Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32
KITOZER
KITOZER

Cabinet M-Type Open Cable Tray Installation, Wiring, and Commissioning Manual

Document No.: LA-QJ-M-2026-V1.0

Version: V1.0

Compiled by: Guangdong Lain Intelligent Equipment Co., Ltd.

Compilation Date: July 2026

Table of Contents

Preface

With the rapid development of the digital economy, scenarios such as data centers, server rooms, and intelligent buildings have placed unprecedented demands on the reliability, flexibility, and maintainability of integrated cabling systems. Traditional enclosed trough-type cable trays suffer from numerous drawbacks, including low heat dissipation efficiency, difficult maintenance and inspection, high expansion and retrofitting costs, and lack of cable visibility, making them increasingly unable to meet the cabling requirements of modern high-density equipment rooms.

As a next-generation grid cabling support system, the cabinet M-type open cable tray has become the mainstream solution for overhead routing in data centers, cabinet-top cabling, and under-floor cabling in raised access floors, thanks to its core advantages of fully open lattice structure, modular rapid installation, excellent ventilation and heat dissipation performance, and visual operation and maintenance management. This manual is compiled based on current national standards including GB 50311-2016 *Code for Engineering Design of Generic Cabling System*, GB 50303-2015 *Code for Acceptance of Quality of Construction of Building Electrical Engineering*, GB 50169-2016 *Code for Construction and Acceptance of Earthing Installation of Electrical Equipment Installation Engineering*, combined with years of practical experience in equipment room cabling engineering from Guangdong Lain Intelligent Equipment Co., Ltd. It comprehensively covers the full process of the M-type open cable tray, including product system, technical parameters, installation techniques, wiring specifications, commissioning methods, operation and maintenance, troubleshooting, and acceptance criteria, providing complete, professional, and actionable technical guidance for construction contractors, operation and maintenance personnel, and system integrators.

This manual applies to the full series of M-type open mesh cable tray products manufactured by Guangdong Lain Intelligent Equipment Co., Ltd., covering all material categories including electro-galvanized, hot-dip galvanized, 304 stainless steel, and 316L stainless steel, compatible with full width specifications from 100mm to 600mm. It can be directly used for cable tray installation construction and operation and maintenance management in data center IDC rooms, enterprise server rooms, network rooms, weak current rooms, industrial automation workshops, intelligent buildings, and other scenarios.

The content of this manual will be continuously revised in accordance with product technology iterations and updates to national standards. For any questions, please contact our technical support hotline to obtain the latest version.

Chapter 1 Product Introduction

1.1 Product Definition

The cabinet M-type open cable tray, also known as M-type mesh cable tray, M-type steel mesh cable tray, or Cablofil-style open cable tray, is a fully hollowed mesh-structured cable support and management system, belonging to the sub-category of open cable trays. The product is formed by orthogonal welding of high-strength metal steel wires, with the side edges featuring an M-shaped bent reinforcing structure. It has no solid cover plates or enclosed side panels, and cables are laid fully exposed. It is specifically designed for cabinet-top cabling, under-floor cabling, and horizontal cabling between row header cabinets in equipment rooms, combining multiple characteristics such as high load-bearing capacity, light weight, high ventilation, easy installation, and easy maintenance. It is one of the core infrastructure components of modern equipment room integrated cabling systems.

The core feature of the M-type open cable tray lies in the M-shaped reinforcing structure on its side edges. Compared to ordinary U-type mesh cable trays, the M-type side edge forms a dual-support vertical plane through two bends. Under the same wire diameter and self-weight conditions, the lateral flexural strength is increased by more than 40%, and torsional resistance is increased by more than 50%. It is particularly suitable for narrow-width, high-load cabling scenarios on top of cabinets, enabling maximum cable carrying capacity and structural stability within limited space.

1.2 Product Development History

Cable tray technology has undergone three generations of technology iteration:

First Generation: Enclosed Trough-Type Cable Tray

Born in the 1960s, featuring a fully enclosed metal trough body as the core structure, focusing on physical cable protection, primarily used in industrial power cabling scenarios. However, the enclosed structure resulted in extremely low heat dissipation efficiency, heat accumulation in cables accelerated insulation aging, and maintenance and expansion required complete removal of cover plates, resulting in extremely high operation and maintenance costs.

Second Generation: Ladder-Type Cable Tray

Born in the 1980s, featuring a side rail + rung structure, with significantly improved ventilation performance compared to trough-type trays, primarily used for laying large-diameter power cables. However, the large rung spacing caused small-diameter low-voltage cables to sag and deform, and there were still issues of side panel obstruction and insufficient cable visibility, making it unsuitable for high-density low-voltage cabling.

Third Generation: Open Mesh Cable Tray

Born in Europe in the 1990s, featuring a fully hollowed mesh structure as the core, completely solving the pain points of heat dissipation and maintenance. Among these, the M-type open cable tray, as an optimized and upgraded category of mesh cable trays, specifically strengthened lateral strength for equipment room cabinet cabling scenarios. It gradually entered the domestic market after 2010, and with the explosive growth of the domestic data center industry, it quickly became the standard product for equipment room cabling.

Guangdong Lain Intelligent Equipment Co., Ltd. has been deeply engaged in the open cable tray field since 2015, conducting multiple rounds of technical optimization for domestic equipment room cabling scenarios. The M-type open cable tray series products launched by the company have reached industry-leading levels in weld point strength, anti-corrosion processes, accessory interchangeability, and installation convenience, and have been widely applied in thousands of domestic equipment room engineering projects.

1.3 Product Industry Position

In the current equipment room cabling field, the M-type open cable tray has become one of the core indicators for measuring the advancement of cabling systems. The industry has formed a consensus that “high-end equipment rooms must use open mesh cable trays, and cabinet cabling prioritizes M-type reinforced cable trays.”

Policy and Standards Level: GB 50311-2016 *Code for Engineering Design of Generic Cabling System* explicitly recommends that data centers adopt open cable trays to improve heat dissipation and operation and maintenance efficiency; the TIA-942 data center standard lists open mesh cable trays as the recommended cabling carrier for Class A equipment rooms.

Market Application Level: Among domestic Tier III and above data centers, the usage rate of open cable trays has exceeded 85%, with M-type cable trays accounting for over 70% in cabinet-top cabling scenarios; newly built equipment rooms for financial institutions, telecommunications operators, and internet enterprises have fully adopted M-type open cable trays.

Technology Development Level: M-type open cable trays have evolved from a single cabling carrier to an integrated cabling management system, with supporting accessories such as cable retainers, cable management frames, grounding components, and intelligent cabling sensors, forming a complete cabling ecosystem.

1.4 Performance Comparison with Traditional Cable Trays

The core performance comparison between M-type open cable trays and traditional trough-type and ladder-type cable trays is as follows:

Comparison Dimension M-Type Open Cable Tray Traditional Trough-Type Cable Tray Traditional Ladder-Type Cable Tray
Ventilation and Heat Dissipation Efficiency Ventilation rate ≥85%, cable temperature close to ambient temperature, heat dissipation efficiency improved by over 70% Ventilation rate <10%, severe heat accumulation, cable temperature 10-15°C higher than ambient Ventilation rate ≈40%, average heat dissipation effect, localized heat accumulation still exists
Cable Visibility 100% fully exposed, cable paths, labels, and damage visible at a glance 0%, requires cover plate removal for inspection, extremely low maintenance efficiency Approximately 30%, side panels obstruct view, bottom cables not visible
Expansion and Retrofit Efficiency On-site cutting, branching, and bending at will, no customization required, expansion efficiency improved by 300% Requires pre-manufactured elbows and tees, retrofitting requires shutdown and cover plate removal, long cycle time Branching requires custom accessories, moderate retrofit difficulty
Self-Weight to Load-Bearing Ratio Self-weight only 30%-40% of trough-type trays, load-bearing capacity per unit self-weight is 2.5 times that of trough-type trays High self-weight, high steel consumption, low load-bearing capacity per unit self-weight Self-weight approximately 60% of trough-type trays, moderate load-bearing capacity
Cable Protection Capability Mesh structure effectively supports cables, edges are rounded with no burrs, extremely low cable damage rate Strong physical protection, but prone to dust and water accumulation, corroding cable jackets Ladder rung edges prone to scratching cables, small cables prone to sagging
Installation Construction Efficiency Modular rapid connection, screwless quick-connect accessories enable single-person installation, efficiency 2-3 times that of traditional trays Requires extensive bolt fastening, multi-person coordination required, low installation efficiency Moderate installation efficiency, significant beam welding workload
Fire Safety Performance Fully open structure with no flue gas accumulation, excellent flame retardant performance, smoke can quickly dissipate during fire Enclosed structure prone to toxic smoke accumulation, fire easily spreads along the trough Moderate fire protection performance, rungs easily conduct heat

1.5 Product Design Philosophy

Guangdong Lain M-type open cable trays uphold the core design philosophy of “Safe, Efficient, Flexible, Low-Carbon,” with every structural design detail based on actual engineering requirements:

Safety-First Design: All edges undergo rounded passivation treatment, eliminating the risk of scratching cables and operators during construction and maintenance; weld points use full penetration welding, with single-point tensile strength ≥500N, eliminating the risk of cable tray fracture; the grounding system is fully conductive throughout, ensuring electrical safety.

Efficient Maintenance Design: The fully open structure achieves complete cable visibility, reducing fault troubleshooting time from hours to minutes; modular accessories support rapid expansion and retrofitting without large-scale shutdowns, adapting to rapid business iteration needs.

Flexible Adaptation Design: Straight sections can be cut at will on site; elbows, tees, and crosses can all be fabricated on site without factory customization; the support system is compatible with multiple installation methods including suspension mounting, wall mounting, cabinet-top mounting, and floor mounting, adapting to various complex equipment room environments.

Low-Carbon Energy-Saving Design: High ventilation rate reduces cable operating temperature, reducing air conditioning energy consumption by approximately 15%-20%; lightweight structure reduces steel consumption and carbon emissions; the product is 100% recyclable, conforming to green data center construction standards.

1.6 Product Implementation Standards

This series of products is strictly manufactured and tested in accordance with the following national and industry standards:

  • GB/T 23639-2017 *Energy-saving and Corrosion-resistant Steel Cable Tray*
  • GB 50311-2016 *Code for Engineering Design of Generic Cabling System*
  • GB 50303-2015 *Code for Acceptance of Quality of Construction of Building Electrical Engineering*
  • GB 50169-2016 *Code for Construction and Acceptance of Earthing Installation of Electrical Equipment Installation Engineering*
  • TIA-942-B *Telecommunications Infrastructure Standard for Data Centers*
  • YD/T 2165-2010 *Cable Tray for Telecommunication*
  • GB/T 13912-2002 *Metallic coatings – Hot dip galvanized coatings on fabricated iron and steel articles – Specifications and test methods*
  • GB/T 9799-2011 *Metallic and other inorganic coatings – Electroplated coatings of zinc on iron or steel*

Chapter 2 Product Composition

The cabinet M-type open cable tray system consists of four major core components: cable tray main units, connection and fastening components, support and installation systems, and auxiliary accessories. Each component adopts standardized, modular design with full-series interchangeability, allowing flexible combination based on engineering requirements.

2.1 Cable Tray Main Units

The cable tray main unit is the direct load-bearing carrier for cables and the core component of the entire system. The M-type open cable tray main body is a standard straight trough section manufactured using an integrated welding process.

2.1.1 Main Trough Structure

The M-type cable tray main trough consists of three parts: the bottom load-bearing mesh, the M-type reinforced side edges, and the end connection sections:

Bottom Load-Bearing Mesh: Formed by orthogonal welding of transverse and longitudinal steel wires to create a rectangular grid, serving as the main load-bearing surface for cables. The standard mesh size is 50mm×100mm, with a 50mm×50mm mesh option available for high-density cabling configurations to ensure small-diameter cables do not sag or fall through. Transverse wires serve as the primary load-bearing members, longitudinal wires serve as distribution members, and all intersection points use fully automated resistance welding, ensuring solid weld points with no cold welds.

M-Type Reinforced Side Edges: The side edges on both sides of the trough undergo two 90° bends to form an M-shaped cross-section, comprising three structural faces: the outer vertical face, the intermediate reinforcing rib, and the inner vertical face. The dual-vertical-face structure significantly enhances the lateral flexural and torsional strength of the trough, with particularly notable advantages on narrow-width cable trays. The top wires of the side edges feature rounded end caps with no sharp burrs, preventing scratches to cables and construction personnel.

End Connection Sections: Both ends of the trough are pre-drilled with standard connection interfaces, with mesh dimensions consistent with the main body. Quick connection to other straight sections, elbows, tees, and other components is achieved through connection clips, with flush, aligned interfaces ensuring smooth cable laying.

2.1.2 Main Unit Material Classification

Q235B Low-Carbon Steel Main Body: The most commonly used basic material grade, offering high mechanical strength, good toughness, and moderate cost. The surface is treated with electro-galvanizing or hot-dip galvanizing for corrosion protection, suitable for the vast majority of indoor equipment room scenarios.

304 Stainless Steel Main Body: Offers excellent corrosion resistance, resistant to weak acids and alkalis, not prone to rusting. Suitable for high-humidity equipment rooms, coastal area equipment rooms, clean workshops, and other scenarios with higher anti-corrosion requirements.

316L Stainless Steel Main Body: High-end anti-corrosion material grade, resistant to strong corrosion and chloride ion attack. Suitable for seaside outdoor environments, chemical workshops, sewage treatment plants, and other harsh corrosive environments.

2.2 Connection and Fastening Components

Connection and fastening components are used to achieve secure connections between cable tray straight sections, and between straight sections and special-shaped components, ensuring the integrity and electrical continuity of the cable tray system. They are core components for ensuring structural safety.

2.2.1 Standard Connection Clips

The standard connection clip is the most commonly used joining accessory for M-type cable trays, consisting of four parts: an outer clip, inner clip, M6 carriage bolt, and M6 flange nut. Each set of clips achieves a secure connection between two cable tray sections.

Outer Clip: Fits over the outside of the cable tray side edge, manufactured by stamping, conforming perfectly to the M-type side profile, providing lateral support force.

Inner Clip: Fits inside the cable tray side edge, working with the outer clip to clamp the tray side wall, forming dual fixation.

Carriage Bolt: Dome head design; the bolt head locks into the mesh grid preventing rotation, allowing single-person tightening of the external nut.

Flange Nut: Features an integral self-locking toothed face, eliminating the need for additional flat washers and spring washers, providing excellent vibration resistance after tightening, suitable for equipment room vibration environments.

Standard connection clips offer high connection strength with flush, aligned joints. Single connection point tensile strength is ≥1200N, fully satisfying heavy-load cabling requirements.

2.2.2 Quick Connection Bars

Quick connection bars are screwless quick-connect accessories featuring a spring clip structure. Connection is achieved by simply clipping into the bottom mesh of two adjacent cable tray sections. Installation speed is over 3 times faster than standard clips, suitable for low-voltage cabling scenarios with high construction efficiency requirements and lighter loads.

Quick connection bars are made of spring steel with a galvanized anti-corrosion surface treatment. Once clipped in place, they automatically lock and will not loosen. Single-bar connection tensile strength is ≥600N, and they can be used in conjunction with standard clips for heavy-load scenarios.

2.2.3 L-Shaped Connectors

L-shaped connectors are used for on-site fabrication and reinforcement of 90° horizontal elbows in cable trays, and can also be used for vertical up/down bend connections. The connector is a stamped L-shaped steel plate with galvanized surface treatment, supplied with inner clips and bolts. It can fix two straight cable tray sections into an elbow at any angle, with an adjustment range of 0°-180°, eliminating the need for custom-manufactured elbows and significantly reducing construction costs and lead times.

2.2.4 T-Shaped Connectors

T-shaped connectors are used for on-site fabrication of tee branches in cable trays, achieving 90° vertical connection between the main cable tray and branch cable trays. They are compatible with same-width and variable-width branching scenarios, secured with bolts and clips. Connections are firm, with flush transitions at branch points and no protruding burrs that could scratch cables.

2.2.5 Cross Connectors

Cross connectors are used for fabricating four-way junction nodes in cable trays, achieving convergence connections of cable trays from four directions. They are suitable for intersection points between main cabling channels and multi-branch channels in equipment rooms, replacing traditional custom-fabricated crosses with extremely high on-site flexibility.

2.2.6 Reinforcement Bar Assemblies

Reinforcement bar assemblies are used for structural strengthening in large-span installations and heavy-load cabling scenarios. Installed at the longitudinal bottom position of the cable tray, they significantly enhance the flexural load-bearing capacity of the tray. The reinforcement bar is a galvanized steel plate formed by stamping, supplied with inner clips and bolts for fastening. A single reinforcement bar can increase the per-meter load capacity of the cable tray by more than 50%. Reinforcement bars must be installed for large-span suspension installations and power cable laying scenarios.

2.2.7 Expansion Connection Plates

Expansion connection plates are used for thermal expansion and contraction compensation in straight cable tray sections, installed at every 30m interval in straight sections and at building structural expansion joints. The connection plates feature slotted holes, allowing ±20mm of expansion/contraction margin for the cable tray, preventing deformation or fracture caused by temperature changes. Expansion connection plates also maintain electrical continuity, with no significant change in grounding resistance.

2.3 Support and Installation Systems

Support and installation systems are used to secure the cable tray main body to building structures or cabinets. They serve as the load-bearing foundation of the entire cable tray system and are classified into four major categories: suspension systems, wall-mounting systems, cabinet-top mounting systems, and floor-mounting systems.

2.3.1 Suspension Support Components

The suspension system is the most commonly used support method for overhead cabling in equipment rooms, consisting of hanger rods, cross members, and adjustment accessories.

Fully Threaded Rod Hangers: Manufactured from Q235 carbon steel with galvanized treatment. Common specifications include M8, M10, and M12, with customizable lengths. The upper end is secured to the floor slab or beam using expansion bolts, and the lower end connects to the cross member. Installation height of the cable tray can be flexibly adjusted using nuts.

U-Shaped Cross Members: U-section galvanized steel plates with holes at both ends for threading hanger rods. The cable tray rests on the cross member and is secured with clips or cable ties. U-shaped cross members offer high strength and can support multiple layers of cable trays simultaneously, making them the standard accessory for horizontal suspension installation.

Cable Tray Hanger Clips: Accessories that directly suspend the cable tray from cross members or angle steel. No drilling required—simply clip into the mesh grid for fixation. Easy installation, suitable for light-load cable tray suspension.

Anti-Sway Brackets: Used for lateral fixation of vertical cable tray sections and long-distance horizontal sections, preventing swaying of the tray under external forces and enhancing system stability. Mandatory for installation in earthquake-prone areas.

2.3.2 Wall-Mounting Support Components

Wall-mounting systems are used for cable trays laid along wall surfaces, consisting of wall brackets and expansion bolts.

M-Type L Wall Brackets: Wall-mounting brackets specifically designed for M-type cable trays. L-shaped structure with the vertical face secured to the wall using expansion bolts and the horizontal face supporting the cable tray. M-type brackets are stamped from thickened steel plate with reinforcing ribs, offering superior load-bearing capacity compared to ordinary angle brackets, making them the preferred choice for heavy-load wall-mounting scenarios. Bracket lengths are available in 180mm, 230mm, 280mm, 380mm, and 480mm specifications, compatible with different cable tray widths.

Triangular Support Frames: Welded heavy-duty wall-mounting brackets with triangular diagonal bracing, offering higher load-bearing capacity. Suitable for wide cable trays and heavy-load power cable wall-mounting scenarios.

Adjustable-Angle Wall Brackets: Support angle adjustable within 0°-90°, suitable for special installation scenarios such as sloped surfaces and curved walls.

2.3.3 Cabinet-Top Mounting Support Components

Cabinet-top mounting is the most typical application scenario for M-type cable trays. Dedicated cabinet mounting accessories are provided, requiring no modification to building structures—direct fixation to the cabinet top.

Cabinet Rail Connectors: Fixed to the mounting holes on the top rails of the cabinet, connecting the cable tray support cross members. No drilling required, compatible with the universal hole spacing of 19-inch standard cabinets.

Cabinet-Top Cross Members: Installed across the top of two adjacent cabinets to support the cable tray. Length can be customized based on cabinet spacing, enabling continuous cable tray laying across multiple cabinets.

Cabinet Side Fixing Brackets: Secure the cable tray to the side rails of the cabinet, suitable for vertical cabling scenarios on the cabinet side.

2.3.4 Floor-Mounting Support Components

Floor-mounting systems are used for cable trays installed under raised access floors or surface-mounted on floors, consisting of support columns and base plates.

U-Shaped Columns: U-section galvanized steel columns with the bottom secured to the floor via base plates. The columns feature elongated adjustment slots for flexible height adjustment of the cable tray, compatible with different floor heights.

Base Plates: Square steel plates secured to the floor with expansion bolts, connected to the columns by welding or bolting, ensuring support stability.

Floor-Mounting Wall Brackets: Installed on columns to support the cable tray, can be installed in multiple layers for layered under-floor cabling.

2.4 Auxiliary Accessories

2.4.1 Cable Fixing Accessories

Mesh Cable Retainers: Clipped onto the cable tray mesh to secure cables in layers and bundles, keeping cable arrangements neat and orderly, preventing cable slippage and tangling. Essential accessories for high-density cabling. Available in plastic and metal versions, with flexibly adjustable spacing.

Nylon Cable Ties: Used for temporary fixation of cables to the cable tray. Manufactured from flame-retardant nylon, aging-resistant, and easy to fasten.

Cable Management Frames: Installed at cable tray entry/exit points to cabinets, organizing cable bend radii to ensure they comply with specifications and prevent bend damage to cables.

2.4.2 Grounding Accessories

Copper Braided Bonding Jumpers: Used for grounding bridges between non-galvanized cable tray sections, ensuring electrical continuity. Common specifications: 4mm² and 6mm², with copper cable lugs at both ends.

Grounding Terminals: Used for connection between the cable tray and the grounding main conductor, secured with bolts. Low contact resistance and reliable conductivity.

Equipotential Bonding Conductors: Used for equipotential bonding between the cable tray, cabinets, and grounding busbars, eliminating potential differences.

2.4.3 Protection and Identification Accessories

Edge Protection Strips: Installed at cable tray cut ends to cover metal burrs and prevent cable scratches. Manufactured from flame-retardant PVC material.

Cable Label Holders: Clipped onto the cable tray side edge, used for securing cable identification tags, facilitating operation and maintenance management.

Warning Identification Signs: Installed at key nodes of the cable tray, marking different cable types such as power, low-voltage, and fiber optic, and warning of operation and maintenance precautions.

2.4.4 Special Function Accessories

Fire Barrier Separators: Installed inside the cable tray to separate power and low-voltage cables, or used for fire compartmentation isolation at fire separation zones. Manufactured from fire-resistant flame-retardant panels.

Dust Cover Plates: Optional accessories covering the top of the cable tray for dusty environments. Clip-on installation, easy removal, balancing dust protection and heat dissipation.

Intelligent Cabling Sensors: Optional intelligent accessories that monitor cable temperature, vibration, smoke, and other parameters inside the cable tray in real time, integrating with the equipment room environment and monitoring system (DCIM).

Chapter 3 Product Classification

Guangdong Lain M-type open cable tray products feature a comprehensive system, classifiable by multiple dimensions including material, specification, installation method, application scenario, and functional characteristics, comprehensively covering various equipment room cabling requirements.

3.1 Classification by Base Material

3.1.1 Electro-Galvanized Carbon Steel M-Type Cable Tray

  • Base Material: Q235B high-quality low-carbon steel
  • Surface Treatment: Electro-galvanizing (yellow chromate/white zinc), zinc layer thickness ≥8μm
  • Characteristics: Economical cost, corrosion protection meets ordinary indoor environment requirements, smooth and aesthetically pleasing surface
  • Application Scenarios: Ordinary indoor equipment rooms, weak current rooms, above-ceiling areas of office buildings, and other dry environments
  • Industry Share: Approximately 70%, the highest-volume basic-grade product

3.1.2 Hot-Dip Galvanized Carbon Steel M-Type Cable Tray

  • Base Material: Q235B high-quality low-carbon steel
  • Surface Treatment: Hot-dip galvanizing, zinc layer thickness ≥65μm
  • Characteristics: Excellent corrosion resistance, strong zinc layer adhesion, wear-resistant, outdoor service life up to 20 years or more
  • Application Scenarios: Underground parking garages, semi-outdoor corridors, humid factories, and humid and dusty environments such as indoor areas in coastal regions
  • Notes: Hot-dip galvanized products may have slight zinc spangles and zinc nodules on the surface, which are normal process phenomena and do not affect performance

3.1.3 304 Stainless Steel M-Type Cable Tray

  • Base Material: 304 (06Cr19Ni10) stainless steel
  • Surface Treatment: Pickling and polishing, smooth surface
  • Characteristics: Corrosion resistance far superior to galvanized products, resistant to weak acids and alkalis, not prone to rusting, high cleanliness, easy to clean
  • Application Scenarios: Clean equipment rooms, pharmaceutical factories, food workshops, high-humidity equipment rooms, indoor equipment rooms in coastal areas
  • Advantages: Low total life-cycle cost, no periodic anti-corrosion maintenance required, excellent appearance quality

3.1.4 316L Stainless Steel M-Type Cable Tray

  • Base Material: 316L (022Cr17Ni12Mo2) low-carbon stainless steel
  • Surface Treatment: Pickling and polishing
  • Characteristics: Molybdenum addition significantly enhances corrosion resistance and chloride ion attack resistance, resistant to strong acids and alkalis, high-temperature resistant
  • Application Scenarios: Seaside outdoor environments, chemical industry parks, sewage treatment plants, and industrial scenarios with severe corrosive environments
  • Positioning: High-end anti-corrosion grade, suitable for extreme harsh environments

3.1.5 Powder-Coated M-Type Cable Tray

  • Base Material: Q235B carbon steel, with zinc coating base treatment
  • Surface Treatment: Electrostatic powder spraying, color options available (commonly telecommunications gray, milky white, black)
  • Characteristics: Aesthetic appearance, customizable colors, good corrosion protection, certain insulation properties
  • Application Scenarios: Surface-mounted installations in office areas with high aesthetic requirements, exhibition halls, commercial complexes, and similar scenarios

3.2 Classification by Specification and Dimensions

The standard height of M-type open cable trays is 100mm, with widths covering 100mm to 600mm, meeting different cable capacity requirements. Special specifications can be customized.

3.2.1 Narrow Width Series (100mm-200mm)

  • Common Widths: 100mm, 150mm, 200mm
  • Wire Diameters: 4mm, 5mm
  • Rated Load Capacity per Meter: 80kg-150kg
  • Application Scenarios: Single cabinet-top cabling, low-voltage branch circuits, inter-row cabling in small equipment rooms; the mainstream specification for cabinet M-type cable trays
  • Advantages: Small footprint, flexible installation, compatible with standard cabinet widths

3.2.2 Medium Width Series (300mm-400mm)

  • Common Widths: 300mm, 400mm
  • Wire Diameters: 5mm, 6mm
  • Rated Load Capacity per Meter: 150kg-250kg
  • Application Scenarios: Main cabling channels between equipment room rows, medium-density cabling areas, power and low-voltage co-layout with separation
  • Advantages: Moderate capacity, strong versatility, common specification for horizontal backbone cable trays in equipment rooms

3.2.3 Wide Width Series (500mm-600mm)

  • Common Widths: 500mm, 600mm
  • Wire Diameters: 6mm
  • Rated Load Capacity per Meter: 250kg-400kg
  • Application Scenarios: Main cabling corridors in data centers, IDC room backbone channels, high-volume power cable laying
  • Configuration: Wide width trays come standard with reinforcing ribs; additional bottom reinforcement bars required for large-span installations

3.2.4 Custom Specifications

Special widths, heights, and lengths of cable trays, as well as curved, sector, and special-shaped trays, can be customized based on customer requirements to meet individualized engineering needs.

3.3 Classification by Installation Method

3.3.1 Ceiling-Suspended M-Type Cable Tray

  • Installation Method: Suspended below floor slabs and beams
  • Supporting Accessories: Threaded rod hangers, U-shaped cross members, expansion bolts
  • Application Scenarios: Overhead cabling systems in equipment rooms, above-ceiling cabling; the most mainstream installation method

3.3.2 Wall-Mounted M-Type Cable Tray

  • Installation Method: Secured to walls and columns via wall brackets
  • Supporting Accessories: M-type L wall brackets, triangular support frames, expansion bolts
  • Application Scenarios: Vertical cable trays along walls, corridor side cabling, equipment room wall cabling

3.3.3 Cabinet-Top Mounted M-Type Cable Tray

  • Installation Method: Fixed to the top of standard cabinets
  • Supporting Accessories: Cabinet connectors, top-mounting cross members
  • Application Scenarios: Cabinet-top cabling, inter-row header cabinet cabling; the most representative installation method for M-type cable trays

3.3.4 Floor-Mounted M-Type Cable Tray

  • Installation Method: Supported on the floor via columns
  • Supporting Accessories: U-shaped columns, base plates, floor-mounting wall brackets
  • Application Scenarios: Under raised access floor cabling, surface-mounted floor cabling; commonly used in underfloor air supply equipment rooms

3.4 Classification by Application Scenario

3.4.1 Equipment Room Dedicated M-Type Cable Tray

Optimized design for equipment room environments: uniform wire diameter, smooth weld points with no burrs, clean surface treatment, complete series of equipment room cabling accessories, compatible with cabinet installation. This is the flagship product series.

3.4.2 Industrial Dedicated M-Type Cable Tray

Reinforced design for industrial environments: thicker wire diameters, enhanced anti-corrosion treatment, improved vibration and impact resistance, supplied with heavy-duty support accessories. Suitable for factories, mines, power industry, and other industrial scenarios.

3.4.3 Outdoor Dedicated M-Type Cable Tray

Designed for outdoor environments: hot-dip galvanized or stainless steel materials, equipped with snow guards and fall protection accessories, enhanced wind load and snow load resistance. Suitable for outdoor pipe racks, base stations, and outdoor cabling in industrial parks.

3.4.4 Cleanroom Dedicated M-Type Cable Tray

Designed for clean environments: polished surface treatment, no dust accumulation dead corners, resistant to dust accumulation, easy to clean, conforming to cleanroom classification requirements. Suitable for pharmaceutical, electronics, and food cleanrooms.

3.5 Classification by Functional Characteristics

3.5.1 Standard Load-Bearing Type

Standard-grade product meeting conventional low-voltage cabling requirements. Economical cost, wide application range.

3.5.2 Reinforced Load-Bearing Type

Thickened wire diameters and additional longitudinal reinforcement bars enhance load-bearing capacity. Suitable for heavy-load cabling scenarios with power cables, large-pair-count cables, and fiber optic cables.

3.5.3 Fire-Resistant Flame-Retardant Type

Cable tray body manufactured from fire-resistant materials or treated with fire-retardant coatings, supplied with fire barrier separators and fire-stop sealing components. Meets high-level fire protection requirements, suitable for key fire safety areas.

3.5.4 Intelligent Monitoring Type

Integrates temperature, smoke, and vibration sensors with data acquisition modules, connectable to environment and monitoring systems for real-time monitoring of cable tray operating status. Suitable for high-end data centers.

Chapter 4 Product List

4.1 Standard Configuration List (Example: 100 meters of 100mm wide electro-galvanized M-type cable tray)

The following is the standard configuration list for a single project, adjustable based on actual project scale, installation method, and scenario requirements.

No. Component Name Specification/Model Unit Quantity Remarks
1 M-Type Open Cable Tray Straight Section LA-M-100, W100mm×H100mm×L3000mm, wire diameter 5mm, electro-galvanized Meter 100 Main trough body, standard length 3m/section
2 Standard Connection Clip LA-KK-01, M6 bolt, galvanized Set 34 2 sets per joint, approximately 34 joints per 100m
3 U-Shaped Suspension Cross Member LA-HD-120, length 120mm, U-shaped galvanized Pcs 50 1 per 2m suspension spacing, 50 total per 100m
4 Fully Threaded Rod Hanger M8×1000mm, galvanized Pcs 100 2 hanger rods per cross member
5 Hex Flange Nut M8, galvanized Pcs 200 2 nuts per hanger rod, for height adjustment
6 Expansion Bolt M8×80mm, galvanized Set 100 Secures top end of hanger rods
7 Cable Tray Hanger Clip LA-DK-01, galvanized Pcs 100 2 per cross member, secures cable tray
8 Expansion Connection Plate LA-SS-100, compatible with 100mm width Set 4 1 set per 30m, additional at structural expansion joints
9 Edge Protection Strip PVC, 100mm width Meter 10 Protection for cut ends
10 Copper Braided Bonding Jumper 4mm², length 200mm Pcs 2 For first/last end grounding bridge; optional for galvanized trays
11 Grounding Terminal M6, copper tinned Pcs 4 For grounding connections
12 Product Certificate of Conformity / Copy 1 Supplied with goods
13 Factory Inspection Report / Copy 1 Supplied with goods

4.2 Optional Accessories List

No. Component Name Specification/Model Unit Application Scenario
1 Quick Connection Bar LA-KL-01, spring steel galvanized Bar Rapid construction, light-load cabling scenarios
2 L-Shaped Connector LA-L-100, compatible with 100mm width Set On-site fabrication of 90° elbows
3 T-Shaped Connector LA-T-100, compatible with 100mm width Set On-site fabrication of tee branches
4 Bottom Reinforcement Bar LA-JQ-100, length 3000mm Pcs Heavy-load, large-span reinforcement
5 M-Type L Wall Bracket LA-TB-200, length 200mm Pcs Wall-mounted cable tray installation
6 Triangular Support Frame LA-SJ-300, length 300mm Pcs Heavy-load wall-mounting scenarios
7 Cabinet-Top Mounting Connector LA-JG-19, compatible with 19-inch cabinets Set Cabinet-top cable tray installation
8 Mesh Cable Retainer Plastic/Metal, 10 grids Pcs High-density cabling cable organization
9 Fire Barrier Separator Fire-resistant panel, 100mm height Meter Power/low-voltage separation, fire compartmentation
10 Dust Cover Plate LA-GB-100, clip-on type Meter Dust protection in dusty environments
11 Cable Label Holder Nylon, clip-on type Pcs Cable identification management
12 Anti-Sway Bracket Custom Set Long-distance, vertical cable tray anti-sway
13 U-Shaped Floor-Mounting Column LA-LZ-500, height 500mm Pcs Under-floor, floor-mounting installation
14 Column Base Plate 100×100mm steel plate Pcs Secures floor-mounting columns

4.3 Installation Tool List

The following tools must be prepared before construction to ensure smooth installation:

4.3.1 Measurement and Layout Tools

  • Laser Level: Used for cable tray elevation positioning and levelness calibration
  • Steel Tape Measure: 5m and 50m, one each, for dimensional measurement and point marking
  • Plumb Bob: Used for verticality inspection
  • Ink Line (Chalk Line): Used for marking reference lines
  • Marker Pen: Used for marking points

4.3.2 Cutting and Processing Tools

  • Angle Grinder: Fitted with metal cutting discs, for cable tray cutting
  • Stainless Steel Dedicated Cutting Discs: For stainless steel cable trays, preventing rust at cut edges
  • Files and Sandpaper: For deburring cut ends
  • Manual Mesh Cutting Shears: For on-site cutting of small cable trays

4.3.3 Fastening and Installation Tools

  • Rotary Hammer Drill: Fitted with M8, M10 drill bits, for drilling holes in walls and floor slabs
  • Electric Drill: For drilling operations
  • Socket Wrench: 8mm, 10mm, for bolt tightening
  • Adjustable Wrench: 6-inch, 8-inch, backup
  • Torque Wrench: For precise control of bolt tightening torque
  • Screwdrivers: Phillips and flat-head, various sizes
  • Rubber Mallet: For cable tray alignment and seating

4.3.4 Safety Protection Equipment

  • Safety Helmet and Safety Harness: Essential for work at height
  • Protective Gloves: Cut-resistant, anti-electric shock
  • Safety Goggles: Protection during cutting and drilling
  • Insulated Shoes: Electrical work protection

4.3.5 Inspection and Acceptance Tools

  • Ground Resistance Tester: For testing grounding resistance
  • Feeler Gauge: For checking joint gaps
  • Spirit Level: For checking levelness
  • Vernier Caliper: For checking wire diameter and zinc layer thickness
  • Tensiometer (Force Gauge): For spot-checking weld point and connection point strength

4.4 Accessory Compatibility Table for Different Cable Tray Specifications

Cable Tray Width Recommended Wire Diameter Compatible Connection Clip Model Compatible Wall Bracket Length Recommended Hanger Rod Specification Standard Support/Hanger Spacing
100mm 4mm/5mm LA-KK-01 180mm M8 2.0m
150mm 5mm LA-KK-01 230mm M8 2.0m
200mm 5mm LA-KK-02 280mm M8/M10 1.8m
300mm 5mm/6mm LA-KK-02 380mm M10 1.5m
400mm 6mm LA-KK-03 480mm M10 1.5m
500mm 6mm LA-KK-03 580mm M12 1.2m
600mm 6mm LA-KK-04 680mm M12 1.2m

Chapter 5 Product Principles

5.1 Mechanical Structural Principles

The mechanical performance core of the M-type open cable tray originates from its M-type side edge structure and mesh load-bearing system, achieving a balance between lightweight design and high load-bearing capacity through rational structural design.

5.1.1 Flexural Mechanics Principle

When the cable tray is installed horizontally, it primarily bears vertically downward cable loads, making it a typical simply supported beam in flexure. The bottom longitudinal wires serve as the primary tension members, bearing the tensile forces generated by bending moment; the M-type side edges serve as the primary flexural members, equivalent to the two webs of a beam, carrying shear forces and bending moment.

Compared to the single-side U-type structure, the M-type dual-side-edge structure significantly increases the cross-sectional moment of inertia. According to material mechanics formulas, the cross-sectional moment of inertia I is proportional to the cube of the section height. The M-type side edge achieves an equivalently higher section height through two bends. With the same material usage, flexural strength is increased by more than 40%, and deflection deformation is reduced by more than 30%. This enables excellent load-bearing capacity even on narrow-width cable trays, making it highly suitable for narrow-space cabling scenarios on top of cabinets.

5.1.2 Mesh Load Distribution Principle

The bottom mesh uses an orthogonal welded structure with transverse wires as primary load-bearing members and longitudinal wires as distribution members. Under load, transverse wires transmit loads to the side edges on both sides, while longitudinal wires distribute loads evenly across multiple transverse wires, preventing overload on any single wire. The 50mm×100mm mesh size design ensures sufficient wire density to prevent small cable sagging while controlling self-weight and material costs, representing the optimal balance between mechanical performance and economy.

5.1.3 Weld Point Load-Bearing Principle

Each mesh intersection point is welded using fully automated resistance spot welding, with weld nugget diameter ≥3mm and single-point shear strength ≥500N. Weld points are uniformly distributed; under overall loading, loads are dispersed evenly through weld points to all wires, with no single-point stress concentration. The full welding process ensures weld points do not detach. Even if individual weld points have defects, surrounding weld points can share the load, providing redundant safety margin.

5.1.4 Support System Load-Bearing Principle

The support/hanger system adopts a multi-point continuous support mode, transmitting cable tray loads evenly to the building structure. The standard 2-meter support spacing design places the maximum bending moment of each tray section at mid-span, with deflection controlled within L/200, meeting national standard requirements. For heavy-load or large-span scenarios, reducing support spacing further reduces bending moment and deflection, increasing the safety factor.

5.2 Ventilation and Heat Dissipation Principles

One of the core advantages of the M-type open cable tray is its excellent heat dissipation performance, based on the natural air convection and thermal radiation of the fully open structure.

5.2.1 Convection Heat Dissipation

In traditional enclosed cable trays, internal air circulation is poor, and heat generated by cables cannot be discharged in a timely manner, resulting in heat accumulation and elevated cable operating temperatures. The fully hollowed structure of the M-type open cable tray allows air to flow freely from the bottom, sides, and top in all directions. Cable surfaces are in direct contact with ambient air, significantly improving natural convection heat exchange efficiency.

Based on measured data, under identical cable loads, cable temperatures in open cable trays are 8-15°C lower than in enclosed cable trays. The higher the ventilation rate, the more significant the heat dissipation effect. For every 10°C reduction in cable operating temperature, insulation aging rate is halved and service life can be more than doubled. Additionally, cable ampacity can be increased by 10%-15%, allowing the use of smaller-diameter cables and reducing cabling costs.

5.2.2 Radiant Heat Dissipation

Heat from cable surfaces can be directly dissipated to the surrounding environment through thermal radiation, without requiring conduction through the cable tray walls. The open structure has no obstructions, keeping the thermal radiation path clear, further improving heat dissipation efficiency. In equipment rooms with air conditioning supply, cold air can pass directly through the cable tray mesh and blow across cable surfaces, achieving higher heat exchange efficiency, effectively reducing the equipment room PUE value and meeting green data center energy-saving requirements.

5.2.3 Uniform Temperature Heat Dissipation

The mesh structure ensures that every cable has full air contact, preventing localized overheating caused by stacking, compression, or wrapping. The entire cable bundle maintains uniform temperature, avoiding the problem of accelerated aging from localized hot spots. In layered cabling arrangements, there is no obstruction between upper and lower cable layers, so heat does not accumulate layer by layer, and each cable layer maintains good heat dissipation conditions.

5.3 Electromagnetic Compatibility Principles

When high-voltage and low-voltage cables are routed on shared racks within a data center, electromagnetic interference is a critical factor affecting signal transmission quality. The metal mesh structure of the M-type open cable tray provides excellent electromagnetic shielding and grounding discharge capabilities.

5.3.1 Electromagnetic Shielding Function

The continuous metal mesh structure acts as a Faraday cage, providing a degree of electromagnetic shielding for internal cables. It reduces the impact of external electromagnetic interference on low-voltage signals while also attenuating electromagnetic radiation emitted outward by internal high-voltage cables. Compared with non-metallic cable trays, the electromagnetic shielding effectiveness of metal mesh cable trays can reach 20–30 dB, effectively reducing crosstalk between high-voltage and low-voltage cables.

5.3.2 Grounding Discharge Function

Once the cable tray is reliably grounded throughout its entire length, induced static charges and interference currents can be rapidly discharged to earth, eliminating potential differences and preventing static accumulation that could damage equipment. For shielded cables, multi-point grounding between the tray and the shield layer forms a complete shielding system, substantially enhancing immunity to interference.

5.3.3 Layered Isolation Principle

By routing cables in multiple layers of trays, with power cables at the lower level and low-voltage cables at the upper level, and with a layer spacing of ≥300 mm, electromagnetic interference is attenuated through spatial distance. When high-voltage and low-voltage cables share the same tray, the installation of a metal partition plate with reliable grounding provides physical shielding isolation, keeping interference within the limits permitted by applicable regulations and meeting the requirements of the GB 50311 standard.

5.4 Cable Management Principles

The M-type open cable tray is not merely a cable support system but a complete scientific cable management system. Its structural design fully aligns with modern cable management concepts.

5.4.1 Visual Management Principle

The fully open structure leaves all cables completely exposed, making cable labels, routing paths, and physical condition visible at a glance. Maintenance personnel can quickly locate faults and verify circuits without disassembling any components, reducing fault location time from several hours with traditional trays to just minutes, significantly improving O&M efficiency. Visual management also helps prevent operational errors and reduce maintenance incidents.

5.4.2 Modular Expansion Principle

The standardized mesh interface supports branching and expansion at any position without requiring custom accessories. When business upgrades require additional cables, they can be laid directly onto the existing tray without stopping work to remove covers. When new branch circuits are needed, tees can be fabricated on site — no factory customization required — perfectly matching the rapid iteration needs of business in the Internet era.

5.4.3 Layered and Categorized Management Principle

The cable tray enables layered, categorized, and bundled cable routing through the use of cable retainers. Power cables, low-voltage cables, and fiber optic cables are arranged separately with clear identification and orderly routing, preventing tangled or messy cable installation. Standardized cable management is not only aesthetically pleasing but also facilitates later maintenance and expansion, reducing full-lifecycle O&M costs.

6.1 Mechanical Performance Parameters

6.1.1 General Mechanical Parameters

Parameter Item Requirement Test Standard
Rated uniformly distributed load per meter 80 kg–400 kg (depending on specification) GB/T 23639-2017
Mid-span deflection (under rated load) ≤L/200 GB/T 23639-2017
Single spot weld shear resistance ≥500 N GB/T 23639-2017
Butt joint tensile resistance ≥1200 N/set Enterprise standard
Lateral bending strength of side rail ≥800 N/side Enterprise standard
Overall torsional angle ≤5°/m (under rated load) Enterprise standard
Vertical load capacity of support hanger ≥500 kg/set (M10 suspension rod) Enterprise standard

6.1.2 Detailed Mechanical Parameters by Specification

Electro-galvanized Carbon Steel Series

Model Width Height Wire Diameter Standard Length Rated Uniform Load Recommended Max Span Self Weight
LA-M-100 100 mm 100 mm 4.0 mm 3000 mm 80 kg/m 2.0 m 1.2 kg/m
LA-M-100J 100 mm 100 mm 5.0 mm 3000 mm 120 kg/m 2.0 m 1.5 kg/m
LA-M-150 150 mm 100 mm 5.0 mm 3000 mm 150 kg/m 2.0 m 1.8 kg/m
LA-M-200 200 mm 100 mm 5.0 mm 3000 mm 180 kg/m 1.8 m 2.2 kg/m
LA-M-300 300 mm 100 mm 5.0 mm 3000 mm 220 kg/m 1.5 m 3.0 kg/m
LA-M-300J 300 mm 100 mm 6.0 mm 3000 mm 280 kg/m 1.5 m 3.6 kg/m
LA-M-400 400 mm 100 mm 6.0 mm 3000 mm 320 kg/m 1.5 m 4.2 kg/m
LA-M-500 500 mm 100 mm 6.0 mm 3000 mm 360 kg/m 1.2 m 5.0 kg/m
LA-M-600 600 mm 100 mm 6.0 mm 3000 mm 400 kg/m 1.2 m 5.8 kg/m

Stainless Steel Series (304 Material)

Model Width Height Wire Diameter Standard Length Rated Uniform Load Recommended Max Span Self Weight
LA-M-B100 100 mm 100 mm 4.0 mm 3000 mm 70 kg/m 2.0 m 1.1 kg/m
LA-M-B200 200 mm 100 mm 5.0 mm 3000 mm 160 kg/m 1.8 m 2.0 kg/m
LA-M-B300 300 mm 100 mm 6.0 mm 3000 mm 250 kg/m 1.5 m 3.3 kg/m
LA-M-B400 400 mm 100 mm 6.0 mm 3000 mm 290 kg/m 1.5 m 4.0 kg/m

6.2 Electrical Performance Parameters

Parameter Item Requirement Remarks
Contact resistance between sections ≤0.1 Ω Galvanized tray, bolted connection
Overall grounding resistance ≤4 Ω After reliable connection to grounding busbar
Electromagnetic shielding effectiveness 20–30 dB At 1 GHz frequency
Rated operating voltage ≤1000 V Suitable for low-voltage distribution and low-voltage systems
Equipotential bonding resistance ≤0.3 Ω Connected to data center equipotential system
Insulation resistance (powder-coated type) ≥100 MΩ For powder-coated surface products

6.3 Environmental Adaptation Parameters

Parameter Item Electro-galvanized Type Hot-dip Galvanized Type 304 Stainless Steel Type 316L Stainless Steel Type
Operating ambient temperature -40°C to +80°C -40°C to +120°C -80°C to +200°C -80°C to +250°C
Relative humidity ≤85% (non-condensing) ≤95% 100% (long-term wet conditions) 100%
Salt spray resistance No red rust for 48 h No red rust for 200 h No red rust for 1000 h No red rust for 2000 h
Corrosion protection grade C2 C4 C5-M C5-M+
Outdoor suitability Not recommended Suitable Suitable Suitable for highly corrosive outdoor environments
Seismic rating 8 degrees 8 degrees 8 degrees 8 degrees
Flame retardant rating Non-combustible Class A Non-combustible Class A Non-combustible Class A Non-combustible Class A

6.4 Material and Surface Treatment Parameters

6.4.1 Base Material Parameters

  • Q235B low-carbon steel: Yield strength ≥235 MPa, tensile strength 375–500 MPa, elongation ≥26%, compliant with GB/T 700 standard.
  • 304 stainless steel: Yield strength ≥205 MPa, tensile strength ≥520 MPa, elongation ≥40%, chromium content 18–20%, nickel content 8–10.5%, compliant with GB/T 3280 standard.
  • 316L stainless steel: Yield strength ≥170 MPa, tensile strength ≥480 MPa, elongation ≥40%, chromium content 16–18%, nickel content 10–14%, molybdenum content 2–3%, low carbon content ≤0.03%, compliant with GB/T 3280 standard.

6.4.2 Surface Treatment Parameters

  • Electro-galvanizing: Zinc layer thickness ≥8 μm, neutral salt spray test 48 h without white rust, compliant with GB/T 9799 standard.
  • Hot-dip galvanizing: Zinc layer thickness ≥65 μm (for parts with thickness ≥6 mm), adhesion qualified, no peeling in hammer test, compliant with GB/T 13912 standard.
  • Stainless steel polishing: Surface roughness Ra ≤1.6 μm, pickling and passivation treatment, surface free of oil stains and burrs.
  • Electrostatic powder coating: Coating thickness 60–80 μm, adhesion grade 0, impact strength 50 kg·cm, compliant with GB/T 1732 standard.

6.5 Installation Accuracy Parameters

Inspection Item Allowable Deviation Inspection Method
Cable tray centerline positioning deviation ≤50 mm Steel tape measurement
Horizontal level deviation ≤2 mm/m, total length ≤20 mm Spirit level, string line measurement
Vertical plumb deviation ≤3 mm/m, total length ≤20 mm Plumb bob, steel tape measurement
Joint gap ≤0.5 mm Feeler gauge measurement
Support hanger spacing deviation ≤50 mm Steel tape measurement
Height difference of same-layer trays ≤5 mm Level instrument measurement
Layer spacing deviation of multi-layer trays ≤10 mm Steel tape measurement

6.6 Cable Laying Parameters

Cable Type Maximum Fill Rate Recommended Fixing Spacing Minimum Bending Radius Requirement
4-pair twisted pair cable ≤40% Horizontal 1.5 m, vertical 1.0 m ≥10 times cable outer diameter
Large-pair backbone cable ≤40% Horizontal 1.0 m, vertical 0.8 m ≥15 times cable outer diameter
Indoor optical cable ≤30% Horizontal 1.0 m, vertical 0.8 m ≥20 times optical cable outer diameter
Low-voltage power cable ≤40% Horizontal 1.0 m, vertical 0.8 m ≥10 times cable outer diameter
Control cable ≤50% Horizontal 1.5 m, vertical 1.0 m ≥10 times cable outer diameter

7.1 Core Functions

7.1.1 Cable Support and Protection Function

The most fundamental core function of the M-type open cable tray is to provide stable support for various types of cables, uniformly transferring cable weight to the building structure and preventing cables from hanging unsupported or deforming under tension. The mesh structure effectively supports cables of various diameters, preventing sagging or detachment. Rounded and blunted edges prevent abrasion of cable insulation, ensuring long-term safe operation of cables.

7.1.2 Cable Routing Planning Function

The cable tray system provides standardized routing paths for cables, keeping cable runs orderly and preventing the chaos of arbitrary installation. Through fittings such as elbows, tees, and crosses, cable turns, branches, and junctions can be achieved, building a complete cabling network that adapts to the layout of cabinets, power distribution cabinets, and patch panels within the data center.

7.1.3 Heat Dissipation and Energy Saving Function

The fully open structure ensures adequate heat dissipation for cables, lowering operating temperatures, extending cable service life, and simultaneously reducing the cooling load of data center air conditioning, lowering PUE, and achieving energy savings. For high-density data centers, the long-term energy saving benefits of the heat dissipation function far exceed the procurement cost of the cable tray itself.

7.1.4 Electrical Safety and Grounding Function

The all-metal cable tray is reliably grounded along its entire length, forming a continuous electrical path that discharges static electricity and induced currents, protecting personnel and equipment safety. In the event of cable insulation damage and leakage, the cable tray can serve as a PE conductor to carry fault current, triggering protection devices and preventing electric shock hazards.

7.1.5 Operation and Maintenance Management Function

The visual structure makes cable conditions visible at a glance, facilitating routine inspections, fault troubleshooting, and expansion modifications. Combined with the identification system, refined cable management can be achieved, substantially improving O&M efficiency and reducing maintenance difficulty and cost.

7.2 Core Product Features

7.2.1 Structural Features: M-type Reinforcement, High Strength and Lightweight

  • M-type double-folded edge design: The side rail is folded twice to form a double-vertical-plane structure, providing lateral strength far exceeding that of ordinary U-type trays. High load capacity is maintained even at narrow widths, making it perfectly suited for overhead cabling above cabinets.
  • Full mesh open structure: Ventilation rate ≥85%, no dead corners for dust or water accumulation, high cleanliness.
  • Modular standardized design: All accessories are interchangeable and universal; straight sections, elbows, and tees can be freely combined with strong compatibility.
  • Lightweight design: Self-weight is only 30%–40% of traditional trough-type trays, reducing building structural load and making transport and installation more convenient.

7.2.2 Installation Features: Fast, Flexible, and Highly Adaptable On-site

  • Custom-free on-site fabrication: Straight tray sections can be cut to any length on site; elbows, tees, and reducer fittings can all be fabricated on site without factory customization, substantially shortening construction cycles and providing greater flexibility in responding to design changes.
  • Quick-connect fittings: Snap-buckle connections allow single-person installation, achieving construction efficiency 2–3 times that of traditional trays and significantly saving labor costs.
  • Multiple installation methods: Compatible with suspension mounting, wall mounting, cabinet-top mounting, and floor mounting, adaptable to various complex environments without concern for on-site conditions.
  • Highly flexible height adjustment: The support system allows stepless adjustment of installation height, adapting to different elevation requirements, and installation errors are easily corrected.

7.2.3 O&M Features: Fully Visual, Efficient and Convenient

  • 100% visual O&M: All cables are exposed, with labels, routing, and physical condition clearly visible. Fault troubleshooting achieves second-level positioning without removing cover plates, improving O&M efficiency by over 80%.
  • Zero-shutdown expansion and modification: New cables can be laid directly, and branch circuits can be added at any time without large-scale shutdown or dismantling, adapting to rapid business development needs.
  • Convenient fault handling: When cable faults occur, splicing and replacement operations can be performed directly on the tray with ample working space and convenient access.
  • Simple cleaning and maintenance: The open structure does not easily accumulate dust; cleaning can be accomplished with brushes or compressed air, resulting in low maintenance costs.

7.2.4 Safety Features: Multiple Protections, Safe and Reliable

  • Structural safety: High weld point strength, redundant support system design, deflection under rated load far below national standard limits, and excellent wind resistance, seismic resistance, and vibration resistance.
  • Electrical safety: Fully grounded along the entire length, good electrical continuity, low contact resistance, and rapid discharge of leakage current and static electricity.
  • Fire safety: All-metal materials are non-combustible, the fully open structure prevents smoke accumulation, and fire risk is low, meeting data center fire protection requirements.
  • Personnel safety: All edges are rounded and blunted with no sharp burrs, reducing the risk of injury during construction and maintenance.

7.2.5 Cost Features: Low Full-Lifecycle Cost

  • Procurement cost: Lower steel consumption and material cost than traditional trays; standardized accessories enable low mass-production costs.
  • Construction cost: High installation efficiency, reducing labor hours by more than 50%; no custom fittings required, saving customization expenses.
  • O&M cost: Substantially reduced inspection, fault handling, and expansion costs, with long-term O&M costs of only approximately 30% of traditional trays.
  • Energy saving benefits: Excellent heat dissipation reduces cable losses and air conditioning energy consumption, providing significant long-term energy savings.
  • Recycling value: The product is made entirely of metal and can be 100% recycled after decommissioning, with high residual value.

7.3 Differentiated Advantages over Similar Products

Compared with ordinary U-type mesh cable trays, the KITOZER M-type open cable tray offers the following differentiated advantages:

  • Higher lateral strength: The M-type side rail provides 40% greater bending resistance than the U-type single side rail. Lateral deformation and twisting are less likely after installation, with particularly notable stability advantages for narrow trays.
  • Better fitting of accessories: Dedicated M-type connecting buckles and support arms fit perfectly against the side rail with large contact area, providing more secure connections and preventing buckle slippage or detachment.
  • Superior cable protection: The M-type side rail features double-arc transition at the top edge without sharp corners, making it less likely to scratch cables during pulling.
  • Greater load redundancy: At the same wire diameter, the M-type tray provides 20% higher load capacity, offering greater safety for heavy-duty cabling applications.
  • Higher installation accuracy: The M-type structure provides clear positioning reference points, making alignment easier during splicing, resulting in better straightness and overall appearance.

With its excellent comprehensive performance, the M-type open cable tray is widely used in various scenarios requiring structured cabling. Data center cabinet cabling is its core advantageous field. The main application scenarios are detailed below.

8.1 Data Centers and IDC Data Center Scenarios

8.1.1 Scenario Characteristics

Data centers are high-density cabling scenarios characterized by a large number of cabinets, high cable density, and strict reliability requirements. They typically use an overhead cable routing architecture with extremely high demands on heat dissipation, O&M, and expansion capability. Tier III and Tier IV data centers have strict standards for cabling system availability and maintainability.

8.1.2 Application Methods

  • Cabinet-top cabling: M-type trays are installed directly on top of 19-inch standard cabinets, serving as the horizontal cabling channel for each row of cabinets, connecting power distribution cabinets and server cabinets, and carrying network patch cords, fiber patch cords, and power cables. The narrow-profile M-type tray fits the cabinet width perfectly without occupying additional space, making it the preferred choice for this scenario.
  • Main channel cabling: Wide-profile M-type trays are used in the main corridor of the data center as the backbone cabling channel, carrying large-pair cables, backbone optical cables, and busway supporting cables.
  • Segregated high/low-voltage routing: Multi-layer suspended M-type trays are used, with low-voltage signal cables in the upper layer and power cables in the lower layer, with layer spacing in compliance with code requirements to avoid electromagnetic interference.
  • Vertical cabling at power distribution cabinets: M-type trays are installed vertically along cabinet columns, connecting the overhead tray to in-cabinet patch panels for vertical cable routing.

8.1.3 Scenario Value

  • High heat dissipation performance lowers cable temperatures, reduces fault rates, and improves system reliability.
  • Visual O&M substantially reduces fault troubleshooting time and improves data center availability.
  • Modular rapid expansion adapts to phased data center construction and rapid business deployment requirements.
  • Complies with TIA-942, GB 50174 and other data center standards, meeting certification requirements.

8.2 Enterprise Server Room Scenarios

8.2.1 Scenario Characteristics

Enterprise server rooms are medium-sized, with cabinet quantities ranging from a few to several dozen. The cabling system must balance reliability and economy, and may require expansion or modification as the business develops. O&M personnel are typically not professional cabling engineers, requiring a system that is simple and easy to maintain.

8.2.2 Application Methods

  • Cabinet-top or ceiling-suspended M-type trays are used to build a simple cabling network covering all cabinets and network equipment.
  • When high-voltage and low-voltage cables share the same tray, metal partition plates are installed for separation, saving space and cost.
  • Floor-mounted M-type trays are used under raised access floors, replacing traditional chaotic underfloor cabling for easier maintenance.

8.2.3 Scenario Value

  • Moderate cost with performance far superior to traditional trough-type trays, offering excellent value for money.
  • Simple structure with low O&M barriers; ordinary IT personnel can perform routine inspections and simple expansions.
  • Flexible later expansion; the tray system does not need to be replaced when the enterprise business upgrades.
  • Neat and aesthetically pleasing cabling that enhances the overall image of the server room.

8.3 Telecommunications Rooms and Equipment Rooms Scenarios

8.3.1 Scenario Characteristics

Telecommunications rooms are convergence points for floor-level cabling. Space is confined, equipment is dense, and cables are numerous and varied. The cabling system must make full use of limited space while facilitating patch cord management.

8.3.2 Application Methods

  • M-type trays are installed in multiple layers along walls, carrying cables of different systems (network, telephone, surveillance, building control, etc.) in separate layers.
  • Trays extend vertically to connect upper and lower floors, forming vertical backbone channels.
  • Combined with cable management panels and cable retainers, cables are arranged neatly with clear identification.

8.3.3 Scenario Value

  • Small footprint; narrow-profile trays fit the confined space of telecommunications rooms.
  • Layered and categorized cabling keeps each system’s cables independent for separate management and maintenance.
  • The fully open structure facilitates patch cord operations, much more efficient than closed trough-type trays.

8.4 Industrial Automation Plant Scenarios

8.4.1 Scenario Characteristics

Industrial plant environments are complex, with adverse factors such as vibration, dust, humidity, and corrosion. The cabling system must provide high reliability, interference immunity, and corrosion resistance while facilitating adjustment and modification of industrial equipment.

8.4.2 Application Methods

  • Hot-dip galvanized or stainless steel M-type trays are installed along plant columns, walls, or roof trusses, connecting PLCs, sensors, servo motors, industrial switches, and other equipment.
  • Power cables and control cables are routed in separate layers to reduce electromagnetic interference and ensure stable industrial control signals.
  • When production equipment is readjusted, the tray can be quickly modified in parallel, adapting to production line upgrade requirements.

8.4.3 Scenario Value

  • Corrosion-resistant materials withstand harsh industrial environments with long service life.
  • Vibration-resistant structural design with secure weld points prevents loosening due to equipment vibration.
  • The open structure facilitates cable fault tracing, reducing production downtime losses.
  • Flexible modification; the cabling system can quickly follow production line adjustments with short shutdown periods.

8.5 Smart Buildings and Commercial Complex Scenarios

8.5.1 Scenario Characteristics

Smart buildings encompass multiple low-voltage systems including network, communications, security, fire protection, building control, and broadcasting. The cabling system covers the entire building with dispersed termination points and complex routing paths, requiring aesthetics, reliability, and suitability for phased construction and maintenance.

8.5.2 Application Methods

  • M-type trays are suspended above ceilings as horizontal cabling channels, connecting termination points in various office areas.
  • M-type trays are installed vertically in weak-current shafts as vertical backbones.
  • In areas with exposed installation such as underground garages and corridors, powder-coated trays are used for an attractive appearance that harmonizes with the interior decoration style.

8.5.3 Scenario Value

  • Modular installation adapts to phased building construction, allowing progressive installation as decoration progresses.
  • Multiple systems share the same tray, saving space and cost, with partition plates preventing mutual interference.
  • Convenient O&M and inspection; property maintenance is simple after building delivery.

8.6 Cleanrooms and Healthcare Scenarios

8.6.1 Scenario Characteristics

Cleanrooms in pharmaceutical, electronics, and food industries, as well as hospital operating rooms and laboratory departments, have strict cleanliness requirements. The cabling system must not accumulate dust, should resist bacterial growth, be easy to clean, and be corrosion-resistant.

8.6.2 Application Methods

  • 304 stainless steel M-type trays with polished surfaces are used, with no dead corners for dust accumulation.
  • Suspended installation provides sufficient clearance from the floor for easy cleaning and disinfection.
  • All accessories are made of stainless steel to prevent rust and environmental contamination.

8.6.3 Scenario Value

  • The fully open structure does not easily accumulate dust, has no sanitary dead corners, and meets cleanliness grade requirements.
  • Stainless steel is corrosion-resistant, withstands disinfectant chemicals, and is easy to clean.
  • Exposed cables facilitate inspection with no hidden spaces for dirt accumulation.

8.7 Outdoor and Utility Tunnel Scenarios

8.7.1 Scenario Characteristics

Outdoor utility tunnels, plant outdoor areas, and base stations are exposed to natural environments, facing challenges such as sun and rain, corrosion, wind load, and snow load, placing high demands on tray corrosion protection and structural strength.

8.7.2 Application Methods

  • Hot-dip galvanized or 316L stainless steel M-type trays are used with heavy-duty support systems and densified hanger spacing.
  • Anti-fall accessories are installed to prevent cables from being blown off by strong winds.
  • Expansion compensation devices are installed where crossing expansion joints to accommodate temperature-induced movement.

8.7.3 Scenario Value

  • Excellent corrosion resistance adapts to outdoor environments with long service life.
  • The open structure prevents water and snow accumulation, reducing load and preventing tray collapse.
  • Low wind resistance provides better wind resistance performance than closed trays.

8.8 Special Custom Scenarios

In addition to the above conventional scenarios, KITOZER M-type trays can be customized to meet special requirements in industries such as rail transit, mining, electric power, and military applications, satisfying special requirements for fire resistance, explosion protection, impact resistance, and electromagnetic interference protection.

9.1 Pre-installation Preparation

Adequate preparation is the prerequisite for ensuring installation quality and construction efficiency. Four tasks must be completed before installation: technical preparation, material preparation, on-site preparation, and personnel preparation.

9.1.1 Technical Preparation

  • Drawing review: Organize construction technical personnel to familiarize themselves with construction drawings, clarifying tray routing, specifications, elevations, support hanger positions, and grounding requirements. Verify positional relationships with other discipline pipelines (HVAC, plumbing, fire protection) to avoid conflicts. If conflicts exist, communicate with the design unit in advance for changes.
  • Technical disclosure: The project technical leader conducts a comprehensive technical disclosure to the construction crew, covering construction specifications, quality standards, safety requirements, schedule plans, key milestone precautions, etc., with written disclosure records signed for confirmation.
  • Plan preparation: Develop special construction plans for complex projects, including hoisting plans,working at height (working at height) plans, grounding plans, and finished product protection plans. Hazardous projects exceeding a certain scale must undergo expert review as required by regulations.
  • Standard confirmation: Clarify the acceptance standards applicable to the project, such as national standards, industry standards, or enterprise standards, and prepare the corresponding standard texts and inspection forms.

9.1.2 Material Preparation

  • Material incoming inspection: When trays and accessories arrive on site, check specifications, models, and quantities against the supply list, and inspect quality documents including product certificates, factory test reports, and material certificates. Perform sampling inspection of tray appearance, requiring no deformation, no weld detachment, intact anti-corrosion coating without scratches, and dimensional deviations within allowable limits. Non-conforming products are strictly prohibited from entering the site.
  • Material storage: Incoming materials are stored sorted by category in dry, ventilated indoor areas, protected from rain and moisture that could cause rust. Stacking height of trays should not exceed 1 m to prevent bending deformation. Accessories are packed by category with clear labels to prevent loss or mixing. Stainless steel materials are stored separately to avoid carbon steel contact that could cause carbon contamination and rust.
  • Tool preparation: Prepare all installation and inspection tools per the tool list in Section 4.3, verify that tools are in good working condition, and ensure measuring instruments are within their calibration validity period. Working-at-height equipment such as scaffolding and lifting platforms should be commissioned and positioned in advance.

9.1.3 On-site Preparation

  • Site clearance: Clear obstacles from the installation area, ensure construction access routes are unobstructed, and set up warning zones below working-at-height areas to keep unauthorized personnel out.
  • Structural condition confirmation: Verify that the building structure at the installation location has reached the required construction strength, and that load-bearing structures such as floor slabs, walls, and beams meet the load requirements. Confirm that reserved openings and embedded steel parts are correctly positioned and dimensioned.
  • Benchmark handover: Coordinate with the civil construction unit for handover of elevation benchmarks and axis benchmarks, completing handover procedures as the basis for tray positioning and layout.
  • Temporary power: Arrange temporary construction power supply in compliance with the three-level distribution and two-level protection requirements, ensuring electrical safety for power tools.

9.1.4 Personnel Preparation

  • Personnel allocation: Configure construction personnel based on project scale, typically 2–3 persons per group: one responsible for measurement and positioning, one for drilling and installation, and one for tray assembly. Personnel working at height must hold valid certifications, be in good health, and have no medical conditions contraindicated for working at height.
  • Safety training: Conduct safety education and training before construction, emphasizing precautions for working at height, electrical safety, and machinery operation safety. Personnel may only begin work after passing the assessment.
  • Technical training: Provide specialized training to construction personnel on the installation characteristics of M-type trays, covering key processes such as connecting buckle installation, on-site elbow fabrication, and grounding treatment, to prevent errors from applying traditional tray installation experience.

9.2 Survey Positioning and Layout

Survey positioning is the first step of installation and directly determines the positional accuracy and aesthetics of tray installation. It must be executed strictly in accordance with drawings and specifications.

9.2.1 Positioning Principles

  • Position according to the routing and elevations specified in the design drawings; paths must not be arbitrarily changed without approved design changes.
  • Clearance between the tray and various pipes/equipment meets code requirements:
  • Parallel clearance to general process piping ≥0.4 m; crossing clearance ≥0.3 m
  • Parallel clearance to thermal piping ≥0.5 m; crossing clearance ≥0.3 m
  • Parallel clearance to flammable/explosive gas piping ≥1.0 m; crossing clearance ≥0.5 m
  • Distance from tray top to floor slab or obstruction ≥0.3 m; distance from tray bottom to floor ≥2.5 m (at pedestrian walkways)
  • Avoid building expansion joints and settlement joints where possible; when crossing is unavoidable, install compensation devices per code.
  • Straight sections should follow the most direct route to minimize unnecessary elbows and reduce cable pulling resistance.

9.2.2 Layout Operation Steps

1. Determine elevation: Based on the elevation benchmark, use a laser level to mark the tray bottom elevation line on walls and columns, or mark the suspension rod top installation elevation line. The elevation of the same tray section must be consistent, with deviation controlled within ±5 mm.

2. Mark centerline: Snap a centerline along the tray routing as the tray positioning reference. Mark a reference point every 5–10 m on straight sections and align with a string line. At turns, mark the turning center point and radius.

3. Mark support hanger points: Mark the installation position of each support hanger on the centerline according to the design spacing. Support hanger spacing conforms to Table 6.5 requirements and additionally satisfies:

  • Support hangers must be installed within 0.5 m on both sides of tray joints
  • Additional support hangers at 0.3–0.5 m on both sides of elbows, tees, crosses, and other special fittings
  • Additional support hangers at 0.3 m from cabinet entry/exit points, wall penetrations, and floor penetrations
  • Vertical section support hanger spacing ≤1.5 m, with a fixed point required at each floor slab

4. Verification: After layout is completed, comprehensively re-check the positions, elevations, and spacings of all points, confirm no conflicts with other pipelines, and proceed to the next process only after all checks pass.

9.3 Support Hanger Installation

Support hangers are the load-bearing foundation of the tray system. Their installation quality directly determines the structural safety of the entire system. They must be secure and reliable, evenly spaced, and perfectly horizontal and vertical.

9.3.1 Suspended Support Hanger Installation (Most Common Method)

1. Drilling: Based on the marked points, use a rotary hammer drill to drill holes in the floor slab or beam bottom, with hole diameter and depth matching the expansion bolt specifications. For M8 expansion bolts, drill hole diameter φ12, depth ≥80 mm; for M10 expansion bolts, drill hole diameter φ14, depth ≥90 mm. Keep drilling perpendicular to avoid angled holes, and clean dust from holes thoroughly.

2. Install expansion bolts: Insert expansion bolts into holes and tap the expansion sleeve to ensure full expansion. Bolt exposed length should be appropriate to accommodate nut tightening.

3. Install suspension rods: Connect the top end of each fully threaded suspension rod to the expansion bolt and tighten the nut. Rods must be vertical; angled rods must be adjusted and corrected. Rod length is cut according to installation height, with cut ends ground smooth to remove burrs.

4. Install crossbars: Thread the two ends of the U-type crossbar onto two suspension rods, initially attach nuts without tightening. Use a spirit level to adjust crossbar levelness and elevation, then tighten nuts to secure once requirements are met.

5. Adjustment and verification: Pull a string line across the same row of hangers to ensure all crossbars are on the same horizontal plane, with height difference ≤5 mm. Suspension rods are vertical, crossbars are level, with no tilt.

6. Anti-sway treatment: For long straight tray runs, install lateral anti-sway bracing every 10–15 m. For vertical trays, install fixed supports every 2 m. For vertical trays exceeding 10 m in height, add additional load-bearing supports.

9.3.2 Wall-mounted Support Hanger Installation

1. Drilling and fastening: Drill holes in the wall at marked points and install expansion bolts.

2. Install support arms: Secure the M-type L-shaped support arm or triangular bracket to the wall and tighten bolts. Use a spirit level to verify support arm levelness. The upper surface of the support arm must remain level and must never tilt downward; a slight upward tilt of 1–2 mm may be provided as settlement allowance.

3. Spacing control: Wall-mounted support hanger spacing meets the same requirements as suspended mounting, with densification for heavy-load scenarios.

4. Multi-layer installation: For multi-layer wall-mounted trays, install the bottom support arm first, then install upper layers sequentially. Layer spacing meets design requirements with deviation ≤10 mm.

9.3.3 Cabinet-top Support Hanger Installation

1. Preparation: Confirm that cabinets are installed, leveled, and secured. Verify the dimensions of mounting holes on the cabinet top.

2. Install connecting brackets: Secure cabinet-specific connecting brackets into the mounting holes of the cabinet top columns — no drilling required, using existing cabinet holes, with bolts tightened.

3. Install crossbars: Secure the tray crossbar onto the connecting brackets of the cabinets on both sides, adjusting levelness and height to ensure the crossbar is parallel to the cabinet top.

4. Cross-cabinet connection: Align crossbars between adjacent cabinets to form continuous support, allowing the tray to run continuously across multiple cabinets.

5. Precautions: Drilling directly into cabinet top panels is strictly prohibited to avoid damaging cabinet structure and protection rating. Tray weight must not exceed the cabinet top load limit; heavy-load trays require additional support points.

9.3.4 Floor-mounted Support Hanger Installation

1. Base anchoring: Secure the column base to the floor with expansion bolts at the marked points, ensuring the base is level.

2. Install columns: Secure the U-type column vertically to the base, checking plumb with deviation ≤3 mm/m.

3. Install support arms: Mount support arms onto the adjustment holes of the column, adjust to design height, and tighten fixing bolts.

4. Leveling and alignment: Pull a string line to adjust all support arms to uniform height, with straightness meeting requirements.

5. Applicable scenarios: For installation under raised access floors, the tray top should be ≥50 mm from the floor panel surface and the tray bottom ≥100 mm from the sub-floor, providing adequate ventilation and access for inspection.

9.3.5 Support Hanger Installation Quality Requirements

  • Support hangers are securely fixed, expansion bolts fully expanded, with no looseness or false contact.
  • Suspension rods are vertical, crossbars are level, support arms are flat, with no tilt or deformation.
  • Support hanger spacing is uniform with deviation ≤50 mm, and positions comply with code requirements.
  • All support hanger cut ends are smooth with burrs ground off, and damaged anti-corrosion coating is touched up with rust-preventive paint.
  • Support hangers make good contact with the tray, load is evenly distributed, with no gaps or warping.
  • Support hangers crossing fire compartments or floor slabs receive fireproofing treatment.

9.4 Main Cable Tray Installation

After support hangers are installed and accepted, assembly and installation of the main tray body can proceed.

9.4.1 Tray Handling and Positioning

  • Handle trays with care during transport, avoiding dropping that could cause deformation or anti-corrosion coating detachment.
  • When installing at height, use ropes for hoisting. Direct throwing is strictly prohibited, and a warning zone must be established below.
  • Place tray sections onto support hangers one by one, adjusting positions so that the tray centerline aligns with the positioning centerline.

9.4.2 Straight Section Butt Joint Installation

1. Align the ends of two tray sections. Joint surfaces must be flush with gap ≤0.5 mm and height difference ≤0.5 mm.

2. Install standard connecting buckles: place the inner buckle inside the tray side rail, the outer buckle outside, align holes, insert carriage bolts, attach flange nuts, and tighten with a socket wrench.

3. Install 2 buckles per joint (one on each side). For heavy-load and wide trays, increase to 4 buckles (2 upper and 2 lower).

4. Bolt tightening torque should be moderate; M6 bolt tightening torque is 4–5 N·m to avoid over-tightening that could crush the tray side rail or under-tightening that could result in loose connections.

5. Continue butt-joining sections sequentially to form a continuous tray channel. After every 3–5 sections, pull a string line to correct straightness and levelness, adjusting deviations promptly.

9.4.3 Quick-Connect Installation

For light-load scenarios, quick-connect strips may be used to improve efficiency:

1. After aligning two tray sections, position the quick-connect strip over the bottom mesh and press down firmly so the spring buckles snap into the mesh openings.

2. Install 2 quick-connect strips per joint, one on each side of the bottom.

3. After snapping in, check that they are locked; gently pulling without detachment confirms a proper connection.

4. Heavy-load scenarios must use additional standard buckles; quick-connect strips must not be used alone for load-bearing.

9.4.4 On-site Elbow Fabrication

One of the greatest advantages of the M-type tray is the ability to fabricate elbows at any angle on site without factory customization. The steps are as follows:

90° Horizontal Elbow Fabrication

1. Determine the elbow center point and bending radius. The bending radius must be ≥ the minimum bending radius of the thickest cable in the tray, typically ≥300 mm.

2. Mark cutting positions on two straight tray sections and cut 45° miter cuts.

3. Join the two sections at 90°, align the joint, and secure with L-shaped connectors and buckles.

4. The inner corner of the elbow should have a smooth arc transition without sharp edges; polish smooth if necessary.

5. Support hangers must be installed within 0.5 m on both sides of the elbow.

Vertical Up/Down Elbow Fabrication

  • Similar to horizontal elbows: cut the tray side rail and fold to the vertical angle, reinforcing with L-shaped connectors.
  • The bending radius of the vertical elbow must also satisfy cable bending radius requirements.

Arbitrary Angle Elbow

  • Calculate the cutting angle based on the actual angle required, cut and splice on site, and secure with connectors.

9.4.5 Tee and Cross Fabrication

  • Tee fabrication: Mark the branch opening position on the side of the main tray, cut away the side rail wires, insert the branch tray into the opening, adjust to the vertical angle, and secure with T-shaped connectors and buckles. Grind cut edges smooth and install edge-protection strips.
  • Cross fabrication: Open both sides of the main tray, connect two branch trays, and secure with cross connectors.
  • Additional support hangers must be installed at branch points to ensure reliable load support. Branch trays must be securely connected to the main tray without looseness.

9.4.6 Reducer and Elevation Transition Treatment

  • Reducer connection: When connecting trays of different widths, use reducer plates or fabricate reducer sections on site, with a smooth flared transition to avoid steps that could scratch cables. Reducer section length ≥2 times the width difference.
  • Elevation transition: When the tray elevation needs to change, fabricate a sloped transition section with slope ≤15°, ensuring smooth cable transitions without sharp bends.

9.4.7 Expansion Joint and Structural Joint Treatment

  • Expansion joint installation: Install an expansion connector plate every 30 m on straight sections, replacing ordinary connecting buckles. The slotted holes on the connector plate allow axial expansion of the tray. Nuts are initially left loose; after all tray installation is complete, retain expansion allowance and then tighten.
  • Structural joint treatment: When the tray crosses building settlement joints or expansion joints, install compensation devices. Disconnect the tray, leave a 20–30 mm gap, and bridge with flexible copper tape for grounding to maintain electrical continuity. Install a support hanger on each side of the joint.

9.4.8 Wall and Floor Penetration Treatment

  • Wall penetration: When the tray passes through a wall, the reserved opening should be 50–100 mm larger than the tray external dimensions. After the tray passes through, seal the gap with firestop materials, meeting fire compartment requirements.
  • Floor penetration: When the tray passes through a floor slab, install a waterproof curb or firestop, with a water barrier around the opening to prevent water flow to lower floors. The tray is securely fixed at the penetration point with dense firestop sealing around it.
  • Cut edges at wall/floor penetrations must be ground smooth and fitted with edge-protection strips to prevent cable damage.

9.5 Grounding System Installation

Grounding is the core safeguard for electrical safety. The M-type open cable tray must form a continuous grounding path throughout its entire length and be reliably connected to the data center grounding system.

9.5.1 Grounding Requirements

  • The metal tray must have no fewer than 2 connection points to the grounding (PE) busbar along its total length.
  • For straight sections exceeding 30 m, an additional grounding point is installed every 20–30 m.
  • For galvanized trays, grounding jumper wires may be omitted at connection plate ends, but each end of the connection plate must have no fewer than 2 connecting bolts with lock nuts.
  • For non-galvanized trays and stainless steel trays, copper grounding jumper wires with cross-sectional area ≥4 mm² must be installed across both ends of each connection plate.
  • The total grounding resistance of the tray system ≤4 Ω; special-requirement systems follow design specifications.

9.5.2 Jumper Installation

  • At joints between sections of non-galvanized trays, install copper braided jumper wires. Both ends of the jumper wire are secured with grounding lugs and bolts directly to the tray body — not to connection plate bolts. Contact surfaces must be ground to remove oxide layers, ensuring good contact.
  • At expansion joints and structural joints, flexible copper tape jumpers must be installed with sufficient slack to accommodate tray expansion.
  • Ensure electrical continuity between support hangers and the tray; contact surfaces with paint or powder coating must be ground clean.
  • Multiple layers of trays are interconnected with grounding wires to form a unified grounding network.

9.5.3 Grounding Busbar Connection

  • At the first end, last end, and designated intermediate positions of the tray, connect the tray reliably to the data center equipotential grounding bar using grounding conductors.
  • Grounding conductors use stranded copper wire with cross-sectional area per design requirements, generally ≥16 mm².
  • Connection points are clearly marked for later inspection.

9.5.4 Grounding Test

  • After grounding installation is complete, measure grounding resistance with a ground resistance tester. Test points include both ends, intermediate sections, and branch points. Resistance values must meet requirements to pass. Non-conforming installations must be investigated for poor contact points and re-treated.

9.6 Installation Finished Product Protection

After the cable tray installation is complete, it is strictly forbidden to step on or stack heavy objects on the tray to avoid deformation.

During construction by other trades, pay attention to protecting the anti-corrosion coating of the cable tray, avoiding burns from electric welding and impacts from heavy objects.

During cross-construction, cover and protect installed cable trays to prevent contamination from cement, paint, etc.

When working inside the equipment room, pay attention to protecting finished products such as floors, walls, and cabinets to avoid construction damage.

Clean up site debris at the end of each working day to keep the construction area tidy.

Chapter 10 Product Wiring

The “wiring” described in this chapter refers to cabling operations within the cable tray system, including cable laying, bundling, termination preparation, and labeling management. It is the core link for the cable tray system to function and must strictly comply with generic cabling specifications.

10.1 Preparations Before Cable Laying

10.1.1 Cable Tray Inspection

Before cable laying, conduct a comprehensive inspection of the installed cable tray system:

  • Tray installation straightness, levelness, and firmness meet requirements, with no looseness or deformation.
  • All splice joints are flat without misalignment, cut burrs are ground smooth, protective edge strips are properly installed, with no risk of sharp protrusions scratching cables.
  • Transitions at bends and tees are smooth, with bending radius meeting cable bending requirements.
  • No debris, water accumulation, or dust inside the tray; ensure it is cleaned.
  • Grounding system is installed and tested qualified.

10.1.2 Cable Inspection

  • Verify cable specifications, models, quantities, and grades are consistent with design drawings; product certificates and test reports are complete.
  • Inspect cable appearance; the outer sheath must have no damage, kinks, crushing, water ingress, or other defects; optical cable ends must be properly sealed.
  • Perform drum testing on cables and optical cables to confirm continuity, attenuation, and other performance parameters are qualified; unqualified cables are strictly prohibited from being laid.
  • Plan the start/end points and routing for each cable based on the wiring plan, and compile a cable numbering table.

10.1.3 Personnel and Tool Preparation

  • Laying personnel allocation is determined by cable quantity and weight; large-pair-count cables and optical cables require multi-person coordination with unified command.
  • Prepare cable payout stands, pulling ropes, pulleys, tape, cable ties, labels, scissors, wire strippers, and other tools.
  • For vertical and long-distance laying, prepare specialized tools such as pulling machines to avoid manual brute force that could damage cables.

10.1.4 Routing Planning

  • Plan the cable laying sequence based on the cable tray routing: lay main routes first, then branches; lay long-distance routes first, then short-distance ones.
  • Plan the arrangement positions of cables within the tray; power, weak-current, and fiber optic cables should be laid in separate zones to avoid crossing.
  • Determine cable bundling points and fixing points in advance, with clear markings.

10.2 Cable Laying Specifications

10.2.1 General Laying Requirements

  • The pulling force during cable laying must meet cable specification requirements; exceeding the maximum allowable pulling force is strictly prohibited to avoid tensile damage. Pulling force for twisted-pair cables ≤100N; pulling force for optical cables shall comply with manufacturer specifications.
  • Avoid twisting, coiling, or sharp bending during cable laying; the bending radius must always be greater than the minimum allowable bending radius.
  • Cables shall be arranged neatly with minimal crossing; straighten and align after laying is complete.
  • Cables must not overflow the sides of the tray or be stacked too high; fill rate complies with requirements in Section 6.6.
  • Continuously check the cable outer sheath during laying; promptly address any damage found, and replace cables with severe damage.
  • Reserve sufficient length at both ends of cables: 3-5m at the equipment end and 1-2m at the distribution frame end, to facilitate termination.

10.2.2 Horizontal Laying

  • For horizontal tray cable laying, proceed progressively from one end to the other; set up auxiliary pulling points in the middle for long-distance laying.
  • Handle cables carefully when placing them into the tray; dragging or rubbing against tray wires is strictly prohibited.
  • When laying multiple cables simultaneously, arrange them neatly, organizing during laying to avoid tangling.
  • Secure cables at the head end, tail end, bends, and equipment entry/exit points in horizontal sections; bundle and fix at intervals of 1.5m in straight sections.

10.2.3 Vertical Laying

  • For vertical tray cable laying, it is recommended to lay from top to bottom, using the cable’s own weight to lower slowly, with personnel below assisting in pulling.
  • Cables in vertical sections must be firmly fixed with one tie at every 1.0-1.5m to prevent cables from sliding down under their own weight.
  • Use dedicated cable retainers or binding ties for fixing, with moderate tightness to avoid crushing cables.
  • Install cable buffer devices at the bottom of vertical sections to prevent cables from being bent and stressed directly.

10.2.4 Laying at Bends and Branches

  • At bends, lay cables along the inner radius, arranged neatly with consistent bending radius; forced bending is strictly prohibited.
  • Add bundling/fixing points at bends to prevent cable slippage and displacement.
  • At branch points, separate cables according to routing, straighten them out before entering the branch tray, avoiding crossing and confusion.

10.2.5 Laying with Power and Weak-Current Cables in the Same Tray

  • When laying power and weak-current cables in the same tray, a metal partition must be installed to separate them, with partition height flush with the tray side edges.
  • The metal partition must be reliably grounded to form shielding isolation.
  • Power cables are laid in the lower layer or on one side; weak-current cables are laid in the upper layer or on the other side. Mixed placement is strictly prohibited.
  • Cables of different voltage levels and different systems should be laid in separate layers/zones as much as possible to reduce interference.

10.2.6 Special Cable Laying

  • Optical Cable Laying: Bending radius ≥20 times the outer diameter; moderate pulling force; excessive bending strictly prohibited. Optical cables in the tray should be bundled separately to avoid compression against copper cables. Install arc guide rollers at bends to protect optical cables.
  • Large-Pair-Count Cables: These are heavy; distribute force evenly during laying and increase fixing points. Calculate weight before laying and confirm the tray’s load-bearing capacity is sufficient.
  • Shielded Cables: The shield must be continuous with reliable grounding. Avoid damaging the shield during laying; both ends grounded per design requirements.
  • Power Cables: Power cables are heavy; verify tray load-bearing capacity in advance and reduce support hanger spacing. Leave gaps between cables for heat dissipation.

10.3 Cable Bundling and Fixing

10.3.1 Bundling Principles

  • Bundling must be firm with moderate tightness, without damaging the cable outer sheath or affecting cable heat dissipation.
  • Bundling spacing should be uniform, straight and level, neat and aesthetically pleasing.
  • Different categories of cables should be bundled separately with clear labeling.
  • Bundle joints should face inward or downward to not affect appearance.

10.3.2 Nylon Cable Tie Bundling

  • Use flame-retardant nylon cable ties with width ≥4mm, strength meeting cable weight requirements.
  • Trim excess after tightening ties; cut ends should be smooth with no sharp burrs.
  • Tie spacing should be uniform: 1.5m spacing on straight sections, with denser spacing at bends and entry/exit points.
  • After bundling, the cross-sectional area of bundled cables should not exceed 40% of the tray cross-sectional area.

10.3.3 Cable Retainer Installation

For high-density wiring, grid cable retainers are recommended for neater, more standardized wiring:

  • Cable retainers are clipped onto the transverse wires of the tray, with spacing determined by cable quantity, typically one every 0.5-1m.
  • Place cables in layers into the retainer slots, with consistent number of cables per layer, arranged neatly.
  • Cable retainers must be firmly fixed without sliding along the tray.
  • Cables lie naturally straight in the retainers without compression deformation.

10.3.4 Vertical Fixing

  • Cables in vertical sections must be secured with dedicated fixing clamps or multiple cable ties; a single tie bearing the weight is strictly prohibited. Fix each cable individually or in small bundles to prevent inner cables from sliding down when bundled together. Fixing point spacing ≤1.5m; the bottom, top, and bends must be fixed.

10.4 Cable Termination Preparation

After cables are laid in place, perform preparation work before termination to pave the way for subsequent module and distribution frame termination.

10.4.1 Cable Organization

  • Organize the reserved cables at the cabinet/equipment end, straighten the cable runs, and maintain consistent bending arcs.
  • Group and arrange cables by wire sequence and numbering for convenient subsequent termination.
  • Coil excess cable neatly and secure at available positions in the cabinet, with coil radius meeting bending requirements.

10.4.2 Cable Labeling

  • Affix labels at both ends of each cable, indicating cable number, start point, end point, specification, and other information. Labels must have clear printing and be resistant to falling off.
  • Install identification plates at tray bends, branches, and equipment entry/exit points, indicating cable routing and numbering ranges.
  • Labeling rules should be uniform and comply with project management requirements for convenient later maintenance.

10.4.3 Cable Testing

  • Before termination, perform basic tests on cables including continuity, length, short circuit, and open circuit to confirm no damage occurred during laying. Replace problematic cables promptly to avoid rework after termination.

10.5 Wiring Label Management

A complete labeling system is the foundation for later maintenance and must be standardized, clear, and durable.

10.5.1 Label Content

  • Cable labels: Number, start point, end point, specification, model, laying date
  • Cable tray labels: Number, route name, cable type, voltage level
  • Node labels: Mark numbers at key nodes such as bends, tees, crosses, and grounding points
  • Warning labels: Warning messages for power areas, fiber optic areas, no stepping, etc.

10.5.2 Label Materials

  • Use PVC label paper and heat-shrink tube labels for indoor environments.
  • Use waterproof labels and metal nameplates for humid/outdoor environments.
  • Labels must adhere firmly, be wear-resistant and non-fading, with a service life consistent with equipment lifespan.

10.5.3 Label Positions

  • Affix one label at each end of cables, 20-30mm from the cable end.
  • Install an identification plate every 10m along the cable tray.
  • Install identification plates at all cable entry/exit points, bends, and branch points.
  • Labels should face the maintenance access aisle for easy viewing and reading.

Chapter 11 Product Commissioning

After cable tray installation and cable laying are complete, comprehensive system commissioning is required to verify structural safety, electrical performance, and cable operating status, ensuring the system meets design requirements.

11.1 Pre-Commissioning Preparations

  • Documentation preparation: Organize installation records, grounding records, cable laying records, product quality documents, etc., as the basis for commissioning.
  • Tool preparation: Prepare grounding resistance testers, spirit levels, steel tape measures, tension gauges, cable testers, infrared thermometers, and other commissioning/testing tools; measuring instruments must be within calibration validity.
  • Personnel preparation: Commissioning personnel must have appropriate qualifications, be familiar with system principles and commissioning procedures, and clearly understand commissioning items and acceptance criteria.
  • Site preparation: Clean the commissioning area, remove unrelated debris, ensure commissioning access is clear, and confirm safe commissioning conditions.

11.2 Structural Stability Commissioning

11.2.1 Appearance and Dimension Verification

  • Inspect the entire cable tray route, checking for deformation, dents, warping, and weld point detachment or cracking.
  • Spot-check straightness, levelness, and verticality: measure one point every 20m; bends and branches must be measured; deviations must meet the accuracy requirements of Section 6.5.
  • Check splice gaps and height differences using a feeler gauge; ≤0.5mm with no obvious misalignment.
  • Check support hangers for tilting or looseness; bolts tightened properly; anti-loosening devices complete.
  • Check whether bends, tees, expansion joints, and other special components are installed correctly and structurally secure.

11.2.2 Load-Bearing Capacity Test

  • Spot-check principle: Conduct load spot-checks on heavy-load sections, large-span sections, and critical passage sections; the spot-check ratio should not be less than 5% of the total length, and no fewer than 3 sections.
  • Test method: Apply 1.2 times the rated uniformly distributed load on the tray, maintain for 1 hour, and observe tray deformation.
  • Acceptance criteria: After unloading, the tray must have no permanent deformation; mid-span deflection ≤L/200; no weld point cracking; no connection looseness.
  • Load gradually during testing; no personnel allowed beneath; ensure test safety.

11.2.3 Connection Strength Test

  • Spot-check the connection strength of butt joints and branch joints using a tension gauge applied axially; qualified if no loosening or deformation occurs at 1.5 times the rated load.
  • Check that clips are properly installed, bolts are tightened, and locknuts are effectively secured.
  • Check that the support arm is in close contact with the tray with no sliding/displacement marks.

11.2.4 Anti-Sway and Seismic Commissioning

  • Apply lateral force to long-distance and vertical trays to check sway amount; sway amplitude ≤1/50 of tray width is qualified.
  • Check anti-sway supports are firmly installed and quantity/position meet design requirements.
  • Compensation devices at expansion/deflection joints move freely without jamming or seizure.

11.3 Grounding System Commissioning

11.3.1 Electrical Continuity Test

  • Test resistance between any two points along the entire tray route; contact resistance at segment joints ≤0.1Ω.
  • Test conductivity between support hangers and the tray; resistance ≤0.1Ω, ensuring overall electrical connectivity.
  • Test the continuity of bonding jumpers; no open circuits or loose connections.

11.3.2 Ground Resistance Test

  • Use a ground resistance tester, applying the four-point method to test the tray system’s ground resistance.
  • Test point selection: head end, tail end, middle section, branch end, highest point, lowest point; no fewer than 4 test points.
  • Acceptance criteria: Ground resistance ≤4Ω; follow design requirements if special requirements exist.
  • If test fails, investigate poor contact at grounding points, grounding main line issues, etc.; rectify and retest until qualified.

11.3.3 Equipotential Bonding Test

  • Test equipotential resistance between the tray and other metal components such as equipment room cabinets, grounding bars, and metal pipes; ≤0.3Ω is qualified, eliminating potential differences and ensuring personal safety.

11.4 Cable Performance Testing

11.4.1 Copper Cable Link Testing

  • Perform certification testing on twisted-pair links; test parameters include wire map, length, attenuation, near-end crosstalk, return loss, etc., meeting standard requirements for the corresponding cable category (e.g., Cat 5e, Cat 6, Cat 6A).
  • Perform continuity and pair testing on large-pair-count cables to ensure no wrong pairs, short circuits, or open circuits.
  • Perform insulation resistance testing on power cables; insulation resistance must meet code requirements with no insulation damage.

11.4.2 Fiber Optic Link Testing

  • Perform loss testing on fiber optic links using an OTDR to test fiber attenuation, splice loss, and length; record test curves.
  • Check fiber end-face cleanliness; no scratches or contamination.
  • Test results must meet design and optical cable technical parameter requirements; unqualified fusion splices and mechanical splices must be re-made.

11.4.3 Cable Temperature Rise Test

  • After cables operate at rated load for 2 hours, use an infrared thermometer to check cable surface temperature and tray temperature.
  • Maximum cable temperature must not exceed the cable’s allowable long-term operating temperature; temperature difference between different positions ≤5°C with no local hot spots.
  • Verify tray heat dissipation effectiveness; temperature within a reasonable range with no abnormal overheating.

11.5 System Integrated Commissioning

11.5.1 Integrated Commissioning with Environment Monitoring System

  • For trays equipped with smart monitoring sensors, integrate with the equipment room environment monitoring system; test whether temperature, smoke, vibration, and other alarm functions work properly, whether threshold settings are reasonable, and whether alarm information can be uploaded accurately.

11.5.2 Integrated Commissioning with Fire Protection System

  • Check firestop sealing where the tray penetrates fire compartments; test whether fire protection measures in the tray area are effective during fire alarm integration; firestop sealing meets fire protection acceptance requirements.

11.5.3 Integrated Commissioning with Grounding System

  • Simulate leakage faults to verify that the tray grounding can quickly discharge fault current and trigger protective device operation, ensuring electrical safety.

11.6 Commissioning Records and Rectification

  • All commissioning items must be truthfully recorded in commissioning records, including test data, test locations, test personnel, and test times.
  • For failed commissioning items, issue rectification notices specifying rectification content and deadlines; after rectification, retest until all items pass.
  • After commissioning passes, compile a commissioning report as supporting documentation for final acceptance.

Chapter 12 Product Precautions

12.1 Construction Safety Precautions

Work at Heights Safety

  • Safety belts must be worn when working at heights (height ≥2m); belts should be attached high and used low, with reliable anchor points.
  • Use qualified scaffolding or lifting platforms; standing on cable trays, pipes, or equipment to work is strictly prohibited.
  • Set up warning zones below work-at-height areas with dedicated personnel supervising; unauthorized personnel prohibited from entering.
  • Tools must be placed in tool bags; throwing tools or materials up or down is strictly prohibited; use ropes for hoisting.
  • Stop outdoor work at heights during severe weather including winds of force 6 or above, thunderstorms, and heavy fog.

Electrical Safety

  • Temporary power for construction must comply with three-level distribution and two-level protection requirements; distribution boxes locked and managed by dedicated personnel.
  • Power tools must have good insulation; power cords free of damage; wear insulating gloves when operating.
  • Use safety voltage in humid environments; unauthorized wiring is strictly prohibited.
  • Cut off construction power at the end of the workday; confirm no fire hazards before leaving.

Machinery Operation Safety

  • Check that protective guards on angle grinders, impact drills, and other power tools are intact before use; wear safety goggles when operating.
  • During cutting operations, no personnel allowed in front of the cutting disc rotation direction to prevent injury from flying fragments.
  • Coordinate multiple personnel when moving heavy objects with unified command to prevent crushing injuries.
  • Operating machinery with defects is strictly prohibited; stop immediately for inspection upon discovering abnormalities.

Fire Safety

  • Provide adequate fire extinguishing equipment on site; smoking strictly prohibited in construction areas.
  • Obtain hot work permits for electric welding and gas cutting operations; assign dedicated fire watchers; clear flammable materials in the vicinity.
  • Inspect the site after daily construction to confirm no fire sources before leaving.

12.2 Installation Process Precautions

Material Protection

  • Avoid impacts during tray handling and installation; protect the anti-corrosion coating; promptly touch up scratches with anti-rust paint.
  • Stainless steel trays are strictly prohibited from direct contact with carbon steel tools and materials to prevent carbon permeation and rusting; wear clean gloves during installation.
  • Standing on trays or stacking heavy objects on trays is strictly prohibited; temporary loads during installation must not exceed rated load-bearing capacity.

Precision Control

  • Install strictly according to string line positioning; changing routing and elevation arbitrarily is prohibited; handle design change procedures if changes are truly necessary.
  • Verify straightness and levelness promptly after each segment is installed to avoid error accumulation.
  • Cut ports must be ground to remove burrs and fitted with protective edge strips; bare cuts that could scratch cables are strictly prohibited.

Structural Safety

  • Support hangers must be installed on load-bearing structures; fixing to ceiling joists, lightweight partition walls, or other non-load-bearing positions is strictly prohibited.
  • Expansion bolts must be installed in solid bases such as reinforced concrete and solid brick; hollow brick and foam brick require special anchors or reinforcement.
  • Arbitrarily increasing support hanger spacing is strictly prohibited; heavy-load and large-span scenarios must be densified as required.
  • Additional support hangers must be installed at bends, tees, ends, and other locations as required to prevent end drooping.

Grounding Requirements

  • Grounding is mandatory; omitting bonding jumpers and grounding connections is strictly prohibited.
  • Bonding jumpers must be connected to the tray body, not to splice plate bolts.
  • Contact surfaces must be ground to remove oxidation layers and paint to ensure good conductivity; false grounding strictly prohibited.
  • Soft bonding jumpers must be used at expansion joints and deformation joints; rigid connections that restrict expansion/contraction are prohibited.

12.3 Cable Laying Precautions

Cable Protection

  • Laying tension must not exceed the cable’s maximum allowable value; brute-force pulling that damages cables is strictly prohibited.
  • Cable bending radius must always be greater than the minimum; sharp kinks strictly prohibited.
  • Cables must not rub against sharp edges; provide protection at bends.
  • Special care for optical cable laying: stepping on or crushing strictly prohibited; keep ends sealed.

Fill Rate Control

  • Strictly control cable fill rate in the tray: weak current ≤40%, control cables ≤50%; over-filling strictly prohibited.
  • Excessive fill rate causes poor heat dissipation, temperature rise, accelerated cable aging, and may even cause safety hazards.
  • Reserve expansion space; single-time laying should not exceed 70% of design capacity.

Power and Weak-Current Separation

  • Mixed placement of power and weak-current cables without isolation is strictly prohibited; separate layers or partitions are required.
  • Maintain sufficient spacing between cables of different voltage levels to avoid electromagnetic interference.
  • Shielded cable grounding complies with specifications; single-point or double-point grounding per design.

Label Management

  • Both ends of cables must be labeled; laying without labels strictly prohibited.
  • Label content should be accurate, clear, and durable to avoid maintenance identification difficulties later.
  • Keep records synchronized during laying; update wiring drawings to ensure documentation matches actual conditions.

12.4 Precautions for Different Material Products

Electro-Galvanized Cable Trays

  • Suitable for indoor dry environments only; outdoor use strictly prohibited to avoid rust from long-term humidity.
  • Protect the zinc layer during installation; promptly touch up scratched areas with galvanizing paint.
  • Avoid contact with corrosive media such as acids and alkalis.

Hot-Dip Galvanized Cable Trays

  • Surface zinc flowers and slight zinc nodules are normal process phenomena that do not affect use; grinding to remove the zinc layer is strictly prohibited.
  • After on-site cutting, apply zinc-rich paint to cut surfaces for corrosion protection.
  • Regularly check the zinc layer condition for outdoor use; promptly address large areas of white rust.

Stainless Steel Cable Trays

  • Avoid contact with carbon steel during transport and installation to prevent iron ion contamination and rusting.
  • Use dedicated stainless steel cutting discs; using ordinary carbon steel cutting discs is strictly prohibited.
  • Clean surface stains with neutral cleaners; scrubbing with steel wool or other hard objects is strictly prohibited.
  • Choose 316L material for environments with high chloride ion content; 304 material is prone to pitting corrosion with prolonged chloride ion exposure.

Powder-Coated Cable Trays

  • Avoid scratching the coating with sharp objects; repair scratches with same-color touch-up paint.
  • Keep away from high-temperature heat sources to prevent coating blistering and peeling.
  • Grind off the coating at contact surfaces during installation to ensure grounding conductivity.

12.5 Operation and Maintenance Precautions

  • Hanging heavy objects on trays, installing other pipelines on trays, and personnel stepping on trays are strictly prohibited.
  • When adding cables, verify tray load-bearing capacity and fill rate; overloading is strictly prohibited.
  • Conduct regular inspections; promptly address issues to prevent small problems from developing into major failures.
  • During equipment room renovation and equipment relocation, protect cable trays from impacts and pulling.
  • Protect cable trays when welding, painting, or performing other operations nearby.

12.6 Special Environment Precautions

High-Altitude Environments

  • Above 2000m altitude, electrical insulation strength decreases; appropriately reduce rated voltage or strengthen insulation.
  • Slightly poorer heat dissipation in thinner air; derate cable ampacity appropriately; reduce fill rate by 10%.

High-Temperature Environments

  • When ambient temperature exceeds 40°C, derate cable ampacity per specifications to avoid over-temperature operation.
  • Check anti-corrosion coating’s high-temperature resistance to ensure it does not fail.

Corrosive Environments

  • Regularly inspect tray corrosion; promptly replace severely corroded sections.
  • Avoid direct spraying of corrosive liquids onto the tray.

Chapter 13 Product Repair and Maintenance

The M-type open cable tray has a simple structure and high reliability, but proper routine maintenance and care are still essential to effectively extend product service life and ensure long-term stable system operation.

13.1 Routine Inspection System

Establish a graded inspection system, incorporating the cable tray system into the equipment room’s routine operation and maintenance inspection scope to promptly identify and eliminate hazards.

13.1.1 Daily Inspection (routine inspection by O&M personnel)

  • Inspection content: Visual appearance inspection, checking for obvious deformation or sagging of the tray, detached connectors, loose cables, or cables falling off the tray.
  • Inspection frequency: Once daily, synchronized with routine equipment room inspections.
  • Recording requirements: Promptly record and report any abnormalities found.

13.1.2 Monthly Inspection

  • Inspection content:
  • Check support hanger bolts for looseness; support arms for displacement or deformation.
  • Check tray splice joints for misalignment or looseness; clips for missing pieces.
  • Check grounding connections for looseness; bonding jumpers for breaks.
  • Check cable bundling for looseness or detachment; cables for abnormal heating or sheath damage.
  • Clean dust and debris from tray surfaces to maintain cleanliness.
  • Inspection frequency: Once monthly.
  • Recording requirements: Fill in monthly inspection record forms, recording inspection status and handling measures.

13.1.3 Quarterly Inspection

  • Inspection content:
  • Spot-check tray levelness and deflection; check for obvious downward deflection deformation.
  • Test ground resistance at key locations to confirm the grounding system is normal.
  • Check firestop sealing for damage or detachment; repair promptly.
  • Check whether expansion joints and deformation joint compensation devices operate normally.
  • Check anti-corrosion coating condition for rusting or peeling.
  • Inspection frequency: Once quarterly.

13.1.4 Annual Comprehensive Overhaul

  • Overhaul content:
  • Conduct comprehensive inspection of the entire tray system, covering all areas including concealed locations such as above ceilings and below floors.
  • Comprehensively test ground resistance and electrical continuity.
  • Tighten all connection bolts; replace rusted or aged bolts and accessories.
  • Repair damaged anti-corrosion coatings and firestop sealing.
  • Evaluate and replace tray sections with severe deformation or rusting.
  • Organize cables, replenish missing labels, and update wiring documentation.
  • Inspection frequency: Once annually, can be synchronized with the equipment room annual overhaul.
  • Recording requirements: Issue annual overhaul reports, recording system status, problem handling, replaced parts, and other information for archival reference.

13.2 Routine Maintenance Content

13.2.1 Cleaning and Maintenance

  • Regularly clean dust and debris from tray surfaces to maintain cleanliness and prevent dust accumulation from absorbing moisture and causing corrosion.
  • Use brushes, dry cloths, or compressed air for cleaning; washing with large amounts of water is strictly prohibited.
  • Wipe stainless steel trays with neutral cleaners to keep surfaces clean and prevent long-term stain adhesion and corrosion.
  • Clear debris beneath the tray to keep ventilation channels clear and ensure heat dissipation.

13.2.2 Anti-Corrosion Maintenance

  • For galvanized trays with light white rust, wipe clean and apply galvanizing anti-rust paint. For red rust, grind to remove rust, apply anti-corrosion paint, and replace severely rusted tray sections.
  • For stainless steel trays with light rust spots, treat with stainless steel passivation paste to prevent rust spread.
  • All exposed metal surfaces after cutting and drilling must be promptly coated with anti-corrosion paint.
  • Replace rusted bolts and accessories promptly with same-specification anti-corrosion bolts.

13.2.3 Fastening Maintenance

  • Regularly tighten all connection bolts and support hanger bolts to prevent loosening caused by vibration.
  • Increase fastening frequency where large vibration equipment exists in the equipment room; check the effectiveness of anti-loosening devices.
  • Control torque when tightening bolts to avoid over-tightening (crushing the tray) or under-tightening (ineffective).

13.2.4 Label Maintenance

  • Check cable labels and tray labels; promptly replace or re-affix blurred or fallen labels.
  • Correct or replace crooked or damaged label plates promptly to keep labels clear and complete.
  • Update labels and drawings promptly after wiring changes to ensure documentation accuracy.

13.3 Common Damage Repair Methods

13.3.1 Tray Deformation Repair

  • Minor deformation: For minor local dents or side bending that do not affect load-bearing or cable laying, may temporarily continue use with enhanced observation.
  • Moderate deformation: For deflection exceeding limits or lateral deformation affecting cable laying, install reinforcement strips on the deformed section, add support hangers, and verify load-bearing capacity after reinforcement.
  • Severe deformation: For severe tray deformation, weld cracking, or deflection far exceeding limits, remove and replace with new tray sections. When replacing, first transfer cables, provide temporary support, then replace the tray, and re-secure cables afterward.

13.3.2 Missing or Damaged Connector Repair

  • Promptly replace missing or damaged clips, bolts, connection plates, and other accessories with same-specification parts.
  • Replace point by point; removing multiple connection points simultaneously is strictly prohibited to prevent tray collapse.
  • Check connection firmness after replacement to ensure proper installation.

13.3.3 Support Hanger Loosening/Deformation Repair

  • Re-tighten loose support hanger bolts. For loose expansion bolts, replace with larger-size expansion bolts or relocate and reinstall.
  • Replace deformed support arms. Straighten or replace bent hanger rods.
  • For support hangers with insufficient load-bearing capacity, add support hangers to densify support and distribute loads.

13.3.4 Grounding Fault Repair

  • For ground resistance exceeding limits, investigate poor contact points section by section; grind contact surfaces and re-tighten bonding jumpers.
  • Replace broken or aged bonding jumpers with new ones.
  • If grounding points are insufficient, add grounding points to ensure reliable grounding along the entire route.

13.3.5 Anti-Corrosion Coating Damage Repair

  • Small-area damage: Grind and clean, then apply matching anti-corrosion paint; use galvanizing paint for galvanized parts and passivation agents for stainless steel parts.
  • Large-area damage: For large-area coating detachment or severe rusting, replace that tray section.

13.4 Maintenance Safety Precautions

  • When repairing at heights, implement safety protection: wear safety belts and have supervision below.
  • When repairing in areas with live cables, implement insulation protection to avoid touching exposed conductors; perform de-energized work when necessary.
  • When replacing tray sections, first move cables to temporary supports; confirm temporary supports are secure before removing the old tray.
  • For welding repairs, obtain hot work permits, implement fire prevention measures, and prevent welding slag from igniting cables.
  • After repair completion, clean the site and confirm no safety hazards before leaving.

13.5 Spare Parts Management

  • It is recommended to keep an appropriate quantity of spare parts on site, including 1%-2% of straight tray sections, commonly used connection clips, bolts, support arms, bonding jumpers, and other wear-prone accessories.
  • Store spare parts in categories with clear labeling, protected from moisture and rust.
  • Establish a spare parts ledger with requisition registration; replenish regularly to ensure emergency availability.
  • Pre-stock special specifications and custom parts to avoid long procurement lead times affecting use.

13.6 Product Service Life

Under normal installation, standard use, and regular maintenance, the product design service life is as follows:

Product Type Design Service Life
Electro-galvanized indoor type 10-15 years
Hot-dip galvanized indoor/outdoor type 20-30 years
304 stainless steel indoor type 30-50 years
316L stainless steel type Over 50 years

Actual service life is affected by environmental corrosion levels, load conditions, maintenance levels, and other factors. Regular maintenance can effectively extend service life. After reaching the service life limit, conduct a comprehensive safety assessment to determine whether to continue use or replace.

Chapter 14 Common Product Problems and Solutions

14.1 Installation-Related Common Problems

Problem 1: Tray not straight/level after installation—tilting left/right, uneven heights

Possible causes:

  • Inaccurate string line positioning with large datum point deviation.
  • Inconsistent support hanger installation heights; large errors in hanger rod length cutting.
  • Misalignment during tray jointing, forced splicing causing deformation.
  • Support hangers not firmly fixed, sinking under load.

Solutions:

  • Re-pull string lines to determine datum elevation and centerline; reposition sections with large deviations.
  • Adjust support hanger heights, fine-tune elevation via hanger rod nuts to ensure all crossarms are on the same horizontal plane.
  • Disassemble misaligned joints and re-joint to ensure flush interfaces; forced hard splicing is strictly prohibited.
  • Reinforce loose support hangers; reinstall loose expansion bolts.
  • Verify straightness promptly after every 3-5 segments installed to avoid error accumulation.

Problem 2: Excessive burrs on cut ports scratching cables

Possible causes:

  • Dull cutting tools producing rough cuts.
  • No grinding after cutting; direct use.
  • No protective edge strips installed.

Solutions:

  • Replace with sharp cutting discs to ensure smooth cuts.
  • Grind inner and outer burrs smooth with files/sandpaper after cutting; no scratching sensation by hand.
  • All cut ports must be fitted with PVC protective edge strips fully covering the metal cut edges.
  • For cables already scratched: minor damage—apply insulation treatment; severe damage—replace the cable.

Problem 3: Excessive support hanger spacing causing mid-span sagging

Possible causes:

  • Support hangers not installed per standard spacing during construction; quantity arbitrarily reduced.
  • Actual cable load exceeds design values; original spacing insufficient for load-bearing.
  • No densified support in large-span areas.

Solutions:

  • Immediately add support hangers at mid-span, densifying spacing to code requirements.
  • Verify actual loads; further densify support hangers for heavy-load scenarios, or install bottom reinforcement strips.
  • For tray sections with excessive deflection, observe after unloading; replace sections with permanent deformation.
  • Strictly install support hangers per design and code spacing; arbitrarily reducing is strictly prohibited.

Problem 4: Irregular on-site fabricated bends with unsmooth transitions

Possible causes:

  • Inaccurate cutting angle calculation; angle deviation after splicing.
  • Right angles not verified during splicing; forced fixation.
  • Bending radius too small; abrupt transitions.

Solutions:

  • Calculate cutting angles in advance; perform layout using angle gauges before cutting.
  • Verify angles with a right-angle ruler during splicing; tighten connectors only after correct.
  • Increase bending radius to ensure smooth cable transition, at least 10 times the outer diameter of the thickest cable.
  • Add support hangers on both sides of bends for firm fixation to avoid deformation under load.

Problem 5: Unqualified sealing at wall/floor penetrations

Possible causes:

  • Firestop sealing not performed per fire protection requirements; sealing materials do not meet fire rating.
  • Sealing not compact, with gaps.
  • No water barrier/fire curb installed.

Solutions:

  • Use firestop putty and firestop pillows meeting fire rating requirements for sealing; seal compactly without gaps.
  • Install a 5cm-high waterproof curb at floor penetrations to prevent water entering lower floors.
  • Clean debris from openings before sealing; sealing surfaces should be smooth and neat.
  • Regularly check sealing integrity; promptly repair damage.

14.2 Structure-Related Common Problems

Problem 6: Tray weld point detachment and cracking

Possible causes:

  • Product quality defects: cold welding, false welding.
  • External impact or overload during installation or use.
  • Corrosion causing weld points to rust through.

Solutions:

  • For a small number of detached weld points, add clips and reinforcement strips around the area; may continue use if load-bearing is unaffected, with enhanced observation.
  • For large-scale weld point detachment with tray deformation, immediately replace that tray section: transfer cables, remove and replace.
  • For product quality issues, contact the manufacturer for return/exchange.
  • For corrosion-induced issues, replace with cable trays of higher anti-corrosion grade.

Problem 7: Tray lateral twisting and tilting

Possible causes:

  • Support hangers not on the same line, causing uneven force distribution on the tray.
  • Excessive single-side loading; cables laid with offset load.
  • Lateral impact from external forces.

Solutions:

  • Adjust support hanger positions to be in a straight line for even force distribution.
  • Organize cables to distribute evenly within the tray, avoiding one-side accumulation.
  • For slight twisting, correct and add lateral bracing; for severe twisting, replace.
  • Avoid stacking debris near tray passageways to prevent impact.

Problem 8: Connection clips loose or detached

Possible causes:

  • Bolts not tightened, or locknuts failed.
  • Clips not matching the tray side edges, poor fit.
  • Long-term vibration causing bolt loosening.

Solutions:

  • Re-tighten bolts; replace failed locknuts.
  • Replace with matching dedicated clips to ensure full fit with M-type side edges.
  • In vibrating environments, add spring washers or apply thread-locking adhesive.
  • Conduct regular inspections; promptly tighten any looseness found.

Problem 9: Expansion joint stuck, unable to expand/contract freely

Possible causes:

  • Expansion connecting plate bolts tightened too much, leaving no expansion allowance.
  • Debris, cement, etc., blocking the expansion joint.
  • Expansion joint installed crooked, causing eccentric sticking.

Solutions:

  • Loosen expansion connecting plate bolts, reserve sufficient expansion clearance, then moderately tighten to ensure slidability.
  • Clean debris around the expansion joint to ensure unobstructed expansion path.
  • Correct the expansion joint position to ensure coaxial alignment with the tray without eccentric tilting.

14.3 Electrical-Related Common Problems

Problem 10: Ground resistance exceeding limits, not meeting standards

Possible causes:

  • Insufficient grounding points; poor grounding continuity along the entire route.
  • Poor contact at connection plates and bonding jumpers; paint or oxide layers on contact surfaces.
  • Grounding main line resistance itself unqualified.
  • Non-galvanized tray without bonding jumpers.

Solutions:

  • Add grounding points per code requirements, ensuring no fewer than 2 points along the entire length; add more in the middle of extra-long sections.
  • Grind all grounding contact surfaces to remove oxide layers, paint, and oil; re-tighten bonding jumpers and grounding terminals.
  • Test grounding main line resistance; rectify the entire grounding system if the main line is unqualified.
  • Install copper braided bonding jumpers on non-galvanized trays to ensure electrical continuity.
  • Investigate breakpoints section by section; focus on treating poor contact points.

Problem 11: Non-standard bonding jumper installation

Possible causes:

  • Bonding jumper cross-section insufficient, less than 4mm².
  • Bonding jumper connected to splice plate bolts rather than the tray body.
  • Bonding jumpers connected in series; multiple sections sharing one jumper.

Solutions:

  • Replace with copper bonding jumpers with cross-section ≥4mm²; use 6mm² for heavy-load and high lightning protection requirements.
  • Bonding jumper terminals must be fixed directly to bolts on the tray body; connecting to splice plate bolts in series is strictly prohibited.
  • Each joint must have its own dedicated bonding jumper; series connection is strictly prohibited to avoid total failure from one point breaking.
  • Leave appropriate slack in bonding jumpers; not taut or stressed.

Problem 12: Tray energized, tingling sensation on touch

Possible causes:

  • Poor tray grounding; cable insulation damage causing leakage and energizing the tray.
  • Static induction; no effective grounding for discharge.
  • Contact with live parts causing cross-energization.

Solutions:

  • Immediately investigate the leakage point, find the damaged cable, repair or replace to eliminate the leakage fault.
  • Inspect and improve the grounding system to ensure reliable grounding and effective static discharge.
  • Check live parts near the tray; provide insulation isolation to avoid contact.
  • Before fault resolution, post warning signs and prohibit personnel from touching.

14.4 Operation and Maintenance-Related Common Problems

Problem 13: Messy cables in tray, crossed and tangled

Possible causes:

  • No organization during laying; arbitrary placement.
  • Arbitrary cable addition during later expansion without proper routing.
  • No cable retainers used; no fixing measures.

Solutions:

  • Use maintenance window periods to comprehensively organize cables, classifying and arranging them by layer in order.
  • Install cable retainers or binding ties to fix cables neatly at uniform spacing.
  • Establish wiring management rules; new cables must be laid per specifications; arbitrary placement strictly prohibited.
  • Improve cable labeling for easy maintenance identification.

Problem 14: Heavy dust accumulation on tray surface, poor heat dissipation

Possible causes:

  • Dusty environment; long-term lack of cleaning.
  • Dust cover plates not cleaned in time; ventilation holes blocked.

Solutions:

  • Regularly clean tray dust with brushes and compressed air to maintain cleanliness.
  • For extremely dusty environments, use dust-proof cover plates and clean periodically by opening them.
  • Protect cables during cleaning to avoid dust entering equipment.

Problem 15: Tray rusting, anti-corrosion coating failure

Possible causes:

  • Humid environment with corrosive media; insufficient anti-corrosion grade.
  • Anti-corrosion coating damage not repaired promptly.
  • Wrong material selection, e.g., electro-galvanized used outdoors.

Solutions:

  • For light rust, grind to remove rust, apply anti-corrosion paint, and enhance observation.
  • For severe rust, replace with higher anti-corrosion grade trays, e.g., replace hot-dip galvanized with stainless steel.
  • Analyze corrosion causes and select materials accordingly to prevent recurrence.
  • Improve the environment, reduce corrosion sources, and enhance ventilation and dehumidification.

Problem 16: Cable temperature too high, severe heating

Possible causes:

  • Excessive cable fill rate causing poor heat dissipation.
  • Cable overload operation.
  • Poor tray ventilation with surrounding obstructions.

Solutions:

  • Verify cable fill rate; divert excess to other trays to reduce fill rate.
  • Test load current; adjust loads for overloaded circuits or replace with larger gauge cables.
  • Clear obstructions around the tray to ensure smooth air circulation.
  • Strengthen temperature monitoring during high-temperature periods to prevent overheating accidents.

Chapter 15 Product QA

15.1 Selection-Related Questions

Q1: What is the difference between M-type and ordinary U-type mesh cable trays? How should I choose?

A: The core difference lies in the side edge structure: M-type has a double-folded M-shaped cross-section, while U-type has a single-folded U-shaped cross-section. The M-type tray’s lateral bending and torsional strength are over 40% higher than the same-specification U-type, with more obvious load-bearing advantages at narrow widths. It is more suitable for scenarios requiring high lateral strength, such as cabinet-top wiring and narrow channel wiring. U-type trays are slightly lower in cost, suitable for scenarios without high wide-span and heavy-load requirements. For cabinet wiring, prioritize M-type; for main wide-span trays, choose based on budget.

Q2: What width of M-type cable tray is suitable for equipment room wiring?

A: Calculate fill rate based on cable quantity and diameter. Weak-current tray fill rate is calculated at 40% reserved, with 30% expansion space reserved. For single cabinet top wiring, 100-150mm width is sufficient; for aisle wiring, calculate based on cabinet quantity, typically 200-300mm; for main corridor wiring, select 300-600mm based on total cable volume. If uncertain, provide the cable list and our company can assist with selection calculations.

Q3: How to choose between electro-galvanized, hot-dip galvanized, and stainless steel?

A: For ordinary indoor dry equipment rooms, electro-galvanized is sufficient with the best cost-performance ratio; for humid basements, semi-outdoor, and dusty environments, choose hot-dip galvanized; for high humidity, coastal, clean rooms, and corrosive environments, choose 304 stainless steel; for strong corrosion, seaside outdoor, and chemical environments, choose 316L stainless steel. Select based on the corrosion level of the usage environment to avoid over-investment or insufficient corrosion protection.

Q4: Can M-type cable trays be used for laying power cables?

A: Yes, but note the following: first, verify load-bearing capacity—power cables are heavy, requiring thickened wire heavy-duty versions and densified support hanger spacing; second, fill rate must not exceed 40% to ensure heat dissipation; third, when power and weak-current cables share a tray, metal partitions must be installed; fourth, pay attention to bending radius matching for large-diameter power cables.

Q5: Can M-type cable trays be used for wiring under anti-static floors?

A: Absolutely, and it is much more standardized than traditional random cable laying on the floor. Use columns to support the M-type tray under the floor for elevated installation, with clearance from the ground for good ventilation and heat dissipation, and neat cables for easy maintenance. If floor height is sufficient, multiple layers can be installed with power and weak-current separated by layer. Note: maintain at least 50mm clearance between the tray top and the floor panel.

15.2 Installation-Related Issues

Q6: Must M-type cable tray use the dedicated connecting clips? Can ordinary cable ties be used for fixing?

A: The dedicated connecting clips must be used for splicing. Cable ties can only be used for temporary fixing or auxiliary cable securing, and must not be used for splicing the tray body itself. The dedicated connecting clips have high mechanical strength, provide firm connections, and ensure structural safety; cable ties have low strength and are prone to aging and breakage. Using them for body connections poses a safety hazard and is strictly prohibited as a replacement for the dedicated clips.

Q7: Can the cable tray be cut on-site? Will it rust after cutting?

A: On-site cutting is permitted, and this is one of the advantages of the open-type cable tray. After cutting, deburr and smooth the cut edge. For galvanized material, apply zinc-rich anti-rust paint to the cut edge; for stainless steel material, perform passivation treatment on the cut edge. Proper anti-corrosion treatment will prevent rusting. It is recommended to use edge protection strips, which both prevent cable abrasion and protect the cut edge.

Q8: Can the support hanger spacing exceed 2 meters?

A: Under standard specifications and rated loads, the maximum spacing should not exceed 2 meters. For heavy-duty and wide-width cable trays, the spacing should be reduced to 1.5 meters or even 1.2 meters. If large spans are truly necessary, load-bearing verification must be performed, reinforcement strips must be installed, and the deflection must satisfy the requirement of ≤ L/200. Blindly increasing the spacing that leads to tray deformation or fracture is strictly prohibited.

Q9: Does galvanized cable tray require bonding jumpers?

A: According to GB 50303 specifications, when the galvanized cable tray connection plates have no fewer than 2 connecting bolts with lock nuts at both ends, the ground bonding jumper may be omitted. However, in actual engineering practice, to ensure grounding reliability, it is recommended that bonding jumpers be appropriately added at critical locations and along long-distance tray runs. Non-galvanized cable trays and stainless steel cable trays must have bonding jumpers installed.

Q10: Can the cable tray be directly fixed to the top of a cabinet? Will it crush the cabinet?

A: It can be fixed to the cabinet mounting rails using dedicated cabinet mounting brackets — not to the top panel. The load is borne by the mounting rails and will not crush the cabinet. However, attention must be paid to the cabinet top load limit. Standard server cabinets typically have a top load capacity of 50–100 kg. Light-load low-voltage cabling is acceptable, but heavy-load power cables require additional independent support.

15.3 Operation & Maintenance Issues

Q11: The M-type cable tray has no cover plate — will it accumulate a lot of dust?

A: The open-type cable tray does not have a cover plate, but the fully open structure actually resists dust accumulation. With air circulation, dust does not easily settle. Any small amount of floating dust can be easily removed with an air blower or brush. Traditional enclosed cable trays may appear dust-proof, but once dust accumulates inside, it is very difficult to clean, and they actually collect more dust over time. For scenarios with particularly high dust protection requirements, snap-on dust cover plates can be optionally configured to balance dust protection with heat dissipation.

Q12: Can personnel stand on the cable tray for maintenance?

A: Absolutely not. The cable tray is a cable-supporting structure designed to bear uniform cable loads, not concentrated human loads. Standing on it can cause local deformation, weld cracking, or even collapse — this is extremely dangerous. Maintenance work must use ladders or lifting platforms, and stepping on the cable tray is strictly prohibited.

Q13: How to add branch circuits later? Is shutdown required?

A: The greatest advantage of the M-type cable tray is its ease of expansion — adding branches does not require shutdown. Simply cut a side opening at the desired branch location and use a T-type connector to attach a branch section of tray. The entire process does not affect the operation of existing cables, and a branch modification can be completed in just tens of minutes — far more efficient than traditional cable trays.

Q14: Does the cable tray require annual ground resistance testing?

A: Annual testing is recommended and should be included in the annual maintenance plan. The grounding system may degrade due to corrosion, loosening, and other factors. Regular testing can identify hidden hazards in a timely manner and ensure electrical safety. Testing frequency may be increased for critical areas and before the thunderstorm season.

Q15: Must the cable tray be completely replaced when its service life expires?

A: Not necessarily. After the service life is reached, a comprehensive safety assessment should be conducted, including structural strength, corrosion level, grounding performance, etc. If the condition remains good, continued use is acceptable with shortened inspection intervals and intensified monitoring. If corrosion is severe or structural strength has notably degraded, phased replacement is recommended to avoid the high cost of one-time full replacement.

15.4 Compliance & Standards Issues

Q16: Does the M-type cable tray comply with national acceptance specifications?

A: Fully compliant. The M-type open cable tray belongs to the steel mesh cable tray category and complies with the GB/T 23639-2017 “Energy-saving and corrosion-resistant steel cable tray” standard. Installation and acceptance follow national standards including GB 50303 and GB 50311. It is a formally compliant wiring product that passes all types of engineering acceptance inspections.

Q17: Can it pass fire protection acceptance?

A: Yes. Metal cable trays are inherently non-combustible materials with excellent fire performance. As long as fire compartment sealing and fire separation are properly implemented in accordance with regulations, fire protection requirements are satisfied, and fire acceptance can be passed. For special fire protection requirements, fire-resistant boards, fire-retardant coatings, and other measures can be used in conjunction.

Q18: Can strong current and weak current cables share the same M-type cable tray?

A: Regulations do not prohibit this, but conditions must be met: install a metal partition plate of the same height as the side walls to physically separate strong current and weak current cables, with the metal partition plate reliably grounded; the fill rate for each shall not exceed 40%; and cables with excessively large voltage differences are not recommended to share the same tray. Where conditions permit, layered installation is preferred for lower interference and greater safety.

15.5 After-sales & Service Issues

Q19: What is the warranty period for the products? What should be done if quality issues occur?

A: All M-type cable tray products from Lain (Guangdong) carry a 2-year warranty. During the warranty period, product quality issues not caused by human damage will be replaced or repaired free of charge. If product issues arise, contact our technical support hotline. We respond within 24 hours, provide technical guidance, and offer on-site service for major issues.

Q20: Can on-site installation services be provided?

A: Our company can provide technical guidance and installation supervision services, and can also cooperate with professional installation teams to provide installation services. Specific arrangements are negotiated based on project scale and requirements. Complete installation manuals and technical training are also provided to help construction teams master the installation process.

Chapter 16 Product Acceptance

Product acceptance is divided into four stages: factory acceptance, incoming acceptance, concealed works acceptance, and final completion acceptance. Each stage is executed strictly in accordance with standards, with acceptance records retained to ensure project quality.

16.1 Factory Acceptance

Factory acceptance is the quality inspection performed at the factory before product shipment, executed by the manufacturer’s quality inspection department. Products may only be shipped after passing inspection.

16.1.1 Acceptance Contents

Visual Inspection: Tray surfaces shall be smooth, free from deformation, cracks, and burrs; welds shall be uniform and full, without cold welds, missed welds, or weld burn-through; anti-corrosion coatings shall be uniform and complete, without peeling, scratches, or bubbles.

Dimensional Inspection: Key dimensions including width, height, length, wire diameter, and mesh size shall conform to drawings and standard requirements, with deviations within allowable tolerances.

Performance Sampling: Periodic sampling inspections of weld strength, load deflection, anti-corrosion salt spray, ground resistance, and other performance indicators shall comply with technical parameter requirements.

Accessory Inspection: Accessories shall be complete in specification, dimensionally matched, properly surface-treated, and accurate in quantity.

Documentation Inspection: Quality documents including product certificates, factory test reports, and material certifications shall be complete.

16.1.2 Acceptance Methods

Standard Batches: The manufacturer’s quality inspection department conducts batch sampling at a sampling rate of 5%. Non-conforming batches require double sampling; if still non-conforming, the entire batch is reworked.

Major Projects: Clients may commission third-party inspection agencies to perform factory supervision and acceptance in accordance with agreed standards.

16.1.3 Acceptance Records

Issue the product factory inspection report and product certificate, which accompany the shipment and serve as the basis for incoming acceptance.

16.2 Incoming Acceptance

Upon material arrival at the site, the construction unit, supervision unit, and construction owner shall jointly conduct acceptance. Materials may only be used after passing inspection.

16.2.1 Acceptance Document Verification

  • Product factory certificates and factory test reports.
  • Material certifications for base materials such as steel and stainless steel.
  • Supply lists, verifying specifications, models, and quantities.
  • Manufacturer qualification documents, production licenses, ISO certifications, etc.

16.2.2 Visual and Dimensional Sampling Inspection

  • Randomly sample cable trays and accessories of different specifications, no fewer than 3 pieces per specification.
  • Visual inspection: Surfaces free from deformation, rust, coating peeling, weld cracking, and edge burrs.
  • Dimensional measurement: Use steel tape measures and vernier calipers to measure width, height, wire diameter, and mesh spacing. Deviations shall comply with standards:
Dimension Tolerance
Width deviation ±2 mm
Height deviation ±1 mm
Length deviation ±5 mm
Wire diameter deviation ±0.2 mm
  • Accessory inspection: Good mating with cable trays, free from deformation and damage, with intact galvanized coating.

16.2.3 Quality Dispute Handling

  • Products failing acceptance shall be marked and isolated, strictly prohibited from use, and returned to the manufacturer for replacement.
  • For quality disputes, a third-party testing agency shall be commissioned for inspection, with the test report as the final basis.
  • Complete the material incoming acceptance record with signatures from all parties. Products passing acceptance are approved for site use.

16.3 Concealed Works Acceptance

For portions of the cable tray installation that will be covered by subsequent work processes and cannot be inspected later, concealed works acceptance must be performed before concealing. Concealment may proceed only after passing acceptance.

16.3.1 Acceptance Scope

  • Cable trays installed within suspended ceilings, accepted before ceiling closure.
  • Cable trays installed under anti-static raised floors, accepted before floor installation.
  • Cable trays passing through walls and floor slabs, including fire-stop sealing.
  • Cable trays in buried or inaccessible utility trench locations.
  • Concealed components such as expansion anchor bolts and embedded parts of support hangers.

16.3.2 Acceptance Contents

  • Cable tray specifications, routing, and elevations conform to design requirements.
  • Support hangers are firmly installed with spacing conforming to specifications.
  • Tray connections are secure, splicing is level and flush, and grounding is reliable.
  • Cut edge treatment is properly executed without burrs, and edge protection strips are complete.
  • Expansion joints and deformation joint treatment conform to requirements.
  • Fire-stop sealing is compact and conforms to fire protection requirements.
  • Cable installation is neat, bundling and fixing are standardized, and the fill rate conforms to requirements.

16.3.3 Acceptance Procedure

1. After the construction unit completes self-inspection, notify the supervision/construction owner unit 24 hours in advance for acceptance.

2. Conduct item-by-item on-site inspection and verify concealed works records.

3. Upon passing acceptance, signatures confirm approval before proceeding with the next work process for concealment.

4. If acceptance fails, rectification is required followed by re-acceptance until passing.

5. Retain concealed works acceptance records and photographic documentation for archival reference.

16.4 Final Completion Acceptance

After the entire project is completed, an overall final acceptance is conducted. This is the ultimate acceptance before delivery for use.

16.4.1 Acceptance Document Review

The following completion documents must be submitted:

  • Commencement report, completion report, and technical disclosure records.
  • Drawing review records, design change notices, and engineering consultation records.
  • Product factory certificates, test reports, material certifications, and incoming acceptance records.
  • Concealed works acceptance records, installation construction records, and grounding test records.
  • Commissioning reports and cable test reports.
  • As-built drawings, indicating actual tray routing, specifications, grounding points, and node locations.
  • Sub-division quality acceptance records and division quality acceptance records.
  • Quality incident handling records and rectification re-inspection records.

16.4.2 On-Site Physical Acceptance

1. Visual and Installation Quality Inspection

  • Overall tray routing is rational: level and plumb, neat and aesthetically pleasing.
  • Tray body is free from deformation, rust, and damage; splicing is level and flush with uniform gaps.
  • Support hanger spacing is uniform, installation is secure, level and plumb, without tilting.
  • Transition fittings such as elbows, tees, and crosses have smooth transitions and neat appearance.
  • Identification markings are complete, clear, and standardized.
  • Cable installation is neat, bundling is secure, layers are clearly separated, without crossing or tangling.
  • Grounding connections are clearly visible with standardized bonding jumpers.

2. Dimensional Accuracy Inspection

Inspection Item Tolerance
Levelness: deviation per meter ≤ 2 mm
Levelness: total length deviation ≤ 20 mm
Verticality: deviation per meter ≤ 3 mm
Verticality: total length deviation ≤ 20 mm
Centerline deviation ≤ 50 mm
Support hanger spacing deviation ≤ 50 mm
Height difference of same-layer trays ≤ 5 mm
Splicing gap ≤ 0.5 mm

3. Structural Safety Inspection

  • Sample-check support hanger firmness — no loosening or deformation.
  • Sample-check tray deflection — ≤ L/200 under rated load.
  • Connection points are secure, with clips and bolts properly tightened.

4. Electrical Performance Inspection

  • Ground resistance test: ≤ 4 Ω, with no fewer than 3 test points.
  • Electrical continuity test: fully conductive throughout; inter-segment contact resistance ≤ 0.1 Ω.

5. Fire Protection and Safety Inspection

  • Fire compartment sealing is complete and conforms to fire protection requirements.
  • Safe clearances from other pipelines and equipment conform to specifications.
  • No obvious safety hazards.

16.4.3 Acceptance Conclusions

  • All items pass: All inspection items conform, documents are complete. Issue the final completion acceptance report with signatures from all parties, and formally deliver for use.
  • Minor non-conformities: Issue a rectification notice with a deadline. After rectification and re-inspection passes, process the acceptance.
  • Major quality issues or safety hazards: Acceptance is withheld, work is halted for rectification until passing.

16.4.4 Acceptance Standards Basis

  • GB 50303-2015 “Code for acceptance of quality of construction of building electrical engineering”
  • GB 50312-2016 “Code for acceptance of engineering quality of generic cabling system”
  • GB 50169-2016 “Code for construction and acceptance of earthing installation of electrical equipment installation engineering”
  • GB/T 23639-2017 “Energy-saving and corrosion-resistant steel cable tray”
  • Technical requirements specified in design drawings and construction contracts

16.5 Acceptance Transfer

After acceptance passes, complete the project transfer procedures, handing over completion documents, spare parts, and special tools to the operating unit. Conduct technical disclosure simultaneously, informing of usage and maintenance precautions and contact information, completing the full-process delivery.

Chapter 17 SEO Keywords and Optimization Tag System

17.1 Search Keyword Categorized Integration

17.1.1 Core Primary Keywords

Cabinet M-type open cable tray, M-type mesh cable tray, open mesh cable tray, data center open cable tray, cabinet top cable tray

17.1.2 High-Conversion Long-Tail Keywords

Cabinet M-type open cable tray installation, M-type mesh cable tray manufacturer, data center wiring open cable tray specifications, 100mm wide M-type cable tray parameters, electro-galvanized M-type mesh cable tray price, stainless steel M-type cable tray customization, cabinet top-mounted cable tray construction plan, data center M-type cable tray

17.1.3 Industry Traffic Keywords

Data center wiring cable tray selection, generic cabling cable tray standards, open cable tray installation specifications, mesh cable tray technical parameters, cable tray acceptance standards, overhead cable routing tray system, underfloor cable routing tray, strong/weak current shared cable tray

17.1.4 Brand-Specific Keywords

Guangdong Lain M-type cable tray, Lain open mesh cable tray, Lain data center cable tray manufacturer, Guangzhou M-type cable tray production, Lain cabinet cable tray

17.1.5 Dropdown/Related Search Keywords

Difference between M-type and U-type cable trays, which is better between open tray and trough tray, mesh cable tray support hanger spacing, M-type cable tray grounding specifications, open cable tray fill rate requirements, mesh cable tray on-site elbow fabrication method, data center cable tray installation steps

17.2 SEO Optimization Tag System

17.2.1 Page Core Optimization Tags

Title Tag: Cabinet M-type Open Cable Tray Installation, Wiring and Commissioning Manual_Data Center Mesh Cable Tray Manufacturer – Guangdong Lain Intelligent Data Center

Meta Keywords: Cabinet M-type open cable tray, M-type mesh cable tray, open cable tray installation, data center wiring cable tray, mesh cable tray technical parameters, Guangdong Lain cable tray manufacturer

Meta Description: Guangdong Lain Intelligent Data Center specializes in manufacturing cabinet M-type open cable trays and M-type mesh cable trays, providing a complete installation, wiring and commissioning manual covering product introduction, parameters, installation and acceptance processes, suitable for data centers, server rooms and other scenarios. Consultation hotline: +86 13538869979.

17.2.2 Content Hierarchy Tags

H1 Tag: Cabinet M-type Open Cable Tray Installation, Wiring and Commissioning Manual

H2 Tags: Product Introduction, Product Composition, Product Classification, Product List, Product Principles, Product Technical Parameters, Product Features and Advantages, Product Application Scenarios, Product Installation, Product Wiring, Product Commissioning, Product Precautions, Product Repair and Maintenance, Product Common Problems and Solutions, Product QA, Product Acceptance

17.2.3 Internal Link Optimization Tags (Natural Anchor Text Integration)

Core Anchor Text: Cabinet M-type open cable tray, M-type mesh cable tray, open mesh cable tray

Long-Tail Anchor Text: M-type open cable tray installation method, data center mesh cable tray technical parameters, cabinet top-mounted cable tray construction technique, mesh cable tray grounding specifications

Related Anchor Text: Data center generic cabling system, data center infrastructure, server cabinet wiring, anti-static raised floor wiring, cable tray acceptance standards

Copyright Notice

This document is copyrighted by Guangzhou Lain Intelligent System Development Co., Ltd. and is protected by national copyright law.

No entity or individual may reproduce, redistribute, excerpt, or alter all or part of this document without the written authorization of our company, nor may this document be used for commercial purposes.

For reprinting or citation of this document’s content, the source must be indicated as “Source: Guangzhou Lain Intelligent System Development Co., Ltd. (KITOZER)”.

Scroll to Top