KITOZER
KITOZER

51-Point Network Host, Telephone and TV System

Table of Contents

Technical Design Solution

1. Cover / Document Information

– Document Title: 51-Point Network Host, Telephone and TV System Technical Design Solution

– Designed by: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand Support: KITOZER (Pioneer)

– Version: V1.0

– Date: August 2026

2. Table of Contents Structure

1. Company Introduction

2. Project Overview

3. User Requirement Analysis

4. System Overall Design Description

5. System Equipment Quotation and Configuration List

6. Detailed Technical Parameters of Each System

7. Core Advantages of the Solution

8. Common Technical Q&A

9. Construction Schedule Plan

10. Construction Organization Plan

11. After-Sales Service System

12. Operation and Maintenance Training Plan

13. Similar Project Cases

14. SEO Optimization System

15. Contact Information

3. Company Introduction

Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise focusing on computer room construction, shielding engineering, low-voltage (weak current) system integration and intelligent cabinet R&D and production. With more than 20 years of industry experience, the company has built a full-chain service capability from solution design, product R&D to engineering implementation and after-sales O&M. Its own core brand KITOZER (Pioneer) has been widely used in government, finance, education, medical care, communications, industrial manufacturing and many other fields, gaining recognition and praise from numerous customers.

The company’s business covers micro-module cold aisle cabinets, integrated data cabinets, outdoor rainproof cabinets, shielded cabinets, shielded desks, consoles and other full-category computer room supporting products. It also provides integrated solutions such as shielded computer room construction, IDC data center construction, low-voltage generic cabling and environmental monitoring systems. With its own production base and professional R&D design team, the company can provide flexible customization services according to the customer’s on-site environment, business needs and budget range, and free output of multiple differentiated design solutions to highly match actual project needs.

In quality control, the company has established a complete quality management system. All products implement strict industry standards and enterprise internal control standards. Process links have clear operation specifications and inspection procedures, and third-party testing institutions are introduced for regular sampling to ensure stable and reliable product performance. In after-sales service, the company has built a 7×24-hour technical service system, equipped with dedicated customer service and senior engineer teams, responding quickly to customer consultation and fault repair needs, implementing a project service model with dedicated personnel follow-up, and providing full-lifecycle technical support.

Relying on more than 20 years of industry accumulation and technical heritage, Guangzhou Lain Intelligent always adheres to the product concept of “efficient, green, innovative, safe and convenient”, committed to creating high-reliability, high-cost-performance intelligent infrastructure solutions for customers and helping digital upgrading and informatization construction in all industries.

4. Project Background and Objectives

Guangzhou Lain 51-Point Network Host, Telephone and TV System overall render

4.1 Project Background

This project is the low-voltage comprehensive system construction of a three-story building, covering three core low-voltage subsystems: computer network, telephone voice and cable TV. The project is designed according to the standard architecture of the “Telephone, Network and TV System Diagram”, adopting a three-level star topology of “inlet core layer – floor distribution layer – terminal access layer”. Through vertical trunk cable trays and horizontal cabling systems, the low-voltage signal coverage of the whole building is realized, meeting the basic informatization needs of daily office communication, network access and TV reception.

The project plans a total of 51 terminal points, configures 1 core network host as the data forwarding core of the whole network, sets an independent low-voltage room and integrated wiring box on each floor, uses RC50 hot-dip galvanized steel pipes buried underground for outdoor inlet cables, configures surge protective devices (SPD) at the inlet end to meet lightning protection standards, and the whole system follows relevant national design specifications and construction standards, balancing practicality, reliability and scalability.

4.2 Construction Scope

The construction of this project covers all areas from floor 1 to floor 3 of the building, specifically including:

– Inlet system: outdoor buried steel pipe laying, inlet lightning surge protection, installation of the floor-1 main integrated equipment box and deployment of core equipment;

– Vertical trunk system: installation of low-voltage metal cable trays, laying of vertical trunk cables of the three systems;

– Floor distribution system: installation of comprehensive wiring boxes in low-voltage rooms on each floor, deployment of floor distribution equipment, cable termination;

– Horizontal terminal system: concealed laying of terminal point conduit pipes, horizontal cable laying, terminal panel installation;

– System commissioning and acceptance: full-system link testing, function commissioning, completion acceptance and delivery training.

4.3 Construction Objectives

– Functional objectives: realize stable access of 51 terminal points; network points support gigabit to desktop; telephone points have clear voice without noise; TV points support HD digital signal transmission;

– Performance objectives: full-link transmission performance meets the corresponding grade standards, no bottlenecks, no obvious attenuation, core equipment supports 7×24-hour uninterrupted operation;

– Reliability objectives: select national-standard high-quality materials and mature equipment, equipped with complete lightning protection grounding and physical protection, adapting to complex indoor and outdoor environments;

– Scalability objectives: cable tray capacity, equipment ports and trunk links all reserve sufficient redundancy, supporting subsequent point addition and system upgrades;

– Standardization objectives: design, construction and acceptance strictly follow national specifications, with neat cabling and clear labels, convenient for later O&M management.

4.4 Design Basis

This solution strictly follows the following national specifications, industry standards and project drawing requirements:

– GB 50311-2016 “Code for Engineering Design of Generic Cabling System”

– GB 50312-2016 “Code for Engineering Acceptance of Generic Cabling System”

– GB/T 50200-2018 “Standard for Engineering Design of Cable Television Network”

– GB 50343-2012 “Technical Code for Protection of Building Electronic Information System Against Lightning”

– GB 50054-2011 “Code for Design of Low Voltage Electrical Installations”

– GB 51348-2019 “Standard for Electrical Design of Civil Buildings”

– GB 51158-2015 “Code for Engineering Design of Communication Line Engineering”

– The “Telephone, Network and TV System Diagram” construction drawings provided by the project

– Guangzhou Lain Intelligent enterprise construction and product internal control standards

5. User Requirement Analysis

5.1 Point Scale Requirements

The project has a total of 51 terminal points, evenly distributed by system type and floor:

Floor Network data points Telephone voice points Cable TV points Floor total
Floor 1 8 6 3 17
Floor 2 8 6 3 17
Floor 3 8 6 3 17
Total 24 18 9 51

5.2 Core Equipment Requirements

One enterprise-grade core network host (core switch) is configured, deployed in the network separation compartment of the floor-1 main integrated equipment box, undertaking the data aggregation and forwarding function of 24 network points in the whole network. It is required to have stable forwarding performance, complete Layer-2 management functions, and support port mirroring, VLAN division, storm suppression and other functions, meeting the management and security needs of the office network.

5.3 System Architecture Requirements

According to the drawing requirements, the system adopts a layered star topology and a three-compartment box structure:

– Three-level topology: floor-1 inlet core layer → floor-2/3 distribution layer → terminal access layer of each room, with clear levels, convenient for management and fault troubleshooting;

– Three-compartment box: the main equipment box and floor wiring boxes all set three independent separation compartments for TV, telephone and network inside, realizing physical isolation to avoid signal interference between different systems;

– Shared cable tray: cables of the three systems share the 200×100 low-voltage metal cable tray, with zoned binding and spacing maintained inside the tray, balancing cabling economy and management convenience.

5.4 Cabling and Conduit Requirements

– Trunk cable tray: both vertical trunk and horizontal branch use 200mm×100mm galvanized metal cable trays with good mechanical strength and electromagnetic shielding performance;

– Outdoor inlet: 1 pipe for the TV system and 3 pipes for the telephone/network systems, a total of 4 RC50 hot-dip galvanized steel pipes, buried 0.8m outdoors, with waterproof sealing treatment;

– Horizontal branch pipes: JDG20 galvanized conduit pipes concealed from the cable tray to terminal points, protecting cables from external force damage, complying with building decoration specifications.

5.5 Lightning Protection Safety Requirements

Surge protective devices (SPD) with corresponding interfaces are built into the inlet ends of the three systems respectively, meeting the Class D lightning protection standard, effectively suppressing lightning-induced overvoltage and surge current, protecting the safety of back-end equipment, and the grounding resistance meets specification requirements.

5.6 Equipment Box Requirements

– Floor-1 main integrated equipment box: recommended size 400mm×600mm×150mm, wall-mounted, 1.5m above ground;

– Floor-2/3 floor wiring boxes: recommended size 260mm×300mm×100mm, wall-mounted, 0.5m above ground;

– All boxes are made of cold-rolled steel plate with electrostatic powder coating, equipped with locks and grounding terminals.

5.7 O&M Management Requirements

The system needs a complete labeling system. Both ends of cables, equipment ports and panels are marked with unique numbers, and link documentation is complete. The system architecture is simple and clear, and O&M personnel can complete daily inspection and basic fault handling after simple training.

6. Design Principles and Applicable Standards

6.1 Design Principles

#### 6.1.1 Balance of Advancement and Maturity

Adopt current industry mainstream and mature technical solutions. The network system adopts Category 6 unshielded cabling standard, supporting gigabit transmission and compatible with 10-gigabit upgrades; core equipment uses enterprise-grade commercial switches with complete functions and stable operation, avoiding the risk of immature new technologies.

#### 6.1.2 Reliability and Stability First

All links use national-standard high-quality cables and connectors, and key equipment uses high-reliability models; cabling links are designed with redundancy, and the lightning protection grounding system is complete, minimizing system failure probability and ensuring long-term stable operation.

#### 6.1.3 Standardization and Compatibility

All product interfaces, performance and dimensions follow national and industry standards, and products of different brands can interoperate; the cabling system uses a universal modular structure, convenient for later maintenance, replacement and expansion.

#### 6.1.4 Economy and Practicality

On the premise of meeting functions and performance, optimize system architecture and product selection to avoid over-configuration; the solution closely fits the actual use needs of the project, with practical functions and simple operation, maximizing investment benefits.

#### 6.1.5 Scalability and Flexibility

The cable tray capacity reserves more than 30% spare space, core equipment reserves spare ports, and trunk links reserve redundant cores; supports future point addition, system upgrades and business adjustments without large-scale modification of the original architecture.

6.2 Applicable Standards

The design, construction and acceptance of this solution follow GB 50311-2016, GB 50312-2016, GB/T 50200-2018, GB 50343-2012, GB 50054-2011, GB 51348-2019, GB 51158-2015 and the project’s “Telephone, Network and TV System Diagram” drawings, as listed in section 4.4.

7. System Architecture and Working Principle

7.1 Overall Topology Architecture

The system adopts a three-level star topology, with the three subsystems sharing conduits and cable trays, physically separated, independently operated and centrally managed.

#### 7.1.1 Inlet Core Layer (Floor-1 Main Equipment Room)

As the hub of the whole low-voltage system, outdoor operator cables are introduced into the floor-1 main integrated equipment box through RC50 buried steel pipes:

– Network system: after the inlet passes through the network SPD for lightning protection, it is connected to the core network host, and connected to the floor-2/3 wiring boxes through vertical Category 6 trunk cables;

– Telephone system: after the inlet passes through the telephone SPD, it is connected to the 110-type main distribution frame, and connected to the terminal blocks of each floor through Category 3 large-pair trunk cables;

– TV system: after the inlet passes through the TV SPD, it is connected to a 1-to-4 main splitter, one port reserved, and the other three ports connected to the floor splitters of each floor through coaxial cables.

#### 7.1.2 Floor Distribution Layer (Floor-2/3 Low-Voltage Rooms)

Each floor’s low-voltage room is set with a three-compartment integrated wiring box, receiving vertical trunk signals and distributing them to all terminal points of the floor:

– Network compartment: after the vertical trunk cable is terminated, it is connected to horizontal cables through jumpers and distributed to the 8 network points of the floor;

– Telephone compartment: the large-pair trunk cable is terminated to the floor 110 terminal block, jumped to horizontal voice cables, and distributed to the 6 telephone points of the floor;

– TV compartment: the trunk coaxial cable is connected to a 1-to-3 floor splitter and distributed to the 3 TV points of the floor.

#### 7.1.3 Terminal Access Layer

86-type terminal panels are set in each room and office area. Horizontal cables are led from the cable tray to the panels through JDG conduit pipes, and after terminating corresponding modules, terminal equipment access is realized.

7.2 Conduit and Cable Tray System Design

#### 7.2.1 Low-Voltage Metal Cable Tray

– Specification: 200mm (W) × 100mm (H) trough-type galvanized metal cable tray;

– Laying path: vertical laying through floors 1-3 in the low-voltage shaft, horizontal laying in the ceiling of each floor corridor;

– Capacity calculation: tray cross-sectional area 20000mm²; at 40% fill rate, usable area is 8000mm²; the total occupied area of the three systems’ vertical + horizontal cables is less than 1000mm², leaving ample expansion space;

– Installation requirements: bracket spacing ≤2m, vertical deviation ≤3mm/m, horizontal deviation ≤2mm/m, cross-bonding grounding at tray connections.

#### 7.2.2 Outdoor Inlet Steel Pipes

– Specification: RC50 hot-dip galvanized welded steel pipe, wall thickness ≥3.5mm;

– Quantity: 4 pipes in total, including 1 for the TV system and 3 for the telephone/network systems;

– Laying requirements: buried 0.8m outdoors, with sleeve protection when crossing roads; both ends of the pipes are waterproof sealed, pipe mouths polished smooth without burrs to avoid scratching cables;

– Grounding requirements: both ends of the steel pipes are reliably connected to equipotential grounding terminals.

#### 7.2.3 Horizontal Conduit Pipes

– Specification: JDG20 set-screw-type galvanized steel conduit, wall thickness ≥1.2mm;

– Laying method: concealed in walls, floors or ceilings, with junction boxes at turns; intermediate boxes added when conduit length exceeds specification;

– Wiring requirements: no more than 2 Category 6 cables or 1 coaxial cable per pipe, and the bending radius meets cable bending requirements.

7.3 Lightning Protection Grounding System Design

#### 7.3.1 Protection Level

According to the “Technical Code for Protection of Building Electronic Information System Against Lightning”, the low-voltage system of this project is designed to Class D protection level, with signal surge protective devices installed at the inlet end, nominal discharge current 5kA, maximum discharge current 10kA.

#### 7.3.2 Configuration Plan

– Network system inlet: 1 RJ45-interface gigabit network SPD;

– Telephone system inlet: 1 RJ11-interface telephone signal SPD;

– TV system inlet: 1 F-interface coaxial signal SPD.

#### 7.3.3 Grounding Requirements

– All SPD grounding terminals use stranded copper wire of not less than 4mm² connected to the building low-voltage equipotential terminal;

– All metal cable trays, steel pipes and equipment boxes are equipotentially bonded, with grounding resistance ≤4Ω;

– Grounding wires are short and straight, avoiding loops, ensuring smooth discharge.

8. Detailed Technical Design

8.1 Network System Design

The network system is the core data subsystem of the whole building. A 24-port gigabit Layer-2 managed switch is deployed in the floor-1 main equipment box as the core network host, aggregating the data of 24 network points in the whole building:

– Horizontal cables of each floor’s network points are terminated on the 24-port Category 6 patch panel in the main equipment box, and connected to the switch through Category 6 jumpers;

– The switch supports VLAN division, port mirroring, storm suppression, link aggregation and other functions, meeting office network management and security needs;

– Category 6 unshielded cabling supports gigabit to desktop, and the link performance fully meets the TIA/EIA 568-C.2 and GB/T 18015 standards.

8.2 Telephone System Design

The telephone system adopts a large-pair trunk + horizontal Category 6 cable architecture:

– The operator telephone inlet is connected to the 100-pair 110-type main distribution frame in the main equipment box through the SPD;

– 25-pair Category 3 indoor large-pair trunk cables are laid vertically from floor 1 to floors 2 and 3, terminated on the 50-pair 110 terminal blocks of each floor’s wiring box;

– Horizontal voice cables are jumped from the terminal blocks to the 6 telephone points of each floor, terminated with RJ11 voice modules;

– Horizontal telephone points use Category 6 network cables, so telephone points can be flexibly converted to network points in the future without re-cabling.

8.3 Cable TV System Design

The TV system adopts a splitter + branch structure:

– The operator TV inlet is connected to the 1-to-4 main splitter in the main equipment box through the SPD; one port reserved, three ports output;

– Three output ports are connected to the 1-to-3 floor splitters of floors 1-3 through SYWV75-5 coaxial cables;

– Each floor splitter distributes to the 3 TV points of the floor, terminated with 86-type single-port TV panels;

– F-type cold-pressed connectors are used at all connection points, and the full-band 5MHz-1000MHz design supports analog, digital and bidirectional transmission.

8.4 Equipment Box Design

– Main integrated equipment box (400×600×150mm): three internal separation compartments for TV, telephone and network equipment, physically isolated to avoid signal interference; built-in mounting rails and fixing holes for installing the switch, patch panels, splitter and SPDs; single door with anti-theft lock, optional transparent observation window; upper and lower knockout holes with rubber protection rings; dedicated grounding terminal; wall-mounted at 1.5m;

– Floor wiring boxes (260×300×100mm): three small compartments corresponding to TV, telephone and network systems, installing terminal blocks, splitters and other equipment; wall-mounted at 0.5m; latch lock; grounding terminal.

8.5 Terminal Panel Design

– 86-type dual-port information panel: adapts standard RJ45 network modules and RJ11 telephone modules, with dust-proof doors and label slots, used at network+telephone shared points;

– 86-type single-port network panel: adapts standard Category 6/5e network modules, with dust-proof door and label slot, used at pure network points;

– 86-type TV panel: built-in F-type female socket, 75Ω impedance, 5-1000MHz, supporting HD digital TV;

– 86-type concealed back boxes: PVC flame-retardant, depth 50mm, four-sided knockout holes, pre-embedded in walls, adapting to all 86-type panels.

8.6 Cabling and Labeling Design

– All cables are laid with zones bound by system in the shared tray, keeping spacing and avoiding crossing and knotting;

– Both ends of all cables are reserved with 30-50cm margin and marked with temporary labels;

– All panels, ports and equipment are numbered uniquely, and link documentation is complete, facilitating O&M management.

9. Recommended Configuration and Preliminary Budget

9.1 Core Network System Configuration

No. Material Specification Unit Qty Brand Remarks
1 Core network host (gigabit switch) 24-port gigabit rack-mounted Ethernet switch set 1 KITOZER Deployed in floor-1 main equipment box, core aggregation of whole network, full line-speed forwarding
2 Category 6 unshielded patch panel 19-inch 24-port modular Category 6 pcs 1 KITOZER Installed in main equipment box, terminates all horizontal and trunk network cables
3 1U cable manager 19-inch metal cable manager pcs 1 KITOZER With patch panel to organize jumpers, standardize box cabling
4 Category 6 network jumper 1m unshielded finished jumper pcs 24 KITOZER Patching between patch panel and switch
5 Category 6 unshielded twisted pair 4-pair 8-core 23AWG oxygen-free copper m 1200 KITOZER Horizontal + vertical trunk network cables, incl. redundancy and construction loss
6 Category 6 network module RJ45 90° punch-down unshielded pcs 24 KITOZER One per network point terminal
7 Network signal surge protector RJ45 gigabit SPD pcs 1 KITOZER Inlet lightning protection, Class D standard

9.2 Telephone Voice System Configuration

No. Material Specification Unit Qty Brand Remarks
1 Main voice patch panel 100-pair 110-type rack-mounted pcs 1 KITOZER Installed in floor-1 main equipment box, operator inlet termination
2 Floor voice terminal block 50-pair 110 wall-mounted pcs 2 KITOZER One for floors 2 and 3, floor telephone cable termination/distribution
3 Category 3 large-pair cable 25-pair indoor voice large-pair m 60 KITOZER Floors 1-3 vertical trunk voice transmission
4 Category 6 unshielded twisted pair 4-pair 8-core national standard oxygen-free copper m 900 KITOZER Horizontal telephone point cables, voice-compatible
5 Voice telephone module RJ11 Category 3 voice module pcs 18 KITOZER One per telephone point terminal
6 Telephone jumper 1m RJ11 finished jumper pcs 18 KITOZER Patching between patch panel and terminal blocks
7 Telephone signal surge protector RJ11 signal SPD pcs 1 KITOZER Telephone inlet lightning protection

9.3 Cable TV System Configuration

No. Material Specification Unit Qty Brand Remarks
1 Main signal splitter 1-in-4-out broadband CATV splitter pcs 1 KITOZER Floor-1 main equipment box, trunk signal to floors
2 Floor branch splitter 1-in-3-out floor TV splitter pcs 3 KITOZER One per floor, distribution to floor TV points
3 Coaxial cable SYWV75-5 physically foamed m 540 KITOZER Vertical trunk + horizontal TV cables, incl. loss
4 CATV terminal panel 86-type single-port TV panel pcs 9 KITOZER One per TV point
5 F-type cold-pressed connector 75-5 zinc alloy nickel-plated pcs 30 KITOZER Both cable ends, incl. spare
6 TV signal surge protector F-type coaxial SPD pcs 1 KITOZER TV inlet lightning protection

9.4 Conduit and Cable Tray System Configuration

No. Material Specification Unit Qty Brand Remarks
1 Low-voltage metal cable tray 200×100mm galvanized trough type m 75 KITOZER Incl. 15m vertical trunk + 60m horizontal branch
2 RC50 hot-dip galvanized steel pipe DN50, wall 3.5mm m 40 National standard 4 outdoor inlet pipes, 10m each, buried 0.8m
3 JDG20 galvanized conduit pipe DN20 set-screw type, wall 1.2mm m 153 National standard Horizontal point branch pipes, avg 3m for 51 points
4 Cable tray accessories Elbows, tees, couplers, covers lot 1 KITOZER For 200×100 tray installation
5 Cable tray fixing bracket L-type galvanized support arm set 38 KITOZER One per 2m, incl. expansion screws

9.5 Equipment Box and Terminal Panel Configuration

No. Material Specification Unit Qty Brand Remarks
1 Main integrated equipment box 400×600×150mm three-compartment wall-mounted set 1 KITOZER Floor-1 low-voltage room, 1.5m above ground
2 Floor integrated wiring box 260×300×100mm three-compartment wall-mounted set 2 KITOZER One for floors 2 and 3, 0.5m above ground
3 Dual-port information panel 86-type network + telephone pcs 18 KITOZER For shared network/telephone points
4 Single-port network panel 86-type single RJ45 pcs 6 KITOZER For pure network points
5 Concealed back box 86-type PVC flame-retardant pcs 51 National standard One per terminal point

9.6 Installation Auxiliary Materials and Others

No. Material Specification Unit Qty Brand Remarks
1 Category 6 RJ45 connectors Three-prong gold-plated, 100/box box 1 KITOZER Cable termination and spare
2 Cable ties, screws, expansion tubes National standard general spec lot 1 National standard Whole-system installation and fixing
3 Cable label tags Waterproof self-adhesive sheet 5 National standard Cable and port numbering labels

Reference estimate note: The configuration list above is provided for engineering planning purposes. The final quotation is a reference estimate in RMB (CNY) and does not constitute a formal commercial quotation from Guangzhou Lain; final pricing depends on actual requirements, quantities and site conditions.

10. Technical Specifications

Reference estimate note: All specifications below are reference estimates in RMB (CNY) and do not constitute a formal commercial quotation from Guangzhou Lain. Final pricing depends on actual requirements, quantity and site conditions.

10.1 Core Network System Product Parameters

#### 10.1.1 Core Network Host (24-Port Gigabit Ethernet Switch)

Hardware parameters

– Port configuration: 24 10/100/1000BASE-T auto-negotiation Ethernet ports, supporting Auto MDI/MDIX auto crossover, compatible with 10M/100M/1000M devices;

– Switching capacity: ≥48Gbps, all ports support line-speed non-blocking forwarding;

– Packet forwarding rate: ≥35.7Mpps, meeting large-traffic concurrent data transmission;

– MAC address table: 8K capacity, auto learning and aging, aging time configurable;

– Buffer capacity: 256KB shared data cache per port, coping with burst traffic;

– Power input: AC 100-240V 50/60Hz wide voltage, adapting to grid fluctuations;

– Power consumption: ≤18W, low power, energy saving;

– Cooling: fanless natural heat dissipation, silent operation, suitable for office environments;

– Physical size: standard 19-inch rack-mount, 1U height, 440mm×200mm×44mm;

– Housing: 1.0mm cold-rolled steel plate, electrostatic powder coating, anti-corrosion and anti-EMI;

– Installation: rack-mount or wall-mount, with mounting ears.

Layer-2 function parameters

– VLAN: supports 802.1Q VLAN, up to 4K VLANs; port VLAN and protocol VLAN, dividing broadcast domains by service;

– Spanning tree: supports STP/RSTP/MSTP, preventing network loops and improving reliability;

– Link aggregation: supports static aggregation and LACP dynamic aggregation, up to 8 aggregation groups, up to 8 ports per group;

– Port mirroring: supports 1:1 and many-to-1 mirroring, ingress/egress/bidirectional traffic mirroring for monitoring and troubleshooting;

– Rate limiting: port-based ingress/egress rate limiting, minimum granularity 64Kbps;

– Storm suppression: broadcast, multicast and unknown unicast storm suppression with configurable thresholds;

– Jumbo frames: up to 9K bytes, improving large-file transfer efficiency;

– Cable detection: VCT virtual cable test, diagnosing short circuit, open circuit, pair errors and fault distance.

Management and maintenance

– Web graphical management, Console CLI, Telnet/SSH remote management;

– Configuration file backup/restore, firmware online upgrade;

– Port traffic statistics, port status, system temperature and CPU usage monitoring;

– System logs, operation logs and alarm logs, log server reporting;

– SNMP v1/v2c/v3, connectable to common network management platforms.

Environment and reliability

– Operating temperature 0°C ~ 45°C; storage -10°C ~ 70°C; humidity 10%~90% non-condensing;

– Protection level IP30; MTBF ≥100000 hours;

– Certifications: CE, FCC, RoHS, compliant with national EMC standards.

#### 10.1.2 24-Port Category 6 Unshielded Patch Panel

– 19-inch rack-mount modular Category 6 patch panel, 1U height;

– Performance per TIA/EIA 568-C.2, ISO/IEC 11801, GB/T 18015, 250MHz bandwidth;

– 24 RJ45 ports with dust covers;

– Contact pins: phosphor bronze base, gold plating ≥50μinch, three-prong contact, ≥750 insertions, contact resistance ≤20mΩ;

– IDC terminals: phosphor bronze tin-plated, 22-26AWG, ≥200 punch-downs, insulation resistance ≥1000MΩ;

– Clear T568A/T568B wiring sequence marks on ports and rear punch-down blocks;

– 1.5mm cold-rolled steel frame, black electrostatic powder coating;

– Rear integrated cable management rings;

– Replaceable paper label strips with transparent covers;

– Transmission performance: insertion loss ≤1.6dB, return loss ≥20.1dB, NEXT ≥39.1dB, ACR ≥18dB, ELFEXT ≥23.2dB @250MHz;

– Size 482.6×44.45×100mm; operating temperature -10°C ~ 60°C; UL, ETL, RoHS certified.

#### 10.1.3 1U Metal Cable Manager

– 19-inch rack-mount, 1U height;

– 12-ring double-sided structure with front and rear cabling space;

– 1.2mm cold-rolled steel, black electrostatic powder coating;

– Organizes jumpers and cables, keeps box cabling neat, reduces cable bending damage, improves heat dissipation.

#### 10.1.4 1m Category 6 Unshielded Network Jumper

– Category 6 unshielded finished RJ45-RJ45 jumper;

– 24AWG stranded oxygen-free copper conductor, 4-pair 8-core, HDPE insulation, PVC jacket;

– Three-prong gold-plated contacts, gold ≥50μinch, ≥1000 insertions;

– Per TIA/EIA 568-C.2, 250MHz, gigabit Ethernet;

– Insertion loss ≤0.4dB, return loss ≥22dB, NEXT ≥42dB @250MHz;

– VW-1 flame-retardant jacket; 1m length; blue color.

#### 10.1.5 Category 6 Unshielded Twisted Pair

– UTP CAT6 4×2×0.57mm; single-strand high-purity oxygen-free copper (OFC), 23AWG, diameter 0.57±0.02mm, purity ≥99.99%;

– HDPE physical foam insulation, standard color coding (white/blue-blue, white/orange-orange, white/green-green, white/brown-brown);

– Built-in PE cross skeleton separating the four pairs, reducing crosstalk;

– Precision twisted pair pitches, optimized crosstalk and return loss;

– PVC gray jacket, CM/CMR flame retardant;

– Transmission (20°C): bandwidth 250MHz, supports 10/100/1000Mbps and short-distance 10Gbps; DC resistance ≤9.38Ω/100m; imbalance ≤3%; working capacitance ≤5.6nF/100m; characteristic impedance 100±15Ω; attenuation ≤22.5dB/100m; NEXT ≥39.1dB/100m; ACR ≥17.0dB; ELFEXT ≥23.2dB; RL ≥20.1dB @250MHz;

– Min bending radius ≥8× cable diameter during laying, ≥4× after installation; max tensile force ≤100N; operating temperature -20°C ~ 60°C;

– TIA/EIA 568-C.2, ISO/IEC 11801, GB/T 18015, UL, ETL, RoHS; 305m/box.

#### 10.1.6 Category 6 Unshielded Network Module

– RJ45 Category 6 unshielded information module, 90° punch-down type;

– Per TIA/EIA 568-C.2, 250MHz, gigabit;

– Standard 8P8C RJ45 female port, compatible with RJ11;

– Phosphor bronze contacts gold-plated ≥50μinch, three-prong contact, ≥750 insertions;

– IDC terminals for 22-26AWG, ≥200 punch-downs;

– T568A/T568B color marks on module side;

– High-strength flame-retardant ABS housing, UL94-V0;

– Snap-in installation, compatible with 86-type panels, floor sockets and patch panels;

– Contact resistance ≤20mΩ; insulation resistance ≥1000MΩ; withstand AC 1000V/1min; insertion loss ≤0.4dB; return loss ≥20dB; NEXT ≥39dB @250MHz; operating temperature -10°C ~ 60°C; RoHS.

#### 10.1.7 Gigabit Network Signal Surge Protector (SPD)

– RJ45 serial gigabit network surge protector, single channel 1-in-1-out;

– Standard RJ45 8P8C, full 8-core protection;

– For 10/100/1000Mbps Ethernet and Category 6 cabling;

– Nominal discharge current In: 5kA (8/20μs); max discharge current Imax: 10kA (8/20μs);

– Voltage protection level Up ≤15V; response time ≤1ns;

– Insertion loss ≤0.5dB @1000MHz; transmission rate 1000Mbps;

– Working voltage 5V DC; M4 grounding terminal; metal shielded housing;

– Wall-mount or DIN-rail installation; temperature -40°C ~ 85°C, humidity ≤95% non-condensing;

– Per GB 50343-2012, IEC 61643-21.

10.2 Telephone Voice System Product Parameters

#### 10.2.1 100-Pair 110-Type Voice Patch Panel

– 19-inch rack-mount 110-type voice patch panel, 1U height;

– Capacity 100 pairs, standard 20 5-pair connection blocks;

– 1.5mm cold-rolled steel base, electrostatic powder coating;

– Phosphor bronze tin-plated terminals, low contact resistance, anti-oxidation;

– For Category 3/5e large-pair cables, 22-26AWG single-strand voice cables;

– Contact resistance ≤3mΩ; insulation resistance ≥1000MΩ; withstand AC 250V/1min;

– ≥200 terminations; latching pull force ≥133N;

– Clear pair number labels; 482.6×44.45×100mm.

#### 10.2.2 50-Pair 110-Type Voice Terminal Block

– Wall-mounted 110 voice terminal block;

– Capacity 50 pairs, standard 10 5-pair connection blocks;

– Flame-retardant engineering plastic base;

– Phosphor bronze tin-plated terminals;

– Contact resistance ≤5mΩ; insulation resistance ≥500MΩ; withstand AC 250V/1min;

– Wall-mount, for floor wiring boxes; 250×80×30mm.

#### 10.2.3 25-Pair Category 3 Indoor Large-Pair Cable

– HYV 25×2×0.5mm Category 3 indoor voice large-pair cable;

– Single-strand oxygen-free copper, 24AWG, 0.5±0.01mm;

– HDPE insulation, full color coding, 25-pair standard sequence;

– PVC gray jacket, CM flame retardant;

– Bandwidth 16MHz; DC resistance ≤95Ω/km; characteristic impedance 100±15Ω @1MHz; working capacitance ≤52nF/km; NEXT ≥43dB @1MHz;

– Min bending radius ≥10× cable diameter; operating temperature -20°C ~ 60°C;

– Per YD/T 838.1, TIA/EIA 568 Category 3; 305m/spool.

#### 10.2.4 RJ11 Voice Telephone Module

– RJ11 Category 3 voice module, 6P4C structure;

– Standard RJ11 female port;

– Phosphor bronze gold-plated contacts ≥30μinch;

– IDC punch-down terminals for 22-26AWG;

– Flame-retardant ABS housing, UL94-V0;

– Snap-in installation for 86-type panels;

– Contact resistance ≤20mΩ; insulation resistance ≥1000MΩ; withstand AC 250V/1min; ≥750 insertions; -10°C ~ 60°C.

#### 10.2.5 1m RJ11 Telephone Jumper

– RJ11-RJ11, 6P4C; 2-pair 4-core oxygen-free copper, PVC jacket;

– Gold-plated 6P4C connectors; supports voice transmission without noise or attenuation; 1m length.

#### 10.2.6 Telephone Line Surge Protector

– RJ11 serial telephone signal surge protector, single channel;

– RJ11 6P4C interface;

– In 5kA, Imax 10kA (8/20μs); Up ≤15V; response ≤1ns; insertion loss ≤0.2dB;

– Working voltage 110V DC/AC; M4 grounding terminal; metal shielded housing;

– Per GB 50343-2012.

10.3 Cable TV System Product Parameters

#### 10.3.1 1-In-4-Out CATV Main Splitter

– Indoor 1-to-4 CATV splitter; F-type female ports, 75Ω;

– Band 5MHz ~ 1000MHz, supports analog TV, digital TV and bidirectional transmission;

– Split loss: ≤8.0dB (5-550MHz), ≤8.5dB (550-1000MHz);

– Isolation: ≥25dB (5-550MHz), ≥22dB (550-1000MHz);

– Return loss: input ≥16dB, output ≥14dB;

– Zinc alloy nickel-plated F connectors; zinc alloy die-cast housing nickel-plated;

– Wall-mount; -20°C ~ 60°C; per GY/T 137-1999.

#### 10.3.2 1-In-3-Out Floor TV Branch Splitter

– Indoor 1-to-3 TV branch splitter; F-type female, 75Ω;

– Band 5MHz ~ 1000MHz, supports digital HD TV;

– Branch loss ≤10dB (5-550MHz), ≤11dB (550-1000MHz);

– Insertion loss ≤1.5dB (5-550MHz), ≤2.0dB (550-1000MHz);

– Isolation ≥22dB full band; shielding ≥100dB @5-1000MHz;

– Zinc alloy metal housing nickel-plated; wall-mount; per radio and TV industry standards.

#### 10.3.3 SYWV75-5 Coaxial Cable

– SYWV-75-5 physically foamed polyethylene insulated coaxial cable;

– Inner conductor: single-strand oxygen-free copper (BC), 1.0mm diameter, purity ≥99.95%;

– Insulation: physical high-foam polyethylene (FPE), foam degree ≥70%, insulation outer diameter 4.8mm;

– Shielding: aluminum-plastic composite film + aluminum-magnesium alloy braid, braid density ≥60%;

– PVC jacket, black/white optional, CM flame retardant;

– Characteristic impedance 75±3Ω @5-1000MHz;

– Attenuation: ≤4.5dB/100m @50MHz; ≤9.0dB/100m @200MHz; ≤15.0dB/100m @550MHz; ≤21.0dB/100m @1000MHz;

– Shielding attenuation ≥60dB; return loss ≥20dB @5-1000MHz; withstand AC 1000V/1min;

– Min bending radius ≥10× cable diameter; tensile ≥100N; -20°C ~ 70°C;

– Per GY/T 135-1998, GB/T 14864; 200m/spool.

#### 10.3.4 Single-Port 86-Type CATV Panel

– 86-type concealed single-port TV terminal panel;

– Built-in F-type female socket, 75Ω;

– ABS engineering plastic, matte white, UL94-V0;

– Frameless design, smooth surface, dust-proof cover;

– Band 5-1000MHz, supports digital HD TV.

#### 10.3.5 F-Type Cold-Pressed Connector

– For SYWV75-5 coaxial cable; F-type male, cold-pressed;

– Brass nickel-plated body, gold-plated pin;

– Three-piece structure (body, sealing ring, crimp ring), waterproof;

– 75Ω; DC-3GHz; installed with dedicated F-head crimping pliers.

#### 10.3.6 Coaxial TV Signal Surge Protector

– F-type serial coaxial signal surge protector; F male-in female-out, 75Ω; single channel;

– In 5kA, Imax 10kA (8/20μs); Up ≤35V; response ≤1ns;

– Insertion loss ≤0.2dB @5-1000MHz; VSWR ≤1.1; DC-2500MHz;

– M4 grounding terminal; metal shielded housing; per GB 50343-2012.

10.4 Conduit and Cable Tray System Product Parameters

#### 10.4.1 200×100 Galvanized Metal Cable Tray

– Trough-type galvanized cable tray (low-voltage metal cable tray); 200mm W × 100mm H;

– Q235B high-quality cold-rolled steel plate; trough body ≥1.2mm, cover plate ≥1.0mm;

– Electro-galvanized or hot-dip galvanized, zinc layer ≥12μm;

– Trough type with cover plate, snap-on or screw fixing;

– Accessories: horizontal/vertical elbows, tees, crosses, reducers, couplers, same material and thickness;

– Uniform load ≥100kg/m, deflection ≤1/200;

– IP30; bracket spacing ≤2m; per JB/T 10216-2013, CECS 31:2006; -20°C ~ 60°C.

#### 10.4.2 RC50 Hot-Dip Galvanized Steel Pipe

– Welded steel pipe for low-pressure fluid transmission (RC water-gas pipe); DN50 (2 inch);

– Outer diameter 60.3mm; wall thickness ≥3.5mm;

– Q235B carbon structural steel; internal and external hot-dip galvanizing, zinc layer ≥85μm;

– Threaded coupling connection with elbows, couplers and waterproof seals;

– Tensile strength ≥375MPa; yield ≥235MPa; elongation ≥20%; test pressure ≥2.5MPa;

– Per GB/T 3091-2015; outdoor inlet cable protection pipe, buried laying.

#### 10.4.3 JDG20 Galvanized Conduit Pipe

– Set-screw-type galvanized steel conduit (JDG pipe); DN20;

– Outer diameter 20mm; wall thickness ≥1.2mm;

– High-quality cold-rolled strip steel, double-sided galvanized, zinc weight ≥65g/m²;

– Set-screw connection, no threading or welding needed, with couplers, bends and locknuts;

– Electrically continuous after connection, usable as auxiliary grounding;

– Per GB/T 20041.1-2015, CECS 120:2007; 4m/root; concealed in walls, floors and ceilings.

#### 10.4.4 L-Type Cable Tray Fixing Bracket

– Q235B cold-rolled steel plate, thickness ≥2.0mm;

– Hot-dip galvanized; for 200×100 tray, support arm 250mm, height 100mm;

– L-type structure with mounting holes; load ≥200kg; with expansion bolts.

10.5 Equipment Box and Terminal Panel Parameters

#### 10.5.1 Main Integrated Equipment Box (400×600×150)

– Wall-mounted low-voltage integrated equipment box (three-compartment);

– 400mm W × 600mm H × 150mm D; 1.2mm cold-rolled steel box, 1.0mm door plate;

– Electrostatic powder coating, matte white;

– Three independent compartments (TV, telephone, network), physical isolation; built-in mounting rails and fixing holes;

– Single door with anti-theft lock, optional transparent window;

– Upper/lower knockout holes with rubber protection rings;

– Dedicated grounding terminal; wall-mounted at 1.5m; IP30; per GB 7251.3.

#### 10.5.2 Floor Integrated Wiring Box (260×300×100)

– Floor low-voltage wiring box (three-compartment);

– 260mm W × 300mm H × 100mm D; 1.0mm cold-rolled steel, electrostatic powder coating;

– Three small compartments for TV, telephone and network systems, installing terminal blocks and splitters;

– Wall-mounted at 0.5m; upper/lower knockout holes with protection rings;

– Latch lock; grounding terminal; IP30.

#### 10.5.3 86-Type Dual-Port Information Panel

– 86-type concealed dual-port panel; flame-retardant ABS, UL94-V0, matte white;

– Adapts RJ45 network modules and RJ11 telephone modules, snap-in installation;

– Dust-proof door; label slot under ports; M4 mounting screws;

– Frameless design; per GB/T 11313.

#### 10.5.4 86-Type Single-Port Network Panel

– 86-type concealed single RJ45; flame-retardant ABS, matte white;

– Adapts Category 6/5e network modules; dust-proof door and label slot.

#### 10.5.5 86-Type Concealed Back Box

– 86-type universal concealed back box, 50mm depth;

– PVC flame-retardant engineering plastic, UL94-V0, fire rating B1;

– Four-sided knockout holes; built-in fixing nut posts;

– Pre-embedded in walls and columns, adapts all 86-type panels.

11. Key Advantages and Customer Value

11.1 Standardized Architecture, Matches Drawing Design

This solution is strictly designed according to the provided telephone, network and TV system diagram, adopting a three-level star topology. Each floor’s low-voltage room is set with a three-compartment integrated wiring box, vertical and horizontal cabling uses 200×100 metal cable trays, outdoor inlet uses RC50 steel pipes buried 0.8m, SPD surge protection is configured at the inlet end, and all box sizes and installation heights are consistent with the drawing recommended values, fully meeting the design requirements.

11.2 High-Quality Materials, Stable and Reliable Performance

All cables, connectors and equipment of the whole system are national-standard high-quality products. The core network host is an enterprise-grade gigabit switch, and the cabling adopts a Category 6 unshielded system supporting gigabit to desktop; the TV system uses physically foamed coaxial cables and broadband distribution devices to ensure clear HD signal transmission; all metal conduits and cable trays are galvanized for corrosion protection with long service life. Full-link performance meets or exceeds relevant national standards, ensuring long-term stable system operation.

11.3 Lightning Protection, Improved Safety Level

Aiming at the lightning-induced risk of outdoor inlet cables, surge protective devices with corresponding interfaces are configured at the inlet ends of the network, telephone and TV systems respectively, meeting the Class D lightning protection standard with nanosecond response time, effectively suppressing surge voltage and current and protecting back-end equipment safety. At the same time, all metal cable trays, steel pipes and boxes are equipotentially grounded, further improving the electrical safety performance of the system.

11.4 Reserved Redundancy, Convenient Expansion and Upgrade

Cable tray capacity, equipment ports and trunk cables all reserve sufficient redundancy. The actual utilization rate of the 200×100 cable tray is less than 30%, the core switch reserves spare ports, and future point additions and system upgrades do not require large-scale modification of the original architecture, protecting early investment and adapting to business development needs.

11.5 Clear Labels, Convenient O&M Management

All cables, ports and panels are marked with unique numbers, link documentation is complete, and the hierarchy is clear. Ordinary O&M personnel can complete daily inspection and basic fault troubleshooting after simple training, reducing later O&M cost and difficulty.

11.6 Original Factory, Full-Process Service Guarantee

The solution is provided by a professional manufacturer with more than 20 years of low-voltage and computer room industry experience, fully responsible from solution design, product supply to construction guidance and after-sales O&M. Products are customizable, delivery is guaranteed, after-sales response is fast, and 7×24-hour technical support is provided, solving customers’ worries.

12. Technical Q&A (50+ Items)

12.1 Overall Solution

Q1: How are the 51 points of this solution distributed?

A: This solution has a total of 51 points, evenly distributed across three floors, with 17 points per floor, including 8 network points, 6 telephone points and 3 cable TV points per floor, totaling 24 network points, 18 telephone points and 9 TV points, matching the three-compartment architecture of the system diagram.

Q2: Why adopt a three-level star topology?

A: The three-level star topology is the standard architecture of low-voltage cabling, with the advantages of clear structure, convenient fault isolation, simple O&M management and flexible expansion. In this project, floor 1 is the main equipment room, floors 2 and 3 are floor distribution points, and terminal points access the floor boxes in star fashion, conforming to the building’s layered layout and convenient for operator inlet and management.

Q3: Will sharing one cable tray among the three systems cause signal interference?

A: No. First, the metal cable tray itself has good electromagnetic shielding performance; second, cables of different systems are zoned and bound with spacing maintained inside the tray; network cables are twisted pair and TV cables are shielded coaxial, with strong anti-interference capability themselves; and this project has few points and few cables, so actual interference is negligible and well within the standard allowable range.

Q4: How long is the total construction period of this project?

A: The standard construction period is 20 days, including 2 days of construction preparation, 3 days of conduit laying, 3 days of cable tray installation, 4 days of cable laying, 2 days of equipment installation, 3 days of termination and testing, 2 days of system commissioning and 1 day of completion acceptance. The period can be adjusted according to the actual site situation and Party A requirements.

12.2 Network System

Q5: Is a 24-port switch enough for 24 network points? Should spare ports be reserved?

A: The 24-port core switch configured in this solution exactly corresponds to 24 network points, meeting the current access requirements. At the same time, the switch supports cascade expansion. If points increase in the future, capacity can be expanded by adding floor switches without replacing the core host; if the customer wants spare ports, it can also be upgraded to a 48-port switch, and the solution can be flexibly adjusted.

Q6: Why choose Category 6 cabling instead of Category 5e?

A: Category 6 cabling supports 250MHz bandwidth, stably supports gigabit to desktop, and can support 10-gigabit transmission over short distances. It is the mainstream standard for office networks. Although Category 5e can also support gigabit, its performance margin is small and its future upgrade potential is insufficient. Category 6 cabling has limited cost increase but far better performance and lifecycle than Category 5e, with higher cost-effectiveness.

Q7: Why configure a patch panel for the network system?

A: The patch panel is the standard configuration of generic cabling, with three functions: first, it realizes standardized connection between horizontal cables and the switch, with neat and beautiful cabling; second, it protects switch ports from damage caused by frequent plugging and unplugging; third, it facilitates line scheduling and management – point adjustment only requires changing jumpers without re-punching cables.

Q8: What is the maximum transmission distance of Category 6 network cable?

A: According to the generic cabling standard, the permanent link of Category 6 unshielded twisted pair is up to 90m, and the channel link (including jumpers) is up to 100m. Beyond this distance, signal attenuation will exceed the standard and affect transmission stability. This project is designed according to the conventional size of a three-story building, and horizontal point distances are all within the standard range.

Q9: What is the difference between a managed switch and an unmanaged switch?

A: A managed switch supports configuration and management functions such as VLAN division, port mirroring, link aggregation, storm suppression and remote management, suitable for enterprise office networks that require management and security; an unmanaged switch is plug-and-play without configuration, suitable for small simple networks. This project uses a managed switch to meet the office network’s management and security needs.

Q10: What is the function of VLAN?

A: VLAN (Virtual Local Area Network) logically divides a physical network into multiple independent broadcast domains. Its functions include: isolating broadcast traffic to reduce network congestion; enhancing security by isolating different departments or businesses; facilitating management by flexibly grouping devices by function regardless of physical location. In this project, VLAN can be divided by floor or department as needed.

Q11: What is the function of port mirroring?

A: Port mirroring copies the traffic of a specified port to a monitoring port, which is used for network monitoring, traffic analysis, fault diagnosis and security auditing. When the network fails, the administrator can use mirroring to capture and analyze packets to locate the problem quickly.

Q12: What should be done if a network point cannot access the network?

A: Troubleshooting steps: 1. check whether the panel indicator is normal and the terminal device network card is normal; 2. check whether the jumper between the switch and patch panel is loose; 3. use a cable tester to test the link from the panel to the patch panel, checking wiring sequence, continuity and attenuation; 4. check whether the switch port is enabled and whether VLAN configuration is correct; 5. if the problem persists, contact the technical engineer for on-site handling.

12.3 Telephone System

Q13: Why use large-pair cable for the telephone trunk?

A: Large-pair cable is the standard solution for voice system vertical trunks. It integrates multiple twisted pairs into one cable, with neat cabling, small space occupation and convenient construction. This project has 6 telephone points per floor, and the 25-pair large-pair cable has ample capacity with plenty of spare pairs reserved, providing high reliability.

Q14: Can Category 6 network cable be used for telephone points?

A: Yes, and in this solution the horizontal telephone points are indeed laid with Category 6 network cable. The advantage is point flexibility – telephone points can be converted to network points at any time in the future without re-cabling, improving system flexibility; at the same time, Category 6 cable performance is better than ordinary telephone wire, providing better voice transmission quality.

Q15: What is the difference between a 110 patch panel and a network patch panel?

A: The 110 patch panel is a punch-down patch panel dedicated to voice systems, suitable for termination and patching of large-pair voice cables, with low cost and high density; the network patch panel is an RJ45 modular patch panel suitable for network jumpers and high-frequency data transmission. The two have different application scenarios and cannot be mixed.

Q16: What should be done if there is noise on the telephone?

A: Noise causes and handling: 1. check whether the telephone line connection is loose and re-plug it; 2. check whether the horizontal cable is terminated properly; 3. check whether the terminal block contact is good; 4. check whether the telephone cable is laid in parallel with strong current lines over a long distance and increase separation; 5. if the noise persists, use a multimeter to test line continuity and insulation, or contact technical personnel.

12.4 Cable TV System

Q17: Why use a splitter + branch structure for the TV system?

A: This is the standard structure of CATV distribution: the floor-1 main splitter distributes the signal to each floor, and the floor branch splitter distributes to each terminal point. This method distributes signals evenly, keeps point levels consistent, ensures uniform TV picture clarity, and facilitates floor-level management and fault troubleshooting.

Q18: What is the difference between SYWV75-5 and SYWV75-7?

A: The main difference is wire diameter and attenuation. 75-7 has a thicker diameter, smaller signal attenuation and longer transmission distance, but higher cost and more difficult construction. 75-5 is the mainstream specification for indoor points. This project has low floor height and short transmission distance, so 75-5 fully meets the attenuation requirements with higher cost-effectiveness.

Q19: How many TVs can one TV point support at most?

A: This solution configures one 1-to-3 branch splitter per floor to drive 3 TV points, with 9 points in the whole building. On the premise of ensuring signal level, more points can be supported by reasonably calculating distribution loss and adding amplifiers; the specific number needs to be calculated according to the inlet signal strength.

Q20: What should be done if there is no TV signal at a point?

A: Troubleshooting steps: 1. check whether the TV source and channel settings are correct; 2. check whether the coaxial cable connector at the panel is loose and re-tighten it; 3. use a field strength meter to test the signal level at the point; 4. check whether the branch splitter port is normal and whether the trunk cable is damaged; 5. if the level is low, check whether the main splitter and trunk connections are good and whether an amplifier is needed.

Q21: Why use F-type connectors for the TV system?

A: F-type connectors are the standard interface of the CATV system with the advantages of reliable connection, low loss, good shielding and low cost. The F-type cold-pressed connector used in this project has a three-piece waterproof structure, is suitable for SYWV75-5 cable, and after professional crimping provides good contact and excellent high-frequency performance up to 3GHz.

12.5 Conduit and Cable Tray

Q22: How many Category 6 network cables can a 200×100 cable tray hold?

A: According to the specification requirement that the tray fill rate does not exceed 40%, the 200×100 tray has a cross-sectional area of 20000mm² and a usable area of 8000mm²; a single Category 6 network cable has a diameter of about 6mm and a cross-sectional area of about 28.3mm², so theoretically about 280 cables can be placed. All cables of the three systems in this project total less than 50, with very low occupancy and ample reserved space.

Q23: Why use RC steel pipe instead of PVC pipe for outdoor inlet?

A: Outdoor buried laying requires the conduit to have high strength, corrosion resistance and crush resistance. The RC hot-dip galvanized steel pipe is a welded steel pipe with 3.5mm wall thickness, high mechanical strength, crush and impact resistance, and long galvanized anti-corrosion life, suitable for outdoor buried environments; PVC pipe has low strength and is easily crushed, generally only used indoors.

Q24: What is the difference between JDG pipe and SC pipe?

A: SC pipe is a welded steel pipe with thicker wall and high strength, suitable for high-strength scenarios such as buried and load-bearing walls; JDG pipe is a thin-wall galvanized steel pipe with set-screw connection, convenient construction and lower cost, suitable for concealed laying in indoor ceilings and lightweight partition walls. The horizontal points of this project are indoors, and JDG20 fully meets the requirements.

Q25: What are the installation specification requirements for cable trays?

A: Cable tray installation should be horizontal and vertical, with horizontal deviation ≤2mm/m and vertical deviation ≤3mm/m; bracket spacing ≤2m, with additional brackets at turns and cable entry/exit points; cross-bonding grounding wires at tray connections to ensure electrical continuity; covers complete and firmly fixed.

Q26: What should be noted when laying cables?

A: Cable laying should avoid strong pulling, with tension not exceeding the cable’s maximum allowable value; the bending radius at turns must meet requirements to avoid damaging the cable structure; cables of different systems should be zoned and bound with clear labels; both cable ends should reserve appropriate margin for termination and repair.

12.6 Lightning Protection and Grounding

Q27: Why install SPD surge protectors?

A: Outdoor overhead or buried cables easily induce lightning overvoltage. This surge voltage will enter the room along the cable and damage electronic equipment such as switches, TVs and telephones. The SPD can conduct within nanoseconds, discharging the surge current into the ground and limiting the voltage to a safe range, protecting back-end equipment.

Q28: Where should the SPD be installed?

A: According to the principle of “grounding nearby”, the SPD is installed at the inlet end, that is, on the inlet side of the floor-1 main equipment box. Operator cables first pass through the SPD and then connect to the core equipment. This gives the shortest discharge path and the best protection effect.

Q29: What is the required grounding resistance?

A: The lightning protection grounding resistance of the low-voltage system is required to be ≤4Ω. If sharing the grounding electrode with the building lightning protection grounding, the grounding resistance is required to be ≤1Ω. In this project, the SPD and metal boxes are all connected to the building equipotential grounding terminal, meeting the specification requirements.

Q30: Why is equipotential bonding needed for metal cable trays and steel pipes?

A: Equipotential bonding connects all exposed conductive parts and metal installations to the same potential, preventing potential differences from causing electric shock and equipment damage. When lightning current or fault current flows, equipotential bonding ensures that metal parts such as cable trays, steel pipes and boxes are at the same potential, avoiding spark discharge and protecting personnel and equipment safety.

12.7 Construction and Acceptance

Q31: How is the generic cabling tested after construction?

A: The network system is tested with a Category 6 link tester, testing parameters including wiring diagram, length, attenuation, NEXT and return loss; all parameters meeting the Category 6 standard is qualified. The telephone system tests continuity and wiring sequence; the TV system tests signal level and picture quality. After all tests pass, a test report is issued and then completion acceptance is carried out.

Q32: What are the technical requirements for termination?

A: Network modules and patch panels must be punched down strictly according to the T568B wiring sequence, punched in place with surplus wires trimmed; telephone 110 patch panels are punched according to color code sequence with a dedicated punch-down tool to ensure good contact; coaxial F connectors are made to specification, with the shielding mesh not short-circuited to the inner conductor, and firmly crimped; panels are installed flat and close to the wall with clear labels corresponding to point numbers.

Q33: What should be done before material entry?

A: All materials are procured according to the solution specifications, and product certificates, test reports and warranty documents are provided upon entry. After entry, appearance inspection and specification verification are carried out, stored by category, with moisture-proof, anti-theft and anti-damage measures. Core equipment is powered and tested after entry to confirm normal function before installation.

Q34: What does the three-inspection system mean?

A: The three-inspection system is team self-inspection, inter-process mutual inspection and quality inspector special inspection. Each process must pass the previous level before entering the next; unqualified previous processes cannot flow into the next process. This ensures construction quality problems are discovered and corrected in time.

12.8 After-Sales and O&M

Q35: How long is the warranty period of the system?

A: This solution provides a standard warranty period: the whole equipment and cabling system is warranted for 1 year, and core equipment can enjoy a longer warranty according to the manufacturer’s policy. Within the warranty period, non-human damage is repaired and replaced free of charge, and free technical support is provided.

Q36: How quickly can faults be responded to?

A: A 7×24-hour technical hotline is provided. General faults are solved by phone guidance; for faults requiring on-site handling, response within 4 hours in urban areas and resolution within 24 hours; remote areas are appropriately extended according to distance.

Q37: What work does daily O&M include?

A: Daily O&M mainly includes: regularly checking equipment running status and indicator lights; regularly cleaning equipment box dust and keeping dry; avoiding unauthorized modification of lines and equipment; maintaining line labels and documentation archives. Contact technical personnel promptly if abnormalities are found.

Q38: What should be done if the core switch fails?

A: First confirm the fault phenomenon (power, port, configuration). Try restarting the device and reconnecting; check whether the power supply and network cables are normal; if the configuration is lost, restore the backup configuration. If the device is damaged, contact after-sales to provide a spare device or repair service. This project supports spare device service for core equipment.

Q39: Can the system be expanded in the future?

A: Yes. The system has reserved redundancy in tray capacity, switch spare ports and trunk cable pairs. Adding network points only requires laying horizontal cables to the floor wiring box and adding modules and jumpers; adding telephone points can use the spare pairs of the large-pair cable; the TV system can increase branch ports or add amplifiers as needed. Expansion does not require modifying the original architecture.

Q40: What documents will be delivered at acceptance?

A: At completion acceptance, the following documents are delivered: completion drawings, point schedule, test reports, equipment manuals, O&M manual, warranty certificate and other paper and electronic materials, facilitating later management and maintenance.

Q41: What should be noted when using the equipment box?

A: Keep the box dry and clean, avoid blocking the knockout holes and affecting ventilation; do not place flammable items near the box; regularly check whether the grounding connection is firm; operate the lock gently; when adding equipment, follow the compartment layout and keep cables neat.

Q42: Can the switch support 7×24-hour continuous operation?

A: Yes. The enterprise-grade switch used in this project is designed for 7×24-hour continuous operation, with a fanless design, low power consumption and an MTBF of ≥100000 hours, and can stably run for a long time in a suitable indoor environment.

Q43: How to ensure the TV picture is clear and stable?

A: Ensure the inlet signal level is sufficient; the splitter and branch structure distributes signals evenly; use physically foamed coaxial cable and F-type cold-pressed connectors to reduce loss; the shielding performance of the branch splitter is ≥100dB, effectively shielding external interference; after acceptance, field strength testing ensures each point’s level is within the standard range.

Q44: What should be done if a panel is damaged?

A: Panels and modules are standard 86-type products and are easy to replace. Replace the panel or module of the same specification: first remove the damaged panel, disconnect the terminated cables, install the new module (punch down according to T568B for network, color code for telephone), fix the panel, and test the link. Spare parts can be provided by our company.

Q45: Is the whole system suitable for office buildings with high requirements?

A: Yes. The solution adopts enterprise-grade core equipment, Category 6 cabling, complete lightning protection and grounding, clear labeling and standardized construction, which can meet the requirements of ordinary office buildings and also support higher-standard scenarios through upgrades (such as adding access control, monitoring or wireless systems later).

Q46: How is the construction quality guaranteed?

A: Construction strictly follows national acceptance specifications, with material entry inspection, three-inspection system, key process supervision by the technical director, complete construction and test records, and full-link testing before acceptance. All test data is retained and traceable.

Q47: What are the advantages of choosing Guangzhou Lain?

A: Guangzhou Lain is a source manufacturer with more than 20 years of experience in low-voltage and computer room industries, with complete product supply, professional design and construction team, strict quality management system, 7×24-hour technical support, and full-process service from design, supply, construction to after-sales, providing one-stop assurance.

Q48: Can the solution be adjusted according to actual needs?

A: Yes. The solution can be flexibly adjusted according to the actual needs of the project: point quantities and distribution can be adjusted; switch ports can be upgraded (e.g., 48 ports); the cable tray specification can be increased; SPD configuration can be upgraded to a higher protection level; equipment box sizes can be customized; and budget-appropriate adjustment suggestions will be provided.

Q49: What should be paid attention to in the later addition of TV points?

A: Adding TV points should consider: 1. whether the branch splitter has spare ports; 2. whether the trunk signal level is sufficient (if insufficient, add an amplifier); 3. laying horizontal coaxial cable from the floor wiring box to the new point; 4. using F-type connectors and testing the signal level after termination.

Q50: How to keep the system documentation?

A: Keep the completion drawings, point schedule, test reports and maintenance records in a unified archive, and update the documents in time after any line or point adjustment. It is recommended that O&M personnel use the point schedule to mark the adjustment records, keeping the documentation consistent with the actual system.

Q51: What is the significance of the three-compartment physical isolation design?

A: The three-compartment design physically isolates TV, telephone and network equipment inside the box, with the following advantages: avoiding signal interference between different systems; facilitating independent management and maintenance of each system; preventing mutual influence during fault handling; and meeting the regulatory requirements for separation of strong and weak current and different systems.

Q52: What is the service life of the system?

A: With national-standard materials and standardized construction, the cabling system service life generally reaches 15-20 years; the switch and active equipment service life is generally 5-8 years according to the manufacturer’s specifications, and can be upgraded and replaced as needed. Regular maintenance and proper use can effectively extend the system service life.

Q53: Can wireless coverage be added later?

A: Yes. The network system reserves switch ports and tray space, and later can add wireless access points in corridors and public areas, connected through the reserved network points or newly laid cables. AP installation positions, power supply and management configuration can be planned in advance to achieve seamless coverage.

Q54: How is the construction coordinated with the building decoration?

A: The construction plan is coordinated with the decoration schedule: conduit and back box embedding are completed before decoration, cable laying and tray installation are completed during decoration, and panel installation, equipment installation and commissioning are completed after decoration. This avoids repeated construction and damage to decoration.

Q55: What safety measures are taken during construction?

A: All construction personnel receive safety education before entering the site and hold certificates; high-altitude operations wear safety belts; electric tools are reliably grounded and temporary power use complies with regulations; the site is equipped with fire extinguishers and smoking is prohibited; construction noise reduction measures are taken to avoid affecting normal office work; finished products are protected to prevent damage to decoration.

13. Construction Schedule

Stage Work contents Duration Responsible Acceptance criteria
Construction preparation On-site survey, drawing review, material entry inspection, construction tool preparation, technical disclosure 2 days Project manager Material specifications and quantities verified, construction personnel clear on process requirements
Conduit laying Outdoor RC50 steel pipe buried laying, indoor JDG conduit concealed laying, back box embedding 3 days Conduit team leader Conduit route conforms to drawings, bending radius qualified, firmly fixed, smooth wiring
Cable tray installation Vertical trunk tray installation, horizontal branch tray installation, bracket fixing, grounding cross-bonding 3 days Tray team leader Trays horizontal and vertical, bracket spacing compliant, reliable grounding, complete covers
Cable laying Network cable, telephone large-pair, TV coaxial cable laying, temporary labels at both ends 4 days Cabling team leader Cables undamaged, unknotted, appropriate margin, clear labels
Equipment installation Main equipment box and floor wiring box installation, core switch, patch panels, splitters, SPD installation 2 days Technical director Boxes firmly installed at correct heights, equipment neatly fixed, standard wiring
Termination and testing Cable termination modules, panel installation, patch panel punch-down, full-link performance testing 3 days Test engineer All link test parameters meet corresponding standards, test report issued
System commissioning Network system commissioning, telephone line continuity test, TV signal level test and commissioning 2 days Technical director All points function normally, performance qualified, clear and stable signals
Completion acceptance Documentation, on-site acceptance, completion report, delivery 1 day Project manager Complete acceptance documents, all functions qualified, acceptance form signed

Total construction period: 20 days (adjustable according to actual site conditions and Party A requirements)

14. Construction Organization and Quality/Safety Measures

Guangzhou Lain 51-Point Network Host, Telephone and TV System on-site installation real photo

14.1 Construction Organization Structure

A dedicated project department is established with a project manager responsibility system:

– Project manager: 1 person, overall responsibility for project progress, quality, safety and coordination;

– Technical director: 1 person, responsible for solution disclosure, technical guidance, testing and commissioning, quality control, and solving technical problems in construction;

– Safety officer: 1 person, responsible for on-site safety management, civilized construction, safety inspection and education, preventing safety accidents;

– Quality inspector: 1 person, responsible for material entry inspection, quality inspection of each process, acceptance testing, ensuring quality compliance;

– Construction teams: conduit team 3 persons, cabling team 3 persons, equipment termination team 2 persons.

14.2 Construction Preparation

#### 14.2.1 Technical Preparation

– Organize construction personnel to familiarize themselves with drawings and solution, conduct technical and safety disclosure, clarifying construction technology and acceptance standards;

– Verify on-site building structure, low-voltage room location and point positions against drawings, communicating and solving problems in advance;

– Compile detailed construction schedule and material entry plan, arranging processes and personnel reasonably.

#### 14.2.2 Material Preparation

– All materials procured according to solution specifications, providing product certificates, test reports and warranty documents upon entry;

– After entry, appearance inspection and specification verification, stored by category with moisture-proof, anti-theft and anti-damage measures;

– Core equipment powered and tested after entry to confirm normal function before installation.

#### 14.2.3 On-Site Preparation

– Coordinate construction power, water and material storage space with Party A, handle entry construction procedures;

– Clean the construction area, protect finished products, avoid damage to building decoration;

– Arrange temporary safety facilities and warning signs to ensure construction safety.

#### 14.2.4 Tool Preparation

– Prepare wire pullers, punch-down tools, wire strippers, F-head crimping pliers, electric drills, cutting machines, Category 6 link testers, multimeters, field strength meters and other construction and testing tools, ensuring tools are in good condition and measurement is accurate.

14.3 Main Construction Technology

#### 14.3.1 Conduit Laying Technology

– Position and mark out according to drawings, determine conduit route and point positions;

– Outdoor buried pipe excavation depth 0.8m, trench bottom leveled with fine sand cushion;

– Steel pipe threaded connection, pipe joints wrapped with PTFE tape for waterproofing, pipe mouths polished smooth without burrs;

– Indoor JDG pipes use set-screw connection, fixed with pipe clips, junction boxes added at turns;

– After conduit laying, conduct a pass-through test to confirm the conduit is unobstructed.

#### 14.3.2 Metal Cable Tray Installation Technology

– Position and set out, determine bracket installation positions, bracket spacing not greater than 2m;

– Fix brackets with expansion bolts, adjust levelness and verticality;

– Splice trays, with flat joints and tightened connecting screws;

– Add grounding cross-bonding wires at tray connections, reliably connect to grounding terminals as a whole;

– Install tray covers, firmly fixed with even gaps.

#### 14.3.3 Cable Laying Technology

– Verify cable specifications and quantities before laying, check cable appearance for damage;

– Pull cables at uniform speed during laying, tension not exceeding the cable’s maximum allowable value, avoiding strong pulling;

– Lay vertically from top to bottom, binding and fixing at intervals to prevent cable self-weight damage;

– Lay horizontally with cables straight in the tray, no crossing or knotting, different systems zoned and bound;

– Reserve 30-50cm margin at both cable ends, mark temporary labels with numbers and destinations.

#### 14.3.4 Equipment Box Installation Technology

– Position according to drawing elevation, mark and drill, fix the box with expansion bolts;

– Adjust box levelness and verticality, deviation not exceeding specification requirements;

– Reliably connect the box grounding terminal to the building equipotential;

– Install equipment in compartments according to layout, reasonable arrangement for convenient operation and maintenance.

#### 14.3.5 Termination Technology

– Network modules and patch panels punched strictly per T568B sequence, punched in place, surplus wires trimmed;

– Telephone 110 patch panels punched per color code sequence with dedicated punch-down tool, ensuring good contact;

– Coaxial F connectors made to specification, shielding mesh not short-circuited to inner conductor, firmly crimped;

– Panels installed flat, close to the wall, labels clearly corresponding to point numbers.

#### 14.3.6 Testing Technology

– Network system tested link by link with a professional Category 6 certified tester, test data saved;

– Telephone system tested with a multimeter for continuity and wiring sequence, confirming no short circuit or open circuit;

– TV system tested with a field strength meter for signal level at each point, ensuring within standard range;

– After all tests pass, a formal test report is issued as the acceptance basis.

14.4 Quality Assurance Measures

– Strictly implement relevant national construction acceptance specifications and solution requirements, construct per drawings without arbitrary changes;

– Strict material entry inspection, unqualified materials strictly prohibited;

– Implement the three-inspection system: team self-inspection, inter-process mutual inspection and quality inspector special inspection; unqualified previous processes cannot enter the next process;

– Key processes are supervised on site by the technical director to ensure correct construction technology;

– Complete construction and test records with complete and traceable documentation.

14.5 Safety and Civilized Construction Measures

– All construction personnel receive safety education before entering the site, hold certificates, and comply with on-site safety management systems;

– High-altitude operations wear safety belts, electric tools are reliably grounded, and temporary power use complies with regulations;

– The site is equipped with fire extinguishers, smoking is strictly prohibited, and fire prevention measures are in place;

– Construction waste is cleaned daily, materials are stacked neatly, keeping the site clean;

– Noise reduction measures are taken during construction to avoid affecting normal office work, achieving civilized construction.

14.6 Finished Product Protection Measures

– Laid cables are protected from damage by subsequent construction;

– Installed panels and equipment are protected from dust and collision, with protective film removed before completion acceptance;

– During construction, protect building decoration, doors and windows and floors from pollution and damage;

– Strengthen personnel education, strictly prohibiting stepping on or bumping completed processes.

15. After-Sales Service

15.1 Warranty Commitment

– The overall warranty period of this project is 12 months, calculated from the date of completion acceptance;

– Within the warranty period, faults caused by product quality and construction technology are repaired and parts replaced free of charge;

– Free technical consultation and guidance provided within the warranty period, with regular return visits on system operation;

– Damage caused by human factors or force majeure is not within the free warranty scope; paid repair services can be provided.

15.2 Response Mechanism

– A 7×24-hour technical service hotline is established to accept customer consultation and fault reports at any time;

– General faults and technical problems: phone response within 1 hour, guiding customers to troubleshoot and solve;

– Faults requiring on-site handling: engineers arrive at the site within 4 hours in urban areas and eliminate faults within 24 hours; suburban and surrounding areas appropriately extended according to distance;

– Major faults activate the emergency plan, prioritizing core business recovery before thorough troubleshooting.

15.3 Daily O&M Service

– Within the warranty period, a phone return visit every quarter and an on-site inspection every six months, checking equipment running status and cable connections, cleaning dust, and discovering hidden dangers in time;

– Establish a project-specific service archive recording system configuration, repair records and inspection status, tracking the system lifecycle;

– Provide system upgrade and expansion consultation services, offering optimization suggestions according to customer business development.

15.4 Post-Warranty Services

– After the warranty period, annual maintenance agreements can be signed to provide continuous O&M services at favorable fees;

– Without a maintenance agreement, lifetime cost-price repair and parts replacement services are provided, charging only cost;

– Free technical consultation continues to ensure long-term stable system operation.

15.5 Spare Parts Support

– The company keeps common equipment and accessory inventory to ensure quick replacement during fault repair, shortening downtime;

– Spare device service for core equipment: in major faults, spare equipment can be provided for temporary use first, then the faulty equipment is repaired.

16. Training Plan

16.1 Training Objectives

Through training, enable the customer’s O&M management personnel to master the basic principles, daily operation methods and basic fault troubleshooting skills of the system, able to independently complete daily inspection and simple fault handling, ensuring normal system operation.

16.2 Training Targets

The customer’s IT personnel responsible for low-voltage system management, administrative and logistics personnel; no limit on the number of people.

16.3 Training Contents

#### 16.3.1 Theoretical Foundation

– Overall system architecture and composition, working principles of the three systems;

– Functions and roles of main equipment, cable routes and point distribution;

– Daily precautions and safety specifications of the system.

#### 16.3.2 Practical Skills

– Basic operation and status viewing of the core switch;

– Patch panel jumper operation and point adjustment methods;

– Simple replacement of panels and modules;

– Simple TV signal troubleshooting and telephone line continuity judgment.

#### 16.3.3 Fault Troubleshooting

– Common fault phenomena and cause analysis;

– Troubleshooting steps for common problems such as network failure, telephone noise and no TV signal;

– Fault reporting process and precautions.

16.4 Training Methods

– On-site practical training: after completion acceptance, explain and demonstrate at the project site combined with the actual system, with trainees operating hands-on;

– Document delivery: deliver completion drawings, point schedules, equipment manuals, O&M manual and other paper and electronic materials;

– Online Q&A: after training, technical consultation is available anytime by phone or WeChat, continuously answering questions.

16.5 Training Schedule

– Centralized training duration: 1 day, including half a day of theory and half a day of practice;

– Training time can be flexibly selected according to Party A’s work arrangements, recommended before or after completion acceptance.

16.6 Training Assessment

– After training, a simple practical and Q&A assessment is conducted to ensure trainees master basic skills; those who fail can receive free retraining until mastery.

17. Anonymous Typical Project Scenarios

The following cases are anonymous, generalized examples based on typical project implementations; no real customer names or locations are disclosed.

17.1 Office Building Low-Voltage Generic Cabling Project of an Industrial Park

Project Overview

A three-story office building with a total construction area of about 3000㎡, covering four low-voltage systems: network, telephone, cable TV and monitoring.

Construction Contents

120 generic cabling points, core computer room construction, floor low-voltage room equipment deployment, outdoor inlet lightning protection system.

Solution Features

Category 6 unshielded cabling system, layered star architecture, metal cable tray laying, enterprise-grade core switch, full-link qualified testing.

Operation Effect

The system has operated stably for more than 3 years without major faults, smooth network transmission, clear voice, stable TV signals, and has received high praise from the customer.

17.2 Low-Voltage Renovation Project of a Scientific Research Building

Guangzhou Lain 51-Point Network Host, Telephone and TV System project case photo 1

Project Overview

The original low-voltage system of a four-story research office building was aging and required overall upgrade and renovation.

Construction Contents

Replaced all horizontal and vertical cables, updated core network equipment, added a cable TV system, and restructured the low-voltage room equipment.

Solution Features

Reused the original conduits, optimized tray layout, adopted high flame-retardant cables, configured a complete lightning protection grounding system, and construction did not affect normal office work.

Operation Effect

After renovation, the network speed improved, the failure rate dropped significantly, meeting the high-bandwidth needs of research office work.

17.3 Low-Voltage System Project of an Enterprise Comprehensive Building

Project Overview

A five-story comprehensive building including offices, meeting rooms, rest areas, exhibition halls and other multifunctional areas.

Construction Contents

86 network points, 42 telephone points, 15 TV points, with complete low-voltage shaft, cabinets and lightning protection grounding systems.

Solution Features

Customized low-voltage boxes, modular design, ample expansion space reserved, full-link labeling management, convenient O&M.

Operation Effect

The system has operated stably after delivery, with flexible point adjustment, supporting the enterprise’s multiple business expansions and adjustments.

18. SEO Optimization Section

18.1 Keyword System

Core primary keywords

telephone network TV system solution, 51-point network host solution, low-voltage generic cabling configuration list

High-conversion long-tail keywords

three-story building low-voltage system design, office building telephone network TV solution, 200×100 low-voltage metal cable tray quantity, RC50 outdoor inlet steel pipe, low-voltage SPD lightning protection configuration

Industry traffic keywords

low-voltage system design solution, generic cabling system configuration, cable TV system construction, telephone voice system cabling, low-voltage engineering quotation list

Brand-specific keywords

Guangzhou Lain Intelligent, KITOZER Pioneer, Lain low-voltage solution

Dropdown/related search keywords

low-voltage three-compartment equipment box, floor wiring box dimensions, Category 6 cabling technical parameters, low-voltage construction schedule

SEM keywords

low-voltage system design, generic cabling engineering company, office building low-voltage construction, network host configuration

GEO keywords

Guangzhou low-voltage engineering, Panyu low-voltage construction, Guangdong generic cabling company

18.2 Page Optimization Tags

– Title tag: 51-Point Network Host Technical Design Solution_Telephone Network TV System Configuration List – Guangzhou Lain Intelligent

– Meta Keywords: 51-point network host, telephone network TV system, low-voltage configuration list, generic cabling solution, 200×100 metal cable tray, Guangzhou Lain Intelligent

– Meta Description: Guangzhou Lain Intelligent provides a professional 51-point network host and telephone network TV system design solution, including detailed configuration lists, full product technical parameters, construction organization and after-sales service, adapted to three-story building low-voltage construction.

– H1 tag: 51-Point Network Host, Telephone and TV System Technical Design Solution

– H2 tags: Project Overview, User Requirement Analysis, System Configuration List, Product Technical Parameters, Construction Organization Plan, After-Sales Service

18.3 Internal Link Anchor Text

– Core anchor text: low-voltage system solution, generic cabling configuration

– Long-tail anchor text: 51-point network host configuration, telephone network TV system design

– Related anchor text: micro-module cold aisle cabinet, shielded computer room construction, integrated cabinet

19. Official Contact Information

– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Website: https://gdlain.com

– Tel: +86 139 2228 9957 (WeChat available) / +86 185 2066 8845 (WeChat available)

– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China

Shopping Cart