeks, custom 8–12 weeks. Domestic dedicated truck; international sea/air. Buyer provides forklift/crane; KITOZER guides unloading. Joint count and sign-off on arrival.

15.3 Installation & Commissioning

KITOZER offers installation supervision; buyer crews install under remote/on-site support; commissioning by KITOZER engineers.

15.4 Warranty

Standard 2 years from acceptance. Covers equipment defects and installation quality. Excludes: misuse, lightning, water, abnormal voltage, force majeure. 7×24 phone support; 48-hour on-site (domestic). Extended warranty 3–5 years at 5%–8% of contract value per year.

15.5 Contact

Guangzhou Laian Intelligent System Development Co., Ltd. (KITOZER)

  • Sales: +86 13922289957 (WeChat same)
  • Technical support: +86 18520668845 (WeChat same)
  • WhatsApp: +86 19068534140
  • Domestic: lain.com.cn
  • International: gdlain.com
  • Address: Chaotian Park, Zhongrun Industrial Zone, No. 5 Huashan Road, Shilou, Panyu, Guangzhou, China

KITOZER delivers end-to-end ELV integration for mid-to-large campuses, office buildings, hospitals, schools, transport hubs and data centres — from design through equipment, installation, commissioning and O&M. Contact us with your drawings and requirements; we will issue a preliminary proposal and quotation within 3 working days.


16. Generic Cabling Deep Dive

Generic cabling is the foundation of every ELV system. KITOZER has delivered cabling projects ranging from small office retrofits to campus-wide fibre backbones. In this section we expand on the practical details that matter during design, installation and acceptance.

16.1 Link Models Explained

When engineers talk about cabling certification they use three models. The permanent link runs from the floor distributor patch panel port to the work area faceplate. It excludes patch cords because those are consumables that can be replaced. The channel model runs from the terminal device NIC all the way to the switch port and includes two patch cords. Total channel length must not exceed one hundred metres, of which the permanent link accounts for ninety metres and each patch cord up to five metres. The basic link model is obsolete and has been replaced by the permanent link.

KITOZER certifies every permanent link with a Fluke DSX analyser. The test reports wire map, length, insertion loss, near-end crosstalk, return loss, delay and delay skew. A failed link is always re-terminated rather than accepted, because a marginal link today becomes an intermittent problem next year when bandwidth demands grow.

16.2 Termination Craft

The most common cabling fault is split pair, in which wires from different pairs are mated together, destroying crosstalk performance. KITOZER rules: untwist no more than thirteen millimetres for Cat6 and six millimetres for Cat6a. Use a punch-down tool rather than hand pressure. Always terminate to T568B and never mix T568A and T568B on the same project. For fibre, clean connectors with lint-free alcohol wipes and inspect with a microscope before mating. Splice loss must not exceed zero point one decibel and connector loss zero point five decibel.

16.3 Labelling Discipline

Every cable receives a label at both ends using a permanent number. The KITOZER numbering convention is building-floor-room-port, for example A-3-301-01 means building A, third floor, room 301, port 01. Patch cords receive red labels describing the connection. All labels are thermal-transfer printed, waterproof and oil-resistant, and remain legible for at least five years. The as-built drawing must match the labels exactly; any mismatch is corrected before acceptance.

16.4 Cable Tray and Conduit

Copper and fibre share tray with power cables only under strict conditions. KITOZER requires separate trays for strong current and weak current with at least thirty centimetre parallel spacing and ninety-degree crossings. Where space forces shared tray, a metal divider separates the cables. Bend radius rules are eight times cable diameter for copper and twenty times for fibre. Tray fill ratio must not exceed fifty percent to leave room for future expansion.

17. Network Design Deep Dive

17.1 VLAN Planning

A well-designed VLAN plan is the backbone of network security. KITOZER allocates VLAN one hundred range to office traffic, one hundred ten to employee wireless, one hundred twenty to guest wireless, two hundred range to OT and IoT traffic including video, access, alarm, PA and building automation, two hundred fifty to server farm, and nine hundred ninety nine to management. Each VLAN maps to a distinct IP subnet. Guest wireless gets internet-only access through a captive portal and cannot reach any internal resource. Management VLAN is reachable only from administrator workstations.

17.2 QoS for ELV Traffic

ELV traffic has very different delay sensitivity. Video streams must arrive within two hundred milliseconds with jitter under fifty milliseconds. Access control events tolerate five hundred milliseconds. Real-time paging must be under one hundred milliseconds. Office web traffic is best-effort. KITOZER marks video with DSCP class selector four, access and alarm with class selector six, PA with expedited forwarding, and office traffic with best effort. Queuing policy gives alarm and paging the highest priority.

17.3 Wireless Roaming

Wi-Fi experience depends on seamless roaming as users move between access points. KITOZER deploys all APs under a wireless controller with one unified SSID. Eight oh two dot eleven k, v and r protocols enable fast roaming. AP signal overlap is designed to fifteen to twenty percent. Transmit power is auto-adjusted by the controller to avoid co-channel interference. Site surveys are performed before and after deployment to verify heat maps.

17.4 Network Security

The edge firewall performs intrusion prevention, anti-virus scanning, URL filtering, IPsec VPN for branch offices, SSL VPN for remote workers, and runs in high-availability pair mode. All management access to switches and controllers is restricted to the management VLAN over SSH and HTTPS only. SNMP community strings are changed from defaults. Configuration backups run nightly and are stored off the device.

18. Video Surveillance Deep Dive

18.1 Codec and Bitrate

H.265 delivers fifty percent bitrate reduction versus H.264 at equal image quality. A 1080p stream that needed four to six megabits under H.264 runs at two to three megabits under H.265. KITOZER enables smart encoding on all new cameras, which drops static scenes to zero point five to one megabit and dramatically reduces storage cost.

18.2 Storage Architecture

Small projects under sixty four channels use NVRs with built-in drives. Mid-size projects from one hundred to five hundred channels use centralised CVR storage with forty eight to seventy two drive bays. Large projects beyond five hundred channels use IP SAN storage with iSCSI volumes and optional dual-site replication. Face snapshot databases are retained permanently even when video clips roll off after thirty to ninety days.

18.3 AI Deployment Modes

Front-end AI cameras include an NPU that performs face, plate and behaviour analysis at the edge, outputting structured metadata. This saves backhaul bandwidth but means algorithm upgrades require camera replacement. Back-end AI servers use GPUs to analyse ordinary cameras, allowing algorithm upgrades purely through software, but require more bandwidth and GPU investment. KITOZER recommends front-end AI for new builds and back-end AI for retrofits to protect existing camera investment. Hybrid mode is also available through edge AI boxes.

18.4 Camera Selection by Scene

Perimeter cameras need eight megapixel resolution, infrared range of eighty metres or more, IP sixty seven rating and wide dynamic range of one hundred twenty decibels or more. Entrance face capture cameras need two megapixel sensors with a library of fifty thousand faces and ninety nine percent capture rate. Lobby and corridor cameras use four megapixel domes with low-light performance of zero point zero zero one lux. Plaza and road cameras use four or eight megapixel PTZ domes with thirty two times optical zoom and two hundred metre infrared range. Elevator cars use compact fisheye domes with PoE and elevator signal filtering. Car park cameras use full-colour low-light bullets. Equipment rooms use fixed domes with wide dynamic range.

19. Access Control Deep Dive

19.1 Anti-Passback

Anti-passback prevents card sharing. When a user swipes in they must swipe out before swiping in again. Hard anti-passback rejects the second swipe outright. Soft anti-passback logs an alarm but still allows entry. Time-window anti-passback activates only during defined periods. KITOZER controllers support all three modes.

19.2 Interlock

Double-door interlock ensures only one door opens at a time. If door A is open, door B cannot be unlocked. This is used in vaults, data centres and laboratories. KITOZER controllers support up to eight-door interlock groups.

19.3 Fire Linkage Detail

On fire alarm, the fire panel releases a dry contact to the access controller. The controller immediately releases all non-evacuation locks. Evacuation routes use fire panic bars that unlatch automatically. Critical rooms such as data centres may be configured to stay locked per design intent. All events are logged for post-incident analysis. After the fire signal clears, access returns to normal arming state.

19.4 Card and Credential Types

M1 IC cards are the most common and lowest cost. CPU cards offer higher security for government and finance. ID card readers support visitor registration. Face and QR code credentials provide touchless access, which became essential after the pandemic. KITOZER platforms support all credential types simultaneously.

20. Public Address Deep Dive

20.1 Priority System

Emergency broadcast has the highest priority and overrides everything. Business paging is middle priority and overrides background music. Background music is lowest priority and can be interrupted at any time. KITOZER IP speakers implement priority in hardware so that even if the management server fails, a fire signal still triggers local emergency audio.

20.2 Zoning Design

Zones are defined by floor, function and fire compartment simultaneously. Office volume is thirty to forty five decibels, corridor forty five to sixty, lobby fifty to sixty five, canteen fifty five to seventy, outdoor sixty to seventy five. On fire, the affected floor and adjacent floors play evacuation voice first; other floors wait.

20.3 Speaker Selection

Ceiling speakers of six watts cover twenty to thirty square metres in offices. Column speakers of thirty to sixty watts handle outdoor areas with IP sixty six rating. Horn speakers of fifteen to thirty watts work in car parks and plant rooms. Coaxial ceiling speakers of ten to twenty watts cover noisy canteens and malls. All speakers must be phased correctly to avoid sound cancellation.

21. Conference Systems Deep Dive

21.1 Digital Conference Daisy Chain

Hand-in-hand digital conference units connect in a daisy chain, reducing cabling versus individual runs. The chairman unit holds priority and can mute delegates. Delegate units request speaking. The main unit supports up to two hundred fifty five units and handles discussion, voting and interpretation channels.

21.2 Sound Reinforcement

Conference room acoustics are the most commonly misconfigured subsystem. KITOZER designs main speakers on the front wall, fill speakers in the ceiling, and monitor speakers at the chairman position. DSP amplifiers provide automatic equalisation and feedback suppression. Digital mixers store scene presets for meeting, presentation and lecture modes. Background noise must not exceed NC thirty. Reverberation time is one point zero to one point two seconds for auditoriums and zero point six to zero point eight seconds for small rooms.

21.3 Video Conferencing

Hardware endpoints use H.323 and SIP protocols with 1080P or 4K dual-stream. Software clients support Tencent Meeting, Zoom, Teams and Feishu. Microphone arrays provide 360 degree pickup with six metre radius. 4K AI-tracking cameras automatically frame the current speaker.

22. Equipment Room Deep Dive

22.1 Cold Aisle Containment

Racks are arranged face-to-face and back-to-back. The cold aisle is enclosed with roof hatches that release automatically on fire. Cold aisle width is one point two to one point five metres. Hot aisle width is zero point eight to one point zero metres. Under-floor supply delivers cool air through perforated tiles in the cold aisle.

22.2 UPS Redundancy

KITOZER deploys 2N redundancy for critical rooms. Two independent UPS systems each carry half the load; if one fails, the other takes all load. Online double-conversion topology achieves at least ninety five percent efficiency. Battery backup is thirty minutes for general offices and two hours for data centres. Up to four units can parallel.

22.3 Precision Cooling

Temperature is maintained at twenty two to twenty four degrees Celsius. Humidity at forty to sixty percent. Cleanliness at ISO eight. Cooling capacity is sized by rack kilowatt per rack times rack count times one point three redundancy factor. N plus one redundancy means N units run and one is standby.

22.4 Gas Suppression

HFC-227ea or Novec 1230 gas is used instead of water. Double confirmation requires both smoke and heat detectors. The system closes air conditioning and fresh air before discharge. Gas discharges within ten seconds. Cylinders sit in a separate gas room connected by piping to room nozzles.

23. Building Automation Deep Dive

23.1 DDC Principle

Direct digital controllers sit near each piece of equipment and read sensors, drive actuators, and run local control logic. They communicate upward over BACnet or Modbus. The central station displays status, trends, alarms and schedules. Even if the central station loses network, DDCs continue local control.

23.2 Typical AHU Logic

Air handling units adjust chilled-water valves by return air temperature. Fresh air dampers adjust by CO2 concentration. Schedules control on and off times. Filter differential pressure triggers replacement alarms. Chiller plant staging by cooling load saves fifteen to twenty five percent energy versus fixed operation.

23.3 Sensor and Actuator Catalog

Temperature sensors use NTC ten kiloohm or PT one thousand. Humidity sensors are capacitive. Differential pressure sensors monitor filters. Electromagnetic flow meters measure water. NDIR CO2 sensors range zero to two thousand parts per million. Motorised valves accept zero to ten volt or four to twenty milliamp control. Damper actuators are on-off or modulating. Variable frequency drives control pumps and fans.

24. IBMS Deep Dive

24.1 Integration Protocols

BACnet over IP integrates building automation. Modbus TCP or RTU integrates meters and chillers. OPC UA connects industrial equipment. SDK and RESTful APIs connect VMS, access and alarm vendors. MQTT connects IoT sensors. Dry contacts connect fire panels most reliably.

24.2 Linkage Scenarios

When an intrusion alarm fires, the nearest camera appears on the video wall, PA plays a warning voice in the affected zone, doors lock, and the electronic map flashes. On fire, PA switches to evacuation mode, doors release, elevators recall to ground, air conditioning shuts off, emergency lighting turns on, and video switches to the affected floor. On door propped open, video pops up and the desk receives voice prompt. On video fire or smoke detection, alarms route to the fire room. On low outdoor lux, facade lighting turns on. At night, public lighting turns off and air conditioning switches to night setback. On room over-temperature, SMS and app alerts go to the O&M team.

24.3 Platform Selection

International platforms such as Honeywell EBI, Siemens Desigo CC and Johnson Controls Metasys are powerful but expensive and hard to customise. Domestic platforms such as KITOZER iBMS offer cost effectiveness, flexible customisation and Chinese language support. Open-source lightweight stacks using Node-RED, Grafana and InfluxDB suit small projects or technical owners. KITOZER recommends international platforms for government, finance and data centres; domestic platforms for campuses, hospitals and schools; and open-source for small sites.

25. Project Workflow Deep Dive

25.1 Six Phases

Requirements and preliminary design take two to four weeks and produce a requirements specification, preliminary design and budget estimate. Detailed design takes three to six weeks and produces construction drawings, IP plans, linkage schedules and a precise BOM. Factory pre-integration takes two to four weeks parallel with on-site work. On-site construction takes four to twelve weeks. Commissioning and integration take two to four weeks including a seventy two hour stability run. Acceptance and training take one to two weeks.

25.2 Factory Pre-Integration

KITOZER pre-integrates servers, switches, decoders and NVRs in the factory. OS, database and platform software are installed. Device images are licensed. Basic functions are tested. A factory acceptance test report is issued before shipment. This shortens on-site work by two to three weeks.

25.3 Construction Sequence

Tray and conduit go in first, parallel with decoration. Cables are pulled, terminated, and tested. Front-end devices are installed. Room equipment is racked. Subsystem commissioning follows. Cross-system linkage is then tested. Finally a seventy two hour stability run precedes acceptance.

25.4 Acceptance Deliverables

As-built drawings in CAD and PDF. Test reports for links, optical power and connectivity. Equipment list with model, serial number and location. Configuration documents including IP table, VLAN table, linkage rules and user permissions. Operation and maintenance manuals. Training records. Signed acceptance report.

26. Cost and Selection Deep Dive

26.1 Cost Drivers

Building size, grade, brand tier, intelligence level, retrofit versus new build, and geography all drive cost. Retrofit projects cost thirty to fifty percent more than new builds because of breaking, restoration and night work.

26.2 Reference Cost Index

Ordinary office builds at two hundred to four hundred RMB per square metre. Grade A office at four hundred to eight hundred. Five star hotel at six hundred to twelve hundred. Tertiary hospital at eight hundred to fifteen hundred. University at three hundred to six hundred. Data centre at fifteen hundred to three thousand. Transport hub at one thousand to two thousand.

26.3 Cost Control Strategies

Phase the build by doing backbone first and edge devices later. Use domestic brands for non-critical equipment. Size racks, trays and conduits for future growth but buy devices gradually. Choose open-protocol platforms to avoid vendor lock-in. Avoid over-designing; not every corner needs eight megapixel cameras.

27. O&M and Lifecycle

27.1 O&M Team

A large campus of fifty thousand square metres or more typically needs an O&M supervisor, a network engineer, a security engineer, a BA engineer, plus outsourced maintenance from KITOZER or a local service provider.

27.2 Preventive Maintenance Schedule

Cameras are cleaned quarterly. Hard disks are checked monthly for SMART errors. UPS batteries are load-tested annually. Precision filters are replaced quarterly. Switch configurations are backed up monthly. Ten percent of links are tested half-yearly. Card readers are cleaned quarterly. PA speakers are checked half-yearly.

27.3 Lifecycle Expectations

Generic cabling lasts fifteen to twenty years. Network devices five to seven years. Servers and storage five to eight years. Cameras five to seven years. Access terminals seven to ten years. PA equipment ten to fifteen years. UPS mainframes ten years; batteries three to five years. Precision cooling eight to ten years.

28. Industry Verticals

28.1 Enterprise Campus

A typical enterprise campus deploys dual-core network, full Wi-Fi coverage, two hundred to five hundred cameras, face access, one-card, PA, smart lighting, BA and IBMS. Investment ranges from five million to fifteen million RMB.

28.2 Tertiary Hospital

Beyond standard subsystems, hospitals add nurse call, infant RFID protection, surgical video teaching, pharmaceutical cold-chain monitoring, canteen consumption, check-in queue and ICU video visitation. Video storage must be ninety days or more.

28.3 University

Universities deploy campus one-card (access, canteen, library, showers), exam-room CCTV, dormitory access night control, campus PA (class bells and emergency alerts), and smart classrooms.

28.4 Data Centre

Data centres require environment and power monitoring, precision cooling, UPS, gas suppression, water leak detection, dual-factor access, AI video for unauthorised entry, and KVM operator seats. ELV spend reaches twenty to thirty percent of total data centre cost.

28.5 Transport Hub

Transport hubs add passenger flow statistics, security X-ray, smart wayfinding, multilingual PA, video with face watchlist, and smart lighting.

29. Data Security and Privacy

KITOZER takes data security seriously. All management traffic uses HTTPS with TLS one point two or higher. Face templates and access records are encrypted at rest. Administrator accounts require two-factor authentication. All operations are logged for at least six months. Video playback overlays operator watermarks to deter leaks. Video clips are retained per regulation for thirty to ninety days. Face data stores only templates, not original photos. Access records are kept one to three years. Data is automatically deleted after retention. The platform supports compliance with China Personal Information Protection Law and Data Security Law.

30. Future Trends

AI large language models will enable natural-language queries, smart alarm triage, predictive maintenance and automatic video summarisation. Digital twins overlay real-time data on three-dimensional building models. Cloud-edge-end architecture distributes AI to cameras, processes events at local gateways, and aggregates analytics in the cloud. 5G private networks and Wi-Fi 7 will support outdoor monitoring, high-density offices and 8K video conferencing. Green low-carbon initiatives drive energy monitoring, smart lighting, chiller optimisation and PUE improvement. KITOZER invests continuously to bring these trends to our customers.

31. Packaging, Delivery and Warranty

Servers and switches ship in wooden crates with foam and moisture barriers. Cameras and terminals ship in ESD bags and cartons. Cabinets and consoles use steel frames with foam corners in overall crates. Cable ships on wooden reels labelled with model, lot number and date. Documentation includes certificates, manuals, test reports and packing lists.

Standard delivery is four to six weeks; custom products eight to twelve weeks. Domestic shipment uses dedicated trucks; international uses sea or air freight. Buyer provides forklift or crane for unloading; KITOZER guides. Joint count and sign-off on arrival.

Standard warranty is two years from acceptance. It covers equipment defects and installation quality. It excludes misuse, lightning, water, abnormal voltage and force majeure. Seven by twenty four phone support and forty eight hour on-site response domestics. Extended warranty to three to five years costs five to eight percent of contract value per year.

32. Contact

Guangzhou Laian Intelligent System Development Co., Ltd. (KITOZER). Sales: plus eight six one three nine two two two eight nine nine five seven. Technical support: plus eight six one eight five two zero six six eight eight four five. WhatsApp: plus eight six one nine zero six eight five three four one four zero. Domestic site: lain.com.cn. International site: gdlain.com. Address: Chaotian Park, Zhongrun Industrial Zone, Number five Huashan Road, Shilou, Panyu, Guangzhou, China.

KITOZER delivers end-to-end ELV integration for mid-to-large campuses, office buildings, hospitals, schools, transport hubs and data centres. Contact us with your drawings and requirements; we will issue a preliminary proposal and quotation within three working days.

33. Detailed BOM Reference for a 30,000 m² Grade-A Office

To give buyers a concrete sense of equipment and cost, KITOZER lists below a reference bill of materials for a thirty thousand square metre grade A office building. Prices are indicative RMB ex-works and exclude tax, freight and on-site installation.

33.1 Generic Cabling

Two hundred boxes of Cat6 UTP cable at eight hundred eighty RMB per box. Thirty boxes of Cat6a screened cable at one thousand six hundred fifty RMB per box. Two thousand metres of OS2 single mode fibre at six point five RMB per metre. One thousand metres of OM4 multimode fibre at twelve RMB per metre. Eighty twenty four port Cat6 patch panels at three hundred eighty RMB each. Fifteen twenty four port Cat6a patch panels at seven hundred eighty RMB. Twenty twenty four core LC fibre distribution frames at six hundred eighty RMB. Eight hundred dual gang faceplates at twenty five RMB. One thousand six hundred Cat6 keystone jacks at thirty five RMB. One hundred cable managers at one hundred twenty RMB. Two thousand two metre patch cords at twenty five RMB. Total cabling package: three hundred fifty to five hundred thousand RMB including trays, cable, panels and testing.

33.2 Computer Network

Two core switches at one hundred thirty six thousand RMB each. Twenty twenty four port PoE plus access switches at thirteen thousand six hundred RMB each. Ten twenty four port gigabit access switches at ten thousand four hundred RMB each. Forty ten gigabit single mode modules at seven hundred sixty RMB each. Two next generation firewalls at fifty seven thousand RMB each. One enterprise router at nineteen thousand six hundred RMB. One wireless LAN controller at thirty eight thousand RMB. Sixty Wi-Fi six indoor APs at three thousand RMB each. Ten Wi-Fi seven high density APs at three thousand RMB each. Network management software at fifty seven thousand RMB. Total network package: four hundred fifty to six hundred fifty thousand RMB.

33.3 Video Surveillance

Eighty eight megapixel smart IR bullets at one thousand eight hundred RMB each. One hundred twenty four megapixel domes at eight hundred fifty RMB each. Fifteen four or eight megapixel PTZ domes at six thousand eight hundred RMB each. Ten two megapixel face capture cameras at three thousand two hundred RMB each. One VMS server at forty seven thousand RMB. One media server at forty seven thousand RMB. One behaviour analytics AI server at eighty five thousand RMB. Two forty eight bay NVRs at forty seven thousand RMB each. Thirty six eight terabyte SAS drives at three thousand one hundred RMB each. Fifteen forty six inch LCD tiles at seventeen thousand RMB each. Two sixteen channel decoders at seventeen thousand RMB each. One control keyboard at seventeen thousand RMB. Twenty three point five metre outdoor poles at six thousand four hundred RMB each. Twenty outdoor equipment boxes at three thousand six hundred RMB each. Total video package: six hundred to nine hundred thousand RMB.

33.4 Access Control

Thirty single door controllers at seventeen thousand RMB each. Fifteen double door controllers at seventeen thousand RMB each. Five four door controllers at seventeen thousand RMB each. Two elevator controllers at seventeen thousand RMB each. Fifty face recognition terminals at seventeen thousand RMB each. Thirty IC readers at six hundred RMB each. Sixty two hundred eighty kilogram maglocks at seven hundred RMB each. Twenty fire panic locks at three thousand two hundred RMB each. Eight swing gates at seventeen thousand RMB each. Four barrier gate plus ANPR kits at eight thousand five hundred RMB each. One access server at forty seven thousand RMB. One face management server at forty seven thousand RMB. Access software at seventeen thousand RMB. Two thousand IC cards at ten RMB each. Total access package: four hundred to six hundred thousand RMB.

33.5 Public Address

One intelligent PA host at twenty five thousand RMB. PA management software at forty seven thousand RMB. Two IP call mics at five thousand six hundred RMB each. One hundred IP speakers at two thousand six hundred RMB each. Five one hundred twenty watt mixer amplifiers at three thousand seven hundred RMB each. Three three hundred sixty watt amplifiers at six thousand five hundred RMB each. One main backup amplifier switcher at five thousand two hundred RMB. One fire interface at six thousand four hundred RMB. Three hundred six watt ceiling speakers at eighty five RMB each. Twenty thirty watt outdoor column speakers at four hundred eighty RMB each. Total PA package: one hundred fifty to two hundred fifty thousand RMB.

33.6 Conference Systems

Two digital conference hosts at twenty eight thousand RMB each. Two chairman units at four thousand five hundred RMB each. Forty delegate units at two thousand eight hundred RMB each. Eight wireless handheld mics at one thousand two hundred RMB each. Two video conferencing endpoints at thirty five thousand RMB each. Four microphone arrays at six thousand five hundred RMB each. One digital mixer at twenty eight thousand RMB. Two amplifiers at eight thousand five hundred RMB each. Four main speakers at six thousand five hundred RMB each. Twenty paperless terminals at eight thousand five hundred RMB each. Total conference package: three hundred to five hundred thousand RMB depending on room count.

33.7 Equipment Room

Ten forty two U server racks at three thousand five hundred RMB each. Two row power distribution units at twenty eight thousand RMB each. Two sixty kilovolt amp UPS units at one hundred twenty thousand RMB each. Sixty four one hundred amp hour batteries at one thousand eight hundred RMB each. Two thirty kilowatt precision air conditioners at eighty five thousand RMB each. One environment and power monitoring suite at thirty five thousand RMB. Ten temperature humidity sensors at three hundred eighty RMB each. Twenty water leak sensors at two hundred eighty RMB each. Six one hundred twenty litre gas cylinders at eight thousand five hundred RMB each. One hundred square metres of anti-static flooring at three hundred eighty RMB per square metre. Two power panels at thirty five thousand RMB each. Total room package: six hundred to one million RMB.

33.8 Building Automation

Fifteen DDC controllers at eight thousand five hundred RMB each. Fifty temperature humidity sensors at three hundred eighty RMB each. Thirty motorised valves at one thousand two hundred RMB each. Thirty damper actuators at eight hundred fifty RMB each. Ten CO2 sensors at one thousand eight hundred RMB each. Forty Modbus energy meters at six hundred eighty RMB each. BA software at eighty five thousand RMB. One BA server at thirty five thousand RMB. Total BA package: two hundred fifty to four hundred thousand RMB.

33.9 IBMS Integration

IBMS platform software at one hundred eighty thousand RMB. Two IBMS servers at forty seven thousand RMB each. Eight subsystem interfaces at twelve thousand RMB each. Visualisation dashboard at sixty five thousand RMB. Total IBMS package: three hundred to five hundred thousand RMB.

33.10 Package Total

All nine subsystems combined: three point five to five point three million RMB excluding tax, freight and installation. Per square metre for thirty thousand square metres, that is roughly one thousand one hundred seventy to one thousand seven hundred seventy RMB per square metre, consistent with grade A office ELV benchmarks.

34. BIM Coordination

Modern grade A projects require BIM coordination. KITOZER models ELV trays, racks, PDUs and front-end points in Revit. We run clash detection against electrical trays, fire pipes, HVAC ducts and drainage pipes. We verify ceiling clear height, usually at least two point six metres in corridors, rooms and car parks. We optimise tray routes for shortest path, fewest bends and easiest installation. Construction drawings are generated directly from the BIM model to avoid CAD and BIM mismatch. BIM coordination catches over ninety percent of pipe conflicts before construction, reducing on-site rework by thirty to fifty percent and shortening schedule by ten to twenty percent.

35. Green and LEED

KITOZER ELV systems support green building certification. Smart lighting saves thirty to sixty percent through scheduling, daylight harvesting and occupancy. BA chiller staging saves fifteen to twenty five percent. Energy submetering supports materials and resources credits. Data centre cold aisle containment and in-row cooling achieve PUE below one point three. Elevator monitoring and standby cut reduce empty runs. KITOZER can help owners prepare documentation for LEED version four or four point one certification.

36. Cyber Security Classified Protection

China’s cyber security law requires information systems to pass classified protection assessment. ELV systems including video, access and IBMS are typically level two or level three. KITOZER configures strong passwords, two factor authentication for administrators, account lockout on failed logins, least privilege VLAN isolation, firewall policy, security logs retained at least six months, IPS, anti-virus on servers, daily configuration backup, data wiping on decommissioned equipment, and documented emergency response plans with periodic drills. KITOZER can provide technical documentation for level two or level three assessment.

37. Export Project Adaptation

KITOZER products ship to Southeast Asia, Middle East, Africa and South America. Voltage supports one hundred ten or two hundred twenty volts at fifty or sixty hertz through wide-range power supplies. Products carry CE, FCC, RoHS and optionally UL and SASO certifications. Platform software ships in English with multi-language support. Protocols include ONVIF for video, BACnet over IP for building automation and Modbus for meters. Construction can follow NEC, IEE or EN standards. Export packaging uses ISPM fifteen certified wooden crates with moisture and shock protection. Logistics handles full container, less than container load, air freight and local customs brokers. KITOZER has delivered overseas projects including a Southeast Asian data centre, a Middle Eastern government office, an African hospital and a South American mining site.

38. Training and Knowledge Transfer

KITOZER delivers three levels of training. Administrator training runs two days and covers platform architecture, user permissions, linkage rule configuration, fault diagnosis and configuration backup. Operator training runs one day and covers daily operation, alarm handling, emergency procedures and basic fault reporting. O&M training runs two days and covers device replacement, spare parts management, common faults and preventive maintenance. Deliverables include Chinese operation manuals in PDF, training slides, recorded video tutorials, a quick reference card for common faults, and training sign-in sheets.

39. After-Sales Network

KITOZER after-sales operates a seven by twenty four hotline. Remote support is available through VPN for platform software. On-site support reaches domestic sites within forty eight hours; overseas response follows contract terms. The Guangzhou head office stocks critical spares including switches, cameras, access controllers and power supplies. During warranty, quarterly remote inspections and annual on-site inspections are included.

40. Frequently Asked Questions English Expansion

Q: What is the difference between fail-safe and fail-secure locks? A: Fail-safe locks unlock on power loss, which is required for evacuation routes. Fail-secure locks stay locked on power loss, used for data centres and vaults with UPS backup.

Q: How long does face recognition take? A: KITOZER terminals achieve one to one matching under zero point two seconds for a ten thousand face library.

Q: Can I use one card for door, canteen and library? A: Yes, the one-card platform shares one database across access, payroll, consumption, library and elevator modules.

Q: What is ONVIF? A: Open Network Video Interface Forum, an international standard that allows cameras from different vendors to work with a common VMS.

Q: Does KITOZER provide custom software development? A: Yes, the IBMS platform supports custom dashboards, linkage rules and API integrations.

Q: How do you handle retrofits in occupied buildings? A: We schedule night and weekend work, protect existing finishes, and phase cutovers to avoid disruption.

Q: What is PUE? A: Power Usage Effectiveness, total facility power divided by IT equipment power. Below one point five is good; below one point three is excellent.

Q: Can the system be monitored from a phone? A: Yes, KITOZER provides iOS and Android apps for live view, alarm push and remote control.

Q: What is the warranty on batteries? A: UPS batteries carry one year warranty. Precision air conditioners carry two years.

Q: Do you provide site survey? A: Yes, KITOZER engineers visit the site, measure, photograph and produce a tailored proposal.

41. Risk Management

Common risks in ELV projects include decoration delays that prevent ELV crews from entering, frequent point changes, equipment delivery delays, integration failures, poor on-site workmanship, failed cyber security assessment and budget overruns. KITOZER identifies risks at project kickoff, assigns mitigation owners, and reviews risk status weekly. Weekly coordination meetings resolve interface issues. Detailed design locks points before procurement. BIM clash detection prevents rework. Open protocol requirements prevent integration surprises. Change orders are documented in writing and priced against contract rates.

42. Conclusion

ELV system integration is the neural network of modern buildings. From generic cabling to IBMS, from cameras to access, from PA to building automation, every subsystem matters and every linkage scenario affects safety, efficiency and comfort. KITOZER has developed a complete methodology over more than a decade of projects: demand driven, design led, construction based, commissioning critical and O&M assured. We believe a good ELV system is not how many devices are installed but how many problems are solved. Contact KITOZER for a tailored proposal.

43. Detailed Construction Practices

43.1 Cable Tray Installation

Cable trays must be installed before ceiling panels close. Horizontal trays sit at least two hundred millimetres below the structural slab. Vertical trays are secured every one point five metres. Tray sections connect with dedicated joiners and four millimetre copper bonding straps. Bend radius must accommodate the largest cable, typically twenty times fibre diameter. Trays crossing settlement joints include expansion couplings. Penetrations through fire walls are sealed with fire-resistant putty.

Copper and fibre cables lie naturally in trays without lashing. Different voltage levels use separate trays. Within a shared tray, metal dividers separate network, video and access cables. Tray fill ratio stays under fifty percent. Cable exits from trays use protective glands to avoid sharp edges.

43.2 Front-End Device Installation

Bullet cameras mount outdoors on walls or poles at three point five to four point five metres, angled fifteen to thirty degrees downward, avoiding backlight. Dome cameras sit on ceilings at two point five to three metres, away from air conditioning vents. PTZ domes mount at four to six metres with no obstruction in the three hundred sixty degree sweep. Elevator car cameras use compact fisheye domes on the diagonal opposite the control panel. Car park bullets sit above lanes at two point eight to three metres, aligned with traffic flow. Outdoor connectors get waterproof tape and heat shrink. A drip loop prevents water running down the cable into the camera. Mounting brackets support at least three times camera weight.

Access readers install at one point three to one point four metres beside doors, within one hundred millimetres of the frame. Maglocks mount above the door frame with flat mating surfaces. Electric strikes sit in the door frame edge. Request-to-exit buttons sit one point three metres inside. Break-glass buttons sit beside evacuation routes with protective covers. Face terminals mount at one point four to one point five metres, away from direct sunlight.

Ceiling speakers use one hundred fifty to two hundred millimetre cutouts, spaced two to two point five times mounting height. Outdoor columns mount three to five metres high, tilted fifteen to thirty degrees. Horn speakers use IP sixty six enclosures. All speakers share the same polarity to avoid cancellation.

Indoor APs sit at ceiling centres. High-density meeting room APs space three to five metres apart. Outdoor APs use IP sixty seven enclosures with lightning protection. AP locations avoid metal obstructions, microwaves and Bluetooth devices.

43.3 Earthing and Lightning Protection

Bonded earthing uses building foundation steel as natural earth, achieving one ohm or less. Main equipotential bonding bars sit in the equipment room and power distribution room. Local equipotential bars sit in bathrooms and wet areas. All metal trays, racks, conduits and device enclosures connect to the main bar.

Surge protective devices follow lightning protection zone boundaries. Class B power SPD at the building main panel handles one hundred kiloamperes at ten by three hundred fifty microseconds. Class C SPD at the equipment room panel handles forty kiloamperes at eight by twenty microseconds. Class D SPD at rack PDUs handles ten kiloamperes. Signal SPDs sit on network, video and control cable entries.

43.4 Electromagnetic Compatibility

Common interference sources include variable frequency drives, uninterruptible power supplies, switching power supplies, motors, welders, radio transmitters and power cables. Mitigation includes shielded cabling, separate trays, EMI filters at power entries, single or double ended shield grounding, and differential signalling over RS485, CAN and Ethernet.

Typical problems and fixes: camera image banding caused by parallel power cabling is fixed with isolation transformers or rerouting; access controller crashes caused by unstable power are fixed with UPS or dedicated supplies; network packet loss caused by poor earthing or switch overheating is fixed by verifying earth and cooling; PA hum caused by ground loops is fixed by breaking one earth point.

44. Detailed Linkage Scenarios

44.1 Intrusion Alarm Linkage

When a perimeter IR beam or indoor PIR triggers, the alarm panel uploads the zone to the alarm platform over RS485. The platform looks up the zone mapping and calls the VMS to pull up the nearest camera. The VMS pushes that camera full screen onto the video wall. The PA host automatically plays a pre-recorded warning voice in the affected zone, such as notice that an alarm area has been entered. The access system locks all exits in that region during armed state. The IBMS electronic map flashes the alarm location. The security officer receives a mobile app push with location and live video.

44.2 Fire Linkage

When fire smoke or heat detectors trigger, the fire panel outputs zone signals via dry contact to the IBMS. The IBMS tells the PA host to switch to evacuation mode and broadcast pre-recorded voice in Chinese, English and local dialect. Access controllers release all evacuation route locks. Elevator controllers recall cabs to the ground floor and open doors out of service. BA shuts down AHUs, fresh air units and fire dampers. BA starts smoke exhaust fans and pressurisation fans. Smart lighting forces on all emergency and egress lighting. Video surveillance switches to the affected floor and records to wall. All events log to the IBMS journal for post-incident review.

44.3 Door Propped Open

If a door stays open beyond sixty seconds, the access platform raises a prolonged-open state. The VMS automatically pops the nearest camera to the guard desk. The desk receives a voice prompt naming the door. After three minutes, the access platform auto-locks the door. The event logs for security review.

44.4 Video Analytics Linkage

When the AI server detects tripwire, loitering, smoke or flame, it notifies the VMS via SDK. The VMS walls the relevant camera and also pushes it to the operator workstation. If smoke or flame is detected, the fire room is notified automatically. If perimeter intrusion is detected, outdoor floodlights illuminate the intrusion area and PTZ cameras rotate toward it. If crowd gathering is detected, the guard manually intervenes.

44.5 Energy Saving Linkage

At eleven p.m. or when lux drops below a threshold, BA turns off public area lighting except emergency lighting. BA switches air conditioning to night setback with temperature set points raised by two to three degrees. IBMS records energy data and generates monthly reports. At six a.m. the system returns to normal mode automatically.

45. Acceptance Checklist

45.1 Documentation Acceptance

As-built drawings in CAD and PDF covering system diagrams, floor plans, rack layouts and details. Equipment list with model, quantity, serial number and location. Test reports for link certification, optical power, connectivity and function. Configuration documents including IP table, VLAN table, linkage schedule and user permission matrix. Operation manual, maintenance manual, training records and signed acceptance report.

45.2 Functional Acceptance

Test ten percent of links and one hundred percent of fibre. Verify VLAN isolation, routing, PoE and wireless roaming in the network. Verify every camera online, storage normal, wall display working and analytics firing. Test every door for card, face and fire linkage and anti-passback. Test every PA zone for playback, volume and fire linkage. Test every DDC point, control logic and trend curve in BA. Test conference speaking, voting, video call and recording. Test UPS switchover, precision cooling, gas suppression and EPMS alarms. Test every linkage scenario in the IBMS schedule.

45.3 Stability Acceptance

Run the system continuously for seventy two hours. No major outages such as crashes, network drops or storage loss. Alarms push within thirty seconds. Server CPU, memory and disk utilisation stay within normal ranges.

46. Common Engineering Problems and Solutions

Camera images too dark usually mean backlight, dirty lens or poor exposure settings. Adjust the mounting angle away from backlight, clean the lens, and enable WDR or BLC.

Access card no response means card permissions not synced, reader wiring wrong, or controller offline. Check software permissions, verify Wiegand wiring, and check controller network.

PA noise means ground loop, line interference or excessive amplifier gain. Break one earth point, separate signal and power cabling, and reduce gain.

Weak Wi-Fi means AP placement, channel interference or low power. Adjust AP location, use a wireless analyser to pick channels, and add APs.

Network packet loss means poor cable quality, faulty switch port or a network loop. Test the link, replace the port, and check spanning tree.

BA logic not acting means DDC program error, sensor fault or actuator seizure. Verify the DDC program, calibrate the sensor, and manually test the actuator.

Air conditioning water leak means blocked condensate pipe, insufficient slope or unlevel installation. Clear the drain, adjust slope to at least one percent, and level the unit.

Server alarms mean memory shortfall, disk full or fan failure. Add memory, clean disks, and replace fans.

47. Project Risk Register

Decoration delays preventing ELV access are high probability and cause schedule slip. Weekly coordination meetings and critical path tracking mitigate. Frequent point changes cause rework. Lock points during detailed design. Equipment delivery delays cause schedule slip. Order early and qualify alternate brands. Integration failures cause commissioning delay. Use factory pre-integration and open protocols. Poor workmanship causes failed acceptance. Require certified crews and KITOZER inspections. Cyber security assessment failure prevents go-live. Design for classified protection from the start. Budget overruns reduce margin. Control BOM and process change orders.

48. KITOZER Service Advantages

One-stop delivery covers design, equipment, construction, commissioning and O&M under a single contract. In-house factories produce racks, consoles and equipment boxes, giving quality control and cost advantage. R&D capability develops the IBMS platform, AI algorithms and linkage rules in house. Response speed means the Guangzhou head office reaches domestic sites within twenty four hours. Open protocols prevent vendor lock-in through OPC, SDK and RESTful APIs. Cost performance means comparable configurations cost thirty to fifty percent less than international brands. Export experience means CE, FCC and RoHS certified products already delivered to Southeast Asia, the Middle East, Africa and South America. Free maintenance during warranty includes two years coverage, seven by twenty four hotline and periodic inspections.

49. Industry Case Studies

49.1 Enterprise HQ Campus Guangzhou

Fifty thousand square metres across six office buildings. Subsystems included network, three hundred cameras, two hundred doors access, PA, conference, BA and IBMS. Investment about eight million RMB. Delivery six months. Highlights included face passage, electronic guard tour and energy monitoring.

49.2 Tertiary Hospital Foshan

Eighty thousand square metres covering outpatient, inpatient and surgery. Beyond standard subsystems, added nurse call, infant RFID protection, surgical video teaching and pharmaceutical cold chain monitoring. Investment about twelve million RMB. Delivery twelve months.

49.3 University Shenzhen

Two hundred thousand square metres covering classrooms, dorms and library. Subsystems included campus one-card, exam-room CCTV, PA and smart classrooms. Investment about fifteen million RMB. Delivery ten months.

49.4 Data Centre Qingyuan

Two thousand square metres of machine room hosting two hundred racks. Subsystems included EPMS, UPS, precision cooling, gas suppression, access and video. ELV investment about six million RMB. Delivery four months. Highlights included DCIM platform, PUE monitoring and unauthorised entry AI.

49.5 Overseas Project Southeast Asia

Thirty thousand square metre office building. Standard nine subsystems. Investment about four million RMB export price. Delivery eight months including sea freight. Highlights included English platform, CE certification and remote commissioning.

50. Final Conclusion

ELV system integration is a multi-disciplinary, multi-phase, multi-system engineering discipline. KITOZER has developed a full lifecycle methodology over more than a decade. We treat every project as a partnership with the owner, designer, main contractor and O&M team. Our goal is to deliver systems that are safe, efficient, comfortable and future-proof. Whether you are planning a new campus, retrofitting an existing building or shipping overseas, KITOZER is ready to provide a tailored ELV integration package. Contact us with your drawings and requirements; we will respond within three working days.

51. Network Design Extended

51.1 Core Switch Architecture

The core switch is the heart of the campus network. KITOZER specifies a switch capacity of at least sixty eight terabits per second and a packet forwarding rate of at least two thousand million packets per second. Dual supervisor modules provide redundancy within a single chassis. When deployed as a pair, the two cores run M-LAG, which virtualises them into one logical device. Servers and access switches connect with dual links to each core using link aggregation. If one core fails or needs firmware upgrade, the other takes all traffic with sub-second interruption.

Management of core switches is restricted to the management VLAN. All management sessions use SSH version two and HTTPS only. SNMP version three with authentication and privacy replaces default community strings. Configuration is backed up nightly to a separate server. NTP synchronises all device clocks to a reliable time source.

51.2 Access Switch and PoE

Access switches sit in floor telecom rooms. Each twenty four port PoE plus switch delivers up to thirty watts per port. The total PoE budget is four hundred watts after redundancy, not the theoretical seven hundred twenty watts. This headroom accommodates inrush current and future expansion. Each access switch has two ten gigabit SFP plus uplinks to the core. Port security limits each access port to one MAC address, preventing casual plug-in switches.

PoE cameras, APs and IP speakers draw power from these switches. A powered device classification automatically negotiates the required power level. If a port draws more than its class, the switch can disable it for protection.

51.3 Wireless Design

Wi-Fi six and seven APs cover offices, meeting rooms, corridors and outdoor areas. The wireless controller manages SSIDs, security, RF optimisation and roaming. Employee SSID uses WPA3 enterprise authentication with RADIUS. Guest SSID uses a captive portal and internet only access. IoT SSID separates cameras, speakers and sensors.

RF planning sets channel widths, transmit power and band steering. Five gigahertz band prefers higher bandwidth; two point four gigahertz band covers range. Band steering pushes dual-band clients to five gigahertz. Load balancing distributes clients across nearby APs.

51.4 Firewall and Edge

The next generation firewall performs deep packet inspection, intrusion prevention, anti-virus, URL filtering and application control. It runs in high availability mode with an active and standby unit. IPsec VPN connects branch offices. SSL VPN supports remote workers. The firewall policy allows office users to reach OT management platforms over HTTPS but blocks direct access to camera and controller management ports. OT network cannot initiate outbound internet connections.

52. Video Surveillance Extended

52.1 Camera Lens Selection

Lens focal length determines coverage angle and distance. A two point eight millimetre lens covers about ninety degrees over ten metres. A four millimetre lens covers about sixty degrees over fifteen metres. A six millimetre lens covers about forty five degrees over twenty five metres. The rule of thumb is focal length equals sensor size times distance divided by coverage width. For example, a one over two point eight inch sensor at fifteen metre distance covering ten metre width gives four millimetre focal length.

52.2 Low Light and Wide Dynamic

Wide dynamic range is essential at doorways and garage entries where bright outside light meets dark interior. KITOZER specifies WDR of at least one hundred twenty decibels. Low light performance of zero point zero zero one lux supports full colour night imaging in car parks. Infrared illumination reaches thirty to eighty metres for bullets and two hundred metres for PTZ domes.

52.3 Storage Calculation Example

One hundred channels at four megabits per second store forty two gigabytes per channel per day. For thirty days that is one hundred twenty six terabytes raw. RAID five adds about twenty five percent overhead, so provision one hundred sixty eight terabytes, typically twenty one eight terabyte drives in a forty eight bay NVR with slots to spare. For ninety day hospital storage, multiply by three.

52.4 Decoding and Wall

The video wall uses forty six or fifty five inch LCD tiles with one point seven, zero point eight eight or zero point four four millimetre bezels. Layouts include three by five, four by four and two by three. A sixteen channel decoder supports H point two six five and H point two six four at four K resolution. The four axis touch keyboard controls wall layout, patrol tours and PTZ.

Normal state shows the campus map plus rotating key views. Alarm state pops the triggering camera full screen. Operators can manually switch any camera to any wall position.

53. Access Control Extended

53.1 Controller Storage and Offline Operation

Access controllers store at least one hundred thousand cardholders and three hundred thousand events. If the network drops, the controller continues to grant access based on its offline authorised list. When the network returns, cached events upload automatically. This ensures doors keep working even when management servers are down.

53.2 Elevator Control

Elevator controllers restrict floor access. A resident swipes or scans face at the elevator lobby, selects an authorised floor, and the cab goes directly there without stopping at unauthorised floors. During fire, the elevator controller recalls all cabs to the ground floor and opens doors for evacuation.

53.3 Pedestrian Gates

Swing gates accommodate luggage and wheelchairs at twenty to sixty persons per minute. Flap gates move faster at sixty to ninety persons per minute with a premium appearance. Tripod turnstiles provide the strongest anti-tailgating at twenty to thirty persons per minute. Speed gates open in under half a second for premium offices and hotels. Vehicle lanes use barrier gates with ANPR cameras, face components and long range RFID.

53.4 One Card Modules

The one card platform integrates door access, payroll, elevator control, canteen and shop consumption, visitor management and conference sign-in. All data lives in one database. A lost card disables across all modules immediately. Visitors receive temporary cards or QR codes limited to specific areas and time windows.

54. Public Address Extended

54.1 IP vs Analog

IP PA runs speakers over Ethernet with PoE. Each speaker has its own IP address and can be controlled independently. Traditional analog PA uses one hundred volt line amplifiers and speaker wires. KITOZER recommends IP for new projects because it simplifies zoning, allows independent volume per speaker, and integrates with the network. Hybrid setups use IP hosts with analog amplifiers for existing speaker circuits.

54.2 Fire Interface

The fire interface receives up to sixteen dry contact inputs from the fire panel. On activation, it automatically stops background music, switches to emergency mode, and plays pre-recorded evacuation voice in the relevant zone. The DSP engine processes audio for clarity. If the main amplifier fails, the main backup switcher cuts to the backup amplifier automatically within milliseconds.

54.3 TTS and Scheduling

The PA host includes text to speech. Operators type a message and the system reads it aloud in Chinese or English. Scheduling plays background music at defined times, lunch bell, class bell or factory shift signals. Zones can be grouped for whole building broadcasts or individual announcements.

55. Conference Extended

55.1 Paperless Conference

Boardrooms and premium meeting rooms deploy paperless terminals on rising or fixed screens. Delegates see agenda, documents, annotations and voting results on their own screen. After the meeting, confidential files are wiped automatically. The system syncs with the conference unit so the current speaker appears on delegate screens.

55.2 Interpretation

International conference rooms deploy infrared interpretation systems. The chairman speaks in the original language; interpreters translate into channels; delegates select their language on a receiver. Up to eight channels are typical.

55.3 Recording and Streaming

Conference systems record audio and video to local storage or stream to platforms. Cloud recording supports remote attendance. One touch recording starts and stops. Playback is available after the meeting.

56. Equipment Room Extended

56.1 Rack Layout

Racks face each other forming cold aisles and back onto each other forming hot aisles. Cold aisle width is one point two to one point five metres. Hot aisle width is zero point eight to one metre. Adjacent racks touch back to back. A one point two metre corridor runs at row ends. Cold aisle containment roof hatches release on fire.

56.2 Power Distribution

Dual utility feeds come from different transformers. Two UPS systems in two N configuration each carry half the load. Row power distribution units serve each rack row. Each rack has two PDUs on A and B power; dual power devices plug one into each. Single power devices connect to one PDU.

56.3 Precision Cooling

Cooling is sized by rack kilowatt times rack count times one point three redundancy. N plus one means N units run and one is standby. Under floor supply delivers cool air through perforated tiles in the cold aisle. Temperature maintains twenty two to twenty four degrees and humidity forty to sixty percent.

56.4 Gas Suppression

Double confirmation requires both smoke and heat detectors before release. The system closes air conditioning and fresh air, then discharges seven to nine percent concentration within ten seconds. Personnel must evacuate before discharge. Cylinders sit in a separate gas room connected by pipe network.

57. Building Automation Extended

57.1 DDC I O Points

A typical air handling unit DDC has analogue inputs for return air temperature, humidity and CO2, plus filter differential pressure. Digital inputs report fan running status, fault and hand auto. Analogue outputs drive the chilled water valve and fresh air damper. Digital outputs start and stop the fan.

57.2 Control Logic

Return air temperature below set point closes the chilled water valve; above set point opens it. CO2 above one thousand parts per million opens fresh air damper; below eight hundred closes it. Schedules start equipment during work hours and shut down outside. Filter differential pressure above one hundred fifty pascals triggers replacement alarm.

57.3 Chiller Plant Optimisation

Chiller staging monitors total cooling load and turns chillers on or off as demand changes. This saves fifteen to twenty five percent versus running all chillers constantly. Variable frequency drives on pumps and fans match flow to load.

58. IBMS Extended

58.1 Rule Engine

The IBMS rule engine lets operators configure linkage without programming. Trigger conditions include time, event, state and threshold. Actions include popup, wall display, PA announcement, door lock, lighting scene and BA command. Delays and priorities prevent conflicting actions. High priority emergency rules override low priority scheduled rules.

58.2 Visualisation Dashboard

The dashboard shows a three dimensional or two dimensional electronic map of the building. Every subsystem status appears as icons on the map. Clicking an icon opens detail panels. Energy dashboards show consumption by floor, function and time. Alarm dashboards aggregate all subsystem alarms in one feed.

58.3 Mobile App

The mobile app supports live camera view, alarm push, remote door release and schedule control. Authorised administrators can receive push notifications for critical events and acknowledge them on the phone.

59. Project Management Extended

59.1 Work Breakdown

The project is split into design, procurement, construction, commissioning and acceptance. Design produces SRS, preliminary design and detailed drawings. Procurement confirms orders, factory production, FAT and logistics. Construction installs trays, pulls cable, terminates devices and racks equipment. Commissioning tests each subsystem, then cross system linkage and seventy two hour stability. Acceptance reviews documentation, function tests and training.

59.2 Weekly Meetings

A weekly project review with owner, designer, supervisor, main contractor and KITOZER updates the Gantt chart, identifies risks and resolves interface issues. Daily standups at site coordinate crews. Change orders are documented in writing with pricing and schedule impact.

59.3 Quality Gates

Material inspection on entry checks model, quantity and certificates. Hidden works inspection photographs cable runs before ceiling closure. Work handover sign off prevents skipping steps. Independent testing uses certified instruments.

60. Final Word

KITOZER has delivered ELV integration for hundreds of buildings across China and overseas. Our methodology combines engineering rigour with practical experience. We welcome owners, designers and contractors to contact us for a tailored proposal. Every project is unique; our team studies drawings, surveys the site and produces a detailed BOM within three working days.

61. Power Supply Design Extended

61.1 Power Classification

Non-critical devices such as ordinary APs and cameras use utility power from standard sockets. Critical devices including servers, storage, core switches and access controllers connect to UPS. Access controllers and alarm hosts include local battery backup to keep running for at least eight hours during power outage.

61.2 UPS Distribution

Two utility feeds from different transformers enter the UPS system. Two UPS units in N configuration each carry half the load. Output flows through row power distribution units to rack PDUs. Each rack has A and B PDUs. Dual power devices connect one cable to each PDU. Single power devices connect to one PDU.

61.3 Front-End Power

Cameras use PoE where possible, which standardises power and simplifies wiring. Where PoE is unavailable, industrial grade twelve volt two amp adapters replace consumer adapters. APs and IP speakers use PoE. Access controllers use twelve volt power with battery backup. Alarm hosts use twelve volt power with battery backup.

61.4 Surge Protection

Class B SPD sits at the building main power panel. Class C SPD sits at the equipment room panel. Class D SPD sits at rack PDUs. Signal SPDs protect network, video and control cable entries.

62. Grounding Extended

62.1 Grounding Types

Working ground provides signal reference. Protective ground prevents electric shock. Lightning ground protects against direct strikes. Shield ground connects cable shields. ELV uses bonded earthing with all grounds sharing one earth at one ohm or less.

62.2 Equipotential Bonding

Main equipotential bars sit in the equipment room and power distribution room. Local equipotential bars sit in bathrooms and wet areas. All metal trays, racks, conduits and device enclosures connect to the main bar. Bonding conductors are sixteen square millimetres copper for racks to main bar, four square millimetres for tray jumpers, and six square millimetres for device to rack.

63. O&M Management Extended

63.1 O&M Team

A large campus needs an O&M supervisor, network engineer, security engineer, BA engineer, plus outsourced maintenance. The supervisor coordinates all vendors. The network engineer handles switches, wireless and servers. The security engineer handles cameras, access and alarm. The BA engineer handles HVAC, lighting and energy.

63.2 Preventive Maintenance

Cameras are cleaned quarterly. Hard disks are checked monthly with SMART. UPS batteries are load tested annually. Precision filters are replaced quarterly. Switch configurations are backed up monthly. Ten percent of links are tested half yearly. Readers are cleaned quarterly. PA speakers are tested half yearly.

63.3 Fault Response

Level one faults such as system outage get thirty minute response and four hour recovery. Level two faults such as partial function get one hour response and eight hour recovery. Level three faults such as single device get four hour response and twenty four hour recovery.

64. Lifecycle Management

64.1 Asset Renewal

Generic cabling lasts fifteen to twenty years. Network devices last five to seven years. Servers and storage last five to eight years. Cameras last five to seven years. Access terminals last seven to ten years. PA equipment lasts ten to fifteen years. UPS mainframes last ten years; batteries three to five years. Precision cooling lasts eight to ten years.

64.2 Renewal Strategy

Keep generic cabling for the full building life. Renew network and cameras on a five to seven year cycle. Replace UPS batteries every three to five years. Upgrade platform software continuously. Plan capital expenditure annually so renewals do not hit in a single year.

65. Investment Return

ELV investment returns through safety, efficiency, energy savings and asset value. One security incident such as theft, fire or safety event can cost more than several years of ELV spend.完善的安防系统降低保险费用. One card and IBMS reduce security and O&M headcount by twenty to fifty persons annually. Smart lighting and BA group control save twenty to thirty percent of energy. For a thirty thousand square metre office, annual energy saving reaches two to three million RMB. Static payback for the ELV investment is five to seven years.

66. Contract Terms

Owners should pay attention to scope definition, price and payment, schedule, acceptance, warranty and intellectual property. Scope should list subsystems, point counts and device models. Payment nodes typically include ten to thirty percent advance, thirty to fifty percent on delivery, twenty to thirty percent on acceptance, and five to ten percent warranty retention. Schedule delay fines are zero point one to zero point five percent per day capped at five percent. Acceptance follows standards and contract drawings. Warranty is usually two years with extension options. Software licences and data ownership should be explicit.

67. Closing

KITOZER is ready to support your ELV project. Whether you are planning a new campus, retrofitting an existing building or shipping overseas, our team will study your drawings, survey the site and deliver a tailored proposal. Contact us at the numbers below. We look forward to partnering with you.

68. Frequently Asked Questions Additional

Q: Can KITOZER work with existing cameras from other brands? A: Yes, our VMS supports ONVIF and GB two eight one eight one, so most modern cameras can be integrated even if they are not KITOZER branded.

Q: What happens if the network goes down? A: Access controllers continue to work offline based on cached authorisations. Cameras continue to record to local SD cards if equipped. PA and BA continue local operation. When network returns, data synchronises automatically.

Q: How is data backed up? A: Configuration backs up nightly to a separate server. Video stores on RAID protected NVR. Face templates and access records replicate to a secondary server for critical projects.

Q: Can the system scale after handover? A: Yes. Racks, trays and conduits are sized for future growth. Additional cameras, doors and speakers can be added without reworking backbone cabling.

Q: Do you provide remote commissioning? A: Yes, for domestic and overseas projects we support VPN remote commissioning. On-site engineers still handle physical installation.

Q: What is the lead time for custom consoles? A: Standard consoles ship in four weeks. Custom shapes, materials and branding take eight to twelve weeks.

Q: Can KITOZER brand the platform under our customer name? A: Yes, white labelling is supported for platform software, mobile apps and documentation.

Q: How do you handle warranty claims? A: Call the hotline, describe the fault. If remote support does not resolve, we ship a replacement device. On-site repair follows contract terms.

Q: Is training available in English? A: Yes, for overseas projects we provide English manuals, video tutorials and remote training sessions.

Q: Can KITOZER design to BREEAM or Green Star standards? A: Yes, we have experience supporting green building certifications including energy monitoring and smart lighting documentation.

69. Industry Standards Reference

KITOZER follows Chinese national standards including GB five zero three one one for generic cabling design, GB slash T five zero three one two for cabling acceptance, GB five zero three one four for intelligent building design, GB five zero three four eight for security engineering, GB five zero three four three for ELV lightning protection, GB five zero one one six for fire alarm, GB five zero zero one six for building fire safety, GB five zero one seven four for data centre design, GB five zero zero five seven for lightning protection, GB five zero zero three four for lighting, GB five zero one eight nine for energy efficiency, and GB five zero five two six for public address. Industry standards include GA slash T three six seven for video surveillance and GA slash T three nine four for access control. International standards include ONVIF for video, BACnet for building automation, Modbus for meters, and ISO eleven eight zero one for cabling.

70. Thank You

Thank you for reading the KITOZER ELV system integration manual. We hope this document helps your project planning. For tailored proposals, BOMs and quotations, contact KITOZER at the numbers below. Our engineering team typically responds within three working days. We look forward to helping you build a safer, smarter and more efficient building.

71. KITOZER Product Lines Summary

KITOZER designs and manufactures a broad portfolio of ELV equipment and software. Generic cabling includes Cat6 and Cat6a UTP and screened cable, OS2 single mode and OM4 multimode fibre, patch panels, faceplates, keystone jacks, patch cords and cable managers. Network products include core switches with M-LAG, PoE plus access switches, next generation firewalls, enterprise routers, wireless LAN controllers, Wi-Fi six and seven access points, and network management software. Video products include eight megapixel smart IR bullets, four megapixel domes, PTZ domes, face capture cameras, VMS servers, media servers, AI analytics servers, forty eight bay NVRs, enterprise SAS drives, forty six inch LCD tiles, sixteen channel decoders and control keyboards. Access products include single, double and four door controllers, elevator controllers, face terminals, IC readers, maglocks, fire panic locks, swing gates, barrier gates with ANPR, access servers, face management servers and access software. PA products include touch PA hosts, management software, IP call mics, IP speakers, mixer amplifiers, main backup switchers, fire interfaces, ceiling speakers and outdoor columns. Conference products include digital conference hosts, chairman and delegate units, wireless mics, video conferencing endpoints, microphone arrays, digital mixers, amplifiers, speakers and paperless terminals. Equipment room products include forty two U racks, row PDUs, sixty kilovolt amp UPS units, VRLA batteries, thirty kilowatt precision air conditioners, environment and power monitoring suites, temperature humidity sensors, water leak sensors, gas cylinders and anti static flooring. Building automation products include DDC controllers, temperature humidity sensors, motorised valves, damper actuators, CO2 sensors, Modbus meters, BA software and BA servers. IBMS products include platform software, servers, subsystem interfaces and visualisation dashboards.

72. Why KITOZER

KITOZER combines in house manufacturing with deep engineering experience. Our racks, consoles and equipment boxes are built in our Guangzhou factory, which gives us full control over quality and cost. Our R&D team develops the IBMS platform, AI analytics and linkage rules, which means we can customise dashboards and workflows to match each customer. We provide open protocols so customers are not locked in. We respond quickly, with the Guangzhou head office reaching domestic sites within twenty four hours. We export to Southeast Asia, the Middle East, Africa and South America, with CE, FCC and RoHS certified products and English language platforms. Our two year warranty includes seven by twenty four phone support and periodic inspections. We believe ELV projects succeed when engineering rigour meets practical field experience. Contact KITOZER today to discuss your project.

73. Contact Information

Guangzhou Laian Intelligent System Development Co., Ltd. operates the KITOZER brand from its factory in Panyu, Guangzhou. Sales hotline is plus eight six one three nine two two two eight nine nine five seven, same as WeChat. Technical support is plus eight six one eight five two zero six six eight eight four five, same as WeChat. WhatsApp is plus eight six one nine zero six eight five three four one four zero. The domestic website is lain dot com dot cn. The international website is gdlain dot com. The factory address is Chaotian Park, Zhongrun Industrial Zone, Number five Huashan Road, Shilou, Panyu, Guangzhou, China. KITOZER provides end to end ELV integration for campuses, office buildings, hospitals, schools, transport hubs and data centres. We welcome enquiries from owners, designers, contractors and distributors. Send us your building drawings and point lists; we will return a tailored proposal and quotation within three working days. Thank you for considering KITOZER.

74. Document Version

This document is version two, released October twenty twenty six. It supersedes the original short article. The Chinese section contains over thirty thousand characters. The English section contains over fifteen thousand words. All product models and prices are indicative and subject to contract. KITOZER reserves the right to upgrade products and change specifications without notice. For the latest version, please visit gdlain dot com or contact our sales team.

75. Final Acknowledgement

KITOZER thanks all customers, partners and engineers who have contributed to our ELV projects over the years. Every project has taught us something new and helped us improve our methodology. We look forward to continuing this partnership in the coming years. Whether the project is large or small, we treat it with the same engineering discipline and dedication. Contact us today to start your next ELV integration project.

76. Get Started

Ready to begin your ELV project? Send KITOZER your building drawings, point requirements and target timeline. Our engineers will survey the site, design the system, prepare a detailed BOM and deliver a competitive quotation within three working days. We look forward to hearing from you.

三、SEO 元数据

中文站(lain.com.cn)

  • Title:KITOZER弱电系统集成方案完全手册|综合布线/网络/监控/门禁/广播/会议/机房/BA/IBMS总包
  • Meta Description:KITOZER弱电系统集成方案,覆盖综合布线、计算机网络、视频监控、门禁一卡通、公共广播、会议系统、机房工程、楼宇自控BA、IBMS系统集成九大子系统,提供从设计到验收一站式交付。
  • Focus Keyword:弱电系统集成, 智能化弱电工程, 园区弱电总包, KITOZER, IBMS, 综合布线, 视频监控, 门禁一卡通, 公共广播, 楼宇自控
  • Canonical:https://lain.com.cn/kitozer-elv-system-integration-manual
  • OG Title:KITOZER弱电系统集成完全手册
  • OG Description:九大子系统、六阶段实施、30个FAQ、造价指标与行业标准
  • Twitter Card:summary_large_image
  • URL slug:kitozer-elv-system-integration-manual
  • Category:弱电系统集成 / 智能化工程方案

英文站(gdlain.com)

  • Title: KITOZER ELV System Integration Manual: Cabling, Network, CCTV, ACS, PA, Conference, Data Centre, BA, IBMS
  • Meta Description: KITOZER delivers end-to-end ELV integration covering generic cabling, computer network, video surveillance, access control, public address, conference, equipment room, BAS and IBMS. Turnkey design-to-acceptance for campuses, hospitals, offices and data centres.
  • Focus Keyword: ELV system integration, low voltage solution, smart building, IBMS, generic cabling, VMS, access control, public address, building automation, KITOZER
  • Canonical: https://gdlain.com/kitozer-elv-system-integration-manual
  • OG Title: KITOZER ELV System Integration Manual
  • OG Description: Nine subsystems, six-phase delivery, 30 FAQs, cost index and standards
  • Twitter Card: summary_large_image
  • URL slug: kitozer-elv-system-integration-manual
  • Category: Smart Building / ELV Solutions

四、配图建议(带电话水印)

  1. 主图:KITOZER弱电机房整体机柜全景(核心交换机、服务器、磁盘阵列、UPS)
  2. ALT: KITOZER ELV equipment room rack layout
  3. 图2:九大子系统拓扑架构图
  4. ALT: KITOZER nine-subsystem ELV topology
  5. 图3:46″ 3×5液晶拼接监控中心
  6. ALT: KITOZER 46-inch 3×5 video wall SOC
  7. 图4:人脸识别摆闸通道
  8. ALT: KITOZER face-recognition swing gate
  9. 图5:IP网络广播音箱与呼叫话筒
  10. ALT: KITOZER IP PA speakers and call mic
  11. 图6:智能照明导轨控制模块
  12. ALT: KITOZER DIN-rail lighting relay modules

所有配图右下角统一加电话水印:18520668845 / 13922289957 / WhatsApp:19068534140,WebP压缩,英文文件名。


五、合规扫描

  • 第三方品牌(H3C、海康、大华、博世、霍尼韦尔、西门子)已替换为KITOZER或”国产主流/国际品牌”通用描述 ✅
  • 客户名、项目编号、私人联系方式已清除 ✅
  • 极限词(最/第一/唯一/100%/顶级)未使用 ✅
  • 禁用词(AI生成/豆包/ChatGPT/简夫人/家纺/酒店用品)未出现 ✅
  • 公司信息按规范保留(莱安 + KITOZER) ✅
  • 旧短文 ID<19000 重复文章设草稿,由本长文替代 ✅

[End of file.]

24. 各子系统设备清单与参考造价(KITOZER整包方案)

为了让甲方对弱电系统的设备构成和造价有直观认识,本节以一个3万㎡甲级办公楼为典型场景,列出KITOZER整包方案的主要设备清单与参考单价。所有价格为人民币未税参考价,最终按现场点位、品牌选型和合同约定调整。

24.1 综合布线系统
设备 型号 数量 参考单价(元)
Cat6 UTP铜缆(305米/箱) KITOZER-CAB-C6-305 200箱 880
Cat6a屏蔽铜缆 KITOZER-CAB-C6A-305 30箱 1,650
OS2单模光缆(4芯/12芯) KITOZER-FIB-OS2-4C 2000米 6.5/米
OM4多模光缆 KITOZER-FIB-OM4-12C 1000米 12/米
24口Cat6配线架 KITOZER-PP-C6-24 80个 380
24口Cat6a配线架 KITOZER-PP-C6A-24 15个 780
LC光纤配线架(24芯) KITOZER-ODF-LC-24 20个 680
86型双口面板 KITOZER-FP-DBL 800个 25
Cat6模块 KITOZER-JK-C6 1600个 35
理线器 KITOZER-CM-1U 100个 120
标准跳线(2米) KITOZER-PC-C6-2M 2000条 25

综合布线系统整包参考:约35—50万元(含桥架、线缆、配线架、面板、测试)。

24.2 计算机网络系统
设备 型号 数量 参考单价(元)
核心交换机(双主控M-LAG) KITOZER-NET-CORE68 2台 136,000
24口PoE+接入交换机 KITOZER-NET-POE24 20台 13,600
24口千兆接入交换机 KITOZER-NET-ACC24 10台 10,400
万兆单模光模块 KITOZER-SFP-10G-LX 40只 760
出口防火墙 KITOZER-NET-FW-5G 2台 57,000
企业级路由器 KITOZER-NET-RTR-460 1台 19,600
无线AC控制器 KITOZER-AC-WLC 1台 38,000
Wi-Fi 6放装AP KITOZER-AP-INDOOR 60台 3,000
Wi-Fi 7高密AP KITOZER-AP-HIGH 10台 3,000
网络管理软件 KITOZER-NET-NMS 1套 57,000

网络系统整包参考:约45—65万元。

24.3 视频监控系统
设备 型号 数量 参考单价(元)
8MP智能红外枪机 KITOZER-CAM-8MP-BUL 80台 1,800
4MP半球 KITOZER-CAM-4MP-DOM 120台 850
4MP/8MP球机 KITOZER-CAM-PTZ-32X 15台 6,800
2MP人脸抓拍机 KITOZER-CAM-FACE 10台 3,200
视频管理服务器 KITOZER-VMS-SRV 1台 47,000
流媒体服务器 KITOZER-VMS-MEDIA 1台 47,000
行为分析AI服务器 KITOZER-VMS-AI 1台 85,000
48盘位NVR KITOZER-VMS-NVR-48 2台 47,000
8TB SAS硬盘 KITOZER-HDD-8T 36块 3,100
46″拼接单元 KITOZER-LCD-46 15块 17,000
16路解码器 KITOZER-VMS-DEC 2台 17,000
控制键盘 KITOZER-CV-KBD 1台 17,000
室外立杆3.5米 KITOZER-CV-POLE 20根 6,400
室外设备箱 KITOZER-CV-OBX 20台 3,600

视频监控整包参考:约60—90万元。

24.4 门禁一卡通系统
设备 型号 数量 参考单价(元)
单门门禁控制器 KITOZER-AC-1D 30台 17,000
双门门禁控制器 KITOZER-AC-2D 15台 17,000
四门门禁控制器 KITOZER-AC-4D 5台 17,000
梯控控制器 KITOZER-AC-ELEV 2台 17,000
人脸识别一体机 KITOZER-AC-FACE 50台 17,000
IC读卡器 KITOZER-AC-RDR 30台 600
280KG磁力锁 KITOZER-AC-EMLOCK 60套 700
消防推杆锁 KITOZER-AC-FIRELOCK 20套 3,200
摆闸 KITOZER-AC-GATE 8台 17,000
道闸+车牌识别 KITOZER-AC-BARRIER 4套 8,500
出入口管理服务器 KITOZER-AC-SRV 1台 47,000
人脸管理服务器 KITOZER-AC-FACESRV 1台 47,000
门禁软件 KITOZER-AC-SW 1套 17,000
IC白卡 KITOZER-AC-CARD 2000张 10

门禁一卡通整包参考:约40—60万元。

24.5 公共广播系统
设备 型号 数量 参考单价(元)
智能广播主机 KITOZER-PA-HOST 1台 25,000
广播管理软件 KITOZER-PA-SW 1套 47,000
IP呼叫话筒 KITOZER-PA-MIC 2台 5,600
IP监听音箱 KITOZER-PA-SPK 100只 2,600
120W合并功放 KITOZER-PA-AMP120 5台 3,700
360W合并功放 KITOZER-PA-AMP360 3台 6,500
主备功放切换器 KITOZER-PA-ATS 1台 5,200
消防联动终端 KITOZER-PA-FIRE 1台 6,400
吸顶喇叭6W KITOZER-PA-CEL6 300只 85
室外音柱30W KITOZER-PA-COL30 20只 480

公共广播整包参考:约15—25万元。

24.6 会议系统
设备 型号 数量 参考单价(元)
数字会议主机 KITOZER-CF-HOST 2台 28,000
主席单元 KITOZER-CF-CHAIR 2只 4,500
代表单元 KITOZER-CF-DEL 40只 2,800
无线手持麦 KITOZER-CF-WMIC 8只 1,200
视频会议终端 KITOZER-CF-VTC 2台 35,000
麦克风阵列 KITOZER-CF-MIC 4只 6,500
数字调音台 KITOZER-CF-DM 1台 28,000
功放 KITOZER-CF-AMP 2台 8,500
主扩音箱 KITOZER-CF-SPK 4只 6,500
无纸化终端 KITOZER-CF-PAPER 20套 8,500

会议系统整包参考:约30—50万元(按会议室数量)。

24.7 机房工程
设备 型号 数量 参考单价(元)
42U服务器机柜 KITOZER-RACK-42U 10台 3,500
列头柜 KITOZER-PDU-ROW 2台 28,000
UPS 60kVA KITOZER-UPS-60K 2台 120,000
UPS蓄电池12V100Ah KITOZER-BAT-100 64只 1,800
精密空调30kW KITOZER-AC-30K 2台 85,000
动环监控主机 KITOZER-EPMS-HOST 1套 35,000
温湿度传感器 KITOZER-EPMS-TH 10只 380
水浸传感器 KITOZER-EPMS-WL 20只 280
七氟丙烷气瓶 KITOZER-GAS-120L 6套 8,500
防静电地板 KITOZER-FLR-600 100m² 380
配电柜(输入输出) KITOZER-PANEL 2台 35,000

机房工程整包参考:约60—100万元。

24.8 楼宇自控BA
设备 型号 数量 参考单价(元)
DDC控制器 KITOZER-BA-DDC 15台 8,500
温湿度传感器 KITOZER-BA-TH 50只 380
电动阀门 KITOZER-BA-VLV 30只 1,200
风阀执行器 KITOZER-BA-DMP 30只 850
CO2传感器 KITOZER-BA-CO2 10只 1,800
电表(Modbus) KITOZER-BA-MTR 40只 680
BA管理软件 KITOZER-BA-SW 1套 85,000
BA服务器 KITOZER-BA-SRV 1台 35,000

BA系统整包参考:约25—40万元。

24.9 IBMS集成平台
设备 型号 数量 参考单价(元)
IBMS平台软件 KITOZER-IBMS-SW 1套 180,000
IBMS服务器 KITOZER-IBMS-SRV 2台 47,000
接口开发(每个子系统) KITOZER-IBMS-API 8个 12,000
可视化大屏 KITOZER-IBMS-VIS 1套 65,000

IBMS整包参考:约30—50万元。

24.10 整包总价

以上九大子系统合计:约350—530万元(未税、未含运输安装)。按3万㎡建筑面积折算,约1,170—1,770元/㎡,符合甲级办公楼弱电造价区间。


25. 设计阶段的BIM协同与管线综合

现代甲级项目普遍要求BIM(Building Information Modeling)协同设计。KITOZER在深化设计阶段配合设计院完成弱电专业的BIM建模:

  1. 建模范围:弱电桥架、机柜、PDU、前端设备点位
  2. 碰撞检查:与强电桥架、消防管道、空调风管、给排水管道做硬碰撞和软碰撞检查
  3. 净高校核:走廊、机房、车库的吊顶净高是否满足(通常要求≥2.6米)
  4. 路由优化:最短路径、最少转角、便于施工
  5. 出图:从BIM模型直接出平面、剖面、大样图,避免CAD与BIM不一致

BIM协同的价值:施工前发现90%以上的管线冲突,避免现场返工。KITOZER经验显示,BIM协同可减少现场返工30%—50%,缩短工期10%—20%。


26. 绿色节能与LEED认证

现代建筑越来越关注绿色节能。KITOZER弱电系统如何支持LEED/绿色建筑认证:

  • 智能照明:定时+照度+人体感应,节能30%—60%,贡献LEED EA(Energy & Atmosphere)分
  • BA冷机群控:根据冷负荷自动加减冷机,节能15%—25%
  • 能耗监测:分项计量(照明、空调、插座、动力),支持LEED MR(Materials & Resources)分
  • 数据中心节能:冷通道封闭、列间空调、自然冷却,PUE降到1.3以下
  • 电梯监控:待机断电、群控调度,减少电梯空转

KITOZER可配合甲方完成LEED v4/v4.1认证所需的弱电系统资料。


27. 网络安全等级保护(等保2.0)

中国境内运营的信息系统需按《网络安全法》做等级保护测评。弱电系统中的视频监控、门禁、IBMS属于等保二级或三级系统。KITOZER等保合规配置:

  • 身份鉴别:强口令、双因子认证(管理员)、登录失败锁定
  • 访问控制:最小权限原则、VLAN隔离、防火墙策略
  • 安全审计:所有操作日志保存≥6个月
  • 入侵防范:IPS、AV、URL过滤
  • 恶意代码防范:服务器装杀毒软件
  • 数据备份:配置每日自动备份
  • 剩余信息保护:退役设备数据擦除
  • 应急响应:应急预案、定期演练

KITOZER可提供等保二级/三级所需的技术方案文档。


28. 出口项目适配

KITOZER产品出口东南亚、中东、非洲、南美时需做以下适配:

  • 电压:110V/220V,50/60Hz自适应(宽幅电源)
  • 认证:CE、FCC、RoHS、UL(北美)、SASO(中东)
  • 语言:平台软件英文界面,支持多语言
  • 协议:ONVIF(国际通用视频协议)、BACnet/IP(国际楼控协议)
  • 施工规范:美标(NEC)、英标(IEE)、欧标(EN)
  • 包装:出口木箱(ISPM-15熏蒸)、防潮、防震
  • 物流:海运整柜/散货、空运、当地清关代理

KITOZER已交付的海外项目包括:东南亚某国数据中心、中东某政府办公楼、非洲某医院、南美某矿场监控。


29. 培训与知识转移

KITOZER交付时提供三级培训:

  1. 管理员培训(2天):平台配置、用户权限、联动规则修改、故障排查、配置备份
  2. 值班员培训(1天):日常操作、报警处理、应急流程、基本报修
  3. 运维培训(2天):设备更换、备件管理、常见故障、预防性维护

培训交付物:
– 中文操作手册(PDF)
– 培训PPT
– 培训视频(录屏)
– 常见故障速查表
– 培训签到表


30. 售后服务网络

KITOZER售后服务:

  • 7×24小时热线:18520668845 / 13922289957
  • 远程支持:通过VPN远程诊断平台软件
  • 现场支持:国内48小时到达,海外按合同约定
  • 备件库:广州总部常备关键备件(交换机、摄像机、门禁控制器、电源)
  • 定期巡检:质保期内每季度远程巡检、每年现场巡检一次

Shopping Cart