KITOZER UPS sizing guide walks engineers through correct capacity calculation for critical power rooms. First sum the rated IT load in kW, divide by UPS output power factor (typically 0.9) to obtain required kVA, then apply a 20 to 30 percent headroom for future growth. Choose redundancy topology based on availability target: N for non-critical loads, N+1 for enterprise server rooms, 2N for dual-corded Tier III halls, and dual bus for Tier IV environments. Modular UPS allows pay-as-you-grow scaling, while static switchgear supports parallel redundancy across independent power strings. Always verify battery backup runtime at full load and at expected end-of-discharge voltage.
Table of Contents
ToggleKey Inputs
Total rack kW, power factor, expected growth, runtime minutes, ambient temperature, and redundancy target. KITOZER supplies single phase 1 to 20 kVA and three phase 10 to 800 kVA online double-conversion UPS.
Price
From $0.08/VA. Contact +86 13922289957 for UPS sizing worksheet and quotation.
Guangzhou Laian Intelligent System Development Co., Ltd. | Tel/WeChat: +86 13922289957 / +86 18520668845 | WhatsApp: +86 19068534140 | www.gdlain.com