This guide covers output cable connection for KITOZER UPS systems. Output cables must be sized by full load current with a derating factor for conduit and ambient temperature. For a three-phase UPS, route L1, L2, L3, neutral, and earth in the same conduit to avoid inductive heating. Use copper cable lugs crimped with a hydraulic tool, then torque to the value printed on the terminal block. After connection, insulate all exposed terminals with heat shrink and label each cable at both ends. Before energizing, perform a continuity test between output phases and earth to confirm no short circuit.
Torque
Follow nameplate torque, typically 8 Nm for 16 mm2 lugs. Output distribution cabinets from $1,280.