Table of Contents
ToggleChapter 1 Product Introduction
1.1 Product Definition
A High-Frequency UPS (High Frequency Uninterruptible Power Supply) is a modern uninterruptible power supply system that employs high-frequency pulse width modulation (PWM) technology, utilizes Insulated Gate Bipolar Transistors (IGBTs) as the core power switching devices, and eliminates the traditional line-frequency output transformer. Through the AC-DC-AC dual-conversion topology, this product achieves complete electrical isolation between the utility mains and the load, and is capable of providing continuous, stable, and clean sinusoidal AC power to load equipment under various operating conditions including normal mains, abnormal mains, and mains failure, ensuring zero-interruption operation of critical loads.
Compared with traditional line-frequency UPS systems, high-frequency UPS leverages high-frequency switching technology to substantially reduce the size and weight of magnetic components, increasing the overall power density by 2-3 times and improving conversion efficiency by 3-5 percentage points. It also features superior input power factor and lower input current harmonic distortion. It is currently the mainstream power protection device for data centers, telecommunication equipment rooms, financial settlement centers, and similar scenarios.
1.2 Product Development History
The development of UPS technology has gone through three major stages:
The first stage was the line-frequency UPS era (1960s-1990s), which adopted thyristor rectification and line-frequency transformer isolation architecture. These systems were bulky, heavy, and relatively inefficient, but had strong surge-withstand capability, and were mainly used in industrial and early telecommunications applications.
The second stage was the emergence of high-frequency UPS (1990s to early 2000s). With the maturation of IGBT power devices and the widespread adoption of PWM control technology, high-frequency topologies began to be applied in low-power UPS systems, progressively achieving miniaturization and higher efficiency, although high-power high-frequency technology was not yet mature.
The third stage is the comprehensive popularization of high-frequency UPS (2010 to present). The widespread application of digital signal processors (DSPs), breakthroughs in third-generation semiconductor devices, and the promotion of modular design concepts have enabled high-frequency UPS to achieve leapfrog development in power rating, reliability, and intelligence levels, comprehensively covering the full power range from 1kVA to the MW level, making it the mainstream solution for equipment room power supply.
Guangzhou Lain Intelligent System Development Co., Ltd. has been deeply engaged in the UPS field for many years. Relying on independently developed all-digital control algorithms and efficient thermal dissipation design, the company’s full series of high-frequency UPS products covers single-phase input/single-phase output, three-phase input/single-phase output, and three-phase input/three-phase output models, with power ratings from 1kVA to 800kVA. These products are widely used in government, finance, telecommunications, education, healthcare, industrial manufacturing, and many other industries.
1.3 Core Differences Between High-Frequency UPS and Line-Frequency UPS
The essential difference between high-frequency UPS and line-frequency UPS lies in the power conversion architecture and core components, resulting in significant differences in performance, size, efficiency, and applicable scenarios:
| Comparison Dimension | High-Frequency UPS | Line-Frequency UPS |
|---|---|---|
| Core Components | IGBT high-frequency rectifier + high-frequency inverter, switching frequency 20kHz-50kHz | Thyristor line-frequency rectifier + line-frequency inverter, switching frequency 50Hz |
| Output Transformer | No line-frequency output transformer; some models use small high-frequency isolation transformer | Equipped with bulky line-frequency output transformer |
| Size and Weight | 40%-60% smaller volume and 50%-70% lighter weight at the same power rating | Large volume, heavy weight |
| Overall Efficiency | 93%-96.5%, up to 97% or higher in efficiency mode | 88%-92% |
| Input Power Factor | ≥0.99, close to ideal value | Approximately 0.8, requires additional power factor correction equipment |
| Input Current Harmonics | ≤3%-5%, minimal pollution to the power grid | 25%-30%, severe harmonic pollution |
| Dynamic Response Speed | Millisecond level, minimal voltage fluctuation during load transients | Slow response, large voltage fluctuation |
| Surge Withstand Capability | Relatively weaker, suitable for IT-type nonlinear loads | Strong overload and short-circuit surge withstand capability, suitable for inductive loads |
| Noise Level | Low, typically ≤55dB | High, typically ≥60dB |
1.4 Product Industry Position and Value
Against the backdrop of rapid digital economy development, the scale of data center and computing equipment room construction continues to expand, with power supply reliability and energy efficiency becoming core assessment indicators. High-frequency UPS, leveraging its core advantages of high efficiency, compact size, intelligence, and green operation, has become the preferred solution for equipment room-grade uninterruptible power supply, holding over 80% market share.
From the user value perspective, high-frequency UPS delivers multiple benefits:
Space Value: Higher power density means less equipment room floor area is occupied for the same power rating, effectively reducing site rental and construction costs.
Energy Efficiency Value: Higher overall efficiency significantly reduces long-term electricity costs. Based on 8000 hours of full-load annual operation, a 100kVA high-frequency UPS can save approximately 20,000 kWh of electricity per year compared with a line-frequency unit.
Grid Value: High power factor and low harmonic characteristics reduce pollution to the power grid, decrease reactive power losses in the distribution system and cable heating, and eliminate the need for additional harmonic treatment equipment.
Management Value: Fully digital control and intelligent monitoring capabilities enable remote operation and maintenance, fault pre-warning, and data analysis, substantially reducing O&M costs and improving system reliability.
Chapter 2 Product Composition
2.1 Main Power Circuit Module
The main power circuit is the core of high-frequency UPS power conversion, comprising six major components: the input filter unit, active rectifier unit, DC bus unit, DC-DC battery converter unit, inverter unit, and output filter unit.
##### 2.1.1 Input Filter Unit
The input filter unit is located at the UPS input port and consists of an EMI filter circuit, surge suppression circuit, and input reactor. The EMI filter circuit is used to filter out high-frequency electromagnetic interference from the power grid while also suppressing high-frequency interference generated by the UPS itself from feeding back into the grid. The surge suppression circuit employs a combination of varistors and gas discharge tubes to absorb transient overvoltages caused by lightning strikes and switching operations. The input reactor is used to limit inrush current during closing and improve input current waveform quality.
##### 2.1.2 Active Rectifier Unit (PFC Rectifier)
The active rectifier unit uses IGBTs as power switching devices, implementing AC-DC conversion through high-frequency PWM control technology while simultaneously performing power factor correction. Compared with traditional thyristor rectification, active IGBT rectification achieves an input power factor close to unity (≥0.99), with total input current harmonic distortion (THDi) ≤3%, truly achieving “zero pollution” to the power grid. Additionally, active rectification supports a wide input voltage range, typically up to ±25% of the rated voltage, greatly enhancing adaptability to poor grid conditions.
The rectifier unit also integrates charge management functionality, providing float charge, boost charge, and trickle charge modes for the battery bank when the mains is normal, enabling intelligent battery management.
##### 2.1.3 DC Bus Unit
The DC bus unit serves as the energy hub connecting the rectifier, inverter, and battery, consisting of a large-capacity electrolytic capacitor bank, DC bus voltage detection circuit, and bus protection circuit. The DC bus capacitors provide energy buffering and voltage filtering, smoothing power fluctuations between the rectifier output and inverter input, and maintaining stable DC bus voltage. The bus voltage detection circuit monitors the bus voltage status in real time, providing feedback signals to the control circuit. The bus protection circuit includes multiple protections for overvoltage, undervoltage, overcurrent, and short circuit, ensuring safe operation of the DC system.
##### 2.1.4 DC-DC Battery Converter Unit
The DC-DC converter unit is a signature component of high-frequency UPS, implementing bidirectional energy conversion between the battery bank and the DC bus. When the mains is normal, this unit operates in buck mode, converting the high DC bus voltage to battery charging voltage. When the mains fails, this unit operates in boost mode, stepping up the battery’s low DC voltage to the rated DC bus voltage to supply energy to the inverter.
Through the DC-DC converter unit, the battery bank voltage can be significantly lower than the DC bus voltage, reducing the number of series-connected batteries, lowering battery bank cost, and improving battery management flexibility. Additionally, this unit provides electrical isolation between the battery and DC bus, enhancing system safety.
##### 2.1.5 Inverter Unit
The inverter unit employs a full-bridge IGBT inverter topology, using SPWM (Sinusoidal Pulse Width Modulation) technology to convert DC power into clean sinusoidal AC power. The inverter unit consists of IGBT power modules, driver circuits, and snubber circuits. The IGBT modules handle high-frequency switching, modulating the DC voltage into high-frequency pulse trains. The driver circuits provide gate drive signals from the low-voltage control signals to the high-power devices. The snubber circuits suppress voltage spikes generated during IGBT switching transitions, protecting the power devices.
The high-frequency inverter switching frequency is typically above 20kHz, far higher than line frequency, requiring only a small output filter to produce high-quality sinusoidal output. Output voltage steady-state accuracy reaches ±1%, and dynamic response time is less than 2ms under load transients.
##### 2.1.6 Output Filter Unit
The output filter unit consists of an LC low-pass filter, used to filter out the high-frequency harmonic components in the inverter’s SPWM output waveform and restore the high-frequency pulse wave to a smooth standard sine wave. The output filter also provides a certain short-circuit current-limiting capability, restricting the current rise rate at the moment of load short circuit, buying time for the protection circuit to operate.
2.2 Bypass and Static Switch Module
The bypass system is an important guarantee of UPS reliability. When the inverter system faults, experiences overload, or requires maintenance, the system can seamlessly transfer to bypass power supply to ensure the load is not interrupted. The bypass module consists of four parts: bypass input circuit, bypass voltage stabilization circuit, static switch, and maintenance bypass switch.
##### 2.2.1 Static Switch
The Static Transfer Switch (STS) employs a high-power thyristor anti-parallel configuration to achieve microsecond-level seamless transfer between inverter output and bypass power. The static switch has no mechanical contacts, no wear, long service life, and fast switching speed, with typical transfer time of less than 2ms, ensuring the load equipment experiences no perceptible disturbance during transfer.
The static switch features intelligent current detection and interlock control, effectively preventing circulating current between the inverter and bypass power sources, and provides overload and short-circuit protection capability.
##### 2.2.2 Maintenance Bypass Switch
The maintenance bypass is a manually operated molded case circuit breaker used when the UPS equipment requires shutdown for maintenance. It transfers the load to direct mains supply through the maintenance bypass, enabling complete de-energization of the UPS host while the load remains powered. The maintenance bypass switch is equipped with both mechanical and electrical interlocking to prevent parallel connection accidents caused by misoperation.
2.3 Intelligent Control Module
The control module is the “brain” of the UPS, employing a high-performance Digital Signal Processor (DSP) as the core, supplemented by auxiliary microcontrollers and programmable logic devices, implementing fully digital control and intelligent management.
##### 2.3.1 Master Control Unit
The main DSP controller is responsible for executing core control algorithms, including rectifier PFC control, inverter SPWM control, battery charge/discharge control, mode transfer logic, and protection logic. Compared with traditional analog control, fully digital control offers advantages of high control accuracy, good parameter consistency, flexible and configurable functionality, and strong anti-interference capability. Through high-precision AD sampling and high-speed computation, the DSP enables real-time monitoring and rapid regulation of parameters such as voltage, current, frequency, and temperature.
##### 2.3.2 Human-Machine Interface Unit
The human-machine interface unit consists of an LCD display, LED status indicators, and operation keys. The display provides real-time UPS operating status, input/output parameters, battery status, and alarm information. The indicator lights intuitively show operating states including mains, inverter, bypass, battery, and fault. The operation keys support parameter setting, functional testing, and fault reset operations.
##### 2.3.3 Communication Monitoring Unit
The communication monitoring unit integrates multiple communication interfaces, including RS232, RS485, dry contacts, USB, Ethernet, and SNMP, supporting integration with local monitoring software, environment monitoring systems, and cloud platforms for remote monitoring, parameter configuration, firmware upgrades, fault alarms, and data statistical analysis. Mobile APP and web-based multi-platform access enables users to monitor UPS operating status anytime, anywhere.
2.4 Battery Bank Module
The battery is the energy storage unit of the UPS, releasing electrical energy to maintain load power supply during mains failure. High-frequency UPS can accommodate various battery types including valve-regulated sealed lead-acid batteries (VRLA), gel batteries, and lithium-ion batteries.
The battery bank consists of multiple cells connected in series, with the number determined by the DC bus voltage and individual cell voltage. For example, with 12V cells, a 384V DC bus system requires 32 cells in series; a 192V system requires 16 cells in series. The battery bank is installed in battery cabinets or battery racks, equipped with battery circuit breakers, fuses, voltage/current detection, temperature sensors, and other accessories.
2.5 Thermal Dissipation and Structural Module
##### 2.5.1 Thermal Dissipation System
High-frequency UPS employs an intelligent forced-air cooling system consisting of axial fans, airflow channel structures, and temperature sensors. The fans feature temperature-controlled speed regulation, automatically adjusting speed based on internal temperature and load level, reducing noise and energy consumption while ensuring effective cooling. The airflow channels are optimally designed to provide smooth front-to-rear or bottom-to-top airflow, ensuring critical power devices receive adequate cooling.
##### 2.5.2 Enclosure Structure
The enclosure is fabricated from high-quality cold-rolled steel plate, with surfaces treated by phosphating and electrostatic powder coating for excellent corrosion and rust resistance. The structural design balances strength and thermal performance, with internal modular layout and segregated zones for different functional modules. High-voltage and low-voltage circuits are separated to enhance electromagnetic compatibility and maintainability. Rack-mount models comply with standard 19-inch cabinet mounting dimensions, while tower models support both upright and horizontal installation to suit different application scenarios.
2.6 Protection System Module
The protection system is the guarantee of safe and reliable UPS operation, covering full-chain protection across the input side, DC side, output side, and battery side, as well as auxiliary protections for temperature, lightning, and grounding.
Input Protection: Overvoltage protection, undervoltage protection, overcurrent protection, phase loss protection, phase reversal protection, frequency anomaly protection
DC Protection: Bus overvoltage protection, bus undervoltage protection, DC overcurrent protection, polarity reversal protection
Output Protection: Output overvoltage protection, output undervoltage protection, overload protection, short-circuit protection, overtemperature protection
Battery Protection: Battery overvoltage protection, battery undervoltage protection, battery overcurrent protection, battery overtemperature protection, charge overcurrent protection
Chapter 3 Product Classification
3.1 Classification by Input/Output Configuration
##### 3.1.1 Single-Phase Input/Single-Phase Output High-Frequency UPS (1P/1P)
Single-phase input/single-phase output high-frequency UPS has both input and output as single-phase 220V AC, with power ratings typically ranging from 1kVA to 20kVA. These models are compact and easy to install, primarily targeting small equipment rooms, network cabinets, office desktops, and small servers. They are the most widely used type of low-power UPS.
Single-phase input/single-phase output models are further divided into standard models and long-run models: standard models have built-in battery banks with backup times typically of 5-15 minutes; long-run models require external battery banks and allow flexible battery capacity configuration based on backup time requirements.
##### 3.1.2 Three-Phase Input/Single-Phase Output High-Frequency UPS (3P/1P)
Three-phase input/single-phase output high-frequency UPS has three-phase 380V AC input and single-phase 220V AC output, with power ratings typically ranging from 10kVA to 40kVA. These models are suitable for three-phase distribution environments, providing more balanced input currents and being more grid-friendly to the three-phase network, while the single-phase output is well-suited for IT loads. They are mainly used in small-to-medium equipment rooms and branch office data rooms.
##### 3.1.3 Three-Phase Input/Three-Phase Output High-Frequency UPS (3P/3P)
Three-phase input/three-phase output high-frequency UPS has both input and output as three-phase 380V AC, with power ratings typically ranging from 10kVA to 800kVA. It is the mainstay model for medium-to-large data centers and core equipment rooms. Three-phase output better matches three-phase distribution systems, achieving balanced three-phase load distribution, reducing neutral wire current, and improving power supply efficiency and reliability.
Three-phase input/three-phase output high-frequency UPS is further divided into tower models and modular models: tower models have an integrated structure with fixed power ratings; modular models consist of multiple power modules in parallel, supporting online hot-swappable expansion and redundancy backup, offering stronger reliability and scalability.
3.2 Classification by Power Rating
Low-Power High-Frequency UPS: 1kVA-20kVA, predominantly single-phase input/single-phase output, mainly used for desktop-level and cabinet-level power protection
Medium-Power High-Frequency UPS: 20kVA-200kVA, predominantly three-phase input/three-phase output, mainly used in small-to-medium data centers and enterprise equipment rooms
High-Power High-Frequency UPS: Above 200kVA, predominantly modular three-phase input/three-phase output, mainly used in large data centers, cloud computing centers, and telecom carrier core equipment rooms
3.3 Classification by Structural Form
##### 3.3.1 Tower High-Frequency UPS
Tower models feature a vertical cabinet structure for standalone placement, covering a wide power range with corresponding products from 1kVA to 800kVA. Tower models have ample internal space, good thermal dissipation conditions, moderate power density, and convenient maintenance, making them suitable for scenarios with sufficient equipment room space.
##### 3.3.2 Rack-Mount High-Frequency UPS
Rack-mount models comply with standard 19-inch cabinet mounting dimensions, with heights typically ranging from 1U to 6U and power ratings from 1kVA to 40kVA. Rack-mount UPS can be installed directly into server cabinets, deployed in the same rack as IT equipment, saving equipment room space and simplifying cabling. They are suitable for high-density cabinet and modular equipment room scenarios.
Some rack-mount models support dual-use tower/rack-mount configurations, allowing flexible conversion of installation orientation based on on-site conditions.
##### 3.3.3 Modular High-Frequency UPS
Modular high-frequency UPS adopts a “system cabinet + power module + battery module” architecture. The system cabinet provides common components including power distribution, monitoring, cooling, and bypass; power modules are standardized units supporting online hot-swapping. Modular UPS provides N+X redundancy capability, where a single module fault does not affect overall system operation, greatly improving reliability. It also supports on-demand expansion by incrementally adding power modules, reducing initial investment costs.
Modular UPS power ratings typically start from 20kVA, with individual module power ratings ranging from 10kVA to 50kVA. A single cabinet can support over 500kVA, and multi-cabinet parallel operation can achieve MW-level power supply systems.
3.4 Classification by Operating Principle
##### 3.4.1 Double-Conversion Online High-Frequency UPS
Double-conversion online architecture is the mainstream high-frequency UPS topology. When the mains is normal, power always passes through the “AC-DC-AC” dual conversion before being supplied to the load, providing complete electrical isolation between the mains and the load and delivering the highest output power quality. Regardless of whether the mains is normal, the inverter is always in operation, requiring no transfer when the mains fails, truly achieving zero-interruption power supply. This type is suitable for critical load scenarios requiring the highest power supply quality.
##### 3.4.2 Line-Interactive High-Frequency UPS
Line-interactive UPS achieves mains voltage regulation through high-frequency transformer tap changing. When the mains is normal, the load is supplied directly from the regulated mains, and the inverter is in standby charging state. When the mains is abnormal, it transfers to inverter power supply. This type has a simple structure, high efficiency, and low cost, but provides poor isolation during mains operation and average power supply quality. It is suitable for office and home scenarios with moderate power supply requirements.
3.5 Classification by Battery Type
Lead-Acid Battery High-Frequency UPS: Compatible with valve-regulated sealed lead-acid batteries, featuring mature technology, low cost, and high safety; this is currently the mainstream configuration
Lithium Battery High-Frequency UPS: Compatible with lithium-ion batteries such as lithium iron phosphate, featuring high energy density, long service life, and fast charge/discharge rates; this is the future development direction
Hybrid Battery High-Frequency UPS: Supports mixed use of lead-acid and lithium batteries, compatible with multiple battery types, offering strong adaptability
Chapter 4 Product Checklist
4.1 Host Standard Configuration Checklist
Taking the 100kVA three-phase input/three-phase output high-frequency tower UPS as an example, the standard configuration includes the following items:
| No. | Component Name | Specification/Model | Qty | Remarks |
|---|---|---|---|---|
| 1 | UPS host cabinet | LA-HF-100KVA | 1 unit | Includes rectifier, inverter, control, bypass, thermal dissipation systems |
| 2 | Input circuit breaker | MCCB 250A 3P | 1 pc | Built-in |
| 3 | Output circuit breaker | MCCB 250A 3P | 1 pc | Built-in |
| 4 | Maintenance bypass circuit breaker | MCCB 250A 3P | 1 pc | Built-in |
| 5 | Battery circuit breaker | DC circuit breaker 200A | 1 pc | Built-in |
| 6 | LCD operation panel | 7-inch color touchscreen | 1 pc | Front-mounted |
| 7 | Cooling fan | Axial fan 220V | 4 pcs | Intelligent temperature control |
| 8 | Communication interface board | RS232/RS485/dry contacts/USB | 1 pc | Standard |
| 9 | Input surge arrester | Class C surge protection 20kA | 1 set | Built-in |
| 10 | Leveling feet and casters | Adjustable load-bearing feet + universal casters | 1 set | 4 groups |
| 11 | Product manual | Installation, commissioning and operation manual | 1 copy | Printed version |
| 12 | Certificate of conformity and warranty card | Product conformity certificate and warranty voucher | 1 pc | – |
| 13 | Factory inspection report | Factory test report | 1 copy | – |
4.2 Battery Bank Configuration Checklist
The battery bank is an optional configuration customized according to user backup time requirements. Taking a 100kVA UPS with 30-minute backup time using 12V 100Ah lead-acid batteries as an example:
| No. | Component Name | Specification/Model | Qty | Remarks |
|---|---|---|---|---|
| 1 | VRLA battery | 12V 100Ah | 32 cells | 32 cells in series, 384V system |
| 2 | Battery cabinet | A16 battery cabinet | 2 units | Each holds 16 cells |
| 3 | Battery connecting bar | Copper tinned connecting bar | 32 pcs | With insulating sleeve |
| 4 | Battery connecting cable | 35mm² stranded copper cable | 1 set | Battery cabinet to UPS host |
| 5 | Battery fuse | DC500V 150A | 2 pcs | 1 each for positive and negative poles |
| 6 | Battery temperature sensor | NTC temperature probe | 2 pcs | Battery temperature monitoring |
4.3 Installation Accessory Checklist
Standard installation accessories include:
| No. | Component Name | Specification | Qty | Remarks |
|---|---|---|---|---|
| 1 | Input/output cables | Configured according to power rating | User-supplied | Recommend stranded copper flame-retardant cable |
| 2 | Grounding cable | 16mm² yellow-green dual-color | User-supplied | Protective grounding |
| 3 | Expansion bolts | M12×100 | 8 sets | Host anchoring |
| 4 | Cable lugs | Corresponding to cable specification | Quantity as needed | Terminal connections |
| 5 | Cable ties, insulating tape | Standard specification | Quantity as needed | Cable bundling and securing |
| 6 | Copper busbar | Custom | Optional | For high-current parallel operation or power distribution |
4.4 Optional Accessory Checklist
| No. | Accessory Name | Functional Description |
|---|---|---|
| 1 | SNMP network adapter | Enables Ethernet remote monitoring, supports SNMP protocol |
| 2 | Environment monitoring module | Monitors temperature, humidity, smoke, water immersion and other environmental parameters |
| 3 | Battery inspection module | Real-time monitoring of individual cell voltage, internal resistance, and temperature |
| 4 | Parallel operation kit | Supports parallel operation of multiple UPS units for capacity expansion or redundancy |
| 5 | Output isolation transformer | Adds output electrical isolation, enhances anti-interference capability |
| 6 | Input surge protection upgrade kit | Upgrades to Class B surge protection, enhances lightning protection capability |
| 7 | Host computer monitoring software | Centralized monitoring and management on local computer |
| 8 | Cloud platform monitoring service | Cloud-based remote monitoring, big data analysis, fault pre-warning |
Chapter 5 Product Operating Principles
5.1 Overview of Core Operating Modes
The high-frequency double-conversion online UPS has four basic operating modes: mains inverter mode, battery supply mode, bypass supply mode, and maintenance bypass mode. The system automatically switches between operating modes based on mains status, load conditions, and its own health status, ensuring uninterrupted power supply to the load at all times.
5.2 Mains Inverter Mode (Normal Operating Mode)
Mains inverter mode is the primary operating mode of the UPS. When the mains input voltage and frequency are within the normal range, and the UPS has no faults and the load is within limits, the system operates in this mode.
The operating process is as follows:
1. Three-phase/single-phase AC mains enters the active IGBT rectifier through the input circuit breaker, input filter, and EMI suppression circuit.
2. Under DSP control, the rectifier performs high-frequency PWM chopping to convert AC power into stable DC power while implementing power factor correction, making the input current waveform in phase with the voltage waveform, with input power factor ≥0.99.
3. The rectified DC output is fed into the DC bus, with one branch supplying the inverter and the other branch stepping down through the DC-DC converter for float charging of the battery bank, maintaining the batteries at full capacity.
4. The inverter employs SPWM modulation technology to convert the DC bus DC power into high-frequency pulse AC, which, after filtering by the output LC filter, produces clean, stable, standard sinusoidal AC power.
5. The output AC power is supplied to the load equipment through the static switch and output circuit breaker.
In this mode, the load is completely powered by the inverter, and complete electrical isolation between the mains and the load is achieved through the AC-DC-AC dual conversion. All power quality issues in the grid, including voltage fluctuations, harmonic interference, surges, and frequency drift, are completely isolated, and the load receives optimal power supply quality.
5.3 Battery Supply Mode
When the mains input is interrupted, voltage exceeds the allowable range, frequency is abnormal, or mains quality severely deteriorates, the UPS automatically transfers to battery supply mode with zero-interruption transfer, and the load experiences no perceptible disturbance.
The operating process is as follows:
1. The control circuit monitors the mains status in real time. When mains abnormality is determined, the rectifier is immediately shut down, stopping AC-DC conversion.
2. The DC-DC converter immediately switches from charging mode to discharging boost mode. The DC power released by the battery bank is stepped up by the DC-DC converter and stably delivered to the DC bus, maintaining constant bus voltage.
3. The inverter continues to operate, converting DC bus power into standard sinusoidal AC power for the load, with operating conditions identical to mains mode.
4. During battery discharge, the control system monitors battery voltage, discharge current, and battery temperature in real time, calculating remaining capacity and backup time. When the battery voltage drops to the end-of-discharge voltage, a low voltage alarm is issued. If the mains has not recovered, the system automatically shuts down for protection, preventing battery damage from deep discharge.
The duration of battery supply mode depends on the battery bank capacity and load power level. When the mains recovers, the system automatically transfers back to mains inverter mode, and the rectifier and DC-DC converter automatically enter charging mode to replenish the battery.
5.4 Bypass Supply Mode
When the UPS inverter faults, output overload timeout occurs, internal temperature is excessive, or a manual command is issued, the system automatically transfers to bypass supply mode through the static switch, with the mains directly powering the load to ensure business continuity.
The operating process is as follows:
1. Bypass power passes through bypass voltage stabilization and filtering circuits before connecting to the bypass terminal of the static switch. The bypass power source is phase-locked and synchronized with the inverter output at the same frequency and phase.
2. When bypass transfer conditions are satisfied, the control circuit issues a transfer command, first turning off the inverter-side static switch, then turning on the bypass-side static switch. The entire transfer process is completed within 2ms, achieving seamless transfer.
3. After transfer is complete, the load is directly powered by the bypass mains. The UPS inverter is in standby or fault state, awaiting fault clearing or overload elimination.
4. Once the fault is cleared or overload is eliminated, the system automatically detects the synchronization status between inverter output and bypass power, and automatically transfers back to inverter mode when conditions are met.
Bypass mode is the backup protection mode of the UPS. Although power supply quality is not as good as inverter mode, it maintains load power supply when the UPS itself has a fault, avoiding business interruption caused by single points of failure.
5.5 Maintenance Bypass Mode
Maintenance bypass mode is used when the UPS host requires shutdown for inspection, component replacement, or equipment upgrades. The load is manually transferred to direct mains supply through the maintenance bypass switch, enabling complete de-energization of the UPS host while the load continues to operate.
The operating procedure is as follows:
1. First transfer the UPS to automatic bypass mode and confirm the load is being powered by the static bypass switch.
2. Following the operating manual sequence, close the maintenance bypass circuit breaker. At this point, the load is powered by both the maintenance bypass and static bypass in parallel.
3. Sequentially open the output circuit breaker, bypass input circuit breaker, mains input circuit breaker, and battery circuit breaker. The UPS host is now completely de-energized.
4. The load is directly powered by the maintenance bypass circuit breaker, and safe maintenance work can be performed on the UPS host.
5. After maintenance is complete, close each circuit breaker in reverse sequence. After confirming normal UPS startup, open the maintenance bypass circuit breaker to restore normal bypass state, then transfer back to inverter mode.
Maintenance bypass operations must be strictly performed in accordance with procedures. Operating the maintenance bypass switch under load is strictly prohibited to prevent arc injury and equipment damage.
5.6 Mode Transfer Logic and Synchronization Technology
Transfers between UPS modes must satisfy strict synchronization conditions, particularly between inverter and bypass. The control system uses Phase-Locked Loop (PLL) technology to track the voltage phase and frequency of the bypass power source in real time, controlling the inverter output to maintain strict synchronization with the bypass power source.
When a transfer is required, the transfer action is only permitted when the voltage difference, phase difference, and frequency difference are all within allowable ranges, ensuring no circulating current, no surge, and no noticeable voltage fluctuation on the load during transfer.
Chapter 6 Product Technical Specifications
6.1 Input Technical Specifications
Taking the 100kVA three-phase input/three-phase output high-frequency UPS as an example, typical input specifications are as follows:
| Parameter | Specification |
|---|---|
| Rated input voltage | 380V/400V/415V AC three-phase four-wire |
| Input voltage range | 208V-478V AC (±25% wide range) |
| Rated input frequency | 50Hz/60Hz adaptive |
| Input frequency range | 40Hz-70Hz |
| Input power factor | ≥0.99 (full load) |
| Input current total harmonic distortion (THDi) | ≤3% (linear full load) |
| Input power factor correction | Active IGBT PFC |
| DC bus voltage | 384V DC |
| Input circuit breaker rated current | 250A |
| Input surge protection level | Class C, nominal discharge current 20kA, maximum discharge current 40kA |
| Phase sequence requirement | Phase sequence self-adaptive supported, reverse phase does not affect operation |
6.2 Output Technical Specifications
| Parameter | Specification |
|---|---|
| Rated output capacity | 100kVA / 90kW |
| Output configuration | Three-phase five-wire (3P+N+PE) |
| Rated output voltage | 380V/400V/415V AC |
| Output voltage regulation accuracy | ±1% (steady state) |
| Output frequency | Phase-locked and synchronized in mains mode; 50Hz/60Hz ±0.1% in battery mode |
| Output waveform | Pure sine wave |
| Output voltage total harmonic distortion (THDu) | ≤2% (linear load), ≤5% (nonlinear load) |
| Load power factor | 0.9 leading/lagging |
| Dynamic response | 0-100% load transient, voltage fluctuation ≤±5%, recovery time ≤2ms |
| Overload capability | 110% load for 60 minutes; 125% load for 10 minutes; 150% load for 1 minute |
| Short-circuit capability | 150% rated current current-limited, protection after 200ms |
| Bypass transfer time | ≤2ms (typical) |
| Output efficiency | ≥95% (double-conversion mode), ≥98% (economy mode) |
6.3 Battery Technical Specifications
| Parameter | Specification |
|---|---|
| Battery type | VRLA battery (standard), gel battery/lithium battery (optional) |
| Nominal cell voltage | 12V |
| System nominal voltage | 384V DC (32 cells in series) |
| Float charge voltage | 432V DC (13.5V per cell) |
| Boost charge voltage | 441.6V DC (13.8V per cell) |
| End-of-discharge voltage | 345.6V DC (10.8V per cell) |
| Charging method | Three-stage intelligent charging (constant current, constant voltage, float) |
| Maximum charging current | 0.1C |
| Battery temperature compensation | Supported, -3mV/℃/cell |
| Backup time | Configured according to battery capacity and load level; 30 minutes standard, optional |
6.4 Environmental and Mechanical Specifications
| Parameter | Specification |
|---|---|
| Operating ambient temperature | 0℃-40℃ (recommended 20℃-25℃) |
| Storage temperature | -20℃-55℃ (excluding batteries) |
| Relative humidity | 0%-95%, non-condensing |
| Altitude | ≤1000m (derating required above 1000m, 5% derating per additional 1000m) |
| Noise level | ≤55dB (at 1 meter, full load) |
| Protection rating | IP20 |
| Dimensions (W×D×H) | 600mm×800mm×1800mm (reference value) |
| Net weight | Approximately 580kg (excluding batteries) |
| Installation method | Upright tower installation; rack-mount optional |
6.5 Electromagnetic Compatibility and Safety Specifications
| Parameter | Specification |
|---|---|
| Electromagnetic compatibility | Compliant with GB 7260.2, EN 62040-2 standards |
| Safety standards | Compliant with GB 7260.1, EN 62040-1 standards |
| Insulation resistance | ≥2MΩ (input/output to ground) |
| Dielectric strength | Input to ground 2500V AC/1min, output to ground 2000V AC/1min, no breakdown, no flashover |
| Grounding requirement | Protective grounding resistance ≤4Ω |
| Safety certification | CCC certification; CE, UL certification optional |
6.6 Monitoring and Communication Specifications
| Parameter | Specification |
|---|---|
| Display method | 7-inch color LCD touchscreen |
| Display content | Input voltage, current, frequency; output voltage, current, frequency, power, load percentage; battery voltage, current, capacity, temperature; operating status, alarm information, operating records |
| Standard interfaces | RS232, RS485, dry contacts (4 inputs, 4 outputs), USB |
| Optional interfaces | Ethernet, SNMP, MODBUS, dry contact expansion |
| Alarm methods | Audible/visual alarm, SMS alarm (optional), email alarm (optional), platform alarm (optional) |
| Event logging | Stores more than 500 historical alarm records |
Chapter 7 Product Functions and Features
7.1 Core Power Supply Functions
##### 7.1.1 Uninterruptible Power Supply Function
Employing double-conversion online architecture, zero transfer time during mains failure truly achieves zero-interruption load power supply, ensuring critical loads such as servers, storage, and network equipment do not go down due to power loss, guaranteeing business continuity.
##### 7.1.2 Pure Sine Wave Output
Using high-precision SPWM inverter technology, output is a pure sine wave with low waveform distortion, compatible with various sensitive loads including servers, switches, and precision instruments, without causing equipment damage or operational anomalies.
##### 7.1.3 High-Precision Voltage and Frequency Regulation
Output voltage steady-state accuracy of ±1% and frequency stability of ±0.1% completely eliminate the effects of grid voltage fluctuations and frequency drift on the load, providing a stable and reliable power environment for precision electronic equipment.
##### 7.1.4 Electrical Isolation and Purification
The AC-DC-AC dual-conversion structure achieves complete electrical isolation between the mains and the load, effectively filtering out various grid disturbances including surges, spikes, harmonics, and noise, providing a clean power environment for the load.
7.2 Intelligent Battery Management Functions
##### 7.2.1 Three-Stage Intelligent Charging
Adopting a three-stage charging curve of constant current charging, constant voltage boost charging, and float charging, combined with temperature compensation, the system automatically adjusts charging parameters based on battery status, ensuring batteries are fully charged while avoiding overcharge damage, effectively extending battery service life.
##### 7.2.2 Intelligent Battery Testing
The system automatically performs periodic battery self-test functions, detecting battery health status through short-duration discharge tests, identifying aging and failed batteries in a timely manner, providing early warning, and avoiding the risk of battery failure when the mains is interrupted.
##### 7.2.3 Battery Temperature Compensation
Built-in battery temperature sensors automatically adjust charging voltage based on battery ambient temperature, reducing charging voltage at high temperatures to prevent overcharging and appropriately increasing charging voltage at low temperatures to ensure full charge, adapting to battery usage requirements in different temperature environments.
##### 7.2.4 Battery Tiered Protection
Comprehensive battery protections include overvoltage, undervoltage, overcurrent, overtemperature, and short circuit. During discharge, tiered alarms are issued based on battery voltage levels, with automatic shutdown at end-of-discharge voltage to prevent damage from deep discharge.
7.3 Multiple Protection Functions
##### 7.3.1 Full-Chain Electrical Protection
Covers overvoltage, undervoltage, overcurrent, short circuit, phase loss, phase reversal, overfrequency, and underfrequency protection across the entire chain of input, DC, output, and battery, comprehensively safeguarding equipment and load safety.
##### 7.3.2 Intelligent Overload Protection
Tiered overload protection mechanism with extended delay for minor overloads and short delay for severe overloads, both accommodating load inrush starting requirements and protecting UPS components from damage. After overload is cleared, inverter power supply is automatically restored.
##### 7.3.3 Overtemperature Protection
Multi-point temperature monitoring provides real-time monitoring of critical locations including IGBT modules, rectifier, fans, and ambient temperature. When temperature is excessive, automatic derating or protective shutdown is initiated to prevent component damage from overheating.
##### 7.3.4 Lightning and Surge Protection
Built-in Class C surge protection module, combined with multi-stage surge suppression circuits, effectively absorbs overvoltages from lightning strikes and grid switching operations, protecting equipment from surge damage.
7.4 Intelligent Management Functions
##### 7.4.1 Fully Digital Control
Employing high-performance DSP digital processors for fully digital control, offering high control accuracy, good parameter consistency, and strong anti-interference capability, with support for flexible parameter configuration to suit different application scenarios.
##### 7.4.2 Rich Communication Interfaces
Standard multiple communication interfaces support seamless integration with environment monitoring systems and monitoring platforms, enabling remote monitoring, parameter configuration, and firmware upgrades, with support for multi-platform centralized management.
##### 7.4.3 Intelligent Economy Mode
Supports ECO economic operation mode. When mains quality is good, the load is directly supplied by the mains through the bypass, achieving efficiency above 98% and significantly reducing operating energy consumption. When the mains is abnormal, it automatically transfers back to inverter mode, balancing energy saving and reliability.
##### 7.4.4 Fault Self-Diagnosis
The system has comprehensive self-diagnostic functionality, capable of real-time monitoring of each module’s operating status, precisely locating fault points, and recording fault codes with occurrence times for rapid troubleshooting and repair.
7.5 Core Product Features
##### 7.5.1 High Efficiency and Energy Saving
Overall system efficiency as high as 95% or more, reaching 98% in economy mode, with input power factor of 0.99 and harmonic distortion ≤3%, substantially reducing grid losses and operating electricity costs, meeting green data center construction requirements.
##### 7.5.2 Compact and High-Density
With the elimination of the line-frequency transformer and high-frequency design, power density is high with small size and light weight, saving equipment room floor space and reducing floor loading requirements, lowering equipment room construction costs.
##### 7.5.3 Wide-Range Adaptability
Ultra-wide input voltage range of ±25% adapts to poor grid environments, reducing battery discharge cycles and extending battery life, particularly suitable for remote areas and industrial environments with significant voltage fluctuations.
##### 7.5.4 Reliable and Stable
Using mature IGBT power devices and fully digital control technology, key components are sourced from internationally renowned brands, undergoing rigorous reliability testing and burn-in trials, with Mean Time Between Failures (MTBF) ≥200,000 hours.
##### 7.5.5 Easy Maintenance
Modular design with key components easy to disassemble and replace; front-panel operation and maintenance allow routine inspections without disassembly; comprehensive fault codes and status indications enable rapid problem identification.
##### 7.5.6 Low-Noise Operation
Intelligent temperature-controlled variable-speed fans automatically adjust speed based on load and temperature, with normal operating noise ≤55dB, suitable for office environments and attended equipment rooms.
Chapter 8 Product Application Scenarios

8.1 Data Centers and IDC Facilities
Data centers are the most critical application scenario for high-frequency UPS systems. IT loads such as servers, storage devices, and network switches place extremely high demands on power quality and reliability. Any power interruption can result in enormous economic losses and business impact.
With high reliability, high efficiency, high power density, and low harmonic distortion, high-frequency UPS systems perfectly match the load characteristics of data centers. From small and medium-sized enterprise server rooms to large-scale cloud computing data centers, from single-cabinet power supply to megawatt-level power supply systems, high-frequency UPS offers mature solutions for all applications. Modular high-frequency UPS is the preferred choice for large data centers, supporting N+X redundancy, on-demand expansion, and online maintenance, meeting the availability requirements of Tier III and Tier IV data centers.
8.2 Financial Industry Computer Rooms
Core business systems, settlement systems, and trading systems of financial institutions such as banks, securities firms, and insurance companies are critical loads with extremely high requirements for power supply continuity. Any momentary power interruption may cause trading disruptions and data loss, resulting in incalculable economic losses and reputational damage.
The double-conversion online architecture of high-frequency UPS provides the highest level of power protection. Pure sine wave output ensures the stable operation of precision financial equipment, and comprehensive monitoring and alarm functions enable 7×24 hour unattended operation. Widely applied in bank data centers, stock exchange facilities, insurance company computer rooms, and business outlets.
8.3 Telecommunications Industry
Core switching offices, base stations, and transmission nodes of telecommunications operators are critical nodes in communication networks. Power interruptions would cause widespread communication outages, affecting public services and emergency communications.
High-frequency UPS features compact size, high efficiency, and strong environmental adaptability, making it suitable for the limited space and complex power supply conditions of telecommunication facilities. From high-power three-input/three-output UPS for core switching offices to low-power single-input/single-output UPS for base stations, it comprehensively covers power protection needs at all levels of the telecommunications industry. Additionally, the low harmonic characteristics of high-frequency UPS reduce electromagnetic interference to communication equipment, ensuring communication signal quality.
8.4 Medical Industry
Critical medical equipment in hospitals, including MRI, CT, color Doppler ultrasound, intensive care units (ICU), and operating rooms, requires extremely high power supply reliability and power quality. Power interruptions may endanger patient lives, and power interference may affect diagnostic accuracy.
The pure sine wave output and excellent voltage regulation performance of high-frequency UPS ensure the stable operation of precision medical equipment. Zero-interruption transfer ensures uninterrupted power during surgeries and emergency procedures. Low-noise operation meets hospital environmental requirements. Widely applied in Grade-A tertiary hospital data centers, imaging departments, operating rooms, ICUs, clinical laboratories, and other critical areas.
8.5 Government and Public Institutions
Government affairs systems, command centers, and data centers of government agencies, public security, traffic police, fire departments, taxation, and social security departments carry the functions of public services and emergency command, requiring high power supply reliability and security.
High-frequency UPS is stable, reliable, and easy to maintain, ensuring 7×24 hour stable operation of government systems, ensuring uninterrupted public services and reliable emergency command. Furthermore, domestically manufactured high-frequency UPS products comply with government information security requirements, supporting the development of digital government.
8.6 Industrial Automation
PLC control systems, DCS distributed control systems, precision instruments, and automated production lines in industrial production require high power supply stability and anti-interference capability. Grid fluctuations and interference may cause production stoppages, product scrap, or even equipment damage.
The wide voltage input range of high-frequency UPS adapts to the large fluctuations in industrial power grids. High anti-interference capability adapts to complex industrial electromagnetic environments, providing stable and clean power for industrial automation equipment. Widely applied in control rooms and automated production lines in automotive manufacturing, electronics manufacturing, food processing, petrochemical, and electric power industries.
8.7 Education and Research Institutions
Data centers, laboratories, and supercomputing centers of universities and research institutes house large numbers of servers, precision experimental instruments, and high-performance computing equipment, requiring high power quality and reliability.
High-frequency UPS ensures the stable operation of research equipment, preventing experimental failures and data loss caused by power issues. High efficiency and intelligent management also align with the concepts of green campuses and smart campuses.
8.8 Commercial and Office Scenarios
Information centers, security systems, building automation systems in large shopping malls, hotels, and office buildings, as well as enterprise office servers, network equipment, and office computers, require basic-level power protection.
Medium and low power high-frequency UPS features compact size, flexible installation, and moderate cost, meeting the power supply needs of commercial and office scenarios while preventing data loss and business interruption caused by sudden power outages.
Chapter 9 Product Installation

9.1 Pre-Installation Preparations
9.1.1 Technical Documentation Preparation
Before installation, carefully read this manual, product certificate, factory inspection report, and other technical documents. Familiarize yourself with the product structure, technical parameters, installation requirements, and safety regulations. Verify that the equipment model, specification, and quantity match the contract. Inspect the equipment exterior for transportation damage and verify all accessories are complete.
Prepare construction drawings, power distribution system diagrams, and floor plans required for installation. Clearly define the installation location, cable routing paths, and grounding methods. Organize installation technical staff for technical disclosure, clarifying work assignments and safety precautions.
9.1.2 Tools and Instruments Preparation
The following tools and instruments are required for installation:
Electrical tools: Screwdriver set, wrench set, socket wrench, wire stripper, crimping tool, electrician’s knife, tape measure, spirit level, torque wrench
Measuring instruments: Multimeter, clamp ammeter, insulation resistance tester (megger), phase sequence meter, thermometer
Auxiliary tools: Hydraulic fork lift, manual pallet truck, lifting slings, pry bar, insulating gloves, insulating shoes, safety helmet
Others: Marker pen, cable ties, insulating tape, heat shrink tubing, cleaning tools
All measuring instruments should be within their calibration validity period to ensure accurate and reliable measurement data.
9.1.3 Site Condition Inspection
Conduct a comprehensive inspection of the installation site before installation to confirm the following conditions are met:
Load-bearing check: The floor load-bearing capacity of the equipment room should be greater than the total equipment weight (including batteries). A 100kVA UPS main unit plus batteries weighs approximately 1.5-2 tons; recommended floor load-bearing capacity is ≥800kg/m². If load-bearing capacity is insufficient, reinforcement measures must be taken.
Space check: Reserve sufficient operation and maintenance space around the equipment: front ≥1000mm, rear ≥800mm, sides ≥600mm, top ≥500mm. Equipment access passage width should be greater than the equipment width to ensure the equipment can be moved into position.
Environmental check: The equipment room environment should be clean, dry, free from dust, corrosive gases, and flammable/explosive materials. Ambient temperature 0-40°C, relative humidity ≤95% without condensation. Avoid direct sunlight and keep away from heat sources and water sources.
Ventilation check: The equipment room should have good ventilation and heat dissipation conditions. Precision air conditioning is recommended to maintain ambient temperature at 20-25°C. The equipment air intake and exhaust outlets must not be obstructed to ensure smooth airflow paths.
Power distribution check: Mains input power distribution should be in place, input capacity meeting the UPS rated power requirements, and input switches and cable specifications conforming to design requirements. The grounding system should be complete with grounding resistance ≤4Ω.
9.2 Equipment Transportation and Positioning
9.2.1 Transportation Precautions
Equipment transportation should be performed by professional personnel using fork lifts or transport equipment that meets load-bearing requirements.
Keep the equipment upright during transportation. Tipping at an angle exceeding 30 degrees is strictly prohibited. Inversion, rolling over, and dropping are strictly prohibited.
Check that the equipment packaging is intact before transportation. Take care to protect the equipment surface paint and panels when removing packaging.
Avoid collisions and vibration during transportation. Protect vulnerable components such as the display screen and operation panel.
Use a freight elevator for multi-story transport, confirming the elevator’s load capacity and dimensions meet requirements. If no freight elevator is available, develop a dedicated lifting plan.
9.2.2 Positioning Installation
Determine the equipment installation position according to the floor plan and mark the installation reference line.
Use a fork lift or transport cart to slowly move the equipment to the installation position. Adjust the orientation and position to ensure the equipment front faces the operation aisle.
Adjust the adjustable leveling feet at the equipment base. Use a spirit level to calibrate the equipment levelness and verticality. Horizontal deviation should be ≤2mm/m.
After confirming the equipment is placed stably, lock the casters (if equipped) to ensure the equipment will not shift.
If floor fixing is required, use expansion bolts to securely fix the equipment base to the floor.
The battery cabinet positioning method is the same as the main unit. The battery cabinet should be placed close to the main unit to shorten battery connection cable length and reduce line losses.
9.3 Detailed Installation Environmental Requirements
9.3.1 Temperature Requirements
The optimal operating ambient temperature for UPS is 20°C-25°C. Excessively high ambient temperature accelerates component aging and shortens service life, particularly for batteries. For every 10°C increase in ambient temperature, battery life decreases by approximately 50%. Excessively low ambient temperature causes battery capacity to decline, affecting backup time.
The equipment room should be equipped with an air conditioning system to maintain a stable temperature within the reasonable range. No heat sources should be present near the equipment. Keep away from radiators, heaters, high-power resistors, and other heat-generating equipment.
9.3.2 Humidity Requirements
Ambient relative humidity should be controlled between 30%-70%, without condensation. Excessive humidity can cause insulation performance degradation, leading to short circuits and leakage faults. Excessively low humidity can generate static electricity that damages electronic components.
Equipment rooms in high-humidity regions should be equipped with dehumidification equipment. Dehumidifiers may be appropriately deployed in dry regions. Installing UPS equipment directly below water pipes or air conditioning units is strictly prohibited to prevent water leakage from entering the equipment.
9.3.3 Cleanliness Requirements
The equipment room should be kept clean. Dust, metal debris, and fiber contaminants can block air ducts, reduce heat dissipation effectiveness, and cause circuit board short circuits and poor contact. Metal dust in particular can easily cause short circuits that burn out equipment.
Dust prevention measures should be implemented in the equipment room with regular cleaning and maintenance. Dust generated during construction and installation should be thoroughly cleaned before equipment is powered on for operation.
9.3.4 Space and Ventilation Requirements
UPS generates heat during operation and requires good ventilation for heat dissipation. The equipment air intake is typically located at the front or bottom, and the exhaust outlet at the rear or top. Installation must ensure the intake and exhaust outlets are unobstructed and not blocked by walls, cables, or other equipment.
When multiple units are installed side by side, sufficient spacing should be maintained between units to prevent hot air recirculation between units. If installed in a sealed cabinet, forced ventilation and heat dissipation systems must be provided to ensure the cabinet internal temperature does not exceed limits.
9.4 Grounding System Installation
9.4.1 Importance of Grounding
Proper grounding is the foundation for safe and reliable UPS operation. It ensures personnel safety, suppresses electromagnetic interference, improves surge and lightning protection capability, and ensures stable system operation. Poor UPS grounding can cause abnormal equipment operation, reduced anti-interference capability, lightning damage, and even electric shock accidents.
9.4.2 Grounding Requirements
The UPS system adopts combined grounding, where the functional ground, protective ground, and lightning protection ground share one common grounding electrode. Grounding resistance should be ≤4Ω.
The UPS main unit protective grounding terminal must be reliably connected to the equipment room grounding busbar using dedicated grounding cable. The grounding cable should be yellow-green dual-color stranded copper wire with cross-sectional area ≥16mm².
Battery cabinets and distribution cabinet enclosures must each be independently and reliably grounded.
Grounding conductors must never be connected in series. Each should be connected directly to the grounding busbar.
Grounding connections should be firm and reliable. Terminals should be tin-plated to prevent oxidation. Grounding resistance should be checked regularly.
9.4.3 Grounding Installation Procedure
1. Locate the protective grounding terminal on the rear of the UPS main unit, marked as PE or with the grounding symbol.
2. Crimp an appropriate cable lug onto one end of the grounding cable, and secure it to the grounding terminal with bolts at the specified tightening torque.
3. Connect the other end of the grounding cable to the equipment room grounding busbar, also securely crimped and fastened.
4. Use an insulation resistance tester (megger) to measure the resistance between the equipment enclosure and the grounding busbar. It should be ≤0.1Ω, confirming proper grounding.
5. Apply grounding identification labels and record the grounding resistance test data.
Chapter 10 Product Wiring

10.1 Pre-Wiring Preparation and Safety Regulations
10.1.1 Safety Regulations
Wiring work must be performed by certified electricians in strict compliance with electrical safety operating procedures.
Before wiring, confirm that all input and output switches are in the OPEN (OFF) position. Verify no voltage is present before proceeding with work.
Work personnel must wear insulating gloves and insulating shoes, use insulated tools, and take appropriate safety precautions.
Strictly follow the wiring diagrams. Unauthorized changes to wiring methods and cable specifications are strictly prohibited.
All wiring terminals must be securely fastened to prevent loosening and heat generation that could cause accidents.
After wiring is completed, a comprehensive inspection must be performed. Power can only be applied after confirming everything is correct.
10.1.2 Cable Selection Principles
Cables should be copper-core PVC-insulated flame-retardant cables (ZR-YJV), meeting current-carrying capacity requirements with a suitable safety margin.
Cable current-carrying capacity should be greater than the UPS maximum input/output current, considering derating factors for ambient temperature and installation method.
Recommended input/output cable cross-sectional areas (using three-input/three-output as an example):
| UPS Rating | Cable Cross-Sectional Area |
|---|---|
| 10kVA | 6mm² |
| 20kVA | 10mm² |
| 40kVA | 16mm² |
| 60kVA | 25mm² |
| 100kVA | 35mm² |
| 200kVA | 70mm² |
Battery DC cables should be dedicated DC cables. Cross-sectional area should be calculated based on maximum discharge current with voltage drop ≤1%.
All cables should have 3C certification, be of qualified quality, and match the specifications and models required by the design.
10.1.3 Pre-Wiring Inspection
Check that all circuit breakers and switches are in the OPEN (OFF) position and verify that no voltage is present.
Verify that cable specifications, models, and lengths meet requirements. Inspect cables for exterior damage.
Prepare cable lugs of the appropriate specifications, crimping tools, torque wrenches, and other tools.
Clear the wiring area, ensuring sufficient space and adequate lighting.
10.2 Mains Input Wiring
Locate the mains input wiring terminals on the UPS main unit, marked as “Mains Input” or “MAIN INPUT”, comprising R, S, T, and N terminals.
Connect the three-phase input cable phase conductors R, S, T, and N to the corresponding terminals, ensuring correct phase sequence.
Strip cable ends to the appropriate length, crimp copper lugs, and ensure good contact.
Use a torque wrench to tighten the terminal bolts to the specified torque, ensuring secure connections with no looseness.
Connect the other end of the input cables to the output terminals of the upstream distribution circuit breaker, maintaining consistent phase sequence.
After wiring is complete, check that the phase sequence is correct and confirm there are no short circuits or incorrect connections.
10.3 Bypass Input Wiring
Locate the bypass input terminals, marked as “Bypass Input” or “BYPASS INPUT”, comprising R, S, T, and N terminals.
The bypass input power source should be taken from the same mains supply as the mains input to ensure phase consistency. If dual mains feeds are used, confirm that both mains sources are from the same source with identical phase.
Connect bypass cables to the terminals according to phase sequence correspondence. Tightening torque must meet requirements.
A dedicated circuit breaker should be configured upstream of the bypass input for convenient maintenance and servicing.
After wiring is completed, verify that the bypass and mains phase sequences are consistent. Incorrect phase connection is strictly prohibited.
10.4 Output Wiring
Locate the UPS output terminals, marked as “Output” or “OUTPUT”, comprising R, S, T, and N terminals.
Connect output cables to the output terminals according to phase sequence correspondence and secure them firmly.
Connect the other end of the output cables to the load distribution system, such as distribution panels, PDUs, etc.
The output neutral conductor should be routed separately. Mixing with the input neutral conductor is strictly prohibited.
Phase sequence identification labels should be applied at the load end to ensure correct phase sequence for load equipment.
After wiring is completed, check for short circuits or ground faults at the output end.
10.5 Battery Wiring
10.5.1 Battery String Connection
Batteries are installed in the battery cabinet, arranged in sequence. Confirm that each battery has intact appearance and normal voltage.
Connect batteries in series: the positive terminal of the first battery to the negative terminal of the second battery, continuing in series until the battery string ends with overall positive and overall negative terminals.
Use dedicated battery connection bars to connect battery terminals. Tighten with a torque wrench to the specified torque, typically 8-10N·m.
During connection, take care to prevent short circuits between positive and negative terminals. Use insulated tools and wear insulating gloves.
The total battery string voltage should be the per-cell voltage multiplied by the number of cells. For 32 cells of 12V batteries, the total voltage is approximately 384V. Measure and confirm the voltage is normal.
10.5.2 Battery-to-Main-Unit Connection
Locate the battery connection terminals on the UPS main unit, marked as “Battery +” and “Battery -“. Note the positive and negative terminal identification.
Connect the battery string overall positive cable to the UPS battery positive terminal, and the overall negative cable to the battery negative terminal. Reverse connection is strictly prohibited.
A battery circuit breaker and fuse should be installed in the battery circuit, typically on the positive line or on both positive and negative lines.
The battery switch should be in the OPEN (OFF) position. After wiring is completed, measure the voltage at the UPS battery terminals to confirm correct polarity and normal voltage.
Battery connection cables should be as short as possible to reduce line losses and voltage drop. Apply clear positive/negative identification labels at both ends of the cables.
10.6 Grounding and Signal Cable Wiring
Protective grounding wiring: Connect the PE grounding cable to the UPS grounding terminal, with the other end connected to the equipment room grounding busbar. See Section 9.4 for details.
Communication cable wiring: Based on monitoring requirements, connect RS232, RS485, Ethernet, or other communication cables. Communication cables should be shielded types, with the shield grounded at one end only. Keep communication cables away from power cables to avoid interference.
Dry contact wiring: Based on alarm linkage requirements, connect dry contact input/output signal cables to the environmental monitoring system or audible/visual alarm devices.
Temperature sensor wiring: Attach the battery temperature sensor to the battery surface. Connect the signal cable to the corresponding interface on the main unit for battery temperature compensation and over-temperature protection.
10.7 Wiring Inspection and Acceptance
After all wiring is completed, a comprehensive inspection must be performed. Power can only be applied after confirming everything is correct:
Visual inspection: All wiring should be neat and securely fastened, with clear identification labels, no exposed copper strands, and good insulation.
Phase sequence check: Use a phase sequence meter to check the phase sequence of mains input, bypass, and output. Confirm correct three-phase sequence and consistent phase sequence between mains and bypass.
Polarity check: Verify correct positive/negative polarity in the DC battery circuit with no reverse connection.
Continuity check: With all circuit breakers in the OPEN (OFF) position, measure all circuits for short circuits and ground faults.
Insulation check: Use a 500V insulation resistance tester to measure the insulation resistance of each circuit to ground. It should be ≥2MΩ.
Tightness check: Sample-check the tightening torque of critical wiring terminals to confirm compliance with requirements.
Label check: Both ends of each cable should have clear identification labels indicating the circuit name, destination, and phase sequence.
Chapter 11 Product Commissioning
11.1 Pre-Commissioning Inspection
Before commissioning, a comprehensive inspection must be completed to ensure the equipment meets energization conditions:
All installation and wiring work is complete. Wiring inspection is satisfactory with complete records.
No tools, wires, metal debris, or other foreign objects are left inside the equipment.
All circuit breakers and switches are in the OPEN (OFF) position.
Input mains voltage is normal and within the UPS allowable input range.
The grounding system is in good condition with grounding resistance meeting requirements.
Equipment room ambient temperature, humidity, and cleanliness meet requirements.
Loads are temporarily disconnected for no-load commissioning first.
Commissioning personnel are in position with clear division of responsibilities and emergency response plans prepared.
11.2 Power-On Commissioning Procedure
11.2.1 Pre-Energization Confirmation
Confirm all UPS internal switches and external input/output switches are in the OFF position.
Confirm the battery switch is in the OFF position.
Confirm the load main switch is in the OFF position.
Measure the mains input voltage and record the value. Confirm it is within the normal range.
11.2.2 Bypass Energization Check
Close the bypass input circuit breaker to energize the UPS bypass circuit.
Observe the panel indicator status. The bypass indicator should illuminate, and the equipment should be in standby mode.
Measure the bypass input voltage to confirm it matches the panel display with balanced three-phase voltage.
Check that the cooling fans and control panel are operating normally without abnormal sounds or odors.
Measure the bypass output voltage to confirm normal voltage and correct phase sequence.
11.2.3 Mains Energization and Rectifier Startup
Close the mains input circuit breaker to energize the mains circuit.
Observe the control panel. The mains input indicator should illuminate, showing normal input voltage and frequency.
Start the rectifier and observe the DC bus voltage gradually rising to the rated value, stable without fluctuation.
Measure the DC bus voltage and record the value. It should match the displayed value.
Observe the rectifier operating status. There should be no abnormal noise, no overheating, and the input current should be stable.
Check the input power factor and harmonic indicators to confirm compliance with technical parameter requirements.
11.2.4 Inverter Startup
After confirming the DC bus voltage is stable and normal, press the inverter start button.
Observe the inverter startup process. The output voltage should gradually build up and reach the rated value.
Measure the three-phase output voltage to confirm balance, stability, and sine wave waveform.
Observe the output frequency. In battery mode it should be 50Hz±0.1%; in mains mode it should be synchronized with the mains.
Measure the output voltage harmonic distortion to confirm compliance with technical specifications.
Check the inverter operating status. IGBT module temperatures should be normal with no abnormal alarms.
11.2.5 Inverter-to-Bypass Transfer Test
After confirming the inverter output is synchronized with the bypass power source, perform the manual bypass transfer operation.
Observe the transfer process. The output voltage should show no significant fluctuation and the load should experience no power interruption.
Test both inverter-to-bypass and bypass-to-inverter transfers. Transfer should be smooth with no impact.
Record the transfer time. It should be ≤2ms.
Repeat the transfer test multiple times to confirm stable and reliable transfer functionality.
11.3 Battery Function Commissioning
11.3.1 Battery Charging Test
Close the battery circuit breaker to connect the battery system.
Observe the battery charging status. The charging current should be stable and the battery voltage should gradually rise.
Check the charging parameter settings. Float charge voltage, equalization charge voltage, and charging current should meet battery requirements.
Measure the charging voltage and charging current. They should match the panel display.
Verify the temperature compensation function. Simulate temperature changes and observe whether the charging voltage adjusts accordingly.
11.3.2 Battery Discharge Test
Open the mains input circuit breaker to simulate a mains power failure. The UPS should automatically transfer to battery power mode.
Observe the transfer process. The output should be uninterrupted with stable voltage.
Record the battery voltage at the start of discharge and the discharge current.
Allow the battery to discharge for 3-5 minutes. Observe the battery voltage drop and calculate the battery capacity status.
Restore mains input. The UPS should automatically transfer back to mains mode and the battery should resume charging.
Test the battery low-voltage alarm function, verifying the staged alarm and shutdown protection logic.
11.4 Load Testing
11.4.1 No-Load Test
In no-load status, monitor UPS operating parameters: input voltage/current, output voltage/current, DC bus voltage, battery voltage, overall efficiency, power factor, temperature, noise, etc. Record all data and compare with factory parameters to confirm normal operation.
11.4.2 Progressive Load Test
Close the output circuit breaker and progressively connect loads from 25%, 50%, 75% to 100% of rated load.
After each load level stabilizes, record input/output parameters and observe voltage stability and current balance.
Observe the dynamic response to sudden load changes. Output voltage fluctuation and recovery time should meet specifications.
Run at full load for 30 minutes. Monitor temperatures at all locations. There should be no overheating and fans should operate normally.
Test the overload protection function by progressively increasing load to 110% and 125%, verifying the overload time-delay protection logic.
11.4.3 Non-Linear Load Test
Connect typical non-linear loads such as servers and switching power supplies. Test output voltage waveform distortion to confirm it is within allowable limits. The UPS should operate stably without abnormal vibration or noise.
11.5 Protection Function Testing
Input over/under-voltage protection: Simulate excessively high and low input voltages to verify the UPS automatically transfers to battery mode or activates protection.
Output short-circuit protection: Simulate an output short circuit to verify fast UPS protection with no component damage. The UPS should recover after the fault is cleared.
Over-temperature protection: Simulate excessive temperature to verify over-temperature alarm, derating, and protection functions.
Battery reverse-polarity protection: Verify the protection function against battery reverse connection to prevent equipment damage.
Fault alarm testing: Simulate various faults to verify audible/visual alarms and remote alarm functions operate correctly with accurate fault codes.
11.6 Parameter Setting and Function Configuration
11.6.1 System Parameter Settings
Set basic system parameters through the operation panel:
- Output voltage level and frequency
- Battery type, cell count, float charge voltage, equalization charge voltage, end-of-discharge voltage
- Charging current limit
- Overload protection threshold and delay time
- High/low voltage alarm thresholds
- Date and time settings
11.6.2 Communication and Monitoring Configuration
Set communication parameters such as RS485 address, baud rate, and protocol type.
Configure network IP address, gateway, and subnet mask. Test network connectivity.
Set alarm parameters such as alarm contacts, alarm methods, and alarm thresholds.
Integrate with the environmental monitoring system and verify data upload and remote control functions.
Test remote power on/off, parameter setting, firmware upgrade, and other functions.
11.6.3 Advanced Function Configuration
Configure advanced functions according to user requirements:
- ECO economic mode enable and settings
- Parallel operation parameters (for multi-unit parallel configurations)
- Battery self-test cycle settings
- Scheduled power on/off functions
- Historical data and log export
11.7 Commissioning Completion Confirmation
After all commissioning items are completed, organize the commissioning records. Confirm all functions operate normally, parameters meet requirements, and the equipment operates stably. Conduct an operation demonstration and training session for the user, explaining basic operations, daily maintenance, and fault handling procedures. Both parties jointly sign the commissioning acceptance record, completing the commissioning work.
Chapter 12 Product Precautions
12.1 Safety Precautions
High voltage hazard: The UPS contains high-voltage DC and AC power internally. Opening the cabinet cover while the equipment is energized is strictly prohibited. Touching internal components is strictly prohibited to prevent electric shock. Maintenance must be performed by qualified professionals. Wait for capacitors to fully discharge after power-off before performing any work.
Battery safety: Batteries store significant electrical energy. Short circuits can produce enormous currents, creating fire and explosion hazards. Use insulated tools and wear protective equipment when working with batteries. Short circuits between positive and negative terminals are strictly prohibited. Dispose of waste batteries according to regulations. Never discard them improperly.
Operational safety: Strictly follow operating procedures for power on/off and mode transfers. Operating the maintenance bypass switch under load is strictly prohibited. Stand to the side when operating circuit breakers to prevent arc burns.
Fire safety: Smoking and open flames are strictly prohibited in the equipment room. Appropriate fire-fighting equipment should be available. Flammable and explosive materials must not be stored near the UPS or batteries.
Personnel qualifications: Installation, commissioning, and maintenance must be performed by qualified professional electricians or technicians with appropriate certifications. Non-professionals are strictly prohibited from disassembling the equipment or modifying wiring.
12.2 Installation Precautions
The equipment must be installed indoors. Outdoor installation is strictly prohibited. Protect from rain, direct sunlight, and moisture.
The installation location must meet load-bearing requirements to prevent floor collapse.
The equipment must be reliably grounded with grounding resistance meeting requirements. Operation without proper grounding is strictly prohibited.
Input/output cable specifications must meet current-carrying capacity requirements. Using undersized cables is strictly prohibited as this can cause cable overheating and fire.
Phase sequence and polarity must be correct during wiring. In particular, battery positive/negative connections must never be reversed, as this will burn out the equipment.
Equipment installation should be kept away from strong electromagnetic interference sources such as high-power motors, variable frequency drives, and transmitters.
When multiple UPS units are installed in parallel, all units must be the same model and specification. Wiring must strictly follow parallel operation procedures.
12.3 Operating Precautions
Load limitation: The UPS rated capacity is apparent power (kVA). When applying loads, the load power factor must be considered. The actual active power (kW) must not exceed the rated value. Long-term overload operation is strictly prohibited.
Load types: High-frequency UPS is suitable for IT-type non-linear loads. It is not suitable for directly supplying high-power inductive loads (such as motors, air conditioners, water pumps) or capacitive loads. If inductive loads are required, a larger capacity UPS should be selected.
Power on/off sequence: When powering on, start the UPS first and wait for normal output before starting load equipment one unit at a time. When powering off, shut down loads first before turning off the UPS. Avoid simultaneous load startup to prevent inrush impact.
Battery usage: Deep discharge is strictly prohibited. Batteries should be recharged promptly upon reaching the end-of-discharge voltage. Batteries not in use for extended periods should be periodically recharged to prevent damage from over-discharge.
Bypass operation: Bypass mode is for emergency use only. The system should not operate in bypass mode for extended periods. Faults should be promptly identified and repaired.
Fan maintenance: Clean the air intake filter screen regularly to prevent blockage and inadequate heat dissipation. Fans showing abnormal noise or abnormal speed should be replaced promptly.
12.4 Storage and Transportation Precautions
Equipment storage environment should be dry, well-ventilated, free from corrosive gases, with temperature between -20°C and 55°C.
For long-term storage, batteries should be periodically recharged, typically once every 3 months, to prevent battery failure from over-discharge.
During transportation, the equipment must be kept upright with tilt angle not exceeding 30 degrees to prevent battery leakage and component damage.
Use shock-proof, moisture-proof, and dust-proof packaging during transportation. Avoid collisions and rain exposure.
Equipment stored for more than 6 months should undergo comprehensive inspection and battery charging before use. Only after confirming normal status should the equipment be put into service.
12.5 Environmental Precautions
Keep the equipment room clean and remove dust regularly to prevent dust from entering the equipment and affecting heat dissipation and insulation.
Control equipment room temperature and humidity within the optimal range to avoid accelerated equipment aging from high temperature and high humidity conditions.
Maintain the equipment room air conditioning system regularly to ensure proper cooling and prevent UPS over-temperature protection during summer high temperatures.
Prevent liquid splashing onto the equipment. Placing cups or liquid containers on the equipment is strictly prohibited.
Install water leakage detection devices in the equipment room to prevent water pipe bursts or air conditioning leaks from flooding the equipment.
Chapter 13 Product Maintenance and Repair
13.1 Daily Maintenance (Daily/Weekly)
13.1.1 Daily Inspection Items
Check UPS operating status through the panel or monitoring system. Confirm operation in inverter mode with no alarm messages.
Record key parameters including input voltage, output voltage, load percentage, battery voltage, and temperature. Observe trends over time.
Listen for equipment operating sounds. Fans should run smoothly without abnormal noise, screaming, or grinding sounds.
Check for burning or unusual odors. Investigate immediately if any abnormality is found.
Observe the equipment exterior. Indicator lights should display normally with no damage or deformation.
Check the equipment room ambient temperature and humidity. Record values and confirm they are within the normal range.
13.1.2 Daily Maintenance Notes
Daily inspection does not require opening the equipment. It can be performed through external observation and monitoring data.
Record and handle abnormal alarms promptly. Contact technical support immediately for major faults.
Maintain an operation log. Record operating parameters and events daily for traceability and analysis.
Keep the equipment room and equipment surfaces clean. Use a dry cloth to wipe dust from the enclosure. Washing with water is strictly prohibited.
13.2 Quarterly Maintenance (Every 3 Months)
13.2.1 Quarterly Maintenance Items
Cleaning and dust removal: Clean the equipment air intake filter screen to remove dust and debris. Use a brush or vacuum cleaner to remove dust from equipment surfaces and ventilation openings.
Connection inspection: Check input/output and battery wiring terminals for signs of overheating or oxidation. Re-tighten if necessary.
Battery inspection: Measure the total battery string voltage and individual battery voltages. Check battery exteriors for bulging, leakage, or swelling. Check connection bars for looseness or oxidation.
Fan inspection: Check that fans operate smoothly without abnormal noise. Clean dust from fan blades.
Function testing: Perform one battery self-test to check battery health status. Test alarm functions for proper operation.
Data backup: Export UPS operation logs and alarm records for archiving and backup.
13.2.2 Quarterly Battery Maintenance Key Points
Batteries are the most vulnerable component in the UPS system. More than 70% of UPS faults are battery-related. Quarterly maintenance should focus on the batteries:
Measure the float charge voltage of each battery. For 12V lead-acid batteries, the float charge voltage should be between 13.5-13.8V. Batteries with deviation exceeding 0.1V require special attention.
Check battery terminals for oxidation and overheating. Connection bar tightening torque should meet requirements.
Check battery cases for bulging, deformation, or leakage. Replace immediately if any abnormality is found.
Record the battery room ambient temperature. Take cooling measures if the temperature is too high.
13.3 Annual Maintenance (Every 12 Months)
Annual maintenance is a comprehensive deep maintenance procedure. It is recommended that qualified technical personnel perform it, with shutdown maintenance arranged when necessary.
13.3.1 Deep Cleaning
Power off the equipment and wait for capacitors to fully discharge before opening the cabinet cover.
Use compressed air, brushes, and vacuum cleaners to thoroughly clean internal dust. Focus on power modules, circuit boards, fans, and air ducts.
Clean accumulated dust from heat sinks to ensure effective heat dissipation.
After cleaning, check the interior for any remaining debris. Close the cabinet cover properly.
13.3.2 Electrical Performance Testing
Measure input, output, DC bus, and battery voltage and current parameters. Compare with rated values.
Test output voltage regulation accuracy, waveform distortion, and frequency stability.
Test input power factor and harmonic distortion to confirm performance indicators are normal.
Measure temperatures of key components such as IGBTs, rectifier bridges, capacitors, and transformers.
Test protection functions, verifying over-voltage, under-voltage, overload, and short-circuit protection.
13.3.3 Key Component Inspection
Power device inspection: Check IGBT modules, rectifier bridges, diodes, and other power devices for discoloration, cracks, or burn marks.
Capacitor inspection: Check electrolytic capacitors for bulging, leakage, or leakage traces. Measure capacitance. Replace if capacitance has degraded by more than 20%.
Fan inspection: Comprehensively inspect fan bearings and blades. Replace fans showing significant aging.
Circuit breaker and switch inspection: Check contacts of all circuit breakers and switches for burn marks. Verify operating mechanisms are smooth.
Circuit board inspection: Check all control boards for secure seating. Check for cold solder joints, burn marks, or leakage on components.
13.3.4 Deep Battery Maintenance
Perform one full verification capacity discharge test. Discharge to the end-of-discharge voltage. Record the actual discharge capacity to assess battery health.
Measure the internal resistance of each battery. Batteries with internal resistance deviation exceeding 20% of the average are considered degraded.
Clean battery surfaces and terminals. Polish oxidized terminals and apply conductive grease.
Tighten all battery connection bars to the specified torque.
Battery strings with capacity below 80% of rated value should be scheduled for replacement.
13.4 Wearing Parts Replacement
The wearing parts of high-frequency UPS mainly include cooling fans, electrolytic capacitors, circuit breakers, and surge arresters. These require periodic replacement:
Cooling fans: Design life is typically 3-5 years. Replacement is recommended every 3-4 years, or promptly when abnormal noise or reduced speed is observed.
Electrolytic capacitors: DC bus capacitors and filter capacitors have a design life of approximately 5-8 years. Inspection is recommended every 5 years. Replace when capacitance degradation exceeds 20%. Replace all capacitors no later than 8 years of service.
Surge arresters: Inspect after lightning strikes or surge events. Replace promptly when failed. Replacement is recommended after 5 years of normal service.
Batteries: Valve-regulated lead-acid batteries have a design life of 3-5 years. Actual service life is greatly affected by ambient temperature. Battery replacement should be considered after 3-4 years of service.
13.5 Repair Procedures and Standards
13.5.1 Fault Reporting
When equipment faults occur, users can call the technical support hotline at +86 13538869979. Provide the equipment model, fault description, alarm codes, and other information. Technical personnel will provide remote troubleshooting guidance.
13.5.2 Fault Level Classification
Level 1 faults (Emergency): Equipment shutdown or load power loss. Engineers are dispatched immediately for on-site emergency repair.
Level 2 faults (Major): Equipment transferred to bypass, battery faults, alarms without power supply interruption. On-site service within 24 hours.
Level 3 faults (General): Minor alarms, performance degradation, abnormal indicator lights. On-site service by appointment.
13.5.3 On-Site Repair Standards
Repair personnel must be certified, wear identification badges, and comply with customer equipment room management regulations.
Conduct safety briefing before repair work. Implement safety measures. Verify power-off and absence of voltage before proceeding.
Use original factory genuine spare parts. Use of inferior substitute parts is strictly prohibited.
After repair completion, conduct comprehensive testing to confirm the fault is resolved and the equipment operates normally.
Complete a repair record documenting the fault cause, handling process, and replaced parts. Both parties sign for confirmation.
Explain the fault cause and preventive measures to the user. Provide maintenance recommendations.
13.6 Maintenance Service Plans
Guangzhou Lain Intelligent System Development Co., Ltd. provides professional UPS maintenance services, including:
| Service Item | Description |
|---|---|
| Quarterly inspection service | On-site inspection and maintenance once per quarter |
| Annual deep maintenance | One comprehensive inspection and maintenance per year |
| 7×24 hour technical support | Round-the-clock telephone technical support |
| Emergency on-site repair | Rapid on-site response when faults occur |
| Spare parts replacement service | Genuine parts supply and replacement |
| Battery testing service | Professional battery capacity testing and evaluation |
Chapter 14 Common Product Problems and Solutions
14.1 Power-On Faults
Fault 1: UPS cannot power on, no panel display
*Possible causes:*
- Mains input power not supplied; input circuit breaker tripped
- Loose or poor contact in input power connections
- Battery voltage severely low, unable to start
- Internal fuse blown
- Control panel fault or loose ribbon cable
- Switching power supply failure
*Troubleshooting and solutions:*
1. Check whether the upstream distribution switch is closed. Measure whether the input voltage is normal.
2. Check whether the UPS input circuit breaker has tripped. If tripped, first disconnect the load, eliminate any short circuit, then re-close.
3. Check input wiring terminals for looseness or oxidation. Re-tighten.
4. If the mains is normal but the UPS still cannot power on, connect the battery and attempt battery startup.
5. If there is still no response, power off and inspect the internal fuses and switching power supply output. Replace if damaged.
6. Non-professionals should not open the equipment for internal inspection. Contact technical support.
Fault 2: Immediate tripping after power-on
*Possible causes:*
- Internal short circuit in the UPS
- Short circuit on the load side
- Input circuit breaker undersized
- Excessive inrush current at startup
*Troubleshooting and solutions:*
1. Open the output circuit breaker and battery switch. Energize only the mains input to determine whether the fault is internal to the UPS.
2. If the input is normal, reconnect the output. Disconnect all loads, then progressively add loads to identify the short-circuit point.
3. Check whether the input circuit breaker specification meets requirements and whether the trip curve matches.
4. Do not force repeated closing of a breaker that fails. Contact qualified personnel for repair.
14.2 Battery-Related Faults
Fault 3: UPS shuts down immediately after mains failure; battery cannot supply power
*Possible causes:*
- Battery switch not closed
- Loose or disconnected battery connection cables
- Severely aged or discharged batteries, voltage too low
- Battery fuse blown
- DC-DC converter fault
- Battery polarity reversed
*Troubleshooting and solutions:*
1. Check whether the battery circuit breaker is in the CLOSED (ON) position.
2. Measure the battery terminal voltage to confirm the battery string voltage is normal.
3. Check battery connection bars and cables for looseness, breakage, or oxidation.
4. Check whether the battery fuse is blown. If blown, identify the cause before replacing.
5. Confirm battery positive/negative connections are correct with no reverse connection.
6. If battery voltage is normal but discharge is still not possible, the main unit may be faulty. Contact technical support.
Fault 4: Battery backup time significantly reduced
*Possible causes:*
- Battery aging and capacity degradation
- High ambient temperature accelerating battery aging
- Batteries not fully charged for extended periods; charging circuit fault
- Load power increased beyond expectations
- Individual battery failure affecting the entire string
- Long-term float charging causing plate sulfation
*Troubleshooting and solutions:*
1. Measure the voltage and internal resistance of each battery to identify degraded individual cells.
2. Check the battery room ambient temperature. If above 25°C, implement cooling measures.
3. Check whether the charging parameter settings are correct and whether charging voltage and current are normal.
4. Calculate the actual load power to confirm whether load increase is causing shortened backup time.
5. Perform one full charge-discharge cycle to activate battery performance and observe whether capacity recovers.
6. When battery capacity is below 80%, replacement of the entire string is recommended.
Fault 5: Battery over-voltage alarm
*Possible causes:*
- Normal voltage rise during equalization charging
- Incorrect charging parameter settings; charging voltage too high
- Low battery temperature causing temperature-compensated voltage rise
- Charging control circuit fault causing uncontrolled overcharging
*Troubleshooting and solutions:*
1. Confirm whether the system is in the equalization charge phase. Equalization voltage higher than float voltage is normal.
2. Check whether the charging voltage settings match the battery type and cell count.
3. Check battery temperature. Slightly higher voltage at low temperature is normal.
4. If voltage continuously rises beyond the limit, open the battery switch and check the charging control circuit.
5. Overcharging severely damages batteries and must be promptly identified and resolved.
14.3 Bypass and Transfer Faults
Fault 6: UPS frequently transfers to bypass
*Possible causes:*
- Load overload exceeding inverter capacity
- Sudden high inrush loads causing momentary overload
- Inverter fault or over-temperature
- Frequent mains voltage fluctuations beyond input range
- Control board false detection
*Troubleshooting and solutions:*
1. Check the current load percentage to confirm overload. Reduce non-essential loads.
2. Check the load type for impact loads such as motors or printers. Dedicated power supply is recommended for such loads.
3. Observe the inverter temperature. Check for overheating. Inspect air ducts and fans.
4. Observe mains voltage fluctuation conditions. Consider installing a voltage stabilizer upstream if the mains is unstable.
5. Frequent transfers affect equipment service life. Identify and eliminate the cause promptly.
Fault 7: Bypass transfer failure causing load power loss
*Possible causes:*
- Bypass power source outage or abnormal condition
- Static switch damage
- Bypass circuit breaker tripped
- Bypass and inverter not synchronized, unable to transfer
*Troubleshooting and solutions:*
1. Check whether the bypass input power source is normal and whether the circuit breaker is closed.
2. Measure the bypass input voltage to confirm it is within the allowable range.
3. If the bypass power source is normal but transfer still fails, the static switch may be faulty. Contact maintenance personnel.
4. Regularly test the bypass transfer function to ensure reliable operation.
14.4 Output and Load Faults
Fault 8: Unstable Output Voltage with Significant Fluctuation
Possible causes:
- Severe load fluctuation with insufficient dynamic response capability
- Unstable DC bus voltage
- Inverter drive or control circuit failure
- Output filter capacitor failure
- Severely unbalanced load
Troubleshooting and solutions:
- Observe load variation patterns to check if loads fluctuate frequently and significantly.
- Measure the DC bus voltage to verify stability.
- Check three-phase load distribution, balance the phases as much as possible, and ensure the neutral line current is not excessive.
- If voltage fluctuation exceeds ±5% of the rated range, contact technical personnel for inspection and repair.
Fault 9: Output Overload Alarm
Possible causes:
- Total connected load power exceeds the UPS rated capacity
- High inrush current during load startup
- Local short circuit on the load side
- Current detection circuit failure causing false alarm
Troubleshooting and solutions:
- Calculate the actual load power to confirm whether the UPS is overloaded; reduce some loads.
- Start high-power equipment individually to avoid simultaneous startup inrush currents.
- Disconnect individual branch circuits to check for short circuit faults.
- If the overload alarm persists with no load connected, the detection circuit is faulty; contact maintenance personnel.
14.5 Alarm and Display Faults
Fault 10: Continuous Buzzer Alarm on UPS
Possible causes:
- Battery mode operation with low battery voltage alarm
- Overload alarm
- Bypass mode alarm
- Fault alarm (overtemperature, overvoltage, output abnormality, etc.)
- Test mode alarm
Troubleshooting and solutions:
- Check the alarm code and alarm information displayed on the panel to determine the alarm type.
- Battery alarm: Verify whether the mains power is normal and whether the battery is depleted.
- Overload alarm: Reduce the load.
- Fault alarm: Handle according to the fault code; transfer to bypass or shut down for serious faults.
- The buzzer can be temporarily silenced via the mute key, but the root cause of the fault must be addressed promptly.
Fault 11: Garbled Display, Distorted Screen, or No Display on Control Panel
Possible causes:
- Loose ribbon cable on the control panel
- Damaged display screen
- Abnormal power supply to the control board
- Program crash caused by electromagnetic interference
Troubleshooting and solutions:
- Restart the UPS and check whether normal operation is restored.
- If restart is ineffective, power off the UPS and check whether the panel ribbon cable is securely connected.
- If the issue persists, it is a hardware fault; contact personnel to replace the panel.
14.6 Temperature and Heat Dissipation Faults
Fault 12: Overtemperature Alarm with Automatic Derating or Shutdown
Possible causes:
- Excessive ambient temperature
- Clogged air intake filter, causing restricted airflow
- Fan failure, reduced speed, or complete stoppage
- Excessive load generating excessive heat
- Temperature sensor failure, causing false detection
- Heavy internal dust accumulation, impairing heat dissipation
Troubleshooting and solutions:
- Check the machine room ambient temperature and activate air conditioning for cooling.
- Clean the air intake filter to ensure proper ventilation.
- Check fan operation; replace fans that have stopped or produce abnormal noise promptly.
- Reduce the load to avoid prolonged full-load operation at high temperatures.
- Perform periodic internal dust removal and keep heat sinks clean.
- Temperature sensor failure requires replacement by qualified professionals.
14.7 Communication and Monitoring Faults
Fault 13: Monitoring Software Unable to Connect to UPS
Possible causes:
- Communication cable disconnected or poor contact
- Mismatched communication parameters (address, baud rate, protocol)
- Damaged UPS communication port
- Monitoring software malfunction or incorrect settings
- Network interruption (network-based monitoring)
Troubleshooting and solutions:
- Check that communication cables are securely connected and free of damage.
- Verify communication parameters to ensure consistency on both ends.
- Test with a different serial port or computer to determine whether the port is damaged.
- For network-based monitoring, check IP settings, network cables, and switch operation.
- Restart both the monitoring software and UPS, then re-establish the connection for testing.
Chapter 15 Product QA
Q1: Which is better — a high-frequency UPS or a line-frequency UPS?
A: There is no absolute answer to which is better; the two types are suited to different applications. High-frequency UPS units are compact, lightweight, highly efficient, produce low harmonic distortion, and have a high power factor. They are ideal for IT load scenarios such as data centers and server rooms, and currently represent the mainstream trend. Line-frequency UPS units offer strong surge resistance and overload capability, making them suitable for harsh industrial environments with inductive loads. For the vast majority of data center applications, the high-frequency UPS is the superior choice.
Q2: Can a UPS power inductive loads, such as motors or air conditioners?
A: It is not recommended to directly connect high-power inductive loads to a high-frequency UPS. Inductive loads draw high startup currents (up to five to seven times the rated current) and have a low power factor, which can easily trigger UPS overload protection. If motor-type loads must be powered, the UPS capacity should be oversized by three to five times during selection, or a soft-start device should be installed on the load side. Power equipment such as air conditioners and water pumps should be supplied directly from mains power and should not be connected to a UPS.
Q3: How many years can a UPS battery typically last?
A: The design service life of valve-regulated sealed lead-acid batteries is generally three to five years. Actual service life is closely related to ambient temperature, charge/discharge cycles, and maintenance practices. With an ambient temperature around 25°C and proper maintenance, the battery can last four to five years. If the ambient temperature consistently exceeds 30°C for extended periods, service life will be significantly shortened, potentially requiring replacement within two to three years. When the battery’s actual capacity drops below 80% of its rated capacity, replacement is recommended.
Q4: Will the battery be damaged if the UPS is unused for a long period?
A: Yes, it will. Batteries undergo self-discharge, and prolonged storage without charging will lead to depletion. In severe cases, plate sulfation occurs, resulting in permanent capacity loss. For long-term storage, it is recommended to charge the UPS battery once every three months, with each charge lasting no less than 24 hours. The storage environment should be dry, cool, and maintained at an optimal temperature of 0–25°C.
Q5: Can UPS units be operated in parallel? What is the maximum number of units?
A: This series of high-frequency UPS units supports parallel operation for capacity expansion or redundant backup. Up to eight units of the same model and specification can be directly paralleled, supporting N+1 and N+X redundancy modes. Parallel operation requires dedicated parallel kits and professional commissioning. Unauthorized parallel connection is strictly prohibited.
Q6: Is grounding mandatory for UPS installation? Can it be skipped?
A: Reliable grounding is mandatory. Grounding is a fundamental requirement for personal safety, equipment safety, and electromagnetic compatibility. Without grounding, the equipment enclosure may carry dangerous voltage, posing an electric shock risk. Additionally, resistance to interference is reduced, which may cause operational anomalies and increased susceptibility to lightning damage. The grounding resistance must not exceed 4 Ω.
Q7: Can a UPS be installed outdoors?
A: No. Standard high-frequency UPS units are designed for indoor use with an IP20 protection rating and do not feature waterproofing, dust protection, or resistance to temperature extremes. Outdoor installation will result in water ingress, dust infiltration, and temperature excursions that can rapidly damage the equipment. For outdoor use, a customized outdoor-rated UPS is required, or the UPS must be installed inside an outdoor enclosure with temperature control.
Q8: Does the UPS need to be shut down daily for rest?
A: No. UPS units are designed for 7×24 continuous operation. Frequent power cycling is actually detrimental to both the equipment and the battery. Under normal conditions, the UPS should remain powered on continuously and only be shut down for maintenance or inspection. In environments where mains power is consistently stable, it is recommended to perform a battery self-test periodically, such as once per month, to maintain battery activity.
Q9: Does the UPS consume significant power when mains power is normal?
A: Power consumption mainly depends on overall efficiency. A 100 kVA high-frequency UPS achieves approximately 95% efficiency at full load, with losses of about 5 kW. Even at half load, efficiency remains around 94%. Compared with line-frequency units, high-frequency UPS units provide significant energy savings. If the ECO economic mode is enabled, efficiency can reach above 98%, further reducing losses.
Q10: What should I do if the UPS malfunctions? Can I disassemble it myself?
A: Self-disassembly and repair are not recommended. UPS units contain high voltages and precision internal structures. Disassembly by non-professionals can lead to electric shock, worsen the fault, and void the warranty. When a fault occurs, first check the fault code and perform simple troubleshooting according to the manual for external issues such as switches, wiring, and loads. If the issue cannot be resolved, call the technical support hotline at +86 13538869979 for professional guidance or on-site service.
Q11: Can a battery with electrolyte leakage still be used?
A: Absolutely not. Electrolyte leakage indicates damage to the battery casing. The electrolyte is corrosive and will corrode terminals and equipment, potentially causing short circuits and fires. Immediately stop use upon detecting leakage, disconnect the battery switch, remove the leaking battery, dispose of it properly, and replace it with a new battery. Also clean any areas affected by the corrosive electrolyte.
Q12: Can the UPS accept generator input?
A: Yes. High-frequency UPS units feature a wide input frequency range (40–70 Hz), making them compatible with generator power supplies. However, the generator output rating must be sufficient — typically two to three times the UPS rated power — to prevent severe waveform distortion when driving nonlinear loads, which could cause UPS anomalies. Installation of a filter on the generator side is recommended.
Q13: Why is there current on the UPS input neutral line? Is this normal?
A: For three-phase input UPS units, current flowing on the neutral line when the three-phase loads are unbalanced is a normal phenomenon. However, the neutral line current should not exceed 25% of the phase line current. Excessive neutral current indicates severe three-phase imbalance, and load distribution should be adjusted. Additionally, the high-frequency UPS rectifier circuit inherently generates some neutral harmonic current, which is normal as long as it remains within reasonable limits.
Q14: Does a newly installed UPS require a break-in period?
A: It is recommended to conduct a 24–48 hour no-load trial run before formal loading. Observe whether the equipment operates stably, and check for abnormal alarms, temperature readings, and noises. After confirming all parameters are normal, gradually apply the load. This serves as a form of equipment break-in and burn-in, exposing potential problems in advance and ensuring reliable formal operation.
Q15: How is the UPS battery backup time calculated?
A: The approximate formula is: Backup time (hours) = Total battery capacity (Ah) × Battery voltage (V) × 0.8 (discharge coefficient) ÷ Load power (W). For example, with 32 pieces of 12V 100Ah batteries and a 50 kW load, the backup time is approximately (100 × 384 × 0.8) ÷ 50000 ≈ 0.61 hours ≈ 37 minutes. The actual time is also affected by battery aging, ambient temperature, and discharge rate.
Chapter 16 Product Acceptance
16.1 Acceptance Basis Standards
Product acceptance is performed in accordance with the following national and industry standards:
- GB 7260.1-2008 *Uninterruptible Power Systems (UPS) — Part 1: General and Safety Requirements for UPS Used in Operator-accessible Areas*
- GB 7260.2-2009 *Uninterruptible Power Systems (UPS) — Part 2: Electromagnetic Compatibility (EMC) Requirements*
- GB 7260.3-2003 *Uninterruptible Power Systems (UPS) — Part 3: Methods of Specifying the Performance and Test Requirements*
- YD/T 1095-2018 *AC Uninterruptible Power Supply (UPS) for Telecommunications*
- Project design documents and contract technical requirements
- Factory inspection standards for outgoing products
16.2 Acceptance Process
16.2.1 Delivery Acceptance
Upon arrival of the equipment, both parties shall jointly conduct unpacking inspection:
- Check whether the packaging is intact, with no damage, water immersion, or impact marks.
- Verify the model and quantity of the host unit, accessories, spare parts, and documentation against the packing list.
- Inspect the equipment appearance for paint peeling, deformation, damage, or corrosion.
- Verify the product nameplate, serial number, and date of manufacture.
- Check that certificates of conformity, warranty cards, operating manuals, and other documents are complete.
- Sign the delivery acceptance form upon successful inspection; record any issues for return or exchange if inspection fails.
16.2.2 Installation Acceptance
After installation and wiring are complete, installation quality acceptance shall be performed:
- Verify that the equipment is positioned correctly, level both horizontally and vertically, and securely fixed.
- Confirm that cable selection, routing, and labeling comply with specifications, with neat and secure wiring.
- Verify the grounding system meets requirements and that grounding resistance tests pass.
- Confirm that insulation resistance tests for all circuits pass, with no short circuits or ground faults.
- Verify correct phase sequence and polarity, with clear labeling.
- Confirm that the machine room environment, space, and ventilation meet equipment operating requirements.
- Sign the installation acceptance record.
16.2.3 Commissioning Acceptance
After commissioning is completed, functional acceptance shall be performed:
- Verify normal startup and operation, smooth switching between all modes, and no abnormal alarms.
- Confirm that all measured technical parameters meet contract and technical specification requirements.
- Verify normal protection function operation and accurate alarm indication.
- Confirm normal battery charge/discharge operation and sufficient backup time.
- Verify normal monitoring and communication functions, accurate data upload, and effective remote control.
- Conduct a continuous 72-hour full-load trial run, confirming stable operation with no failures.
- Sign the commissioning acceptance report and formally hand over the equipment for service.
16.3 Acceptance Test Items
16.3.1 Appearance and Structural Inspection
- Equipment appearance intact, free of damage, deformation, or corrosion
- Labels and nameplates clear and complete
- Sturdy structure with smooth-opening doors and panels
- No loose fasteners; all components installed
16.3.2 Input Performance Tests
- Rated input voltage and frequency test
- Input voltage range verification
- Input power factor test (≥0.99 at full load)
- Input current harmonic distortion test (≤3%)
- Input overvoltage/undervoltage protection function test
16.3.3 Output Performance Tests
- Output voltage regulation accuracy test (±1%)
- Output frequency stability test
- Output waveform distortion test (≤2% for linear load)
- Three-phase voltage unbalance test
- Dynamic response test (sudden load change)
- Overload capability test
16.3.4 Battery Performance Tests
- Float charge voltage and boost charge voltage test
- Charging current test
- Battery discharge test to verify backup time
- Battery low-voltage alarm and protection test
- Battery temperature compensation function test
16.3.5 Functional Tests
- Mains inverter mode, battery mode, and bypass mode switching test
- Maintenance bypass operation test
- All protection function tests
- Audible and visual alarm function test
- Communication and monitoring function test
- ECO mode test (if enabled)
16.3.6 Environmental and Safety Tests
- Noise test (≤55 dB at 1 meter distance)
- Temperature rise test (key component temperatures)
- Insulation resistance test
- Dielectric strength test
- Grounding resistance test
16.4 Acceptance Documentation
Upon completion of acceptance, the following complete technical documentation shall be delivered:
- Product certificate of conformity and factory inspection report
- Installation and commissioning instructions, operation and maintenance manual
- Installation records, wiring diagrams, and test records
- Commissioning report and trial operation records
- Acceptance report (signed and sealed by both parties)
- Warranty card and after-sales service commitment
- Monitoring software and drivers
16.5 Acceptance Conclusion
When all acceptance items pass, the final acceptance report shall be signed, and the equipment formally enters the warranty period. If any non-conforming items are found, rectification shall be completed within the specified period, followed by re-acceptance until all items pass.
Chapter 17 SEO Optimization System and Keyword Layout
I. Keyword Classification System
1. Core Primary Keywords
High-frequency UPS, high-frequency UPS power supply, high-frequency uninterruptible power supply, online high-frequency UPS, data center high-frequency UPS
2. High-Conversion Long-Tail Keywords
High-frequency UPS installation wiring commissioning, high-frequency UPS installation manual, high-frequency UPS commissioning steps, high-frequency UPS wiring methods, high-frequency UPS maintenance and repair, high-frequency UPS technical parameters, high-frequency UPS operating principle, high-frequency UPS manufacturer quotation, data center high-frequency UPS configuration plan, high-frequency UPS fault handling methods
3. Industry Traffic Keywords
Data center UPS uninterruptible power supply, data center UPS power supply, three-phase in/three-phase out high-frequency UPS, single-phase in/single-phase out high-frequency UPS, modular high-frequency UPS, UPS power supply installation and construction, UPS power supply commissioning and acceptance, UPS power supply routine maintenance, UPS power supply common faults, UPS battery replacement
4. Brand-Specific Keywords
Lain high-frequency UPS, Guangdong Lain UPS, Lain smart data center UPS, LA series high-frequency UPS, Lain UPS manufacturer, Guangzhou high-frequency UPS manufacturer, Guangdong Lain Smart Data Center Equipment Co., Ltd.
5. Dropdown/Related Search Keywords
Differences between high-frequency UPS and line-frequency UPS, which high-frequency UPS brand is best, high-frequency UPS price, high-frequency UPS operating principle diagram, high-frequency UPS installation specifications, how to connect high-frequency UPS batteries, how to operate high-frequency UPS bypass, how to handle high-frequency UPS alarms
II. SEO Optimization Tag System
1. Page Core Optimization Tags
Page title: High-Frequency UPS Installation, Wiring and Commissioning Manual_Complete Technical Guide
Keyword density: Core keywords evenly distributed at 2%–3% density
Content length: Extended in-depth content covering all technical dimensions
Originality: Original technical content with complete structure and high professionalism
2. Title Tag
High-Frequency UPS Installation Wiring Commissioning Manual_Operating Principle_Technical Parameters_Fault Repair — Guangdong Lain Smart Data Center Equipment Co., Ltd.
3. Meta Keywords
High-frequency UPS, high-frequency UPS installation, high-frequency UPS commissioning, high-frequency UPS wiring, high-frequency UPS manual, high-frequency UPS operating principle, high-frequency UPS technical parameters, data center UPS power supply, Guangdong Lain UPS
4. Meta Description
Guangdong Lain Smart Data Center Equipment Co., Ltd. provides a complete high-frequency UPS installation, wiring, and commissioning manual covering product introduction, principles, parameters, installation, wiring, commissioning, maintenance, fault handling, and acceptance in the full process. Includes detailed 100 kVA three-phase in/three-phase out high-frequency UPS technology. Factory direct supply, technical support: +86 13538869979.
5. H1 Tag
High-Frequency UPS Installation, Wiring, and Commissioning Complete Manual
6. H2 Tags
Product Introduction, Product Composition, Product Classification, Product List, Product Operating Principle, Product Technical Parameters, Product Functions and Features, Product Application Scenarios, Product Installation, Product Wiring, Product Commissioning, Product Precautions, Product Maintenance and Repair, Product Common Problems and Solutions, Product QA, Product Acceptance
III. Internal Link Optimization Tags (Natural Anchor Text Placement)
1. Core Anchor Text
High-frequency UPS, high-frequency UPS power supply, high-frequency uninterruptible power supply
2. Long-Tail Anchor Text
High-frequency UPS installation and commissioning, high-frequency UPS technical parameters, high-frequency UPS operating principle, high-frequency UPS fault repair, high-frequency UPS manufacturer
3. Related Anchor Text
Data center UPS power supply, modular UPS, UPS battery, precision air conditioning, micro-module data center, shielded cabinet
Chapter 18 Copyright Notice and Contact Information
Copyright Notice
The copyright of this document is owned by Guangdong Lain Smart Data Center Equipment Co., Ltd. and is protected by the Copyright Law of the People’s Republic of China.
Without prior written authorization from the company, no individual or organization may reproduce, reprint, excerpt, modify, or distribute all or any part of this document in any form, nor use this document for commercial purposes.
When authorized reprinting is granted, the source must be credited as “Source: Guangdong Lain Smart Data Center Equipment Co., Ltd.” and the copyright notice and contact information within this document must be retained.
Violators will be held legally accountable by the company.
The content of this document is subject to update without prior notice. The latest version shall prevail.
Manufacturer Information
- Manufacturer: Guangdong Lain Smart Data Center Equipment Co., Ltd.
- Service Hotline: +86 13538869979 (WeChat ID: same)
- Technical Support: +86 13538869979
- Address: Zhongrun Industrial Park, No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China
- Official Website: https://gdlain.com
The final right of interpretation of this manual belongs to Guangdong Lain Smart Data Center Equipment Co., Ltd.