Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32
KITOZER
KITOZER

3m×7m Integrated Residential-Office Station

Table of Contents

Technical Design Solution

Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd. | Date: July 2026

Document-Level Disclaimer: The configuration and budget information shown in this document are provided for preliminary design, technical discussion and budgetary reference only. They do not constitute a formal commercial quotation from Guangzhou Lain Intelligent System Development Co., Ltd. Final product selection, quantities, specifications and pricing are subject to the actual project requirements and the company’s formal quotation.

1. Company Introduction

Guangzhou Lain Intelligent System Development Co., Ltd. was established in 2002 and is a high-technology enterprise specializing in computer room construction, modular buildings and intelligent protection equipment R&D, production and sales. With more than two decades of industry experience, the company holds the KITOZER brand and dozens of product patents and industry qualifications, serving government, communications, power, transport, construction and tourism customers, and has been recognized by thousands of domestic and international enterprises.

Main products cover IDC data center construction, shielding room engineering, integrated data cabinets, micro-module cold aisle cabinets, outdoor intelligent cabinets, shielding cabinets, shielding desks and control consoles, as well as integrated modular buildings, outdoor duty stations and container computer rooms — forming full-chain capability from equipment R&D, manufacturing and engineering implementation to after-sales O&M.

The company operates a modern production base with CNC bending machines, laser cutters, automatic coating lines and hot-dip galvanizing lines, a strict quality control system, and third-party inspection of all products. A 24-hour professional online service system supports full-process delivery from solution design, manufacturing and transport/installation to O&M training. With 20+ years of production experience, flexible customization and source-factory pricing, Guangzhou Lain is an influential supplier of computer room equipment and modular buildings in South China.

2. Project Overview

2.1 Project Background

As infrastructure construction accelerates, industrial parks expand and outdoor public services and emergency systems improve, demand is growing for temporary, movable, fully functional office-living integrated spaces. Traditional brick-and-mortar temporary buildings have long construction periods, produce construction waste, cannot be reused, adapt poorly to sites and carry high overall cost. Modular integrated buildings — factory prefabricated, site-assembled and relocatable — have become the preferred solution, yet many market products are single-function, crudely built, poorly insulated or incompletely equipped.

Combining more than twenty years of computer room construction and modular equipment experience, Guangzhou Lain has launched the standardized 3m×7m integrated residential-office station, delivering structure, enclosure, MEP, finishing, furniture and HVAC as one integrated package for outdoor duty, construction site office, park gate and scenic service scenarios.

2.2 Project Objectives

– Complete functions: daily office + living for 2–3 people, with a washing area, power/weak-current systems, HVAC and storage furniture — move-in ready with no extra purchases.

– Structural safety: hot-dip galvanized steel frame designed strictly per national loading codes, resisting wind, earthquake and pressure for outdoor environments; main structure design life ≥15 years.

– Standardized appearance: classic blue-white-grey scheme — sea-blue flat roof with parapet, milk-white upper / light grey lower walls with dark grey waist band; neat, stable and suited to park, municipal and site settings.

– Efficient delivery: factory prefabrication rate ≥95%; on-site foundation treatment plus assembly and commissioning; single-unit installation and handover in 3 days.

– Green and low-carbon: recyclable materials, no wet work, no mass construction waste, fully relocatable — lifecycle carbon emissions far below traditional buildings.

– Convenient O&M: universal standard components, simple maintenance, easy fault finding, easily procured spares, low long-term O&M cost.

2.3 Applicable Scenarios

Construction sites (project offices, manager dormitories, gate duty rooms, worker rest rooms); industrial parks (gate posts, patrol duty points, temporary offices, material rooms); municipal transport (road maintenance stations, sanitation worker rest stations, traffic duty posts); scenic areas (visitor service points, security duty rooms, equipment rooms, temporary ticket points); power and communications (substation/base station O&M duty rooms); mining and oil fields (field office/living); emergency support (temporary shelters, inspection points, command posts, temporary medical points).

2.4 Design Basis

The solution follows current national standards and codes, primarily: GB 50009-2012 (Load code for the design of building structures); GB 50017-2017 (Standard for design of steel structures); GB/T 6728-2017 (Cold-formed steel hollow sections); GB/T 13912-2002 (Hot-dip galvanized coatings); GB/T 23932-2009 (Insulated sandwich panels with metal facings for building); GB/T 28887-2012 (Plastic windows for buildings); GB 50016-2014 (2018 ed.) (Code for fire protection design of buildings); GB 51348-2019 (Standard for electrical design of civil buildings); GB 50015-2019 (Standard for design of building water supply and drainage); GB 50037-2013 (Code for design of building floors); GB 50243-2016 (Acceptance code for ventilation and air conditioning works); JGJ/T 492-2018 (Technical standard for modular buildings); JGJ 46-2005 (Safety technical code for temporary electricity on construction sites); plus the customer’s reference renderings and functional requirements. Governing editions are confirmed per project.

2.5 Core Technical Indicators

Indicator Value
External dimensions 7000 mm (L) × 3000 mm (W) × 2900 mm (H incl. parapet)
Interior clear height 2700 mm
Usable interior area ≈21 m²
Design service life Main structure ≥15 years; enclosure ≥10 years
Seismic intensity 7 degrees (0.10 g)
Wind resistance Level 10 (basic wind pressure 0.55 kN/m²)
Roof live load 0.5 kN/m²
Floor uniform live load 2.0 kN/m²
Wall heat transfer coefficient ≤0.73 W/(m²·K)
Airborne sound insulation Walls ≥30 dB; doors/windows ≥25 dB
Fire rating B1 standard; Class A upgrade available
Electrical rating 220V/50 Hz; design total load 5 kW
Water supply pressure ≥0.1 MPa
Drain interface φ50 mm standard

3. User Requirement Analysis

3.1 Functional Space Requirements

– Office zone: at least 2 standard workstations with desks, chairs and a file cabinet; ample sockets and network ports; uniform glare-free lighting.

– Rest zone: at least 2 fixed beds plus 1 spare bed; lockers for personal items; privacy via partition; zoned low-level lighting.

– Washing zone: pedestal washbasin with hot/cold tap; odor-trap floor drain; concealed neat piping.

– Storage: layered storage via file cabinet, locker and under-bed space for documents, personal items and tools.

3.2 Structural Safety Requirements

– The structure must resist self-weight, snow/wind loads and activity loads without deformation or collapse risk in extreme weather, with ample safety margin.

– Excellent corrosion resistance for southern humidity, coastal salt spray and industrial atmospheres.

– Enclosure panels with sufficient strength and stiffness against impact, and no rain seepage.

– Foundation adaptable to hardened sites, concrete floors and plain earth; stable and level without settlement or tilt.

– Basic seismic capacity — no damage at intensity 7.

3.3 Appearance Requirements

– Square, neat profile with straight lines and stable coordinated colors.

– Sea-blue flat roof with parapet border forming a regular top frame.

– Two-tone walls (light grey lower, milk-white upper) with a dark grey waist band.

– White door/window system with flat bright glass and even gaps.

– No exposed screws or messy piping; neat trims and uniform joints.

3.4 Environmental Adaptability

– Normal use at −10 °C to 45 °C; good insulation reduces indoor temperature impact.

– Complete waterproof sealing of roof, walls and doors/windows against heavy rain; smooth drainage.

– Wind-resistant anchoring; no damage or panel lifting at level-10 winds.

– Moisture/mold resistance during southern plum-rain seasons.

– Screens and tight sealing block insects.

3.5 Electrical and Plumbing Requirements

– 220V mains plug-in use; ample lighting and sockets; separated power/weak-current wiring; leakage, overload and short-circuit protection; dedicated AC circuit; network points in both zones.

– Municipal water or storage tank supply; drainage to municipal network or temporary collection; anti-leak, anti-block and anti-odor design.

3.6 O&M Requirements

– Universal standard components, quick replacement, low repair cost; common faults handled without specialists.

– Simple routine maintenance (cleaning, sealant and fastener checks).

– Overall lifting relocation and reuse; easy disassembly, assembly and transport.

– Flexible upgrades (fire panels, extra furniture, weak-current expansion).

4. Overall Design Description

4.1 Design Philosophy

The design follows “standardization, integration, humanization and high reliability”: all systems — structure, enclosure, MEP, finishing and furniture — are prefabricated and pre-installed in the factory; the site only needs simple assembly. Within the limited 21 m², scientific zoning and humanized details integrate office, living and washing functions while strictly ensuring structural safety, environmental comfort and long-term durability.

4.2 Overall Exterior Design

Strictly matches the reference rendering — classic square flat-roof profile:

– Roof: flat with 200 mm sea-blue parapet border, 45° miter joints sealed; sea-blue coated panel surface, flat and clean, waterproof and decorative.

– Walls: three-level scheme — lower 1000 mm light grey (stain-resistant), middle 150 mm dark grey waist band, upper milk-white (bright, improves interior daylight).

– Doors/windows: entry door on the 7 m facade with a 300×600 mm observation window; 2 sliding windows (1200×1200 mm) on the 7 m facade and 1 on the 3 m side, white frames.

– Details: all external/internal corners and edges finished with dedicated trims; all exposed screws concealed.

4.3 Interior Layout

“Office at front, rest at rear, washing at the side”:

– A 50 mm partition wall at about 4 m from the entry divides the space: front office zone ≈12 m², rear rest zone ≈9 m², with an 800 mm internal door.

– Office zone: 2 desks (1200×600 mm) with 3 chairs along one wall, file cabinet opposite, 4 sockets + 2 network ports, 2 LED lights.

– Rest zone: 1 double bunk bed (1.2 m), folding bed storage corner, two-door locker; washing corner with pedestal washbasin and floor drain; 2 LED lights on independent switch; 4 sockets + 2 network ports + 1 AC socket.

– Circulation: entry → office → internal door → rest/washing; main aisle ≥800 mm.

4.4 Overall Performance

– Structure: Q235B hot-dip galvanized steel frame, bolted + self-tapping dual connections; satisfies intensity-7 seismic design; resists level-10 winds; roof 0.5 kN/m², floor 2.0 kN/m².

– Thermal: 50 mm EPS sandwich panels + roof glass-wool reinforcement; overall heat transfer coefficient ≤0.6 W/(m²·K).

– Waterproofing: three-layer design — tongue-and-groove joints + weatherproof sealant + gutter drainage; waterproof grade ≥III per GB/T 21086-2007; no leakage in heavy rain.

– Acoustic: wall Rw ≥30 dB, doors/windows ≥25 dB.

– Fire: B1 (EPS) standard; Class A (rock wool) upgrade available.

– Environmental: all materials meet national standards; indoor formaldehyde meets E1; no odor — occupiable immediately.

4.5 Standards System

Full-process standard system covering design, production, installation and acceptance: structure per GB 50017/GB/T 6728/GB 50009 with mechanical verification; enclosure materials per GB/T 23932 and GB/T 12754 with full inspection; MEP per GB 51348 and GB 50015; construction/acceptance per GB 50205, GB 50210 and JGJ/T 492 with process-by-process acceptance.

5. Recommended Configuration and Reference Budget

5.1 Pricing Notes

This configuration is the standard 3m×7m integrated residential-office station, including all materials and installation for the main structure, enclosure, doors/windows, interior finishing, electrical, plumbing, furniture and HVAC systems. The unit prices below are reference estimates transcribed from the source document for preliminary budgetary discussion only — they are not a formal quotation. Prices exclude tax and transport (logistics paid on delivery); VAT special invoices at +10% tax points, ordinary invoices at +3%. The site foundation (100 mm C20 slab) is included. Custom upgrades are quoted separately. Warranty: main steel structure 2 years; other systems 1 year; AC per the manufacturer’s national warranty.

5.2 Reference Configuration and Budget Summary

System Key Items Qty Ref. Amount (RMB)
Main steel structure Corner columns, bottom/top frames, purlins, wall studs, hardware 1 set ≈10,330
Roof enclosure EPS roof panels, parapet, sealant, gutter, downpipes, glass wool 21 m² set ≈7,999
Wall enclosure Lower/upper wall panels, waist band, partition, edge strips 50 m² set ≈12,189
Doors and windows Entry door, 3 sliding windows, partition door, sealing kit 5 units ≈3,530
Interior finishing Floor base board, PVC flooring, ceiling, corner trims 21 m² set ≈2,829
Electrical Distribution box, LED lights, sockets, switches, network points, wiring 1 set ≈1,913
Plumbing PPR supply, PVC drain, washbasin, valve, floor drain 1 set ≈520
Furniture Bunk bed, folding bed, desks, chairs, file cabinet, locker 9 units ≈3,410
HVAC and ventilation 1.5 HP inverter AC, 2 louvre exhaust fans 3 units ≈2,430
Transport/installation/foundation Sealing materials, installation labor, transport, C20 slab 1 set ≈16,420
Total (reference) ≈61,570 (excl. tax & freight)

*Individual reference unit prices from the source document include, e.g.: corner column ¥235/pc, bottom main beam ¥380/pc, roof panel ¥165/m², entry door ¥850/set, sliding window ¥650/set, AC ¥2,200/unit, installation labor ¥4,500/item, transport ¥6,800/truck, foundation ¥220/m².*

5.3 Optional Upgrade Configurations (Reference)

Upgrade Content Ref. Unit Price (RMB)
Fire rating upgrade EPS → Class A rock-wool sandwich panels (walls + roof) +80/m²
Additional AC Second 1.5 HP wall-mounted AC for rest zone +2,200/unit
Private bathroom Toilet, shower, waterproofing, sewage lift pump +8,500/set
Anti-theft upgrade Entry door → steel security door, C-grade cylinder +1,200/set
Weak-current upgrade CCTV, wireless AP, access control +1,800/set
Insulation upgrade Extra 20 mm wall insulation layer +45/m²
Custom appearance Enterprise logo, custom color scheme +800/set

Pricing disclaimer: The configuration and budget shown in this document are provided for preliminary design, technical discussion and budgetary reference only. They do not constitute a formal commercial quotation from Guangzhou Lain Intelligent System Development Co., Ltd. Final product selection, quantities, specifications and pricing are subject to the actual project requirements and the company’s formal quotation. All budget figures are stated in RMB/CNY only.

6. Steel Structure System

6.1 System Overview

The steel structure is the load-bearing skeleton, carrying vertical loads, horizontal wind loads and seismic action. All members are Q235B carbon structural steel, CNC cut, punched and cold-formed, then fully hot-dip galvanized; site assembly uses high-strength galvanized bolts — no field welding. The system comprises corner columns, bottom frame (longitudinal main beams + transverse secondary beams), top frame (main beams + purlins), wall studs (vertical + horizontal) and connection hardware, forming an integrated spatial load path with ample redundancy.

6.2 Key Member Specifications

Member Model Specification Key Data
Corner column KITOZER-GZ100 100×100×2.5 mm galvanized square tube, 2800 mm, 4 pcs Q235B per GB/T 6728-2017 & GB/T 700-2006; A=9.75 cm², Ix=Iy=149.3 cm⁴, W=29.86 cm³; axial stability capacity ≥65 kN per column (total ≥260 kN, safety factor ≥3.5); zinc ≥85 μm (min 70); length ±2 mm, straightness ≤1/1000; M12 bolted to bottom beams
Bottom longitudinal main beam KITOZER-ZL120 120×60×2.75 mm, 7000 mm, 2 pcs Ix=202.5 cm⁴; max bending stress ≤120 MPa vs 215 MPa design; deflection ≤L/300 vs L/250 limit; angle bracket + M10 bolted, ≥4 bolts per end
Bottom transverse secondary beam KITOZER-CL80 80×40×2.5 mm, 3000 mm, 12 pcs @600 mm Ix=52.1 cm⁴; bending stress ≤110 MPa, deflection ≤L/200; carries 2.0 kN/m² floor live load
Top longitudinal main beam KITOZER-DZL120 120×60×2.5 mm, 7000 mm, 2 pcs Ix=188.3 cm⁴; carries roof and upper wall loads; levelness ≤3 mm/7 m
Top transverse purlin KITOZER-DL60 60×40×2.0 mm, 3000 mm, 10 pcs @700 mm Ix=19.6 cm⁴; supports roof panels; 0.5 kN/m² live load without permanent deformation
Wall vertical stud KITOZER-LG50 C-section 50×30×1.5 mm, 2800 mm, 14 pcs @500 mm Per GB/T 6725-2017; verticality ≤1/1000 (≤2 mm full height); zinc ≥70 μm
Wall horizontal stud KITOZER-HLG50 C-section 50×30×1.5 mm, 8 pcs Bottom @100 mm, middle @1000 mm (waist band), top below ceiling; levelness ≤2 mm/7 m

6.3 Connection Hardware

Galvanized bolts M8/M10/M12 (4.8 grade, per GB/T 5782-2016); 2.0 mm galvanized angle brackets (L/T types); self-drilling screws ST5.5/ST6.3 with EPDM waterproof washers (per GB/T 15856.1-2002); M10×100 mm expansion bolts (pull-out ≥10 kN) anchoring the base to concrete; aluminum/steel blind rivets for trims. Bolt tensile strength ≥400 MPa, yield ≥320 MPa; nodes configured per load calculations to achieve “strong joints, weak members” seismic design.

6.4 Hot-Dip Galvanizing Process

Members are degreased, acid-pickled, fluxed, dried, dipped in 440–460 °C molten zinc (forming γ/δ/ζ/η alloy layers — metallurgical bond), cooled and passivated. Coating thickness: ≥2.5 mm members ≥85 μm average (70 μm min); 1.5–2.5 mm members ≥70 μm (55 μm min); fasteners ≥50 μm. Outdoor corrosion life 15–20 years; magnetic thickness gauging ≥10% sampling per batch; hammer adhesion tests; galvanizing quality records issued per batch.

6.5 Mechanical Verification (Summary)

Per GB 50009-2012 and GB 50017-2017: dead loads (steel 0.5 + enclosure 0.3 + finishing/furniture 0.4 kN/m²), live loads (floor 2.0, roof 0.5, snow 0.4 kN/m²), wind (0.55 kN/m² basic, level-10), seismic (7 degrees, 0.10 g). Results: corner column max axial design ≈42 kN, stability stress ≈140 MPa < 215 MPa; beam max bending ≈120 MPa < 215 MPa, deflection ≈L/300 < L/250; wall studs wind bending ≈100 MPa, deflection ≤L/200; anti-overturning safety factor ≥1.5; seismic response elastic. All checks pass with ample margin.

6.6 Fabrication and Acceptance

Factory: CNC cutting/punching/forming, clean cuts, sound welds, clean surfaces before galvanizing. Factory acceptance: dimensions per drawings; uniform bright zinc coating; no distortion. Site acceptance: frame length/width ±5 mm, diagonal ±8 mm; column verticality and beam levelness per requirements; all fasteners torqued; structure stable without abnormal movement.

7. Roofing System

7.1 System Overview

50 mm EPS color steel sandwich panels + 20 mm glass-wool reinforcement + sea-blue parapet + PVC gutter/downpipes + neutral silicone weatherproof sealant — complete waterproofing, insulation, load-bearing and decoration matching the reference appearance.

7.2 Roof Sandwich Panel (KITOZER-WM50)

Tongue-and-groove EPS sandwich panel, 50 mm, 21 m² full coverage; facings: sea-blue HDP polyester-coated steel 0.4 mm outer / milk-white 0.3 mm inner (GB/T 12754-2019; coating ≥20 μm front, ≥5 μm back; pencil ≥HB; impact 50 kg·cm; salt spray ≥500 h); galvanized base ≥80 g/m²; EPS core ≥18 kg/m³, closed-cell ≥90%, λ ≤0.041 W/(m·K), oxygen index ≥30% (B1), dimensional stability ≤0.5% (70 °C/48 h), water absorption ≤4% (GB/T 10801.1-2002); bonding strength ≥0.1 MPa, 180° peel ≥60 N/25 mm; flexural ≥1.5 kN/m² @700 mm span; surface density ≈7.5 kg/m²; per GB/T 23932-2009; screws ≤300 mm spacing with waterproof washers; sealant at all ends/joints/corners.

7.3 Parapet Border (KITOZER-WQ200)

Sea-blue 0.5 mm coated steel, CNC formed, 200 mm high with water-barrier lip; 20 m around the roof; 45° miter corners sealed; concealed fixings; forms the reference blue frame and guides rainwater to the gutter.

7.4 Waterproof Sealant

Zhongjiang neutral silicone weatherproof sealant, 300 ml ×12 (GB/T 14683-2017): movement ±25%, sag ≤2 mm, skin ≤60 min, full cure ≈7 days, tensile modulus ≤0.4 MPa, −40 °C ~ 150 °C, elongation ≥400%, outdoor life ≥10 years; applied to all panel joints, parapet joints, screw heads, penetrations and corners (joint width ≥6 mm, depth ≥5 mm).

7.5 PVC Gutter and Downpipes

Liansu PVC-U gutter 100 mm wide × 75 mm high, 2.0 mm wall, 14 m at 0.5% slope (GB/T 5836.1-2018; ring stiffness ≥4 kN/m², Vicat ≥79 °C); φ75 mm downpipes ×2 (2.3 mm wall) diagonally arranged with rain hoppers and grid screens; clamp spacing ≤1.2 m; single pipe capacity ≥10 L/s — ample for the 21 m² roof; rain-hopper grids ≤10 mm mesh.

7.6 Insulation Reinforcement (KITOZER-BW20)

Centrifugal glass wool blanket: 20 mm, ≥24 kg/m³, λ ≤0.038 W/(m·K), Class A non-combustible, slag ball ≤10%, fiber ≤7 μm, water absorption ≤5%, hydrophobicity ≥98% (GB/T 13350-2017); laid between purlins above the ceiling.

7.7 Waterproof Design & Thermal Calculation

Triple waterproofing: construction (tongue-and-groove labyrinth joints + 200 mm parapet + 0.5% gutter slope), material (coated steel + sealant + bonded gutter), drainage (gutter + dual downpipes); grade III per GB 50345-2012, durability ≥10 years. Thermal: R ≈ 1.9 m²·K/W (50 mm EPS 1.22 + 20 mm glass wool 0.53 + surface resistances), K ≈ 0.53 W/(m²·K) — far better than ordinary color steel roofs (~2.5) and 240 mm brick walls (~1.8). Wind: screw pull-out ≥1 kN each, ample margin against level-10 wind suction.

8. Wall System

8.1 System Overview

Upper/lower two-tone EPS sandwich panel walls with dark grey waist band and dedicated edge strips; external walls light grey lower + milk-white upper, internal partition milk-white; excellent insulation, sound insulation and wind resistance matching the reference appearance.

8.2 Wall Panels

– Lower panels (KITOZER-WQ-H): 50 mm EPS, 20 m², light grey 0.4 mm outer / milk-white 0.3 mm inner; flexural ≥1.2 kN/m² @500 mm; Rw ≥30 dB; fixing ≤400 mm spacing; sealed at base.

– Upper panels (KITOZER-WQ-W): 50 mm EPS, 30 m², milk-white both faces (0.4 mm outer / 0.3 mm inner); aligned with lower panels, openings reinforced.

– Common: EPS ≥18 kg/m³, λ ≤0.041 W/(m·K), B1; per GB/T 23932-2009; wall K ≈ 0.73 W/(m²·K) (R ≈ 1.37 m²·K/W) — superior to 240 mm brick; cold bridges minimized by insulation filling and trims.

8.3 Decorative Waist Band (KITOZER-YX150)

Dark grey 0.5 mm coated steel, CNC formed, 150 mm wide with 20 mm folds; 20 m at 1000 mm height; 45° miter corners sealed; concealed fixings; decorative, covers the panel joint and reinforces mid-wall stiffness.

8.4 Interior Partition (KITOZER-GD50)

50 mm EPS sandwich, double milk-white 0.3 mm faces; 8.4 m² (3×2.8 m); EPS ≥16 kg/m³, λ ≤0.042 W/(m·K); Rw ≥28 dB; door opening reinforced.

8.5 Edge Strips (KITOZER-SB)

Milk-white 0.4 mm coated steel: 50×50 mm external corner, 50×50 mm internal corner, U/L top and bottom closures; 36 m; blind-rivet fixing ≤300 mm spacing, 45° miter joints, sealant sealed.

8.6 Performance

– Acoustic: mass-spring-mass structure, Rw ≥30 dB walls; door/window areas optimized with gaskets and tempered glass; partition ≥28 dB.

– Fire: EPS B1 (oxygen index ≥30%, low smoke, no melt drip); rock-wool Class A upgrade; per GB 8624-2012.

– Wind/deformation: studs at 500 mm; wall deflection ≤L/200 at 0.55 kN/m²; temperature deformation absorbed by tongue-and-groove joints and sealant movement; impact resistant.

9. Door and Window System

9.1 Entry Door (KITOZER-M900)

Color steel sandwich swing door with observation window; opening 900×2100 mm; 50 mm leaf (EPS core, milk-white faces); 300×600 mm tempered glass window (GB 15763.2-2005, transmittance ≥85%); stainless handle lock (key, double-side), 3 galvanized hinges; 1.5 mm galvanized steel frame, white powder coated; EPDM gasket; watertightness III, air-tightness III, wind load III, Rw ≥25 dB; foam-filled and sealant-sealed frame gaps.

9.2 Double Sliding Windows (Hailuo)

UPVC sliding windows 1200×1200 mm ×3 (2 front + 1 side), with screens; 80-series profiles ≥2.0 mm wall with steel reinforcement (GB/T 28887-2012, Vicat ≥75 °C); 5 mm tempered glass; nylon double rollers (≥60 kg/sash, ≥30,000 cycles), crescent locks, silicone brush seals; wind load 3 (2.5 kPa), watertight 3, air-tightness 4 (q1 ≤1.0 m³/(m·h)), Rw ≥28 dB, K ≤3.0 W/(m²·K) (GB/T 7106-2019); total glazing ≈4.32 m², operable ≈2.16 m².

9.3 Partition Inner Door (KITOZER-M800)

Color steel simple swing door, opening 800×2000 mm; 50 mm leaf, milk-white; 2 hinges, ball handle lock with key; no window for privacy.

9.4 Sealing Kit

EPDM gaskets (Shore A 60±5, tensile ≥10 MPa, elongation ≥300%, compression set ≤20%, life ≥10 years, per GB/T 10712-2009) + neutral silicone sealant (movement ±20%); multi-seal design for water/air/sound integrity; door/window hardware durability: rollers ≥30,000 cycles, hinges ≥50,000, locks ≥20,000.

10. Electrical System

10.1 System Overview

220V/50 Hz mains supply covering power distribution, lighting, sockets and network weak-current modules; designed strictly per civil building electrical codes with overload, leakage and short-circuit protection; separated power/weak-current wiring.

10.2 Entry Distribution Box (CHINT)

6-circuit surface-mounted, IP30, per GB 7251.3-2006: 2P 32A RCD main (30 mA, ≤0.1 s) + 1P 10A lighting MCB + 1P 16A RCD socket MCB + 1P 20A AC MCB + 1–2 spare circuits (GB 10963.1-2020; 6 kA breaking; electrical life ≥10,000 cycles); mounted 1.5 m high; box grounding ≤4 Ω.

10.3 LED Ceiling Lights (NVC)

24 W cool white (6500K), ≥2160 lm, ≥90 lm/W, Ra≥80, PF ≥0.9, constant-current flicker-free; life ≥30,000 h (3000 h decay ≤3%); per GB 7000.1-2015; 4 units (2 per zone) on zoned switches; average illumination ≥300 lx.

10.4 Sockets (Bull)

10A 5-hole 86-type: one-piece tin-phosphor bronze, ≥10,000 cycles, PC V0 flame-retardant panel, child shutters, per GB 2099.1-2021; 8 units at 0.3 m. 16A AC sockets: thickened bronze, 4 mm² dedicated circuit with 20A MCB; 2 units at 2.2 m.

10.5 Switches (Bull)

86-type rocker, silver alloy contacts, ≥40,000 cycles, per GB 16915.1-2014; 3 units (double-control at entry for office zone; single at rest zone door), 1.3 m height.

10.6 Network Sockets (Nuoton)

Cat5e UTP modules, 100 Mbps, gold-plated pins, IDC termination per T568B; per TIA/EIA 568-C.2 and YD/T 926.1-2009; 4 units at 0.3 m, ≥30 cm from power sockets.

10.7 Full Wiring Kit (Zhujiang Cable)

– Power: BV 2.5 mm² (lighting/sockets, ≈25 A), BV 4 mm² (AC circuit, ≈32 A), ZR-BV flame-retardant PVC insulation per GB/T 5023-2008; ≈80 m.

– Weak current: Cat5e UTP 8-core 0.5 mm, ≈60 m.

– Conduit: flame-retardant PVC φ20 mm ≥1.2 mm wall; 86-type boxes; power/weak current separated ≥30 cm; no joints inside conduit.

10.8 Outdoor Waterproof Inlet Box (CHINT)

IP65 ABS box with waterproof glands; exterior wall near the distribution box; protects the mains entry joint.

10.9 Safety Protection Design

Leakage protection (30 mA RCDs at main and socket circuits, ≤0.1 s), overload protection (per-circuit MCBs), short-circuit instantaneous trip, grounding protection (all socket PE terminals, TN-C-S system with repeating ground, ≤4 Ω), flame-retardant materials throughout, child-proof socket shutters.

10.10 Load Calculation and Cable Verification

Loads: lighting 4×24 W = 96 W; AC ≈1100 W cooling / 1500 W heating; office equipment ≈1000 W; other ≈500 W; total design load 5 kW; inlet current ≈22.7 A → 32 A main MCB; 2.5 mm² lighting/socket circuits and 4 mm² AC circuit verified with ample margin.

10.11 Grounding and Lightning

TN-C-S system with repeating ground at entry (≤4 Ω); grounding busbar in the box; SPD mounting position reserved; steel frame acts as lightning down-conductor to the foundation; equipotential bonding of metal frames and plumbing.

11. Plumbing System

11.1 System Overview

PPR supply and PVC-U drainage with pedestal washbasin, main inlet valve and odor-trap floor drain — simple, practical, leak-proof, block-proof and odor-proof.

11.2 Supply Pipes (Liansu PPR)

φ20 mm, S5 series, 1.25 MPa, 2.0 mm wall (GB/T 18742.2-2017); Vicat ≥131.5 °C; potable per GB/T 17219-1998; heat-fusion joints; λ = 0.24 W/(m·K); life ≥50 years; 15 m concealed.

11.3 Drain Pipes (Liansu PVC-U)

φ50 mm, ≥2.0 mm wall, ring stiffness ≥4 kN/m², Vicat ≥79 °C, per GB/T 5836.1-2018; solvent-welded; 10 m with full fittings; standard slope; life ≥30 years.

11.4 Pedestal Washbasin (Keling)

Ceramic, water absorption ≤0.5% (GB 6952-2015), ≈500×400 mm, 800 mm pedestal; full-copper chrome-plated tap with ceramic cartridge (≥500,000 cycles) and aerator; stainless pop-up drain with overflow.

11.5 Main Inlet Valve (Emico)

Brass globe valve DN15, PN1.6 MPa, per GB/T 13927-2008; at the inlet, ≈30 cm height.

11.6 Odor Trap Floor Drain (Submarine)

304 stainless panel 100×100 mm, water seal ≥50 mm, drainage ≥1.0 L/s, filter grid; per CJ/T 186-2018; installed at the lowest point with 1% slope.

11.7 Hydraulic Verification

Supply: design flow ≈0.1 L/s, φ20 mm at ≈0.4 m/s economic velocity; inlet pressure ≥0.1 MPa sufficient; tap flow ≈6 L/min. Drainage: total ≈0.5 L/s vs φ50 mm capacity ≥2 L/s; P-trap + floor drain double water seal.

11.8 Freeze and Leak Prevention

Indoor routing avoids freezing; drain pipes when idle in winter; outdoor inlet insulated; all joints pressure-tested at 0.8 MPa (30 min, drop ≤0.05 MPa); waterproofing reinforced around floor drain and risers.

12. HVAC and Ventilation System

12.1 Wall-Mounted AC (Xiaomi/Midea optional)

1.5 HP inverter heat/cool; cooling 3500 W, heating 4500 W (with auxiliary); APF ≥3.8 (new tier-3); R32; airflow 650 m³/h; coverage 16–23 m²; indoor noise ≤24 dB(A) low / ≤41 dB(A) high, outdoor ≤52 dB(A); 16A plug on dedicated circuit; self-cleaning, dehumidify, sleep modes; per GB/T 7725-2022; holds 18–28 °C from −5 °C to 40 °C ambient.

12.2 Louvre Exhaust Fans (Jinling)

10-inch wall type ×2 (one per zone, independent switches); 220V/50 Hz, 35 W, ≥200 m³/h each (400 m³/h total), 1200 rpm, ≤40 dB(A); ABS housing with self-closing louvres; life ≥30,000 h; per GB/T 14806-2017.

12.3 Comfort and Ventilation Verification

Summer: 35 °C outdoor / 26 °C set — cooling load ≈1500 W vs 3500 W capacity; winter: 0 °C / 20 °C — heat load ≈1200 W vs 4500 W capacity; temperature uniformity ≤2 °C; humidity 40–60% with dehumidify. Ventilation: room volume ≈56.7 m³; required ≈170 m³/h (3 ACH) vs 400 m³/h provided (≈7 ACH, full air change in ≈8 min); natural ventilation with 3 windows (≈2.16 m² operable) reaches ≥5 ACH at 1.5 m/s breeze. Energy: enclosure cuts heat transfer to ≈40% of ordinary panel houses (AC runtime −35%); inverter AC −30% vs fixed-speed; zoned use + natural ventilation → ≥40% annual energy reduction vs traditional temporary buildings.

12.4 Noise Control

Indoor background ≤45 dB(A) office / ≤35 dB(A) night low-fan; outdoor unit ≤52 dB(A) with anti-vibration mounts, positioned away from windows; gaskets and sandwich panels complete the acoustic envelope.

13. Transport, Installation and Foundation

13.1 Sealing and Fixing Materials

Neutral silicone weatherproof sealant (movement ±25%, tensile ≥1.0 MPa, elongation ≥400%); polyurethane foam (30–40× expansion, ≥70% closed cell, B2); galvanized self-drilling screws ST5.5×25/ST6.3×50 with EPDM washers (salt spray ≥500 h); M10×100 expansion bolts (pull-out ≥10 kN); butyl waterproof tape (elongation ≥800%, −40 °C ~ 90 °C).

13.2 Installation Standards

Process: foundation check → base frame leveling → corner columns → top frame → wall studs → roof purlins → roof panels → wall panels → doors/windows → ceiling → floor → MEP → furniture/HVAC → cleaning → acceptance. Accuracy: frame ±5 mm (diagonal ±8 mm); column verticality ≤1/1000 (≤3 mm); levelness ≤3 mm; wall flatness ≤2 mm/2 m; joints ≤1 mm; 24-hour roof water test.

13.3 Transport

Packed volume ≈18 m³, weight ≈2.5 t — 4.2 m flatbed/panel truck, no oversize permits; steel strapped with end protectors; panels on timber pallets with film and foam; doors/windows/furniture boxed with corner guards; hardware boxed with manifest; dual strapping in transit; arrival joint inspection with damage claims on the spot.

13.4 Foundation

Standard 3m×7m station: 3.4×7.4 m slab (200 mm overhang each side); compacted subgrade (≥0.93); 100 mm C20 concrete with φ6@200 double mesh; surface troweled, flatness ≤3 mm/2 m; 5% drainage slope (300 mm wide) around; finished level ≥100 mm above natural ground; φ50 MEP sleeves pre-embedded.

13.5 Bearing Verification

Total vertical load ≈89.74 kN (self-weight 37.24 + floor live 42 + roof/snow 10.5); base area 25.16 m² → mean bearing pressure ≈3.57 kPa vs ≥80 kPa typical subgrade capacity — safety margin >20×; no settlement or tilt risk.

13.6 Acceptance

Three-level acceptance (crew self-check → project re-check → customer final); hidden works (steel nodes, MEP conduits, waterproofing) accepted before covering; itemized acceptance per discipline (structure, enclosure, doors/windows, MEP); final overall inspection, full function test, document handover and acceptance signing.

14. Core Advantages

1. Integrated prefabrication. Over 95% of processes completed in-factory with CNC equipment and standardized lines — millimeter-level accuracy, stable quality regardless of weather or site labor; factory pre-assembly checks and multi-stage QC make each module a finished product.

2. Reliable structure. Fully galvanized steel frame with complete mechanical verification; vertical, wind and seismic performance per national codes with ample margin; 15+ years outdoor corrosion life; bolted nodes with clear load paths; adapts to mountains, riverbanks and construction sites without settlement or collapse risk.

3. Rapid deployment. Standard products delivered in as few as 10 days from order; 3 days on-site installation — 3× faster than traditional 30–45 day temporary buildings; ideal for emergency duty, rush projects and temporary offices.

4. Full environmental adaptability. Normal use from −10 °C to 45 °C; multi-layer waterproofing resists heavy rain; safe at level-10 winds; corrosion/mold resistance in humid coastal and salt-spray areas; upgrades available per region.

5. Energy saving. 50 mm insulated sandwich panels + roof reinforcement cut heat transfer to ~40% of ordinary panel houses; with inverter AC, annual HVAC energy −40%+; LED lighting and natural ventilation further reduce operating cost.

6. All-in-one function. Not just a shell — structure, enclosure, finishing, MEP, furniture and HVAC delivered complete; connect mains and water to use; office, living and washing ready — true move-in readiness.

7. Controllable lifecycle cost. Transparent pricing including materials, installation and warranty with no hidden items; low failure rate; universal wear parts; relocatable with high residual value — over a 3-year cycle, comprehensive cost ≈60% of traditional temporary buildings.

8. Relocatable and reusable. Modular bolted design supports full disassembly and re-assembly with material loss <5%; integral lifting relocation or knockdown transport; supports functional upgrades and layout changes — green, circular and low-carbon.

15. Technical Q&A

Q1. What is the usable area and capacity of the 3m×7m station?

A: ≈21 m² usable. Standard: office zone 2–3 persons; rest zone double bunk bed for 2 plus a folding bed for a third — 2–3 persons’ office + living combined.

Q2. What is the design service life?

A: Main steel structure 15+ years; color steel enclosure 10+ years; doors/windows and MEP 5–8 years; regular maintenance extends life.

Q3. Can size and appearance be customized?

A: Yes — length/width, color scheme and logo; interior layout can add a private bathroom, meeting room or storage zone.

Q4. What wind level can it resist? Can it be used in typhoon areas?

A: Standard resists level-10 winds (0.55 kN/m²). Coastal typhoon areas can add anchors, denser studs and thicker panels — up to level-12 with verification per local wind pressure parameters.

Q5. Seismic performance?

A: Lightweight steel with good ductility; meets intensity-7 seismic requirements; no damage in frequent earthquakes, no collapse in rare earthquakes.

Q6. What foundation treatment is needed? Is concrete required?

A: A 100 mm concrete slab is recommended (best flatness/durability). For short-term use, placement on hardened cement or asphalt ground is acceptable; plain earth requires compaction, leveling and ground beams to avoid uneven settlement.

Q7. Will it leak in rain? What is the waterproof warranty?

A: No — triple waterproofing (tongue-and-groove + weatherproof sealant + gutter drainage). Waterproofing workmanship warranted 1 year with free on-site repair for leakage during warranty.

Q8. Is it hot in summer / cold in winter?

A: Insulated cores far outperform single-layer panel houses; with AC, ≈26 °C in summer and ≥20 °C in winter — no “cold in winter, hot in summer” problem.

Q9. Are the sandwich panels fireproof?

A: Standard EPS is B1 (difficult to ignite), meeting general temporary building requirements; Class A rock-wool upgrade available for higher requirements.

Q10. What is the total electrical load and inlet cable?

A: Design total 5 kW, 220V; 4 mm² copper inlet cable suffices; standard household/commercial mains works.

Q11. Are there network points? Can CCTV be added?

A: Standard 4× Cat5e points (2 per zone); CCTV, AP and other weak-current devices can be added on request.

Q12. How is drainage handled?

A: Washbasin and floor drainage exit via φ50 mm pipe to municipal sewers or temporary collection tanks; roof rainwater discharges via downpipes, optionally to storm mains.

Q13. What is the delivery and installation period?

A: Standard stock: dispatch within 7 days of order, transport 1–3 days, installation 3 days — total 10–15 days; custom orders generally ≤25 days.

Q14. Are transport and installation included? Can remote areas be served?

A: Options with or without transport/installation; nationwide on-site service; remote areas quoted per distance.

Q15. Can invoices be issued?

A: Yes — ordinary and VAT special invoices per current national tax rates.

Q16. What is the warranty and its scope?

A: Main steel structure 2 years; enclosure, doors/windows, MEP and furniture 1 year; AC per manufacturer national warranty (whole unit 3 years, compressor 5 years). Non-human quality faults repaired/replaced free.

Q17. What happens after warranty?

A: Lifetime cost-price maintenance (parts + basic labor), year-round spare supply, and an optional annual inspection visit.

Q18. Can you dismantle and reinstall for relocation?

A: Yes — professional disassembly, transport and re-installation services preserving performance and appearance.

16. Construction Schedule

16.1 Overall Schedule

Standard total: 15 calendar days from order confirmation to acceptance — factory prefabrication, transport, site installation. With an existing hardened foundation, delivery can compress to 10 days.

16.2 Phase Details

Phase Days Main Activities Deliverable
1. Factory prefabrication Day 1–7 Day 1 order review & materials; Day 2–3 steel cutting/punching/forming; Day 4 hot-dip galvanizing & verification; Day 5 panel cutting, bend parts, accessories; Day 6 factory pre-assembly, packing, QC; Day 7 loading, documents Production orders, galvanized members, packed products, shipping docs/certificates
2. Transport Day 8–9 Full-truck transport with tracking; arrival unloading and customer material inspection Material arrival acceptance
3. Site installation Day 10–15 Day 10 site clearing, foundation re-check, base frame leveling & anchoring; Day 11 columns, top frame, studs (hidden acceptance); Day 12 purlins, roof panels, parapet, wall panels, waist band (enclosure acceptance); Day 13 doors/windows, partition, ceiling, floor base & PVC flooring (finishing acceptance); Day 14 power wiring, distribution box, sockets/lights, plumbing, sanitary ware, AC, exhaust fans (MEP acceptance, trial run); Day 15 cleaning, full commissioning, self-check, customer acceptance Acceptance record

16.3 Key Node Control

Dispatch (end of day 7, early-warning 2 days ahead); main structure completion (end of day 11, critical path); MEP completion (end of day 14); acceptance (end of day 15).

16.4 Schedule Assurance

50% safety stock of standard products; dedicated experienced installation teams with backup crews; full tooling; daily morning/evening meetings with same-day problem resolution; parallel/cross operations (enclosure starts during late structure work, MEP during late enclosure).

16.5 Delay Contingency

Bad weather → prioritize indoor finishing and MEP prefabrication; transport delay → backup logistics channels and local stock replenishment; personnel emergencies → backup crews; customer changes → minor changes absorbed, major changes documented and agreed.

17. Construction Organization, Quality and Safety

17.1 Organization

Project manager (1): overall schedule/quality/safety/cost and customer liaison; technical lead (1): disclosure, workmanship guidance, QC, problem resolution; steel crew (3): frame, studs, enclosure; MEP technician (1): electrical, plumbing, HVAC installation and commissioning; safety/QC officer (1); logistics coordinator (1).

17.2 Preparation

Drawing review and written technical + safety disclosure (signed); material arrival check against manifest; tooling and PPE ready; site cleared, foundation dimensions/level verified, temporary power/water connected, warning signs and storage zones set.

17.3 Key Processes

– Steel: layout lines → main beams leveled with shims → corner columns bolted with verticality check → top frame installed, levelness/diagonals corrected → secondary beams and purlins at design spacing → wall studs → overall verification → cold-spray zinc repair at cut/drilled points.

– Enclosure: roof panels laid width-wise, tongue-and-groove; self-drilling screws with washers at design spacing; parapet with 45° miter sealant; gutter/downpipes at 0.5% slope; sealant at all joints/screw heads/corners; 24 h water test. Walls: vertical laying from corners, waist band after lower panels, openings cut and reinforced, partition with door opening, edge strips with blind rivets, all gaps sealed.

– Doors/windows: frame positioning with temporary wedges, plumb/level correction, expansion bolt fixing, foam filling trimmed, outer weatherproof + inner decorative sealant, hardware and screens installed, water-spray test.

– Finishing: fiber cement base boards screw-fixed with filled joints; PVC flooring full-adhesive with hot-welded seams; sandwich ceiling panels aligned with precise light openings; PVC corner trims.

– Electrical: layout marking; conduits concealed with power/weak current separated ≥30 cm; color-coded BV wires (red live/blue neutral/yellow-green PE), no joints in conduit; distribution box per diagram with clear labels; sockets/switches/lights wired firmly with correct phase; full power-on tests including RCD action, insulation and grounding resistance; inlet box waterproofed.

– Plumbing: PPR heat-fusion, level and firmly clipped; inlet valve at accessible position; washbasin with P-trap; PVC drain solvent-welded at standard slope to outdoor point; floor drain slightly below floor; 0.8 MPa pressure test (30 min, drop ≤0.05 MPa); flow-through test.

– HVAC: indoor unit level (≤1°), outdoor unit on anti-vibration bracket, copper pipes evacuated and charged, insulation complete, condensate drained; exhaust fans wall-mounted with sealed edges and free louvres; trial run of all modes.

17.4 Quality System

Four-level inspection (crew self → inter-process → QC officer → project manager final); incoming materials require certificates; QC hold points at key processes with dedicated supervision; hidden works accepted by the customer before covering; finished panels/doors/floors protected; targeted prevention of common defects (leakage, electric leakage, noise).

17.5 Safety and Civilized Construction

All personnel trained and assessed; hard hats and harnesses; three-level two-protection temporary power with certified electricians; guards on tools; fire extinguishers on site, no open flames, flammables away from ignition; weekly safety inspection. Civilized: materials stacked and labeled; waste cleared daily; no night noise; uniforms and site rules observed; warning signs around the work area.

17.6 Emergency Response

Electric shock: cut power, move casualty to fresh air, CPR if needed, call 120, never pull a casualty by hand. Fall: stop work, assess, protect the scene, call 120, bandage bleeding. Machinery injury: stop machine, treat wound, hospital for deep wounds/fractures. Fire: cut power, use extinguishers; if uncontrollable, evacuate and call 119. First-aid kit, extinguishers, emergency lighting and vehicle contacts prepared on site.

18. After-Sales Service

18.1 Warranty Commitment

Free repair, part replacement and on-site service for non-human quality problems under normal use, per national regulations and product standards.

18.2 Warranty Scope and Period

System Period Scope
Main steel structure 2 years Structural deformation, abnormal zinc corrosion, loose/detached nodes (non-human)
Enclosure system 1 year Panel delamination, abnormal sealant cracking, trim detachment, non-human roof/wall leakage
Doors and windows 1 year Hardware damage, gasket detachment, glass self-breakage (non-external force), opening faults
Interior finishing 1 year Floor lifting/debonding, ceiling deformation, trim detachment (non-human)
Electrical system 1 year Distribution box faults, switch/socket failure, wiring faults (non-human)
Plumbing system 1 year Pipe leakage, valve faults, sanitary ware hardware (non-human)
Furniture system 1 year Structure loosening, panel deformation, hardware damage (non-human)
HVAC Manufacturer warranty Wall AC: whole unit 3 years, compressor 5 years, national on-site warranty

Exclusions: misuse, unauthorized modification/disassembly, force majeure, maintenance neglect, normal wear of consumables (bulbs, filters, gaskets), faults from non-company repairs.

18.3 Fault Response

7×24 hotline; initial solution within 1 hour; on-site within 24 h (Pearl River Delta), 48 h (province), negotiated outside the province; common parts replaced within 48 h, special parts within 7 days; telephone follow-up within 3 working days after each repair.

18.4 Routine Maintenance Guide

Structure: check bolts every 6 months, zinc coating yearly with touch-up paint; enclosure: clean panels with neutral cleaner, check sealant before rainy season, clear gutters/downpipes; doors/windows: clean tracks, lubricate hinges/rollers, care for gaskets; electrical: monthly RCD test, no overloading, repair loose/hot sockets; plumbing: drain pipes when idle in winter, clean floor-drain filters, replace tap cartridges; AC: clean filters, keep outdoor unit ventilated.

18.5 Lifetime Maintenance and Upgrades

Annual proactive visit with maintenance advice; repairs at parts cost + basic labor only; upgrade services (fire panels, extra AC, layout changes, weak-current additions); professional disassembly/relocation service.

18.6 Spare Parts

Full stock of wear and core parts (sealant, switches, sockets, lamps, locks, hardware); original specification, perfectly matched; compatible replacements for discontinued models; next-day delivery within the PRD, 2 days in-province.

19. Training Plan

19.1 Objectives and Audience

Enable the customer’s project, property and daily maintenance personnel (recommended 2–3) to master product structure, correct use, routine maintenance, fault finding and emergency handling.

19.2 Theory Content

Product introduction (structure, systems, parameters); structural safety (no overloading, no unauthorized modification); enclosure knowledge (panel properties, waterproofing principle, sealant role, avoid impacts); electrical knowledge (circuit layout, RCD principle, safe use, no overloading/unauthorized wiring); plumbing (routing, valve positions, freeze/leak prevention); HVAC (correct AC use, energy tips, fault codes); common fault diagnosis (tripping, leakage, stuck doors/windows, AC not cooling); safety and emergency procedures.

19.3 Hands-On Content

Distribution box operation and RCD test/reset; switch/socket and lamp replacement; door/window adjustment and gasket replacement; inlet valve, floor drain clearing and simple tap repair; AC mode operation and filter cleaning; simulated common fault handling; maintenance practice (sealant check, bolt tightening, gutter clearing).

19.4 Method and Schedule

On-site training at acceptance (≈2 hours, theory + practice); remote refresher training by video/phone/manual for personnel changes; paper “Product Usage and Maintenance Manual” provided; one free annual refresher.

19.5 Assessment

Theory: 5–10 random questions, ≥80% pass; practical: 2–3 maintenance/fault tasks performed correctly; both passed → training confirmation; free retraining until passed.

19.6 Ongoing Support

Technical consultation answered within 15 minutes during working hours, 1 hour for urgent off-hours issues; detailed drawings, parameter tables and repair manuals on request; professional guidance for upgrades.

20. Anonymous Typical Project Scenarios

*All scenarios below are anonymous, generalized examples for reference. They do not refer to any real customer, project address or testimonial.*

Scenario A — National-level industrial park gate duty station.

An industrial park replaced simple security booths with 3m×7m integrated stations at its entrance gate for 24-hour security duty and rest. Outcome: neat, standardized appearance raised the park’s gateway image; good insulation and soundproofing improved duty conditions; after more than a year of rain and heat — no leakage, no faults; the park subsequently reordered the same model for other gates.

Scenario B — Key infrastructure construction site temporary office and lodging.

A time-critical infrastructure project needed project management office and duty lodging urgently; traditional panel houses could not meet the schedule. Four 3m×7m stations served as project manager office, technical office, dormitory and material duty room, delivered in 12 days from order. Outcome: markedly better insulation and comfort than ordinary panel houses; fast deployment kept the project on schedule; after completion the four units were relocated to the next site, greatly reducing second temporary-building cost.

Scenario C — 4A scenic area visitor service station.

A scenic area needed a hilltop visitor rest and staff duty point where traditional construction was infeasible. Modular stations were transported in sections and assembled on site. Outcome: solved the missing hilltop service facilities, improved visitor experience; stable and warm indoors despite strong cold hilltop winds; solved remote-post lodging for staff.

Scenario D — Municipal road maintenance duty station.

A municipal road maintenance department set up three duty points along a maintenance route for 24-hour team duty, tool storage and emergency lodging. Outcome: emergency response time cut by 40%; complete indoor functions improved duty conditions; units can be crane-relocated along the route as needs change.

Scenario E — Mountain power base station O&M duty point.

A power base station in a remote mountain area required on-site O&M lodging with difficult site conditions. A 3m×7m station with upgraded moisture protection and reinforced anchoring was installed on leveled ground. Outcome: solved staff accommodation at the remote station and improved O&M capability; no dampness or mold indoors in the humid mountain environment; stable and secure even during unattended periods.

21. SEO Optimization

21.1 Keyword Classification

– Core keywords: 3m×7m integrated residential-office station, integrated building, modular integrated station, outdoor office-living unit.

– Long-tail keywords: construction site temporary office-lodging unit, industrial park gate duty station, scenic area visitor service station, municipal road maintenance duty point, base station O&M duty room, movable integrated office-dormitory, container-style office-living unit.

– Industry keywords: modular integrated building, temporary integrated housing, outdoor integrated station, integrated office building, integrated lodging building, upgraded mobile panel house, insulated integrated building.

– Brand keywords: KITOZER integrated station, Guangzhou Lain integrated building.

– Related/search keywords: integrated station price per unit, integrated office manufacturer, where to buy outdoor integrated housing, modular station installation period, integrated building waterproofing, integrated building wind rating.

21.2 SEO Tags

– SEO Title: 3m×7m Integrated Residential-Office Station — Outdoor Office + Living, Factory Direct | Lain

– Meta Keywords: integrated residential-office station, 3m×7m integrated building, outdoor office-living unit, modular integrated station, construction site integrated building, park gate duty station

– Meta Description: Guangzhou Lain manufactures 3m×7m integrated residential-office stations — factory prefabricated, rapid on-site assembly, combining office, living and washing; insulated, waterproof and wind-resistant; for construction sites, parks, scenic areas and municipal use; factory direct, customizable.

– H1: 3m×7m Integrated Residential-Office Station Technical Design Solution

– H2 structure: Product Parameters | Core Advantages | Configuration and Budget | Construction and Installation | After-Sales Service | Project Scenarios

21.3 Internal Link Anchor Suggestions

– Core anchors: integrated residential-office station.

– Long-tail anchors: outdoor office-living integrated building, construction site temporary office-living station.

– Related anchors: modular integrated building, integrated building manufacturer, hot-dip galvanized steel integrated building.

*Note: keywords are placed naturally; no keyword stuffing.*

22. Official Contact Information

– Company: Guangzhou Lain Intelligent System Development Co., Ltd.

– Website: https://gdlain.com

– Phone: +86 139 2228 9957 / +86 185 2066 8845

– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, Guangdong, China

Shopping Cart