KITOZER battery bank installation service covers battery rack mounting, VRLA or lithium battery placement, intercell cable connection, and internal resistance measurement for UPS and solar storage systems. Our technicians keep batteries upright, follow the layout drawing, and torque intercell connectors to the manufacturer spec. Before connecting the battery string to the UPS, we measure open circuit voltage and internal resistance of each cell, flagging any unit outside tolerance for replacement.
Table of Contents
ToggleInstallation Steps
1. Fix battery rack to the floor and verify level. 2. Place batteries on shelves per layout, upright and stable. 3. Connect intercell cables with torque wrench, alternating polarity as designed. 4. Insulate each terminal with rubber boots. 5. Measure open circuit voltage per cell with a calibrated voltmeter. 6. Measure internal resistance with a battery impedance tester, record all values. 7. Connect string end cables to the UPS DC breaker.
Safety
Technicians wear insulated gloves and face shield. Tools are insulated to prevent short circuit across terminals.
Price
From $120 per battery unit for installation and internal resistance test. Contact +86 13922289957 for rack layout drawing.
Guangzhou Laian Intelligent System Development Co., Ltd. | Tel/WeChat: +86 13922289957 / +86 18520668845 | WhatsApp: +86 19068534140 | www.gdlain.com