LA-P Series Steel Plate Modular Shielding Enclosure Product Manual

The LA-P series steel plate modular shielding enclosure is positioned in the mid-to-high-end electromagnetic shielding engineering market. Guided by the core design philosophy of “high reliability, high construction efficiency, high adaptability, and high reuse value,” it serves government agencies, military organizations, financial institutions, research institutes, and large enterprises with strict requirements for information security and electromagnetic environments. The product provides a full-chain electromagnetic shielding space solution covering scheme design, manufacturing, installation and commissioning, to after-sales maintenance.

Compared with traditional welded shielding rooms, the core value of this product is reflected in four dimensions:

1. Performance Reliability Value. Factory-standardized prefabricated steel plate module units are adopted. Each module undergoes three quality inspection processes: CNC bending, surface treatment, and continuity testing. On-site assembly requires no hot work welding, avoiding material stress deformation and weld defect issues caused by high welding temperatures. Combined with multiple electromagnetic sealing structures, shielding effectiveness consistency is higher, with a long-term attenuation rate below 2%, far superior to the average annual attenuation of over 5% for traditional welded shielding rooms.

2. Engineering Efficiency Value. The fully modular structure enables an industrialized construction model of “factory prefabrication, on-site assembly.” The main installation period for a standard 20m² shielding room is only 3-5 days, reducing construction time by over 60% compared with traditional welding processes. With no on-site welding, grinding, or large-scale anti-corrosion work, construction dust and noise pollution are substantially reduced, making the product suitable for renovation projects in office buildings, industrial parks, and other environments with strict construction restrictions.

3. Scenario Adaptability Value. The product supports custom sizing at any dimension from 1m² to 500m² and can adapt to various building spaces with floor load-bearing capacity ≥200kg/m². Whether for reserved space in new computer rooms or renovation of existing offices and conference rooms, installation can be completed through modular disassembly and flexible combination without large-scale modification of the original building structure, minimizing impact on the building itself.

4. Long-Term Asset Value. The steel plate modular shielding enclosure uses bolted connections throughout. All module units feature disassemblability, relocatability, and reconfigurability. When users relocate office premises or adjust spatial layouts, the shielding enclosure can be completely dismantled and reused, with asset reuse rates reaching over 90%. This avoids the asset waste of traditional welded shielding rooms that become scrap upon relocation, significantly reducing the user’s whole-lifecycle cost.

LAIN consistently adheres to the product principle of “shielding effectiveness as the core, structural safety as the foundation, and user experience as the orientation.” The LA-P series steel plate modular shielding enclosure not only satisfies basic electromagnetic shielding functions but also incorporates comprehensive optimization in structural safety, fire resistance, anti-corrosion durability, and human-machine experience. It seamlessly integrates with the full range of shielding ancillary products including shielding doors, power filters, signal filters, ventilation waveguide windows, air conditioning waveguides, and fire protection waveguide interfaces, forming a complete shielding room integrated solution that provides users with a safe, stable, and durable electromagnetic protection space.

Table of Contents

1.4 Product Applicable Standards

The design, production, installation, and acceptance of the LA-P series steel plate modular shielding enclosure strictly comply with current national, industry, and military standards and specifications. The primary applicable standards include but are not limited to:

  • GB/T 50719-2011 “Technical code for engineering of electromagnetic shielding enclosure”
  • GB/T 12190-2023 “Measuring method for shielding effectiveness of electromagnetic shielding enclosure”
  • BMB3-1999 “Technical requirements for electromagnetic shielding enclosures handling classified national information”
  • GJBz 20269-95 “General specification for military electromagnetic shielding rooms”
  • GJB 151B-2013 “Electromagnetic emission and susceptibility requirements and measurements for military equipment and subsystems”
  • GB 50016-2014 (2018 Edition) “Code for fire protection design of buildings”
  • GB 50057-2010 “Code for design protection of structures against lightning”
  • GB 50169-2016 “Code for construction and acceptance of grounding connection of electric equipment installation engineering”
  • GB/T 13912-2002 “Metallic coatings — Hot dip galvanized coatings on fabricated iron and steel articles — Specifications and test methods”
  • YD/T 2163-2010 “Technical requirements and measurement methods of electromagnetic shielding for telecommunication room”

All products pass third-party authoritative organization inspection and certification before leaving the factory. Core indicators including shielding effectiveness, structural strength, and fire resistance performance meet or exceed national standard requirements, satisfying various compliance acceptance needs such as classified information system hierarchical protection, military confidentiality qualification certification, and Class 3 or higher classified protection.

1.5 Product Model Naming Convention

The LA-P series steel plate modular shielding enclosure adopts a standardized model naming system, allowing customers to quickly identify product grade, specification, and configuration through the model number. The specific naming convention is as follows:

LA – P □ – □ □

│   │  │    │ └── Additional function designation: M-Standard door, F-Standard filter, T-Standard ventilation system, Q-Full configuration
│   │  │    └──── Shielding grade designation: 1-Class C, 2-Class B, 3-Class A
│   │  └───────── Internal net area (unit: m², integer)
│   └─────────── Product series code: P represents steel plate modular shielding enclosure
└─────────────── Brand code: LA represents LAIN

Example: LA-P20-2M represents a LAIN P-series steel plate modular shielding enclosure with an internal net area of 20m², Class B shielding level, and standard shielding door.

In addition to standard models, Guangzhou Lain Intelligent System Development Co., Ltd. can provide fully customized models according to actual customer requirements, covering special sizes, ultra-high shielding grades, special function integration, and other customization needs. All customized models follow the same production processes and quality standards.

2 Product Composition

2.1 Overall Structure Overview

The LA-P series steel plate modular shielding enclosure is a six-sided closed modular structure, composed of floor shielding modules, wall shielding modules, and ceiling shielding modules that together form a complete shielding enclosure system. Combined with the electromagnetic sealing system, structural support keel system, functional interface modules, and supporting accessories, it forms a closed electromagnetic shielding space with continuous conductive performance. The overall structure adopts a dual-layer structural system of “keel frame load-bearing + steel plate module shielding.” The keel bears vertical and horizontal loads, while the steel plate modules perform electromagnetic shielding and enclosure functions. The two work in coordination, balancing structural strength and shielding performance.

According to different shielding grades and application scenarios, the product is available in three series: Standard Type, Enhanced Type, and High-Performance Type. Each series differs in steel plate thickness, sealing structure, keel specifications, and supporting interfaces, while the core composition structure remains consistent.

  • Standard Type: Suitable for ordinary office confidentiality, general data rooms, and other Class C shielding requirements.
  • Enhanced Type: Suitable for classified conference rooms, medium-sized data centers, and other Class B shielding requirements.
  • High-Performance Type: Suitable for military laboratories, EMC testing rooms, and other Class A shielding requirements.

2.2 Shielding Enclosure Main Modules

The main shielding enclosure modules are the core carriers for electromagnetic shielding functions. All modules use high-quality cold-rolled steel plates as the base material and are prefabricated through multiple processes including CNC shearing, bending, punching, and surface anti-corrosion treatment. All modules are standardized in size with interchangeability, allowing flexible combination and adaptation to different spaces during on-site installation.

2.2.1 Floor Shielding Module

The floor shielding module is laid between the building floor and the interior floor finishing layer. It serves as the bottom enclosure structure of the shielding enclosure and also transmits the vertical loads of indoor equipment, forming the foundation of the overall shielding structure.

  • Base Material: Q235B high-quality cold-rolled steel plate. Standard Type: 2.0mm thickness; Enhanced Type: 2.5mm thickness; High-Performance Type: 3.0mm thickness. Steel plate base material yield strength ≥235MPa, tensile strength ≥375MPa, providing good mechanical strength and electromagnetic shielding performance.
  • Module Specifications: Standard module dimensions are 1000mm × 2000mm, with additional non-standard adjustment modules of 1000mm × 1000mm, 500mm × 2000mm, and 500mm × 1000mm to accommodate corner and edge filling requirements of different space dimensions. All module dimensional tolerances are controlled within ±0.5mm to ensure uniform joint gaps.
  • Structural Form: The module perimeter is bent in a single operation by CNC bending machine to form a 50mm high splicing flange edge, with the bending angle strictly controlled at 90° ± 0.5°. M8 bolt connection holes are prefabricated at uniform intervals on the flange edge with hole spacing ≤100mm and hole position tolerance of ±0.3mm, ensuring bolt density at splicing joints meets electromagnetic continuity requirements and avoiding gap leakage caused by excessive bolt spacing.
  • Surface Treatment: Both sides of the steel plate undergo phosphating rust removal + electrostatic powder spraying treatment, with coating thickness of 60-80μm, providing good anti-corrosion and rust-resistant performance. The bottom surface additionally receives an epoxy zinc-rich anti-corrosion coating with thickness ≥40μm, suitable for humid floor environments. The splicing flange surfaces undergo conductive passivation treatment, with the powder coating removed and conductive oxidation applied to ensure conductive continuity of the splicing surfaces, with contact resistance ≤1mΩ.
  • Reinforcement Structure: Two 40×40×2.0mm square steel reinforcing ribs are welded at uniform spacing on the module back side, using full welding between ribs and steel plate with weld height ≥3mm, enhancing module load-bearing capacity. Standard floor modules have a uniformly distributed load capacity of ≥500kg/m², Enhanced Type up to 800kg/m², and High-Performance Type up to 1000kg/m², satisfying the placement requirements of cabinets and heavy equipment.
  • Grounding Interface: One M6 grounding terminal is pre-installed on the inner side of the long edge of each floor module, connected to the steel plate body by welding with continuity resistance ≤0.5mΩ, used for connection to the grounding busbar to ensure equipotentiality of floor modules.

2.2.2 Wall Shielding Module

Wall shielding modules form the vertical enclosure structure of the shielding enclosure. They are divided into four types: standard wall modules, corner modules, door opening reserved modules, and window opening reserved modules, which together form the four-wall shielding system—the largest portion of the shielding area.

  • Base Material: Same as floor modules, using Q235B cold-rolled steel plate. Standard Type: 1.5mm thickness; Enhanced Type: 2.0mm thickness; High-Performance Type: 2.5mm thickness. For scenarios requiring high-frequency shielding, a double-layer structure with inner composite copper foil can be customized to further enhance high-frequency shielding effectiveness.
  • Standard Wall Modules: Standard dimensions are 1000mm wide × 2500mm high. Different height specifications such as 2000mm, 3000mm, and 3500mm can be customized based on ceiling height. The perimeter is bent to form a 50mm flange edge. M8 bolt holes are prefabricated on vertical flange edges with spacing ≤100mm, and horizontal flange edge hole spacing ≤150mm. Two vertical reinforcing ribs are pre-installed on the module back side to enhance wall lateral pressure resistance.
  • Corner Modules: Divided into internal corner (concave) modules and external corner (convex) modules, manufactured using integral steel plate one-piece bending technology with bending radius R=50mm, avoiding through-gap leakage from right-angle split assembly. Corner modules are integrally formed with no splicing welds, providing superior shielding performance compared with split assembly structures. Flange edges on both sides of corner modules match standard wall modules and can be directly bolted.
  • Door Opening Reserved Modules: Customized according to the dimensions of the matching shielding door, using thickened 2mm steel plate with double vertical keel reinforcement. Shielding door mounting fixing holes and grounding terminals are pre-reserved to ensure conductive continuity between the door and wall modules after installation. Double-layer sealing gasket installation grooves are provided around the door opening module perimeter, forming multiple sealing with the shielding door knife edge—a critical structure for movable gap shielding.
  • Window/Interface Reserved Modules: For reserved openings such as ventilation waveguide windows, air conditioning waveguides, and fire protection pipeline interfaces, one-piece bending technology is used for the opening. A 30mm wide reinforced flange and sealing interface are provided around the opening perimeter to avoid stress deformation and electromagnetic leakage at the opening. Opening dimensions precisely match the corresponding interface equipment flange dimensions with tolerance ≤1mm.

2.2.3 Ceiling Shielding Module

Ceiling shielding modules form the top enclosure structure of the shielding enclosure, bearing top loads and providing upper electromagnetic shielding. They are divided into three types: standard ceiling modules, access hatch modules, and pipeline interface modules.

  • Base Material: Q235B cold-rolled steel plate. Standard Type: 1.2mm thickness; Enhanced Type: 1.5mm thickness; High-Performance Type: 2.0mm thickness. For large spaces with spans exceeding 4m, thickened steel plate with reinforcement rib structures can be selected to avoid long-term sagging deformation.
  • Standard Ceiling Modules: Standard dimensions of 1000mm × 2000mm, with 50mm bent flange edges around the perimeter and bolt hole spacing consistent with wall modules. Three 40×40×2.0mm square steel reinforcing ribs are welded on the module back side at 500mm spacing, connected and fixed to the top keel to prevent module deformation and sagging. Module flatness error ≤2mm/m².
  • Access Hatch Modules: Integrate a standard 400×600mm access hatch with a shielding access door of the same shielding grade, using beryllium copper spring finger strips for sealing. This meets top equipment maintenance and pipeline servicing needs while ensuring shielding effectiveness. The access door is equipped with a locking mechanism, providing uniform sealing pressure when closed with no local gaps.
  • Pipeline Interface Modules: Reserve cable penetration interfaces for power, signal, and fire protection pipelines, with pre-installed filter mounting flanges and grounding terminals to achieve shielding and sealing during pipeline penetration. Multi-aperture interface modules can be customized according to the quantity and specifications of pipelines, avoiding on-site hole cutting that would damage the shielding structure.

2.3 Electromagnetic Sealing System

The electromagnetic sealing system is the core component that compensates for electromagnetic leakage at splicing joints and opening gaps. Its performance directly determines the overall shielding effectiveness of the modular shielding enclosure. Electromagnetic waves exhibit the characteristic of “leaking at any gap”—when the gap length reaches 1/10 of the electromagnetic wavelength, significant leakage occurs. Therefore, the sealing system is the core technical focus of modular shielding enclosures. The LA-P series product adopts a triple sealing system of “primary sealing + auxiliary sealing + conductive compensation” to ensure stable shielding effectiveness across the full frequency band.

2.3.1 Electromagnetic Sealing Gaskets

Electromagnetic sealing gaskets are installed between module splicing flange surfaces to fill splicing gaps, achieving conductive continuity between two steel plate modules, serving as the first primary sealing barrier. According to application position and function, they are divided into three types:

  • Flange Splicing Joint Gaskets: Use hollow circular conductive rubber gaskets with cross-section diameter Φ8mm. The base material is silicone rubber matrix with uniformly filled silver-plated copper powder, volume resistivity ≤0.01Ω·cm. Good elastic recovery performance is provided, with optimal conductive contact achieved at 30% compression, permanent deformation rate ≤10%. Suitable for all flat splicing joints in walls, floors, and ceilings. Single-piece length is custom-made as required, with joints using 45° bevel splicing to avoid straight joint leakage paths.
  • Shielding Door Knife-Edge Gaskets: Use beryllium copper finger spring strips with 0.2mm strip thickness, 5mm finger spacing, gold-plated surface, contact resistance ≤2mΩ. Elastic life ≥100,000 open/close cycles without fatigue deformation, suitable for frequently opened and closed shielding doors. Installed in the shielding door frame sealing groove, forming multi-point line contact sealing with the door knife edge. Even with minor door deformation, good contact is maintained, making this a critical guarantee for high-frequency shielding effectiveness.
  • Opening/Interface Gaskets: Use conductive rubber sheet gaskets, 2mm thick, 30mm wide, Shore hardness 50±5. Used for sealing the connecting surfaces between flange interfaces of filters, waveguide windows, waveguides, etc., and steel plate modules, ensuring no electromagnetic leakage at interfaces. Gaskets can be customized as complete ring structures according to flange shapes, providing joint-free construction and superior sealing performance.

2.3.2 Conductive Sealing Adhesive

Conductive sealing adhesive serves as the second auxiliary sealing material, filling the inner corners of splicing joints to form a continuous conductive sealing layer while providing moisture protection, corrosion prevention, and gasket fixation.

  • Performance Parameters: Silver copper-filled room-temperature curing conductive silicone rubber, volume resistivity ≤0.05Ω·cm, Shore hardness 40±5 after curing, bonding strength ≥1.0MPa. Operating temperature range: -40°C to 120°C, with excellent aging resistance.
  • Application Scenarios: Internal concave corners of splicing joints, gasket joints, perimeter of module mounting holes, and small hole and gap areas. Applied using a caulking gun for uniform extrusion, with adhesive joint width of 5mm and height of 3mm, ensuring continuous application without breaks.
  • Functional Features: Effectively compensates for minor gaps in gasket installation, with particularly significant improvement in low-frequency electromagnetic shielding. Also provides waterproof and moisture-proof functions, preventing moisture from entering splicing joints and causing steel plate corrosion and gasket oxidation, extending product service life.

2.3.3 Equipotential Conductive Components

Equipotential conductive components ensure conductive continuity between all modules, between modules and keels, and between modules and the grounding system, eliminating potential differences between different components and avoiding electromagnetic coupling leakage caused by potential differences. These are key to achieving overall equipotential shielding.

  • Inter-Module Conductive Straps: Made of 0.1mm thick copper foil, 50mm wide, with tin-plated surface for oxidation resistance. Installed on the outside of splicing flanges, bridging the splicing joint between two modules, with both ends compressed by bolts. One strap is installed every 200mm to increase the conductive cross-sectional area at splicing joints, reduce contact resistance, and enhance large current discharge capability.
  • Keel Conductive Strip: Made of 20×2mm copper strip with tin-plated surface. Laid continuously along the keel frame, connecting all keel nodes into an integrated unit and providing multiple connection points to the grounding system, forming an equipotential frame. The keel conductive strip is reliably connected to each vertical keel, floor beam, and ceiling beam, with connection point resistance ≤0.5mΩ.
  • Grounding Terminals and Braided Straps: Each wall module has one M6 grounding terminal on the back side, and top and bottom modules have one grounding terminal per 2m². Connection to the main grounding busbar uses 6mm² multi-strand copper braided straps, with both ends of the braided strap crimped with cold-pressed terminals to ensure reliable connection. All grounding terminals have continuity resistance ≤0.5mΩ to the steel plate body.

2.4 Structural Support Keel System

The keel system is the load-bearing skeleton of the steel plate modular shielding enclosure, bearing the shielding enclosure’s own weight, interior decoration loads, equipment loads, and external loads. It also provides positioning, leveling, and reinforcement functions, ensuring overall structural stability of the shielding enclosure without deformation during long-term use.

2.4.1 Floor Beam Keels

Floor beam keels are laid on the building floor, forming the bottom foundation of the entire shielding enclosure. They support the floor shielding modules, transmit loads, and achieve horizontal leveling of the floor modules.

  • Material Specifications: 50×100×3.0mm hot-dip galvanized square steel, galvanized layer thickness ≥85μm, with excellent anti-corrosion performance, complying with GB/T 13912 standard requirements. Steel yield strength ≥235MPa, meeting load-bearing requirements.
  • Layout Method: Arranged in both longitudinal and transverse directions across the shielding room floor at 1000mm spacing, corresponding one-to-one with the reinforcement rib positions of floor modules. Floor beams are connected by welding or M10 bolts to form an integrated frame, with secondary anti-corrosion treatment applied at weld locations.
  • Leveling Structure: M12 adjustable support feet are installed at the bottom of floor beams at 1000mm spacing, with 100×100×5mm base plates at the foot bottoms to increase the load-bearing area. Adjustable support feet can adjust height within ±50mm range, adapting to floor unevenness and ensuring overall floor beam levelness error ≤2mm/m².
  • Grounding Connection: The floor beam frame has at least 4 main grounding points, located at the four corners, connected to the building grounding system via 25mm² copper core cables, with grounding resistance ≤1Ω.

2.4.2 Wall Vertical Keels

Wall vertical keels are vertically installed between floor beams and ceiling beams to fix wall shielding modules, bear horizontal loads and lateral wind pressure, and ensure wall verticality and structural stability.

  • Material Specifications: 50×50×2.5mm hot-dip galvanized square steel, standard spacing of 1000mm, corresponding to module width. Double vertical keels provide reinforcement on both sides of door and window openings, with load-bearing crossbeams added above large door openings to distribute the door weight.
  • Connection Method: The bottom is fixed to floor beams by welding with weld length ≥50mm; the top is connected to ceiling beams using M10 bolts for ease of installation adjustment. Module fixing holes are pre-fabricated on keels with hole spacing matching the flange holes of wall modules, connected using M8 bolts.
  • Lateral Support: When wall height exceeds 3m, one horizontal support keel is installed at each 2m height interval to enhance wall lateral stability. When the shielding room area exceeds 50m², diagonal supports are added in the middle of walls to prevent lateral pressure deformation.
  • Verticality Requirements: Single vertical keel verticality error ≤2mm, entire wall surface verticality error ≤3mm, ensuring flat installation of wall modules and uniform splicing joint gaps.

2.4.3 Ceiling Beam Keels

Ceiling beam keels form the top frame, supporting ceiling shielding modules and top equipment loads, while connecting with vertical keels to form the integrated frame structure—the top constraint of the six-sided structure.

  • Material Specifications: Main keels use 50×100×3.0mm hot-dip galvanized square steel; secondary keels use 50×50×2.5mm hot-dip galvanized square steel. Main keel spacing is 2000mm, secondary keel spacing is 1000mm, corresponding to ceiling module reinforcement ribs.
  • Connection Method: Main keels are welded and fixed to the tops of wall vertical keels, forming a closed frame. Secondary keels are connected to main keels using M10 bolts for convenient on-site spacing adjustment. Ceiling modules are fixed to secondary keels via M8 bolts, with no fewer than 6 fixing points per module.
  • Hanging Fixation: When there is a gap between the shielding enclosure top and the building floor slab, Φ10 galvanized round steel hanger rods can connect the ceiling beam keels to the building floor slab, enhancing top structural stability. Hanger rods are uniformly arranged at 2000mm × 2000mm spacing, with adjusting nuts at both ends for fine-tuning the top height.
  • Deflection Requirement: Under full load conditions, the maximum deflection of ceiling keels is ≤1/400 of the span, preventing ceiling module sagging that could cause splicing joint cracking.

2.5 Functional Interface Modules

Functional interface modules serve as the channels connecting the shielding enclosure with external systems while ensuring that the shielding effectiveness at connection positions is no lower than that of the enclosure body. The LA-P series shielding enclosure can integrate various standard functional interfaces. All interfaces are factory-prefabricated for direct docking installation on site, avoiding on-site hole cutting that would damage the shielding structure.

2.5.1 Shielding Door Interface

The shielding door is the personnel access channel of the shielding room and also the largest movable gap on the shielding enclosure. Its shielding performance directly affects overall effectiveness. The LAIN shielding enclosure can accommodate the full series of shielding door products with standardized interface design for seamless integration.

  • Manual Single-Leaf Shielding Door: Standard passage dimensions of 900×2100mm, suitable for small shielding rooms, confidential conference rooms, and small equipment rooms. Equipped with manual locking mechanism, three-point locking, and uniform sealing pressure. Shielding grade matches the enclosure body.
  • Electric Sliding Shielding Door: Size range from 1500×2100mm to 2000×2500mm, suitable for large shielding computer rooms and equipment passage channels. Motor-driven sliding operation with remote control and local control, equipped with anti-pinch function.
  • Airtight Shielding Door: Combines electromagnetic shielding and airtight functions, with airtightness level up to Grade 6 per GB/T 7107-2019 standard. Suitable for special shielding spaces with cleanliness and air pressure requirements, such as precision instrument laboratories and classified data cleanrooms.
  • Interface Form: The door opening module has pre-installed door frame mounting flanges and double-layer sealing grooves. The door body and door frame are connected by bolts, with double-layer conductive rubber gaskets installed at the interface to ensure gap-free sealing. The door frame and wall modules are equipotentially connected with continuity resistance ≤1mΩ.

2.5.2 Ventilation Waveguide Interface

Ventilation waveguide interfaces are used for ventilation and air conditioning of the shielding room. They achieve electromagnetic shielding using the waveguide cutoff principle while allowing air circulation, serving as the core components of the shielding room ventilation system.

  • Honeycomb Waveguide Window: Uses hexagonal honeycomb core structure, made of brass or 304 stainless steel. The cutoff frequency of a single cell is far higher than the operating frequency band. Large ventilation capacity, air resistance ≤5Pa, stable shielding effectiveness. Standard sizes: 300×300mm, 400×400mm, 600×600mm, with larger sizes available on customization.
  • Air Conditioning Waveguide: Uses circular steel waveguide tube with 2mm wall thickness. Length is customized according to shielding wall thickness, generally no less than 300mm. Both ends are equipped with flange interfaces for flexible connection to air conditioning ducts, avoiding vibration transmission. Diameter specifications: Φ100mm to Φ500mm, adapting to different airflow requirements.
  • Exhaust Waveguide Interface: For fresh air system exhaust requirements, configured with waveguide windows of the same specification as the intake to form air convection. Can integrate an electric air valve for ventilation volume adjustment and automatic closure during fire incidents.
  • Interface Form: Wall modules have corresponding sized openings pre-reserved. Waveguide windows/waveguides are connected to steel plates via flanges with bolts, with a 2mm thick conductive rubber gasket at the contact surface, and conductive sealing adhesive applied around the perimeter for reinforcement.

2.5.3 Power and Signal Filter Interface

Filter interfaces are used for power lines and signal lines entering and exiting the shielding room, filtering electromagnetic interference signals on cables and blocking electromagnetic leakage through cable conduction paths—the “conduction shielding” of the shielding system.

  • Power Filters: Available in single-phase and three-phase series, current ratings from 10A to 400A, insertion loss ≥100dB (14kHz to 10GHz). Dual filtering capability for both differential mode and common mode, adapting to different power supply capacity requirements. Steel shielding enclosure housing with flange mounting form.
  • Signal Filters: Cover various signal types including network signals, video signals, control signals, and RF signals, supporting RJ45, BNC, RS485, fiber optic, and other interface types. Low insertion loss without affecting normal signal transmission while effectively filtering electromagnetic interference.
  • Interface Form: Wall modules have pre-reserved filter mounting holes. Filters are fixed to the outside of the steel plate via flanges, with input and output terminals positioned on the outside and inside of the shielding room respectively. Conductive sealing treatment is applied at contact surfaces, with contact resistance between flange and steel plate ≤1mΩ.

2.5.4 Fire Protection and Security Interface

Dedicated shielding interfaces are configured for the fire protection and security needs of the shielding room, ensuring normal system operation without compromising shielding effectiveness, while meeting fire protection acceptance and security specification requirements.

  • Fire Protection Waveguide: Used for fire sprinkler pipes, smoke detector signal lines, and temperature detector signal lines penetrating the steel plate. Steel waveguide structure with diameter customized according to pipeline specification, length ≥300mm. Multi-pipeline applications can use multi-hole honeycomb waveguide panels that accommodate both cable routing and shielding.
  • Fiber Optic Waveguide: Used for fiber optic cable penetration through the steel plate, with built-in cutoff waveguide structure and sealing filler to prevent electromagnetic wave leakage along fiber gaps. Includes fiber optic splice box for indoor-outdoor fiber connection.
  • Grounding Copper Bar Interface: A dedicated grounding copper bar is installed on the indoor side of the shielding room, specification 30×3mm tinned copper, with more than 10 M6 grounding terminals reserved for internal equipment grounding, static grounding, cabinet grounding, etc. The copper bar is connected to the main grounding system of the shielding enclosure via 25mm² copper cable.

2.6 Supporting Accessory Components

In addition to the core structure, the product includes various installation accessories and functional components to ensure installation quality and daily use convenience.

  • Fastener Kit: All use Grade 8.8 galvanized bolts, nuts, flat washers, and spring washers. Splicing bolts: M8 specification; keel connection bolts: M10. Galvanized layer thickness ≥8μm, providing good anti-corrosion performance and mechanical strength. Each product set includes 10% spare fasteners to compensate for on-site losses.
  • Insulating Washer Kit: Used for insulation isolation at bolt penetration points through the steel plate, preventing bolts from forming “conductive columns” that cause electromagnetic leakage. Epoxy resin material, 2mm thickness, insulation resistance ≥100MΩ. Washer dimensions are 5mm larger than the bolt hole to ensure complete coverage of the hole edge.
  • Decorative Trim Components: Made of 304 stainless steel or electrostatic powder-coated material, including internal corner trim strips, external corner trim strips, door opening trim strips, and window opening trim strips. Used for decorative finishing of internal/external corners, door openings, and window openings to cover splicing joints and bolt heads, enhancing interior aesthetics.
  • Label and Signage Kit: Includes shielding effectiveness grade labels, grounding labels, safety warning labels, shielding door operating instruction labels, and filter maintenance labels. Compliant with national confidentiality and safety regulations, installed in prominent positions.
  • Specialized Tool Kit: Includes dedicated torque wrenches, continuity testers, and gasket installation tools for on-site installation and testing, ensuring construction processes meet standard requirements.

3 Product Bill of Materials

3.1 Bill of Materials Preparation Notes

This bill of materials is prepared based on the LA-P series standard configuration products and is divided into five parts: main equipment list, sealing auxiliary material list, keel structure list, functional interface list, and supporting accessory list. All quantities are configured for a standard 20m² shielding room (internal net dimensions 4m × 5m × 2.5m). Products of other dimensions may be converted proportionally by area. Customized products require a dedicated bill of materials based on the actual design scheme.

All materials undergo quality inspection before leaving the factory, accompanied by product certificates of conformance, test reports, and shipping lists. Upon arrival at the site, items must be checked one by one against the list, confirming quantity, specification, and appearance are correct before installation.

3.2 Main Shielding Module List (20m² Standard Type)

No. Component Name Specification/Model Material Qty Unit Remarks
1 Floor standard module 1000×2000×2.0mm Q235 cold-rolled steel plate 10 pcs Main floor module
2 Floor adjustment module 1000×1000×2.0mm Q235 cold-rolled steel plate 0 pcs For corner filling, configured as needed
3 Wall standard module 1000×2500×1.5mm Q235 cold-rolled steel plate 18 pcs Main module for four walls
4 Wall internal corner module R50×2500H×1.5mm Q235 cold-rolled steel plate 4 pcs Four internal corners
5 Door opening reserved module 1000×2500×2.0mm Q235 cold-rolled steel plate 1 pcs Reserved 900×2100 door opening
6 Window opening reserved module 1000×2500×1.5mm Q235 cold-rolled steel plate 1 pcs Reserved 400×400 waveguide window opening
7 Ceiling standard module 1000×2000×1.2mm Q235 cold-rolled steel plate 10 pcs Main ceiling module
8 Ceiling access hatch module 1000×2000×1.2mm Q235 cold-rolled steel plate 1 pcs Includes 400×600 shielding access door
9 Ceiling pipeline interface module 1000×1000×1.2mm Q235 cold-rolled steel plate 1 pcs Reserved filter penetration holes

3.3 Electromagnetic Sealing System List (20m² Standard Type)

No. Component Name Specification/Model Material Qty Unit Remarks
1 Splicing joint conductive rubber gasket Φ8mm hollow circular Silver-plated copper silicone rubber 120 m All module splicing joints
2 Interface flange conductive rubber gasket 2mm thick × 30mm wide Silver-plated copper silicone rubber 10 m Waveguide window and filter interfaces
3 Beryllium copper spring finger gasket 5mm finger spacing Beryllium copper, gold-plated 6 m Shielding door frame sealing
4 Conductive sealing adhesive 310ml/tube Silver-copper conductive silicone rubber 20 tubes Inner sealing of splicing joints
5 Copper conductive strap 50mm wide × 0.1mm thick Copper, tin-plated 200 pcs External bridging of splicing joints
6 Equipotential copper strip 20mm × 2mm Copper, tin-plated 50 m Keel equipotential connection
7 Copper braided grounding strap 6mm² Multi-strand copper braid 50 m Module to grounding busbar connection
8 Grounding terminal M6 Brass, tin-plated 30 pcs Module grounding connection points

3.4 Keel Support System List (20m² Standard Type)

No. Component Name Specification/Model Material Qty Unit Remarks
1 Floor beam main keel 50×100×3.0mm Hot-dip galvanized square steel 18 m Floor longitudinal and transverse beams
2 Adjustable support foot M12×100mm Galvanized steel 20 pcs Floor beam leveling support
3 Support base plate 100×100×5mm Galvanized steel plate 20 pcs Support foot base plate
4 Wall vertical keel 50×50×2.5mm Hot-dip galvanized square steel 45 m Wall vertical support
5 Ceiling beam main keel 50×100×3.0mm Hot-dip galvanized square steel 18 m Top main frame
6 Ceiling beam secondary keel 50×50×2.5mm Hot-dip galvanized square steel 25 m Ceiling module support
7 Ceiling hanger rod Φ10×500mm Galvanized round steel 15 pcs Top hanging reinforcement
8 Keel connection bolt M10×30mm Grade 8.8 galvanized 200 sets Keel node connection

3.5 Standard Functional Interface List (20m² Standard Type)

No. Component Name Specification/Model Qty Unit Remarks
1 Manual single-leaf shielding door 900×2100mm, Class C 1 unit Personnel passage
2 Honeycomb ventilation waveguide window 400×400mm, Class C 2 pcs 1 supply air, 1 exhaust air
3 Single-phase power filter 220V/32A 2 units Lighting and socket circuits
4 Three-phase power filter 380V/63A 1 unit Main equipment power supply circuit
5 Network signal filter 8-port RJ45, Gigabit 1 unit Network signal access
6 Fire protection cable waveguide Φ50mm, 300mm length 2 pcs Fire signal cable penetration
7 Indoor grounding copper bar 30×3mm×1000mm 1 pc Indoor equipment grounding
8 Main grounding cable 25mm² copper core 20 m Enclosure to building ground grid

3.6 Supporting Accessory List (20m² Standard Type)

No. Component Name Specification/Model Qty Unit Remarks
1 Module splicing bolt M8×20mm, Grade 8.8 galvanized 800 sets Includes nut, flat washer, spring washer
2 Insulating washer Φ9×20mm, epoxy resin 800 pcs Bolt penetration insulation
3 Internal corner trim strip 25×25mm, powder-coated white 50 m Interior concave corner decoration
4 Door opening trim set Customized 1 set Interior and exterior door decoration
5 Label and signage kit Standard configuration 1 set Includes various safety labels
6 Spare sealing gasket Φ8mm, 10m/roll 1 roll Maintenance spare
7 Spare conductive sealing adhesive 310ml/tube 2 tubes Maintenance spare
8 Specialized tool kit Includes torque wrench, continuity tester 1 set Installation and commissioning

3.7 Product Acceptance Accompanying Documentation List

Each batch of products ships with complete technical documentation for on-site acceptance and later maintenance archiving, including:

  • Product certificate of conformance: 1 copy
  • Main material material test report: 1 copy
  • Copy of third-party shielding effectiveness test report: 1 copy
  • Product installation, wiring, and commissioning manual: 1 copy
  • Product shipping list: 1 copy
  • Instruction manuals for supporting equipment (shielding door, filters, etc.): 1 copy each
  • Factory inspection record: 1 copy

4 Product Operating Principle

4.1 Basic Electromagnetic Shielding Theory

Electromagnetic shielding uses conductive or magnetically permeable materials to construct a closed space that reflects, absorbs, and multiply reflects incident electromagnetic waves, thereby attenuating electromagnetic wave energy, preventing electromagnetic interference from entering the shielded space, and simultaneously preventing internal electromagnetic information from leaking outward. Shielding Effectiveness (SE) is the core indicator for measuring shielding performance, expressed in decibels (dB)—the higher the value, the better the shielding effect.

According to electromagnetic shielding theory, the total shielding effectiveness of a shield consists of three components: Reflection Loss (R), Absorption Loss (A), and Multiple Reflection Loss (B), expressed as:

SE = A + R + B (dB)

4.1.1 Reflection Loss

Reflection loss is the loss produced when electromagnetic waves incident on the shield surface are partially reflected back to the original space due to wave impedance mismatch between air and the shielding material. Reflection loss is related to the conductivity and permeability of the shielding material, as well as the frequency and wave impedance of the electromagnetic wave.

  • For electric field waves (high-impedance waves), reflection loss is greater. Low-frequency electric field waves rely primarily on reflection loss for shielding.
  • For magnetic field waves (low-impedance waves), reflection loss is smaller. Low-frequency magnetic field shielding is more difficult and requires high-permeability materials.
  • Plane wave reflection loss falls between the two.

As a good conductor, steel plate possesses high conductivity, providing excellent reflection loss for electric field waves and plane waves—one of the fundamental principles of steel plate shielding.

4.1.2 Absorption Loss

Absorption loss is the loss produced when electromagnetic waves entering the shield interior are attenuated as the energy is converted to heat through induced eddy currents during propagation through the material. Absorption loss is positively correlated with material thickness, conductivity, permeability, and electromagnetic wave frequency. The higher the frequency and the thicker the material, the greater the absorption loss.

  • High-frequency electromagnetic waves rely primarily on absorption loss for shielding, so high-frequency shielding has relatively lower material thickness requirements.
  • Low-frequency electromagnetic waves have small absorption loss, requiring thicker materials or high-permeability materials to enhance absorption effectiveness.

Cold-rolled steel plate possesses certain permeability and high conductivity. As steel plate thickness increases, absorption loss increases linearly—the core reason higher-grade shielding rooms use thicker steel plates.

4.1.3 Multiple Reflection Loss

Multiple reflection loss is the additional loss produced by electromagnetic waves reflecting multiple times between the two surfaces of the shield. When the shield thickness is thin and absorption loss is small, multiple reflection loss effects are significant. When absorption loss exceeds 10dB, multiple reflection loss can be neglected.

For modular shielding enclosures, multiple reflections at splicing gaps are an important cause of gap leakage. Therefore, sealing gaskets are needed to fill splicing gaps, reducing multiple reflections and gap diffraction.

4.2 Shielding Principle of the Steel Plate Modular Shielding Enclosure

The LA-P series steel plate modular shielding enclosure uses cold-rolled steel plate as the primary shielding body, combined with a sealing system and equipotential design to achieve full-band electromagnetic shielding. Its principle can be divided into three levels: body shielding, gap shielding, and conduction path shielding.

4.2.1 Body Steel Plate Shielding Principle

Continuous steel plate serves as the primary shielding body, utilizing the high conductivity and ferromagnetic properties of steel to produce dual reflection and absorption effects on electromagnetic waves of different frequency bands:

  • Low Frequency Band (10kHz–100kHz): Dominated by magnetic fields. The ferromagnetism of the steel plate provides a magnetic bypass, reducing magnetic field penetration, while eddy current effects produce a certain absorption loss. Shielding effectiveness in this band is primarily determined by steel plate thickness and permeability.
  • Medium Frequency Band (100kHz–100MHz): Electric and magnetic field components are balanced. The reflection loss and absorption loss of the steel plate act together, with shielding effectiveness rapidly increasing. This is the advantageous frequency band for steel plate shielding—conventional 1.5mm steel plate can achieve shielding effectiveness above 60dB.
  • High Frequency Band (100MHz–10GHz): Dominated by electric fields and plane waves. The skin effect is significant, with energy concentrated in an extremely thin layer on the steel plate surface, relying mainly on surface reflection loss for shielding. This band has extremely high requirements for steel plate continuity—any minute gap will cause significant leakage.

The LA-P series selects different steel plate thicknesses according to shielding grades, achieving the corresponding frequency band shielding effectiveness through precise thickness design while balancing cost and structural performance.

4.2.2 Splicing Gap Shielding Principle

Modular assembly inevitably creates splicing gaps—the core technical challenge of modular shielding enclosures. Electromagnetic waves exhibit diffraction characteristics. When gap length reaches 1/10 of the wavelength, significant electromagnetic leakage occurs. The wider and longer the gap, the more severe the leakage. The LA-P series addresses gap leakage through three measures:

  • Gap Dimension Reduction: High-precision CNC bending technology is used, with module flange flatness error ≤0.2mm and post-assembly gap width ≤0.1mm—far smaller than 1/10 wavelength of high-frequency electromagnetic waves, reducing gap diffraction leakage.
  • Conductive Gasket Filling: Conductive rubber gaskets are installed between splicing flanges. After compression, the gasket fully fills the gap, forming a continuous conductive contact surface that converts discontinuous steel plate gaps into a continuous conductor, eliminating gap discontinuity. The high conductivity of the gasket ensures shielding effectiveness no lower than the steel plate body itself.
  • Multiple Sealing Reinforcement: Conductive sealing adhesive is applied on the inner side as a second sealing layer, and copper conductive straps are installed on the outer side to increase conductive cross-sectional area, forming a triple structure of “gasket primary sealing + adhesive layer auxiliary sealing + copper strap conductive reinforcement.” Even if local gasket contact is poor, other structures ensure conductive continuity, enhancing shielding reliability.

4.2.3 Conduction Path Shielding Principle

Electromagnetic waves not only propagate through space radiation but also enter and exit the shielding room through conduction paths such as power lines, signal lines, and metal pipelines, forming conduction leakage. The steel plate modular shielding enclosure, combined with interface devices such as filters and waveguides, achieves conduction path shielding:

  • Power Lines and Signal Lines: Filters remove conducted interference signals from cables, blocking electromagnetic energy transmission along cables. Filter housings are equipotentially connected to the shielding enclosure, forming continuous shielding.
  • Metal Pipelines and Air Ducts: Connected through waveguides/waveguide windows, utilizing the waveguide cutoff principle to allow air and non-conductive media to pass while electromagnetic waves above the cutoff frequency cannot pass through the waveguide, achieving both ventilation and shielding.
  • Grounding System: The shielding enclosure is connected to ground at multiple points to form an equipotential body, rapidly discharging induced electromagnetic energy to ground, preventing enclosure electrification that could cause secondary radiation. Simultaneously, this ensures consistent potential across all parts of the enclosure, eliminating electromagnetic coupling caused by potential differences.

4.3 Structural Support Working Principle

The keel frame system is designed using steel structure mechanics principles, forming a closed hexahedral frame structure with excellent overall stability and load-bearing capacity:

Vertical Load Transfer Path: Top surface load → Top surface module → Top beam secondary keel → Top beam main keel → Wall vertical keel → Ground beam keel → Adjustable support feet → Building floor; Each level of components distributes the load progressively, ensuring uniform force distribution.

Horizontal Load Resistance Principle: The closed wall frame forms a shear wall structure with excellent lateral displacement resistance; Corner modules and corner keels form rigid nodes, enhancing overall torsional resistance; Large spaces are equipped with diagonal bracing to further improve lateral pressure resistance.

Leveling Principle: The bottom adjustable support feet achieve fine height adjustment through threaded lifting. Each foot can be adjusted independently to accommodate varying degrees of floor unevenness, ensuring the overall frame is level and preventing misalignment of module splicing seams caused by frame tilting.

4.4 Equipotential Bonding Working Principle

Equipotential bonding is the foundation for stable shielding system operation. Its core principle is to connect all metal components of the shielding enclosure, internal equipment metal housings, and the grounding system into a unified equipotential body:

  • Eliminate potential differences between different components, preventing discharge and electromagnetic coupling interference caused by potential differences;
  • Form a unified electromagnetic energy discharge path, rapidly conducting lightning, electrostatic, and electromagnetic interference energy induced on the shielding enclosure into the ground;
  • Ensure uniform shielding effectiveness across all areas of the enclosure, avoiding shielding weak points caused by local potential anomalies.

The LA-P series products achieve equipotentiality of the entire shielding enclosure through a triple design of inter-module conductivity, keel conductivity, and multi-point grounding, with an overall potential difference of ≤1mV, meeting high-standard shielding and electrical safety requirements.

5 Product Technical Parameters

5.1 Core Shielding Effectiveness Parameters

The LA-P series steel plate splicing shielding enclosure is available in three grades: Grade C, Grade B, and Grade A. The shielding effectiveness parameters for each grade are as follows, with test methods complying with GB/T 12190-2023:

Frequency Range Grade C (LA-P-1 Series) Grade B (LA-P-2 Series) Grade A (LA-P-3 Series) Test Method
14kHz~100kHz (Magnetic Field) ≥60dB ≥80dB ≥100dB Small Loop Antenna Method
100kHz~1MHz (Magnetic Field) ≥70dB ≥90dB ≥110dB Small Loop Antenna Method
1MHz~30MHz (Electric Field) ≥80dB ≥100dB ≥120dB Rod Antenna Method
30MHz~1GHz (Plane Wave) ≥90dB ≥110dB ≥130dB Dipole Antenna Method
1GHz~10GHz (Microwave) ≥85dB ≥105dB ≥125dB Horn Antenna Method

Note: The above values represent the shielding effectiveness of the enclosure body itself. After including interfaces such as doors and windows, the overall shielding effectiveness shall not be less than 90% of the body’s effectiveness. Custom models can achieve high-performance shielding above the 18GHz frequency band.

5.2 Structural Performance Parameters

5.2.1 Main Structure Parameters

Parameter Item Standard Type (Grade C) Reinforced Type (Grade B) High-Performance Type (Grade A)
Wall Steel Plate Thickness 1.5mm 2.0mm 2.5mm
Floor Steel Plate Thickness 2.0mm 2.5mm 3.0mm
Ceiling Steel Plate Thickness 1.2mm 1.5mm 2.0mm
Single Module Dimension Tolerance ±0.5mm ±0.5mm ±0.3mm
Maximum Splicing Seam Gap ≤0.1mm ≤0.08mm ≤0.05mm
Module Flatness Error ≤2mm/m² ≤1.5mm/m² ≤1mm/m²

5.2.2 Mechanical Performance Parameters

Parameter Item Performance Requirement Test Standard
Floor Uniform Load ≥500kg/m² (Standard Type) GB/T 23932-2009
Wall Lateral Pressure Strength ≥300Pa GB 50009-2012
Ceiling Uniform Load ≥200kg/m² GB/T 23932-2009
Keel Deflection (Full Load) ≤1/400 span GB 50017-2017
Overall Seismic Grade Intensity 7 GB 50011-2010
Wind Pressure Resistance ≥1000Pa GB/T 7106-2019

5.3 Electrical and Grounding Parameters

Parameter Item Performance Requirement Remarks
Inter-module Contact Resistance ≤1mΩ At flange splicing points
Enclosure Overall Conductivity Resistance ≤0.5Ω Between any two points
System Grounding Resistance ≤1Ω Combined grounding system; Independent grounding ≤4Ω
Insulation Resistance (Bolts to Enclosure) ≥100MΩ DC500V test
Equipotential Potential Difference ≤1mV Any two points on enclosure
Electrostatic Discharge Time ≤0.1s 1000V to 100V

5.4 Environmental Adaptability Parameters

Parameter Item Performance Requirement Test Standard
Operating Temperature Range -10℃~60℃ GB/T 2423.1-2008
Storage Temperature Range -40℃~85℃ GB/T 2423.2-2008
Relative Humidity ≤95% (Non-condensing) GB/T 2423.3-2016
Salt Spray Corrosion Rating No significant corrosion within 48h GB/T 10125-2012
Fire Resistance Rating Non-combustible Class A GB 8624-2012
Service Life ≥20 years (Normal environment) –

5.5 Dimension Specification Parameters

  • Area Range: Standard products cover 1m²~500m², with support for custom dimensions of any size;
  • Floor Height Range: Standard internal clear height is 2.5m, customizable from 2.0m to 4.5m;
  • Overall Dimension Tolerance: Length and width direction ±5mm, height direction ±3mm;
  • Wall Thickness: Main structure thickness 100mm (including keel); total thickness with interior finish 120~150mm;
  • Floor Total Thickness: Structural layer thickness 80mm; total thickness with decorative surface 100~120mm;
  • Ceiling Total Thickness: Structural layer thickness 100mm; total thickness with suspended ceiling 150~200mm.

5.6 Supporting Interface Parameters

5.6.1 Shielding Door Parameters (Standard: Manual Single Door)

Parameter Item Grade C Grade B Grade A
Passage Dimensions 900×2100mm 900×2100mm 900×2100mm
Opening Method Manual Single Swing Manual Single Swing Manual Single Swing
Locking Method 3-point Locking 5-point Locking 7-point Locking
Opening/Closing Cycles ≥100,000 times ≥100,000 times ≥100,000 times
Sealing Type Single-layer Beryllium Copper Spring Strip Double-layer Beryllium Copper Spring Strip Triple-layer Beryllium Copper Spring Strip + Conductive Rubber

5.6.2 Filter Parameters (Standard Configuration)

  • Power Filter Insertion Loss: ≥100dB (14kHz~10GHz);
  • Network Filter Insertion Loss: Signal insertion loss ≤1dB, interference suppression ≥60dB;
  • Rated Operating Voltage: Single-phase 220V AC, Three-phase 380V AC;
  • Insulation Resistance: ≥100MΩ (DC500V);
  • Dielectric Withstand Voltage: AC1500V/1min without breakdown.

6 Product Functions and Features

6.1 Core Functions

6.1.1 Electromagnetic Shielding Protection Function

Electromagnetic shielding is the core foundational function of the product. Through the enclosed steel plate shielding body and sealing system, bidirectional electromagnetic protection is achieved simultaneously:

  • Anti-Leakage: Prevents electromagnetic radiation signals generated by classified electronic equipment, computers, and communication devices inside the shielded room from leaking outward, preventing electromagnetic signal interception and restoration, ensuring information security; Complies with national confidentiality standard BMB3-1999, meeting the operational requirements for classified information systems.
  • Anti-Intrusion: Prevents external electromagnetic interference, strong electromagnetic pulses, and lightning-induced electromagnetic energy from entering the shielded room, protecting internal precision electronic equipment for stable operation, avoiding equipment failures, data errors, and component damage caused by electromagnetic interference.
  • Full Frequency Band Coverage: Provides full-spectrum electromagnetic protection from low-frequency magnetic fields to high-frequency microwaves, simultaneously addressing power-frequency magnetic fields, RF interference, microwave radiation, and other electromagnetic threats, adaptable to various application scenarios with complex electromagnetic environments.

6.1.2 Structural Enclosure and Load-Bearing Function

As the main enclosure structure of the shielded computer room, the product simultaneously provides building enclosure functions and load-bearing capacity:

  • Space Enclosure: Forms an independent closed internal space, providing auxiliary soundproofing, dustproofing, and moisture-proofing functions, offering an independent physical space for internal equipment and personnel;
  • Load Bearing: The floor can bear heavy equipment such as cabinets, servers, and precision instruments; the ceiling can bear lighting fixtures, suspended ceilings, fire protection endpoints, and low-voltage equipment, meeting routine computer room usage requirements;
  • Structural Safety: The overall steel frame structure has excellent seismic and wind pressure resistance, adaptable to different building environments, with stable structure and no deformation during long-term use.

6.1.3 Equipotential Bonding and Electrical Safety Function

The product integrates a complete equipotential bonding and grounding system, ensuring electrical usage safety:

  • Unified Equipotential Platform: The shielding enclosure itself forms a continuous equipotential body; all internal equipment metal housings, cabinets, and pipelines can be connected to the equipotential system, eliminating potential differences and avoiding electric shock and electrostatic discharge risks;
  • Electrostatic Discharge Function: Can rapidly discharge static electricity generated by personnel and equipment, preventing static damage to precision electronic components, suitable for electrostatic-sensitive equipment usage scenarios;
  • Lightning Protection Function: The shielding enclosure combined with the grounding system can effectively attenuate lightning-induced electromagnetic pulses, reducing lightning damage to internal equipment; combined with power surge protectors, it forms a complete lightning protection system.

6.1.4 Function Expansion and Compatibility Function

The product adopts a modular interface design with strong expansion capabilities, allowing integration of various supporting systems as required:

  • Ventilation and Air Conditioning Compatibility: Can integrate ventilation waveguide windows and air conditioning waveguides, interfacing with fresh air systems and central air conditioning systems, meeting indoor temperature, humidity, and fresh air requirements;
  • Fire Protection System Compatibility: Reserved fire protection pipeline penetration interfaces, can connect smoke detectors, heat detectors, sprinklers, gas fire suppression, and other fire protection systems, meeting fire inspection requirements;
  • Low-Voltage System Compatibility: Can be configured with various signal filters to connect network, telephone, video surveillance, access control, broadcasting, and other low-voltage systems, enabling information exchange between inside and outside the shielded room;
  • Decoration Compatibility: The interior of the enclosure can be fitted with color steel panel finishes, anti-static flooring, suspended ceilings, and other decorative layers, adaptable to different decoration styles and usage requirements.

6.2 Product Features

6.2.1 Fully Modular Splicing, Efficient Construction

  • All components are factory-prefabricated standardized modules; on-site assembly requires only bolting, with no need for welding, grinding, anti-corrosion, or other processes, improving construction efficiency by over 60%;
  • No open-flame operations on site, no welding fumes, no large amounts of construction waste, minimal impact on the surrounding environment, particularly suitable for office buildings and renovation of existing buildings;
  • Modules are interchangeable with high installation fault tolerance and flexible on-site adjustment, effectively shortening overall project timelines and enabling rapid delivery for use.

6.2.2 Multi-layer Sealing Design, Stable Performance

  • Utilizes a “conductive gasket + conductive sealant + copper conductive strip” triple sealing structure, providing reliable splicing seam sealing and high shielding effectiveness consistency, avoiding leakage hazards caused by defective welds and cracks in traditional welded construction;
  • All movable interfaces and pipeline interfaces adopt standardized shielded sealing designs, ensuring uniform overall shielding effectiveness with no obvious weak points;
  • Sealing gaskets are made from high-quality materials with aging resistance and fatigue resistance; long-term use shielding effectiveness decay rate ≤2%/10 years, far below industry average levels.

6.2.3 Safe and Reliable Structure, Durable

  • Main body uses Q235 high-quality cold-rolled steel plate with hot-dip galvanized steel structure keels, providing high mechanical strength, strong load-bearing capacity, and overall structural stability;
  • Steel plate surfaces undergo phosphating + powder coating dual anti-corrosion treatment; keels use hot-dip galvanizing process, providing excellent anti-corrosion and anti-rust performance, with service life ≥20 years under normal conditions;
  • Strictly designed in accordance with national steel structure codes, meeting seismic and wind pressure resistance requirements, adaptable to climatic and geological conditions in different regions.

6.2.4 Dismantlable and Reusable, High Asset Value

  • All connections use bolted joints with no welded fixation, allowing complete disassembly, relocation, and reassembly, with a relocation reuse rate of ≥90%;
  • Modules are highly standardized; after relocation, module combinations can be adjusted according to new space dimensions — adding or removing modules adapts to the new site without complete reconstruction;
  • Avoids the problems of traditional welded shielded rooms being single-use investments that are scrapped upon relocation, significantly reducing the user’s lifecycle cost, particularly suitable for users with limited lease terms and frequent planning adjustments.

6.2.5 High Customization, Strong Adaptability

  • Dimensions, shapes, and shielding grades are all customizable, adaptable to rectangular, square, L-shaped, and other irregular spaces;
  • Interface positions, quantities, and specifications can be pre-reserved as required, avoiding on-site cutting that would compromise the shielding structure;
  • Structural design can be optimized based on building load capacity and floor height conditions; installation can be completed in existing buildings without major structural renovation, providing exceptional adaptability.

6.2.6 Strong Compliance, Worry-Free Acceptance

  • Product design, production, and installation strictly comply with relevant national and industry standards; shielding effectiveness, fire resistance, grounding, and other indicators all meet regulatory requirements;
  • Complete test reports, certificates of conformity, and acceptance documentation are provided, ensuring smooth passage of confidentiality acceptance, classified protection evaluation, military certification, and other compliance inspections;
  • Guangzhou Lain Intelligent System Development Co., Ltd. provides full technical support, assisting customers in completing acceptance and ensuring compliant project implementation.

7 Product Application Scenarios

The LA-P series steel plate splicing shielding enclosure, with its excellent shielding performance, flexible installation methods, and high reliability, is widely used in party/government/military, financial, scientific research, communications, medical, industrial, and other fields. The following are typical application scenarios:

7.1 Party/Government/Military Confidentiality Field

The party/government/military confidentiality field is the core application scenario for electromagnetic shielded rooms, with extremely high information security requirements, forming an important part of the confidentiality system.

  • Classified Meeting Rooms: Classified meeting rooms and consultation rooms for party/government agencies and military units at all levels, used to prevent meeting content from leaking through electromagnetic radiation of electronic devices, ensuring classified meeting information security; the spliced structure enables rapid renovation of existing meeting rooms without damaging original building decoration.
  • Classified Computer Rooms: Classified information system computer rooms and cryptography rooms, housing classified servers, storage devices, and cryptographic equipment, preventing electromagnetic information leakage and meeting classified protection and confidentiality qualification certification requirements; modular structure allows rapid expansion to accommodate informatization upgrade needs.
  • Military Research Laboratories: Weapons R&D laboratories and classified testing rooms for military units, preventing R&D information electromagnetic leakage while avoiding external electromagnetic interference affecting test accuracy; high-grade models can meet military standard GJBz 20269-95 requirements.
  • Confidential Office Spaces: Office areas for confidential departments and security rooms, equipped with computers and classified carriers, establishing localized shielding environments to enhance daily office information security levels.

7.2 Financial Data Field

The financial industry has highly sensitive data and extremely high requirements for equipment operational stability; electromagnetic shielding simultaneously ensures data security and equipment stability.

  • Bank Data Center Computer Rooms: Core data computer rooms and disaster recovery computer rooms for banks, preventing external electromagnetic interference from causing server downtime and data errors, while preventing core data electromagnetic leakage; high-reliability structure meets data center 7×24 hour operational requirements.
  • Securities Trading Computer Rooms: Trading system computer rooms for stock and futures exchanges, avoiding electromagnetic interference that could cause trading system failures and market data delays, ensuring stable trading system operation; low electromagnetic leakage characteristics prevent trading data theft.
  • Insurance Data Computer Rooms: Core data computer rooms for insurance companies, housing massive user information and business data, meeting Level 3 or above classified protection requirements, ensuring data security and business continuity.
  • Bank Vault Monitoring Rooms: Monitoring and control rooms for bank vaults and cash box storage, enhancing the anti-interference capability and information confidentiality of security systems, ensuring reliable security system operation.

7.3 Scientific Research and Testing Field

The scientific research and testing field has high requirements for electromagnetic environment cleanliness, requiring a stable low electromagnetic interference environment to ensure testing data accuracy.

  • EMC Electromagnetic Compatibility Laboratories: EMC testing laboratories for electronic products and electrical equipment, establishing standard electromagnetic environments for electromagnetic emission and electromagnetic susceptibility testing; high-performance Grade A models meet high-precision EMC testing requirements.
  • Precision Instrument Laboratories: Precision electronic instrument laboratories, quantum laboratories, and nanofabrication laboratories in universities and research institutions, preventing external electromagnetic interference from affecting instrument measurement precision; custom ultra-high shielding grade models available for extremely weak signal detection requirements.
  • Radio Metrology and Calibration Rooms: Spaces for radio instrument metrology and calibration, shielding external electromagnetic signals to ensure calibration data accuracy and reliability; full frequency band shielding performance adapts to metrology equipment of different frequencies.
  • Medical Device Testing Laboratories: Medical device R&D and testing laboratories, ensuring accurate testing data for medical electronic equipment, complying with medical device testing regulatory requirements.

7.4 Communications and Broadcasting Field

The communications and broadcasting industry has dense high-frequency signals and complex electromagnetic environments; electromagnetic shielding reduces inter-system interference and improves communication quality.

  • Communication Core Computer Rooms: Operator core switch rooms and transmission rooms, reducing electromagnetic interference between different communication systems, improving equipment operational stability; modular expansion can be performed in conjunction with communication equipment upgrades.
  • Radio and Television Broadcast Control Rooms: Broadcast control rooms and transmission rooms for TV stations and radio stations, preventing external electromagnetic interference from affecting broadcast quality and avoiding broadcast accidents; also preventing broadcast signal leakage that could cause illegal retransmission.
  • Satellite Receiving Control Rooms: Receiving control rooms for satellite ground stations, shielding external electromagnetic interference, improving satellite signal reception sensitivity, and ensuring signal reception quality.
  • 5G Base Station Core Computer Rooms: Core node computer rooms for 5G communications, reducing interference of 5G high-frequency signals on internal equipment, ensuring stable core network equipment operation.

7.5 Medical and Healthcare Field

Medical precision equipment is sensitive to electromagnetic interference, and medical data involves patient privacy; electromagnetic shielding serves dual purposes of equipment protection and information security.

  • MRI Room Supporting Shielding: Supporting equipment rooms and control rooms for hospital MRI (Magnetic Resonance Imaging) suites, preventing strong MRI magnetic fields from interfering with other medical equipment while preventing external electromagnetic interference from affecting MRI imaging quality.
  • ECG/EEG Examination Rooms: Examination rooms for weak biophysiological signals such as electrocardiograms (ECG) and electroencephalograms (EEG), shielding external electromagnetic interference to improve detection signal clarity and diagnostic accuracy.
  • Hospital Information Computer Rooms: Computer rooms for hospital HIS and PACS systems, ensuring medical data security and stable system operation, avoiding medical system failures caused by electromagnetic interference.
  • Biosafety Laboratories: Electronic equipment rooms for P2 and P3 biosafety laboratories, establishing clean electromagnetic environments, ensuring stable operation of laboratory equipment while meeting biosafety supporting requirements.

7.6 Industrial Manufacturing Field

Industrial production environments have complex electromagnetic interference and numerous high-power equipment; electromagnetic shielding protects sensitive control systems and ensures production stability.

  • Industrial Control Computer Rooms: Industrial control computer rooms and PLC control rooms for smart manufacturing and semiconductor factories, preventing electromagnetic interference from workshop high-power equipment from affecting control systems and avoiding production downtime.
  • Cleanroom Chip Manufacturing: Control areas of semiconductor chip manufacturing cleanrooms; high-precision chip production has extremely high electromagnetic environment requirements; shielding reduces electromagnetic interference and improves product yield.
  • Automotive Electronics Testing Workshops: Automotive electronic component testing workshops, simulating different electromagnetic environments to test the anti-interference capability of vehicle-mounted electronic equipment, meeting automotive-grade EMC requirements.
  • Electric Power Dispatch Control Rooms: Power grid dispatch centers and substation control rooms, preventing strong electromagnetic environments from interfering with dispatch control systems, ensuring safe and stable power dispatch.

8 Product Installation Specifications and Procedures

8.1 Pre-construction Preparation

Pre-construction preparation is the foundation for ensuring installation quality and schedule. All preparation work must be completed before site entry to ensure smooth construction.

8.1.1 Site Survey and Technical Disclosure

Site Survey

  • Measure the actual dimensions, floor height, and floor flatness of the installation space; verify building floor load-bearing capacity; verify the distribution of building structural beams, columns, and pipelines to avoid conflicts with the shielding enclosure structure;
  • Confirm the location of the building grounding system and grounding resistance values; plan the grounding main line path;
  • Confirm the entry channel dimensions; verify the transportation path for large materials such as modules and keels to ensure they can be smoothly transported to the installation site;
  • Confirm on-site power supply and temporary lighting conditions; plan temporary power usage for construction;
  • Confirm the location of on-site fire protection equipment; implement construction site fire prevention measures.

Technical Disclosure

  • Before construction, the project technical manager shall conduct a comprehensive technical disclosure to the construction team, explaining construction drawings, process standards, quality requirements, and safety regulations;
  • Clarify the sequence of each process, key control points, and acceptance standards, ensuring all construction personnel master the operational requirements;
  • Conduct special disclosure for special nodes and customized interfaces, clarifying installation processes and sequences.

8.1.2 Material Delivery and Acceptance

Material Transportation and Handling

  • All materials use protective packaging for transportation; steel plate modules use pearl cotton + wooden frame packaging to prevent deformation and scratching during transport;
  • Use dedicated suction cups and lifting frames during handling; dragging, dropping, or impacting modules is strictly prohibited to avoid flange edge deformation and surface coating damage;
  • Materials are sorted and stacked after entry; modules are placed flat on level wooden beams, stacking height not exceeding 10 layers to avoid deformation of bottom modules from compression; sealing gaskets, conductive adhesives, and other materials are stored in a cool, dry place away from direct sunlight and high temperatures.

Entry Acceptance

  • Check the specifications, models, and quantities of materials against the delivery list item by item, confirming consistency with the contract and drawings;
  • Inspect steel plate modules for appearance — no deformation, scratches, coating peeling, rust, or other defects; flange edges flat without warping;
  • Inspect sealing gaskets for cracks, aging, or deformation; conductive adhesive within shelf life;
  • Inspect keels for deformation or galvanized layer peeling; fasteners of correct specifications without rust;
  • After acceptance, fill in the material entry acceptance record and sign for confirmation before site construction begins.

8.1.3 Construction Tools and Equipment Preparation

Equip with appropriate tools according to construction scale. Check tool condition before entry; measuring tools must be within calibration validity period. Main tools include:

  • Measuring Tools: Laser level, tape measure, straightedge, feeler gauge, conductivity tester, ground resistance tester;
  • Installation Tools: Torque wrench, electric wrench, hand drill, impact drill, angle grinder, rubber mallet, caulking gun;
  • Lifting Tools: Manual chain hoist, lifting slings, scaffolding, access ladder;
  • Safety Tools: Safety helmet, safety harness, insulated gloves, fire extinguisher, temporary distribution box.

8.2 Foundation and Ground Beam Installation

The ground beam is the foundation of the entire shielding enclosure. Its levelness directly affects the quality of subsequent module installation and must be strictly controlled for precision.

8.2.1 Floor Cleaning and Layout Marking

  • Clean debris and dust from the installation area floor; grind down protruding areas flat, ensuring no sharp protrusions;
  • According to construction drawings, use a chalk line to mark the floor outline, ground beam position lines, and grounding main line position lines of the shielding enclosure; layout error ≤5mm;
  • Verify layout dimensions, confirm consistency with drawings, and mark the four corner points and key node positions.

8.2.2 Ground Beam Frame Assembly

  • Position ground beam keels according to the layout lines; install the outer perimeter frame ground beams first, then the internal longitudinal and transverse ground beams;
  • Ground beam joints use M10 bolts for connection; joint end faces must be flat with tight seams; corner joints use 45° splicing or direct welding, weld length ≥50mm; weld areas are ground smooth and treated with secondary anti-corrosion treatment;
  • Install adjustable support feet at each ground beam node; support feet are fixed to ground beams by welding or bolting to ensure firmness;
  • Initially adjust support foot heights to bring the ground beams approximately level; after verifying the overall frame dimensions, proceed with precision leveling.

8.2.3 Ground Beam Precision Leveling

  • Use a laser level with a measuring scale to adjust adjustable support foot heights point by point, ensuring ground beam upper surface levelness error ≤2mm/m², overall maximum height difference ≤3mm;
  • During the leveling process, simultaneously verify the squareness of the ground beam frame; diagonal error ≤5mm;
  • After leveling is complete, lock the support foot locking nuts to prevent loosening; fill gaps between support foot bases and floor with cement mortar or epoxy mortar to ensure uniform force distribution;
  • Perform ground beam grounding connection, reliably connecting the ground beam frame to the building grounding main line; conduct preliminary ground resistance testing to ensure compliance.

8.2.4 Floor Shielding Module Pre-installation and Grounding Busbar Installation

  • Lay grounding busbar on the ground beams, using 25mm² stranded copper cable or 30×3mm copper busbar, laid continuously along the inner side of the ground beams to form a closed grounding loop;
  • Set a fixing point every 1m for the grounding busbar; insulate and isolate from ground beams to avoid forming loops through multi-point grounding;
  • Reserve module grounding connection terminals on the grounding busbar, positioned corresponding to floor module grounding terminals.

8.3 Floor Shielding Module Installation

8.3.1 Gasket Pre-installation

  • Clean the flange contact areas between the ground beam upper surface and floor module lower surface, ensuring no dust, oil, or debris, ensuring good conductive contact;
  • Adhere conductive rubber gasket in the sealing groove of the floor module splicing flange; gasket joints use 45° bevel joints with a small amount of conductive adhesive applied at joints to ensure flat, non-protruding joints;
  • Gaskets are firmly adhered, centered, without offset or twisting, ensuring uniform compression.

8.3.2 Module Laying and Splicing

  • Start laying the first floor module from the corner; place the module steadily on the ground beam, aligning with positioning lines;
  • Align the second module’s flange with the first module’s flange; insert M8 connecting bolts with insulating washers, passing from inside to outside, nuts on the outside;
  • Gently tap the module flange edges with a rubber mallet to bring splicing seams into tight contact; gap width ≤0.1mm, checked with a feeler gauge;
  • Lay modules one by one in sequence, adjusting module positions as you go to ensure overall dimensional accuracy and surface flatness;
  • Use adjustment modules at corner positions to ensure full coverage of the floor modules without gaps.

8.3.3 Bolt Tightening and Conductivity Testing

  • All splicing bolts are tightened diagonally and uniformly with a torque wrench; tightening torque is 8N·m, ensuring uniform gasket compression of approximately 30%;
  • During tightening, continuously check module surface flatness; check with a 2m straightedge, error ≤2mm;
  • After every 3-5 modules installed, perform a conductivity test; contact resistance between adjacent modules ≤1mΩ qualifies;
  • After all floor modules are installed, connect each module’s grounding terminal to the grounding busbar using copper braided tape; connections must be secure with good conductivity.

8.3.4 Floor Sealing Treatment

  • Apply conductive sealant continuously along the inner side of floor module splicing seams; sealant bead width 5mm, height 3mm, continuous without breaks;
  • Apply conductive sealant around bolt heads, covering bolt hole gaps;
  • Reserve conductive sealant application allowance at the internal corner positions where floor meets walls; apply sealant uniformly after wall installation is complete.

8.4 Wall Shielding Module Installation

Wall installation is the core process of shielding enclosure construction. Verticality and splicing seam quality directly affect the overall shielding effectiveness.

8.4.1 Vertical Keel Installation

  • Mark vertical keel installation positions on the ground beam at 1000mm spacing, corresponding to wall module widths;
  • Erect vertical keels vertically on the ground beam; secure bottoms to the ground beam by welding or bolting;
  • Use a laser level to verify vertical keel verticality; verticality error ≤2mm per keel; entire wall verticality error ≤3mm;
  • Temporarily secure the tops of vertical keels; after top beam installation is complete, permanently secure to top beams;
  • Install reinforced vertical keels at door and window openings; double keel spacing matches opening width to ensure opening load-bearing capacity.

8.4.2 Wall Module Installation

  • Start installation from corner positions; install internal corner modules first, verify verticality, then temporarily secure to vertical keels;
  • Install standard wall modules in sequence; align module flange edges, insert M8 splicing bolts with insulating washers;
  • Verify verticality and flatness after each module installation; ensure module surfaces are flat and splicing seam gaps are uniform ≤0.1mm;
  • Secure modules to vertical keels with bolts; each module requires no less than 3 vertical fixing points to ensure secure connection;
  • When reaching door and window opening positions, install pre-reserved opening modules; verify opening dimensions and positions to ensure compatibility with supporting equipment;
  • Install the four walls in sequence to form a closed wall frame; continuously verify overall dimensions and squareness during installation.

8.4.3 Splicing Sealing and Conductivity Treatment

  • With every two modules spliced, simultaneously install conductive gaskets between flanges, ensuring gaskets are centered without offset or breakage;
  • Tighten bolts in diagonal sequence at 8N·m torque, avoiding module deformation from over-tightening on one side;
  • Install one copper conductive strip every 200mm along the outside of splicing seams, spanning the seam, compressed with bolts to enhance conductivity;
  • Conduct conductivity tests section by section; conductivity resistance between any two points on the wall ≤1Ω qualifies;
  • Apply conductive sealant on the inner side of wall splicing seams; sealant bead continuous and smooth, without bubbles or breaks.

8.4.4 Shielding Door Frame Pre-installation

  • Install the shielding door frame into the pre-reserved door opening module; adjust door frame verticality and levelness, error ≤1.5mm;
  • Install conductive rubber gasket between the door frame and wall module flange; tighten bolts uniformly to ensure tight contact surfaces;
  • Make equipotential connection between door frame and wall modules; conductivity resistance ≤1mΩ;
  • Temporarily secure the door frame with protective measures to avoid collision deformation during subsequent construction.

8.5 Ceiling Shielding Module Installation

Ceiling installation is high-altitude work. Safety protection measures are required to ensure construction safety and installation precision.

8.5.1 Top Beam Keel Installation

  • Install top main keels first, connecting to the tops of wall vertical keels to form a closed top frame;
  • Install secondary keels at 1000mm spacing, bolted to main keels; adjust secondary keel levelness, error ≤2mm/m²;
  • If suspended ceiling reinforcement is required, install hanger rods simultaneously, connecting top beams to the building floor slab, with uniform rod force distribution;
  • Verify overall dimensions and levelness of the top beam frame; after confirmation, lock all connecting bolts.

8.5.2 Ceiling Module Laying

  • Lay ceiling modules sequentially from one side to the other; lift modules above the keels first, then align flange edges;
  • Pre-install conductive gaskets between module splicing seams; insert splicing bolts and temporarily tighten;
  • Secure modules to secondary keels with bolts; each module requires no less than 6 fixing points, ensuring secure connections without loosening;
  • Install access hatch modules and pipeline interface modules at the positions shown on drawings; verify opening positions are accurate;
  • After all modules are laid, adjust module flatness; overall ceiling deflection ≤1/400 span, without obvious sagging.

8.5.3 Ceiling Sealing and Grounding

  • Tighten all splicing bolts to specified torque, ensuring uniform gasket compression;
  • Install copper conductive strips on the outside of splicing seams; apply conductive sealant on the inner side; process same as walls;
  • Connect ceiling module grounding terminals to the top beam keel grounding system, ensuring overall equipotentiality;
  • Inspect all ceiling splicing seams and bolt holes — no missed sealing points.

8.6 Overall Sealing Reinforcement and Structural Strengthening

8.6.1 Overall Sealing Inspection and Reinforcement

  • Comprehensively inspect all splicing seams, corners, openings, and bolt holes; confirm sealing gaskets are continuous and conductive sealant is full;
  • Perform secondary sealing reinforcement on internal corners, corners, interfaces, and other critical areas, increasing conductive sealant thickness;
  • Check all bolt insulating washers are intact, without omission or damage;
  • Inspect sealing at interface flanges of door frames, waveguide windows, filters, etc., and apply additional conductive sealant where needed.

8.6.2 Structural Strengthening

  • Re-tighten all keel connecting bolts and module splicing bolts to ensure no loosening;
  • Apply secondary anti-corrosion treatment to welded areas, brushing on anti-rust paint;
  • Check overall structural stability — no shaking or deformation;
  • Install diagonal bracing on large shielded rooms as per design requirements to enhance structural rigidity.

8.6.3 Overall Conductivity and Grounding Testing

  • Test conductivity resistance between any two points on the shielding enclosure; ≤0.5Ω qualifies;
  • Test system grounding resistance; combined grounding system ≤1Ω, independent grounding ≤4Ω qualifies;
  • Test connection resistance between the enclosure and grounding system; ≤0.5Ω qualifies;
  • Non-conforming areas must be investigated and reworked until qualified.

8.7 Decorative Trim Installation

  • Install interior internal/external corner trim strips to cover splicing seams and bolt heads, improving aesthetics;
  • Install door and window opening trim covers to finish opening edges;
  • Install signage and nameplates, fixed at designated positions;
  • Clean construction debris from the site; clean interior and exterior surfaces of the enclosure.

8.8 Installation Quality Control Points

Process Quality Control Point Allowable Deviation Inspection Method
Ground Beam Installation Levelness ≤2mm/m² Laser Level
Ground Beam Installation Diagonal Error ≤5mm Steel Tape Measure
Floor Modules Surface Flatness ≤2mm/2m 2m Straightedge + Feeler Gauge
Wall Installation Verticality ≤3mm/total height Laser Vertical Indicator
Splicing Seams Gap Width ≤0.1mm Feeler Gauge
Between Modules Contact Resistance ≤1mΩ Conductivity Tester
System Grounding Ground Resistance ≤1Ω Ground Resistance Tester
Ceiling Installation Deflection ≤1/400 span Line Pull + Measuring Scale

9 Product Wiring Process and Requirements

The wiring of the steel plate splicing shielding enclosure mainly consists of four parts: grounding system wiring, power/signal filter wiring, shielding door electrical wiring, and internal power distribution wiring. Wiring quality directly affects shielding effectiveness and electrical safety and must strictly follow specifications.

9.1 Overall Wiring Principles

  • Shielding Continuity Principle: All cables passing through the shielding enclosure must use filters or waveguides; direct opening for cable passage is strictly prohibited; destroying the continuity of the shielding enclosure is strictly prohibited;
  • Equipotential Principle: All metal cable sheaths, shielding layers, and equipment housings must be connected equipotentially to the shielding enclosure, eliminating potential differences;
  • Classified Wiring Principle: Power, low-voltage, and signal cables are laid in separate categories with spacing ≥300mm to avoid mutual interference;
  • Safety Specification Principle: Strictly comply with GB 50303-2015 “Code for Acceptance of Construction Quality of Building Electrical Engineering” to ensure safe and reliable wiring.

9.2 Grounding System Wiring

9.2.1 Grounding System Composition

The shielding enclosure grounding system consists of three parts: main enclosure grounding, internal equipotential grounding, and lightning protection grounding; the three together form a complete grounding system.

  • Main Grounding: Connection between the shielding enclosure body and the building grounding grid, used to discharge electromagnetic energy induced on the enclosure and ensure zero potential of the enclosure;
  • Internal Equipotential Grounding: Connection of internal equipment, cabinets, and metal pipelines to the enclosure grounding busbar, achieving internal equipotentiality;
  • Lightning Protection Grounding: Connection between the shielding enclosure and the building lightning protection system, discharging lightning-induced energy, complying with lightning protection codes.

9.2.2 Main Grounding Wiring Process

  • The shielding enclosure shall have at least 4 main grounding points, located at the four corners; for large spaces, add one grounding point every 10m;
  • Grounding points use 25mm² stranded copper insulated cable; one end crimped to the ground beam keel grounding terminal, the other end connected to the building grounding grid terminal;
  • Grounding cable connections use cold-pressed copper lugs, firmly crimped, contact resistance ≤0.5Ω; terminal points treated with anti-corrosion and insulation treatment;
  • Grounding cables should be as short and straight as possible, avoiding bending and coiling, length ≤5m to reduce grounding impedance;
  • Multiple grounding cables connected in parallel provide redundancy, avoiding single-point grounding failure.

9.2.3 Internal Equipotential Wiring Process

  • Install an equipotential grounding busbar on the interior wall surface at 300mm above the floor; specification 30×3mm tinned copper busbar; busbar fixed with insulated brackets;
  • Grounding busbar connected to the shielding enclosure main grounding terminal using 25mm² copper cable; no less than 2 connection points;
  • Internal cabinets, equipment metal housings, metal pipelines, anti-static floor brackets, etc., all connected to the grounding busbar using 6mm² copper braided tape or stranded copper cable;
  • All grounding connection points must be secure and reliable, without loosening or oxidation; periodically check conductivity.

9.2.4 Grounding Resistance Requirements

  • Combined grounding system (shared with building grounding and lightning protection grounding): Ground resistance ≤1Ω;
  • Independent classified grounding system: Ground resistance ≤4Ω;
  • Ground resistance testing uses a ground resistance tester; tested at least once per year.

9.3 Power Filter Wiring

9.3.1 Filter Installation Requirements

  • Power filters are installed on the exterior wall surface of the shielding enclosure, flange-mounted, tightly fitted to the wall module; conductive rubber gasket placed at the contact surface to ensure shielding continuity;
  • Filter input side faces the outdoor side, output side faces the indoor side; reverse connection is strictly prohibited; input and output cables are routed separately with spacing ≥500mm to avoid coupling interference;
  • Filter housing reliably connected to the shielding enclosure; conductivity resistance ≤1mΩ, ensuring equipotentiality.

9.3.2 Wiring Process

  • Input cable connects to the outdoor power supply circuit; output cable connects to the indoor distribution box; cable cross-section selected according to current rating, meeting ampacity requirements;
  • Wiring uses terminal crimping, secure and reliable, no loose connections; phase, neutral, and ground wires correctly connected with clear labeling;
  • Filter grounding terminal separately connected to the shielding enclosure grounding terminal using 6mm² copper cable; grounding path as short as possible;
  • Filter cable entry/exit holes sealed with sealing putty to prevent dust and moisture ingress while avoiding electromagnetic leakage;
  • When multiple filters are installed side by side, spacing ≥100mm for heat dissipation.

9.3.3 Precautions

  • Connecting other electrical equipment in parallel before the filter is strictly prohibited; all indoor power usage must pass through the filter;
  • Increasing the filter fuse rating arbitrarily is strictly prohibited to avoid overcurrent protection failure;
  • After wiring is complete, check insulation resistance; insulation resistance between phase wires and housing ≥100MΩ.

9.4 Signal Filter Wiring

9.4.1 Network Signal Filter Wiring

  • Filter installed on the exterior wall side, flange-mounted, sealing process same as power filter;
  • Outdoor network cable connects to filter input; indoor network cable connects to output; RJ45 interface direct plug connection, securely inserted;
  • Shielded network cable shielding layers are reliably connected to the filter housing and indoor equipment housing at both ends respectively, ensuring shielding continuity;
  • Multi-port filters wired according to labels, avoiding mix-ups; mark cable numbers.

9.4.2 Other Signal Filter Wiring

  • Video, control, RF, and other signal filters use corresponding connection methods based on interface type; BNC interfaces use crimping or soldering; RS485 uses terminal connections;
  • Signal cable shielding layers have single-ended grounding; grounding end located on the inside of the shielded room to avoid ground loop interference;
  • Signal cables and power cables are laid separately; crossings are at right angles to reduce electromagnetic coupling.

9.5 Shielding Door Electrical Wiring

9.5.1 Electric Shielding Door Wiring

  • Door operator control power is taken from the indoor distribution box, connected to the door controller through a dedicated control filter; power specification AC220V;
  • Control buttons, access control, remote control, and other control lines are connected through signal filters to avoid conducted leakage through control lines;
  • Door motor, limit switches, and anti-pinch sensors are wired according to the manufacturer’s wiring diagram; terminals secure with clear labeling;
  • Door metal housing connected equipotentially to the shielding enclosure; conductivity resistance ≤1mΩ.

9.5.2 Shielding Door Interlock and Access Control Wiring

  • Access control system signal lines enter/exit the shielded room through dedicated signal filters; direct cable penetration is strictly prohibited;
  • Door interlock device wired correctly, achieving linkage with the fire protection system — automatic door opening during fire;
  • After wiring is complete, test door opening/closing, locking, and interlock functions to ensure normal operation.

9.6 Internal Electrical Distribution Wiring

9.6.1 Indoor Distribution Box Installation

The indoor distribution box shall be wall-mounted at a height of 1.5 m above the floor. The metal enclosure of the box shall be reliably connected to the grounding copper busbar.

The incoming supply to the distribution box shall come from the output terminals of the power supply filter. The outgoing circuits shall be divided into lighting circuits, socket circuits, equipment circuits, etc. Each branch circuit shall be provided with a miniature circuit breaker and residual current protection.

Wiring inside the box shall be neatly arranged, clearly labeled, and firmly connected, in compliance with electrical codes.

9.6.2 Lighting and Socket Wiring

Indoor lighting shall adopt shielded luminaires or standard luminaires with shielding covers. Lighting circuits shall be routed through galvanized steel conduits, with both ends of each conduit connected to the grounding copper busbar.

Sockets shall be grounded safety sockets, with the grounding terminal connected to the grounding copper busbar.

All cables shall be neatly laid, securely fixed, with separation of power and weak-current cables to avoid cross interference.

9.6.3 Cable Penetration Requirements

All electrical conduits passing through shielded walls must pass through filters or waveguides. Direct drilling and routing through the wall is strictly prohibited.

Unshielded cables are strictly prohibited from entering or exiting the shielding room directly. They must be processed through filters.

Fiber optic cables passing through the wall shall use dedicated fiber optic waveguides, with the pipe opening sealed with sealant to prevent gap leakage.

9.7 Wiring Acceptance Standards

  • Wiring shall be neat, firm, clearly labeled, with no loose or incorrect connections.
  • Insulation resistance shall meet requirements: power circuits to ground ≥ 100 MΩ.
  • Grounding resistance shall comply with requirements; all grounding connections shall have good continuity.
  • All wall penetration points shall be shielded and sealed, with no direct cable routing that compromises shielding.
  • Upon energization test, each circuit shall supply power normally; switches and sockets shall function correctly.

10 Product Commissioning Methods and Standards

Product commissioning is a critical process for verifying installation quality and ensuring shielding effectiveness meets requirements. It is divided into four stages: appearance and structure commissioning, electrical performance commissioning, shielding effectiveness pre-commissioning, and system integration commissioning.

10.1 Pre-Commissioning Preparation

  • Confirm that all installation work has been completed, the site is clean, and no debris remains.
  • Prepare commissioning tools: continuity tester, ground resistance tester, laser level, feeler gauge, torque wrench, field strength tester, signal generator, etc.
  • Commissioning personnel shall be familiar with the product principles and commissioning standards, and hold valid certifications.
  • Develop a commissioning plan defining the commissioning items, methods, and acceptance criteria.

10.2 Appearance and Structure Commissioning

10.2.1 Appearance Inspection

  • Inspect the inner and outer surfaces of the shielding enclosure: coating intact, no scratches, deformation, or corrosion.
  • Inspect all seams for evenness, uniform gap, and no obvious misalignment or warping.
  • Inspect bolts for proper tightening with no omissions; insulating washers complete.
  • Inspect sealant for continuous, full application; no bubbles, cracks, or detachment.
  • Inspect decorative trim for even installation, no raised edges or loosening.
  • Inspect nameplates and labels for completeness and correct installation positions.

10.2.2 Structural Precision Commissioning

  • Re-verify interior net dimensions: length, width, height deviation ≤ ±5 mm.
  • Check wall verticality: total height deviation ≤ 3 mm.
  • Check floor and ceiling flatness: 2 m straightedge deviation ≤ 2 mm.
  • Check door frame verticality and levelness: deviation ≤ 1.5 mm.
  • Check overall structural stability: no shaking or abnormal noise when pushed with force.

10.3 Electrical Performance Commissioning

10.3.1 Continuity Performance Commissioning

  • Use a milliohm-level continuity tester to measure the continuity resistance between any two points on the shielding enclosure. Acceptance criterion: ≤ 0.5 Ω.
  • Measure the contact resistance across each seam. Acceptance criterion: ≤ 1 mΩ.
  • Measure the continuity resistance between modules and keel framework, and between keel and grounding system. Acceptance criterion: ≤ 0.5 mΩ.
  • For points failing the test, investigate causes: loose bolts, poor gasket contact, surface oxidation layer, etc. After targeted treatment, retest until passing.

10.3.2 Grounding Performance Commissioning

  • Use a ground resistance tester to measure the total system ground resistance. Acceptance: combined grounding ≤ 1 Ω, independent grounding ≤ 4 Ω.
  • Test the connection resistance between the internal grounding copper busbar and the main ground: ≤ 0.5 Ω is acceptable.
  • Test the ground resistance at each equipment grounding point; all must meet requirements.
  • If ground resistance fails, check whether grounding terminal connections are firm, whether grounding cables are intact, and whether the grounding grid meets requirements. If necessary, add grounding electrodes to improve ground resistance.

10.3.3 Electrical Insulation Testing

  • Use a 500 V megger to test the insulation resistance of power circuits to ground: ≥ 100 MΩ is acceptable.
  • Test the insulation resistance between bolts and the enclosure: ≥ 100 MΩ is acceptable, to prevent bolts from forming conductive columns that cause leakage.
  • Test the insulation performance of filter input/output terminals, which shall comply with product parameter requirements.

10.4 Shielding Effectiveness Pre-Commissioning

Formal shielding effectiveness testing shall be performed by a third-party organization. On-site pre-commissioning may be performed to preliminarily identify leakage points.

10.4.1 Preliminary Leakage Point Investigation

  • Use a small field strength tester to scan along seams, door frames, window openings, filter interfaces, and other positions from inside the shielding room.
  • Compare field strength values at different locations. Positions with significantly higher values are suspected leakage points; mark them.
  • Focus on weak areas: corners, joint connections, bolt holes, and areas around interfaces.

10.4.2 Leakage Point Treatment

  • For suspected leakage points, check whether sealing gaskets are properly installed, conductive sealant is fully applied, and bolts are tightened.
  • Replace or add gaskets where broken or missing.
  • For excessive gaps, adjust module positions and tighten bolts to reduce gaps.
  • For poor interface sealing, re-tighten flanges and re-apply conductive sealant.
  • Retest after treatment until field strength is uniform with no obvious abnormal high points.

10.4.3 Pre-Commissioning Acceptance Criteria

  • No obvious overall leakage points; field strength distribution is uniform.
  • Field strength difference at key locations (doors, windows, interfaces) versus the wall body ≤ 10%.
  • All continuity and grounding performance indicators pass.

10.5 System Integration Commissioning

10.5.1 Shielding Door System Commissioning

  • Test shielding door for smooth opening/closing, no sticking or abnormal noise; locking mechanism operates flexibly.
  • For electric doors, test remote control, local buttons, and access control — all shall open/close normally; anti-pinch function effective.
  • Test that when the door is locked, the sealing gap is uniform and contact is good.
  • Test fire alarm integration: simulate fire signal; the door shall automatically unlock and open.

10.5.2 Ventilation and Air Conditioning System Commissioning

  • Start the ventilation system; test that airflow meets requirements with no obvious excessive wind resistance.
  • Test that there is no obvious wind noise or vibration at waveguide windows.
  • With the air conditioning system running, test that waveguide pipe interfaces show no condensation or leakage.

10.5.3 Power Distribution and Low-Voltage System Commissioning

  • Close breakers to test that each circuit supplies power normally; switch protection functions effective.
  • Test network, telephone, surveillance, and other signal transmission for normal operation with no obvious attenuation or interference.
  • Test lighting, sockets, and other terminal equipment for normal operation.

10.6 Commissioning Records and Conclusions

  • All commissioning items shall be truthfully recorded in commissioning logs, including test data and results.
  • After all items pass, issue a commissioning acceptance report as the basis for completion acceptance.
  • Non-conforming items shall receive a rectification notice; re-commissioning shall be performed after rectification.
  • Commissioning documentation shall be organized, archived, and handed over to the user.

11 Product Construction and Usage Precautions

11.1 Construction Safety Precautions

  • Aerial work safety: Ceiling installation is aerial work. Certified scaffolding or work platforms must be erected. Workers must wear safety harnesses, tools must be tethered, and throwing objects from height is strictly prohibited. Scaffolding may only be used after acceptance inspection.
  • Electrical safety: On-site temporary power shall adopt three-level distribution with two-level protection. Distribution boxes shall be reliably grounded. Power tools shall be connected to residual current devices; cables shall be free of damage. Unauthorized wiring is strictly prohibited. Power shall be disconnected at the end of each workday.
  • Fire safety: Smoking is strictly prohibited on site. Sufficient fire extinguishers shall be provided. If hot work is required (e.g., keel welding), a hot work permit must be obtained, a dedicated fire watch assigned, surrounding combustible materials cleared, and no remaining ignition sources after completion.
  • Material handling safety: Steel plate modules shall be moved with multiple workers under unified command to avoid crushing injuries. Modules shall be stacked stably to prevent tipping. When moving long materials such as keels, be aware of the surrounding environment to avoid striking personnel and facilities.
  • Personal protective equipment: Construction personnel shall wear safety helmets, protective footwear, and gloves. Personnel applying sealant shall wear protective goggles. Avoid direct skin contact with conductive sealant and other chemical materials.

11.2 Installation Process Precautions

  • Module protection: During installation, avoid scratching the steel plate surface coating with hard objects. Welding or drilling directly on modules is strictly prohibited. Flange edges must not be struck or deformed, otherwise seam leakage may occur.
  • Sealing gasket installation: Clean the contact surface before gasket installation; no dust or oil. Gasket joints shall be 45° mitered; direct butt joints are strictly prohibited. During installation, avoid stretching or twisting gaskets to prevent breakage.
  • Bolt tightening: Torque wrench must be used to tighten to the specified torque. Over-tightening causing module deformation or gasket crushing is prohibited, as is under-tightening resulting in poor contact. Use a diagonal tightening sequence to ensure uniform stress.
  • Insulating washers: All bolts passing through panels must have insulating washers installed. Omission is strictly prohibited to avoid bolts forming electromagnetic leakage paths. Damaged washers shall be replaced promptly.
  • Conductive sealant application: Conductive sealant must be used within its shelf life. Construction environment: temperature 5°C ~ 35°C, humidity ≤ 80%. Sealant joints shall be continuous and uniform, avoiding air bubbles. Avoid touching or water contact before curing.
  • Finished product protection: After installation, protect the finished work to prevent subsequent decoration construction from damaging the shielding structure. Welding, hanging heavy objects, or strong impact on the enclosure is strictly prohibited.

11.3 Usage Precautions

  • No unauthorized drilling: Drilling, cutting, or opening holes in the shielding enclosure without authorization is strictly prohibited. Any conduit penetration must use dedicated filters or waveguides; otherwise, shielding effectiveness will be severely compromised.
  • Shielding door usage specifications:
  • Open and close the shielding door gently. Violent impact or forced prying is strictly prohibited.
  • Release the handle only after the door is locked, ensuring full sealing closure.
  • Hanging heavy objects on the door is strictly prohibited to avoid door deformation.
  • Regularly clean dust and debris from the door frame sealing groove to prevent interference with sealing.
  • Environmental management:
  • Keep the shielding room dry and well-ventilated. Relative humidity ≤ 80%. Avoid prolonged dampness that causes steel corrosion and gasket oxidation.
  • Storing corrosive, flammable, or explosive materials is strictly prohibited.
  • Avoid scratching the coating on the inner and outer walls with sharp objects.
  • Grounding system maintenance: Removing or modifying grounding circuits without authorization is strictly prohibited. Regularly inspect grounding terminals to ensure firm connections.
  • Equipment placement: Distribute equipment evenly to avoid local overloading. Heavy equipment requires reinforced floor support.

11.4 Special Environment Precautions

  • Humid environments: For underground or basement locations, add dehumidification equipment, periodically inspect steel plate surfaces and seams to prevent corrosion. Additional anti-corrosion coating may be applied to improve moisture resistance.
  • Coastal environments: For high salt-spray coastal environments, use 304 stainless steel or apply additional anti-corrosion coating, with regular anti-corrosion maintenance. Select salt-spray-resistant gaskets to extend service life.
  • Low-temperature environments: For low-temperature operation, select low-temperature-resistant conductive sealant and gaskets to avoid low-temperature embrittlement failure. Periodically inspect sealing performance.
  • Strong vibration environments: Where strong vibration sources are present, add vibration damping measures to prevent long-term vibration from causing bolt loosening and seal failure. Periodically re-tighten bolts.

12 Product Repair and Maintenance Procedures

12.1 Routine Inspection (Daily/Weekly)

  • Appearance inspection: Check inner and outer surfaces of the shielding enclosure for deformation, scratches, or corrosion; check seams for cracks or raised edges.
  • Shielding door inspection: Check smooth opening/closing, proper locking, and whether the sealing surface has debris or damage.
  • Grounding inspection: Check grounding terminals for loosening or detachment, and cables for damage.
  • Environment inspection: Check indoor temperature and humidity, and check for condensation or water leakage.

Routine inspections shall be performed by the user’s operations and maintenance personnel, with inspection records filled out. Abnormalities shall be handled promptly or reported to the manufacturer.

12.2 Monthly Maintenance

  • Cleaning and maintenance: Clean the shielding door sealing groove and beryllium copper spring contacts with a clean soft cloth to remove dust and oil. Using corrosive solvents such as alcohol or acetone on conductive sealing surfaces is strictly prohibited.
  • Bolt inspection: Check bolts on door frames, interface flanges, and other critical locations for loosening. Re-tighten to specified torque if loose.
  • Sealing inspection: Check conductive sealant for cracks or detachment. Promptly re-apply where minor damage exists.
  • Grounding test: Test ground resistance to ensure compliance.
  • Functional testing: Test shielding doors, filters, ventilation system, and other functions for normal operation.

12.3 Quarterly Maintenance

  • Comprehensive bolt re-tightening: Re-tighten all seam bolts and keel bolts, especially during seasons with significant temperature changes, to prevent loosening due to thermal expansion and contraction.
  • Continuity spot check: Spot-check continuity resistance at critical locations to ensure conductive continuity.
  • Gasket inspection: Check door beryllium copper spring contacts for deformation, fatigue, or breakage, and check spring elasticity. Check seam gaskets for aging or crushing.
  • Corrosion inspection: Check steel plate edges, bolt heads, and other corrosion-prone areas. Remove rust and touch up paint promptly where found.
  • Interface inspection: Check filter and waveguide window interface sealing, and tighten connecting bolts.

12.4 Annual Maintenance (Recommended Performed by Professionals)

  • Comprehensive performance testing:
  • Comprehensively test enclosure continuity performance; measure continuity resistance at all critical points.
  • Test system ground resistance.
  • Where conditions permit, perform shielding effectiveness sampling tests to evaluate overall performance status.
  • Sealing system maintenance:
  • Inspect all sealing gaskets; replace aged or failed gaskets.
  • Remove and re-apply aged conductive sealant to ensure reliable sealing.
  • Replace worn door spring contacts and adjust door sealing pressure.
  • Structural system maintenance:
  • Comprehensively inspect keel structure and connection nodes; apply anti-corrosion treatment to corroded areas.
  • Check adjustable support feet for settlement and adjust promptly.
  • Check ceiling deflection; reinforce areas exceeding limits.
  • Electrical system maintenance:
  • Check filter operating status and test insertion loss.
  • Tighten all electrical wiring terminals and investigate hidden loose-connection risks.
  • Test insulation resistance and grounding performance.
  • Maintenance records: After annual maintenance, issue a maintenance report documenting performance status, replaced components, and rectification measures. Archive for reference.

12.5 Repair Methods for Common Damage

12.5.1 Steel Plate Surface Coating Damage Repair

  • Sand the damaged area and a 20 mm surrounding range with sandpaper to remove rust and loose coating.
  • After cleaning, spray rust-preventive primer and finish paint in matching color. Apply uniformly without runs.
  • If damage penetrates deeply into the base material, perform rust treatment first, then touch up paint.

12.5.2 Seam Leakage Repair

  • Investigate the leakage cause: loose bolts, aged gaskets, or excessive gaps.
  • For loose bolts, re-tighten to specified torque.
  • For aged or damaged gaskets, remove old gaskets, clean contact surfaces, install new gaskets of the same specification, and tighten bolts evenly.
  • For excessive gaps, adjust module positions, add gaskets, or apply additional conductive sealant.
  • After repair, test continuity resistance and shielding effectiveness to confirm leakage is eliminated.

12.5.3 Shielding Door Poor Sealing Repair

  • Clean debris from the sealing groove and spring contacts; check spring contacts for deformation or breakage.
  • Correct deformed spring contacts with tweezers; replace broken ones with the same specification.
  • Adjust the door locking mechanism to increase locking pressure, ensuring uniform sealing contact.
  • For door body deformation, adjust the gap between door frame and door, and correct the deformed area.

12.5.4 Bolt Corrosion Repair

  • Remove corroded bolts and clean rust inside the threaded holes.
  • Replace with galvanized or stainless steel bolts of the same specification, and install new insulating washers.
  • Tighten to specified torque and apply touch-up paint around bolt heads.

12.5.5 Poor Grounding Repair

  • Check whether grounding terminal connections are loose. Polish oxidized contact surfaces and re-tighten.
  • Replace broken grounding cables with the same specification, crimping securely.
  • If the grounding grid resistance exceeds limits, add grounding electrodes or contact the grounding system maintenance unit for treatment.

12.6 Maintenance Precautions

  • Maintenance shall be performed by professionals familiar with shielding structures. Blind disassembly is strictly prohibited.
  • After maintenance involving sealing structures, continuity or shielding effectiveness testing must be performed to confirm performance restoration.
  • Replacement parts shall be original factory products of the same specification. Random substitution is strictly prohibited to avoid performance impact.
  • Protect the finished product during maintenance to avoid secondary damage.
  • For major repairs, contact Guangzhou Lain Intelligent System Development Co., Ltd. technical support, or arrange for original factory engineers to perform the work on site.

13 Product Common Problems and Solutions

13.1 Structural Problems

Problem 1: Module seam misalignment, uneven gap

*Cause Analysis:*

  • Floor beam levelness does not meet requirements; uneven foundation.
  • Module flange edges deformed during transport or handling.
  • Incorrect installation sequence causing excessive cumulative error.
  • Incorrect bolt tightening sequence causing one-sided stress shift.

*Solution:*

  • Re-calibrate floor beam levelness to ensure a level foundation.
  • Gently correct deformed flange edges with a rubber mallet; replace severely deformed modules.
  • Re-position installation starting from corners, adjusting module by module to control cumulative error.
  • Use diagonal tightening method with uniform stress to avoid one-sided over-tightening.

*Preventive Measures:*

  • Strictly inspect module appearance upon arrival; reject deformed modules.
  • Re-verify floor beam leveling before proceeding to the next process.
  • Strictly follow installation procedures, controlling precision at every step.

Problem 2: Shielding door opens/closes with sticking, poor locking

*Cause Analysis:*

  • Door frame installation verticality insufficient; door body rubs against door frame.
  • Door hinge/pulley loose or shifted.
  • Locking mechanism lacks lubrication or has debris.
  • Door body deformed or sealing strip too thick.

*Solution:*

  • Correct door frame verticality and adjust door body clearance to ensure uniform gap around all sides.
  • Tighten hinge/pulley screws, adjust position, and apply lubricating oil.
  • Clean debris from the locking mechanism and apply grease.
  • Adjust locking pressure and replace sealing gasket with appropriate thickness.

*Preventive Measures:*

  • Strictly control precision during door frame installation.
  • Regularly clean and lubricate door mechanisms.
  • Avoid violent door operation.

Problem 3: Ceiling module sagging, deflection exceeds limits

*Cause Analysis:*

  • Keel spacing too large, insufficient support.
  • Ceiling load exceeds limits due to stacked heavy objects.
  • Bolts loose; module-to-keel connection failed.
  • Keel size too small, insufficient rigidity.

*Solution:*

  • Add secondary keels, reduce spacing, and enhance support.
  • Remove overweight items from the ceiling and control load within allowable range.
  • Re-tighten all connection bolts to ensure firm connections.
  • Replace keels with larger specifications where rigidity is insufficient, or add suspension rods for reinforcement.

*Preventive Measures:*

  • Strictly use according to design load; ceiling overloading is strictly prohibited.
  • Strengthen keel design in advance for large-span ceilings.
  • Regularly inspect ceiling condition.

13.2 Shielding Effectiveness Problems

Problem 1: Overall shielding effectiveness does not meet requirements

*Cause Analysis:*

  • Multiple seams poorly sealed with numerous leakage points.
  • Grounding system non-compliant; equipotential bonding failed.
  • Unauthorized drilling or direct cable penetration creating major leakage points.
  • Shielding door, waveguide windows, and other interface components with performance lower than the enclosure.

*Solution:*

  • Comprehensively inspect seams, replace aged gaskets, apply additional conductive sealant, and re-tighten bolts.
  • Rectify the grounding system to ensure ground resistance meets requirements and equipotential connections are reliable.
  • Seal unauthorized openings; reroute cables through filters/waveguides.
  • Replace interface equipment with matched performance levels to ensure overall consistency.

*Preventive Measures:*

  • Strictly follow procedures during installation; inspect each process step.
  • Unauthorized drilling and cable routing is strictly prohibited.
  • Select same-grade products for supporting equipment.

Problem 2: Obvious leakage at local points

*Cause Analysis:*

  • Gasket at that location broken, missing, or in poor contact.
  • Bolts missing or loose.
  • Interface flange poorly sealed.
  • Steel plate has small holes or pinhole defects.

*Solution:*

  • Locate the specific leakage point; install or replace gaskets to ensure good contact.
  • Install missing bolts and re-tighten loose bolts.
  • Tighten interface flanges, replace sealing gaskets, and apply additional conductive sealant.
  • Seal steel plate pinholes with conductive putty, reinforce the exterior with copper foil tape, and replace the module if severe.

*Preventive Measures:*

  • Strict factory quality inspection of modules; prevent defective products from shipping.
  • Check gasket condition along every seam during installation.
  • Strictly follow sealing procedures for interface installation.

Problem 3: Poor shielding effectiveness at low frequencies

*Cause Analysis:*

  • Steel plate thickness insufficient; low-frequency absorption loss inadequate.
  • Poor grounding; low-frequency magnetic fields cannot be dissipated effectively.
  • Excessive gaps; low-frequency magnetic fields penetrate through gaps easily.

*Solution:*

  • For scenarios with high low-frequency requirements, add an inner layer of high-permeability material to improve low-frequency shielding.
  • Optimize the grounding system by adding grounding points and reducing ground resistance.
  • Reduce seam gaps and add low-frequency sealing measures such as magnetically permeable gaskets.

*Preventive Measures:*

  • Select appropriate thickness and grade products based on low-frequency requirements during specification.
  • Grounding system construction strictly per code.

13.3 Electrical Problems

Problem 1: Ground resistance exceeds limits

*Cause Analysis:*

  • Grounding cable connection loose, oxidized, poor contact.
  • Grounding cable too long or too thin, excessive impedance.
  • Building grounding grid resistance itself does not meet requirements.
  • Grounding electrode corroded and failed.

*Solution:*

  • Polish wire terminals, re-crimp and tighten to ensure good contact.
  • Replace with thicker grounding cables and shorten grounding paths.
  • Contact property management or grounding construction unit to rectify the building grounding grid.
  • Add grounding electrodes to reduce ground resistance.

*Preventive Measures:*

  • Grounding construction strictly per code.
  • Regularly test ground resistance and maintain promptly.

Problem 2: Internal equipment interference, unstable operation

*Cause Analysis:*

  • Equipment not grounded; static or interference cannot be dissipated.
  • Cables not passing through filters; interference transmitted along cables.
  • Internal power and weak-current wiring disorganized, causing mutual interference.
  • Shielding effectiveness degraded; external interference penetrating.

*Solution:*

  • Ground all equipment metal enclosures to the indoor grounding copper busbar to ensure good grounding.
  • All incoming/outgoing cables must pass through corresponding filters; direct connection is strictly prohibited.
  • Organize internal wiring, separate power from weak-current cables, and meet spacing requirements.
  • Identify shielding leakage points and repair shielding effectiveness.

*Preventive Measures:*

  • Strictly follow the principle of separating power and weak-current cables during wiring.
  • New equipment must be wired per code; unauthorized wiring is strictly prohibited.
  • Regularly maintain the shielding system.

Problem 3: Abnormal filter heating

*Cause Analysis:*

  • Load current exceeds the filter’s rated current.
  • Internal filter component failure.
  • Poor ventilation at installation location, inadequate heat dissipation.
  • Short circuit or ground fault in input/output cables.

*Solution:*

  • Calculate load current and replace with a filter of higher rated current.
  • Power off and test the filter; replace failed units with the same model.
  • Improve ventilation at the installation location; avoid enclosed installation.
  • Investigate line faults and eliminate short-circuit and grounding issues.

*Preventive Measures:*

  • Allow sufficient margin in filter selection; avoid full-load operation.
  • Install in well-ventilated locations.
  • Regularly inspect operating status.

14 Product QA

Q1: What is the difference between a steel plate bolted-assembly shielding room and a traditional welded shielding room?

A: The core differences lie mainly in construction process and product characteristics, as follows:

  • Construction method: Bolted assembly uses factory-prefabricated modules assembled on site with bolts, requiring no welding; welded construction involves on-site cutting and welded forming, with extensive hot work.
  • Construction period: Bolted assembly has a short construction period — a 20 m² equipment room takes 3-5 days for the main structure; welded construction requires 15-20 days, a longer schedule.
  • Shielding effectiveness: Bolted modules are manufactured in standardized factory production with mature sealing processes, giving consistent effectiveness and slow degradation; welded construction depends on welder skill, with weld seams prone to cold welds and pinholes, and long-term corrosion and leakage causing faster effectiveness degradation.
  • Reusability: Bolted assembly can be fully disassembled and relocated, with a reuse rate of over 90%; welded construction is a fixed structure that cannot be relocated and is scrapped upon demolition.
  • On-site environment: Bolted assembly produces no welding fumes, low noise, suitable for renovation projects; welded construction produces heavy fumes and noise with significant impact on surroundings.
  • Cost: For small-area projects, bolted assembly offers better cost efficiency; for large-area projects, welded construction has slightly lower material costs but higher labor costs, with minimal overall cost difference.

Q2: What is the service life of a steel plate bolted-assembly shielding enclosure?

A: Under normal indoor environments, compliant usage, and regular maintenance, the main structure service life of the LA-P series steel plate bolted-assembly shielding enclosure is ≥ 20 years.

Specifically: steel plates, keel structures, and other metal structures can last over 20 years; conductive rubber gaskets, conductive sealant, and other sealing consumables have a service life of approximately 5-8 years and require regular inspection and replacement; beryllium copper spring contacts have a lifespan of approximately 100,000 open/close cycles, typically 8-10 years under normal use. Regular maintenance and timely replacement of wear parts can effectively extend overall service life.

Q3: Must a shielding room have independent grounding? What is the ground resistance requirement?

A: Independent grounding is not mandatory; it depends on the application scenario:

  • For ordinary commercial and industrial shielding rooms, combined grounding is recommended — sharing the grounding grid with building lightning protection grounding and electrical grounding. Ground resistance ≤ 1 Ω is sufficient, offering higher safety and avoiding potential differences between different grounding systems.
  • For high-classification confidentiality requirements, an independent secure grounding may be installed, with ground resistance ≤ 4 Ω, and a separation of ≥ 20 m from other grounding systems to avoid ground potential back-striking.

Regardless of grounding method, the shielding enclosure must achieve good equipotential bonding, which is the key to ensuring shielding effectiveness and electrical safety.

Q4: Can windows and air conditioning be installed in a shielding room?

A: Yes, but ordinary windows and air conditioners cannot be installed directly. Dedicated shielding interfaces are required:

  • Ventilation: Install honeycomb ventilation waveguide windows, which use the waveguide cutoff principle to block electromagnetic waves while providing ventilation. These have low wind resistance and stable shielding effectiveness, and can connect to fresh air systems to ensure indoor air quality.
  • Air conditioning: Air conditioning ducting passes through the shielded wall via dedicated air conditioning waveguides. For split air conditioners, copper pipes and power cables must pass through filters and waveguides for wall penetration to maintain shielding continuity. Alternatively, shielded indoor units may be used for better overall shielding.
  • Drilling into the shielding enclosure to install ordinary windows or air conditioners is strictly prohibited, as this will severely compromise shielding effectiveness.

Q5: What if additional circuits or equipment are needed later?

A: Additional circuits and equipment must comply with shielding regulations. Direct drilling and cable routing are strictly prohibited. Two solutions exist:

  • Use existing spare interfaces: The product is pre-equipped with spare filter interfaces and waveguide interfaces. New circuits can connect to spare interfaces without modifying the enclosure structure.
  • Add interface modules: If more interfaces are needed, replace the standard module at the corresponding location with an interface pre-wired module. Modular replacement does not affect overall structure or shielding performance.

All new circuits must pass through filters of the corresponding specification to ensure shielding effectiveness is not compromised. It is recommended to contact the original factory for modification to avoid self-construction damaging the shielding.

Q6: How large can a bolted-assembly shielding room be? What is the minimum size?

A: The LA-P series steel plate bolted-assembly shielding enclosure offers flexible sizing. Theoretically, it can be expanded indefinitely. Conventionally, sizes up to 500 m² are achievable. Larger areas can be achieved through structural reinforcement, such as large EMC laboratories or full equipment shielding rooms.

The minimum size is approximately 1 m², such as small shielding cabinets or single-person secure operation rooms, accommodating miniaturized and localized shielding needs.

Dimensions can be customized according to user space without being limited to standard module sizes; adjusting module specifications can accommodate any configuration.

Q7: Is fire protection required for a shielding room? How are fire protection requirements met?

A: A shielding room is an enclosed space and must be equipped with fire protection facilities that comply with fire codes. Solutions are as follows:

  • Fire detection: Signal lines from smoke and heat detectors pass in and out of the shielding room through dedicated fire signal filters, ensuring signal transmission without compromising shielding.
  • Suppression system: Gas suppression systems are preferred. Extinguishing agent pipes pass through dedicated waveguides. If sprinkler systems are used, sprinkler pipes pass through fire-rated waveguides with proper sealing.
  • Emergency evacuation: The shielding door is equipped with an emergency release device that can be manually or automatically unlocked in a fire, ensuring rapid personnel evacuation. Electric doors have fire alarm integrated opening functionality.
  • Fire resistance: The shielding enclosure main body is made of steel, a non-combustible material with fire rating Class A, meeting building fire protection requirements.

KITOZER products can be supplied with a complete fire protection shielding solution that meets fire inspection requirements.

Q8: Can bolted-assembly shielding enclosures be installed in existing building renovations? What are the building requirements?

A: This is highly suitable for existing building renovations, and is one of the core advantages of bolted-assembly products. Building requirements are as follows:

  • Floor load bearing: Building floor load capacity ≥ 200 kg/m² is sufficient; conventional office buildings typically meet this. Locations for heavy equipment require load calculation.
  • Space dimensions: Indoor clear height should be ≥ 300 mm higher than the shielding room height, allowing space for top installation. Door openings must accommodate module transport.
  • Building structure: No demolition of existing walls, floors, or ceilings is required. The shielding enclosure is a freestanding structure held by its own weight or light fixation, causing virtually no damage to the building.
  • Grounding conditions: A qualified building grounding system is sufficient; if none exists, a small grounding electrode may be added.

Bolted assembly construction involves no open flame, no major demolition or modification, and has a short construction period, making it highly suitable for office building, office, and meeting room renovation projects.

Q9: How do I select the shielding effectiveness grade? What scenarios correspond to Grade C, Grade B, and Grade A?

A: Shielding grade selection is based primarily on usage requirements and compliance needs, as follows:

  • Grade C (≥60-90 dB): Suitable for ordinary confidential meeting rooms, ordinary data rooms, office confidentiality workstations, and general industrial anti-interference scenarios. Meets basic electromagnetic protection needs at moderate cost.
  • Grade B (≥80-110 dB): Suitable for classified information system equipment rooms, general military classified sites, financial core equipment rooms, and precision instrument laboratories. Meets Classified Level 2 and MLPS Level 3 requirements. This is the mainstream selection currently.
  • Grade A (≥100-130 dB): Suitable for high-level classified sites, military core laboratories, EMC testing laboratories, and high-precision scientific research laboratories. Provides extremely high shielding effectiveness meeting the most stringent protection requirements.

When selecting, consider budget and compliance requirements together. It is recommended to select slightly above actual needs, leaving performance margin.

Q10: What needs to be tested for shielding room acceptance? How is compliance of shielding effectiveness verified?

A: Shielding room acceptance is divided into three parts: appearance and structure acceptance, electrical performance acceptance, and shielding effectiveness acceptance. Shielding effectiveness is the core indicator.

Shielding effectiveness testing must be performed by a third-party testing organization with CMA/CNAS accreditation, in accordance with GB/T 12190-2023. Testing may use the point-frequency method or swept-frequency method, measuring shielding effectiveness across different frequency bands, and issuing an authoritative test report as the acceptance basis.

Routine test points include: wall center, corners, seams, shielding doors, waveguide windows, and filter interfaces, providing a comprehensive evaluation of overall shielding performance. All KITOZER products are tested before leaving the factory. After installation, we can assist customers in arranging third-party testing to ensure acceptance passes.

15 Product Acceptance Standards and Procedures

15.1 Acceptance Basis

Acceptance strictly follows current national standards, design drawings, and contract requirements. Primary references include:

  • GB/T 50719-2011 “Technical Code for Electromagnetic Shielding Room Engineering”
  • GB/T 12190-2023 “Measuring methods for shielding effectiveness of electromagnetic shielding enclosures”
  • BMB3-1999 “Technical Requirements for Electromagnetic Shielding Rooms Handling State Secret Information” (for classified projects)
  • Project construction drawings, technical agreements, and contract documents
  • Technical requirements in this product manual
  • Relevant fire, electrical, and building codes

15.2 Acceptance Stage Division

Acceptance is divided into four stages: incoming material acceptance, concealed work acceptance, sub-project acceptance, and completion acceptance. Only after the previous stage passes may the next construction stage proceed.

15.2.1 Incoming Material Acceptance

  • Time: After materials arrive on site, before installation.
  • Participants: Joint acceptance by the owner, supervisor, and contractor.
  • Acceptance items:
  • Verify product specifications, models, and quantities are consistent with the contract and packing list.
  • Inspect product appearance quality: no deformation, corrosion, coating detachment, or damage.
  • Verify certificates of conformance, test reports, material certificates, and other documentation are complete.
  • Verify supporting accessories and wear parts are complete.
  • Conclusion: Fill out the equipment/material incoming acceptance form with all parties signing. Non-conforming materials shall be returned and replaced.

15.2.2 Concealed Work Acceptance

  • Time: After floor beam installation and before floor module installation; after keel installation and before panel installation.
  • Participants: Owner, supervisor, contractor.
  • Acceptance items:
  • Floor beam and keel specifications, spacing, and connection methods comply with design requirements.
  • Floor beam levelness and leveling precision meet requirements.
  • Grounding trunk line routing and grounding connections comply with codes.
  • Vertical and ceiling keels installed firmly; verticality and flatness meet requirements.
  • Anti-corrosion treatment complete; no weld points missed.
  • Conclusion: Fill out concealed work acceptance records, sign and archive. Non-conforming items shall be rectified and re-accepted.

15.2.3 Sub-Project Acceptance

  • Time: After main structure installation and sealing work are completed.
  • Participants: Owner, supervisor, contractor.
  • Acceptance items:
  • Main structure appearance, dimensions, flatness, and verticality meet requirements.
  • Seam workmanship complies with requirements; sealing gaskets and conductive sealant applied per specification.
  • Bolts tightened properly; insulating washers complete.
  • Continuity performance and ground resistance tests pass.
  • Shielding doors, waveguide windows, filters, and other interfaces installed per specification.
  • Conclusion: Fill out sub-project acceptance records. After passing, decoration and commissioning processes may proceed.

15.2.4 Completion Acceptance

  • Time: After all construction and commissioning are completed.
  • Participants: Owner, supervisor, contractor; third-party testing organization may be invited when necessary.
  • Acceptance items: Comprehensive acceptance of overall appearance, structural performance, electrical performance, shielding effectiveness, functional systems, and completion documentation.

15.3 Completion Acceptance Items and Standards

15.3.1 Appearance and Structure Acceptance

Acceptance Item Acceptance Criterion Inspection Method
Enclosure appearance Surface flat, coating intact, no deformation, corrosion, or scratches Visual inspection
Seams Gap uniform ≤ 0.1 mm, no misalignment or raised edges Feeler gauge, visual inspection
Interior net dimensions Length, width deviation ≤ ±5 mm; height deviation ≤ ±3 mm Steel tape, laser distance meter
Wall verticality Total height deviation ≤ 3 mm Laser vertical aligner
Floor flatness 2 m straightedge deviation ≤ 2 mm 2 m straightedge + feeler gauge
Ceiling deflection ≤ 1/400 span String line measurement
Sealant Continuous and full, no bubbles, cracks, or detachment Visual inspection
Decorative trim Flat and firm, uniform joints, aesthetically pleasing Visual inspection
Nameplates and labels Complete, clear, correct position Visual inspection

15.3.2 Electrical Performance Acceptance

Acceptance Item Acceptance Criterion Inspection Method
Enclosure continuity resistance Between any two points ≤ 0.5 Ω Milliohm meter
Module contact resistance At seams ≤ 1 mΩ Continuity tester
System ground resistance Combined grounding ≤ 1 Ω, independent grounding ≤ 4 Ω Ground resistance tester
Power insulation resistance To ground ≥ 100 MΩ 500 V megger
Bolt insulation ≥ 100 MΩ Megger
Distribution function Each circuit supplies power normally —
Acceptance Item Acceptance Criterion Inspection Method
Enclosure continuity resistance Between any two points ≤ 0.5 Ω Milliohm meter
Module contact resistance At seams ≤ 1 mΩ Continuity tester
System ground resistance Combined grounding ≤ 1 Ω, independent grounding ≤ 4 Ω Ground resistance tester
Power insulation resistance To ground ≥ 100 MΩ 500 V megger
Bolt insulation performance ≥ 100 MΩ Megger
Distribution circuit function Each circuit supplies power normally; switch protection operates reliably; no leakage or short-circuit hazards Energization test, RCD simulated test, multimeter voltage measurement

15.3.3 Shielding Effectiveness Acceptance

Shielding effectiveness acceptance is the core indicator of completion acceptance for steel plate bolted-assembly shielding enclosures. It must be performed by a third-party electromagnetic testing organization with CMA/CNAS accreditation in accordance with GB/T 12190-2023 “Measuring methods for shielding effectiveness of electromagnetic shielding enclosures.” The contractor shall cooperate with on-site setup and test preparation.

Testing Prerequisites

  • The enclosure main structure, sealing system, and all interface equipment are fully installed and commissioned. The site is cleaned with no stray metal debris.
  • All temporary unshielded cables inside the shielding room are removed. Fixed cables are all connected through filters, with no direct cable routing.
  • All movable interfaces and wall-penetrating components, including shielding doors, waveguide windows, and filters, are in the normal closed/operating state.
  • No strong electromagnetic interference sources exist near the test site. Ambient electromagnetic noise is at least 10 dB below the test level to ensure accurate data.
  • All test instruments are within calibration validity, with accuracy meeting the test frequency band requirements.

Test Point Layout

Per standard requirements, measurement points must cover all typical areas and weak points of the enclosure. The number of points is determined by the shielding room area. For a standard 20 m² shielding room, no fewer than 8 points are required, including:

  • Wall center points: One at the center of each wall, 4 total, representing main steel plate shielding performance.
  • Corner points: One at each of two diagonal interior corners, 2 total, representing corner seam shielding performance.
  • Seam points: One at the midpoint of one vertical and one horizontal seam each, 2 total, representing seam sealing performance.
  • Shielding door points: One each at the upper, middle, and lower door gap positions, 3 total, representing movable gap shielding performance.
  • Interface points: One each adjacent to waveguide windows, filters, and conduit penetrations, representing interface shielding performance.
  • Ceiling and floor points: One at ceiling center and one at floor center, representing upper and lower envelope shielding performance.

Test Frequency Bands and Acceptance Criteria

Depending on the product shielding grade, different acceptance criteria apply. All test points must meet the corresponding grade requirements across all frequency bands:

Frequency Range Test Antenna Type Grade C Acceptance Criterion Grade B Acceptance Criterion Grade A Acceptance Criterion
14 kHz ~ 100 kHz Small loop magnetic field antenna ≥ 60 dB ≥ 80 dB ≥ 100 dB
100 kHz ~ 1 MHz Small loop magnetic field antenna ≥ 70 dB ≥ 90 dB ≥ 110 dB
1 MHz ~ 30 MHz Rod electric field antenna ≥ 80 dB ≥ 100 dB ≥ 120 dB
30 MHz ~ 1 GHz Dipole/log-periodic antenna ≥ 90 dB ≥ 110 dB ≥ 130 dB
1 GHz ~ 10 GHz Horn antenna ≥ 85 dB ≥ 105 dB ≥ 125 dB

Note: If a single point falls below the standard value by no more than 5 dB, and the number of points below the standard value does not exceed 10% of total points, the result may be deemed basically acceptable, subject to rectification of weak points and retesting. If any point falls more than 5 dB below the standard value, the result is deemed non-conforming and requires comprehensive rectification.

Rectification Requirements for Non-Conforming Items

  • If local point shielding effectiveness does not meet requirements, first use field strength scanning to locate the specific leakage point and analyze the cause of leakage.
  • For seam leakage, take measures such as re-tightening bolts, applying additional conductive sealant, or replacing gaskets.
  • For interface leakage, re-tighten flanges, replace sealing gaskets, and optimize wiring methods.
  • For shielding door leakage, adjust door body clearance, replace spring contacts, and optimize locking pressure.
  • After rectification, retest until all points meet requirements.

15.3.4 Functional System Acceptance

Functional system acceptance involves item-by-item testing of all subsidiary systems supporting the shielding enclosure, ensuring all usage functions operate normally and meet daily usage requirements.

Shielding Door System

  • Manual shielding door: Smooth opening/closing without sticking; locking mechanism operates flexibly; three-point/multi-point locking engages properly; sealing gap uniform. Door lock switches reliably; emergency release device effective, allowing rapid opening from inside.
  • Electric shielding door: Local buttons, remote control, and access control modes all open/close normally; stable operation without abnormal noise; anti-pinch device sensitive and effective, automatically reversing upon obstacle detection; fire alarm integration works — door automatically opens upon receiving fire signal; limit switches accurate — automatic stop at fully open/closed positions.
  • Door sealing performance: Visual inspection shows sealing surfaces fit evenly with no obvious gaps; continuity test of door-to-frame contact resistance ≤ 1 mΩ.

Ventilation and Air Conditioning Interface System

  • Ventilation waveguide windows: Smooth airflow; wind resistance meets design requirements; no obvious wind noise; securely installed, well sealed, no obvious vibration.
  • Air conditioning waveguides: Firm connection, no air leakage or condensation; indoor temperature and humidity meet requirements during air conditioning operation; no obvious electromagnetic leakage hazards.
  • Damper system: Electric dampers operate flexibly; opening adjustment accurate; good sealing when closed.

Filters and Signal System

  • Power filters: Normal operation when energized; no abnormal heating or noise; stable output voltage; load capacity meets requirements; reliable grounding; good shielding sealing.
  • Signal filters: Network, video, control, and other signals transmit normally; no obvious attenuation, packet loss, or interference; interface connections firm; labels clear.
  • All incoming and outgoing circuits pass through corresponding filters; no unauthorized direct connections or jumpers.

Fire Protection and Security Interfaces

  • Fire protection pipe penetrations well sealed; smoke and heat detector signals transmit normally; alarm functions effective.
  • Gas suppression/sprinkler system interfaces reliably sealed with no leakage.
  • Access control, surveillance, and other security systems function normally with stable signals.

15.4 Completion Acceptance Workflow

15.4.1 Acceptance Application

Upon completion of all construction and commissioning work, and after passing self-inspection, the construction contractor shall submit a completion acceptance application to the construction owner (Party A), along with complete completion documentation. The application shall specify the acceptance time, location, acceptance scope, and recommended participating personnel.

15.4.2 Document Review

Upon receipt of the acceptance application, the construction owner and the supervision unit shall first review the completion documentation, verifying the completeness, authenticity, and compliance of the materials. If the documentation fails the review, it shall be returned to the construction contractor for supplementation and improvement. On-site acceptance may only be organized after the documentation passes review.

15.4.3 On-Site Acceptance

An acceptance kick-off meeting shall be held, during which the acceptance team introduces the acceptance basis, procedures, and acceptance criteria; the construction contractor reports on the construction status and self-inspection results.

The acceptance team shall, in accordance with the acceptance plan, conduct inspections in groups covering: visual appearance inspection, dimensional measurement, electrical performance testing, and functional testing.

If a third-party testing agency is commissioned, on-site shielding effectiveness testing shall be carried out concurrently.

Acceptance records shall be maintained throughout the acceptance process. All identified issues shall be registered one by one, and photographic/video documentation shall be retained for reference.

15.4.4 Rectification of Issues

For general quality issues identified during acceptance, the construction contractor shall issue a rectification plan, specifying the rectification deadline. Upon completion of rectification, the acceptance team shall be notified for re-inspection.

For major issues involving shielding effectiveness or structural safety, the construction contractor must develop a special rectification plan. Implementation may proceed only after confirmation by the supervision unit and Party A. Upon completion of rectification, acceptance shall be re-organized.

All rectification issues must be closed out in a closed-loop manner, with before-and-after comparison documentation retained.

15.4.5 Acceptance Conclusion

After all acceptance items pass and all rectification items are fully closed out, the acceptance team shall jointly sign the completion acceptance report. With signatures and seals from all parties, the project is officially deemed to have passed acceptance.

Following acceptance, the project enters the warranty period. The construction contractor shall provide warranty and after-sales services as stipulated in the contract.

If major quality issues exist that cannot be rectified to meet acceptance standards, the project shall be deemed to have failed acceptance and shall be handled in accordance with the relevant contract terms.

15.4.6 Project Handover

Upon passing acceptance, the construction contractor shall process the project and documentation handover procedures with the construction owner, including:

  • Physical handover of the shielding enclosure and all auxiliary equipment;
  • Handover of the complete set of completion documentation, with handover sign-off procedures completed;
  • Provision of operation and routine maintenance training to Party A’s operations staff, covering usage precautions, key routine inspection points, and basic fault handling methods;
  • Clarification of after-sales service contact information and warranty scope to ensure subsequent operation and maintenance support.

15.5 Completion Handover Documentation Checklist

Upon completion of the completion acceptance, the construction contractor shall hand over two complete sets of completion documentation to the construction owner — one set archived by Party A and one set for operation and maintenance use. The specific documentation includes:

  • Project completion report, completion acceptance certificate, and acceptance records;
  • As-built drawings: shielding enclosure floor plan, elevation views, cross-section views, grounding system diagram, electrical wiring diagram, and interface layout diagram;
  • Product factory documentation: product certificates of conformity, main material quality inspection reports, third-party shielding effectiveness test reports, and instruction manuals and certificates for auxiliary equipment (shielded doors, power filters, waveguide vents, etc.);
  • Construction records: concealed works acceptance records, installation process inspection records, commissioning records, grounding resistance test records, and continuity test records;
  • This installation, wiring, and commissioning manual, as well as the maintenance and upkeep manual;
  • Spare parts list and handover records;
  • Other relevant documentation: design change orders, engineering consultation records, rectification response forms, etc.

16 SEO Keyword System and Optimization Tags

16.1 Search Keyword Classification System

16.1.1 Core Primary Keywords

Steel-plate modular shielding enclosure, shielded machine room steel-plate enclosure, modular steel-plate shielded room, electromagnetic shielding steel-plate enclosure, modular shielded machine room

16.1.2 High-Conversion Long-Tail Keywords

Steel-plate modular shielding enclosure manufacturer, modular steel-plate shielded room price, shielded machine room steel-plate enclosure installation, electromagnetic shielded room steel-plate assembly construction, confidential room steel-plate shielding enclosure customization, Class B steel-plate modular shielded machine room, Class A electromagnetic shielding steel-plate enclosure, welded vs. modular shielded room comparison, shielded room steel-plate module manufacturer, demountable steel-plate shielded room

16.1.3 Industry Traffic Keywords

Electromagnetic shielded room, shielded machine room construction, confidential shielded room, military-industrial shielded room, EMC shielding laboratory, data center shielded machine room, classified machine room shielding project, hospital MRI shielded room, industrial electromagnetic shielded room, shielded room installation and construction

16.1.4 Brand-Specific Keywords

KITOZER shielding enclosure, Guangdong KITOZER shielded machine room, LA-P series steel-plate shielding enclosure, KITOZER modular shielded room, Guangzhou KITOZER electromagnetic shielding

16.1.5 Dropdown / Related Search Keywords

How to install a steel-plate modular shielding enclosure, shielded room steel-plate thickness standard, modular shielded room shielding effectiveness, how to handle steel-plate shielded room seams, electromagnetic shielded room acceptance standard, shielded machine room grounding requirements, routine maintenance of shielded room, how to troubleshoot shielded room leakage

16.2 SEO Optimization Tag System

16.2.1 Page Core Optimization Tags

  • Page Topic: Steel-Plate Modular Shielding Enclosure Installation, Wiring, and Commissioning Manual
  • Core Positioning: Professional electromagnetic shielding product technical documentation, covering full-lifecycle technical guidance
  • Target Audience: Shielded machine room engineering contractors, operations and maintenance personnel, Party A procurement staff, technical managers, confidential and informatization management personnel

16.2.2 Title Tag

Steel-Plate Modular Shielding Enclosure Installation, Wiring, and Commissioning Manual_Electromagnetic Shielded Machine Room Construction and Acceptance Guide – Guangdong Lain Intelligent Data Center

16.2.3 Meta Keywords

Steel-plate modular shielding enclosure, modular steel-plate shielded room, shielded machine room installation, electromagnetic shielded room commissioning, shielding enclosure technical parameters, shielded room acceptance standard, KITOZER shielded machine room

16.2.4 Meta Description

Guangdong Lain Intelligent Data Center professionally provides LA-P series steel-plate modular shielding enclosures. This manual provides a detailed introduction to the product parameters, structural composition, installation process, wiring specifications, commissioning methods, maintenance, fault troubleshooting, and acceptance standards for steel-plate modular shielding enclosures, offering complete technical guidance for shielded machine room engineering construction and operations.

16.2.5 H1 Tag

Steel-Plate Modular Shielding Enclosure Installation, Wiring, and Commissioning Manual

16.2.6 H2 Tags

Product Introduction, Product Composition, Product List, Product Operating Principle, Product Technical Parameters, Product Functions and Features, Product Application Scenarios, Product Installation Specifications and Procedures, Product Wiring Process and Requirements, Product Commissioning Methods and Standards, Product Construction and Usage Precautions, Product Repair and Maintenance Procedures, Product Common Problems and Solutions, Product Q&A, Product Acceptance Standards and Procedures

16.3 Internal Link Optimization Tags (Anchor Text – Natural Placement)

16.3.1 Core Anchor Text

  • Steel-plate modular shielding enclosure: Naturally placed in product introduction, installation, and acceptance sections, linking to the product main page.
  • Shielded machine room: Placed in application scenarios and engineering case-related content, linking to the shielded machine room solutions page.
  • Electromagnetic shielded room: Placed in principle, parameter, and acceptance-related content, linking to the electromagnetic shielded room product topic page.

16.3.2 Long-Tail Anchor Text

  • Modular steel-plate shielded room installation: Placed in the installation section, linking to the installation service page.
  • Shielded room shielding effectiveness testing: Placed in the commissioning and acceptance section, linking to the testing service page.
  • Demountable shielded machine room customization: Placed in the product features section, linking to the customization service page.

16.3.3 Related Anchor Text

  • Shielded door: Placed in product composition and interface sections, linking to the shielded door product page.
  • Power filter: Placed in wiring and product composition sections, linking to the filter product page.
  • Ventilation waveguide vent: Placed in interface and function sections, linking to the waveguide vent product page.
  • Confidential room construction: Placed in the application scenarios section, linking to the confidential room overall solutions page.

17 Contact Information

  • Manufacturer: Guangdong Lain Intelligent Data Center Equipment Co., Ltd.
  • Service Hotline: +86 13538869979 (Same number for WeChat)
  • Technical Support: +86 13538869979
  • Company Address: Zhongrun Industrial Park, No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou
  • Official Website: https://gdlain.com
Scroll to Top