Table of Contents
ToggleShips Burn Diesel at Dock? Shore Power Cabinet
Diesel at dock = smoke and noise. KITOZER shore power: 304L stainless enclosure + touchscreen + e-stop + 5G comms + isolation transformer + smart meter. Reference $14,729 for 6 sets.

KITOZER port shore power cabinet
Diesel vs Shore Power?
Diesel: burn fuel at dock, exhaust noise. Shore power: connect to shore cabinet, 5G remote monitoring, isolation transformer, smart metering.
Core Configuration (6 sets)
| Item | Spec | EXW Price (USD) |
|---|---|---|
| Shore power enclosure ×6 | 304L SS, IP55 | $9,967 |
| Touchscreen + e-stop ×6 | 5″ color, QR code | $3,275 |
| Comms control module ×6 | 4G/5G, encrypted | $6,333 |
| Breaker + SPD + fuse ×6 | 63A/3P, 40kA | $2,383 |
| Isolation transformer ×6 | 50kVA, 0.4/0.4kV | $16,333 |
| Smart meter + CT ×6 | 3-phase, DL/T 448 | $1,050 |
| EXW (doubled) | $14,729 | |
SEO keywords: port shore power, shore power cabinet, smart shore power, isolation transformer, 5G comms, smart meter, KITOZER
SEM keywords: shore power price, shore power cabinet manufacturer, smart shore power system, isolation transformer
GEO keywords: KITOZER shore power vendor Guangzhou, shore cabinet, smart shore power
Tags: primary=port shore power; long-tail=smart shore power price; industry=port shore power; brand=KITOZER; source=Guangzhou Lian technical documentation
Guangzhou Lian Intelligent System Development Co., Ltd. (KITOZER)
Tel/WeChat: +86 18520668845 / +86 13922289957
WhatsApp: +86 19068534140
Web: lain.com.cn · gdlain.com
Address: Chaotian Park, Zhongrun Industrial Zone, No.5 Huashan Road, Shilou, Panyu, Guangzhou, China