0.1 Purpose

This manual provides a comprehensive and systematic description of the technical principles, structural composition, installation specifications, wiring standards, commissioning procedures, operation and maintenance, fault diagnosis, and acceptance criteria for the Double Row Cold Aisle Containment System manufactured by Guangzhou Lain Intelligent System Development Co., Ltd. It is intended to provide project construction personnel, operation and maintenance engineers, and data center facility managers with complete, standardized, and actionable technical guidance, ensuring that system installation quality meets standards, operation is stable and reliable, and energy-saving effects are significant, while also guaranteeing safe operation and efficient management throughout the system’s entire life cycle.

0.2 Scope of Application

This manual applies to the standard Double Row Cold Aisle Containment System manufactured by Guangzhou Lain Intelligent System Development Co., Ltd., covering the full product series compatible with 1200mm aisle widths and standard 42U/47U server cabinets, including multiple configuration versions such as fixed ceiling panel type, fire alarm linkage skylight type, and intelligent monitoring type. This manual is also applicable to various engineering scenarios, including cold aisle construction for new data centers, cold aisle retrofits for existing data centers, and cold aisle expansion for modular data centers.

0.3 Applicable Standards

The design, production, installation, and acceptance of this product strictly comply with the following national and industry standards:

  • *Code for Design of Data Centers* GB 50174-2017
  • *Technical Code for Engineering of Data Centers* GB 50462-2015
  • *Code for Construction and Quality Acceptance of Electronic Information System Machine Room Engineering* GB 50462-2008
  • *Code for Acceptance of Construction Quality of Ventilation and Air Conditioning Works* GB 50243-2016
  • *Code for Acceptance of Construction Quality of Building Electrical Engineering* GB 50303-2015
  • *Code for Design of Gas Fire Extinguishing Systems* GB 50370-2005
  • *Standard for Operation and Maintenance of Data Center Infrastructure* GB/T 51314-2018
  • TIA-942 Telecommunications Infrastructure Standard for Data Centers
  • ASHRAE Thermal Guidelines for Data Processing Environments

0.4 Terminology Definitions

Term Definition
Cold Aisle Containment System An airflow organization system that physically isolates the air intake area in front of two rows of cabinets into a dedicated space, directing cold air to flow specifically through IT equipment air intakes, achieving complete separation of cold and hot airflow.
Double Row Cold Aisle A structure consisting of two rows of standard server cabinets arranged face-to-face, combined with a top containment ceiling, end doors at both ends, and peripheral sealing components to form an independent cold pool structure. It is the most widely used cold aisle configuration in large and medium-sized data centers.
Fire Alarm Linkage Skylight A ceiling assembly installed at the top of the cold aisle that automatically flips open upon receiving fire alarm linkage signals, quickly breaking the containment state of the aisle during a fire to allow even diffusion of extinguishing gas.
Air Leakage Rate The ratio of leaked cold air volume within the cold aisle to the total supply air volume; a core indicator for measuring the sealing performance of the containment system.
Aisle Static Pressure The static pressure differential inside the cold aisle relative to the hot aisle; a key parameter ensuring uniform entry of cold air into cabinets, with a normal range of 5~10 Pa.
PUE (Power Usage Effectiveness) The ratio of total data center energy consumption to IT equipment energy consumption. The core value of the cold aisle containment system is to reduce this value.

Chapter 1: Product Introduction

1.1 Industry Background and Technology Development

Against the backdrop of rapid digital economy development, data centers, as the core infrastructure for computing power, continue to grow in scale and density. Per-cabinet power consumption has risen from the traditional 2~3 kW to 8~15 kW, with some high-density scenarios even exceeding 20 kW. Under the traditional open airflow organization model in conventional machine rooms, cold and hot airflow mix chaotically, resulting in severe cooling waste and frequent localized hot spots. Air conditioning energy consumption accounts for over 40% of total data center energy usage, and PUE values commonly range between 1.8 and 2.0, making it difficult to meet green and low-carbon development requirements.

Cold aisle containment technology, as the core solution for airflow optimization, has undergone three generations of technological iteration:

  • First Generation: Simple Containment Stage — Used plastic curtains and simple baffles for basic isolation. Poor sealing performance, no fire alarm linkage, suitable only for low-density machine rooms.
  • Second Generation: Standardized Containment Stage — Adopted standardized structures using aluminum alloy frames + tempered glass ceiling panels + steel end doors, with basic fire alarm linkage functionality. Sealing performance improved significantly, becoming the industry mainstream.
  • Third Generation: Intelligent Containment Stage — Integrates temperature and humidity monitoring, intelligent airflow adjustment, energy consumption monitoring, and closed-loop fire alarm linkage control, achieving coordinated operation between the containment system and cooling system, further enhancing energy-saving effects and operational intelligence.

Guangzhou Lain Intelligent System Development Co., Ltd. has been deeply engaged in the data center infrastructure field for many years. Its Double Row Cold Aisle Containment System belongs to the third-generation intelligent containment product category, achieving industry-leading levels in structural reliability, sealing performance, fire safety, and intelligent integration. It is widely used in various large and medium-sized data centers.

1.2 Product Definition

The Double Row Cold Aisle Containment System is the core equipment for airflow organization optimization in data center machine rooms. Using two rows of standard server cabinets arranged face-to-face as the carrier, it constructs a completely sealed cold air distribution space through top containment panels, end doors at both ends, and peripheral sealing components. Cold air delivered by precision air conditioners is confined within the aisle, forming a stable positive-pressure cold pool that forces all cold air to enter the equipment interiors through the cabinet front doors. After removing heat, the air is discharged from the cabinet rear doors into the hot aisle and eventually returns to the air conditioner return air inlet, completing a full cold/hot airflow cycle.

The system completely eliminates airflow mixing paths between cold and hot air at the physical level, significantly improving cooling efficiency, eliminating localized hot spots, and reducing air conditioning system energy consumption. It also integrates fire alarm linkage, environmental monitoring, intelligent lighting, and other functions, balancing energy efficiency, safety, and operational convenience.

1.3 Design Philosophy

  • Extreme Sealing Design: Multi-point sealing structure design throughout the entire system. Specialized sealing gaskets are used at joints, sealing modules are configured at cable openings, and overall system air leakage rate is controlled within 3%, minimizing cooling loss to the greatest extent.
  • Safety First Principle: Strictly complies with fire protection regulations. Fire alarm linkage automatically-opening skylights are configured with a response time of ≤3 seconds, ensuring rapid diffusion of extinguishing media during a fire. All materials use flame-retardant materials, meeting UL94 V-0 flame retardancy standards.
  • Modular and Standardized: All components are factory-prefabricated and modularly designed. No on-site cutting or welding is required — only bolted assembly, improving installation efficiency by 60% and supporting flexible future expansion.
  • Operation-Friendly Design: LED intelligent lighting, status indicator lights, and emergency evacuation signage are configured within the aisle. End doors are equipped with observation windows and access control systems, making routine maintenance and emergency evacuation both convenient and safe.
  • Strong Compatibility and Adaptability: Compatible with mainstream brand 42U/47U standard server cabinets. Supports multiple air conditioning supply methods including underfloor supply and overhead supply. Seamlessly interfaces with data center environment and power monitoring systems and fire protection systems.

1.4 Product Value

  • Energy Saving and Cost Reduction: Complete isolation of cold and hot airflow improves cooling efficiency by over 30%, reduces air conditioning system energy consumption by 25%~40%, and can lower data center PUE from 1.8 to the 1.2~1.4 range, significantly reducing operational costs. For a medium-sized machine room with 100 cabinets, annual electricity savings can reach hundreds of thousands of kilowatt-hours, with a typical investment payback period of 2~3 years.
  • Hot Spot Elimination: A uniform positive pressure is formed within the aisle, and cold air is evenly distributed to every cabinet, completely solving the traditional problems of cool upper areas/hot lower areas and localized cabinet overheating. This ensures stable IT equipment operation and extends equipment service life.
  • Increased Density: With improved effective cooling capacity, per-cabinet power density can be increased from 3 kW to 8~15 kW, enhancing computing deployment capability by 2~3 times within the same machine room space and saving spatial investment.
  • Standardized Operations: The contained aisle physically separates cold and hot zones, providing a clear working environment for operations personnel. Combined with the monitoring system, environmental data visualization is achieved, improving the standardization level of machine room management.
  • Compliance and Certification: Meets national green data center construction requirements, complies with various graded machine room certification standards, and assists machine rooms in passing Class A, Class B certification and green data center rating.

1.5 Product Series Classification

Based on configuration levels and functional differences, the Double Row Cold Aisle Containment System is divided into three major series:

Series Configuration Applicable Scenarios
Basic Type — LAC-A Series Fixed containment panels, manual swing doors, basic sealing components Suitable for low-density, budget-constrained small and medium-sized machine rooms; excellent cost-performance ratio
Standard Type — LAC-B Series Fire alarm linkage skylights, electric sliding end doors, basic environmental monitoring Complete fire alarm linkage functionality; suitable for the vast majority of standard machine room scenarios; the mainstream model in the market
Intelligent Type — LAC-C Series Adds intelligent airflow regulation, multi-point temperature/humidity monitoring, energy consumption statistics, intelligent lighting linkage on the basis of the Standard Type Interfaces with environment and power monitoring platforms for refined management; suitable for high-density, high-grade data centers

Chapter 2: Product Composition

The Double Row Cold Aisle Containment System is an integrated airflow management system composed of multiple coordinated subsystems. The complete system is divided into nine major components: main structural system, sealing system, door system, ceiling panel system, electrical control system, fire alarm linkage system, environmental monitoring system, lighting system, and cable management system.

2.1 Main Structural System

The main structural system serves as the supporting framework of the cold aisle, bearing the load of all ceiling panels, doors, and accessories, while ensuring overall structural stability and seismic performance.

2.1.1 Column Assemblies

  • Material: 6063-T5 high-strength aluminum alloy profile, surface anodized for corrosion and wear resistance; alternatively, high-quality cold-rolled steel plate with electrostatic powder coating.
  • Specifications: Single column height is customized to match cabinet height, accommodating 2000mm, 2200mm, 2400mm and other cabinet heights.
  • Structure: Columns feature multiple mounting slots, allowing flexible adjustment of beam and accessory mounting heights. A fixed base is configured at the bottom, connected to the cabinet top via bolts for secure installation.
  • Performance: Single column load-bearing capacity ≥50 kg; overall structure meets 8-degree seismic fortification requirements.

2.1.2 Beam Assemblies

  • Material: Same material as columns — aluminum alloy profile or cold-rolled steel plate — ensuring structural strength and visual consistency.
  • Classification: Divided into three types: top main beams, intermediate reinforcement beams, and door mounting beams. Main beams bear the primary load of ceiling panels; reinforcement beams enhance overall structural rigidity; door mounting beams are used for installing end door tracks and access control equipment.
  • Connection Method: Connected using dedicated angle brackets and bolts; joint gaps are absent, and the structure is sturdy and aesthetically pleasing.

2.1.3 Connecting Fasteners

Includes all connecting components: dedicated angle brackets, connecting bolts, flat washers, spring washers, and nuts. Bolts are made of stainless steel 304, rust-proof and corrosion-resistant, with unified M6 series specifications for ease of installation and maintenance. All connecting components have undergone strength verification to ensure no loosening or deformation during long-term operation.

2.2 Ceiling Panel System

The ceiling panel system is installed at the top of the cold aisle and is the core component for top containment. It is divided into fixed ceiling panels and fire alarm linkage skylights.

2.2.1 Fixed Ceiling Panels

  • Panel Material: 4mm thick tempered transparent glass with transmittance ≥90%, facilitating observation of the interior of the aisle; alternatively, 1.2mm thick cold-rolled steel plate with electrostatic powder coating, suitable for scenarios with light-blocking requirements.
  • Frame Material: Aluminum alloy frame, hermetically bonded to the ceiling panel, with sealing gaskets built into the frame.
  • Specifications: Standard unit dimensions are 600mm × 1200mm, corresponding to standard cabinet width, and can be flexibly combined according to aisle length.
  • Installation Method: Laid on top of beams with gravity self-sealing; no additional fastening required, facilitating later opening for inspection and maintenance.

2.2.2 Fire Alarm Linkage Skylights

  • Structural Composition: Consists of skylight panel, flip mechanism, drive motor, electromagnetic lock, and control module.
  • Panel Material: Same as fixed ceiling panels; tempered glass is standard, sheet metal panel optional.
  • Opening Method: Electrically powered flip opening with opening angle ≥80°, ensuring the aisle top is fully open.
  • Linkage Logic: Under normal conditions, the electromagnetic lock is engaged and the skylight remains closed and sealed. Upon receiving a fire alarm linkage signal, the electromagnetic lock is released instantly, and the skylight opens rapidly with the assistance of gravity and spring force, with an opening response time of ≤3 seconds.
  • Reset Method: After the fire alarm is cleared, the skylight is reset manually or electrically, and the electromagnetic lock re-engages to restore the containment state.
  • Configuration Ratio: Standard configuration is 1 linkage skylight per every 3 standard ceiling panel units, ensuring that fire extinguishing gas can rapidly enter the aisle from any location in the event of a fire.

2.2.3 Ceiling Sealing Structure

  • EPDM rubber sealing strips are configured at the contact points between ceiling panels and beams, with compression ≥3mm, ensuring no air leakage at contact surfaces.
  • Overlapping structures are designed at the joints of adjacent ceiling panel units, combined with sealing gaskets for double-layer sealing.
  • After skylights are closed, sealing gaskets are compressed around the entire perimeter, providing sealing performance equivalent to fixed ceiling panels.

2.3 Door System

The door system is installed at both ends of the cold aisle to achieve end containment while meeting the requirements for personnel passage, equipment transport, and emergency evacuation. It is divided into main aisle doors and emergency escape doors.

2.3.1 Electric Sliding Door (Standard Configuration — Main Door)

  • Door Structure: Double-leaf sliding design; door frame formed from quality cold-rolled steel plate; door panels feature large tempered glass observation windows.
  • Drive System: Equipped with a brushless DC motor for smooth, low-noise operation. Door opening/closing speed is adjustable. Standard configuration includes anti-pinch rebound function — the door automatically reverses upon contacting an obstacle to ensure personnel safety.
  • Control Methods: Supports multiple methods including card access, push-button control, remote control, and manual push-open. Can be manually pushed open during power failure.
  • Sealing Performance: High-density brush seals and rubber sealing strips are configured around the entire door perimeter, with floor-wiping sealing strips at the bottom. When closed, sealing is airtight.
  • Standard Dimensions: Single door leaf width 600mm, height consistent with the internal aisle height, passing clear width ≥1200mm, accommodating personnel and small trolleys.

2.3.2 Manual Swing Door (Optional Configuration)

  • Structure: Single-leaf or double-leaf swing door, steel door frame and door leaf, equipped with tempered glass observation window.
  • Hardware Fittings: Standard configuration includes stainless steel hinges, handles, and door locks; access control system optional.
  • Features: Simple and reliable structure, low failure rate; suitable for aisle ends with low passage frequency or as backup doors.

2.3.3 Emergency Escape Door

  • Location: Each cold aisle section is equipped with at least 1 emergency escape door, typically located at the side or end of the aisle.
  • Opening Method: Push-bar opening from the inside — no key required; personnel inside the aisle can push open with one action to escape. Key required from the outside to prevent unauthorized entry.
  • Dimensions: Clear width ≥800mm, meeting single-person rapid evacuation requirements.
  • Signage: The door is equipped with photoluminescent escape signage; emergency lighting within the aisle indicates the location of the escape door.

2.3.4 Access Control System (Optional)

  • Configuration: Access controller, card reader, electric lock, exit button, access control power supply.
  • Functionality: Supports multiple authentication methods including card, password, and facial recognition. Records personnel entry/exit information and interfaces with the machine room access control management system.
  • Linkage: Automatically unlocks during a fire, coordinating with escape doors for emergency evacuation.

2.4 Sealing System

The sealing system is key to ensuring the cold aisle containment effect, covering all gaps and openings in the aisle to achieve comprehensive sealing.

2.4.1 Inter-Cabinet Sealing

  • Cabinet side sealing strips are installed at the side joints between adjacent cabinets to fill the gaps between cabinet seams.
  • Top sealing brushes or rubber strips are configured between the cabinet tops and the cold aisle frame to eliminate top gaps.
  • Bottom sealing baffles are installed between cabinet bottoms and the raised floor to prevent cold air leakage from beneath cabinets.

2.4.2 Aisle End Sealing

  • End sealing wall panels are configured between the exterior sides of cabinets at both aisle ends and the walls, sealing the remaining space at the aisle ends.
  • Sealing wall panels are made of 1.2mm cold-rolled steel plate with thermal insulation cotton filling inside, providing both sealing and insulation effects.
  • All connection points between wall panels, walls, and cabinets are treated with sealant to ensure no air leakage gaps.

2.4.3 Cable Opening Sealing

  • Modular sealing components are used for power and data cables, and fire protection pipelines passing through the cold aisle ceiling and side panels.
  • Sealing components consist of a frame and rubber sealing modules that can be flexibly combined according to cable diameters. After cables are routed through, bolts are tightened to achieve sealing, with a sealing rating up to IP54.
  • Blind plates are configured for reserved openings; they are completely sealed when not in use.

2.4.4 Bottom Sealing

  • Floor sealing strips are used to fill gaps in the cold aisle floor (raised floor panels), reducing cold air leakage through floor gaps.
  • Dust-proof sealing floor brushes are configured at aisle entrances; when doors are closed, they fit against the floor for sealing.

2.5 Electrical Control System

The electrical control system provides power supply and control for all electrical equipment in the cold aisle, ensuring orderly operation of all components.

2.5.1 Control Host

  • Installation Location: Installed in the cabinet at the aisle end; the core control unit of the cold aisle electrical system.
  • Functions: Collects signals from various sensors; controls skylight drive, lighting, and access control; receives and forwards fire alarm linkage signals; interfaces with the environment and power monitoring system.
  • Power Supply: Operates on DC24V safety voltage, equipped with backup power capable of maintaining more than 30 minutes of emergency operation during power failure.

2.5.2 Drive Modules

  • Skylight Drive Module: Controls skylight motor and electromagnetic lock, enabling skylight opening and reset control, with overload protection.
  • Door Operator Drive Module: Controls sliding door motor operation, implementing functions such as door opening/closing logic, obstacle protection, and delayed closing.
  • Lighting Control Module: Implements manual switching, automatic human-body-sensor switching, and fire emergency illumination functions.

2.5.3 Power Supply Circuits

  • The system uses a dual-power supply design; the main power source is taken from the machine room mains supply, and the backup power source is taken from the UPS circuit, ensuring power supply reliability.
  • Each power circuit is independently configured with an air switch and fuse for graded protection, so that a fault in one circuit does not affect other circuits.

2.6 Fire Alarm Linkage System

The fire alarm linkage system is the core guarantee for the safe operation of the cold aisle, achieving seamless interfacing between the containment system and the machine room fire protection system.

2.6.1 Signal Input Unit

  • Fire alarm signal input interfaces are configured, supporting dry contact signal input and compatible with the signal outputs of mainstream gas fire extinguishing systems and fire alarm systems.
  • Optoelectronic isolation design is adopted to avoid electrical interference between the fire protection system and the cold aisle system.

2.6.2 Linkage Execution Unit

  • Upon receiving a fire alarm signal, control output signals are immediately issued to cut power to the skylight electromagnetic locks, causing the skylights to open automatically.
  • Simultaneously, output signals unlock the access control system and open the aisle doors, facilitating personnel evacuation and firefighting operations.
  • Audible and visual alarms within the aisle are triggered synchronously to alert personnel in the aisle to evacuate immediately.

2.6.3 Feedback Signal Unit

  • Signals including skylight opening status, door status, and system fault status can be fed back to the fire control room and the environment and power monitoring system.
  • Line self-diagnostic functionality is provided; active alarm upon linkage line faults ensures linkage functionality remains effective at all times.

2.7 Environmental Monitoring System

The environmental monitoring system collects environmental parameters inside the cold aisle in real time, providing data support for airflow optimization, energy-saving control, and fault warning.

2.7.1 Temperature and Humidity Sensors

  • Deployment: One sensor group is deployed every 3 meters along the aisle length, installed at upper, middle, and lower heights within the aisle to comprehensively monitor temperature and humidity distribution.
  • Accuracy: Temperature accuracy ±0.5°C; humidity accuracy ±3%RH.
  • Function: Real-time monitoring of supply air temperature; alarm when exceeding thresholds; can also link with the air conditioning system to adjust cooling capacity.

2.7.2 Differential Pressure Sensors

  • Installation: Mounted on the aisle side panels to measure the static pressure differential between the cold aisle and hot aisle.
  • Range: 0~20 Pa, accuracy ±0.5 Pa.
  • Function: Determines aisle sealing performance and supply air volume matching based on pressure differential readings. Low differential pressure indicates air leakage or insufficient supply air; high differential pressure indicates excessive supply air.

2.7.3 Smoke Detectors

  • Photoelectric smoke detectors are uniformly arranged at the aisle ceiling and linked with the machine room fire protection system.
  • “AND” logic is adopted — linkage is triggered only when two or more smoke detectors alarm, reducing the probability of false alarms.

2.7.4 Monitoring Host

  • Centrally collects data from all sensors, displays real-time values on a local LCD screen, and supports historical data storage and query.
  • Provides RS485, TCP/IP and other communication interfaces for interfacing with the machine room environment and power monitoring platform for remote monitoring and management.

2.8 Intelligent Lighting System

2.8.1 Lighting Fixtures

  • LED panel lights or LED strips are used, installed on the aisle ceiling beams, providing uniform illumination without glare.
  • Illuminance: Working surface illuminance within the aisle ≥300 lx, meeting operation and maintenance requirements; emergency illumination ≥50 lx.
  • Service Life: LED light source service life ≥50,000 hours, low power consumption, minimal heat generation.

2.8.2 Control Methods

  • Manual Control: Switch buttons are provided at both ends of the aisle for manual lighting on/off.
  • Occupancy Sensing Control: Infrared human-body sensors are configured; lights automatically turn on when personnel enter the aisle and turn off after a time delay upon exit, achieving energy savings.
  • Emergency Control: During power failure or fire alarm conditions, the system automatically switches to emergency power supply to maintain emergency illumination.

2.9 Cable Management System

2.9.1 Overhead Cable Tray

  • Installation: Installed on one side of the aisle ceiling for routing low-voltage cables for lighting, sensors, skylight drives, and other equipment.
  • Material: PVC or aluminum alloy cable tray, fire rating Class B1.
  • Function: Keeps cables neatly organized to avoid clutter, facilitates maintenance, and prevents cables from affecting ceiling panel sealing.

2.9.2 Cable Identification

  • All cables are equipped with identification sleeves at both ends, marking circuit numbers, origin, and destination for ease of inspection and troubleshooting.
  • Power and data cables are routed in separate trays with spacing ≥150mm to avoid electromagnetic interference.

Chapter 3: Product List

3.1 Standard Configuration List (Example: 10-Cabinet Position Double Row Cold Aisle)

The following is the standard configuration list for the Standard Type LAC-B Series Double Row Cold Aisle (10 cabinets per row, 20 cabinets total, aisle length 6m). Quantities can be proportionally adjusted based on actual cabinet position count.

No. Component Name Model/Specification Unit Qty Material Remarks
1 Aisle Column LA-LZ-2200 Pcs 22 6063 aluminum alloy, anodized Height 2200mm, compatible with 42U cabinets
2 Top Main Beam LA-HL-1200 Pcs 11 6063 aluminum alloy, anodized Length 1200mm, corresponding to aisle width
3 Reinforcement Beam LA-HL-JQ-600 Pcs 20 6063 aluminum alloy, anodized Length 600mm, structural reinforcement
4 Fixed Glass Ceiling Panel LA-DB-6012 Pcs 14 4mm tempered glass + aluminum frame 600×1200mm
5 Fire Alarm Linkage Skylight LA-TC-6012 Set 6 Tempered glass + flip mechanism 600×1200mm, includes drive motor and electromagnetic lock
6 Electric Sliding End Door LA-M-DD-1220 Set 2 Cold-rolled steel plate, powder coated + tempered glass 1200×2200mm, double-leaf sliding
7 Emergency Escape Door LA-M-TS-0820 Leaf 1 Cold-rolled steel plate, powder coated + tempered glass 800×2000mm, push-bar type
8 Cabinet Top Sealing Strip LA-MF-DB m 120 EPDM rubber Cabinet top sealing
9 Cabinet Side Sealing Strip LA-MF-C m 80 EPDM rubber Cabinet seam sealing
10 Bottom Sealing Baffle LA-MF-D Pcs 20 Cold-rolled steel plate, powder coated Cabinet bottom sealing
11 End Sealing Wall Panel LA-MF-QB Set 2 Cold-rolled steel plate + insulation cotton Aisle end closure
12 Cable Sealing Component LA-MF-XL Set 4 Engineering plastic + rubber modules Cable penetration sealing
13 Control Host LA-KZ-ZJ Unit 1 Sheet metal enclosure + circuit board System core control
14 Temperature & Humidity Sensor LA-CG-WS Pcs 6 ABS housing + sensing chip Aisle temperature/humidity monitoring
15 Differential Pressure Sensor LA-CG-YC Pcs 2 Metal housing + sensing element Aisle pressure differential monitoring
16 LED Lighting Fixture LA-ZM-LED Set 6 Aluminum + LED chips Aisle lighting
17 Occupancy Sensor LA-ZM-GY Pcs 4 Infrared sensing module Lighting occupancy control
18 Access Control System LA-MJ Set 2 Access controller + card reader + electric lock End door access management
19 Fire Alarm Linkage Module LA-XF-LD Set 1 Optoelectronic isolation module Fire alarm signal interfacing
20 Audible & Visual Alarm LA-XF-SG Pcs 2 ABS housing Fire alarm audible/visual alert
21 Connecting Angle Brackets & Fasteners — Set 1 Galvanized steel plate Includes all angle brackets, bolts, washers
22 Electrical Auxiliary Materials — Set 1 — Includes cables, cable trays, terminals, etc.

3.2 Optional Configuration List

No. Component Name Model/Specification Unit Description
1 Intelligent Airflow Control Damper LA-FQ-FV Pcs Installed at cabinet air inlets; automatically adjusts air volume
2 HD Network Camera LA-JK-SX Unit Video surveillance within the aisle; interfaces with security system
3 Energy Consumption Monitoring Module LA-NH-JC Set Monitors energy consumption of aisle-related equipment; compiles energy-saving statistics
4 UPS Backup Power Supply LA-DY-UPS Set Extends system endurance during power failure
5 Sheet Metal Ceiling Panel LA-DB-BJ Pcs Replaces glass ceiling panel; suitable for light-blocking scenarios
6 Facial Recognition Access Control LA-MJ-RL Set Upgraded access control authentication method
7 Raised Floor Supply Air Panel LA-DB-SF Pcs High open-area ratio anti-static floor panel; optimizes underfloor air supply effect

3.3 Installation Tool List

The following tools must be prepared before construction and installation to ensure smooth installation:

  • Measuring Tools: Laser level, steel tape measure (5m), vernier caliper, feeler gauge, plumb bob
  • Fastening Tools: Hex key set, socket wrench set, Phillips/flathead screwdriver set, electric screwdriver, torque wrench
  • Cutting Tools: Hacksaw, utility knife, cable cutter, wire stripper
  • Electrical Tools: Multimeter, megohmmeter, voltage tester, crimping tool, terminal crimper
  • Auxiliary Tools: Scaffolding / lift ladder, suction cups (for handling glass ceiling panels), rubber mallet, marker pen, spirit level
  • Safety Equipment: Safety helmet, safety harness, insulating gloves, safety goggles, dust mask

3.4 Spare Parts List

To support future operation and maintenance, it is recommended that users procure the following commonly used spare parts:

No. Spare Part Name Recommended Stock Quantity Purpose
1 EPDM Sealing Strip 10 m Replacement for aged or damaged sealing strips
2 Skylight Electromagnetic Lock 2 pcs Replacement for malfunctioning electromagnetic locks
3 Temperature & Humidity Sensor 2 pcs Replacement for faulty sensors
4 LED Driver Power Supply 2 pcs Replacement for faulty lighting power supplies
5 Connecting Bolt Set 1 set Supplement for lost or damaged fasteners
6 Access Control Card Reader 1 pc Backup access control device
7 Control Host Fuse 10 pcs Replacement for blown fuses

Chapter 4: Product Principles

4.1 Basic Airflow Organization Principles

The core principle of the Double Row Cold Aisle Containment System is physical isolation of cold and hot airflow + directed air supply. Based on fluid mechanics and thermodynamics principles, it constructs an orderly airflow circulation path, completely solving the cooling waste problem caused by cold/hot airflow mixing in traditional machine rooms.

In traditional open machine rooms, cold air delivered by air conditioners diffuses into the entire machine room space and mixes freely with hot air exhausted from cabinets. Only approximately 40%~60% of the cold air actually enters cabinets to cool equipment; the remaining cooling capacity mixes directly with hot air and returns to the air conditioner, causing significant waste. Additionally, disordered airflow causes uneven cabinet intake air temperatures, with upper and far-end cabinets experiencing higher intake temperatures, forming localized hot spots.

After cold aisle containment, cold air is confined within the enclosed aisle space, forming a stable “cold pool.” Since the aisle space is far smaller than the entire machine room space, a small amount of supply air can create a positive pressure of 5~10 Pa within the aisle. Under positive pressure, cold air uniformly enters each cabinet through the front door ventilation openings, flows through IT equipment such as servers and switches, absorbs heat generated by equipment operation, and exits through the cabinet rear doors as hot air into the open hot aisle. The hot air rises along the hot aisle, returns to the precision air conditioner return air inlet, is cooled by the air conditioner, and is again delivered as cold air into the cold aisle, completing a full thermal cycle.

In this cycle, cold and hot airflow are completely separated by the cabinets and containment system with no mixing paths. Cold air utilization rate can be improved to over 95%, and the air conditioner only needs to compensate for the heat generated by IT equipment to maintain stable temperatures, significantly reducing cooling energy consumption.

4.2 Static Pressure Equalization Principle

The static pressure within the cold aisle is the key to ensuring uniform air volume distribution. According to the orifice discharge principle in fluid mechanics, when the static pressure inside a container is uniform and stable, the discharge volume from each outlet opening is essentially consistent.

The Double Row Cold Aisle uses the containment structure to confine supply air within a narrow, elongated channel space. Combined with reasonable supply air velocity design, the static pressure difference along the aisle length and height directions is controlled within ±1 Pa. This ensures that intake air volumes for cabinets at the beginning and end of the aisle, and at upper and lower positions, are essentially identical, avoiding the non-uniformity problems of high air volume at near ends and low air volume at far ends, or high air volume at lower positions and low air volume at upper positions, eliminating localized hot spots at their source.

The static pressure level must be matched with supply air volume and cabinet opening ratio: if static pressure is too low, cabinet intake air volume is insufficient and cooling capacity is inadequate; if static pressure is too high, fan energy consumption increases, door opening resistance becomes greater, and sealing point air leakage worsens. The optimal static pressure range is 5~10 Pa, which ensures sufficient intake air volume while maintaining low leakage rates and fan energy consumption.

4.3 Energy Saving and Consumption Reduction Principles

The energy-saving effects of the cold aisle containment system primarily derive from three aspects:

1. Improved Cold Air Utilization Rate: As described above, the cold air utilization rate increases from 40%~60% to over 95%. Under the same IT load, the required air conditioning cooling capacity is significantly reduced. Some air conditioning units can be directly shut down, reducing air conditioning operating energy consumption.

2. Higher Supply Air Temperature: Traditional machine rooms typically set air conditioning supply air temperatures very low (12~15°C) to avoid hot spots, resulting in low evaporator temperatures and poor energy efficiency ratios. After cold aisle containment, all cooling capacity is used for equipment cooling, allowing supply air temperatures to be raised to 18~22°C. The air conditioning evaporator temperature rises accordingly, improving the Energy Efficiency Ratio (EER) by more than 15%, consuming less electricity for the same cooling capacity.

3. Extended Free Cooling Duration: For air conditioning systems utilizing free cooling technology, raising the supply air temperature correspondingly raises the threshold temperature for outdoor free cooling. The annual duration available for free cooling increases significantly, further reducing compressor operating time and saving energy.

Combining the above three factors, the Double Row Cold Aisle Containment System can reduce air conditioning system energy consumption by 25%~40%, and overall machine room PUE by 0.3~0.6, delivering highly significant energy-saving effects.

4.4 Fire Alarm Linkage Operating Principles

After cold aisle containment, the space becomes relatively enclosed. To ensure the fire extinguishing system operates effectively during a fire, a fire alarm linkage opening mechanism must be configured. Its operating principles are as follows:

Normal Operation State: All ceiling panels and doors of the cold aisle remain closed and sealed, maintaining airflow isolation. Skylights are held closed by electromagnetic locks, and the control module continuously monitors fire alarm input signals.

Fire Event: When a fire occurs in the machine room, the fire alarm system detects and confirms the fire condition, then outputs a fire alarm dry contact signal to the cold aisle control host. Upon receiving the signal, the control host immediately executes the following linkage actions:

1. Cuts power supply to all skylight electromagnetic locks. The electromagnetic locks de-energize and release, and the skylights rapidly flip open under gravity and reset spring force, typically fully opening within 3 seconds, connecting the cold aisle top with the upper machine room space.

2. Outputs signals to unlock the aisle access control; end doors open automatically or can be manually pushed open, facilitating emergency evacuation of personnel within the aisle.

3. Triggers audible and visual alarms, emitting sound and light warnings to alert personnel in the aisle to evacuate immediately.

4. Feeds back signals including skylight opening status and alarm status to the fire control room and environment and power monitoring system.

After all skylights are opened, the containment state is released, and gas fire extinguishing agent in the machine room can freely diffuse into the cold aisle, reaching extinguishing concentration for effective fire suppression. Additionally, hot smoke can be exhausted through the top openings, preventing asphyxiation of personnel within the aisle.

After Fire Extinguishing: After the fire is extinguished and operational personnel confirm safety, the system is reset. Skylights re-close and lock, access control returns to normal, and the system returns to normal operating state.

Anti-False-Activation Logic: To prevent false activation, the linkage logic is designed such that two independent fire alarm signals must be received simultaneously (e.g., two smoke detectors alarming at the same time) to trigger skylight opening. A single signal triggers warning only without activation, minimizing the impact of false alarms on machine room operations.

4.5 Intelligent Monitoring Principles

The Intelligent Type cold aisle system uses a distributed sensor network to collect data in real time on temperature, humidity, pressure differential, skylight status, and door status within the aisle. Data is transmitted to the control host for processing and analysis, enabling the following intelligent functions:

  • Real-Time Environmental Monitoring: Real-time display of temperature, humidity, and pressure differential values at each monitoring point; automatic alarm when values exceed thresholds, alerting operational personnel for timely handling.
  • Air Conditioning Linkage Control: Automatically adjusts the air conditioner supply air volume and supply air temperature based on the deviation between average aisle temperature and setpoint, achieving on-demand cooling and avoiding overcooling waste or overheating risk.
  • Sealing Performance Assessment: Automatically evaluates aisle sealing performance through pressure differential change trends and leakage rate calculations; issues warning when performance degrades abnormally, prompting inspection of sealing components for damage or doors for incomplete closure.
  • Energy Consumption Statistical Analysis: Compiles cooling system energy consumption and IT energy consumption statistics, automatically calculates PUE value, and generates energy-saving reports, quantitatively demonstrating the energy-saving effects of the cold aisle system.
  • Remote Operation Management: Supports remote system status viewing via web and mobile platforms, receives alarm information, and enables unattended and remote operation and maintenance.

Chapter 5: Product Technical Parameters

5.1 Overall System Parameters

Parameter Category Parameter Name Technical Specification Remarks
Structural Parameters Standard aisle width 1200mm 1000mm, 1500mm optional
Aisle internal clear height 2000~2400mm Customized to cabinet height
Single module standard length 6m (10 cabinet positions) Can be extended arbitrarily in 600mm modules
Overall structural load capacity Top uniform load ≥50 kg/m² Meets inspection load requirements
Sealing Performance System air leakage rate ≤3% Tested at standard static pressure of 5 Pa
Aisle static pressure range 5~10 Pa Normal operating range
Energy-Saving Performance Cold air utilization rate ≥95% Complete cold/hot isolation
Air conditioning energy-saving rate 25%~40% Relative to traditional open machine rooms
PUE improvement range 0.3~0.6 Depends on original machine room baseline
Fire Protection Parameters Skylight opening response time ≤3 s From receipt of fire alarm signal
Skylight opening angle ≥80° Fully open state
Linkage signal type Dry contact signal DC24V, passive contact
Material flame retardancy rating UL94 V-0 / Class B1 All non-metallic materials
Electrical Parameters Rated operating voltage AC220V±10%, 50Hz Main power supply
Control voltage DC24V Safety low-voltage control
Rated power ≤200W per 10-cabinet position module Includes lighting, control, access control
Backup power endurance ≥30 min Standard backup battery
Environmental Parameters Operating ambient temperature -10°C~40°C System equipment operating range
Operating ambient humidity 10%~90%RH, non-condensing
Protection rating IP2X Indoor equipment
Lifespan Parameters Main structure service life ≥20 years Under normal usage conditions
Electrical component service life ≥5 years Excluding wear parts
Skylight mechanical lifespan ≥10,000 opening cycles

5.2 Main Structure Technical Parameters

5.2.1 Aluminum Alloy Profile Parameters

Parameter Specification
Alloy grade 6063-T5
Tensile strength ≥160 MPa
Yield strength ≥110 MPa
Elongation ≥8%
Surface treatment Anodized, film thickness ≥10 μm
Profile wall thickness Main column ≥2.0mm; beam ≥1.5mm

5.2.2 Cold-Rolled Steel Plate Parameters

Parameter Specification
Material SPCC quality cold-rolled steel plate
Thickness Structural components ≥1.2mm; door panels ≥1.5mm
Surface treatment Phosphating + electrostatic powder coating, film thickness 60~80 μm
Adhesion Grade 1 (cross-cut test)
Impact resistance ≥50 kg·cm
Salt spray test ≥48 hours without rust

5.3 Ceiling Panel System Technical Parameters

5.3.1 Tempered Glass Ceiling Panel

Parameter Specification
Glass thickness 4mm
Light transmittance ≥90%
Flexural strength ≥180 MPa
Impact resistance 227g steel ball dropped from 1m height without breakage
Dimensional tolerance ±0.5mm
Frame dimensional tolerance ±0.3mm

5.3.2 Fire Alarm Linkage Skylight

Parameter Specification
Unit dimensions 600mm (W) × 1200mm (L)
Opening method Downward-flip gravity opening
Drive voltage DC24V
Electromagnetic lock holding force ≥500N
Reset method Electric reset / manual reset
Opening response time ≤3 s
Full opening time ≤5 s
Operating temperature -20°C~60°C
Protection rating IP30

5.4 Door System Technical Parameters

5.4.1 Electric Sliding Door

Parameter Specification
Clear passage width 1200mm
Clear passage height 2000mm
Door leaf thickness 50mm
Opening/closing speed 0.3~0.6 m/s (adjustable)
Drive motor Brushless DC motor, 60W
Operating voltage DC24V
Noise level ≤55 dB (during opening/closing)
Obstacle rebound force ≤100N
Opening/closing cycle lifespan ≥1,000,000 cycles
Sealing performance Air leakage rate at closed gaps ≤2%

5.4.2 Emergency Escape Door

Parameter Specification
Clear dimensions 800mm (W) × 2000mm (H)
Opening method Push-bar from inside; key from outside
Opening angle ≥90°
Lock Fire-rated push-bar lock, compliant with fire door standards
Sealing rating Same as main door standard

5.5 Environmental Monitoring Parameters

5.5.1 Temperature and Humidity Sensor

Parameter Specification
Temperature measurement range 0°C~50°C
Temperature accuracy ±0.5°C
Humidity measurement range 0%~100%RH
Humidity accuracy ±3%RH (at 25°C)
Output signal RS485, Modbus protocol
Supply voltage DC12~24V
Power consumption ≤0.5W

5.5.2 Differential Pressure Sensor

Parameter Specification
Measurement range 0~20 Pa
Accuracy ±0.5 Pa
Overpressure capability 500 Pa
Response time ≤1 s
Output signal RS485 / 4-20mA
Supply voltage DC24V
Operating temperature -10°C~60°C

5.6 Lighting System Parameters

Parameter Specification
Light source type SMD LED
Color temperature 6000K (cool white)
Single fixture power 18W
Luminous efficacy ≥100 lm/W
Illuminance Working surface ≥300 lx
Emergency illuminance ≥50 lx
Service life ≥50,000 hours
Supply voltage AC220V / DC24V (emergency)

Chapter 6 Product Functions and Features

6.1 Core Functions

6.1.1 Cold/Hot Airflow Isolation Function

This is the most core fundamental function of the system. Through a fully enclosed structural design, cold air is completely contained within the cold aisle, thoroughly blocking the mixing path of cold and hot airflow. Cold air can only enter equipment through the front doors of cabinets, and all hot air is exhausted from the rear of cabinets to the hot aisle, achieving the ideal airflow organization of “100% cold air intake, 100% hot air exhaust,” with cooling capacity utilization reaching over 95%.

6.1.2 Pressure Equalization and Flow Uniformity Cooling Function

Utilizing the static pressure equalization effect of the enclosed aisle, the static pressure at all points within the aisle is uniform and consistent, ensuring that the air intake volume for each cabinet and at each height is essentially equal. This eliminates the traditional computer room problems of uneven temperatures—near-side cold/far-side hot and lower-section cold/upper-section hot. The cabinet inlet air temperature deviation is controlled within ±1°C, thoroughly resolving local hot spot issues and ensuring all IT equipment operates in an optimal temperature environment.

6.1.3 Fire Suppression Linkage Safety Function

The system comes standard with fire suppression linkage skylights, seamlessly integrated with the computer room fire alarm system and gas fire suppression system. In the event of a fire, the skylights automatically open rapidly, breaking the enclosed state and ensuring fire suppression gas quickly enters the aisle. Simultaneously, access control automatically unlocks to facilitate personnel evacuation, fully meeting fire code requirements and eliminating fire safety hazards associated with enclosed spaces.

6.1.4 Environmental Monitoring and Early Warning Function

A built-in multi-dimensional sensor network monitors parameters such as temperature, humidity, differential pressure, and equipment status within the aisle in real time. When values become abnormal, automatic audible and visual alarms are triggered, and data can be uploaded to the environment and power monitoring system (EPMS), helping operations personnel identify problems promptly, preventing equipment downtime caused by excessive temperatures, and enabling proactive maintenance.

6.1.5 Personnel Access and Management Function

Aisle doors are configured at both ends, supporting access control management, recording personnel entry/exit information, and standardizing computer room personnel management. The doors feature large observation windows, allowing viewing of the interior of the aisle without opening the door. Emergency escape doors meet personnel evacuation requirements in emergency situations and comply with safety regulations.

6.2 Intelligent Value-Added Functions (Intelligent Models Only)

6.2.1 Intelligent Cooling Linkage Function

The system can interface with precision air conditioner group control systems, automatically adjusting air conditioner operating status based on real-time aisle temperature. When temperature is high, cooling capacity automatically increases; when temperature is low, cooling capacity automatically decreases, achieving “on-demand cooling.” Compared to fixed setpoint operation, this can further save 10%–15% energy.

6.2.2 Seal Performance Self-Diagnosis Function

The system monitors aisle static pressure changes long-term through differential pressure sensors, combined with supply airflow data, to automatically calculate the air leakage rate. When the leakage rate rises abnormally, an automatic alarm is issued along with possible leak location hints, helping operations personnel quickly locate seal defects, perform timely maintenance, and always maintain optimal system sealing performance.

6.2.3 Intelligent Lighting Energy-Saving Function

Dual control using human body sensing + illuminance sensing: during daytime, lighting automatically turns off when the aisle is unoccupied and automatically turns on when personnel enter; at night, low-brightness emergency lighting is maintained, satisfying both safety requirements and maximizing lighting energy savings.

6.2.4 Energy Consumption Statistics and Analysis Function

The system automatically collects IT load energy consumption and cooling energy consumption data, calculates PUE values in real time, and generates daily, weekly, monthly, and annual energy consumption reports, quantitatively demonstrating the energy-saving effect of the cold aisle and providing data support for computer room energy management.

6.2.5 Remote Operations and Maintenance Management Function

Supports Web-based and mobile APP remote access, allowing viewing of system operating status, environmental parameters, and alarm information anytime, anywhere. Supports remote parameter configuration and firmware upgrades, significantly reducing operations and maintenance workload and improving fault response speed.

6.3 Product Technical Features

6.3.1 Modular Design, Efficient Deployment

All components are factory-prefabricated standardized modules. On-site installation only requires bolting together—no welding, cutting, or other secondary processing is needed, making installation fast. A standard 10-cabinet cold aisle can complete main body installation within 1 day, with minimal impact on existing computer room operations, making it particularly suitable for retrofitting existing computer rooms.

6.3.2 High-Standard Sealing, Ultimate Energy Savings

Multi-layer sealing design is employed. All possible air leakage points—roof panel joints, door perimeters, cabinet gaps, cable openings—are equipped with dedicated sealing components. The overall system air leakage rate is ≤3%, reaching an industry-leading level with more significant energy-saving effects.

6.3.3 Fully Flame-Retardant Materials, Safe and Reliable

All non-metallic components of the system use flame-retardant materials. Sealing gaskets, cables, and plastic parts all meet UL94 V-0 or B1 flame-retardant standards and will not serve as fire propagation carriers. All structural components are made of metal materials with excellent fire resistance performance. The overall system meets Class A computer room fire protection requirements.

6.3.4 High Compatibility, Strong Adaptability

Compatible with standard server cabinets from the vast majority of brands on the market; retrofitting can be performed without replacing existing cabinets. Supports multiple cooling methods including underfloor air supply, overhead air supply, and in-row air conditioner supply, adapting to different computer room air conditioner layouts. A rich selection of optional accessories is available, allowing flexible configuration based on user requirements.

6.3.5 Ergonomic Design, Convenient Operations and Maintenance

Aisle lighting is ample, roof panels use transparent glass providing good natural light, creating a comfortable operations and maintenance working environment. Roof panels can be opened upward for convenient overhead cable inspection. All electrical components feature modular design for quick plug-and-play replacement during faults. System operating noise is low, adding no additional noise pollution to the computer room.

6.3.6 Robust Structure, Long-Lasting Durability

The main structure uses high-strength aluminum alloy or high-quality cold-rolled steel plate, corrosion-resistant and wear-resistant with high structural strength, meeting seismic requirements of Seismic Intensity 8. Under normal use conditions, the main structure has a service life of over 20 years, with no deformation, loosening, or corrosion during long-term operation.

6.4 Comparison Advantages Over Similar Products

Comparison Item Our Company’s Double-Row Cold Aisle Ordinary Manufacturer’s Cold Aisle
Seal Performance Leakage rate ≤3%, multi-layer sealing Leakage rate 5%~10%, only basic sealing
Fire Suppression Linkage 3-second rapid opening, dual-signal triggering, status feedback Slow opening, single-signal triggering, no status feedback
Structural Material 6063-T5 aluminum alloy/1.5mm steel plate, anodized/powder coated Recycled aluminum/thin steel plate, poor surface treatment, prone to corrosion
Modularization Level Fully modular, no cutting or welding required Some parts require on-site processing, slow installation
Intelligent Functions Complete monitoring and linkage control, remote O&M support Basic on/off only, no intelligent functions
Safety Certification Complies with multiple national standards, fire testing certified No standard-compliant design, potential safety hazards
After-Sales Service Direct from manufacturer, fast technical support response, ample spare parts Supplied through intermediaries, no after-sales guarantee

Chapter 7 Product Application Scenarios

As a standard configuration for airflow optimization in data centers, the double-row cold aisle containment system is widely used in various computer room scenarios requiring server cabinet deployment. The following are the main application areas and adaptation solutions.

7.1 Internet IDC Data Centers

IDC data centers are the most extensive application area for cold aisle systems. These computer rooms have a large number of cabinets, high power density, and extremely high requirements for energy consumption and stability.

Scenario Characteristics: High cabinet density, 5–15kW per cabinet, large computer room area, strict PUE requirements—typically needing to achieve below 1.4—and 7×24 hour uninterrupted operation.

Adaptation Solution: Standard or intelligent double-row cold aisle systems are recommended, combined with in-row precision air conditioners to achieve the optimal combination of near-end cooling + enclosed cold aisle. Configure intelligent monitoring and air conditioner linkage functions for refined cooling output control, maximizing PUE reduction. Fire suppression linkage skylights are configured at standard ratios to meet fire code requirements.

Application Value: Significantly reduces air conditioning energy consumption, increases per-cabinet deployment density, improves cabinet rental rates, ensures stable operation of tenant equipment, and enhances IDC service quality and market competitiveness.

7.2 Financial Data Centers

Data centers of financial institutions such as banks, securities, and insurance companies have extremely high requirements for security, reliability, and compliance, falling under Class A computer room standards.

Scenario Characteristics: High-grade equipment, stringent business continuity requirements, standardized computer room management, strict requirements for fire protection, security, and monitoring, and compliance with various regulatory requirements.

Adaptation Solution: Intelligent double-row cold aisle systems are recommended, configured with comprehensive fire suppression linkage, access control management, video surveillance, and environmental monitoring functions. All components use high-reliability designs with redundant configuration of critical components. The system interfaces with the financial computer room’s unified environment and power monitoring platform for centralized management and control.

Application Value: Ensures stable operation of IT systems, reduces risk of overheating-related downtime, meets various compliance certification requirements, achieves energy savings and consumption reduction, and aligns with green finance development directions.

7.3 Government and Public Institution Computer Rooms

E-government computer rooms and data centers of government departments at all levels and public institutions, hosting important services such as government services and public administration.

Scenario Characteristics: High business importance, high security requirements, relatively fixed budgets, and policy requirements for energy conservation and green computer room construction.

Adaptation Solution: Standard double-row cold aisle systems are recommended, balancing performance and cost, configured with basic fire suppression linkage and environmental monitoring to meet government computer room safety standards. Configuration can be flexibly selected based on computer room scale, with expansion as needed.

Application Value: Improves the operational stability of government systems, reduces operations and maintenance energy consumption, saves fiscal expenditure, supports green government building initiatives, and meets e-government computer room rating requirements.

7.4 Telecom Operator Computer Rooms

Core computer rooms, edge computer rooms, and 5G base station supporting computer rooms of telecom operators such as China Telecom, China Mobile, and China Unicom.

Scenario Characteristics: Large number of sites, wide distribution, significant variation in computer room conditions, some with limited space, dispersed operations and maintenance personnel, and high requirements for equipment reliability and maintainability.

Adaptation Solution: Core computer rooms use intelligent double-row cold aisles for centralized monitoring and energy savings; edge computer rooms use basic cold aisles with simple, reliable structures and low maintenance requirements, adapting to computer room scenarios of different scales.

Application Value: Reduces telecom network equipment failure rates, lowers computer room energy expenditures, standardized products facilitate batch deployment and unified operations and maintenance, and improves overall computer room management.

7.5 Enterprise Data Centers

Enterprise-level data centers built by large and medium-sized enterprises, hosting core business systems, ERP, databases, etc.

Scenario Characteristics: Business-critical, high stability requirements, emphasis on return on investment and operating costs, medium-scale computer rooms, typically with professional operations and maintenance teams.

Adaptation Solution: Standard double-row cold aisle systems are recommended, with phased construction and gradual expansion based on enterprise development plans. Configure intelligent monitoring functions to help operations and maintenance teams improve management efficiency.

Application Value: Protects IT equipment investment, extends equipment service life, reduces operating costs, and improves the reliability and energy efficiency of enterprise IT infrastructure.

7.6 Education and Research Computer Rooms

Campus data centers, high-performance computing rooms, and laboratory computer rooms of universities and research institutes.

Scenario Characteristics: Wide variation in equipment density, some high-performance computing clusters with high power density, important scientific computing tasks, and high requirements for temperature stability.

Adaptation Solution: High-density areas use intelligent double-row cold aisles + in-row air conditioners to ensure heat dissipation for high-power equipment; ordinary areas use standard cold aisles. Customized adaptation solutions can be developed for special cabinets.

Application Value: Ensures continuous and stable operation of scientific computing tasks, prevents computing interruptions caused by overheating, reduces computer room energy consumption, and saves research funding.

7.7 Medical Data Centers

Hospital information center computer rooms and imaging data computer rooms, hosting medical information systems such as HIS and PACS.

Scenario Characteristics: Operations directly relate to medical services and patient safety, extremely high continuity requirements, strict computer room environmental requirements, and compliance with medical industry regulations.

Adaptation Solution: High-reliability standard double-row cold aisle systems are recommended, with dual power supply redundancy, comprehensive fire protection and alarm functions, full environmental monitoring coverage, and ensured temperature stability.

Application Value: Ensures 7×24 hour stable operation of medical information systems, eliminates system failures caused by temperature anomalies, and provides reliable IT support for medical services.

7.8 Industrial Control Computer Rooms

Industrial control computer rooms and dispatch center computer rooms in industries such as electric power, petroleum, chemical, and rail transit.

Scenario Characteristics: Relatively complex industrial environments, high requirements for environmental stability, industrial control system shutdowns may cause production accidents, and high safety level requirements.

Adaptation Solution: Customized double-row cold aisle systems with enhanced structural strength and anti-interference capability, adapted to industrial environment temperature and humidity requirements, and configured with comprehensive monitoring and alarm functions.

Application Value: Ensures stable operation of industrial control systems, reduces fault risks caused by environmental factors, and improves the safety and continuity of industrial production.

7.9 Existing Computer Room Retrofit Scenarios

Many traditionally built computer rooms have problems of low cooling efficiency, numerous hot spots, and high energy consumption, making them suitable for cold aisle retrofitting.

Scenario Characteristics: Existing cabinets and air conditioners already deployed, business cannot be interrupted for extended periods, short construction windows, and maximum utilization of existing equipment is required.

Adaptation Solution: Modular cold aisle products are used, adapted to existing cabinet dimensions and heights, with factory-prefabricated components for rapid on-site assembly and installation, short construction periods, and minimal business impact. After retrofitting, results are quickly visible with significantly improved cooling effectiveness.

Application Value: At relatively low retrofit costs, significantly improves computer room heat dissipation capability and energy efficiency, extends computer room service life, and avoids the high investment of complete computer room relocation and reconstruction.

Chapter 8 Product Installation

8.1 Pre-Installation Preparation

8.1.1 Construction Personnel Preparation

Personnel Configuration: Each construction crew is staffed with 1 crew leader, 3–4 structural installers, 1–2 electricians, and 1 safety officer. All personnel must undergo professional training, be familiar with product structure and installation procedures, and electricians must hold valid electrician certificates.

Technical Disclosure: Before construction, the technical lead conducts a technical disclosure session for all construction personnel, explaining construction drawings, installation specifications, quality standards, and safety precautions, and clarifying responsibilities for each position.

Safety Training: Conduct on-site construction safety training, emphasizing safety points such as working at heights, electrical safety, and glass component handling, and implement safety protection measures.

8.1.2 Tool Preparation

Prepare all installation tools according to the tool list in Section 3.3 of this manual, and check tool condition in advance to ensure performance is intact and measurements are accurate. Power tools should be charged in advance or power cords prepared; measuring tools must be within their calibration validity period.

8.1.3 Material Receiving Inspection

Upon arrival of goods, count components one by one against the packing list, checking that model and specifications match the contract.

Inspect component appearance for transportation damage, deformation, scratches, glass breakage, etc., and check whether sealing gaskets have cracks or detachment.

Check whether electrical component packaging is intact, with no signs of moisture or water ingress.

After passing inspection, fill out the receiving acceptance form. If any shortages or damage are found, contact the manufacturer promptly for replacement.

Materials are stored in a dry, level, debris-free indoor area. Glass components are stored upright, avoiding pressure and impact. Electrical components are protected from moisture and dust.

8.1.4 On-Site Condition Confirmation

Before installation, confirm that the computer room site meets the following conditions:

  • Computer room renovation is complete; floor, walls, and ceiling construction finished; raised access floor installed; floor is level.
  • Cabinets are installed and secured in place, arranged neatly in face-to-face configuration; aisle width meets design requirements; cabinet verticality and levelness meet standards.
  • Computer room mains power has been connected; temporary construction power is available.
  • Computer room fire protection system piping has been reserved in place, with conditions for linkage wiring.
  • No other cross-construction interference on site; construction area cleaned; sufficient space for material storage and operations.
  • Computer room elevation and dimensions re-verified with no errors; aisle length, width, and cabinet heights match design drawings.

8.2 On-Site Measurement and Layout Positioning

8.2.1 Reference Line Determination

Using the front edge of the cabinet row as the reference, determine the two longitudinal reference lines of the cold aisle, ensuring the two reference lines are parallel with spacing equal to the designed aisle width, deviation ≤2mm.

Determine transverse reference lines at both ends of the aisle, marking the installation positions of end doors and end columns.

Along the longitudinal reference lines, mark the installation position points for each column at 600mm cabinet spacing.

Use a laser level to verify the levelness and straightness of all marked lines, ensuring overall positioning accuracy.

8.2.2 Elevation Confirmation

Measure the cabinet top elevation, confirming that the top height difference for the same row of cabinets is ≤2mm, and the overall top levelness deviation of the entire cabinet row is ≤3mm.

If cabinet top height deviation is significant, the cabinets must first be leveled, or compensation made through shims at column bases.

Mark the installation elevation lines for beams and roof panels, ensuring overall levelness.

8.3 Main Frame Installation

8.3.1 Column Installation

Align the column base with the pre-marked installation position and place it on the top frame of the cabinet.

Use dedicated fasteners to securely connect the column base to the cabinet top. Tighten connecting bolts evenly with torque controlled at 8–10 N·m.

Use a spirit level to calibrate column verticality, adjusting until the column is vertical in both front-back and left-right directions, deviation ≤1°.

After all columns on the same side are installed, pull a string line to check column straightness. The entire row of columns must have a straightness deviation ≤3mm.

After all columns on both rows are installed, check the spacing between corresponding columns to ensure consistent aisle width, deviation ≤2mm.

8.3.2 Top Beam Installation

First install the main beams at both ends, aligning beam ends with corresponding column slots and connecting with dedicated angle brackets and bolts.

Install the intermediate main beams, with spacing corresponding to cabinet spacing, ensuring one main beam between every two columns.

After main beams are installed, install reinforcing beams to increase overall structural rigidity.

When installing all beams, use a level to check levelness, ensuring all beams are on the same horizontal plane with height difference ≤2mm.

Pre-tighten all connecting bolts initially; after the overall frame is adjusted, tighten them one by one to the specified torque.

8.3.3 Overall Frame Adjustment and Tightening

Comprehensively check the frame’s verticality, levelness, straightness, and aisle width; make fine adjustments where deviations exist.

After adjustment, tighten all connecting bolts evenly to the specified torque, working from the middle toward both ends.

Check all connection points to ensure no loosening or gaps; the structure is stable overall with no visible deformation when shaken by hand.

Clean the protective film and construction debris from the frame surface.

8.4 Roof Panel System Installation

8.4.1 Pre-Installation Inspection

Check roof panel glass for cracks or edge chipping, frame deformation, and whether sealing gaskets are firmly adhered without detachment.

Check whether the linkage skylight flip mechanism operates smoothly and whether electromagnetic locks engage properly.

8.4.2 Fixed Roof Panel Installation

Installation personnel stand outside the aisle or on scaffolding, use glass suction cups to grip the roof panel, and transport it smoothly to the installation position.

Gently place the roof panel onto the side beams on both sides, adjusting position so that the roof panel overlaps evenly on all sides with consistent gaps.

Align joints between adjacent roof panels, controlling gaps within 2mm.

Handle with care during installation to avoid glass colliding with the frame and causing damage. It is strictly prohibited to place heavy objects on roof panels.

8.4.3 Fire Suppression Linkage Skylight Installation

First secure the skylight mounting bracket to the beam, ensuring the bracket is installed level and firmly.

Install the skylight body onto the bracket, connect the flip shaft, and ensure smooth flipping without sticking.

Install the drive motor and electromagnetic lock, adjusting positions so that when the skylight closes, the electromagnetic lock aligns accurately and engages firmly.

Install the control junction box, leaving wiring terminals pre-reserved.

Manually test skylight opening and closing, confirming smooth action and even compression of the perimeter sealing gaskets when closed, with no localized gaps.

Temporarily power up to test electromagnetic lock engagement and release, confirming reliable operation.

8.4.4 Roof Panel Sealing Treatment

After all roof panels are installed, check the sealing gaskets between roof panels and beams, ensuring complete contact without lifting or gaps.

At joints between adjacent roof panels, apply joint sealing gaskets to fill gaps.

With the skylight closed, check the perimeter sealing condition, ensuring no air leakage gaps after closure.

8.5 End Door System Installation

8.5.1 Door Frame Installation

Transport the door frame assembly to the aisle end and align with the pre-marked installation position.

Secure both sides of the door frame to the end columns and the bottom to the floor (or cabinets).

Use a spirit level and plumb bob to calibrate the door frame’s verticality and levelness, adjusting until the door frame is vertical on both front and side faces, deviation ≤1mm/m.

After the door frame is adjusted into position, tighten all fixing bolts evenly to ensure the door frame is firm without wobbling.

8.5.2 Automatic Sliding Door Installation

Install the door track, secured to the top beam of the door frame, with track levelness deviation ≤0.5mm/m.

Hang the door leaf onto the track rollers, adjusting roller positions so the door leaf is vertical with uniform clearance at the bottom from the floor.

Install the drive motor, drive belt, and limit switches, adjusting belt tension to a moderate level.

Install access control electric locks, card readers, exit buttons, and other accessories, routing wiring to the control box.

Manually push the door leaf to check smooth operation, absence of sticking or abnormal noise, and uniform door clearances.

Power up to test door open/close action, adjusting limit switch positions so the door leaf opens and closes accurately to the correct positions with tight sealing when closed.

Test the obstacle detection reversal function by placing an obstacle during door closing, confirming the door leaf rebounds promptly.

8.5.3 Emergency Escape Door Installation

Secure the escape door frame at the pre-reserved installation position and calibrate verticality.

Install the door leaf and hinges, adjusting hinges for smooth door operation and uniform clearances.

Install the push bar lock, test the interior push bar release function, confirming that pressing the push bar immediately releases the door lock and the door leaf can be pushed open.

Test the exterior key release function, confirming the door cannot be opened at will from the outside.

Apply photoluminescent escape signage in a prominent and clearly visible position.

8.6 Sealing System Installation

Sealing system installation is a critical step in ensuring cold aisle performance; every gap must be carefully addressed.

8.6.1 Cabinet Top Sealing

Clean dust and debris from cabinet tops, ensuring the adhesion surface is clean and flat.

Apply cabinet top sealing strips continuously along the top edge of cabinets, with 45° beveled butt joints at splices, firmly adhered.

Sealing strip height aligns with frame bottom contact, with approximately 3mm compression, ensuring a tight seal.

At cabinet splicing gaps, apply vertical sealing strips to fill the gaps between cabinets.

8.6.2 Cabinet Bottom Sealing

Install bottom sealing baffles, secured to the front bottom edge of cabinets, with baffle bottoms close to the raised access floor surface.

Leave a minimal clearance between baffles and the floor to avoid scratching the floor, clearance ≤2mm.

Splice adjacent baffles tightly with no visible gaps.

8.6.3 End Wall Panel Sealing

Install end sealing wall panels to seal gaps between the outer sides of cabinets at both ends of the aisle and the walls.

At connections between wall panels and cabinets/walls, fill with sealing gaskets, then apply neutral sealant for sealing.

Apply sealant at wall panel splices as well, ensuring no air leakage gaps.

8.6.4 Cable Opening Sealing

For openings requiring cable pass-through, install cable sealing frames, secured at the opening positions.

Route cables through sealing modules, combining sealing modules according to cable quantity and diameter, and insert them into the frame.

Tighten frame compression bolts so rubber modules deform and grip cables tightly, achieving sealing.

For unused opening positions, install blanking plates for complete closure.

Check all cable pass-through locations to ensure no visible air leakage gaps.

8.6.5 Door Seal Inspection

After doors are closed, check the contact condition of perimeter sealing gaskets with the door frame, ensuring full-perimeter contact without localized gaps.

The door bottom sweep seal contacts the floor well with no visible gaps.

The paper strip method can be used for leak testing: place a paper strip at the seal location, close the door, and pull the strip—significant resistance indicates a good seal. Test around the entire perimeter, with uniform resistance.

8.7 Electrical Equipment Installation

8.7.1 Control Host Installation

The control host is installed in a cabinet at the aisle end, at a height convenient for operation and maintenance, typically as a 1U standard rack-mount installation.

The host is securely fastened with reliable grounding and sufficient space reserved for heat dissipation and wiring.

Apply identification labels noting the equipment name and circuit number.

8.7.2 Sensor Installation

  • Temperature and Humidity Sensors: Install at designated points on the inner side columns of the aisle, at three heights of 0.3m, 1.1m, and 1.8m from the floor respectively. Sensor probes face toward the interior of the aisle, avoiding direct airflow. Secure firmly with wiring routed downward to prevent water ingress.
  • Differential Pressure Sensor: Install on the side panel at the center of the aisle. The high-pressure port connects to the cold aisle side, and the low-pressure port connects to the hot aisle side. Pressure sampling tubes must be unobstructed without kinks. Installation height is approximately 1.5m for convenient reading and maintenance.
  • Smoke Detector: Install on the beams at the top of the aisle with even spacing, detection direction facing downward.

All sensors must be installed level and upright with clear labeling.

8.7.3 Lighting System Installation

LED luminaires are installed on the inner side of the top beams of the aisle, facing downward, with installation angles providing uniform light coverage of the aisle.

Luminaires are securely fastened with proper insulation treatment of wiring terminals.

Motion sensors are installed at the top of both ends of the aisle, sensing direction facing toward the interior of the aisle, with sensing angle and sensitivity adjusted.

Audible and visual alarm devices are installed in prominent positions at both ends of the aisle, with clearly discernible sound and light effects when activated.

8.7.4 Cable Tray and Wiring

Install low-voltage cable trays along the top of the aisle, secured to the sides of beams.

All cables are routed within cable trays. Power and signal cables are placed in separate trays; where separation is not possible, spacing must be ≥150mm.

Cables are arranged neatly, secured with cable ties, with allowance left at bends to avoid tension and stress.

Sufficient cable length is reserved at both ends for termination and maintenance, typically 30–50cm.

Cable tray covers are installed, presenting an overall straight and neat appearance.

8.8 Grounding System Installation

All metal frames, door bodies, and equipment enclosures of the cold aisle must be reliably grounded, forming an equipotential connection.

Use 4mm² multi-strand copper core yellow-green grounding wire to connect metal components in series, ultimately connected to the computer room equipotential grounding grid.

At grounding connection points, remove paint film and oxide layer to ensure good conductivity and secure connection.

Grounding resistance test ≤4Ω, meeting electrical safety requirements.

All grounding wires are clearly labeled with standardized routing.

8.9 Installation Self-Inspection

After installation is complete, the construction crew conducts a comprehensive self-inspection first, checking:

  • Structural Installation Firmness: All bolts tightened to specification; structure has no loosening, deformation, or wobbling.
  • Installation Accuracy: Verticality, levelness, straightness, and aisle width meet tolerance requirements.
  • Sealing Integrity: All gaps sealed properly, gaskets in good contact, no leak points.
  • Door Operation: Smooth opening/closing, good sealing, access control and escape functions normal.
  • Skylight Operation: Smooth opening/closing, reliable electromagnetic lock engagement.
  • Electrical Installation: Equipment installed level and upright, wiring organized, labels clear, grounding reliable.
  • Appearance Quality: No visible scratches or deformation on surfaces, glass intact, overall aesthetic appearance.

After self-inspection passes, fill out the installation self-inspection record and submit the acceptance application.

Chapter 9 Product Wiring

9.1 Pre-Wiring Preparation

9.1.1 Technical Preparation

Become familiar with the system electrical schematic diagram and wiring diagram, clarifying the wiring method, wire gauge requirements, and terminal numbers for each circuit.

Verify the rated voltage and power of all equipment, confirming that power supply circuit capacity meets requirements.

Conduct wiring technical disclosure for construction personnel, clarifying wiring process standards and safety requirements.

9.1.2 Cable Preparation

Calculate the cable length and specifications for each circuit according to the wiring diagram and prepare the corresponding cables.

Cable Selection Standards:

Circuit Type Cable Specification
Main power supply circuit 2.5mm² copper core PVC insulated wire, colors per phase sequence requirements
Lighting circuit 1.5mm² copper core wire
Control and signal circuits 1.0mm² shielded twisted pair or RVVP flexible wire
Grounding wire 2.5mm² yellow-green two-color multi-strand copper core wire

Check cable appearance for damage, breaks, or oxidation; insulation layer must be intact.

Perform continuity and insulation testing on cables to confirm cable performance is intact.

9.1.3 Tools and Auxiliary Materials Preparation

Tools: Wire strippers, crimping pliers, diagonal cutters, screwdriver set, multimeter, megohmmeter, soldering iron, heat gun.

Auxiliary Materials: Wiring terminals, ferrule number tubes, cable ties, insulating tape, heat-shrink tubing, cable trays, cable markers, label stickers.

9.2 General Wiring Process Specifications

All wiring work must follow the following process standards to ensure reliable wiring quality and neat appearance.

9.2.1 Cable Handling Specifications

Stripping Requirements: Stripping length must match the terminal. Do not damage wire strands during stripping; no broken strands allowed. For screw terminals, stripping length exposes 1.5 times the screw diameter; for crimp terminals, stripping length allows full insertion into the crimp barrel with no conductor exposed and no insulation compressed into the barrel.

Strand Handling: After stripping multi-strand wire, twist strands together—no loose wire filaments. Terminals requiring tinning should be uniformly tinned with full solder and no cold solder joints; do not burn the insulation layer.

Ferrule Number Tube Marking: Install ferrule number tubes on both ends of each wire, marked with circuit number and terminal number, with clear text and consistent orientation for easy identification during maintenance. Ferrule tube length is approximately 20mm, made of flame-retardant PVC.

9.2.2 Terminal Crimping Specifications

Select the appropriate specification of cold-pressed terminal based on wire gauge; terminal and wire strands must match.

Use dedicated crimping pliers for crimping, with proper crimp depth, clear and firm crimp marks.

Post-crimp inspection: Conductor fully inserted into crimp barrel, insulation not damaged by crimp teeth, pull-out force meets standards (1.0mm² wire ≥50N, 1.5mm² wire ≥80N, 2.5mm² wire ≥120N), and appearance free of cracks and burrs.

No more than 2 wires per terminal; wires of different gauges must not be connected at the same crimp point.

9.2.3 Cable Routing and Bundling Specifications

Cable routing is straight and level, clearly layered, with power and signal cables separated. Crossovers must be avoided where possible; when crossing is unavoidable, cross at right angles to reduce electromagnetic interference.

Cable bundling spacing is uniform: 15–20cm on straight sections, with one tie on each side of bends.

Use nylon cable ties for bundling, tightness appropriate—cables should not loosen or deform. Tie tails are trimmed flush with no sharp burrs.

Cables at bends maintain a natural curve with bending radius ≥6 times the cable diameter, avoiding sharp bends that could damage cables.

Cables at moving parts (such as door locations) have allowance and are protected with spiral wrap or cable carriers, with no tension or stress during repeated movement.

9.2.4 Wiring Safety Specifications

All wiring work must be performed with power off, with “UNDER CONSTRUCTION—DO NOT CLOSE SWITCH” warning signs posted and a dedicated person supervising.

Verify absence of voltage before starting work.

Exposed live terminals must be properly insulated to prevent short circuits and electric shock.

After wiring is complete, clean the work area—no leftover wire clippings, tools, or other debris that could cause short circuits.

9.3 Power System Wiring

9.3.1 Main Power Supply Connection

Route one dedicated AC220V power supply from the computer room distribution panel to the power input terminal of the cold aisle control host. Phase wire L is red, neutral wire N is blue, and ground wire PE is yellow-green.

The main power input first connects to the main air circuit breaker. Breaker capacity is selected based on total system power; standard configuration uses a 10A/2P air circuit breaker with residual current protection.

Branch circuits from the air circuit breaker output supply the lighting circuit, skylight drive circuit, access control circuit, and control circuit respectively.

Each branch circuit is configured with an independent branch air circuit breaker and fuse for graded protection.

A backup UPS power supply connects to a transfer switch: mains power supplies the system under normal conditions and automatically switches to UPS power upon mains failure.

9.3.2 Lighting Circuit Wiring

Route power wires from the lighting branch circuit breaker to the lighting control module input terminals.

The lighting control module output connects to LED luminaires. All luminaires are connected in parallel with correct polarity.

Motion sensor signal wires connect to the control module for sensing-based control.

Emergency lighting circuits connect to the backup power supply, automatically switching to emergency lighting upon mains power failure.

Manual switches at both ends of the aisle are connected in parallel to the control circuit for multi-point manual control.

9.3.3 Skylight Drive Circuit Wiring

Skylight drive power is derived from a dedicated circuit on the control host, operating at DC24V, supplied by a switching power supply.

The electromagnetic lock of each skylight is connected in parallel to the control output terminals, paying attention to polarity.

Skylight motor forward/reverse control wires connect to the drive module, controlled by the control module to achieve skylight reset.

Skylight status feedback signal wires (limit switches) connect to the control host input terminals, providing open-position and closed-position status feedback.

Multiple skylights are controlled in groups, maximum 5 per group, to avoid excessive starting current.

9.3.4 Access Control System Wiring

Access control power supply is DC12V from a dedicated power supply, sourced from the main power supply.

The access control controller connects to the card reader, electric lock, exit button, and fire alarm linkage signal respectively.

Card Reader Wiring: Power, data, and ground wires connected correspondingly, with shield layer grounded at one end only.

Electric Lock Wiring: Connect to the access control controller’s lock control output. Use fail-secure electric locks that unlock upon power loss, providing power-off unlocking during fire events.

Exit Button: Connect to the controller’s door-open input; pressing triggers the door-open signal.

9.4 Low-Voltage Signal System Wiring

9.4.1 Sensor Wiring

All sensors use centralized DC24V power supply, derived from the control host power module.

Temperature and humidity sensors use RS485 bus connection in a daisy-chain series configuration, with A and B lines connected correspondingly. A 120Ω termination resistor is installed at each end of the bus.

Differential pressure sensor signal outputs connect to the control host’s analog input terminals, with 4-20mA signal polarity connected correctly.

Smoke detector alarm signals connect to the fire suppression linkage module as passive dry contact signals.

Sensor shield layers are uniformly grounded at the control host end, avoiding interference from multi-point grounding.

Each sensor is assigned a unique address code and registered in the control host with its corresponding installation location.

9.4.2 Fire Suppression Linkage Wiring

Fire suppression linkage signals use passive dry contact inputs. Two signal wires are routed from the computer room fire control host to the input terminals of the cold aisle fire suppression linkage module.

Wiring uses flame-retardant fire-resistant cables, routed through metal conduit, complying with fire protection wiring requirements.

The linkage module outputs connect to the skylight electromagnetic lock control circuits, access control release circuits, and audible/visual alarms respectively.

Status feedback signals from the linkage module outputs are returned to the fire control room, providing skylight open status and system fault status.

Fire protection circuits are routed independently, not sharing trays with other circuits, to avoid interference.

9.4.3 Environment and Power Monitoring (EPMS) Communication Wiring

The control host provides RS485 or TCP/IP communication interfaces for connection to the computer room environment and power monitoring system.

Communication cables use shielded twisted pair or Cat5e network cable, routed away from power circuits.

Configure the correct communication address and baud rate to ensure normal communication with the EPMS system.

Communication cable shield layers are grounded at one end only, with lightning and surge protection implemented.

9.5 Grounding System Wiring

9.5.1 Protective Grounding

All electrical equipment metal enclosures, metal frames, metal cable trays, and metal conduits must be connected to the protective grounding conductor.

The grounding main conductor uses 4mm² yellow-green two-color copper wire, routed along the aisle, reliably connected to the computer room equipotential grounding grid.

Each equipment’s grounding terminal has a dedicated grounding wire to the grounding main conductor; series grounding is not permitted.

At grounding connection points, remove paint film and oxide layer, add spring washers, and tighten bolts to ensure good contact.

9.5.2 Shield Grounding

Shield layers of all shielded cables are grounded at one end only, uniformly at the control host side, with the far end left floating.

Grounding resistance test value ≤4Ω, meeting low-voltage system grounding requirements.

Avoid forming ground loops to reduce common-mode interference.

9.6 Post-Wiring Inspection and Testing

9.6.1 Visual and Continuity Inspection

Visually inspect all wiring: correct wire sequence, secure terminals, clear labels, organized routing, and no exposed conductors.

Use a multimeter in continuity mode to test each circuit, confirming normal conduction with no open circuits or loose connections.

Check for misconnections or short circuits, especially power supply polarity and phase/neutral wires, confirming no short circuits.

9.6.2 Insulation Resistance Testing

Disconnect all electronic equipment and disconnect grounding. Use a 500V megohmmeter to test insulation resistance of each circuit to ground.

Power circuits: insulation resistance ≥0.5MΩ; signal circuits: insulation resistance ≥0.2MΩ to pass.

For circuits failing the test, troubleshoot the cause, re-test after remediation until passing.

9.6.3 Phase Sequence and Voltage Testing

Connect main power and test input voltage, confirming voltage is within AC220V±10% range at 50Hz.

Test output voltage of each branch circuit, confirming voltage levels match equipment requirements.

Test switching power supply outputs of DC24V and DC12V with voltage deviation within ±5%.

9.6.4 Wiring Records

After wiring is complete, fill in wiring records including:

  • Cable model, length, and number for each circuit
  • Terminal wiring cross-reference table
  • Insulation test data
  • Grounding resistance test data
  • Wiring personnel and date

Chapter 10 Product Commissioning

10.1 Pre-Commissioning Preparation

10.1.1 Personnel and Plan

Establish a commissioning team led by a commissioning engineer with construction personnel providing support, and clarify division of responsibilities.

Develop a commissioning plan, clarifying commissioning items, procedures, methods, acceptance criteria, and safety precautions.

Conduct a plan briefing for all participants before commissioning, ensuring familiarity with the commissioning process and emergency response measures.

10.1.2 Tools and Instruments

Prepare the instruments and tools required for commissioning:

Category Instruments/Tools
Electrical Multimeter, clamp ammeter, phase meter, ground resistance tester
Environmental Temperature/humidity meter, micro-differential pressure gauge, anemometer, thermal imaging camera
Auxiliary Stopwatch, two-way radios, marker pens, recording forms
Safety Insulated gloves, safety helmets, fire extinguishers

All measuring instruments must be within their calibration validity period, with accuracy meeting test requirements.

10.1.3 On-Site Confirmation

Confirm installation and wiring are fully complete, self-inspection passed, with no outstanding issues.

Confirm the computer room air conditioning system can operate normally and provide a stable cooling source.

Confirm the fire protection system is in normal condition; simulated fire signals during commissioning will not trigger actual fire suppression.

Clear debris from the aisle, close all doors and roof panels, ensuring the aisle is in an enclosed state.

Confirm no other construction work is ongoing on site and the environment is safe.

10.2 Comprehensive Pre-Power-On Inspection

Before formal power-on, a comprehensive inspection must be conducted to eliminate safety hazards:

Mechanical Structure Inspection:

  • All fasteners tight, structure stable.
  • No obstructions within the operating range of skylights and doors; movement unimpeded.
  • Glass components free of cracks and securely installed.
  • All sealing components in place, none detached.

Electrical Wiring Inspection:

  • All air circuit breakers in the open (OFF) position.
  • Wiring terminals secure, no exposed live parts.
  • No metal debris left in equipment or on circuits.
  • All grounding connections complete and reliably effective.

Equipment Status Inspection:

  • All equipment switches in initial position.
  • No short circuit or burn marks inside the control host.
  • Sensors installed correctly, unobstructed.

10.3 Individual Component Commissioning

10.3.1 Lighting System Commissioning

Close the lighting circuit breaker and check whether lighting illuminates normally, with no flickering or non-illuminating fixtures.

Test manual switch functions—switches at both ends can both control lighting on/off normally.

Test motion sensing function: personnel entering the sensing range triggers automatic lighting; after personnel leave, lighting automatically turns off after the set delay time. Adjust sensing sensitivity and delay time to appropriate values.

Test emergency lighting function: upon mains power disconnection, emergency lighting automatically turns on with illuminance meeting requirements.

Test lighting brightness; aisle work surface illuminance ≥300lx to pass.

Record lighting circuit operating current, confirming no overload.

10.3.2 Skylight System Commissioning

Manual Test: In the de-energized state, manually release the skylight and observe whether it opens smoothly without sticking, opening angle ≥80°.

Motorized Reset Test: After power-on, press the reset button; the skylight motor runs smoothly, driving the skylight closed, with electromagnetic lock automatically engaging and locking upon reaching the closed position.

Response Time Test: Provide the opening signal and use a stopwatch to measure the time from signal issuance to full skylight opening; ≤3 seconds to pass.

Status Feedback Test: The status displayed on the control host matches the actual skylight status accurately for open, closed, and fault conditions.

Multi-Skylight Synchronization Test: When multiple skylights are triggered to open simultaneously, actions are synchronized and consistent with no visible time difference.

Continuous Open/Close Test: Perform 10 consecutive open/reset cycles; all actions are normal and reliable without faults.

10.3.3 Door System Commissioning

Automatic Sliding Door Commissioning:

  • After power-on, press the open button—the door leaf opens smoothly and stops at the open position; press the close button—closes smoothly and stops at the closed position.
  • Adjust opening/closing speed to appropriate values with operating noise ≤55dB.
  • Test obstacle detection reversal: place an obstacle during door closing; the door leaf immediately reverses and opens upon contact with the obstacle; reversal force ≤100N.
  • Test timed auto-close function: after opening, if no one passes through, the door automatically closes after the set time.

Access Control Function Commissioning:

  • Swipe card / enter password: access verification passes, door leaf opens automatically.
  • Press exit button: door leaf opens.
  • Access control recording function operates normally with accurate entry/exit information storage.

Escape Door Commissioning:

  • Pressing the push bar from inside immediately releases the door lock, and the door leaf can be easily pushed open.
  • Exterior opening requires a key; function operates normally.
  • Door leaf seals well when closed.

10.3.4 Sensor and Monitoring System Commissioning

Power on the sensors and allow a 30-minute warm-up period.

Check the communication status of each sensor on the control host, confirming all are online with no communication faults.

Calibrate temperature and humidity sensor readings against a standard temperature/humidity meter; deviation must be within accuracy range.

Calibrate differential pressure sensors with a standard pressure gauge; displayed value deviation from standard value ≤0.5Pa.

Set alarm thresholds, simulate out-of-range conditions, and test alarm functions, confirming audible/visual alarms trigger normally and alarm information uploads accurately.

Test data storage functions; historical data can be queried and exported.

10.4 System Linkage Commissioning

10.4.1 Fire Alarm Linkage Commissioning

This is the core safety item of commissioning and must be tested item by item and pass all tests.

Single-signal test: Simulate one fire alarm signal input. The system issues a pre-alarm notification, and the skylights do not actuate, verifying the false-alarm prevention logic.

Dual-signal linkage test: Simulate two fire alarm signal inputs. The system triggers formal linkage:

  • The skylight electromagnetic locks release, and all skylights automatically open fully within 3 seconds.
  • The access control system automatically unlocks, and corridor doors can be pushed open.
  • The audible and visual alarm activates, emitting sound and light warnings.
  • The linkage status signal is fed back to the fire alarm host panel and displays correctly.

Reset test: Clear the fire alarm signal and operate the system reset. The skylights close and lock in sequence, the access control system returns to normal, and the alarm stops.

Power failure linkage test: Disconnect the main power supply. With backup power supplying the system, the fire alarm linkage can still be triggered normally, and the skylights open reliably.

Repeat the tests 3 times. Each actuation must be accurate and reliable, with no failure or false actuation.

10.4.2 Air Conditioning Linkage Commissioning (Smart Type)

Establish communication connection between the cold aisle system and the air conditioning group control system, and confirm normal data exchange.

Set the aisle target temperature (e.g., 24°C) and observe system operation:

  • When the aisle temperature rises above the set value, the system sends a command to the air conditioning to increase cooling capacity, and the air conditioning adjusts accordingly.
  • When the aisle temperature falls below the set value, a command to reduce cooling capacity is issued.

Test the regulation response speed and temperature stability. The aisle temperature fluctuation shall be controlled within ±1°C.

Test the failure mode: When communication is interrupted, the system automatically switches to local independent operation without affecting the normal operation of either party.

10.4.3 Environmental Monitoring System Integration Commissioning

All monitoring data, equipment status, and alarm information from the cold aisle system shall upload normally to the environmental monitoring platform.

The environmental monitoring platform can view real-time data remotely, query historical records, and receive alarm push notifications.

Test remote control functions: Within authorized scope, remotely switch lighting on/off, reset skylights, etc.

Data refresh frequency and alarm response time shall meet the environmental monitoring system requirements.

10.5 Airflow Performance Commissioning

10.5.1 Aisle Static Pressure Test

Start the air conditioning system and adjust the supply air volume to the design value. All doors and ceiling panels of the cold aisle shall be closed and in normal sealed condition.

After the airflow stabilizes, use a micro-manometer to measure the static pressure differential between the cold aisle and the hot aisle at different positions (front end, middle, rear end) of the aisle.

The static pressure at each point shall be within the range of 5~10 Pa, and the mutual deviation shall be ≤1 Pa, indicating uniform static pressure.

If static pressure is too low, check for air leakage points or appropriately increase the supply air volume; if static pressure is too high, appropriately reduce the supply air volume.

10.5.2 Temperature Uniformity Test

After the system has been operating stably for 1 hour, arrange temperature measurement points inside the aisle. Install measurement points at the upper, middle, and lower positions on the front door of each cabinet.

Record temperatures at all measurement points and calculate the average temperature and maximum temperature difference.

The cabinet inlet air temperature shall be within the design range. The maximum temperature difference between the highest and lowest points in the same aisle shall be ≤2°C, and the temperature difference between upper and lower positions of the same cabinet shall be ≤3°C to be considered qualified.

If locally high temperatures exist, check whether there is air leakage at the corresponding position, whether cabinet openings are blocked, and whether supply air outlets match the position. Make targeted adjustments.

10.5.3 Air Leakage Rate Test

Measure the total air conditioning supply air volume and the total inlet air volume into the aisle.

Air leakage rate = (Total supply air volume – Total inlet air volume) / Total supply air volume × 100%.

An air leakage rate ≤3% is considered qualified.

If the air leakage rate exceeds the standard, use the smoke method or infrared thermography method to locate leakage points, perform sealing remediation, and re-test until compliance is achieved.

10.5.4 Smoke Visualization Test

Release smoke at the cold aisle entrance and observe the smoke flow trajectory.

Under normal conditions, the smoke disperses uniformly within the aisle, all entering through the front doors of the cabinets, with no obvious spillage.

Observe whether there are obvious smoke leakage positions, mark them, and perform sealing treatment.

After testing is complete, turn on ventilation to exhaust the smoke.

10.6 72-Hour Continuous Operation Test

After all individual equipment and linkage commissioning pass, conduct a 72-hour continuous full-load operation test to verify the long-term operational stability of the system.

The system operates in normal operation mode, air conditioning operates at design load, simulating the normal working state of the data center.

Record system operation data every 4 hours, including: temperature and humidity, pressure differential, equipment operating status, voltage and current, etc.

During operation, the system has no fault alarms; skylights, doors, lighting, and sensors all operate normally.

Temperature and humidity remain stable within the design range with no large fluctuations; static pressure remains stable.

If the system runs for 72 hours without any faults and all indicators are qualified, the trial operation is passed.

10.7 Commissioning Records and Reports

After commissioning is completed, compile all test data and prepare a formal commissioning report, including:

  • Project overview and system configuration
  • Commissioning items and test methods
  • Records of all test data
  • Problems encountered during commissioning and rectification status
  • Commissioning conclusions
  • Signatures and dates of commissioning personnel

11.1 Installation and Construction Precautions

  • Installation shall be performed by trained professionals, strictly following this manual and the design drawings. The product structure and installation method shall not be modified arbitrarily.
  • Glass ceiling panels and door glass are fragile items. When handling and installing, suction cups must be used, handle with care, and impacts and compression are strictly prohibited. Installers shall wear gloves to avoid glass cuts.
  • Working at heights (above 2 meters) requires wearing a safety belt. Scaffolding and lifting platforms must be stable and reliable, with a warning zone established below and personnel passage prohibited.
  • On-site electrical use must comply with temporary power regulations. Power tools must be properly grounded, equipped with residual current circuit breakers, and unauthorized wiring is strictly prohibited.
  • During installation, protect existing facility equipment in the data center, avoid scratching floors, colliding with racks and equipment, and promptly clean up construction waste.
  • When installing sealing strips, ensure the bonding surface is clean and dry, and the adhesion is firm. Do not stretch the sealing strip during installation to avoid shrinkage and cracking.
  • Bolts shall be tightened with tools of corresponding specifications, with moderate torque, avoiding over-tightening (thread stripping) or loosening. Apply anti-seize compound to stainless steel bolts to prevent long-term corrosion seizing.
  • Fire alarm linkage wiring must be performed by certified electricians, strictly following fire protection codes for cabling. The linkage logic shall not be modified without authorization.
  • During construction, protect completed work. Installed components should avoid impact and contamination, and be covered with protective film when necessary.
  • At the end of each workday, cut off power, clean the site, check fire safety, and confirm no hazards remain before leaving.

11.2 Wiring Operation Precautions

  • All wiring operations must be performed with power disconnected. Strictly implement the “power-off, voltage verification, safety tag, and supervision” system. Live wiring is strictly prohibited.
  • Cable selection must comply with design requirements. Wire gauge shall not be arbitrarily reduced, and inferior cables shall not be used. Strong-current and weak-current cables must be laid separately to avoid electromagnetic interference.
  • Wiring terminals must be crimped firmly. Loose or false connections are strictly prohibited to prevent contact resistance heating that could cause faults or even fire.
  • All exposed live parts must be properly insulated. Wire cores shall not be exposed to prevent short circuits and electric shock.
  • The grounding system must be reliably connected. The ground wire shall not be omitted, and the neutral wire shall not be used as a ground wire.
  • Fire protection circuits must use flame-retardant and fire-resistant cables, protected by metal conduit, with fireproof treatment at connection points.
  • Cable labels must be clear and complete, corresponding at both ends, to facilitate later maintenance. Unlabeled circuits shall not be put into service.
  • After wiring is completed, insulation testing and continuity testing must be performed. Power can only be applied after passing.
  • Control module parameter settings must be performed by professional personnel. Internal parameters shall not be modified arbitrarily to avoid system logic confusion.
  • Before energizing the system, conduct a comprehensive check to confirm no short-circuit hazards, then close circuit breakers in stages: close the main breaker first, then branch breakers.

11.3 Commissioning and Operation Precautions

  • A dedicated commissioning plan shall be developed with emergency response procedures. In particular, fire alarm linkage commissioning shall be coordinated with data center fire protection management personnel to prevent accidental discharge of fire suppression gas.
  • On first power-up, energize in stages: control circuits first, then power circuits; first no-load, then with load. If any abnormality is found, immediately cut power and troubleshoot.
  • When testing skylight opening, no personnel are allowed to stand underneath to prevent injury from falling skylights.
  • When commissioning doors, keep hands and clothing away from door gaps to prevent pinching. Use dedicated test objects when testing pinch protection, never use body parts.
  • During airflow testing, gradually increase the air conditioning fan volume and observe system status to avoid structural damage from sudden high air pressure.
  • During the 72-hour trial operation, arrange personnel for regular inspections. Handle abnormalities promptly. No unattended operation is permitted.
  • Commissioning data must be recorded truthfully. Do not fabricate data to ensure test results truly reflect system performance.
  • After commissioning is completed, system parameters shall be locked and shall not be modified by unauthorized personnel.

11.4 Daily Use Precautions

  • Cold aisle doors shall remain normally closed. Personnel shall close doors promptly when entering or exiting to avoid prolonged openings causing cold air leakage. It is strictly prohibited to fix doors in the open position.
  • It is strictly prohibited to pile debris inside the cold aisle, block cabinet air inlets, or remain in the aisle for extended periods of rest.
  • It is strictly prohibited to step on or lean against the cold aisle frame and ceiling panels. Do not place any items on the ceiling panels to prevent glass breakage or structural deformation.
  • It is strictly prohibited to disassemble or modify any cold aisle components without authorization. If changes are needed, contact the manufacturer’s technical personnel for evaluation.
  • Sensors, lighting fixtures, alarm devices, and other equipment in the aisle shall not be touched or moved arbitrarily, and sensor probes shall not be blocked.
  • Keep the aisle clean and dry. Do not spill water or pour liquids to prevent electrical short circuits and slippery glass surfaces.
  • Regularly check the operating status of doors and skylights. Address abnormal noises or jamming promptly. Do not force open or close, to avoid damaging mechanisms.
  • When the data center conducts fire drills, confirm in advance that the cold aisle linkage function is normal, and reset promptly after the drill.
  • In non-emergency situations, it is strictly prohibited to manually force open skylights, and hard objects shall not be used to strike glass.
  • Keep both ends of the aisle unobstructed. Do not stack items blocking escape routes. Emergency escape doors must not be locked.

11.5 Safety Protection Precautions

  • The cold aisle system must be reliably grounded. Test the grounding resistance regularly to ensure compliance with safety standards.
  • Electrical equipment maintenance must be performed with power disconnected by certified electricians. Non-professionals shall not open covers for inspection.
  • Regularly check the backup power supply to ensure normal power supply during emergencies.
  • Test emergency lighting in the aisle once a month to ensure it illuminates properly during a power outage.
  • Conduct a fire alarm linkage test at least once a year to ensure reliable operation in the event of a fire.
  • If glass components develop cracks or edge chips, immediately stop using and replace promptly to prevent bursting and injury.
  • Replace aged sealing strips, electrical cables, and other aging components promptly to avoid safety hazards from performance degradation.
  • Provide appropriate fire extinguishing equipment in the data center, placed in accessible locations near the aisle.

11.6 Transportation and Storage Precautions

  • Products must be properly packaged during transportation. Glass components shall be secured upright with shock-absorbing and cushioning measures to avoid collision and compression.
  • Protect against rain and moisture during transportation. Electrical components must not be exposed to rain or dampness.
  • Store products in a dry, ventilated indoor warehouse, away from corrosive gases and liquids, and avoid direct sunlight.
  • Classify and arrange components during storage. Glass components shall be placed upright against supports, not stacked flat. Metal components shall be elevated to prevent moisture corrosion.
  • Keep sealing strips and plastic components away from high-temperature environments to prevent aging and deformation.
  • Store electrical components in their original packaging, protected from moisture and dust, and periodically check for dampness.
  • Storage environment temperature: -10°C to 40°C, relative humidity ≤80%, no condensation.

12.1 Routine Inspection System

Establish a comprehensive inspection system, conduct regular checks and maintenance on the system, identify hidden hazards promptly, and ensure long-term stable operation of the system. Inspections are divided into five levels: daily, weekly, monthly, quarterly, and annual.

12.1.1 Daily Inspection

Performed by data center operations and maintenance personnel, focusing on appearance and operating status:

  • Whether aisle doors are closed properly and free of obstruction.
  • Whether all ceiling panels are closed, shifted, or damaged.
  • Whether lighting is normal and whether any lamps are damaged.
  • Whether the control host has alarm notifications.
  • Whether debris is accumulated in the aisle and whether the environment is normal.
  • Record the temperature and humidity values in the aisle and confirm they are within the normal range.

12.1.2 Weekly Inspection

  • Check whether doors open and close smoothly, without abnormal noise or jamming.
  • Check whether the access control function is normal and card readers respond sensitively.
  • Check whether sealing strips are detached, cracked, or aged.
  • Check whether glass components have cracks or scratches.
  • Check whether the occupancy sensor lighting works normally.
  • Clean dust inside the aisle and maintain a tidy environment.

12.1.3 Monthly Inspection

  • Check whether all fasteners are loose, especially connecting bolts on moving components.
  • Test the manual opening function of skylights to confirm smooth operation.
  • Test the emergency escape door function to ensure the push bar opens flexibly.
  • Test the audible and visual alarm function to confirm normal alarms.
  • Check whether the grounding connection is secure and free of corrosion.
  • Calibrate temperature and humidity sensors and clean dust from probes.
  • Check cables for damage or aging, and verify that cable tray covers are intact.
  • Clean dust from the control host and check cooling fan operation.

12.1.4 Quarterly Inspection

  • Comprehensively check sealing performance, test aisle static pressure, and evaluate the air leakage rate.
  • Apply lubricating oil to moving parts such as skylight drive mechanisms, door tracks, and hinges.
  • Test fire alarm linkage functions: simulate fire alarm signals to verify skylight opening, access control unlocking, and alarm functions.
  • Test backup power endurance to confirm it supports the required duration after power failure.
  • Check electrical insulation of wiring and test grounding resistance.
  • Check the data accuracy of all sensors and perform deviation calibration.
  • Clean the air conditioning supply air outlets to maintain unobstructed airflow.

12.1.5 Annual Comprehensive Maintenance

Performed by the manufacturer’s technical personnel or senior operations and maintenance engineers:

  • Conduct a comprehensive disassembly inspection of the system to evaluate structural component wear and corrosion.
  • Replace aged sealing strips and easily damaged electrical components.
  • Maintain skylight motors and door operator motors: replace lubricating grease and check brush wear.
  • Comprehensively calibrate all sensors and replace sensors with degraded performance.
  • Perform firmware upgrades on the control host and optimize system logic.
  • Conduct comprehensive performance testing, including air leakage rate, static pressure uniformity, temperature uniformity, and linkage response time, to evaluate system performance status.
  • Issue an annual maintenance report with maintenance recommendations and upgrade proposals.

12.2 Periodic Maintenance Content

12.2.1 Structural Component Maintenance

  • Cleaning: Regularly wipe dust and stains from frames, ceiling panels, and door surfaces using neutral cleaners and soft cloths. Strong acids and strong alkalis are strictly prohibited as they can corrode surface coatings.
  • Tightening: Regularly check all connecting bolts and tighten promptly if loose. Increase inspection frequency especially for areas subject to vibration.
  • Anti-corrosion: Check surface coatings on metal components. Touch up paint promptly if peeling or rust is found. In coastal or humid environments, increase the frequency of anti-corrosion treatment.
  • Glass maintenance: Wipe glass surfaces with glass cleaner to maintain transparency. Avoid scratches from sharp objects, and replace promptly if edge chipping is found.

12.2.2 Moving Mechanism Maintenance

  • Lubrication: Apply dedicated lubricating oil quarterly to moving parts such as skylight pivot shafts, door rollers, hinges, and locks to maintain flexible operation and reduce wear. Use low-temperature grease suitable for data center environments.
  • Adjustment: Regularly check belt tension, door lock alignment, and skylight closing clearances. Adjust promptly if deviation occurs to ensure optimal working condition.
  • Dust removal: Clean dust and debris from tracks and guide channels to prevent jamming and wear.

12.2.3 Sealing System Maintenance

  • Regularly clean dust from sealing strip surfaces to maintain elasticity and sealing performance.
  • Check sealing strips for hardening, cracking, or detachment. Replace promptly if aging signs appear. Typically, sealing strips have a service life of 3 to 5 years.
  • Check cable sealing modules regularly. Re-seal after cable changes to ensure sealing effectiveness.
  • Regularly check end wall panels and bottom baffle seals, and reapply sealant at cracked areas.

12.2.4 Electrical System Maintenance

  • Dust cleaning: Clean dust from the control host, sensors, and lighting fixtures every six months to prevent poor heat dissipation and contact issues from dust accumulation. Use anti-static brushes and vacuum cleaners. Cleaning with power connected is strictly prohibited.
  • Terminal tightening: Check all electrical wiring terminals once a year and re-tighten to prevent loosening from long-term thermal expansion and contraction.
  • Power supply check: Regularly test power supply output voltage and check backup battery capacity. Replace promptly if battery capacity is insufficient. Backup batteries typically have a service life of 2 to 3 years.
  • Cable inspection: Check cables for aging, damage, or rodent bite marks, and replace promptly if problems are found.

12.3 Replacement Specifications for Wearing Parts

12.3.1 Sealing Strip Replacement

  • Replacement cycle: After 3 to 5 years of normal use, or when obvious hardening, cracking, or shrinkage occurs.
  • Replacement method:

1. Remove the old sealing strip, clean residual adhesive and dust from the bonding surface, ensuring the surface is clean and flat.

2. Compare the length of the new sealing strip, cut to the appropriate size, and cut the joint ends at a 45° angle for butt joining.

3. Apply dedicated adhesive evenly, align the strip and press firmly.

4. After 24 hours of curing, close the door and ceiling panel, and check the sealing effect.

  • Precautions: Use sealing strips of the same specification and material to ensure consistent sealing performance.

12.3.2 Electromagnetic Lock Replacement

  • Replacement cycle: Replace when insufficient holding force, frequent false release, or coil burnout occurs.
  • Replacement method:

1. Disconnect power, remove the old electromagnetic lock wiring and mounting screws.

2. Install the new electromagnetic lock and adjust alignment so that the lock body and armature plate make full contact when the skylight is closed.

3. Connect the wiring and test the engage and release functions to confirm normal operation.

4. Adjust the holding force to an appropriate value, ensuring firm engagement and smooth release.

12.3.3 Sensor Replacement

  • Replacement cycle: Replace when measurement deviation exceeds standards or when communication faults cannot be repaired.
  • Replacement method:

1. Disconnect sensor power and signal lines, and remove the old sensor.

2. Install the new sensor, secure it firmly, and orient it correctly.

3. Connect wiring correctly and set the same address code.

4. Update the configuration in the control host and calibrate the measured values.

12.3.4 LED Luminaire Replacement

  • Replacement cycle: Replace when the light source is damaged or light decay is severe.
  • Replacement method:

1. Disconnect the lighting power.

2. Remove the luminaire cover and mounting screws, and remove the old luminaire.

3. Install the new luminaire, connect the power wires, noting positive and negative polarity.

4. Energize and test, confirm normal illumination, then reinstall the cover.

12.4 Repair Work Procedure

  • Fault reporting: After a fault is discovered, operations personnel record the fault phenomenon, occurrence time, and impact scope, and submit a repair request.
  • Fault diagnosis: Repair personnel arrive on site and determine the fault cause and fault point through observation, testing, and analysis.
  • Repair plan: Develop a repair plan based on the fault condition. Repairs involving structural changes or replacement of critical components require approval from the technical supervisor.
  • Repair implementation: Perform the repair according to the plan with proper safety protection, work with power disconnected, and replace parts with qualified components of the same specification.
  • Testing and verification: After repair completion, energize and test functionality to confirm the fault is eliminated and the system has returned to normal.
  • Record and archive: Fill in repair records detailing the fault cause, handling process, replaced components, and repair results. Save in the equipment archive.
  • Follow-up: Monitor operation for 24 hours after repair to confirm no recurrence of the fault.

12.5 Repair Safety Regulations

  • Electrical repairs must be performed with power disconnected, with safety tags posted and voltage verification performed to confirm no power before operating.
  • Use qualified climbing tools for elevated repairs, wear safety belts, and arrange for a person to monitor below.
  • When replacing glass components, wear protective gloves and safety goggles to prevent injury from glass breakage.
  • When repairs involve fire alarm linkage functions, notify the fire control room and take protective measures to prevent accidental fire suppression discharge.
  • After repairs, clean the site with no leftover tools or debris, and restore the system to normal operating state.
  • Major fault repairs require a dedicated safety plan, and construction may only proceed after safety measures are implemented.

12.6 Maintenance Record Management

  • Establish a system equipment archive recording equipment models, installation dates, configuration parameters, and maintenance records.
  • Each inspection, maintenance, and repair must be recorded in detail, signed for confirmation, and archived for reference.
  • Record content includes: time, personnel, inspection items, operating status, problems found, handling measures, replaced components, and test data.
  • Regularly analyze maintenance records, summarize fault patterns, optimize maintenance cycles and plans, and achieve preventive maintenance.

13.1 Structural and Sealing Faults

Problem 1: Low cold aisle static pressure, poor cooling effect

  • Phenomenon: The pressure differential gauge shows aisle static pressure below 5 Pa, insufficient cabinet inlet air volume, and high temperatures at upper equipment.
  • Cause analysis:
  • Insufficient air conditioning supply air volume, inadequate supply air pressure.
  • Significant air leakage points in the aisle, severe cold air leakage.
  • Low cabinet perforation rate, or cabinet inlet air blocked.
  • Insufficient raised floor supply air openings, obstructed cold air delivery.
  • Troubleshooting steps:

1. First check the air conditioning supply air volume and supply static pressure to confirm normal cooling output.

2. Inspect sealing areas along the aisle one by one, focusing on whether doors are closed tightly, ceiling panels are properly covered, end wall panels have gaps, and cable openings are sealed.

3. Check whether cabinet front door ventilation holes are blocked by debris or paper, and whether blanking panels are installed properly.

4. Check the floor opening rate and supply air outlet positions beneath the aisle.

  • Solutions:
  • If supply air volume is insufficient, adjust the air conditioning fan speed to increase supply air volume.
  • Locate air leakage points and perform targeted sealing: close doors tightly, reposition ceiling panels, apply sealant to gaps, replace damaged sealing strips, and re-seal cable openings.
  • Clean cabinet air inlets and install missing blanking panels to ensure unobstructed ventilation.
  • Increase the number of supply air floor panels, adjust supply outlet layout, and optimize airflow paths.
  • Preventive measures: Regularly inspect sealing status, keep doors normally closed, and regularly clean supply air outlets and cabinet inlet surfaces.

Problem 2: Uneven temperature in the aisle, local hot spots

  • Phenomenon: Large temperature differences at different positions in the aisle, with noticeably higher inlet air temperatures at some cabinets, creating local hot spots.
  • Cause analysis:
  • Uneven supply air outlet distribution, high airflow at near end and low at far end.
  • Severe local air leakage, excessive cold air loss at that position.
  • Uneven cabinet load distribution, with high-load cabinets concentrated in one area.
  • Obstructions in the aisle structure causing uneven airflow distribution.
  • Troubleshooting steps:

1. Draw an aisle temperature distribution map to locate the exact position of hot spots.

2. Check for air leakage points near hot spots and whether supply air outlets are blocked.

3. Verify cabinet load distribution to confirm whether loads are concentrated.

4. Check for obstructions in the aisle affecting airflow.

  • Solutions:
  • Adjust supply air outlet layout, add outlets at the far end to balance airflow distribution.
  • Seal air leakage points in hot spot areas to increase local static pressure.
  • Optimize cabinet layout by distributing high-load cabinets to avoid concentration.
  • Remove airflow obstructions in the aisle to maintain smooth airflow.
  • Preventive measures: Distribute loads evenly when deploying cabinets, and regularly inspect supply air and sealing conditions.

Problem 3: Condensation on ceiling panel glass

  • Phenomenon: Condensation forms on the inner surface of ceiling panel glass, producing water droplets that fall onto cabinet equipment.
  • Cause analysis:
  • Supply air temperature in the aisle is too low with high humidity, and the glass temperature is below the dew point.
  • Data center ambient humidity exceeds limits, with insufficient dehumidification capacity.
  • Poor ceiling panel insulation, with glass temperature close to aisle temperature.
  • Troubleshooting steps:

1. Measure the supply air temperature and relative humidity in the aisle and calculate the dew point temperature.

2. Measure the glass surface temperature and compare it with the dew point temperature.

3. Check the operation status of the data center dehumidification system.

  • Solutions:
  • Appropriately increase the air conditioning supply air temperature, avoiding excessively low temperatures while meeting cooling requirements.
  • Activate the data center dehumidification function to reduce ambient relative humidity, controlling humidity in the 40%~60% range.
  • Replace with insulated ceiling panels or apply insulating film on the inner side of the glass to raise the glass surface temperature.
  • Preventive measures: Set supply air temperature reasonably and control data center humidity within appropriate range.

Problem 4: Doors do not close tightly, large gaps causing air leakage

  • Phenomenon: After doors close, the surrounding gaps are uneven, with some gaps being large and noticeable air leakage.
  • Cause analysis:
  • Door frame installed out of plumb, excessive verticality deviation.
  • Door deformation, or roller wear causing the door to sag.
  • Sealing strips aged and shrunk, or detached and missing.
  • Debris blocking the floor track, preventing the door from closing fully.
  • Troubleshooting steps:

1. Check the verticality and levelness of the door frame.

2. Check door roller and track wear, and whether the door is tilted.

3. Check the integrity of sealing strips.

4. Clean debris from the track and test whether the door can close fully.

  • Solutions:
  • Re-adjust the verticality of skewed door frames.
  • Adjust roller height to restore the door to level; replace severely worn rollers.
  • Replace aged and damaged sealing strips and bond them firmly.
  • Clean dust and debris from the track and apply lubricating oil.
  • Preventive measures: Regularly clean tracks, lubricate rollers, and check the condition of sealing strips.

Problem 5: Ceiling panel displacement, risk of falling

  • Phenomenon: Ceiling panel positions are offset with insufficient overlap, presenting a risk of sliding off.
  • Cause analysis:
  • Panels not properly seated during installation, insufficient overlap.
  • External impact or vibration caused panel displacement.
  • Crossbeam installed not level, causing panels to slide to one side.
  • Troubleshooting steps:

1. Check the overlap length on both sides of each ceiling panel to confirm it is even and sufficient.

2. Check crossbeam levelness.

3. Confirm whether external impact has occurred.

  • Solutions:
  • Reposition ceiling panels to center, with even overlap on both sides.
  • Adjust crossbeam levelness if not level.
  • Install limit stops on both sides of ceiling panels to prevent displacement and sliding.
  • Preventive measures: Impact on ceiling panels is strictly prohibited; regularly check ceiling panel positions.

13.2 Electrical Control Faults

Problem 6: System completely without power, no equipment response

  • Phenomenon: After connecting power, the control host has no display, and all equipment is non-functional.
  • Cause analysis:
  • Data center utility power outage, or main distribution panel breaker tripped.
  • System main air circuit breaker tripped or damaged.
  • Main power circuit open circuit, loose wiring.
  • Control host power module damaged.
  • Troubleshooting steps:

1. Check whether data center power supply is normal and whether other equipment is powered.

2. Check the status of the distribution panel and system main breaker to see if tripped.

3. Use a multimeter to measure the voltage at the main breaker input and output terminals to confirm voltage output.

4. Check main power circuit wiring terminals for looseness or burning.

5. After confirming normal upstream power, measure the voltage at the control host power input.

  • Solutions:
  • For utility power outage, switch to backup UPS power and wait for utility power restoration.
  • For tripped breakers, first troubleshoot the short-circuit cause, then re-close after eliminating the fault.
  • Re-tighten loose wiring; replace burned terminals.
  • Replace damaged power modules with the same specification.
  • Preventive measures: Regularly tighten wiring terminals, check breaker status, and provide lightning and surge protection.

Problem 7: Lighting not working or partially not working

  • Phenomenon: All lighting in the aisle is off, or individual luminaires are not lit.
  • Cause analysis:
  • Lighting circuit breaker tripped, or power supply fault.
  • Luminaire driver power supply damaged.
  • LED chips burned out, luminaire damaged.
  • Loose wiring, open circuit.
  • Occupancy sensor fault, incorrectly judging no personnel present.
  • Troubleshooting steps:
  • All off: First check whether the lighting circuit breaker has tripped and measure the power supply output voltage.
  • Partial off: Check the wiring of the corresponding luminaire and test whether input voltage is normal.
  • Check the occupancy sensor; test whether manual switching of lighting works, to rule out sensor control issues.
  • Solutions:
  • For tripped breakers, troubleshoot the short-circuit point and re-close after handling.
  • Reconnect loose wiring.
  • Replace damaged driver power supplies or luminaires with the same specification.
  • Replace faulty sensors.
  • Preventive measures: Use quality LED luminaires with stable power supply, and avoid frequent switching.

Problem 8: Skylights cannot open normally

  • Phenomenon: After an opening signal is given, skylights do not actuate, or do not open fully.
  • Cause analysis:
  • Electromagnetic lock fault, not energized or coil burned out, remaining engaged.
  • Control circuit fault, no opening signal output.
  • Skylight pivot shaft jammed, excessive mechanical resistance.
  • Foreign objects blocking skylight rotation.
  • Fire alarm linkage signal not delivered properly.
  • Troubleshooting steps:

1. First test manually: release the electromagnetic lock with power disconnected and see if the skylight can open by gravity.

2. If it can open manually: Check the electrical control section, measure the electromagnetic lock voltage, and verify whether the control signal is normal.

3. If it also binds manually: Check the mechanical structure, pivot shafts, and linkages for deformation or jamming, and check for foreign objects.

  • Solutions:
  • Remove foreign objects blocking operation.
  • For mechanical jamming, adjust pivot shafts and linkages and apply lubricating oil.
  • Replace damaged electromagnetic locks.
  • For control circuit faults, troubleshoot the control module and wiring; repair or replace the control module.
  • Preventive measures: Regularly lubricate moving mechanisms and regularly test skylight opening functions.

Problem 9: Skylights cannot close and reset

  • Phenomenon: After skylights open, the reset operation cannot close them, or they cannot lock after closing.
  • Cause analysis:
  • Reset motor fault, no power supply or motor damaged.
  • Drive mechanism slipping or detached.
  • Skylight position offset, misalignment.
  • Electromagnetic lock position offset, unable to align and engage.
  • Travel limit switch fault, motor stops prematurely.
  • Troubleshooting steps:

1. Measure the reset motor supply voltage to confirm voltage output.

2. Check whether drive belts and gears are intact, with no slipping or detachment.

3. Observe the skylight travel path for offset or jamming.

4. Check whether the electromagnetic lock and armature plate are properly aligned and whether the gap is excessive.

5. Check the travel limit switch position for premature triggering.

  • Solutions:
  • If no motor power, troubleshoot the control circuit and wiring.
  • Replace damaged motors.
  • Adjust belt tension if loose; replace if damaged.
  • Adjust skylight and electromagnetic lock positions for accurate alignment with an engagement gap of ≤1mm.
  • Adjust the travel limit switch position to ensure the motor stops only after the skylight is fully closed.
  • Preventive measures: Regularly inspect the drive mechanism, adjust belt tension, and calibrate limit switches.

Problem 10: Access control system malfunction, card cannot open door

  • Phenomenon: After swiping the card, the access control system has no response and the door cannot be opened.
  • Cause analysis:
  • Access control power supply fault, no power.
  • Card reader damaged, or loose wiring.
  • Access control controller fault.
  • Electric lock damaged, unable to unlock.
  • Card invalid or lost permissions.
  • Troubleshooting steps:

1. Check the access control power indicator to confirm normal power supply.

2. Observe whether the card reader responds when swiping the card and whether the indicator light flashes.

3. Measure the voltage at the electric lock terminals to see if an unlock voltage is output when swiping the card.

4. Test whether the exit button can open the door, to determine whether the issue is with the card reader or the controller/electric lock.

  • Solutions:
  • Repair or replace the access control power supply for power faults.
  • Re-tighten loose wiring.
  • Replace damaged card readers.
  • Replace damaged electric locks.
  • Re-authorize cards for permission issues.
  • Preventive measures: Regularly clean card readers, prevent water ingress and moisture, and standardize card management.

Problem 11: Sensor data inaccurate or no data

  • Phenomenon: Sensor values on the control host show obvious deviation, or display offline with no data.
  • Cause analysis:
  • Sensor power supply fault.
  • Communication line open circuit, short circuit, or wiring error.
  • Sensor address conflict or parameter error.
  • Sensor probe covered with dust or damaged, causing inaccurate measurement.
  • Control host communication port fault.
  • Troubleshooting steps:
  • Single sensor abnormal: Check the sensor power supply, wiring, and address settings.
  • All sensors abnormal: Check bus power supply, communication lines, and host port.
  • Inaccurate data: Use standard instruments for comparative measurement to confirm the deviation magnitude.
  • Solutions:
  • Repair power supply wiring for power issues.
  • Correct wiring errors; replace damaged cables.
  • Resolve address conflicts by re-setting sensor addresses.
  • Clean dirty sensor probes; replace damaged sensors.
  • Replace the communication module for host port faults.
  • Preventive measures: Regularly clean sensors, check wiring, and calibrate measurement accuracy periodically.

13.3 Fire Alarm Linkage Faults

Problem 12: Skylights do not actuate after fire alarm signal is triggered

  • Phenomenon: After simulating a fire alarm signal input, the skylights do not open.
  • Cause analysis:
  • Fire alarm signal line open circuit, signal not delivered.
  • Fire alarm linkage module fault, no control signal output.
  • Linkage logic incorrectly configured, single signal not triggering.
  • Skylight electromagnetic lock circuit fault.
  • Skylight mechanical jamming.
  • Troubleshooting steps:

1. Measure the input terminal of the linkage module to confirm the fire alarm signal is received correctly.

2. Measure the module output terminal to check whether a control signal is output when triggered.

3. Check the linkage logic configuration to confirm the trigger conditions.

4. Manually test skylight opening to rule out mechanical faults.

  • Solutions:
  • Repair open circuits in the fire alarm signal line.
  • Replace damaged linkage modules.
  • Reconfigure linkage parameters for logic errors.
  • Troubleshoot and repair electromagnetic lock circuit faults.
  • Handle mechanical jamming as described in previous methods.
  • Preventive measures: Test fire alarm linkage functionality quarterly to ensure it remains effective.

Problem 13: Skylights open falsely, opening by themselves without fire alarm signal

  • Phenomenon: During normal operation, skylights open automatically for no reason, without any alarm.
  • Cause analysis:
  • Electromagnetic lock power supply fault, unexpected power loss.
  • Insufficient electromagnetic lock holding force, accidentally released.
  • Linkage module false actuation, erroneous opening signal output.
  • Line interference, false trigger signal.
  • Someone manually triggered the emergency open button.
  • Troubleshooting steps:

1. Check whether there was human operation and whether the emergency button was touched.

2. Measure the electromagnetic lock supply voltage to check for power interruption.

3. Check the linkage module output for false triggering.

4. Check lines for short circuits or interference.

  • Solutions:
  • For accidental human operation, provide protection to prevent accidental pressing of the emergency button.
  • For unstable power supply, optimize the supply circuit and add voltage stabilization measures.
  • For insufficient electromagnetic lock holding force, adjust the gap or replace the lock.
  • For line interference, add filtering devices and ensure the shielding layer is reliably grounded.
  • Replace the linkage module for module faults.
  • Preventive measures: Optimize line anti-interference design and regularly check electromagnetic lock status.

13.4 Operation and Maintenance Usage Problems

Problem 14: System air leakage rate increases year over year

  • Phenomenon: After several years of operation, static pressure gradually decreases, cooling effectiveness declines, and the air leakage rate exceeds standards.
  • Cause analysis:
  • Sealing strips aged, shrunk, or cracked, with degraded sealing performance.
  • Frequent door opening/closing causes door seal wear and larger gaps.
  • After cable changes, openings were not re-sealed, leaving gaps.
  • Structural components slightly deformed, with larger joints.
  • Cabinet movement causing larger joint gaps.
  • Troubleshooting steps:

1. Comprehensively inspect all sealing areas, focusing on sealing strip condition.

2. Check cable openings, doors, ceiling panels, and other leak-prone locations.

3. Check whether cabinets and frames have shifted.

  • Solutions:
  • Comprehensively replace aged sealing strips.
  • Re-seal all cable openings.
  • Adjust doors and frames to reduce gaps.
  • Reposition and secure moved cabinets.
  • Seal leak points one by one until the air leakage rate meets standards.
  • Preventive measures: Regularly replace sealing strips, seal promptly after cable modifications, and conduct regular inspections.

Problem 15: High dust levels in the aisle, rapid dust accumulation on equipment

  • Phenomenon: Dust is significant inside the cold aisle, and server inlet filter screens quickly accumulate dust and become blocked.
  • Cause analysis:
  • Poor air filtration in the data center, high dust content in fresh air.
  • High dust accumulation beneath the raised floor, carried in with cold air.
  • Poor aisle sealing, allowing dust-laden outside air to infiltrate.
  • Improper data center cleaning methods, raising dust that enters the aisle.
  • Troubleshooting steps:

1. Check the air conditioning filters and fresh air filtration devices in the data center.

2. Check cleanliness beneath the raised floor.

3. Check the sealing condition of the aisle.

  • Solutions:
  • Regularly replace air conditioning filter screens and upgrade the air filtration level.
  • Regularly clean dust beneath the raised floor.
  • Improve aisle sealing to reduce outside air infiltration.
  • Use wet cleaning methods to avoid dust, and close aisle doors during cleaning.
  • Preventive measures: Regularly clean the data center environment, replace filter consumables, and maintain aisle sealing.

14.1 Product Basics

Q1: What is the difference between a double-row cold aisle and a single-row cold aisle, and what scenarios are they suitable for respectively?

A: A double-row cold aisle consists of two rows of face-to-face cabinets forming an enclosed cold aisle. It offers high space utilization, with more cabinets served per unit length of aisle, and is suitable for large and medium-sized data centers with many cabinets. It is the mainstream application form. A single-row cold aisle encloses along the front of one row of cabinets, typically arranged against a wall, and is suitable for small data centers or retrofit scenarios with limited space and fewer cabinets. For the same number of cabinet positions, the double-row solution offers lower cost and better energy-saving results.

Q2: After the cold aisle is enclosed, does the hot aisle need to be enclosed as well?

A: In the standard solution, only the cold aisle is enclosed. Keeping the hot aisle open meets the cooling requirements of the vast majority of scenarios. Cold aisle containment already achieves the primary separation of cold and hot airflow, with cold air utilization rates of over 95%. For ultra-high-density scenarios (above 15kW per cabinet) or extreme energy-efficiency requirements, the hot aisle can also be enclosed simultaneously to further reduce hot airflow diffusion, raise return air temperature, and improve energy efficiency by another 5%~10%, although costs and fire protection complexity increase accordingly.

Q3: Can your cold aisle accommodate cabinets from other brands?

A: Yes. Our cold aisle system uses standardized design and is compatible with all 19-inch server cabinets conforming to the IEC 60297 standard. Mainstream brand cabinets with widths of 600mm, depths of 1000/1100/1200mm, and heights of 42U/47U are all perfectly compatible. For non-standard size cabinets, we can also provide customized solutions to ensure sealing effectiveness.

Q4: Does the cold aisle system have requirements for the air conditioning supply air method in the data center? Can both underfloor supply and overhead supply be used?

A: Both can be used. The underfloor supply method with raised floor, where cold air is delivered from floor outlets at the bottom of the aisle, is the most classic combination, providing uniform airflow distribution and optimal results. The overhead supply method delivers cold air through ducts to the top of the aisle, which can also achieve good results and is suitable for data centers without raised floors. In-row air conditioning with horizontal supply is also compatible and offers faster cooling response, making it suitable for high-density scenarios. Our system can optimize sealing and airflow design according to different supply air methods.

Q5: Will installing a cold aisle affect the data center fire protection acceptance inspection?

A: No. Our cold aisle system is designed in strict compliance with national fire protection codes. It is equipped with fire alarm linkage automatic skylight opening, which opens automatically in the event of a fire without affecting the operation of the gas-based fire suppression system, fully complying with the requirements of GB 50174 “Code for Design of Data Centers.” The product has passed fire protection-related testing and can support smooth project acceptance through fire protection inspection.

14.2 Installation and Construction

Q6: How long does it take to install a double-row cold aisle, and will it affect existing business operations?

A: Taking a standard 10-cabinet-position double-row cold aisle as an example, with site conditions in place, the main installation can be completed in 1 day, plus wiring and commissioning, totaling 2 to 3 days. For existing data center retrofit projects, we use modular installation methods, with most work performed during low business activity periods. Core enclosure work can be completed quickly during maintenance windows, with minimal impact on existing business — typically without requiring downtime. Before construction, we develop a detailed implementation plan to minimize impact on business.

Q7: What conditions must a data center meet to install a cold aisle?

A: The main requirements are: ① Cabinets are installed, secured, neatly arranged, and in a face-to-face layout; ② The data center has stable utility power supply; ③ The fire protection system has reserved linkage signal interfaces; ④ The aisle space is free of obstructions with adequate working space for construction. For new data centers, it is recommended to construct after cabinet installation and before equipment racking for maximum convenience.

Q8: What is the appropriate aisle width, is wider always better?

A: Wider is not always better. The standard aisle width is 1200mm, which is the optimal size balancing access, cabling, and airflow effectiveness. It accommodates personnel and cart passage while establishing stable static pressure with a smaller supply air volume, providing the best energy efficiency. Aisle widths that are too wide result in excessive space, making it difficult to establish stable static pressure, increasing airflow requirements and reducing energy efficiency. Aisle widths that are too narrow create maintenance access problems. Special scenarios may select widths of 1000mm or 1500mm, which need to be designed based on actual conditions.

Q9: Can people walk on top of the cold aisle, and how much load can it bear?

A: The cold aisle ceiling panels are designed for maintenance loads with a uniformly distributed load capacity of 50kg/㎡. They only allow maintenance personnel to step on briefly for overhead work. Long-term storage of heavy items is strictly prohibited. Glass ceiling panels prohibit single-point loading, and load-spreading boards must be laid when stepping on them. Routine maintenance should be performed inside the aisle whenever possible, and overhead work requires appropriate safety protection.

14.3 Operation and Maintenance

Q10:Is daily maintenance of the cold aisle labor-intensive? Does it require dedicated personnel?

A:The workload is very small. The cold aisle is a purely mechanical structure with simple electrical components, offering high reliability. Daily maintenance only requires routine visual inspection of appearance and status, simple checks monthly, a linkage test quarterly, and comprehensive maintenance annually. No dedicated full-time personnel are required. Ordinary data center operations staff can manage it after simple training.

Q11:How often should the cold aisle sealing strips be replaced? Is replacement troublesome?

A:Under normal data center environmental conditions, sealing strips have a service life of 3 to 5 years, varying slightly depending on ambient temperature, UV intensity, and door opening frequency. Replacement is simple: peel off the old strips, clean the surface, and apply new strips. Operations staff can perform replacement independently. We also provide spare parts and technical guidance.

Q12:What if the glass ceiling panel breaks? Will it injure people or damage equipment?

A:The ceiling panels use tempered safety glass. Even when shattered, they form granular, blunt-edged fragments rather than sharp, jagged large pieces of glass, and will not cause serious injury. Additionally, the glass is supported by the frame beneath, so fragments will not fall directly and damage equipment. Avoid impacts and falling objects during daily use. In the event of breakage, contact the manufacturer to replace with a same-specification panel. Replacement is quick and convenient.

Q13:What happens during a power outage? Can the doors be opened? What happens to the ceiling skylights?

A:The system is equipped with a standard backup power supply, maintaining lighting, access control, and control system operation for more than 30 minutes after a power failure. Doors can be manually pushed open after power loss, and emergency exit doors can be opened via push bar, ensuring personnel passage is unaffected. The skylights feature a power-loss-open design—when power is interrupted, the electromagnetic locks release and the skylights automatically open, ensuring ventilation and safety. After power is restored, they can be manually reset.

Q14:How should system alarms be handled?

A:First, check the alarm type:

  • Temperature/humidity out of range:Check whether the air conditioning is operating normally, whether channel doors are left open, and whether there is a sudden increase in equipment load.
  • Differential pressure too low:Check whether any doors are open, sealing has detached, or there are air leakage points.
  • Equipment fault:Correspondingly check the status of skylights, access control, sensors, and other equipment.

Handle simple issues on-site; for complex issues, contact the manufacturer’s technical support. We provide remote guidance and on-site repair services.

14.4 Technical Performance

Q15:Can the cold aisle really save 30% energy? What PUE can be achieved?

A:Energy savings are based on the original data center conditions. For traditional open data centers with severe cold/hot air mixing and low cooling utilization efficiency, a 25%–40% reduction in air conditioning energy consumption after installing a cold aisle is a common measured result, corresponding to an overall PUE reduction of 0.3–0.6. For example, a data center with an original PUE of 1.8 can typically be reduced to 1.3–1.5 after retrofitting—a very significant energy-saving effect. The specific savings rate depends on original facility condition, load rate, and air conditioner type. We can provide energy-saving calculations before project commencement.

Q16:What level is a 3% air leakage rate? What is the industry average?

A:A 3% air leakage rate represents an excellent industry level. Cold aisles from ordinary manufacturers typically have air leakage rates of 5%–10%, with some simple solutions even higher. For every 1% reduction in air leakage rate, air conditioner energy efficiency improves by approximately 2%. A lower air leakage rate means better sealing performance and energy savings. Through multi-layer sealing design and precision installation, we ensure the system air leakage rate is controlled within 3%.

Q17:Is a 3-second fire linkage skylight response time fast enough? What does the standard require?

A:National standards require that enclosed aisles open quickly in the event of fire to ensure fire suppression media enters promptly. Our product fully opens within 3 seconds, far faster than the industry-common 5–10 second level. This quickly opens the aisle in the early stages of a fire, ensuring fire suppression effectiveness while allowing more time for personnel evacuation, providing higher safety.

Q18:What is the system service life?

A:The main structure (aluminum alloy frame, steel components) has a service life of over 20 years under normal usage conditions. Electrical components and wear parts (sealing strips, motors, sensors, etc.) have a service life ranging from 3 to 8 years and can be periodically replaced and maintained, which does not affect the long-term use of the overall system. The product comes with a 1-year free warranty and lifetime maintenance service.

14.5 Procurement and Service

Q19:What is the procurement process? Can you provide on-site surveys?

A:The process is as follows:① Requirements communication—understand the data center conditions and needs;② Free on-site survey—measure dimensions, confirm the solution;③ Issue design proposal and quotation;④ Confirm contract—factory production commences;⑤ On-site installation and commissioning;⑥ Acceptance and handover—warranty period begins. We provide free survey and solution design services covering major cities nationwide.

Q20:What is the warranty period? How is after-sales service guaranteed?

A:The product has a 1-year free warranty period. During the warranty period, non-human-induced damage is repaired and components replaced free of charge. After the warranty expires, a maintenance agreement can be signed to provide lifetime maintenance services. We have a professional technical support team, with a service hotline providing 7×12 hour response. Common issues are resolved through remote guidance, and major issues receive on-site service within 48 hours (24 hours in core cities). Spare parts are abundantly stocked for rapid supply.

15.1 Acceptance Basis

  • Relevant national standards and specifications:《Data Center Design Specification》 GB 50174-2017,《Electronic Information System Computer Room Construction and Acceptance Specification》 GB 50462-2008,《Ventilation and Air Conditioning Engineering Construction Quality Acceptance Specification》 GB 50243-2016,《Building Electrical Engineering Construction Quality Acceptance Specification》 GB 50303-2015, etc.
  • Project design drawings, technical solutions, and contract technical requirements.
  • This product manual and manufacturer technical standards.
  • Equipment delivery list and factory inspection reports.

15.2 Acceptance Stage Division

Acceptance is divided into four stages:factory acceptance, incoming acceptance, process acceptance, and final completion acceptance.

15.2.1 Factory Acceptance

After product production is completed and before shipment, factory acceptance may be conducted at the factory:

  • Verify product configuration, model, and quantity match the contract.
  • Inspect appearance quality and workmanship.
  • Randomly inspect key component performance parameters.
  • Verify factory inspection reports and certificates of conformity.
  • Upon passing acceptance, sign for confirmation and arrange shipment.

15.2.2 Incoming Acceptance

After goods arrive at the project site, incoming acceptance is conducted:

  • Check component quantity, specifications, and models against the packing list.
  • Inspect whether packaging is intact and whether components have shipping damage, deformation, corrosion, or glass breakage.
  • Verify that accompanying documentation (certificates of conformity, manuals, inspection reports) is complete.
  • Complete the equipment incoming acceptance form with signatures from both parties.
  • Non-conforming components must be promptly returned or exchanged and must not be used for installation.

15.2.3 Process Acceptance

During the installation and construction process, phased acceptance is conducted for key work procedures:

  • Frame installation acceptance:After main frame installation, verify verticality, levelness, straightness, and firmness.
  • Sealing engineering acceptance:After sealing system installation, verify sealing integrity and conduct a preliminary check for air leakage.
  • Electrical wiring acceptance:After wiring completion, verify wiring workmanship, connection quality, insulation resistance, and grounding resistance.

Only after the previous procedure passes acceptance may the next procedure proceed.

15.2.4 Final Completion Acceptance

After the entire system installation and commissioning is complete and a 72-hour trial operation passes, the final completion acceptance is conducted. This is the core stage for comprehensively assessing system performance and quality.

15.3 Completion Acceptance Items and Standards

15.3.1 Structure and Appearance Acceptance

Acceptance Item Acceptance Standard Inspection Method
Overall layout Consistent with design drawings, aisle width deviation ≤5mm Steel tape measure
Column verticality Deviation ≤1mm/m, total height ≤2mm Spirit level, plumb bob
Beam levelness Deviation ≤1mm/m, total length ≤3mm Laser level
Structural firmness No looseness or wobble, all connecting bolts fully tightened Manual inspection, torque spot check
Ceiling panel installation Centered position, uniform overlapping, gaps ≤2mm, no damage Visual inspection, feeler gauge
Door installation Smooth opening/closing, uniform gaps, tight seal when closed Visual inspection, tactile test
Surface appearance Uniform coating, no scratches, deformation, corrosion, glass intact Visual inspection
Sealing strips Firmly adhered, no detachment or cracking, uniform compression Visual inspection

15.3.2 Electrical System Acceptance

Acceptance Item Acceptance Standard Inspection Method
Wiring workmanship Horizontal and vertical routing, neat bundling, clear labeling, separation of power and signal cables Visual inspection
Connection quality Terminals firmly crimped, no loose connections, wire numbers clearly matched Visual inspection, pull test
Insulation resistance Power circuits ≥0.5MΩ, signal circuits ≥0.2MΩ Megohmmeter test
Grounding resistance ≤4Ω Ground resistance tester
Supply voltage AC220V±10%, DC24V±5% Multimeter test
Lighting function All lights operate, illuminance ≥300lx, sensor and manual control functional Lux meter, functional test
Access control function Accurate authentication, smooth unlocking, complete records Actual operation test
Sensor function Accurate data, normal communication, effective alarm function Standard instrument comparison test

15.3.3 Fire Linkage Acceptance

Acceptance Item Acceptance Standard Inspection Method
Skylight opening response time ≤3s Stopwatch test, timing starts from signal trigger
Skylight opening angle ≥80° Angle gauge measurement
Linkage logic Dual-signal trigger, single signal alarm only Simulated signal test
Access control linkage Automatic unlock on fire alarm Simulated fire alarm test
Audible/visual alarm Normal audible and visual warning after trigger Functional test
Status feedback Status signal accurately fed back to fire alarm host Check fire alarm host display
Reset function Normal reset and lock after fire alarm is cleared Operation test

15.3.4 Airflow Performance Acceptance

Acceptance Item Acceptance Standard Inspection Method
Aisle static pressure 5~10Pa, point deviation ≤1Pa Micro-differential pressure gauge, multi-point measurement
Temperature uniformity Aisle temperature difference ≤2℃, cabinet top-to-bottom difference ≤3℃ Multi-point temperature/humidity recorder deployment test
System air leakage rate ≤3% Air volume difference method calculation
Smoke test No obvious external leakage, orderly airflow Smoke visualization observation
Cabinet inlet air temperature Meets design requirements, no local hot spots Deployment test at cabinet inlet face

15.3.5 Documentation Acceptance

Complete technical documentation must be handed over at acceptance, including:

  • Product certificates of conformity and factory inspection reports
  • System installation manual, operation and maintenance manual
  • Electrical schematic diagrams, wiring diagrams, installation drawings
  • Installation self-inspection records, commissioning records, trial operation records
  • Spare parts list, tool list
  • Acceptance test reports
  • Other relevant technical documents

15.4 Acceptance Process

1. Acceptance application:After construction and commissioning are complete and self-inspection passes, the construction party submits the completion acceptance application and acceptance documentation to Party A.

2. Acceptance team formation:Organized by Party A, with the construction party, supervision party, and manufacturer jointly participating in the acceptance team.

3. On-site acceptance:Conduct item-by-item on-site testing and inspection according to the acceptance items, recording test data.

4. Rectification of issues:For issues found during acceptance, the construction party rectifies within a specified period, followed by re-inspection after rectification is complete.

5. Acceptance conclusion:When all items pass and documentation is complete, all parties sign the completion acceptance report, and the system is officially handed over for use.

6. Warranty handover:After acceptance passes, the warranty period begins, and the manufacturer transfers after-sales service contact information.

15.5 Acceptance Qualification Determination

  • Acceptance is deemed qualified when all acceptance items fully meet the standard requirements.
  • If general non-conforming items appear that do not affect the system’s main functions or safety, and re-inspection passes after rectification, the acceptance may be deemed qualified.
  • If serious non-conforming items appear that affect the system’s core functions or pose safety hazards, the system must be rectified to a qualified state before acceptance can pass.
  • A 72-hour continuous trial operation without faults and stable performance indicators is a necessary condition for acceptance qualification.

15.6 Acceptance Dispute Handling

  • When parties involved in acceptance have disputes over results, resolution shall be based on national standards and contract agreements through consultation.
  • When disputes arise over performance test data, an independent third-party testing institution may be commissioned for testing, with the third-party report prevailing.
  • If consultation fails, disputes shall be resolved according to the dispute resolution method specified in the contract.

15.7 Acceptance Record Forms

During the acceptance process, standardized forms including the《Cold Aisle System Installation Acceptance Record Form》《Performance Test Record Form》and《Fire Linkage Test Record Form》shall be completed. All data shall be truthfully recorded, signed and confirmed by all participating personnel, and archived as project completion documentation.

16.1 Search Keyword Classification

16.1.1 Core Primary Keywords

  • Double-row cold aisle containment system
  • Cold aisle containment system
  • Double-row cold aisle
  • Data center cold aisle
  • Cold aisle system

16.1.2 High-Conversion Long-Tail Keywords

  • Double-row cold aisle containment system manufacturer
  • Double-row cold aisle installation wiring and commissioning
  • Data center double-row cold aisle containment system price
  • Guangdong cold aisle containment system manufacturer
  • Data center cold aisle containment system solution
  • Double-row cold aisle fire linkage skylight
  • Data center cold aisle retrofit construction
  • Modular cold aisle containment system
  • Intelligent cold aisle containment system
  • Underfloor supply cold aisle containment system

16.1.3 Industry Traffic Keywords

  • Data center cold aisle
  • Data center airflow organization optimization
  • Cold/hot aisle containment
  • Data center energy-saving retrofit
  • Green data center construction
  • Data center PUE reduction solution
  • Data center infrastructure
  • Data center sealed cold aisle
  • Cold pool containment system
  • Micro-module cold aisle

16.1.4 Brand-Specific Keywords

  • KITOZER cold aisle
  • Guangdong KITOZER cold aisle containment system
  • KITOZER smart data center cold aisle
  • LAC series cold aisle
  • KITOZER double-row cold aisle

16.1.5 Dropdown/Related Search Keywords

  • Double-row cold aisle working principle
  • Double-row cold aisle technical parameters
  • Cold aisle containment system installation steps
  • Cold aisle fire linkage requirements
  • Cold aisle air leakage rate standard
  • Appropriate cold aisle static pressure
  • Cold aisle daily maintenance
  • Cold aisle common fault handling
  • Cold aisle acceptance standard specification
  • Difference between cold aisle and hot aisle

16.2 SEO Optimization Tag System

16.2.1 Page Core Optimization Tags

  • Page core theme:Double-Row Cold Aisle Containment System Installation, Wiring, and Commissioning Manual_Guangdong KITOZER Smart Data Center Equipment Co., Ltd.
  • Core keyword density:Core primary keyword density controlled at 2%–3%, long-tail keywords naturally distributed
  • Content length:Extensive technical documentation to meet deep content indexing requirements
Scroll to Top