KITOZER
KITOZER

KITOZER Battery FAQ: Charge Discharge Test Cycle

Regular capacity discharge testing validates that a UPS battery string still delivers the promised autonomy. KITOZER recommends a full 100 percent discharge test once every 12 months after the commissioning year, and a 50 percent partial test every 6 months in critical facilities. Use a portable resistive load bank at the 0.1C rate, and stop when the lowest cell reaches 1.80V. After the test, recharge at 0.1C until current stabilizes, then equalize for 4 hours. Never discharge below 1.75V per cell because deep cycles shorten VRLA life.

Table of Contents

Safety Notes

Keep the room ventilated, wear acid-resistant gloves, and have eyewash nearby. Isolate the UPS inverter during the test. KITOZER load banks are available for rental with operator.

Price

From $1,500 per discharge test visit. Contact +86 13922289957 for battery capacity test booking.

Guangzhou Laian Intelligent System Development Co., Ltd. | Tel/WeChat: +86 13922289957 / +86 18520668845 | WhatsApp: +86 19068534140 | www.gdlain.com

Shopping Cart