Technical Design Solution

1. Cover / Document Information

– Document Title: AI Server Room Construction Technical Design Solution

– Construction Unit: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Version: V1.0

– Date: August 2026

2. Table of Contents Structure

1. Company Introduction

2. Project Overview

3. User Requirement Analysis

4. Overall Design Description

5. System Configuration List

6. Detailed Technical Parameters of Each System

7. Core Advantages of the Solution

8. Construction Schedule Plan

9. Construction Organization Plan

10. After-Sales Service System

11. O&M Training Plan

12. Typical Project Cases

13. SEO Optimization System and Keyword Layout

14. Subsystem Technical Q&A and Website Backend Configuration

15. Contact Information

3. Company Introduction

Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise integrating R&D, production, construction and O&M of computer room engineering overall solutions, with its own brand KITOZER Pioneer and more than 20 years of computer room industry experience.

The company’s core business covers full-category computer room infrastructure, including AI high-density computer room construction, micro-module cold aisle systems, integrated data cabinets, shielded computer room engineering, containerized data centers, outdoor intelligent cabinets and power environmental monitoring systems, providing customized design and delivery services for computing power needs of different industries and scenarios.

Relying on its own production base and R&D team, Lain masters core technologies such as efficient cooling, intelligent power distribution, liquid cooling heat dissipation and intelligent O&M. Products have passed multiple authoritative testing certifications and hold dozens of patents. With “quality first, customized service, rapid delivery, full-process after-sales” as core advantages, the company serves government, finance, medical care, education, Internet, research institutes and other fields, having completed more than a thousand computer room projects with wide customer recognition.

The company always adheres to the green, energy-saving, intelligent and efficient design concept, closely follows the AI computing power development trend, and launches heavy-duty racks, cold-plate liquid cooling, in-row precision air conditioners and other series products for high-density AI server scenarios, providing stable and reliable underlying support for AI computing power infrastructure.

4. Project Background and Objectives

Guangzhou Lain AI Server Room Construction overall render

With the rapid development of artificial intelligence technology, AI training and inference servers show the characteristics of high density, high power consumption and heavy weight. Traditional general server rooms can no longer meet the requirements in load-bearing capacity, heat dissipation efficiency, power supply reliability and O&M management. Aiming at AI computing power deployment needs, this project builds 2 independent AI server room systems, adopting the overall architecture of “heavy-duty racks + fully enclosed cold aisle + in-row precision air conditioners + cold-plate liquid cooling auxiliary heat dissipation + modular dual-circuit power supply + full-parameter power environmental monitoring”, comprehensively adapting to the stable operation of high-power, heavy AI servers.

Each system adopts a double-row face-to-face cold aisle layout, configures a standard quantity of 42U heavy-duty AI racks, with independent power distribution, cooling, UPS, monitoring and liquid cooling systems. The two systems are physically independent and mutually backed up, meeting the deployment needs of different business zones. The project strictly follows national data center construction standards, balancing reliability, advancement, economy and scalability, guaranteeing room availability above 99.99% throughout the year and supporting long-term stable AI business operation.

5. User Requirement Analysis

Combined with the project indicator requirements, the core requirements are decomposed as follows:

5.1 Rack System Requirements

– 19-inch standard 42U server racks, dimensions 600mm (W) × 1200mm (D) × 2000mm (H);

– Single rack static load ≥3000kg, adapted to heavy AI server deployment, with reinforced cabinet structure;

– Compatible with both air cooling and liquid cooling modes, with reserved liquid cooling pipeline interfaces and cabling space;

– Standard accessories such as shelves, cable managers and brackets to meet equipment installation and cabling needs.

5.2 Power Distribution System Requirements

– Each rack configured with 2 intelligent PDUs for A/B dual-circuit power supply, guaranteeing equipment power redundancy;

– PDUs support energy metering and remote monitoring, connectable to the power environmental monitoring system for refined energy management;

– Full-row through equipotential grounding system guaranteeing equipment electrical safety and static protection;

– Row head cabinet centralized power distribution with independent branch circuit control, intelligent metering and protection devices.

5.3 Cold Aisle Enclosure Requirements

– Full-row fully enclosed cold aisle structure with 1200mm net width, guaranteeing sufficient cold air space;

– Grade A fire doors at both ends of the aisle, meeting fire protection specifications and personnel access management;

– Fixed tempered glass top panels and fire-linkage flip skylights at the top, balancing sealing and fire protection requirements;

– Excellent overall sealing performance, reducing cold air leakage and improving cooling efficiency.

5.4 Cooling System Requirements

– In-row precision air conditioners with horizontal air supply and close-range cooling, adapted to high-density rack heat dissipation;

– Total cooling capacity of a single system meets the heat dissipation needs of full-load AI servers, with constant temperature and humidity control;

– Air-cooled outdoor units adapted to most building outdoor installation conditions;

– Air conditioners support intelligent speed regulation and remote monitoring for energy-saving operation.

5.5 UPS Uninterruptible Power Supply Requirements

– Modular UPS system supporting N+X redundancy, high reliability and online expansion;

– Single system capacity meets all load power supply needs, with full-load backup endurance ≥60 minutes;

– Valve-regulated maintenance-free batteries with dedicated battery cabinets, safe and standardized;

– UPS supports remote monitoring, with operating status and battery parameters included in the power environmental monitoring system.

5.6 Power Environmental Monitoring System Requirements

– Full-parameter collection covering room environment, power distribution, cooling, UPS, PDU and all systems;

– Monitoring points include temperature/humidity, water leakage, smoke, utility power parameters, air conditioner status, UPS status and PDU energy consumption;

– Local visualized monitoring and remote WEB/APP access with multi-level alarm functions;

– Data storable, queryable and exportable to reports, meeting O&M management needs.

5.7 Liquid Cooling System Requirements

– Cold-plate liquid cooling system configured for AI high-power servers, assisting air cooling heat dissipation;

– Cabinet-level coolant distribution unit (CDU) per rack for independent single-rack flow control;

– Outdoor dry cooler for heat dissipation, stainless steel pipelines, corrosion-resistant and durable;

– Leak detection and protection devices included in unified monitoring to guarantee system safety.

6. Design Principles and Applicable Standards

6.1 Design Basis

This solution strictly follows current national relevant standards and specifications, including but not limited to:

– GB 50174-2017 Code for Design of Data Center

– GB 50052-2009 Code for Design of Electric Power Supply and Distribution Systems

– GB 50054-2011 Code for Design of Low Voltage Electrical Installations

– GB 50243-2016 Code for Acceptance of Construction Quality of Ventilation and Air Conditioning Engineering

– GB 50116-2013 Code for Design of Automatic Fire Alarm System

– GB 50057-2010 Code for Design Protection of Structures Against Lightning

– GB 50462-2008 Code for Construction and Acceptance of Electronic Information System Computer Room

– YD/T 1363-2019 Technical Requirements for Power and Environment Monitoring System of Communication Bureau Stations

6.2 Design Principles

– High reliability principle: all core systems adopt redundant architecture, avoiding single points of failure from power supply, cooling to monitoring;

– High-density adaptation principle: strengthen rack load-bearing and heat dissipation for AI server heavy weight and high power consumption, combining air cooling + liquid cooling to break through heat dissipation bottlenecks;

– Energy-saving and efficient principle: reduce room PUE through cold aisle enclosure, EC variable frequency equipment, high-efficiency UPS and intelligent regulation;

– Intelligent O&M principle: full-system digital monitoring, advance fault warning, remote visualized management;

– Scalability principle: modular design, smooth expansion of racks, power distribution, cooling and UPS as needed;

– Safety compliance principle: strictly follow fire protection, electrical, lightning protection and grounding safety specifications;

– Standardization and customization combination principle: standard modular products for the main body, customized adaptation for special needs.

6.3 Overall Architecture Design

Each system adopts a double-row face-to-face cold aisle layout: racks are arranged on both sides with the enclosed cold aisle in the middle; in-row precision air conditioners are embedded in the rack rows with horizontal air supply; cold air enters the cold aisle directly, passes through servers and returns from the hot aisle, forming efficient airflow organization.

The power supply side adopts the utility power + modular UPS architecture, with UPS output dual circuits to the A/B PDUs of each rack for dual-circuit redundant power supply. The grounding system uses equipotential copper busbars through the full row, with all racks, equipment and metal components uniformly grounded.

The liquid cooling system adopts a distributed architecture with a CDU per rack; main supply/return water manifolds run along the top or bottom of racks, the outdoor dry cooler provides centralized heat dissipation, and coolant removes heat from server core components through circulation pipelines, jointly guaranteeing equipment temperature stability with the air cooling system.

The power environmental monitoring system adopts a centralized monitoring host + distributed sensor architecture, with all intelligent equipment and sensors connected to a unified platform for whole-area status perception, alarms and data analysis.

The two systems are independently deployed and operated, can carry different businesses respectively or back each other up, improving the overall architecture’s fault tolerance.

7. System Architecture and Working Principle

7.1 System Composition

Each AI server room system is composed of the following subsystems:

1. AI heavy-duty server rack system: 42U heavy-duty racks (static load ≥3000kg), fixed shelves, vertical cable managers, L-type equipment brackets;

2. Rack power distribution and equipotential system: intelligent rack PDUs (A/B dual circuit), row head power distribution cabinets, full-row equipotential copper busbars, rack grounding wires, PDU input cables;

3. Fully enclosed cold aisle enclosure system: fixed tempered glass top panels, fire-linkage flip skylights, grade A fire doors, support columns, side sealing plates, fire sealing strips, aisle access control;

4. In-row precision air conditioner system: constant temperature and humidity precision air conditioners (N+1 redundancy), outdoor units, refrigerant pipe sets, condensate drain pipes;

5. Modular UPS uninterruptible power supply system: modular UPS system cabinet, power modules, valve-regulated lead-acid batteries, battery cabinets, UPS input/output distribution cabinet;

6. Power environmental monitoring system: monitoring host, temperature/humidity sensors, positioning leak detection, point water immersion sensors, photoelectric smoke detectors, three-phase power transmitters, protocol access modules, monitoring platform software;

7. AI rack liquid cooling system: rack-level CDUs, server cold plate kits, main supply/return water manifolds, rack branch pipelines, environmentally friendly coolant, outdoor dry cooler, leak detection sensors;

8. Installation auxiliary materials and general consumables: galvanized cable trays, Category 6 network cables, rack fixing kits, fire sealing materials, labels.

7.2 Working Principle

– Cooling: cold air from in-row precision air conditioners enters the enclosed cold aisle, passes through the front doors of racks, cools servers and returns to the hot aisle; the liquid cooling system removes core chip heat through cold plates and CDUs, with the outdoor dry cooler dissipating heat to the environment – the two systems work together to maintain stable equipment temperature;

– Power supply: utility power → UPS input/output distribution cabinet → modular UPS (N+X redundancy) → dual output circuits → row head cabinets → A/B PDUs of each rack → dual-power servers; when utility power fails, batteries supply power with ≥60 minutes full-load endurance;

– Monitoring: sensors and intelligent devices collect full parameters → monitoring host → unified platform; multi-level alarms (temperature, humidity, leakage, smoke, power, UPS, PDU, liquid cooling) with local sound/light and remote WEB/APP/SMS/email notifications;

– Fire protection: smoke detectors trigger the fire alarm system, which sends linkage signals to open the flip skylights of the cold aisle, allowing extinguishing gas to enter; grade A fire doors isolate fire spread.

8. Detailed Technical Design

8.1 AI Heavy-Duty Server Rack System Design

– 42U heavy-duty AI server rack: 600×1200×2000mm (tolerance ±2mm); 42U standard 19-inch mounting rails with laser-etched U-position marks; static load ≥3000kg (third-party certified), dynamic load ≥1600kg; 4 heavy adjustable leveling feet (single foot ≥800kg), 4 heavy casters with brakes (single wheel ≥400kg); main frame 2.0mm cold-rolled steel nine-fold profile welded frame; doors/side panels 1.5mm; front/rear mesh doors with hexagonal mesh ≤3mm aperture, ventilation rate ≥75%, with washable dust filter cotton; top strong/weak current cable holes with adjustable covers; electrostatic epoxy powder coating 60-80μm, RAL7035 default, adhesion grade 0 (GB/T 9286-1998), salt spray ≥1000h; front single door, rear double door, three-point linkage locks with universal and management keys; detachable side panels; front/rear grounding copper posts; side panels reserved with 2×φ50mm liquid cooling pipeline holes with rubber rings and sealing covers; IP20; flame retardancy B1; surface resistance 10⁶-10⁹Ω; per GB/T 30094-2013;

– Fixed shelf: 19-inch, 482×400×25mm, 1.5mm cold-rolled steel, static uniform load ≥120kg, deflection ≤1/200, snap-in mounting pins, anti-slip embossed surface;

– Vertical cable manager: 42U, front/rear double-sided with 21 cable rings per side, 1.2mm cold-rolled steel bracket, flame-retardant ABS rings (inner diameter φ30mm, rounded edges), UL94 V0, strong/weak current separated wiring;

– L-type equipment bracket: 19-inch pair, 400×50×25mm, 2.0mm galvanized steel, single pair uniform load ≥80kg, M6 cage nuts, suspended design without blocking airflow.

8.2 Rack Power Distribution and Equipotential System Design

– Intelligent rack PDU: 19-inch 1U horizontal; 250V AC, 32A input, 3×6mm² input cable 3m with industrial connector option; 20× 10A national-standard five-hole outlets + 4× 16A outlets; real-time measurement of voltage, current, active/reactive/apparent power, power factor, energy, frequency (voltage/current ±0.5%, active power ±1%, energy ±1%); LED display; RS485 Modbus-RTU, optional SNMP card; remote on/off optional; 32A double-pole air switch protection; built-in surge protection 10kA (8/20μs), residual voltage ≤1500V; over/undervoltage alarms; aluminum alloy housing; -10°C~60°C; insulation ≥100MΩ, withstand 2000V AC/1min; per GB/T 7251.1-2013;

– Row head power distribution cabinet: 600×1200×2000mm, 2.0mm frame/1.5mm door panels; top-in top-out; 630A 3P+N MCCB (36kA breaking); 40× 32A 1P MCBs (C curve, 6kA); three-phase multifunctional smart meter (0.5 class, RS485 Modbus); copper busbars tin-plated, capacity ≥630A; independent N and PE busbars; second-level SPD 40kA; IP30;

– Full-row equipotential copper busbar: T2 copper purity ≥99.95%, 40×4mm, tin-plated ≥8μm, ampacity ≥600A, resistivity ≤0.017241Ω·mm²/m; laid along the rack row bottom with epoxy insulators at 1m spacing; lap connections with conductive paste;

– Rack grounding wire: BVR 16mm² yellow-green stranded copper, OT terminals M8, 2m;

– PDU input cable: YJV 3×6mm² flame-retardant, 0.6/1kV, 90°C continuous.

8.3 Fully Enclosed Cold Aisle Enclosure System Design

– Fixed top panel: 600×1200mm, 5mm tempered glass (transmittance ≥90%, per GB 15763.2-2005), 6063-T5 aluminum alloy frame 1.2mm anodized, EPDM sealing strips (compression ≥30%), snap-in installation, fire class C glass;

– Fire-linkage flip skylight: 600×1200mm, 5mm tempered fire glass (fire resistance ≥30min), electromagnetic holding DC24V, fire dry contact linkage opening, automatic opening on power failure (angle ≥90°), response ≤1s, manual unlocking device, sealing leakage ≤1%, ≥10000 cycles;

– Grade A fire door: 1200×2000mm single-leaf steel fire door, 1.2mm steel panels with perlite core (density ≥300kg/m³, 50mm thick), 1.5mm door frame with intumescent sealing strip, 400×600mm grade A fire glass window, 3 stainless fire hinges, fire door closer, fire push-bar lock (one-push escape from inside), fire resistance ≥1.5h per GB 12955-2008;

– Support columns: 6063-T5 aluminum alloy, 80×40mm, wall 2.0mm, height 2000mm with ±20mm adjustment, anodized, single column vertical load ≥200kg, deflection ≤1/1000, one per 600mm;

– Side sealing plates: cold-rolled steel sprayed, custom dimensions;

– Fire sealing strips: EPDM, V0 flame retardant;

– Aisle access control: embedded controller (10000 cards, 100000 events, card + password, TCP/IP WEB management), IC card reader (13.56MHz, 3-5cm), 280kg magnetic lock with door status feedback, power-off open (fire compliant), exit button, 12V/5A power with backup battery ≥4h endurance.

8.4 In-Row Precision Air Conditioner System Design

– In-row constant temperature and humidity precision air conditioner (indoor unit): rack-mounted in-row, 600×1200×2000mm; total cooling capacity 55kW (return air 24°C/50%RH, outdoor 35°C), sensible cooling ≥52.25kW, sensible heat ratio ≥0.95; EC centrifugal fans, stepless speed regulation, air volume ≥13000m³/h, external static pressure ≥120Pa; fully enclosed scroll compressor, R410A refrigerant; copper tube aluminum fin evaporator with hydrophilic film; electronic expansion valve; electrode humidifier ≥8kg/h; PTC electric heating ≥6kW; 7-inch LCD color touch screen, temperature control 18-30°C ±1°C, humidity 30%-80%RH ±5%RH; group control and master-slave backup; RS485/SNMP; full protection functions (high/low pressure, compressor/fan overload, leak detection, humidifier overflow, phase loss); G4 primary filter (efficiency ≥90%); power 380V 3N~ 50Hz, cooling input ≈18kW, humidifying+heating max ≈9kW; noise ≤65dB(A) at 1m; per GB/T 19413-2010;

– Outdoor unit: corresponding to 55kW indoor unit, rated heat rejection ≥60kW, EC axial fans ≥18000m³/h, copper tube aluminum fin condenser (fin spacing 1.8mm), scroll compressor matching, galvanized steel housing, cooling operation -15°C~45°C (low-temperature kit to -30°C optional), floor-mounted, ≤62dB(A) at 10m;

– Refrigerant pipe set: TP2 copper, gas φ38×1.5mm / liquid φ19×1.0mm, 20mm closed-cell rubber insulation (λ≤0.034W/(m·K), B1), aluminum foil wrap, brazed connections, pressure test 4.0MPa/24h no leakage, 20m standard length;

– Condensate drain: DN25 UPVC, water seal 50mm, slope ≥3‰.

8.5 Modular UPS Uninterruptible Power Supply System Design

– Modular UPS system cabinet: 600×1200×2000mm; three-in three-out, online double conversion topology, modular parallel redundancy; max 150kVA/150kW, 6 power module slots, N+X redundancy; input 380V 3N~ 50Hz, voltage range 305-485V (full load), input power factor ≥0.99, THDi ≤3%; output voltage accuracy ±1%, frequency ±0.1% (battery mode), waveform distortion ≤2% (linear) / ≤5% (nonlinear), load power factor 0.9; efficiency ≥96% (full load) / ≥95% (half load), ECO mode ≥99%; built-in static bypass (transfer ≤0ms); overload 125%/10min, 150%/1min, 200%/1s; battery DC384V, 32 cells/group, multiple groups parallel; 7-inch LCD touch screen, SNMP card, RS232/RS485/dry contacts; per GB/T 7260.3-2003;

– Power module: 25kVA/25kW, three-level IGBT inverter, efficiency ≥96.5%, hot-swappable rack-mount, auto current sharing ≤3%, independent protection, MTBF ≥200000h;

– Valve-regulated lead-acid battery: 12V 200Ah VRLA, AGM, float voltage 13.5-13.8V, boost 14.1-14.4V, temperature compensation -3mV/°C/cell, design life 10 years (25°C), self-discharge ≤2%/month, internal resistance ≤5.5mΩ, 10h rate 200A, ABS flame-retardant housing UL94 V0, copper tin-plated terminals, per GB/T 19638.2-2014; 64 cells per system (2 groups of 32, DC384V);

– Battery cabinet: 600×1200×2000mm, 4-layer battery rack (8 cells per layer, 32 cells per cabinet), 2.5mm galvanized steel, insulation separators, 250A DC breaker, positive/negative copper busbars tin-plated, load ≥2000kg, IP20;

– UPS input/output distribution cabinet: incoming MCCB, branch outputs, smart meter, second-level SPD.

8.6 Power Environmental Monitoring System Design

– Monitoring host: ARM Cortex-A9 quad-core 1GHz, 1GB DDR3, 8GB eMMC + SD expansion, embedded Linux; 2 Ethernet, 4 RS485, 2 RS232, 8 DI (opto-isolated), 4 DO (5A/250V AC), 4 USB, 1 VGA; Modbus-RTU/TCP, SNMP, HTTP, MQTT, BACnet; up to 256 monitoring points; 1-minute sampling, 1+ year data storage; multi-level alarms (local sound/light, SMS, email, APP push, voice); B/S architecture; DC12V/5A, ≤20W; 1U rack; MTBF ≥50000h;

– Temperature/humidity sensor: 0-50°C / 0-100%RH, accuracy ±0.5°C / ±3%RH, RS485 Modbus-RTU, DC12-24V, ≤0.5W, wall-mounted;

– Positioning leak detection: 1 channel controller, max 100m, positioning accuracy ±0.5m, response ≤2s, 8 sensitivity levels, RS485 + relay output; 10m sensing cable (4-core, HDPE), water resistance detection, false alarm ≤0.1%, reusable;

– Point water immersion sensor: electrode type, DC24V, relay output;

– Photoelectric smoke detector: DC24V, monitoring ≤100μA, alarm ≤50mA, class II per GB 4715-2005, relay output 1A/30V DC, ceiling mounting;

– Three-phase power transmitter: three-phase four-wire 380V, 5A via CT, full electrical measurement, 0.5 class, RS485 Modbus-RTU, AC/DC 85-265V, three-port isolation 2000V AC, DIN rail;

– Protocol access modules: for precision air conditioner and UPS protocols;

– Monitoring platform software: B/S architecture, PC/APP/WeChat clients, up to 1000 points, e-map visualization, real-time monitoring, history query with curves, multi-level alarms, daily/monthly/yearly reports with Excel export, multi-level user permissions, device management, PUE calculation and energy analysis, API interface, 7×24h stable operation with dual-machine hot standby.

8.7 AI Rack Liquid Cooling System Design

– Rack-level CDU: 19-inch 6U; rated cooling capacity 30kW; working fluid 25% ethylene glycol aqueous solution; one supply/one return DN20 quick-connect with self-sealing valves; variable frequency centrifugal pump, flow 50-150L/min, head ≥15m; inlet/outlet temperature and pressure, flow, liquid level and leak detection monitoring; LCD display, closed-loop temperature control, fault self-diagnosis; RS485/SNMP; protections (overcurrent, overtemperature, low liquid level, abnormal pressure, leak alarm with interlock); 304 stainless steel body/pipes; 220V AC, ≤500W;

– Server cold plate kit: micro-channel liquid cold plate, 6061 aluminum alloy vacuum brazed, thermal resistance ≤0.15°C·cm²/W, working pressure ≤1.0MPa, pressure test 1.5MPa/30min no leakage, standard quick-connect with self-sealing, adaptable to mainstream AI server CPU/GPU, thermal grease λ≥8W/m·K, life ≥10 years;

– Main supply/return water manifolds: DN50 304 food-grade stainless steel (OD57mm, wall 3mm), working pressure 1.0MPa, test 1.5MPa/24h, 20mm rubber insulation, argon arc welded with flange removable sections, Ra≤0.8μm;

– Rack branch pipelines: DN20 304 stainless steel with stop valves, quick-connects and metal hoses;

– Environmentally friendly coolant: 25% ethylene glycol aqueous solution, freezing point -15°C, boiling point 108°C, thermal conductivity ≥0.45W/(m·K), viscosity ≤2.0mPa·s, anti-freeze/anti-boil/anti-corrosion/anti-scale, life ≥3 years, 200L per system;

– Outdoor dry cooler: total heat rejection 120kW (35°C ambient, 35°C inlet water), copper tube aluminum fin coils (fin spacing 2.0mm), 4 EC axial fans ≥36000m³/h with intelligent speed control, ≤65dB(A) at 10m; circulating pumps 1+1 backup (200L/min, head 25m); 100L expansion tank with level gauge, auto fill valve, overflow and drain; intelligent temperature controller with RS485; galvanized steel frame; 380V 3N~ 50Hz; -20°C~45°C;

– Leak detection sensors: point electrode type, DC12V, switch output, 1 per rack + manifold nodes.

8.8 Installation Auxiliary Materials

– Galvanized cable tray: 200×100mm trough type, 1.2mm, hot-dip galvanized ≥65μm, uniform load ≥150kg/m, deflection ≤1/200, with fittings, per JB/T 10216-2013;

– Category 6 network cable: CAT6 UTP, 23AWG, HDPE insulation, PE cross skeleton, PVC CM jacket, 250MHz, 100m transmission, 305m/box;

– Rack fixing kit: M12×100mm expansion bolts, 8.8 grade galvanized, 8 per rack;

– Fire sealing materials: organic fire mastic (fire resistance ≥3h, reusable), inorganic fire barrier boards (5mm, ≥3h), fire sealing sealant (≥2h), per GB 23864-2009.

9. Recommended Configuration and Preliminary Budget

9.1 AI Heavy-Duty Server Rack System

No. Material Specification Unit Per system 2 systems Remarks
1 42U heavy-duty AI server rack 19″ standard, W600×D1200×H2000mm, static load ≥3000kg, front/rear mesh doors ventilation ≥75%, electrostatic spraying, liquid cooling holes reserved set 10 20 With locks, feet, casters, cable rings
2 Fixed shelf 19″ standard, cold-rolled steel, static load ≥120kg pcs 20 40 2 per rack
3 Vertical cable manager 19″ 42U, ABS flame-retardant rings, front/rear double-sided pcs 20 40 2 per rack
4 L-type equipment bracket 19″ standard, pair load ≥80kg, galvanized pair 40 80 4 pairs per rack

9.2 Rack Power Distribution and Equipotential System

No. Material Specification Unit Per system 2 systems Remarks
1 Intelligent rack PDU 32A input, 20×10A + 4×16A sockets, full energy metering, RS485/SNMP, overload protection pcs 20 40 2 per rack, A/B dual circuit
2 Row head power distribution cabinet 630A total input, 32A branch MCBs, smart multifunctional meter, surge protection, top-in top-out set 2 4 For A/B dual busbars
3 Full-row equipotential copper busbar 40×4mm T2 copper tin-plated, full row m 24 48 12m per row
4 Rack grounding wire BVR 16mm² yellow-green, crimped terminals pcs 10 20 1 per rack
5 Equipotential terminal kit M8 copper terminals + galvanized bolts/washers set 40 80 With mounting hardware
6 PDU input power cable YJV 3×6mm² flame-retardant m 400 800 ~20m per PDU

9.3 Fully Enclosed Cold Aisle Enclosure System

No. Material Specification Unit Per system 2 systems Remarks
1 Fixed top panel 600×1200mm, 5mm tempered glass, aluminum frame pcs 10 20 Covers aisle top
2 Fire-linkage flip skylight 600×1200mm, electromagnetic holding, fire signal linkage pcs 2 4 Fire acceptance compliance
3 Aisle end fire door Grade A steel fire door, 1200×2000mm, with fire window, closer, push-bar lock set 2 4 One at each end
4 Aisle support column High-strength aluminum alloy, 2000mm, rigid connection to rack top pcs 22 44 Along both sides
5 Side sealing plate Cold-rolled steel sprayed, custom size m² 8 16 On-site adapted
6 Fire sealing strip EPDM, V0 flame retardant m 120 240 Joints and seams
7 Aisle access control Card + password dual verification, reader, electric lock, exit button, power set 2 4 One per end door

9.4 In-Row Precision Air Conditioner System

No. Material Specification Unit Per system 2 systems Remarks
1 In-row constant temperature/humidity precision AC Rack-mounted, 55kW total cooling, SHR ≥0.95, EC fans, R410A, with humidifier and heater set 2 4 N+1 redundancy, total 110kW
2 Indoor unit base No.5 channel steel welded, galvanized, damping pads, 100mm set 2 4 With indoor unit
3 Air-cooled outdoor unit For 55kW indoor unit, EC variable frequency fans, low-temperature adapted set 2 4 Outdoor floor-mounted
4 Refrigerant pipe set φ19/φ38mm copper, with rubber insulation set 2 4 ~20m per set
5 Condensate drain pipe DN25 UPVC, with water seal, hangers m 40 80 ~20m per system
6 AC power cable YJV 5×16mm² flame-retardant m 80 160 ~40m per unit

9.5 Modular UPS Uninterruptible Power Supply System

No. Material Specification Unit Per system 2 systems Remarks
1 Modular UPS system cabinet 42U standard, max 150kVA, online double conversion, monitoring card standard set 1 2 With bypass, monitoring, distribution
2 UPS power module 25kVA/25kW, hot-swappable, high efficiency pcs 5 10 4+1 redundancy, 100kVA usable
3 VRLA battery 12V 200Ah, AGM, 10-year float life cells 64 128 32/group, 2 groups parallel, DC384V
4 Battery cabinet 42U standard, built-in rack, DC breaker, insulation supports set 2 4 32 cells per cabinet
5 Battery connection kit 50×5mm tin-plated copper busbar + insulators + bolts set 2 4 In-cabinet series/parallel
6 UPS input/output distribution cabinet Incoming MCCB, branch outputs, smart meter, second-level SPD set 1 2 Front of UPS

9.6 Power Environmental Monitoring System

No. Material Specification Unit Per system 2 systems Remarks
1 Monitoring host Embedded industrial, multi-protocol, WEB/APP, local storage set 1 2 Rack-mounted
2 Temperature/humidity sensor 0-50°C/0-100%RH, ±0.5°C/±3%RH, RS485 pcs 10 20 Evenly in cold aisle
3 Positioning leak detection 10m sensing cable + controller, leak point location, RS485 set 2 4 Under AC + cable trench
4 Point water immersion sensor Electrode type, relay output, DC24V pcs 4 8 Rack bottom, low spots
5 Photoelectric smoke detector DC24V, photoelectric, relay output pcs 10 20 Aisle top, power room
6 Three-phase power transmitter Three-phase four-wire, full measurement, 0.5 class, RS485 pcs 2 4 A/B utility circuits
7 AC protocol access module For precision AC protocol, status and alarms set 2 4 One per AC
8 UPS protocol access module For UPS protocol, parameters and battery status set 1 2 One per UPS
9 PDU energy collection integration Unified collection of all smart PDU energy/status set 1 2 Bus integration
10 Sound-light alarm DC24V, red strobe + 85dB buzzer pcs 2 4 Aisle entrance + power room
11 Monitoring platform software B/S, real-time, curves, reports, alarms, permissions set 1 2 Permanent license
12 Shielded signal cable RVVP 2×1.0mm² m 300 600 Sensor wiring

9.7 AI Rack Liquid Cooling System

No. Material Specification Unit Per system 2 systems Remarks
1 Rack-level CDU Rack-mounted, 30kW cooling, adjustable flow, temp/pressure monitoring, leak detection, RS485 set 10 20 One per AI rack
2 Server cold plate kit Micro-channel cold plate, mainstream AI server CPU/GPU, quick-connects, thermal grease set 10 20 1 set per rack
3 Main supply/return manifolds DN50 304 stainless steel, welded, 20mm insulation m 60 120 Full row
4 Rack branch pipelines DN20 304 stainless, with stop valves, quick-connects, metal hoses set 10 20 1 per rack
5 Environmentally friendly coolant Ethylene glycol aqueous solution, anti-freeze/anti-corrosion/anti-scale L 200 400 System fill
6 Outdoor dry cooler Total heat rejection 120kW, variable frequency fans, with pumps, expansion tank, control set 1 2 One outdoor unit per system
7 Leak detection sensor Point electrode, DC12V, switch output pcs 12 24 1 per rack + manifold nodes
8 Valve and fitting kit Stop valves, filters, pressure gauges, thermometers, expansion joints lot 1 2 Complete per system

9.8 Installation Auxiliary Materials and General Consumables

No. Material Specification Unit Per system 2 systems Remarks
1 Galvanized cable tray 200×100mm trough, with brackets, connectors, bends m 60 120 Top strong/weak cabling
2 Category 6 unshielded network cable CAT6 UTP, 305m/box box 5 10 Monitoring, access control
3 Rack fixing kit M12×100mm expansion bolts, 8.8 galvanized set 80 160 8 per rack
4 Fire sealing materials Fire mastic, fire boards, fire sealant lot 1 2 Holes and gaps
5 Label tags Cable labels, equipment plates, circuit labels lot 1 2 Full-system standardized
6 General consumables Ties, clips, screws, heat-shrink, electrical tape lot 1 2 General installation

Reference estimate note: The configuration list above is provided for engineering planning purposes. The final quotation is a reference estimate in RMB (CNY) and does not constitute a formal commercial quotation from Guangzhou Lain; final pricing depends on actual requirements, quantities and site conditions.

10. Technical Specifications

Reference estimate note: All specifications below are reference estimates in RMB (CNY) and do not constitute a formal commercial quotation from Guangzhou Lain. Final pricing depends on actual requirements, quantity and site conditions.

10.1 42U Heavy-Duty AI Server Rack

Item Parameter
Dimensions 600×1200×2000mm, tolerance ±2mm, 42U
Static load ≥3000kg (third-party certified)
Dynamic load ≥1600kg
Frame 2.0mm cold-rolled steel nine-fold welded; doors/panels 1.5mm
Ventilation Front/rear mesh doors, aperture ≤3mm, rate ≥75%, washable dust cotton
Coating Electrostatic epoxy powder 60-80μm, RAL7035, adhesion grade 0, salt spray ≥1000h
Liquid cooling 2×φ50mm holes per side panel with sealing covers
Protection IP20, B1 flame retardant, anti-static 10⁶-10⁹Ω
Standard GB/T 30094-2013

10.2 Intelligent Rack PDU

– 250V AC, 32A input; 20×10A + 4×16A outlets;

– Measurement: voltage/current ±0.5%, active power ±1%, energy ±1%; LED display;

– RS485 Modbus-RTU, optional SNMP; surge 10kA, residual ≤1500V; over/undervoltage alarms;

– Aluminum housing; -10°C~60°C; insulation ≥100MΩ, 2000V AC/1min; GB/T 7251.1-2013.

10.3 Row Head Power Distribution Cabinet

– 600×1200×2000mm; 630A 3P+N incoming MCCB (36kA); 40×32A 1P MCBs;

– Three-phase smart meter 0.5 class, RS485; copper busbars ≥630A; SPD 40kA; IP30.

10.4 Precision Air Conditioner (In-Row)

Item Parameter
Cooling capacity 55kW total, sensible ≥52.25kW, SHR ≥0.95
Air volume ≥13000m³/h, EC fans, external static ≥120Pa
Compressor Fully enclosed scroll, R410A
Humidifier / heater Electrode ≥8kg/h / PTC ≥6kW
Control 7″ LCD, 18-30°C ±1°C, 30-80%RH ±5%RH, group control, RS485/SNMP
Power 380V 3N~, cooling ≈18kW, humidify+heat ≈9kW
Noise ≤65dB(A) @1m
Standard GB/T 19413-2010

10.5 Modular UPS

– Three-in three-out, online double conversion; max 150kVA, 6 slots, N+X;

– Input PF ≥0.99, THDi ≤3%; output accuracy ±1%, load PF 0.9;

– Efficiency ≥96% (full) / ≥95% (half), ECO ≥99%; static bypass ≤0ms;

– Battery DC384V, 32 cells/group; LCD + SNMP + RS232/485; GB/T 7260.3-2003;

– Module: 25kVA/25kW, ≥96.5%, hot-swap, sharing ≤3%, MTBF ≥200000h.

10.6 VRLA Battery

– 12V 200Ah, AGM; float 13.5-13.8V, boost 14.1-14.4V; design life 10 years;

– Self-discharge ≤2%/month; internal resistance ≤5.5mΩ; UL94 V0 housing; GB/T 19638.2-2014.

10.7 Monitoring Host and Sensors

– Host: ARM A9 quad 1GHz, 8 DI/4 DO, 4 RS485, up to 256 points, B/S, MTBF ≥50000h;

– Temp/humidity: ±0.5°C/±3%RH, RS485;

– Leak detection: positioning accuracy ±0.5m, response ≤2s;

– Smoke: class II GB 4715-2005, DC24V;

– Power transmitter: 0.5 class, RS485, 2000V isolation.

10.8 Rack-Level CDU and Liquid Cooling

– CDU: 30kW, 25% ethylene glycol, flow 50-150L/min, head ≥15m, leak detection, RS485/SNMP, 304 SS, ≤500W;

– Cold plate: 6061 vacuum brazed, Rth ≤0.15°C·cm²/W, ≤1.0MPa, 1.5MPa/30min test;

– Manifolds: DN50 304 SS, 1.0MPa, 1.5MPa/24h test;

– Dry cooler: 120kW rejection, 4 EC fans ≥36000m³/h, pumps 1+1, 100L expansion tank, -20°C~45°C;

– Coolant: 25% ethylene glycol, freezing -15°C, boiling 108°C, life ≥3 years.

10.9 Auxiliary Materials

– Cable tray 200×100mm, 1.2mm, galvanized ≥65μm, load ≥150kg/m;

– CAT6 UTP, 23AWG, 250MHz, CM jacket;

– Fire mastic ≥3h, fire boards 5mm ≥3h, sealant ≥2h (GB 23864-2009).

11. Key Advantages and Customer Value

11.1 High-Reliability Architecture, Guaranteeing Business Continuity

The entire system adopts a redundant design concept from power supply, cooling to monitoring. The power supply side adopts dual utility power input + modular UPS redundant architecture, with dual-circuit PDU power supply for each rack, avoiding single-point power supply faults; the cooling side adopts N+1 precision air conditioner redundant configuration, with a single unit failure not affecting overall heat dissipation; the monitoring system is independently powered with full-parameter real-time monitoring and alarms. The overall architecture meets availability requirements above 99.99%, guaranteeing 7×24-hour stable operation of AI computing power business.

11.2 Heavy-Duty Structure Design, Adapted to AI High-Density Deployment

The rack adopts a reinforced frame and thickened steel plates with static load up to 3000kg+, far exceeding ordinary server racks, perfectly carrying multi-GPU heavy AI servers. The rack depth is increased to 1200mm, adapting to long-size AI servers with ample cabling and heat dissipation space reserved. The cabinet reserves liquid cooling interfaces, supports the air cooling + liquid cooling dual heat dissipation mode, and can gradually expand liquid cooling capability with computing power upgrades, protecting early investment.

11.3 Efficient Cooling System, Reducing PUE Energy Consumption

The fully enclosed cold aisle + in-row precision air conditioner near-end cooling architecture is adopted: cold air is delivered directly into the cold aisle, passes through servers and returns from the hot aisle, with short and smooth airflow organization, greatly reducing cooling loss. The air conditioners adopt EC variable frequency fans and electronic expansion valves, dynamically adjusting cooling capacity according to load to avoid over-cooling. Combined with the liquid cooling system for precise heat dissipation of high-power chips, the overall room PUE can be controlled within 1.3, significantly reducing long-term electricity costs.

11.4 Full-Stack Intelligent Monitoring, Realizing Unattended Operation

The power environmental monitoring system covers full-dimension parameters of power distribution, UPS, air conditioning, temperature/humidity, water leakage, smoke, access control and PDU energy consumption, with unified platform visualization. Threshold alarms and trend warnings are supported for advance prediction before faults; multi-channel alarm notifications via WEB, APP and SMS allow O&M personnel to remotely view status and handle faults. The system automatically generates energy consumption reports and operation logs, greatly reducing manual O&M workload and realizing lightweight unattended operation.

11.5 Modular and Standardized, Fast Delivery and Easy Expansion

The whole system adopts standardized and modular design; racks, cold aisle, UPS and air conditioners are all factory-prefabricated components for rapid on-site assembly, short construction cycle and high delivery efficiency. The system has good scalability; for later computing power expansion, equipment can be smoothly added by rack unit, with power distribution, cooling and monitoring systems expanding synchronously without large-scale modification of existing infrastructure.

11.6 Full-Process Compliance Design, Meeting Safety Specifications

Strictly follow national data center design specifications, electrical specifications, fire protection specifications and lightning protection grounding specifications for design and construction. The cold aisle is configured with fire-linkage flip skylights and grade A fire doors; the power distribution system has multi-level surge protection and leakage protection; the full-row equipotential grounding system guarantees electrical safety. All materials meet flame-retardant requirements with fire sealing at key parts; the overall solution passes various compliance acceptance such as MLPS and fire protection.

11.7 Original Factory Service, Full-Cycle Guarantee

From solution design, production and manufacturing to construction and installation, after-sales O&M, the whole process is executed by the self-owned team without outsourcing, with controllable quality. 7×24-hour technical support hotline with 4-hour on-site response in urban areas; free regular inspections within the warranty period; annual maintenance services after the warranty period; lifetime technical support and parts supply, guaranteeing full-lifecycle stable system operation.

12. Technical Q&A (50+ Items)

12.1 AI Heavy-Duty Server Rack

Q1: Why do AI servers need dedicated heavy-duty racks? Why not ordinary racks?

A: AI servers usually carry multiple GPU accelerator cards, with a whole-unit weight of 80-150kg; when 8-16 units are deployed in a single rack, the total weight easily exceeds 2000kg. Ordinary server racks generally have a static load of 800-1200kg; long-term overload can cause column deformation, mounting rail cracking and shelf bending, and in severe cases equipment falling and damage. AI heavy-duty racks use thickened steel plates and reinforced welded frames with static load up to 3000kg+, and optimize ventilation structure and cabling space, specially adapting to the high weight, high power consumption and large size of AI servers.

Q2: What do the 600×1200×2000 dimensions of the 42U rack represent? Why must the depth be 1200mm?

A: The unit is millimeters: 600mm is the rack width corresponding to the 19-inch standard mounting spacing, the industry universal standard; 1200mm is the front-rear depth; 2000mm is the overall height corresponding to the internal 42U mounting space. AI servers are generally deeper than ordinary servers, with some GPU servers up to 900-1000mm deep, and cabling space and ventilation gaps need to be reserved at front and rear; 1000mm depth racks will have equipment hitting the door and insufficient cable bending space. 1200mm depth perfectly accommodates long-size AI servers with ample front/rear cabling and ventilation space, improving in-rack airflow organization and heat dissipation.

Q3: What is the difference between static load and dynamic load of a rack?

A: Static load is the maximum weight the rack can safely carry when stationary on leveling feet, the core indicator of long-term carrying capacity, mainly referenced for fixed room deployment. Dynamic load is the maximum weight when the rack is mobile with casters, usually far lower than static load; heavy-duty racks generally have dynamic load of 1500-1800kg. In application, static load applies after positioning and fixing; when moving, do not exceed the dynamic load limit; for heavy equipment, remove it before moving the rack.

Q4: What is the effect of high-ventilation mesh doors on AI server heat dissipation?

A: AI servers have high power consumption and heat generation, requiring large amounts of cold air to pass through the chassis to remove heat. The mesh door ventilation rate directly determines inlet air resistance and volume; ordinary steel doors with ventilation rate below 30% cause insufficient rack inlet air, internal heat accumulation and high equipment temperature. High-ventilation mesh doors with ventilation rate above 75% greatly reduce air resistance, allowing cold aisle air to flow smoothly into racks with good front-to-back airflow. For AI high-density rooms, mesh doors with ventilation rate ≥70% are recommended, with moderate aperture considering dust, rodent and structural strength.

Q5: Why reserve liquid cooling holes in AI racks? Where are they located?

A: Pure air cooling can generally only support 10-15kW per rack; higher-density AI computing power requires liquid cooling. Reserving liquid cooling holes in advance avoids on-site drilling damaging the cabinet coating and structural strength, with sealing rings maintaining cold aisle sealing. The holes are generally in the middle-lower part or rear of the rack side panels, one group on each side, corresponding to CDU installation positions and pipeline routing, with aperture usually φ50mm for standard liquid cooling pipelines. Racks with reserved holes are compatible with both air and liquid cooling modes; upgrading to liquid cooling later does not require rack replacement, protecting investment.

Q6: Why configure front/rear double-sided vertical cable managers?

A: AI racks have many devices and cables; mixing power and signal lines causes electromagnetic interference affecting network and storage signal stability. Front/rear double-sided cable managers realize strong/weak current separation: the front manager routes signal cables (network, fiber), the rear manager routes PDU power cables, physically separated to reduce interference. Double-sided management also keeps cables neat, avoids blocking heat dissipation airflow, and facilitates later O&M troubleshooting and device addition.

Q7: What scenarios are L-type brackets and fixed shelves suitable for?

A: L-type brackets are two cantilever arms supporting both sides of the device, leaving the middle suspended with good ventilation and no airflow blockage, suitable for standard rack-mounted servers, switches and storage devices – the main mounting accessory for AI racks. Fixed shelves are full flat plates with large support area, suitable for non-standard devices, small switches, accessory boxes and O&M tools. For AI racks, 4 pairs of L-type brackets per rack for main servers plus 2 fixed shelves for auxiliary devices is recommended.

Q8: What are the core indicators for judging heavy-duty rack quality?

A: Six core indicators: load rating (clearly marked static load, preferably with third-party test report); material thickness (main frame ≥2.0mm, doors/panels ≥1.5mm); process details (solid welding, uniform coating, galvanized mounting rails, clear U-position marks); ventilation rate (front/rear doors ≥70%); accessory quality (durable locks, sufficient foot load, braked casters); compliance (national rack standards, flame-retardant and anti-static performance).

Q9: What is the function of electrostatic powder coating on racks?

A: Electrostatic spraying electrostatically adsorbs plastic powder on the steel surface and cures at high temperature, with stronger adhesion, more uniform thickness, better wear and scratch resistance than ordinary painting. Three core functions for room racks: anti-corrosion and anti-rust; anti-static (dedicated anti-static powder releases static to avoid static damage to electronic equipment); beautiful and neat appearance. Electrostatic spraying is recommended over ordinary painting.

Q10: What are the design points for strong/weak current separation at the rack top?

A: Physical separation (cable holes divided into strong and weak current zones separated by steel plates to avoid parallel wiring interference); protection rings (rubber rings on hole edges to prevent sharp steel edges cutting cable insulation); sealing design (sealing covers for excess space after wiring to reduce cold aisle air leakage and improve cooling efficiency).

12.2 Power Distribution and Equipotential System

Q11: Why configure 2 intelligent PDUs per rack in AI rooms? Isn’t one enough?

A: AI servers are critical computing power equipment; power interruption causes training interruption and data loss with major losses. Dual-circuit PDUs correspond to A/B independent power supply circuits; server dual power supplies connect to both PDUs, so any single circuit fault is seamlessly carried by the other, avoiding business interruption – the standard configuration for high-reliability room power supply. Single-circuit PDU has single-point fault risk; once the PDU fails or the circuit loses power, all servers in the rack shut down, only suitable for non-core business. AI core computing rooms must adopt dual-circuit redundant power supply architecture.

Q12: What is the difference between intelligent PDU and ordinary PDU?

A: Ordinary PDUs only provide basic power distribution like multi-socket strips; intelligent PDUs add metering, monitoring, communication and management functions: real-time monitoring of voltage, current, power and energy; access to the power environmental monitoring system for remote status viewing and overload/undervoltage alarms; some models support remote on/off control for remote device restart. For AI rooms, intelligent PDUs enable refined energy management, timely discovery of power anomalies and data support for PUE calculation.

Q13: What does 32A input mean for the PDU? How many servers can it carry?

A: 32A input means the rated input current is 32A, corresponding to about 7kW rated power at 220V. In practice, operate at 80% derating (≤5.6kW continuous) to avoid overload heating. The number of servers depends on single-server power: at 500W per AI server, one 32A PDU carries 10-11 units; at 1kW, only 5-6 units. Reserve redundancy in configuration and design integrally with UPS capacity and circuit switch capacity.

Q14: What is a row head power distribution cabinet? Difference from ordinary distribution boxes?

A: The row head cabinet is a dedicated distribution cabinet deployed at the head of a rack row for centralized distribution to the whole row, the core node of the room power distribution system. Compared with ordinary boxes: standard cabinet appearance matching server racks; many branch circuits (usually 20-40 outputs) corresponding to dual-circuit supply of each rack; intelligent multifunctional meters for whole-row electrical monitoring and remote monitoring; internal busbar wiring with large ampacity and high reliability; surge protection and insulation monitoring devices for precision equipment supply.

Q15: What is equipotential grounding? Why do rooms need full-row equipotential?

A: Equipotential grounding connects all equipment metal shells, racks, trays, pipes and other metal components through grounding conductors so they are at the same potential, avoiding potential differences between different equipment. Three core functions: personal safety (preventing step voltage between metal bodies during equipment leakage); static prevention (timely discharge protecting electronic equipment from static breakdown); lightning protection (uniform discharge of lightning current avoiding local potential difference damage). The full-row through equipotential copper busbar keeps the whole row of racks at the same potential – the standard practice for room grounding.

Q16: Why choose 40×4 copper busbar for equipotential? What is the function of tin plating?

A: The 40×4mm copper busbar has a cross-section of 160mm² and ampacity above 600A, fully meeting the grounding discharge needs of a rack row – the universal data center specification. Copper has excellent conductivity and low resistivity, the optimal grounding conductor material. Tin plating: anti-oxidation (copper oxidizes in air increasing contact resistance); lower contact resistance (tin is soft, tighter contact after bolt tightening); anti-electrochemical corrosion with different metals.

Q17: Why use yellow-green dual-color wire for rack grounding? Is 16mm² enough?

A: Yellow-green dual-color is the national standard color for protective grounding wires, distinguishing phase/neutral wires, preventing wrong connection, and eye-catching for O&M. The cross-section is selected per the rack total current and grounding specification; 16mm² stranded copper has large ampacity and high mechanical strength, fully meeting grounding discharge requirements for single-rack currents of tens to hundreds of amps – the universal room rack grounding specification. Connections must be firm with crimped terminals and tightened bolts.

Q18: Why choose YJV power cables? Difference from BV wire?

A: YJV is XLPE insulated PVC sheathed power cable suitable for room power distribution: multi-strand copper core with good flexibility for tray laying and turns; XLPE insulation with 90°C continuous working temperature, larger ampacity and stronger overload capability; unified sheath with good protection; suitable for 380V power distribution. Room main distribution and PDU input cables generally use YJV; BV wire is only for terminal lighting, sockets and other small-power circuits.

Q19: Why do room power distribution systems need surge protection? Where is it installed?

A: Surge is transient high-voltage pulses from lightning and grid switching, entering equipment along power lines and breaking down precision electronic components, damaging servers, switches and UPS. SPDs instantly discharge surge current and clamp voltage to protect downstream equipment. Room distribution generally protects in grades: level 1 at the total inlet, level 2 at UPS output or row head cabinet, level 3 at important equipment front-end. This solution configures second-level surge protection at the row head cabinet.

Q20: Is dual-circuit supply two utility circuits? Is UPS still needed?

A: Dual-circuit supply usually means two independent utility inputs, but even dual-circuit utility can fail simultaneously, and utility interruption is instant – servers shut down immediately. UPS is an uninterruptible power supply that instantly switches to battery power on utility failure, maintaining equipment operation and buying time for data saving and generator startup. Dual-circuit utility solves single-circuit grid faults; UPS solves complete power failure; both are indispensable. High-reliability rooms adopt the “dual utility + UPS + diesel generator” three-level power supply architecture.

12.3 Cold Aisle Enclosure System

Q21: What is cold aisle containment? Why does it save energy?

A: Cold aisle containment places two rows of racks face to face, enclosing the cold air channel in the middle with top panels and end doors, forming a closed cold air space. Cold air from air conditioners is fully contained in the cold aisle, entering racks only through front doors to remove heat, then exhausting to the hot aisle through rear doors. Without containment, cold and hot air mix and much cold air returns to the AC without passing through equipment, wasting cooling. After containment, cold air utilization improves by over 30%, AC can run at reduced frequency, significantly reducing energy consumption; room PUE can drop 0.2-0.3 – one of the most effective energy-saving measures.

Q22: Why is the cold aisle net width usually 1200mm?

A: 1200mm is the industry universal standard, balancing ventilation volume, O&M space and floor utilization. Too narrow (<1000mm): high air speed, high resistance, uneven cold air distribution, insufficient inlet air for end racks, and inconvenient personnel access; too wide: increased floor area, reduced rack density, larger channel volume, slower cooling response and higher cost. 1200mm ensures sufficient ventilation cross-section with reasonable air speed and personnel passage – the best overall cost-effectiveness.

Q23: Why use tempered glass for cold aisle top panels?

A: Three advantages: light transmission (room lighting illuminates the aisle interior without extra lighting); O&M observation (directly see equipment running status without opening the door); light weight (low support column load, easy installation). Steel panels are stronger but opaque and inconvenient; generally only used for special load or fire requirements. AI rooms prefer tempered glass panels.

Q24: Why install fire-linkage flip skylights? Is it mandatory?

A: Flip skylights are important safety components linked with the room fire protection system. When fire occurs and gas extinguishing activates, the skylights automatically flip open for extinguishing gas to enter the cold aisle quickly. Without skylights, the fully enclosed aisle blocks gas, and fires inside cannot be extinguished in time. Per data center fire design specifications, fully enclosed cold aisles must have fire pressure relief and extinguishing gas entry devices; flip skylights are the most common mature solution and a mandatory fire acceptance item.

Q25: How does the flip skylight work? What happens on power failure?

A: The skylight uses electromagnetic holding: energized normally, the electromagnet holds it closed and sealed; on fire linkage signal or power failure, the electromagnet releases and the skylight flips open by gravity for extinguishing gas entry. The power-off-open design ensures reliability – even fire-induced power failure opens it. Manual unlocking is also supported for emergencies. Response ≤1 second for rapid opening.

Q26: Why use grade A fire doors at both ends of the cold aisle?

A: The end doors are not only personnel passages but also fire separation: grade A fire doors have fire resistance ≥1.5h, blocking fire and smoke spread to contain fire locally, buying time for extinguishing and evacuation. Ordinary glass doors have no fire resistance. Grade A doors with fire glass windows for observation and push-bar locks for one-push escape meet fire evacuation requirements; per fire codes, closed cold aisle ends must use fire-rated doors.

Q27: Is the sealing performance of the cold aisle important?

A: Sealing directly determines energy-saving effect; poor sealing leaks large amounts of cold air. Ensure sealing through: sealing strips between top panels and columns; sealing gaskets between racks; sealing plates between sides and walls; intumescent strips around fire doors; fire mastic at cable openings. Quality cold aisle systems control air leakage within 5%; better sealing gives more obvious energy savings and more uniform internal temperature.

Q28: What is the function of the aisle access control? Is it required?

A: Access control manages personnel entry; only authorized personnel enter the cold aisle area. Functions: safety management (preventing unauthorized device touching and misoperation); log records (entry personnel and time for traceability and MLPS compliance); linkage (with power environmental and lighting systems, auto light-on and video on door opening). For managed, government and data center rooms, access control is standard; small self-use rooms may use ordinary locks, but access control is recommended for safety and compliance.

Q29: Which is better, cold aisle or hot aisle containment?

A: Cold aisle containment is more widely applied: safer (personnel operate at normal temperature without entering hot aisles); simpler construction (only the middle aisle is enclosed); better compatibility (adapts to various AC types and fire protection); better visual effect. Hot aisle containment is used in special layouts with restricted return air. Most AI rooms prioritize cold aisle containment.

Q30: Must the cold aisle height match the rack height?

A: Usually yes – 2000mm racks correspond to 2000mm aisles, with top panels resting directly on rack tops: simple structure, convenient installation, good sealing. Higher aisles require additional support frames, higher cost, larger channel volume and slower cooling response without obvious advantages. Special scenarios with many pipes/trays above racks can customize heightening, generally not exceeding 2200mm. Standard 2000mm is optimal.

12.4 In-Row Precision Air Conditioner System

Q31: What is an in-row precision air conditioner? Difference from ordinary room AC?

A: In-row (row-between) AC is installed between rack rows, side by side with racks. Compared with traditional room-level precision AC: the core difference is air supply distance and airflow organization – traditional AC sits at the room wall with cold air traveling far with loss; in-row AC is embedded in the rack row, supplying air directly into the cold aisle in front and drawing hot air from behind, with short paths, high efficiency, low resistance and energy saving. In-row AC matches rack dimensions, neat and standardized, especially suitable for cold-aisle-contained high-density rooms – the mainstream cooling solution for AI rooms.

Q32: What is the difference between total cooling capacity and sensible cooling capacity?

A: Total cooling = sensible + latent cooling. Sensible cooling lowers air temperature; latent cooling dehumidifies and condenses moisture. AI servers generate sensible heat with almost no moisture; room dehumidification needs are low, requiring large sensible cooling for temperature reduction. Sensible heat ratio = sensible/total; higher means more effective cooling for temperature. Ordinary room AC has SHR about 0.6-0.8; in-row precision AC reaches 0.9+; at the same total capacity, more equipment heat is removed. AI high-density rooms must choose high-SHR precision AC.

Q33: What is an EC fan? What are its advantages?

A: EC fans are electronically commutated DC brushless fans; compared with traditional AC fans, the core advantages are high efficiency and stepless speed regulation. AC fans have basically fixed speed; EC fans regulate 0-100% steplessly, reducing speed and power at low load, saving 30-50% energy. EC fans also have low noise, long life, small starting current and precise control, matching precision temperature control. AI room loads fluctuate greatly; EC fans dynamically match air volume with obvious energy savings.

Q34: Why do precision ACs need electric heating and humidifiers?

A: Precision AC targets constant temperature and humidity. The humidifier adds moisture when the room is too dry (static damage risk), generally controlling 40%-60%RH. Electric heating compensates temperature during dehumidification mode (cooling causes simultaneous temperature drop), enabling dehumidification and temperature control simultaneously, and assists heating in winter. Constant temperature/humidity AC controls temperature and humidity within precision ranges year-round – something ordinary AC cannot do.

Q35: What is the difference between air-cooled and water-cooled precision AC?

A: Air-cooled uses outdoor units dissipating heat through refrigerant pipes; water-cooled uses cooling water through cooling towers. Air-cooled: simple installation, lower cost, no leak risk, easy maintenance, suitable for small/medium rooms with rooftop space; disadvantage: outdoor ambient temperature affects efficiency with summer derating. Water-cooled: higher efficiency, less affected by ambient temperature, suitable for large rooms; disadvantages: complex system with cooling towers, pumps and piping, higher cost, leak risk, heavy maintenance. For the two medium-scale AI rooms in this solution, air-cooled fully meets needs with simpler installation and lower overall cost.

Q36: What does N+1 redundancy of precision AC mean? Is it necessary?

A: N+1 redundancy means N units meet total cooling demand plus 1 backup. Normally all units work together; when one fails, the remaining N still meet all cooling needs without room overheating. For AI rooms, server heat generation is large; AC failure causes room temperature to rise rapidly, possibly overheating and downtime within minutes with major losses. N+1 avoids cooling interruption from single-unit failure. Important rooms generally use N+1 or N+2 redundancy; the cost is high cost-effectiveness compared with business interruption losses.

Q37: How often are precision AC filters replaced? What daily maintenance is needed?

A: Filter replacement depends on room cleanliness: primary filters cleaned every 1-3 months, replaced every 6-12 months; shorter cycles for dusty rooms with frequent personnel entry. Daily maintenance: regularly clean filters; check fan operation (abnormal sound/vibration); check compressor high/low pressure for refrigerant sufficiency; clean humidifier scale; check condensate drain flow; clean evaporator/condenser fins; calibrate temperature/humidity sensors. Regular maintenance greatly extends AC life and reduces failure probability.

Q38: Is more air volume always better for in-row AC?

A: No – air volume must match cooling capacity and rack heat load. Too small: insufficient heat removal and rack inlet air; too large: high air speed, high resistance, noise and possible airflow short-circuit reducing efficiency. Generally estimate 150-200m³/h per kW cooling. Match rack count by total heat load: total row power × 1.2-1.3 redundancy factor = required total cooling; divide by single-unit capacity for unit count. For example, 10 racks at 8kW average = 80kW load, ~100kW with redundancy, 2× 55kW in-row ACs meet N+1.

Q39: Can precision AC be connected to the power environmental monitoring system?

A: Mainstream precision ACs have standard RS485 or SNMP interfaces for access to the monitoring system: remote viewing of running status, return air temperature/humidity, set values, compressor status and fan speed; remote modification of temperature/humidity settings and mode switching; reception of AC fault alarms (high/low pressure, fan fault, leak alarm). Remote monitoring greatly improves O&M efficiency – the standard configuration for intelligent room management.

Q40: Why install bases and damping pads for AC indoor units?

A: The base raises the AC for condensate drainage height difference (gravity drainage without overflow) and fixes the AC to maintain cold aisle alignment. Damping pads between base and floor absorb compressor/fan vibration, reducing noise transmission and preventing vibration reaching racks and affecting hard disks and precision equipment, while reducing component wear and extending life.

12.5 Modular UPS System

Q41: What is online double conversion UPS? Why do rooms use online type?

A: Online double conversion is the mainstream UPS topology: utility power is first rectified to DC, charging batteries and feeding the inverter, which inverts to pure AC for the load – the load is always powered by the inverter with no direct path between utility and load. Advantages: stable output voltage/frequency, pure waveform, complete isolation from surges, sags and frequency fluctuations – the best power quality. Offline UPS supplies utility directly and switches on failure with delay and poor quality. Room servers are precision electronic devices requiring high power quality, so online double conversion UPS is mandatory.

Q42: What is the difference between modular UPS and traditional tower UPS?

A: Tower UPS is integrated as one system; modular UPS uses hot-swappable power modules in parallel within a system cabinet. Modular advantages: N+X redundancy (single module failure does not affect overall); online expansion (insert new modules directly without whole-unit replacement); easy maintenance (hot-swap module replacement in minutes without shutdown); higher efficiency (automatic module hibernation at low load). For AI rooms with gradually growing loads, modular UPS’s flexible expansion and high reliability are very advantageous.

Q43: What is the difference between kVA and kW of UPS? How to convert?

A: kVA is apparent power; kW is active power; relation: kW = kVA × power factor. UPS nominal capacity is generally in kVA. Early UPS had PF 0.8 (100kVA = 80kW); mainstream UPS now has PF 0.9 or 1.0 (100kVA = 90kW or 100kW). Note the power factor when selecting; calculate by kW for actual load. The power modules in this solution have PF 1 (25kVA = 25kW) with stronger load capacity.

Q44: How to calculate UPS backup time? How many batteries for 60 minutes full load?

A: Formula: battery capacity (Ah) ≈ (load power × backup time) / (DC voltage × discharge efficiency × battery discharge factor). For 100kW load, DC384V, 60 minutes full load: discharge current ≈260A, 1h capacity ≈260Ah; considering discharge factor and redundancy, configure 2 groups of 32× 12V 200Ah batteries (total 400Ah) for 1-hour full-load backup. Reserve margin and consider battery aging so end-of-life still meets backup time.

Q45: Why use VRLA lead-acid batteries? What about lithium batteries?

A: VRLA is the mainstream room UPS battery: mature technology, low cost, high safety, simple maintenance. Lithium has higher energy density, longer life and better discharge performance, but much higher cost, higher BMS requirements and safety risks requiring complete fire and thermal management. Most room UPS still uses lead-acid for best cost-effectiveness and proven reliability. Lithium UPS is used in space-constrained, weight-sensitive or frequent charge/discharge scenarios; with cost declines, applications will increase, but VRLA remains mainstream.

Q46: Why are UPS batteries in groups of 32? What is the DC voltage?

A: Single 12V battery float voltage ≈13.5V; 32 cells in series ≈432V float, 384V nominal DC – the common room UPS DC level. This level balances device withstand voltage, cable loss, battery count and system cost: higher voltage means lower discharge current and loss but more cells and higher device requirements; lower voltage means larger current, cable size and connection risk. The 384V system is the industry-verified optimal level with mature power device selection, supporting multiple battery groups in parallel for capacity expansion.

Q47: What are UPS input power factor and current harmonic THDi? Why are they important?

A: Input power factor measures grid energy utilization (closer to 1 = higher active proportion, less reactive loss); THDi measures input current harmonic pollution (lower = less grid interference). Traditional UPS with low PF and high harmonics wastes grid capacity, interferes with other precision equipment, causes metering errors and protection misoperation, and increases front-end transformer/cabinet capacity and investment. Mainstream modular UPS with APFC achieves PF ≥0.99 and THDi ≤3%, nearly no harmonic pollution, grid utilization close to 100% – meeting green data center energy-saving requirements.

Q48: What are the core points of UPS daily O&M? How to maintain batteries?

A: Host O&M: regularly clean inlet filters and internal dust; check fans, contactors and relays for abnormal sound/heating; calibrate voltage/current parameters; test inverter-bypass switching every six months; maintain stable room temperature/humidity. Battery O&M: temperature is the first factor – optimal 20-25°C, life halves per +10°C; regularly measure cell float voltage and internal resistance, promptly identify lagging cells; avoid deep discharge; conduct check discharge tests every 6-12 months; keep terminals tight and clean to prevent oxidation and overheating.

Q49: What is UPS ECO mode? Advantages and disadvantages?

A: ECO (economy) mode: when utility quality is normal, the load is directly supplied via bypass with the inverter in standby; when utility exceeds the normal range or fails, the system switches to inverter mode within milliseconds. Advantage: efficiency above 99%, reducing self-loss by over 30% compared with double conversion – an important energy-saving measure. Limitation: reduced protection level – surges, sags and harmonics pass directly to the load; brief switching time on utility failure. For AI rooms with good grid access and server power supplies with certain anti-interference, ECO mode significantly reduces energy while maintaining reliability; for poor grid quality areas with frequent lightning/fluctuation, keep double conversion mode.

Q50: What is the difference between whole-UPS parallel and modular N+X redundancy?

A: Whole-UPS parallel connects multiple independent UPS units in parallel (1+1 or 2+1); modular N+X has multiple hot-swap power modules in parallel within one cabinet sharing bypass, monitoring, battery and distribution. Differences: redundancy granularity (modular is finer, 25/50kVA increments); maintenance convenience (hot-swap modules in minutes without shutdown vs. whole-unit shutdown/bypass for repair); system-level reliability (whole-UPS parallel has fully independent control/bypass without system-level single point; modular shares system control and bypass with system-level single-point risk). For small/medium capacity with expansion flexibility, modular N+X is preferred; for ultra-large core rooms with extreme reliability, “modular UPS whole-machine parallel” combines both.

12.6 Power Environmental Monitoring System

Q51: What does the room power environmental monitoring system monitor? What does “full-parameter collection” mean?

A: Standard systems cover four categories: power (utility parameters, distribution switch status, UPS status, battery parameters, intelligent PDU energy); environment (temperature/humidity, leakage, precision AC status, fresh air); security (access control, video, infrared intrusion); fire (smoke, temperature sensing, fire system status). “Full-parameter collection” means comprehensive collection of all physical and status quantities affecting equipment operation without monitoring blind spots – from utility input to rack terminal, from temperature/humidity to leakage/smoke, all key equipment parameters and statuses are in the unified platform for whole-area visualization.

Q52: What is the architecture of the monitoring system? Centralized vs distributed?

A: Three-layer architecture: collection layer (sensors and intelligent devices), transmission layer (network cables, RS485 bus), platform layer (monitoring host and software). Centralized: all sensors connect to one center host, suitable for small single rooms, simple and low cost. Distributed: collection units per area summarized to the center platform, suitable for multi-room/large rooms, simpler wiring, easier expansion, no global impact from single-point failure. This solution adopts distributed collection + centralized platform: each room has an independent host with data summarized to the overall platform.

Q53: How are temperature/humidity sensors arranged? Do both cold and hot aisles need them?

A: Follow “dense in key areas, overall coverage”: the cold aisle interior is the core supply area – one sensor per 2-3 racks at mid-height on the inlet side monitoring rack inlet air temperature. Hot aisle, room upper/lower levels and AC return air also need sensors for return temperature and overall distribution. Power and battery rooms need separate sensors. Cold and hot aisle coordination is the standard practice for high-density rooms to precisely grasp airflow organization and discover local hot spots.

Q54: What is the difference between point and positioning leak detection?

A: Point water immersion sensors detect water at one point (electrode conduction alarm), low cost, simple, but cannot cover large areas or locate leaks. Positioning leak detection uses a controller and sensing cable laid along pipelines and under ACs; on leakage, the controller precisely calculates the leak point distance (accuracy ≤0.5m) for quick location. In application, positioning sensing cables at key leak risk points (under AC indoor units, pipe joints) and point sensors at rack bottoms and low spots for bottom-line monitoring – the standard room leak protection configuration.

Q55: What notification methods does the monitoring system support for alarms?

A: Multi-level, multi-channel: local sound/light, platform popup, SMS, email, APP push, phone voice. Core to guarantee delivery: multi-channel backup (level-1 alarms trigger sound/light + SMS + phone simultaneously); alarm escalation (if the first responsible person does not confirm within the time, escalate to higher management); alarm masking and debouncing to avoid frequent false alarms. For AI rooms, configure SMS + phone voice core channels with local sound/light and APP push for 7×24-hour uninterrupted alarm notification.

Q56: How long is the monitoring data stored? What is it used for?

A: Storage depends on capacity and sampling interval: minute-level data generally stored 1+ years; alarm records and operation logs 3+ years, expandable. Value: fault traceback (analyze parameter changes before/after faults); trend analysis (optimize cooling and distribution strategies from long-term data for energy savings); compliance audit (MLPS, IDC qualification require complete monitoring records). For AI rooms, long-term energy and temperature data support expansion optimization and refined O&M.

Q57: Can the monitoring system work when disconnected? Will data be lost?

A: Mature systems adopt “local collection/storage + cloud/remote display” architecture – the host has independent computing and storage; collection, alarms and logic run locally; disconnection only affects remote viewing and push, not local collection, storage or sound/light alarms. Data during disconnection is cached locally and auto-uploaded after recovery without loss. High-reliability configurations support dual-machine hot standby. Select embedded industrial hosts, not pure PC software (PC shutdown/freeze stops monitoring).

Q58: What is the difference between the monitoring system and DCIM? Does a small/medium room need DCIM?

A: The power environmental monitoring system focuses on infrastructure status monitoring – power, environment, security real-time monitoring and alarms – the basic O&M tool. DCIM (Data Center Infrastructure Management) adds asset management, capacity management, work orders, energy analysis and 3D visualization for full-lifecycle operations management of large data centers. For small/medium AI rooms, the standard monitoring system fully meets needs with low cost and simple deployment; consider DCIM only for large rooms with professional O&M teams needing refined operations.

Q59: What are the construction considerations for the monitoring system? How to reduce false alarms?

A: Standard wiring and reliable installation: shielded signal cables with strong/weak current separation to avoid EMI data anomalies; sensors installed away from outlets, heat sources and direct sunlight for truthful data; leak sensing cables laid close to the ground and fixed, with insulated joints; smoke detectors away from AC outlets to avoid delayed alarms from airflow dilution; during commissioning, set reasonable alarm thresholds and delays (e.g., 30s temperature alarm delay) to avoid false alarms from transient fluctuations.

12.7 AI Rack Liquid Cooling System

Q60: Why do AI rooms need liquid cooling? Isn’t pure air cooling enough?

A: Air cooling is limited by air specific heat and rack ventilation. Conventional air cooling supports 10-15kW per rack, up to about 20kW optimized; beyond that, fan power surges, noise increases and local hot spots are unsolvable. Current mainstream AI training servers consume 5-10kW per unit; 4-8 units per rack exceed 30kW, beyond air cooling limits. Liquid cooling uses coolant’s high specific heat, directly contacting chips with dozens of times higher heat exchange efficiency, easily achieving 30-100kW per rack, perfectly matching high-power AI computing needs. Liquid cooling also lowers room PUE, reduces fan power and noise – the inevitable technical route for high-density AI rooms.

Q61: What is the difference between cold-plate and immersion liquid cooling?

A: Cold-plate installs metal cold plates on CPU/GPU core devices with coolant flowing through internal channels; coolant does not contact chips (indirect). Advantages: mature technology, good compatibility, minimal server modification, low O&M difficulty, controllable leak risk, lower cost; disadvantage: memory, power supply and other peripheral components still need air cooling. Immersion submerges whole servers in insulating coolant with all heat-generating components directly contacting it: stronger cooling, fans can be eliminated, very low noise; but high cost, large server modification, complex O&M and expensive coolant replacement, suitable for extreme density. For most AI rooms, cold-plate + auxiliary air cooling is the optimal balance of maturity, cost and cooling capability – the mainstream commercial solution.

Q62: What is a rack-level CDU? What role does it play?

A: CDU (Coolant Distribution Unit) is the “hub” of the liquid cooling system, installed in or beside the rack, distributing conditioned coolant from the main pipeline to each server’s cold plate and collecting heated coolant back to the main loop. Three core functions: flow regulation (dynamic adjustment per rack heat load for precise temperature control and energy saving); isolation and pressure stabilization (isolating the low-pressure rack branch from the high-pressure main system, stabilizing branch pressure, avoiding cold plate impact and reducing leak risk); status monitoring (integrated temperature, pressure, flow and leak detection sensors, real-time monitoring with alarms on abnormality) – the core component for safe and reliable liquid cooling operation.

Q63: What is the coolant? Is it toxic? How often replaced?

A: Cold-plate systems commonly use ethylene glycol aqueous solution (antifreeze coolant), similar to automotive antifreeze, composed of ethylene glycol, pure water and anti-rust/anti-corrosion/anti-scale additives. Qualified environmentally friendly glycol coolant is low-toxicity and non-volatile; normal contact is harmless, and it does not corrode pipes or cold plates, with anti-freeze, anti-boil, anti-rust and anti-scale properties. Replacement is infrequent – every 2-3 years in conventional use; daily O&M only requires checking levels, replenishing losses and periodically testing pH and concentration. Compared with immersion special coolant, glycol is low cost, easy to procure and simple to maintain.

Q64: Will the liquid cooling system leak? What safety measures exist?

A: Leakage is the most concerned risk; mature solutions build a complete protection system across four dimensions: design (quick-connect self-sealing fittings that seal automatically on plug/unplug; welded or flanged pipes constructed per pressure standards with pressure testing; graded pressure design with low branch pressure); components (304 stainless steel pipes and quality seals, corrosion/aging resistant, pressure and seal tested); detection (leak sensors under each rack CDU and at pipeline nodes for precise detection and instant alarms); interlock protection (leak alarm closes corresponding branch valves or triggers system pump stop to minimize leakage, with access control and video linkage for rapid handling). Multi-layer protected cold-plate systems have extremely low leak probability with fully controllable risk.

Q65: What is an outdoor dry cooler? Difference from AC outdoor units?

A: The dry cooler is the outdoor heat rejection device of the liquid cooling system, dissipating coolant-carried heat to ambient air – the cooling source of the system. Unlike AC outdoor units (refrigerant medium, compressor required), the dry cooler’s medium is coolant with no compressor: simpler structure, higher reliability and lower energy consumption – only fan power, with much higher energy efficiency ratio than air-cooled AC, the core reason for lower liquid cooling PUE. The dry cooler relies on natural air cooling – lower ambient temperature gives better performance and efficiency, very suitable for northern cold regions; hot regions can use spray assist or larger heat exchange area. Variable frequency speed regulation automatically adjusts fan speed by return water temperature.

Q66: How does the liquid cooling system cooperate with the existing air cooling system?

A: Mainstream AI liquid cooling is “cold-plate liquid cooling + rack-level air cooling” hybrid – not replacing air cooling entirely. CPU/GPU core high-power components are cooled by cold plates; memory, hard disks, power supply modules and rack interior space are cooled by rack fans with cold aisle air. The cold aisle cold air mainly provides auxiliary cooling and environment control, greatly reducing cooling load – existing precision AC can run at reduced frequency or even reduce AC count. The liquid cooling system is independent of AC; the two systems back each other up – if one fails, the other temporarily bears part of the load, improving overall reliability. This hybrid architecture solves the chip heat dissipation bottleneck while retaining air cooling O&M convenience.

Q67: Is liquid cooling O&M complex? What qualifications are needed?

A: Cold-plate liquid cooling O&M is far simpler than immersion, similar to precision AC; regular room O&M personnel can handle it after simple training without special qualifications. Daily O&M core: “check parameters, check levels, inspect leaks” – view temperature/pressure/flow parameters via the platform; regularly check expansion tank levels and replenish coolant; inspect pipe joints, CDUs and cold plates for leaks and verify leak detection. Deep maintenance once a year by professionals: clean dry cooler fins, calibrate sensors, test coolant quality, tighten pipe connections. Overall workload and complexity are lower than traditional air-cooled precision AC.

Q68: Can an existing air-cooled room be retrofitted with liquid cooling?

A: Yes, with feasibility assessment: room load-bearing must meet requirements (liquid cooling is heavier – pipes and coolant, generally satisfied by heavy-duty racks); outdoor space for dry coolers or use of existing AC outdoor positions; liquid cooling pipe routing space. Retrofit can be rack-by-rack – modify high-power racks first without overall shutdown; main pipes can run along rack tops or floors with low construction difficulty. Compared with demolition and rebuild, retrofitting is lower cost, shorter cycle and quickly increases rack power density – the cost-effective solution for existing room expansion.

Q69: What PUE can liquid cooling achieve? How much electricity is saved?

A: PUE is the core room energy efficiency indicator: traditional air-cooled rooms are 1.4-1.8; well-optimized cold aisle contained rooms above 1.3. Cold-plate liquid cooling eliminates AC compressors – main energy is circulation pumps and dry cooler fans – with annual average PUE controlled at 1.1-1.2, and below 1.1 in northern cold regions, approaching the theoretical limit. Electricity savings: a 10-rack AI room with 300kW IT load: air-cooled PUE 1.4 = ~1.05 million kWh annual cooling energy; liquid cooling PUE 1.15 = ~390,000 kWh, saving ~660,000 kWh per year – very significant; typically the incremental investment is recovered in 3-5 years.

Q70: Why choose Guangzhou Lain?

A: More than 20 years of computer room industry experience, own production base and R&D team, mastering high-density rack, cold aisle, precision AC, liquid cooling and intelligent O&M technologies; strict quality control with third-party testing; professional construction team; 7×24-hour after-sales service; full-process one-stop services from design, manufacturing, construction to O&M, providing reliable guarantees for AI computing power room construction.

13. Construction Schedule

The standard construction period for a single system of this project is 21 working days; the two systems can be constructed in parallel with a total period of about 25 working days. The specific stages are as follows:

Stage No. Stage name Duration Main work contents
1 Preliminary preparation 3 days On-site survey and re-measurement, final solution confirmation, material procurement and stocking, construction personnel entry and disclosure, on-site safety protection arrangement
2 Foundation construction 4 days Cable tray installation, grounding copper busbar laying, pipeline pre-embedding, wall/floor hole reservation, rack foundation positioning
3 Equipment arrival acceptance 1 day All equipment and materials arrival unloading, opening inspection, appearance check, parameter verification, acceptance signing
4 Rack and cold aisle installation 4 days Rack positioning and fixing, rack leveling, equipotential connection, cold aisle column installation, top panel and skylight installation, end fire door installation, access control installation
5 Power distribution system construction 4 days Row head cabinet installation, PDU installation, power cable laying, wiring and termination, insulation testing, pre-power-on inspection
6 AC and liquid cooling installation 5 days AC indoor unit installation, outdoor unit installation, refrigerant pipe welding and pressure holding, condensate pipe installation, liquid cooling main pipe laying, CDU installation, branch pipe connection, filling and pressure testing
7 UPS and battery installation 3 days UPS cabinet installation, power module insertion, battery cabinet positioning, battery series/parallel connection, DC circuit testing, input/output wiring
8 Power environmental monitoring installation 3 days Monitoring host installation, sensor installation and fixing, signal cable laying, equipment wiring, software deployment and commissioning
9 System joint commissioning and testing 3 days Subsystem single-unit power-on testing, linkage function testing, load simulation testing, performance indicator verification, alarm function testing
10 Acceptance and delivery 2 days As-built document compilation, user operation training, on-site acceptance testing, acceptance document signing, formal delivery

Note: some processes can be carried out in parallel to compress the total period; the specific period can be adjusted according to actual site conditions and Party A requirements.

14. Construction Organization and Quality/Safety Measures

Guangzhou Lain AI Server Room Construction on-site installation real photo

14.1 Project Organization Structure

A special project department is established with a professional team for full-process execution:

– Project manager (1): overall responsibility for progress, quality, cost and safety management, liaising with Party A and coordinating resources;

– Technical director (1): solution technical disclosure, construction process control, technical problem solving, system commissioning and acceptance technical support;

– Electrician team (2 certified electricians): power distribution system, UPS system and grounding system construction and commissioning;

– HVAC team (2 HVAC engineers): precision AC and liquid cooling system installation, pipeline construction and commissioning;

– Weak current team (2 engineers): power environmental monitoring, access control and generic cabling system construction and commissioning;

– Structure installation team (4 workers): racks, cold aisle, cable trays and other structural installation;

– Safety officer (1): on-site safety management, safety disclosure, hazard investigation.

14.2 Construction Quality Management

– Material entry inspection: all equipment and materials must be accepted on entry, verifying model, specification and quantity, checking appearance integrity and factory certificates/test reports; unqualified materials strictly prohibited from entry;

– Technical disclosure system: before each process, the technical director provides written disclosure to the construction team, clarifying construction technology, quality standards and acceptance requirements, with signature confirmation before construction;

– Three-inspection system: self-inspection, mutual inspection and handover inspection; after each process, the team self-inspects, then reports to the quality inspector for re-inspection; unqualified previous processes cannot enter the next;

– Hidden work acceptance: grounding, embedded pipes and cable laying hidden works must be accepted and signed by Party A or supervision before concealment, with image data retained;

– Completion testing: comprehensive performance testing after completion, including electrical insulation testing, grounding resistance testing, AC performance testing, UPS discharge testing and monitoring function testing, with test reports issued.

14.3 Construction Safety Management

– Safety disclosure: full-personnel safety disclosure before entry, clarifying safety operating procedures and on-site safety regulations; special operation personnel must hold certificates;

– Electrical safety: temporary power with three-level distribution and two-level protection, locked distribution boxes with dedicated personnel; live work requires two persons with insulation protection;

– High-altitude operations: safety belts for work above 2m, qualified climbing tools, warning areas below;

– Fire operations: fire permits for welding and other fire operations, fire extinguishers, dedicated fire watchers, site cleanup and confirmation after work;

– Fire safety: smoking strictly prohibited on site, sufficient fire-fighting equipment, flammable materials stored separately away from fire sources;

– Emergency plans: emergency handling plans for electric shock, fire and high-altitude falls with emergency supplies and regular drills.

14.4 Civilized Construction Management

– Material stacking: on-site equipment and materials stacked neatly by category with clear labels; occupied passages cleaned promptly;

– Site hygiene: daily waste cleaning after construction, clean site after work completion;

– Finished product protection: protection of installed equipment, walls and floors from collision and contamination;

– Noise control: reasonable scheduling of high-noise processes, stopping high-noise construction at noon and night;

– Site discipline: uniform attire with work badges, compliance with Party A site management regulations.

14.5 Project Communication Mechanism

– Daily report: daily construction reports covering progress, completed contents, next-day plan and existing problems;

– Weekly meeting: weekly project meetings summarizing progress, coordinating problems and adjusting plans with meeting minutes;

– Problem closure: on-site problems reported promptly with solutions within 24 hours, tracked to closure;

– Key node reporting: Party A notified to attend at equipment arrival, hidden acceptance, system commissioning and completion acceptance.

15. After-Sales Service

15.1 Warranty Period

– The overall engineering warranty period is 2 years from the date of completion acceptance;

– Core equipment (UPS, precision AC, monitoring host) provides 3-year original factory warranty;

– Within the warranty period, non-human damage equipment faults are repaired and parts replaced free of charge;

– Free software upgrade services within the warranty period.

15.2 Response Time

– 7×24-hour technical support hotline, all year round;

– Phone response within 30 minutes with remote assistance;

– Engineers on site within 4 hours in urban areas; 8 hours in suburbs and surrounding areas;

– General faults repaired within 24 hours; major faults with spare equipment to restore business quickly.

15.3 Inspection Service

– Free on-site inspection every six months within the warranty period (2 times/year);

– Inspection contents: equipment running status check, parameter calibration, cleaning and dust removal, hazard investigation, performance evaluation;

– Formal inspection report issued after inspection with optimization suggestions and O&M guidance.

15.4 Maintenance Service

– After the warranty period, paid annual maintenance services with basic and full maintenance packages;

– Maintenance includes: regular inspection, on-site fault repair, parts replacement discounts, software upgrades and technical consultation;

– Maintenance agreement customers enjoy priority response, priority parts and preferential expansion rights.

15.5 Technical Support

– Lifetime free technical consultation for O&M, expansion and upgrade questions;

– Solution design and construction services for system expansion and renovation;

– Customer-specific archives tracking full-lifecycle operation status.

15.6 Parts Guarantee

– Regional parts warehouses stocking common wearing parts and key spares for rapid replacement;

– Original factory direct supply with reliable quality and warranty on replaced parts;

– At least 5 years of parts supply support for discontinued equipment.

16. Training Plan

16.1 Training Objectives

Through systematic training, enable the user’s O&M personnel to master the basic principles, daily operations, inspection methods, common fault handling and emergency processes of each room system, able to independently complete daily O&M management with basic fault troubleshooting and emergency handling capability.

16.2 Training Targets

– Room O&M engineers; room administrators; related technical directors.

16.3 Training Contents

#### 16.3.1 Basic Operation Training (1 day)

– Room overall architecture introduction, system composition and functions;

– Standard rack equipment installation and cabling specifications;

– Intelligent PDU operation and energy viewing;

– Precision AC on/off operation, parameter setting and mode switching;

– UPS on/off operation and running status viewing;

– Power environmental monitoring platform operation: real-time monitoring, alarm viewing, report export;

– Cold aisle access control management and permission setting.

#### 16.3.2 Daily O&M Training (0.5 day)

– Daily inspection contents, cycles and standards;

– Normal ranges of key parameters (temperature, humidity, voltage, current);

– Daily equipment cleaning and filter replacement;

– Battery daily maintenance and precautions;

– Liquid cooling system level checking and pipeline inspection points;

– O&M record specifications and ledger management.

#### 16.3.3 Fault Handling and Emergency Training (0.5 day)

– Common alarm identification and handling;

– Emergency handling processes for power outage, AC failure, water leakage and fire alarms;

– Simple fault troubleshooting steps and tool use;

– Fault reporting process and precautions;

– Emergency contact mechanism and manufacturer support channels.

#### 16.3.4 Advanced Deepening Training (optional)

– In-depth system principle explanation;

– Advanced fault troubleshooting and analysis;

– System expansion and upgrade methods;

– Energy optimization and energy-saving management.

16.4 Training Methods

– On-site practical training: hands-on teaching with actual equipment;

– Theory explanation: PPT courseware on system principles and standards;

– Materials: operation manual, O&M manual and training courseware in paper and electronic versions;

– Assessment: practical and theory assessment after training.

16.5 Follow-up Training Support

– One free retraining or new technology training per year;

– Free on-site training for new employee onboarding;

– Special training for new functions after system upgrades.

17. Anonymous Typical Project Scenarios

The following cases are anonymous, generalized examples based on typical project implementations; no real customer names or locations are disclosed.

17.1 Cold Aisle Computer Room Project of an AI Computing Power Center

Project Overview

A double-row 20-rack high-density cold aisle computer room was built for the AI computing power center of a technology company, adopting heavy-duty racks, in-row precision air conditioners, modular UPS, cold-plate liquid cooling auxiliary heat dissipation and full-parameter power environmental monitoring systems.

Implementation Effect

Single rack load 3000kg supporting 15kW per rack, overall PUE controlled at 1.28, stable operation for 2 years with zero major faults, supporting the rapid development of the company’s large-model training business.

17.2 AI Training Computer Room Project of a Research Institute

Guangzhou Lain AI Server Room Construction project case photo 1

Project Overview

Two independent AI training computer rooms were built for a research institute, each configured with a 12-rack cold aisle system with liquid cooling heat dissipation and high-reliability power supply systems.

Implementation Effect

Meeting the high-density deployment needs of research team GPU clusters, passing national laboratory acceptance, providing stable computing power support for artificial intelligence, meteorological simulation, bio-computing and other research tasks.

17.3 Data Center Expansion Project of an Enterprise

Project Overview

AI computing power area expansion for a large enterprise data center, adding 15 heavy-duty racks with supporting cooling, power distribution and monitoring systems, uniformly managed with the original room.

Implementation Effect

The project went from design to delivery in only 25 days, quickly meeting business launch needs, successfully passing MLPS level 3 assessment.

17.4 Government Cloud AI Computing Power Room Project

Project Overview

An AI computing power room was built for a municipal government cloud platform, adopting a high-standard redundant architecture with dual utility power + diesel generator + modular UPS supply, N+1 precision AC cooling, fully enclosed cold aisle and MLPS level 3 compliant design.

Implementation Effect

Carrying government AI applications and smart city computing power needs, operating stably and reliably.

18. SEO Optimization Section

18.1 Core Keyword Layout

Core primary keywords

AI server room construction, AI room design solution, high-density room construction, liquid cooling room construction

High-conversion long-tail keywords

AI server room construction solution, 42U heavy-duty rack configuration, fully enclosed cold aisle construction, in-row precision AC configuration, modular UPS room, power environmental monitoring solution, cold-plate liquid cooling system, dual-circuit power supply room design

Industry traffic keywords

data center room construction, IDC room design, server room renovation, room engineering construction, intelligent room construction, constant temperature and humidity room, room power environmental monitoring

Brand-specific keywords

Lain AI room, KITOZER Pioneer room, Guangzhou Lain room engineering, Lain cold aisle rack

Dropdown/related search keywords

how to build an AI room, liquid cooling room cost, cold aisle room advantages and disadvantages, what does room power environmental monitoring include, difference between modular and traditional UPS, heavy-duty rack load standard

18.2 Page Optimization Tags

– Title tag: AI Server Room Construction Solution_Liquid Cooling Cold Aisle High-Density Room Design_Guangzhou Lain Intelligent

– Meta Keywords: AI server room construction, AI room design solution, cold aisle room, in-row precision AC, modular UPS, power environmental monitoring system, liquid cooling room, heavy-duty server rack, Guangzhou Lain

– Meta Description: Guangzhou Lain professionally provides AI server room construction overall solutions, including 42U heavy-duty racks, dual-circuit intelligent PDUs, fully enclosed cold aisles, in-row precision AC, modular UPS, power environmental monitoring and cold-plate liquid cooling systems, adapted to high-density AI servers, integrated delivery from design to construction.

– H1 tag: AI Server Room Construction Technical Design Solution

– H2 tags: Company Introduction, Project Overview, User Requirement Analysis, Design Description, System Configuration List, Product Technical Parameters, Solution Advantages, Construction Schedule, Construction Organization, After-Sales Service, Training Plan, Project Cases

18.3 Internal Link Anchor Text

– Core anchor text: AI server room construction, liquid cooling room design, cold aisle room construction

– Long-tail anchor text: 42U heavy-duty server rack, intelligent PDU power distribution system, in-row constant temperature and humidity precision AC, modular UPS uninterruptible power supply, power environmental monitoring system

– Related anchor text: room engineering construction, data center solution, shielded room construction, integrated cabinet

19. Official Contact Information

– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Website: https://gdlain.com

– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)

– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China

Shopping Cart