KITOZER
KITOZER

Intelligent Shielding Integrated Cabinet Installation Manual

Manufacturer: Guangdong Lain Smart Data Center Equipment Co., Ltd.

Document Version: V3.0

Release Date: July 2026

Applicable Standards: GB/T 12190-2006, BMB19-2006, GB 50174-2017, GJB 5792-2006

Table of Contents

Foreword

This manual is prepared for the LA-PB series intelligent shielding integrated cabinets independently developed and manufactured by Guangdong Lain Smart Data Center Equipment Co., Ltd. It covers the technical description, installation guidance, wiring specifications, commissioning methods, maintenance, and troubleshooting throughout the entire product lifecycle, aiming to provide comprehensive, professional, and actionable operating references for users, integrators, construction personnel, and operations & maintenance staff.

The intelligent shielding integrated cabinet is a new-generation classified information protection device that integrates electromagnetic shielding, intelligent environment & power monitoring, power distribution management, ventilation and heat dissipation, and access control security in one unit. Based on the Faraday cage electromagnetic shielding theory, it adopts a fully welded, high-conductivity shielding cavity structure, combined with multi-stage filter interfaces and an intelligent control system, achieving comprehensive suppression of electromagnetic leakage emissions from internal electronic equipment while withstanding external strong electromagnetic interference. It is widely used in party and government agencies, military units, financial institutions, research institutes, and other scenarios with high requirements for information security and electromagnetic compatibility.

The content of this manual strictly complies with relevant national standards and industry specifications, and all operational procedures have been verified through extensive engineering practice. Users must carefully read the full document before operation and strictly follow the specifications. Improper operation may lead to reduced shielding effectiveness, equipment damage, or even safety accidents. The content of this manual will be continuously updated with product technology iterations. The final interpretation right belongs to Guangdong Lain Smart Data Center Equipment Co., Ltd.

Table of Contents

  • Product Introduction
  • Product Composition
  • Product List
  • Product Working Principle
  • Product Technical Parameters
  • Product Functions and Features
  • Product Application Scenarios
  • Product Installation Specifications
  • Product Wiring Specifications
  • Product Commissioning Process
  • Product Usage Precautions
  • Product Repair and Maintenance
  • Common Problems and Solutions
  • Product Q&A
  • Product Acceptance Standards
  • SEO Optimization System and Keywords
  • Copyright Notice and Contact Information

Chapter 1 Product Introduction

1.1 R&D Background

With the rapid development of information technology, electronic equipment has become increasingly deeply applied in core fields such as government affairs, military, finance, and energy. Electromagnetic security has become a critical link that cannot be ignored in the information security system. On one hand, computers, servers, switches, and other electronic equipment generate electromagnetic leakage emissions during operation. These emission signals carry sensitive information processed by the equipment and can be received and reconstructed by specialized equipment at distances of hundreds of meters or even several kilometers, causing information leakage. On the other hand, external strong electromagnetic interference, electromagnetic pulses, and lightning surges can affect the stable operation of equipment, and in severe cases may cause equipment damage, system paralysis, and data loss.

Traditional standard server cabinets only provide physical support and basic protection functions and cannot solve electromagnetic leakage and electromagnetic interference problems. Traditional shielding cabinets have single-function designs and lack intelligent control capabilities, failing to meet the needs of modern data centers for centralized management, remote monitoring, and intelligent operations. Against this background, Guangdong Lain Smart Data Center Equipment Co., Ltd., leveraging more than a decade of experience in electromagnetic shielding and data center equipment R&D, has launched the LA-PB series intelligent shielding integrated cabinets, deeply integrating high-performance electromagnetic shielding technology with IoT intelligent monitoring technology to create a “security + intelligence” integrated electromagnetic protection solution.

1.2 Product Definition

The intelligent shielding integrated cabinet is an integrated cabinet device that uses high-conductivity, high-permeability metal materials to construct a fully sealed shielding cavity. It achieves electromagnetic shielding through structural sealing, interface filtering, and reliable grounding, while integrating intelligent power distribution, temperature and humidity monitoring, access control management, smoke detection, water leakage detection, remote control, and other functions. It can effectively suppress the leakage of electromagnetic signals from internal equipment to the outside, preventing information theft, and also block external strong electromagnetic interference from entering the cabinet, ensuring stable equipment operation. Meanwhile, the intelligent system enables real-time monitoring and centralized management of the cabinet’s operating status.

1.3 Design Philosophy

This product is built on the core design philosophy of “High Security, High Reliability, High Intelligence, Easy Maintenance”:

  • Safety First: Using national classified shielding effectiveness as the baseline standard, shielding performance is controlled throughout the entire process from material selection, structural design, process manufacturing to installation and commissioning, ensuring the electromagnetic security baseline.
  • Reliability and Durability: Industrial-grade components and mature structural designs are adopted, passing stringent environmental reliability testing to adapt to various complex working conditions and ensure long-term stable operation.
  • Intelligent Integration: Environment and power monitoring, power distribution management, security access control, and other functions are deeply integrated to avoid third-party external devices that would compromise shielding integrity, achieving integrated management.
  • Convenient Operations and Maintenance: Standardized modular design allows for quick replacement of key components, supported by comprehensive fault diagnosis and maintenance guidance, reducing maintenance difficulty and cost.

1.4 Applicable Standards

The design, production, testing, and acceptance of this product strictly comply with the following national and industry standards:

Standard Title
GB/T 12190-2006 Methods of Measurement of Shielding Effectiveness of Electromagnetic Shielding Enclosures
BMB19-2006 Technical Requirements and Test Methods for Electromagnetic Leakage Emission Shielding Cabinets
GB 50174-2017 Data Center Design Specifications
GJB 5792-2006 General Specifications for Military Electromagnetic Shielding Enclosures
GB/T 2887-2011 General Specifications for Computer Sites
GB 7251.1-2013 Low-Voltage Switchgear and Controlgear Assemblies — Part 1: General Rules
GB/T 17626 Electromagnetic Compatibility — Testing and Measurement Techniques (series)
YD/T 2319-2011 Technical Requirements and Test Methods for Electromagnetic Shielding Cabinets for Communication Equipment

1.5 Product Series and Positioning

The LA-PB series intelligent shielding integrated cabinets are divided into multiple sub-series based on shielding level, functional configuration, and dimensional specifications, covering different scenario requirements:

  • LA-PB-C Series: Confidential Level C, meeting BMB19-2006 Level C standards, suitable for general classified information systems and internal office classified scenarios.
  • LA-PB-B Series: Confidential Level B, meeting BMB19-2006 Level B standards, suitable for important classified departments, general military units, and core financial network outlets.
  • LA-PB-A Series: Military/Top Secret Level, meeting GJB and higher shielding requirements, suitable for core military units, top-secret information processing scenarios, and electromagnetic pulse protection scenarios.
  • LA-PB-INT Series: Industrial-grade shielding cabinet, optimized for industrial control scenarios, suitable for factory automation, rail transit, power dispatching, and other strong interference environments.

Chapter 2 Product Composition

The LA-PB series intelligent shielding integrated cabinet features modular integrated design, comprising six core systems: the Shielding Enclosure System, Intelligent Control and Management System, Power Distribution and Filtering System, Ventilation and Heat Dissipation System, Access Control and Lock System, and Internal Mounting and Auxiliary System. Each system operates independently while working in coordination, collectively forming a complete shielding and intelligent management system.

2.1 Shielding Enclosure System

The Shielding Enclosure System is the core body for achieving electromagnetic shielding functionality. It is a six-sided fully sealed metal cavity structure and serves as the foundational support and shielding barrier of the entire product.

2.1.1 Main Enclosure Body

The main enclosure body is formed using high-quality cold-rolled steel plates through a fully automatic robotic argon arc welding process. Different product grades use different plate thicknesses: Level C uses 1.5mm cold-rolled steel plate, Level B uses 2.0mm cold-rolled steel plate, and Level A uses a 2.5mm double-layer composite steel plate structure. Welding adopts a continuous full-seam process with no weld gaps, no cold welds, and no porosity. After welding, the surface is ground, shaped, and subjected to conductive passivation treatment to ensure overall electrical continuity of the enclosure, with surface resistance ≤2.5mΩ/m².

The enclosure structure uses a nine-bend profile reinforced frame that is welded as one piece with the enclosure, greatly enhancing structural strength. The static load capacity reaches over 1500kg, meeting the mounting requirements of high-density servers, storage devices, and other heavy equipment, while also providing Seismic Level 8 resistance. The outer surface undergoes multi-stage anti-corrosion treatment including acid washing, phosphating, and electrostatic powder coating, providing strong coating adhesion, resistance to acid and alkali corrosion, and a smooth, aesthetically pleasing appearance. The inner surface undergoes conductive oxidation treatment to ensure electrical continuity inside the cavity.

2.1.2 Shielding Door Assembly

The shielding door is the only openable component in the shielding cavity and is one of the weakest links in shielding performance. Its sealing quality directly determines the overall shielding effectiveness. This product adopts a knife-blade insertion shielding door structure, consisting of the door body, door frame, conductive sealing assembly, hinge mechanism, and locking mechanism.

  • Door Body: Welded and formed using steel plate of the same thickness as the enclosure, with internal stiffening ribs to prevent door deformation.
  • Door Frame: Precision-machined and welded to the enclosure after installation, with flatness ≤0.3mm/m.
  • Conductive Sealing Assembly: High-elasticity silver-plated beryllium copper spring strips are embedded around the door frame perimeter. The door body has stainless steel knife edges at corresponding positions. When closed, the knife edges insert into the spring strip grooves, forming continuous circumferential conductive contact with contact resistance ≤10mΩ. The beryllium copper spring strips have excellent elasticity and conductivity, with performance degradation ≤5% after 10,000 open/close cycles, and exhibit oxidation and wear resistance.
  • Hinge Mechanism: Heavy-duty load-bearing hinges, with 3 hinge sets per door, providing strong load capacity, smooth opening/closing, and no sagging over long-term use.
  • Locking Mechanism: Three-point locking structure that simultaneously engages the upper, lower, and side locking bolts via a rotating handle, ensuring uniform pressure around the door perimeter and consistent spring strip compression to avoid local poor contact.

2.1.3 Ventilation Waveguide Window

To meet the heat dissipation requirements of internal equipment, the cabinet requires ventilation openings. Ordinary openings would cause severe electromagnetic leakage, so cutoff waveguide ventilation windows are used to achieve both ventilation and shielding.

The waveguide window adopts a honeycomb structure composed of numerous hexagonal waveguide tubes welded together. Utilizing the waveguide cutoff principle, electromagnetic waves with wavelengths greater than the waveguide cutoff wavelength cannot pass through, thus blocking electromagnetic wave propagation while allowing air circulation. This product is equipped with 304 stainless steel honeycomb waveguide windows as standard. The cutoff frequency is designed according to the shielding level, with ventilation rate ≥60%, low wind resistance, and no impact on heat dissipation efficiency.

The cabinet is typically equipped with two sets of waveguide windows — intake and exhaust. The intake window is located at the lower part of the cabinet, and the exhaust window at the upper part, forming a natural convection airflow path. Models with intelligent cooling are equipped with axial fans on the exhaust side, forming a forced-air cooling system. The waveguide windows are connected to the enclosure via flanges, with conductive gaskets filled at the contact surfaces to ensure electrical continuity at the connection points without electromagnetic leakage gaps.

2.1.4 Shielding Interface Components

All cables passing through the shielding enclosure become potential electromagnetic leakage paths. Therefore, all power and signal interfaces must be connected through dedicated shielding interface devices, mainly including:

  • Power Filters: Perform conducted interference filtering on power lines entering and exiting the cabinet, suppressing electromagnetic interference conduction on the lines.
  • Signal Filters: For filtering and shielded transition of network cables, serial ports, fiber optics, and other signal lines. Types include RJ45 signal filters, RS232/485 signal filters, and fiber optic waveguides.
  • Shielding Cable Feed-Through Plates: Used for routing a small number of non-standard cables, equipped with conductive sealing putty. The openings are sealed after cable routing to ensure shielding performance.
  • Grounding Terminals: Dedicated grounding copper bar on the enclosure for connection to the cabinet grounding system.

2.1.5 Seam and Penetration Treatment

All assembly seams and component mounting seams on the cabinet are treated with conductive sealing: fixed seams use conductive gaskets under compression or continuous welding; seams of removable components use beryllium copper spring strips, conductive foam, or conductive rubber seals. All enclosure penetrations use shielded sealed structures to ensure electrical continuity at penetration points with no leakage points.

2.2 Intelligent Control and Management System

The Intelligent Control and Management System is the “brain” of the intelligent shielding integrated cabinet, achieving comprehensive perception, analysis, control, and alarming of the cabinet’s operating status. It consists of the environment & power monitoring host, various sensors, human-machine interface, and remote communication modules.

2.2.1 Environment & Power Monitoring Host

An industrial-grade embedded host with low power consumption and high reliability, equipped with dedicated monitoring software, providing data acquisition, logic processing, alarm output, data storage, and remote communication functions. The host supports multiple analog and digital signal inputs, simultaneously connecting temperature/humidity, smoke, water leakage, door magnetic, voltage, current, and other sensor data. It features built-in storage capable of retaining no less than 1 year of historical operating data, supporting data query and export.

2.2.2 Environmental Monitoring Sensors

  • Temperature and Humidity Sensor: High-precision digital temperature and humidity sensors installed at upper, middle, and lower positions inside the cabinet, providing real-time monitoring of internal temperature and relative humidity. Measurement accuracy: temperature ±0.5°C, humidity ±3%RH. Monitoring range: temperature -10°C to 80°C, humidity 0 to 100%RH.
  • Smoke Detector: Photoelectric smoke sensor installed at the top of the cabinet, providing real-time smoke detection. Response time ≤10s, with anti-false-alarm design. Upon smoke detection, it immediately triggers audible and visual alarms and uploads alarm information.
  • Water Leakage Sensor: Cable-type or point-type leakage sensor arranged at the bottom of the cabinet and at the air conditioner water inlet position, monitoring for liquid leakage. High detection sensitivity, immediately alarms upon water contact, preventing liquid damage to equipment.
  • Access Control and Door Magnetic Sensor: The door magnetic sensor monitors the cabinet door open/close status in real time, records door opening times and counts. Combined with the access control system, it enables door opening permission management.

2.2.3 Human-Machine Interface Unit

The front door is equipped with a 7-inch color touch display panel located in the upper visible area of the door, allowing viewing of cabinet operating status without opening the door. The display uses an industrial-grade touch panel with adjustable brightness and an intuitive interface. It displays real-time temperature/humidity, voltage/current, equipment operating status, alarm information, etc., and supports touch operation for parameter setting, historical data query, system commissioning, and other functions.

2.2.4 Communication and Alarm Module

  • Wired Communication: Standard RJ45 Ethernet interface supporting TCP/IP protocol, capable of connecting to the data center environment & power monitoring system for centralized management.
  • Wireless Communication: Optional 4G/5G, WiFi, and other wireless communication modules for remote cloud monitoring.
  • Alarm Output: Supports multiple alarm methods including audible/visual alarm, SMS alarm, email alarm, and platform alarm. Alarm thresholds are user-definable, with hierarchical alarm management and priority push for critical alarms.
  • Dry Contact Output: Multiple reserved dry contact interfaces for interlocking with third-party fire protection and security systems.

2.3 Power Distribution and Filtering System

The Power Distribution and Filtering System is responsible for power distribution, surge protection, and power filtering for internal equipment within the cabinet, ensuring safe and reliable power supply while blocking electromagnetic conducted leakage through power lines.

2.3.1 Power Filters

The power filter is the core component for blocking electromagnetic conducted leakage through power lines. It uses a multi-stage filter circuit design, including common-mode filtering, differential-mode filtering, and surge suppression units, providing excellent suppression of conducted interference in the 14kHz to 10GHz frequency band, with insertion loss meeting the corresponding shielding level requirements.

Filters are divided into single-phase and three-phase types, selected based on the total cabinet power, with rated currents covering 10A to 100A. The filter housing adopts a metal shielding structure. During installation, the housing must be reliably connected to the cabinet shielding enclosure, and the grounding terminal must be separately connected to the grounding copper bar to ensure filtering effectiveness. The filter input side is located outside the shielding enclosure, and the output side inside the shielding enclosure, with input and output lines physically isolated to avoid coupling interference.

2.3.2 Intelligent PDU Power Distribution Unit

The cabinet is equipped with rack-mounted intelligent PDUs (Power Distribution Units), installed on standard 19-inch mounting, providing multiple national standard or IEC power outlets for powering internal equipment. The intelligent PDU features voltage, current, power, and energy metering functions, enabling remote monitoring of each power outlet’s status. It supports overload alarm and short-circuit protection. Certain high-end models support remote on/off switching for remote power-up/power-down management.

The PDU uses a flame-retardant housing with built-in overload protection switch and lightning surge protection module. The input cable uses flame-retardant shielded cable, connected to the power filter output.

2.3.3 Surge Protection and Electrical Protection

The power distribution system is configured with two-level surge protective devices (SPDs). The first level is located at the main power input, and the second level at the front end of the PDU, effectively suppressing lightning surges and switching overvoltages to protect precision electronic equipment inside the cabinet. Additionally, multiple electrical protections such as air circuit breakers, residual current devices, and overload protectors are configured to ensure electrical safety.

2.4 Ventilation and Heat Dissipation System

The Ventilation and Heat Dissipation System ensures that internal equipment operates in a suitable temperature and humidity environment, preventing overheating-induced frequency throttling or damage. It is divided into two types: natural heat dissipation and intelligent forced-air cooling.

2.4.1 Natural Heat Dissipation System

This relies on the natural airflow path formed by the upper and lower waveguide windows, utilizing the principle of hot air rising for natural convection heat dissipation. It is suitable for scenarios with low equipment heat generation and low power density. A dust filter mesh is provided at the lower part of the intake window to block dust from entering the cabinet. The dust filter is removable for cleaning.

2.4.2 Intelligent Forced-Air Cooling System

Comprising an axial fan assembly, temperature control module, and airflow path structure. The fans are low-noise industrial axial fans installed on the inner side of the top exhaust waveguide window, with exhaust direction upward. The temperature control module automatically adjusts fan speed or on/off status based on internal cabinet temperature, achieving intelligent temperature control that ensures heat dissipation while reducing energy consumption and noise.

The fans use vibration-damping mounting to avoid noise from vibration and structural loosening. The airflow path is optimally designed to form a bottom-in, top-out ordered airflow, reducing local hot spots. Fan power is supplied by the intelligent PDU, with operating status connected to the environment & power monitoring system and automatic alarm upon failure.

2.4.3 Air-Conditioning Type Heat Dissipation System (Optional)

For high power density scenarios, a rack-mounted precision air conditioner can be optionally configured, installed inside or beside the cabinet for precise temperature control. The air conditioning system is also adapted for shielding, with refrigerant pipes and drain pipes passing through the cabinet via dedicated waveguide tubes or shielded sealing components, without compromising shielding performance.

2.5 Access Control and Lock System

The Access Control and Lock System ensures physical access security of the cabinet, preventing unauthorized personnel from opening the cabinet door while recording door opening logs for traceability of access.

2.5.1 Mechanical Lock

Equipped as standard with a high-security mechanical anti-theft lock with dedicated keys. The lock body is robust in structure, resistant to prying and technical opening. It serves as the basic access control and emergency opening means — the cabinet can be opened with the mechanical key during power failure or electronic access control malfunction.

2.5.2 Electronic Access Control System (Standard/Optional)

Standard configuration includes fingerprint + password access control, or optional card swipe and facial recognition access control. The access controller is installed inside the cabinet, and the reader outside the door, with wiring connected through shielding interfaces. The access control system supports multi-user management with configurable permission levels, records all door opening events including personnel, time, and opening method, with data query and export capability. The system features tamper alarm — forced disassembly triggers an alarm.

2.5.3 Electromagnetic Lock and Door Magnetic Sensor

An electromagnetic lock assists locking, automatically engaging after door closure, working with the access control system for electrically controlled door opening/closing. The door magnetic sensor detects the door open/close status in real time, immediately triggering an alarm upon abnormal door opening.

2.6 Internal Mounting and Auxiliary System

2.6.1 Mounting Rails

The cabinet is equipped with four standard 19-inch mounting rails made of high-quality steel plate formed by bending, with galvanized surface treatment and good conductivity. The rails feature U-shaped mounting holes with hole spacing conforming to standard U-dimensions, allowing flexible adjustment of equipment mounting height. The front and rear positions of the rails are adjustable to accommodate equipment of varying depths.

2.6.2 Load-Bearing Shelves

Standard configuration includes fixed shelves and sliding shelves, formed from 1.2mm cold-rolled steel plate by stamping, with powder-coated surfaces. Each shelf has a load capacity ≥150kg. Shelf positions can be flexibly adjusted as needed for placing servers, switches, displays, and other equipment. The sliding shelf is equipped with silent slide rails for smooth extension, used for placing keyboards, mice, and other operating equipment.

2.6.3 Cable Management and Routing Accessories

  • Vertical Cable Managers: Installed on both sides of the mounting rails for organizing internal cabinet cables, keeping wiring neat and presentable.
  • Horizontal Cable Management Rings: Installed above and below equipment to guide cable routing.
  • Cable Ties and Clips: Used for cable fastening.
  • Grounding Copper Bar: A dedicated grounding copper bar is provided inside the cabinet for grounding connections of equipment enclosures, shielding layers, filters, etc.

2.6.4 Other Accessories

  • Leveling Feet and Casters: Adjustable heavy-duty leveling feet at the bottom for cabinet leveling and load-bearing. Heavy-duty casters are optional for cabinet mobility.
  • Lighting System: LED lighting at the top inside the cabinet, automatically illuminating when the door opens and turning off when closed, facilitating operation and maintenance.
  • Blank Panels: 1U/2U and other specification shielding blank panels for covering unused U positions, optimizing airflow and reducing electromagnetic leakage.

Chapter 3 Product List

3.1 Standard Configuration List

Taking the LA-PB-B-42U standard model as an example, the standard factory configuration is as follows:

No. Component Name Specification/Model Qty Unit Remarks
1 Shielding enclosure body LA-PB-B-42U, 2000×700×900mm (H×W×D) 1 Unit Includes shielding enclosure, nine-bend profile frame
2 Shielding door assembly Single-door knife-blade shielding door with beryllium copper spring strip sealing 1 Set Includes door frame, door body, hinges, three-point locking mechanism
3 Intake waveguide window 304 stainless steel honeycomb waveguide window, 300×300mm 2 Pcs Lower left and right of cabinet
4 Exhaust waveguide window 304 stainless steel honeycomb waveguide window, 300×300mm 1 Pc Top of cabinet
5 Single-phase power filter 220V/32A, multi-stage filtering, Level B 1 Unit Power input filtering
6 RJ45 signal filter 8-port, gigabit network filtering 1 Unit Network signal filtering
7 Environment & power monitoring host LA-MON-100, embedded industrial host 1 Unit Includes data acquisition, storage, communication functions
8 Temperature and humidity sensor High-precision digital type 2 Pcs Upper and lower positions inside cabinet
9 Smoke detector Photoelectric type, DC12V powered 1 Pc Top of cabinet
10 Water leakage sensor Point type, sensitivity adjustable 1 Pc Bottom of cabinet
11 7-inch touch display Industrial-grade capacitive touch 1 Panel Installed on outside of front door
12 Intelligent PDU 19-inch, 8-position 10A national standard outlets, with metering 1 Unit Vertically mounted
13 Intelligent forced-air cooling system 4 axial fans, temperature-controlled speed regulation 1 Set Top-mounted
14 Access control system Fingerprint + password + mechanical lock, three-in-one 1 Set Includes reader, controller, electromagnetic lock
15 19-inch mounting rails 42U, front-rear adjustable 4 Pcs Galvanized
16 Fixed shelf 19-inch, load capacity 150kg 3 Pcs Standard configuration
17 Sliding keyboard shelf 19-inch, with slide rails 1 Pc Standard configuration
18 Cable manager Vertical cable manager 2 Pcs One on each left and right rail
19 Grounding copper bar 30×3mm copper, tin-plated 1 Bar Bottom inside cabinet
20 LED lighting DC12V, with door-controlled switch 2 Lamps Top inside cabinet
21 Adjustable leveling feet M16 heavy-duty adjustable feet 4 Pcs Bottom of cabinet
22 Shielding blank panel 1U shielding type 10 Pcs Covering unused U positions
23 Dedicated keys Mechanical lock keys 3 Pcs 2 regular use, 1 spare

3.2 Optional Configuration List

No. Component Name Specification Description Application Scenario
1 Three-phase power filter 380V/63A/100A High-power equipment configuration
2 Fiber optic waveguide Single-mode/multi-mode, 6-channel/12-channel Fiber optic access scenarios
3 Serial port signal filter RS232/RS485, multiple channels Industrial control signal access
4 Video signal filter BNC/VGA/HDMI Video signal access
5 Rack-mounted UPS 1kVA/3kVA/6kVA Backup power requirements
6 Rack-mounted precision air conditioner 3kW/5kW cooling capacity High power density heat dissipation
7 Heptafluoropropane gas fire suppression module Cabinet-type automatic fire suppression High-level fire protection requirements
8 Facial recognition access control Facial recognition door opening, liveness detection High security level scenarios
9 4G wireless communication module Full network compatible, remote alarm Scenarios without wired network
10 Heavy-duty casters 4 swivel casters, 2 with brakes Scenarios requiring mobility
11 Shielding cable feed-through plate 100×100mm, with sealing putty Non-standard cable routing
12 Vibration-damping base Spring shock absorbers, isolation efficiency ≥80% Strong vibration environments

3.3 Accompanying Documents and Tools

No. Name Qty Remarks
1 This installation and commissioning manual 1 Copy Paper version
2 Product certificate of conformity 1 Copy Includes factory inspection records
3 Third-party shielding effectiveness test report 1 Copy Photocopy; original shipped with goods or separately
4 Product warranty card 1 Copy Effective after completion
5 Electrical schematic and wiring diagrams 1 Copy Paper version
6 Dedicated hex key wrench set 1 Set For installation and commissioning
7 Conductive cleaning cloth 2 Pcs For cleaning spring strips
8 Spare conductive gasket 1 Meter For emergency repair
9 Grounding terminal and bolt kit 1 Set For grounding installation

3.4 Acceptance Verification Instructions

  • Upon product arrival, please verify each item against the above lists, checking the quantity, model, and appearance of components for any transit damage.
  • If missing parts, incorrect parts, or damage are found, please retain the packaging and contact our after-sales personnel within 24 hours.
  • Optional configurations are based on actual order selection, subject to the contract configuration list.
  • Please properly keep the accompanying documents as the basis for subsequent acceptance, warranty, and maintenance.

Chapter 4 Product Working Principle

4.1 Core Theoretical Basis of Electromagnetic Shielding

The shielding function of the intelligent shielding integrated cabinet is based on classical electromagnetic theory, with the Faraday cage principle at its core, combined with electromagnetic wave reflection, absorption, multiple-reflection attenuation mechanisms, as well as auxiliary technologies such as cutoff waveguides, filtering, and grounding, collectively achieving full-band electromagnetic shielding.

4.1.1 Faraday Cage Principle

The Faraday cage principle is the core theory of electromagnetic shielding: for a closed enclosure made of conductive material exposed to an external electromagnetic field, induced charges and induced currents are generated on the enclosure surface. The secondary electromagnetic field produced by these induced charges and currents cancels the external field component inside, thereby making the internal space of the enclosure unaffected by the external electromagnetic field. Similarly, electromagnetic fields generated by internal equipment are blocked by the enclosure and cannot leak to the outside.

The fully welded metal enclosure of this product is essentially a high-performance Faraday cage. By ensuring the electrical continuity of the enclosure, minimizing gap leakage, and treating cable penetrations, shielding effectiveness approaching that of an ideal Faraday cage is achieved.

4.1.2 Three Mechanisms of Electromagnetic Wave Shielding

When an electromagnetic wave is incident on a metal shielding body, its energy attenuation consists of three components: reflection loss, absorption loss, and multiple-reflection loss. The total shielding effectiveness is the sum of these three.

Reflection Loss

When an electromagnetic wave travels from air to a metal surface, due to the huge difference in wave impedance between air and metal, most of the electromagnetic wave energy is reflected back at the interface and cannot enter the metal interior. Reflection loss is the primary attenuation mechanism for low-frequency electric fields and high-frequency electromagnetic waves. The higher the electrical conductivity of the metal, the greater the reflection loss. The cold-rolled steel plates and copper spring strips used in this product are all high-conductivity materials with excellent reflection loss capability.

Reflection loss is frequency-dependent: at low frequencies, the magnetic field wave impedance is low, resulting in small reflection loss; at high frequencies, the electric field and plane wave impedance is high, resulting in large reflection loss. Therefore, low-frequency magnetic field shielding requires higher material permeability to supplement absorption loss.

Absorption Loss

Electromagnetic waves that are not reflected and enter the metal interior generate Joule heating through the eddy current effect during propagation, converting electromagnetic energy into heat energy that is dissipated. This process is called absorption loss. Absorption loss increases with increasing metal thickness, electrical conductivity, magnetic permeability, and electromagnetic wave frequency.

For low-frequency magnetic fields, ordinary conductive materials have insufficient absorption loss. Therefore, high-grade shielding products use high-permeability materials (such as permalloy and silicon steel) for composite shielding, guiding the magnetic circuit through high-permeability materials to increase absorption loss. The composite steel plate structure used in the Level A model of this product includes a high-permeability layer to enhance low-frequency magnetic shielding effectiveness.

Multiple-Reflection Loss

When the shielding body is thin, electromagnetic waves entering the metal reflect again at the second interface, with part of the energy reflecting back to the first interface, forming multiple reflections and absorptions. For thick shielding bodies, electromagnetic waves are largely absorbed before reaching the second interface, making multiple-reflection loss negligible; for thin shielding bodies and gap structures, multiple-reflection loss is an important supplement.

4.1.3 Gap Leakage Principle

An ideal metal enclosure without holes or gaps has extremely high shielding effectiveness. However, actual cabinets have gaps and openings such as door seams, ventilation holes, and cable penetrations, which are the primary causes of reduced shielding effectiveness.

The leakage pattern of electromagnetic waves through gaps: when the gap length exceeds 1/20 of the electromagnetic wavelength, significant electromagnetic leakage occurs. The longer and wider the gap, the more severe the leakage. For the same area, the more openings there are with smaller individual dimensions, the less the leakage. Therefore, one of the core principles of shielding design is controlling the dimensions and number of all gaps, converting gaps into continuous conductive contact surfaces through conductive sealing components to eliminate leakage paths.

The shielding door of this product uses circumferential continuous beryllium copper spring strips, dividing the door seam into numerous tiny contact gaps far smaller than 1/20 of the operating wavelength, effectively suppressing leakage. Ventilation openings use honeycomb waveguide structures, where the cutoff wavelength of each hexagonal opening is greater than the operating wavelength, preventing electromagnetic waves from passing through.

4.2 Conducted Interference Suppression Principle

Electromagnetic interference not only propagates through space radiation but also through cables such as power lines and signal lines, known as conducted interference. If only spatial shielding is performed without treating line conduction, the shielding effect will be greatly compromised.

4.2.1 Power Filtering Principle

The power filter is a passive low-pass network that allows DC or 50Hz power frequency current to pass while presenting high impedance to high-frequency electromagnetic interference signals, thereby suppressing conducted interference in power lines. The power filter of this product uses a multi-stage LC filtering structure, including common-mode chokes, differential-mode inductors, X capacitors, and Y capacitors:

  • Common-mode choke: Suppresses common-mode interference between phase, neutral, and ground lines.
  • Differential-mode inductor and X capacitor: Suppress differential-mode interference between phase and neutral lines.
  • Y capacitors: Connected between phase/neutral lines and ground, filtering common-mode interference.

The filter must be reliably grounded to achieve optimal performance — the lower the grounding impedance, the better the filtering effect. Additionally, the filter input and output must be physically isolated to avoid input-output line coupling that would render the filtering ineffective.

4.2.2 Signal Filtering Principle

Signal filters are designed for different signal types, suppressing high-frequency electromagnetic interference on signal lines while ensuring normal transmission of useful signals. Taking the RJ45 network filter as an example, it integrates an isolation transformer and common-mode filtering network internally, with minimal attenuation for network signals below gigabit speed while effectively suppressing high-frequency common-mode interference, blocking the electromagnetic leakage path of signal lines.

For fiber optic signals, since optical signals do not conduct electromagnetic interference, a fiber optic waveguide is sufficient. The waveguide uses the cutoff principle to block electromagnetic waves while allowing optical signals to pass through.

4.3 Grounding System Working Principle

Grounding is an indispensable component of the electromagnetic shielding system, serving the following main functions:

  • Discharging induced charges: Induced charges and induced currents on the shielding enclosure are quickly conducted to earth through the grounding system, maintaining the enclosure at zero potential and enhancing shielding effectiveness.
  • Ensuring filtering effectiveness: The filter capacitors require a grounding path; poor grounding causes significant degradation of filtering performance.
  • Electrical safety protection: Equipment metal enclosures are grounded to prevent electric shock accidents from leakage.
  • Lightning and surge discharge: Surge protective devices discharge lightning current and surge current to earth through grounding.

This product requires grounding resistance ≤1Ω, using a combination of single-point grounding and equipotential bonding to avoid ground loop interference. The cabinet shielding enclosure, filter grounding terminals, equipment enclosures, and PDU grounding terminals are all connected to the internal grounding copper bar, which is then connected via a single point to the data center grounding system.

4.4 Intelligent Control and Management System Working Principle

The Intelligent Control and Management System adopts a four-layer architecture of “Perception Layer – Transmission Layer – Processing Layer – Application Layer”:

  • Perception Layer: Various sensors collect physical quantities such as temperature, humidity, smoke, water leakage, voltage, current, and door status in real time, converting them into electrical signals for upload.
  • Transmission Layer: Sensor data is transmitted to the monitoring host via the internal bus, and externally communicated with host computers and cloud platforms via Ethernet or wireless networks.
  • Processing Layer: The monitoring host processes and calculates the collected data, compares it with preset thresholds, determines whether anomalies exist, generates alarm information, and executes control logic (such as temperature-controlled fan speed regulation).
  • Application Layer: Operating data is displayed to users through interfaces such as the local touch screen, client software, and cloud platform, providing parameter settings, data query, remote control, and other functions.

The system adopts a modular design where each functional unit operates independently. Failure of a single sensor does not affect overall system operation, providing high reliability and scalability.

4.5 Ventilation and Heat Dissipation System Working Principle

The intelligent forced-air cooling system uses the negative pressure air-pulling principle: the top fans exhaust air outward, creating negative pressure inside the cabinet, causing external air to be drawn in from the lower intake waveguide window, flowing across equipment surfaces to remove heat, and then discharged from the top, forming a bottom-in, top-out vertical airflow path.

The temperature control module collects real-time cabinet temperature data. When the temperature is below the set lower limit, the fans run at low speed or stop. When the temperature exceeds the set value, fan speed increases linearly with temperature until full speed. When the temperature exceeds the alarm threshold, a high-temperature alarm is triggered. Through intelligent temperature control, heat dissipation is ensured while achieving energy savings and noise reduction, extending fan service life.

Chapter 5 Product Technical Parameters

This chapter provides detailed technical parameters based on the mainstream models of the LA-PB series. Parameters may vary slightly between models; the contract configuration sheet shall prevail.

5.1 Shielding Performance Parameters

Shielding performance is the core indicator of this product, strictly tested in accordance with BMB19-2006 and GB/T 12190 standards.

Shielding Level Test Frequency Band Required Shielding Effectiveness Typical Measured Value Applicable Standard
Level C 14kHz ~ 150kHz (Magnetic Field) ≥60dB 65~75dB BMB19-2006 Level C
Level C 150kHz ~ 1GHz (Plane Wave) ≥80dB 85~95dB BMB19-2006 Level C
Level C 1GHz ~ 10GHz (Microwave) ≥70dB 75~85dB BMB19-2006 Level C
Level B 14kHz ~ 150kHz (Magnetic Field) ≥70dB 75~85dB BMB19-2006 Level B
Level B 150kHz ~ 1GHz (Plane Wave) ≥90dB 95~105dB BMB19-2006 Level B
Level B 1GHz ~ 10GHz (Microwave) ≥80dB 85~95dB BMB19-2006 Level B
Level A 10kHz ~ 150kHz (Magnetic Field) ≥80dB 85~95dB GJB 5792 Class A
Level A 150kHz ~ 1GHz (Plane Wave) ≥100dB 105~115dB GJB 5792 Class A
Level A 1GHz ~ 18GHz (Microwave) ≥90dB 95~105dB GJB 5792 Class A

Note: Shielding effectiveness tests are performed under empty-cabinet conditions. After equipment installation, actual effectiveness may vary due to factors such as cabling and equipment grounding, requiring on-site commissioning and optimization.

5.2 Structural and Dimensional Parameters

5.2.1 Standard Model Dimensions

Model External Dimensions (H×W×D) mm Usable Internal Height Standard U Positions Usable Internal Width Usable Internal Depth
22U 1200×700×700 977mm 22U 483mm (19-inch) 550mm
32U 1600×700×800 1422mm 32U 483mm 650mm
37U 1800×700×900 1644mm 37U 483mm 750mm
42U 2000×700×900 1866mm 42U 483mm 750mm
47U 2200×800×1000 2089mm 47U 483mm 850mm

5.2.2 Structural Parameters

  • Main body plate thickness: Level C: 1.5mm cold-rolled steel plate; Level B: 2.0mm cold-rolled steel plate; Level A: 2.5mm composite steel plate
  • Frame structure: Nine-bend profile reinforced frame
  • Static load capacity: ≥1500kg (42U model)
  • Door opening angle: ≥110°
  • Surface treatment: Electrostatic powder coating on exterior, conductive oxidation on interior
  • Protection rating: IP50 (closed state)
  • Seismic resistance: Seismic Level 8 intensity
  • Total weight: 42U model approximately 280~350kg (depending on configuration)

5.3 Electrical Performance Parameters

5.3.1 Input/Output Parameters

  • Rated input voltage: Single-phase AC 220V±15%, 50Hz; optional three-phase AC 380V±15%, 50Hz
  • Rated input current: 10A / 16A / 32A / 63A / 100A selectable
  • Output outlet specifications: National standard 10A, national standard 16A, IEC C13, IEC C19 selectable
  • Number of output outlets: 8-position / 12-position / 16-position / 24-position selectable
  • Number of power distribution circuits: 1 to 4 circuits selectable

5.3.2 Filter Parameters

  • Power filter insertion loss: Common-mode ≥60dB, differential-mode ≥40dB within 14kHz to 10GHz (Level B)
  • Signal filter insertion loss: ≤1dB in corresponding operating frequency band, ≥40dB in stopband
  • Surge protection level: Class II, maximum discharge current 40kA (8/20μs)
  • Insulation resistance: Power circuit ≥10MΩ (DC500V)
  • Dielectric strength: AC 1500V/1min, no breakdown, no flashover

5.3.3 Grounding Parameters

  • Grounding terminal specification: M8/M10 grounding bolts
  • Grounding copper bar specification: 30×3mm tinned copper
  • Required grounding resistance: ≤1Ω
  • Enclosure contact resistance: ≤2.5mΩ between any two points

5.4 Environmental and Heat Dissipation Parameters

Parameter Value
Operating Ambient Temperature -5℃~45℃
Storage Ambient Temperature -20℃~60℃
Operating Ambient Humidity 10%~90%RH (Non-condensing)
Storage Ambient Humidity 5%~95%RH (Non-condensing)
Altitude ≤2000m (Derating required above 2000m)
Cooling Method Natural convection / Intelligent forced-air cooling / Rack-mounted air conditioner (optional)
Forced-Air Cooling Capacity ≥3kW (42U Standard forced-air cooling type)
Fan Noise ≤55dB (At 1m distance, full speed operation)
Ventilation Rate ≥60% (Net ventilation area of waveguide vent)

5.5 Intelligent Monitoring Parameters

5.5.1 Monitoring Accuracy

Parameter Specification
Temperature Measurement Range -10℃~80℃, Accuracy ±0.5℃
Humidity Measurement Range 0~100%RH, Accuracy ±3%RH
Voltage Measurement Accuracy ±1%
Current Measurement Accuracy ±1%
Power Measurement Accuracy ±2%

5.5.2 System Parameters

Parameter Specification
Main Control Unit ARM Cortex-A8 1GHz Processor
Memory 512MB DDR3
Storage 8GB eMMC, Supports SD card expansion
Display 7-inch capacitive touchscreen, Resolution 800×480
Data Storage Duration ≥12 months
Data Sampling Interval Adjustable from 1 second to 60 minutes
Alarm Response Time ≤1 second

5.5.3 Communication Interfaces

Interface Specification
Ethernet 1× RJ45, 10/100/1000Mbps auto-negotiation
RS485 2 channels, Supports Modbus-RTU protocol
Dry Contact Input 4 channels
Dry Contact Output 2 channels
USB Interface 2 ports, for data export and debugging

5.6 Access Control and Security Parameters

Parameter Specification
Access Control Method Fingerprint + Password + Mechanical Key (Standard); Card Swipe, Facial Recognition (Optional)
Fingerprint Capacity 1,000 entries
Password Capacity 1,000 entries
Card Capacity 10,000 cards (Card swipe type)
Door Opening Record Storage ≥10,000 records
Electromagnetic Lock Holding Force ≥280kg
Door Magnetic Sensor Type Normally Open / Normally Closed (Selectable)
Alarm Method Local audible/visual, remote SMS/Email/Platform

5.7 Reliability and Lifespan Parameters

Parameter Specification
Mean Time Between Failures (MTBF) ≥50,000 hours
Shielded Door Mechanical Lifespan ≥10,000 open/close cycles
Fan Lifespan ≥50,000 hours (at 25℃ ambient)
Beryllium Copper Contact Strip Lifespan Performance degradation ≤5% after ≥10,000 open/close cycles
Overall Designed Service Life ≥15 years

6.1 Core Shielding Safety Functions

6.1.1 Full-Band Bidirectional Electromagnetic Shielding

Provides bidirectional shielding capability: internally, it suppresses electromagnetic leakage emission from equipment, preventing information leakage through electromagnetic pathways; externally, it resists strong external electromagnetic interference, electromagnetic pulses, and electrostatic discharge, ensuring stable operation of internal equipment. Covers a wide frequency band of 14kHz~18GHz, with different grades meeting various protection needs from commercial confidentiality to military top-secret levels.

6.1.2 Full-Path Leakage Blocking

Not only does the cabinet body itself provide high shielding effectiveness, but all penetration paths are also specially treated: all power and signal lines pass through dedicated filters; ventilation openings use cut-off waveguide vents; cabinet doors use multi-stage conductive sealing; the grounding system is designed according to specifications, achieving 360° leak-free blocking and avoiding the “barrel effect” that could degrade overall shielding performance.

6.1.3 High-Reliability Structural Sealing

All-welded main shell structure eliminates splicing gap leakage risks. The knife-blade type shielded door paired with continuous silver-plated beryllium copper contact strips ensures uniform contact pressure, good electrical continuity, and resistance to deformation over long-term use. All removable components are equipped with conductive gaskets, and shielding performance is not affected after disassembly and reassembly.

6.1.4 Compliance and Certification Assurance

The product has passed testing by the National Secrecy Science and Technology Testing Center, meeting the corresponding grade requirements of the BMB19-2006 standard, and can be used in classified information systems. It has also passed military electromagnetic compatibility testing, satisfying military application requirements, and possesses complete testing and certification qualifications.

6.2 Intelligent Management Functions

6.2.1 Comprehensive Environmental Monitoring

Real-time monitoring of cabinet internal temperature, humidity, smoke, water leakage, access control, and other environmental and security parameters. Abnormal conditions trigger immediate alarms, enabling early detection of hidden hazards and preventing accidents such as equipment overheating, fire, and water ingress. Multi-point temperature and humidity monitoring accurately identifies local hot spots and provides visibility into temperature distribution within the cabinet.

6.2.2 Intelligent Power Distribution Management

The intelligent PDU monitors voltage, current, power, and energy consumption in real time, tracks equipment energy usage, and automatically alarms on overload, undervoltage, and overvoltage conditions. Supports remote on/off control, enabling remote equipment restart, scheduled power on/off, and other functions. The energy metering function supports energy consumption statistics and PUE analysis.

6.2.3 Intelligent Temperature Control and Cooling

Fan speed is automatically adjusted based on cabinet internal temperature, achieving on-demand cooling. Compared to traditional constant-speed fans, this saves more than 30% energy while reducing operating noise and extending fan lifespan. High-temperature automatic alarms and automatic fan failure notifications prevent equipment overheating due to cooling failure.

6.2.4 Multi-Level Alarm and Notification

Supports multiple notification methods including local audible/visual alarms, SMS alarms, email alarms, and platform pop-up alarms. Alarm levels are configurable, with important alarms pushed through multiple channels to ensure timely awareness by operations and maintenance personnel. Alarm information includes time, location, type, and values for rapid problem localization.

6.2.5 Data Recording and Analysis

Automatically records all operational data and alarm events with a storage period exceeding one year. Supports historical data query, trend curve display, and report export. Data analysis enables understanding of equipment operating patterns, optimization of maintenance strategies, and implementation of predictive maintenance.

6.2.6 Centralized Management and Remote Operations

Supports integration into centralized data center environment monitoring platforms for unified management of multiple cabinets. Remote viewing of operational status, parameter modification, and firmware upgrades can be performed without on-site visits, completing most maintenance tasks remotely, significantly improving management efficiency and reducing maintenance costs.

6.3 Structural and Process Features

6.3.1 High-Strength Nine-Fold Profile Frame

The nine-fold profile is used as the main load-bearing frame, featuring high section moment of inertia, high structural strength, and strong load-bearing capacity without deformation at full load. The frame is welded to the shell as one integrated unit, providing excellent overall rigidity and seismic performance, suitable for harsh environments such as vehicle-mounted and field applications.

6.3.2 Modular Integrated Design

All functional units adopt modular design with standardized installation interfaces. Filters, monitoring modules, fans, and PDUs can be quickly removed and replaced for easy maintenance without disassembling the entire cabinet. The modular design also supports flexible configuration, allowing functional modules to be added or removed based on requirements.

6.3.3 Precision Manufacturing Process

Main body welding uses industrial robot fully automated welding, ensuring uniform weld seams and consistent welding quality, eliminating quality variations from manual welding. Sheet metal parts use CNC punching and bending for high dimensional accuracy and good interchangeability. Surface treatment uses automated production lines for uniform coating, strong adhesion, and corrosion-resistant durability.

6.3.4 Ergonomic Structural Design

Both front and rear doors of the cabinet can be opened (some models feature single-door configuration), with unobstructed access on both interior sides for convenient equipment installation and maintenance.

U-position markings on mounting rails are clearly visible, allowing easy identification of installation heights.

The front door features a visual observation window (with optional shielding glass), allowing inspection of internal equipment indicator lights without opening the door.

Adjustable leveling feet provide a wide adjustment range, easily leveling the cabinet on uneven floors.

Sufficient cable management space with segregated routing for power and signal cables facilitates organization and maintenance.

6.4 Safety and Reliability Features

6.4.1 Multiple Electrical Safety Protection

The power distribution system incorporates four layers of protection: overload, short circuit, earth leakage, and surge protection, with graded tripping to safeguard both equipment and personnel. All electrical components are 3C certified or of equivalent qualification, with insulation and voltage withstand performance meeting national standards.

6.4.2 High-Reliability Components

Core components are selected from industrial-grade brand products. Key components including filters, monitoring hosts, sensors, fans, and locks undergo strict screening and burn-in testing, adapting to wide temperature and humidity ranges for stable, reliable long-term operation.

6.4.3 Comprehensive Grounding System

A dedicated grounding copper busbar is installed inside the cabinet, with all components requiring grounding connected at the nearest point. Proper equipotential bonding effectively prevents interference and safety hazards caused by ground potential differences. Short grounding paths with low impedance ensure shielding and filtering effectiveness.

6.4.4 Fire-Resistant and Environmentally Friendly Design

The entire unit uses flame-retardant materials, with all plastic components rated V0 flame retardant, and flame-retardant cables. Smoke detectors provide early fire warning, and an optional automatic fire suppression module can enhance fire safety levels. Product manufacturing complies with RoHS environmental requirements, free from hazardous substances.

6.5 Scenario Adaptation Features

6.5.1 Flexible Deployment

A single cabinet forms a complete system requiring no large-scale data center renovation — simply plug in and use. Suitable for distributed, small-scale classified equipment deployment. Can be used individually or combined into shielded cabinet groups to flexibly adapt to different scale requirements.

6.5.2 Strong Environmental Adaptability

Wide temperature and humidity design enables normal operation at ambient temperatures from -5℃ to 45℃, adapting to different climates including high temperature and high humidity in the south, and low temperature and dry conditions in the north. Dust-proof and corrosion-resistant design allows use in relatively harsh environments such as industrial plants and underground equipment rooms.

6.5.3 Strong Customization Capability

Supports custom non-standard dimensions, special interface customization, and special function customization. Targeted design can be performed based on user site conditions and equipment requirements, meeting various personalized scenario needs.

The LA-PB series intelligent shielded integrated cabinet, with its excellent shielding performance and comprehensive intelligent functions, is widely applied in various scenarios requiring high standards of information security, electromagnetic compatibility, and stable equipment operation. The following are typical application areas and solution descriptions.

7.1 Confidential Office Scenarios for Party and Government Agencies

7.1.1 Scenario Pain Points

Party and government agencies handle large volumes of classified documents and sensitive information. Electromagnetic leakage from office computers, printers, scanners, and other equipment may lead to the theft of classified information, posing serious confidentiality breach risks. Traditional office environments lack electromagnetic protection measures, fail to comply with confidentiality management regulations, and cannot pass confidentiality assessments. Additionally, distributed office equipment is inconvenient to manage with low maintenance efficiency.

7.1.2 Solution

Deploy LA-PB-B/C series intelligent shielded integrated cabinets to centrally house classified computers, classified switches, storage devices, and other equipment. All cabling is routed through filters, effectively blocking electromagnetic leakage and meeting BMB19 standard requirements and confidentiality assessment specifications.

The intelligent monitoring system provides real-time monitoring of cabinet environment and equipment operation status. The access control system manages physical access with traceable door opening records, achieving dual protection of physical security and information security. Single-cabinet deployment is flexible, suitable for distributed deployment across departments or centralized deployment of multiple units in a central equipment room.

7.1.3 Application Value

  • Meets national confidentiality standards, successfully passing confidentiality qualification reviews and routine inspections.
  • Blocks electromagnetic leakage pathways at the physical level, safeguarding classified information security.
  • Intelligent management reduces maintenance workload and improves office equipment management levels.

7.2 Military and National Defense Sector

7.2.1 Scenario Pain Points

Military units handle core confidential information related to weapons and equipment and national defense research. Information security requirements are extremely high, requiring not only prevention of electromagnetic leakage but also resistance against external electromagnetic interference and electromagnetic pulse weapon attacks to ensure stable equipment operation. Military environments may also involve harsh conditions such as vibration and extreme temperatures, demanding high equipment reliability.

7.2.2 Solution

Deploy LA-PB-A series military-grade shielded cabinets that meet military shielding standards, featuring excellent low-frequency magnetic shielding effectiveness capable of withstanding strong electromagnetic pulse impacts. The cabinet uses reinforced structures and high-reliability components adapted to military environments.

Special versions with vibration resistance, shock resistance, and wide temperature ranges can be customized as needed, paired with military-grade filters and special signal interfaces to meet electromagnetic protection requirements for various military equipment testing, operation, and storage. The intelligent monitoring system supports military communication protocol integration for incorporation into military security management systems.

7.2.3 Application Value

  • Meets military electromagnetic protection standards, safeguarding national defense core information and equipment security.
  • High-reliability structure adapts to complex military environments with low failure rates, reducing maintenance pressure.
  • Customized design matches special interfaces and installation requirements of different equipment.

7.3 Financial and Securities Industry

7.3.1 Scenario Pain Points

Core business systems of banks, securities, and insurance companies process large volumes of customer information and transaction data, making data security paramount. Financial branch networks are widely distributed with varying equipment room conditions. External electromagnetic interference may cause transaction system failures and data errors, resulting in economic losses and reputational damage. Dispersed branches also create challenges for operations and maintenance management.

7.3.2 Solution

Deploy LA-PB-B series shielded cabinets in core equipment rooms and branch equipment rooms to house core servers, trading terminals, encryption machines, and other equipment — preventing data electromagnetic leakage while resisting external electromagnetic interference to ensure stable transaction system operation.

Remote intelligent monitoring enables headquarters to centrally manage cabinets across all branches, with real-time operational status visibility and remote fault alerts, reducing on-site maintenance visits and lowering maintenance costs. Access control and operation records meet financial industry audit requirements.

7.3.3 Application Value

  • Protects financial core data security, preventing information leakage risks.
  • Enhances system anti-interference capability, reducing transaction system failure rates.
  • Centralized remote operations and maintenance improves management efficiency and reduces branch maintenance costs.

7.4 Research Institutions and Laboratories

7.4.1 Scenario Pain Points

Precision test instruments and experimental equipment in research institutions require high electromagnetic environment standards. External electromagnetic interference affects test accuracy, leading to inaccurate experimental data. Additionally, sensitive information such as research results and patented technologies requires strict confidentiality protection against electromagnetic theft. Some laboratories contain multiple high-frequency devices with severe mutual electromagnetic crosstalk.

7.4.2 Solution

Configure shielded cabinets of appropriate shielding grades based on the electromagnetic sensitivity and confidentiality level of different equipment, providing precision instruments with a clean electromagnetic environment free from external interference to improve test accuracy. Provide electromagnetic shielding protection for classified research equipment to prevent technical information leakage.

Multiple devices can be placed in independent shielded cabinets to avoid mutual electromagnetic crosstalk. Intelligent temperature and humidity control provides stable environmental conditions for precision equipment, ensuring equipment performance.

7.4.3 Application Value

  • Provides clean electromagnetic environment for precision instruments, improving experimental data accuracy and equipment service life.
  • Protects research achievements and core technologies, preventing electromagnetic information leakage.
  • Resolves electromagnetic crosstalk between multiple devices, improving laboratory space utilization.

7.5 Data Center and Cloud Computing Scenarios

7.5.1 Scenario Pain Points

Data centers have high-density servers and storage equipment with complex electromagnetic environments. Mutual interference between equipment affects system stability. Some colocation customers handle sensitive data with special electromagnetic security requirements. Data centers also demand high energy efficiency and operational efficiency, requiring refined management.

7.5.2 Solution

Deploy LA-PB series shielded cabinets as independent security zones for highly sensitive customer operations, providing dedicated electromagnetic protection and meeting customer information security compliance requirements. Intelligent power distribution and temperature control functions enable cabinet-level energy management, supporting PUE optimization.

The environment monitoring system integrates with the Data Center Infrastructure Management (DCIM) platform for unified management, transparent operational data, and improved refinement of operations and maintenance.

7.5.3 Application Value

  • Provides value-added security services for high-value, highly sensitive operations, enhancing data center competitiveness.
  • Cabinet-level refined management optimizes energy consumption and reduces operating costs.
  • Comprehensive monitoring and alarm systems improve availability and service levels.

7.6 Industrial Control and Smart Manufacturing Scenarios

7.6.1 Scenario Pain Points

Factory workshops contain numerous strong electromagnetic interference sources such as variable frequency drives, motors, and welding equipment, which interfere with industrial control equipment including PLCs, industrial computers, and servo controllers, causing control failures and data errors that affect production stability. Factory environments also feature dust, vibration, and significant temperature/humidity variations, creating harsh operating conditions.

7.6.2 Solution

Deploy LA-PB-INT industrial-grade shielded cabinets to house core control equipment, effectively isolating workshop strong electromagnetic interference and ensuring stable control system operation. The cabinet features reinforced dust-proof and anti-vibration design adapted to harsh industrial environments.

Wide-temperature cooling design adapts to high-temperature workshop environments, and industrial-grade components ensure stable long-term operation. Supports industrial bus protocol integration for incorporation into factory automation control systems.

7.6.3 Application Value

  • Significantly reduces electromagnetic interference failures in industrial control systems, improving production stability.
  • Adapts to harsh industrial environments, extending control equipment service life.
  • Reduces downtime losses, improving production efficiency and product yield.

7.7 Power and Energy Industry

7.7.1 Scenario Pain Points

Substations, power plants, and oil/gas stations feature complex electromagnetic environments. High-voltage equipment generates strong electromagnetic fields that easily interfere with relay protection devices, measurement and control devices, and communication equipment, potentially causing protection misoperation or failure to operate, leading to power accidents. Stations are also often located in remote areas with inconvenient maintenance access, demanding extremely high equipment reliability.

7.7.2 Solution

Deploy LA-PB series power-industry-specific shielded cabinets to house secondary equipment including relay protection, measurement and control, and communication devices, shielding against high-voltage electromagnetic field interference and ensuring safe and stable operation of power secondary systems. Products comply with power industry electromagnetic compatibility standards and have passed corresponding EMC testing levels.

Remote monitoring functionality enables remote operations and maintenance of unattended stations, with proactive alarm notification of abnormal conditions for early hazard detection, ensuring power system safety. The cabinet features moisture-proof and salt-spray-resistant characteristics adapted to outdoor station environments.

7.7.3 Application Value

  • Protects power secondary equipment from strong electromagnetic interference, preventing power accidents caused by protection misoperation.
  • Remote intelligent monitoring reduces maintenance difficulty for remote stations, improving maintenance efficiency.
  • High-reliability design meets power system high-availability requirements.

7.8 Medical and Biological Research Scenarios

7.8.1 Scenario Pain Points

Medical equipment such as MRI machines and X-ray systems generate strong electromagnetic radiation that interferes with nearby computers, patient monitors, and laboratory equipment, affecting normal equipment operation and test accuracy. Certain medical data involving patient privacy also requires information security protection.

7.8.2 Solution

Place susceptible medical information equipment inside shielded cabinets to isolate interference from strong electromagnetic equipment, ensuring stable equipment operation and accurate test data. Provide electromagnetic shielding protection for servers storing patient privacy data, complying with medical data security regulations.

7.8.3 Application Value

  • Prevents electromagnetic interference between medical equipment, improving diagnostic accuracy and equipment reliability.
  • Protects patient privacy data, complying with medical information security regulatory requirements.

7.9 Communication and Broadcasting/Television Scenarios

7.9.1 Scenario Pain Points

Base stations, broadcasting transmission sites, and similar locations feature high-power transmitting equipment that generates strong electromagnetic fields, interfering with transmission equipment and monitoring equipment and affecting communication quality. Communication core equipment also involves user data and network security, requiring electromagnetic leakage protection.

7.9.2 Solution

Use shielded cabinets to house core transmission and control equipment, resisting strong RF interference and ensuring stable communication equipment operation. Shielding performance covers the full communication frequency band, effectively blocking electromagnetic leakage and interference.

7.9.3 Application Value

  • Enhances communication equipment anti-interference capability, reducing failure rates and ensuring network stability.
  • Protects core network equipment from electromagnetic leakage, ensuring communication network security.

8.1 Pre-Installation Preparation

8.1.1 Personnel Preparation

Installation personnel must possess relevant qualifications and experience in electrical installation and low-voltage systems, and be familiar with electromagnetic shielding equipment installation requirements.

At least 2 installation personnel are required on site; additional personnel are needed for large or heavy cabinets.

Carefully read this manual before installation to understand product structure, installation steps, and safety precautions.

Designate a site supervisor and a safety officer, and implement construction safety responsibilities.

8.1.2 Tool Preparation

The following tools must be prepared and confirmed in good working condition before installation:

  • Measuring Tools: Laser level, tape measure, feeler gauge, ground resistance tester, multimeter, torque wrench
  • Installation Tools: Hex key set, adjustable wrench, socket wrench set, screwdriver set, electric drill, impact drill, utility knife, wire stripper, crimping tool
  • Auxiliary Tools: Forklift or hydraulic pallet truck, pry bar, rubber mallet, gloves, safety harness, cleaning cloth
  • Testing Tools: Surface resistance tester (optional, for checking conductive contact)

8.1.3 Site Environment Inspection

  • Floor Conditions: The installation floor must be level, solid, and dry, with load-bearing capacity exceeding the total weight of the fully loaded cabinet. Floor flatness tolerance ≤2mm/m. If the floor is significantly sloped, leveling treatment is required.
  • Space Requirements: Reserve ≥800mm operating space in front of the cabinet, ≥600mm maintenance space at the rear and sides, and ≥300mm heat dissipation space above the cabinet.
  • Environmental Conditions: No corrosive gases or flammable/explosive materials on site. Ambient temperature between 0℃~40℃, relative humidity ≤80%RH, non-condensing.
  • Electromagnetic Environment: Maintain a distance of at least 1 meter from strong electromagnetic interference sources such as large transformers, motors, and transmitting antennas.
  • Power Supply and Grounding: A compliant AC power source and independent grounding system must be available on site, with grounding resistance ≤1Ω.

8.1.4 Goods Arrival Inspection and Acceptance

  • After cabinet delivery, inspect the outer packaging for damage, collision marks, or water ingress.
  • After unpacking, verify component quantities and models against the product packing list. Inspect cabinet appearance for deformation, paint peeling, or scratches. Check the shielded door, glass, and other components for damage.
  • Verify that accompanying documents and accessories are complete.
  • Complete the arrival inspection record after passing acceptance. Contact the manufacturer promptly if any abnormality is found.

8.2 Cabinet Handling and Positioning

8.2.1 Handling Precautions

  • The cabinet is heavy and must be moved using a forklift or hydraulic pallet truck. Manual lifting by personnel is strictly prohibited to prevent injury and equipment damage.
  • Keep the cabinet upright during handling. Tilt must not exceed 15°. Overturning or laying the cabinet on its side is strictly prohibited to prevent internal component displacement or damage.
  • Avoid severe vibration and impacts during handling. Protect the cabinet surface and shielded door from scratches and deformation.
  • Measure dimensions in advance when passing through elevators and doorways to avoid collisions.
  • Lower the cabinet gently into position to avoid impact on the floor and cabinet body.

8.2.2 Positioning and Leveling

  • Determine the cabinet installation position according to the design drawings and mark positioning lines.
  • Move the cabinet to the designated position and adjust the adjustable leveling feet at the bottom.
  • Use a laser level to measure the levelness of the cabinet top and the plumbness of the sides. Adjust the height by rotating the leveling feet until cabinet levelness deviation is ≤2mm/m and verticality deviation is ≤3mm/m.
  • All four leveling feet must bear load evenly with no floating feet, ensuring the cabinet is stable and does not rock.
  • If casters are configured, lock the brake casters after leveling to prevent cabinet movement.
  • For multi-cabinet side-by-side installation, level each cabinet individually, ensuring alignment between cabinets, uniform gaps, and consistent top surface heights.

8.2.3 Floor Fixing (Optional)

  • For scenarios requiring seismic resistance or where the floor is smooth and prone to sliding, the cabinet must be fixed to the floor.
  • Based on the cabinet base mounting hole positions, drill holes in the floor and install expansion anchors.
  • Use M10 expansion anchors to securely fix the cabinet base to the floor, with bolt torque meeting requirements.
  • Re-check levelness and verticality after fixing.

8.3 Cabinet Component Installation

8.3.1 Shielded Door Inspection and Adjustment

  • The shielded door is pre-installed and adjusted at the factory. After transportation, inspect the door frame for deformation and hinges for looseness.
  • Open and close the door several times to check smooth operation for sticking, jamming, or abnormal noise.
  • Check that the door lock engages smoothly and the three-point locking bolts operate synchronously.
  • Use a feeler gauge to check the gap around the entire door perimeter. Gaps should be uniform with deviation ≤0.5mm. If gaps are uneven, adjust hinge positions and locking points.
  • Inspect beryllium copper contact strips for damage, deformation, detachment, or oxidation. Verify proper knife-edge insertion depth.

8.3.2 Waveguide Vent Inspection

  • Check that the inlet/outlet waveguide vents are securely installed and flange mounting bolts are not loose.
  • Inspect waveguide honeycomb cells for deformation or blockage. Clean any dust or debris.
  • Verify that dust screens are properly installed and intact.

8.3.3 Internal Mounting Rails and Tray Installation

  • Determine the front/rear position of mounting rails based on the equipment installation plan. Loosen rail fixing bolts, adjust rail depth, and re-tighten.
  • Install fixed trays and sliding trays according to U-position markings. Trays must remain level with fixing bolts tightened securely.
  • Tray mounting spacing should be determined by equipment height, with clearance reserved for heat dissipation and cable routing.
  • Install vertical cable management racks and cable management rings, securing them firmly.

8.3.4 Grounding Copper Busbar Installation

  • The cabinet grounding copper busbar is pre-installed at the factory. Check that it is securely mounted and free from oxidation.
  • Confirm the location of the grounding lead-out terminal for subsequent grounding work.
  • Clean the busbar surface to ensure good electrical conductivity.

8.4 Grounding System Installation

The grounding system is critical to ensuring shielding effectiveness and electrical safety and must be installed in strict accordance with specifications.

8.4.1 Grounding Requirements

  • The cabinet must be connected to an independent, qualified grounding system. Connection to non-dedicated grounding points such as water pipes, lightning protection strips, or power supply neutral conductors is strictly prohibited.
  • Grounding resistance requirements: ≤1Ω for confidentiality-grade cabinets, ≤0.5Ω for military-grade.
  • Use multi-strand copper-core insulated conductors for grounding cables, with cross-sectional area ≥16mm², kept as short as possible to minimize grounding impedance.
  • Grounding connections must use bolted compression joints. Contact surfaces must be ground clean and coated with conductive paste to ensure low contact resistance.
  • For multiple cabinets installed side by side, connect the grounding copper busbars of each cabinet with equipotential copper straps, then connect to the equipment room grounding busbar at a single point to avoid ground loops.

8.4.2 Grounding Installation Procedure

  • Measure the grounding resistance of the equipment room grounding busbar to confirm compliance.
  • Cut the grounding cable to the appropriate length, crimp copper lug terminals at both ends, ensure secure crimping, and apply insulation treatment.
  • Connect one end to the grounding bolt of the cabinet grounding copper busbar. Tighten the bolt to torque ≥20N·m.
  • Connect the other end to the equipment room grounding busbar with a secure connection.
  • After connection, measure the resistance between the cabinet shell and the grounding busbar; it should be ≤0.1Ω.
  • Measure the overall grounding resistance to confirm compliance with specified requirements.
  • Route the grounding cable along the cabinet side, secure it neatly, and label it clearly.

8.4.3 Grounding Precautions

  • No splices are permitted in the middle of the grounding cable, and no other equipment may be connected in series.
  • Grounding cables should be routed away from power cables to avoid coupling interference.
  • Grounding bolts must have anti-loosening measures to prevent loosening from long-term vibration.
  • Cabinet grounding and lightning protection grounding must not be directly shared; they should be connected through equipotential bonding.

8.5 Auxiliary System Installation

8.5.1 Intelligent Monitoring System Installation

  • The monitoring host is pre-installed and secured at the designated position inside the cabinet at the factory. Check that it is securely fixed.
  • Verify that all sensors are installed at correct positions and cable connections are reliable.
  • Check the front door touchscreen for secure wiring connections and screen damage.
  • The audible/visual alarm device is installed at a prominent position on the top of the cabinet. Verify correct wiring.

8.5.2 Forced-Air Cooling System Installation

  • The fan assembly is pre-installed on the top at the factory. Check that fans are securely fixed and vibration dampers are intact.
  • Manually rotate fan blades to confirm smooth rotation without sticking or friction.
  • Fan wiring should be connected to the temperature control module and PDU with secure connections and correct polarity.
  • Check the air duct for obstructions to ensure unobstructed airflow.

8.5.3 Access Control System Installation

  • The access control controller is installed inside the cabinet, and the card reader is installed at the designated position on the outside of the door, securely fixed.
  • The electromagnetic lock and strike plate must be accurately aligned with tight attraction and sufficient holding force.
  • The door magnetic sensor must be properly installed with correct door open/close signals.
  • Wiring connects to the access control controller and monitoring host. Cables should be organized and secured.

8.5.4 PDU Installation

  • Install the intelligent PDU on the rear mounting rail of the cabinet at an appropriate height for convenient plug insertion and removal.
  • Tighten fixing bolts. The PDU must remain vertical without tilting.
  • Reserve appropriate length of input cable for subsequent connection.

8.6 Precautions During Installation

  • Drilling, welding, or cutting on the shielding shell without authorization is strictly prohibited, as it damages shielding integrity. Any required openings must use dedicated shielded interface components.
  • Protect sealing components such as beryllium copper contact strips and conductive gaskets during installation. Avoid collision-induced deformation and contamination by oil, grease, or dust.
  • All bolts and fasteners must be tightened to specification. Components with anti-loosening requirements must be fitted with spring washers or lock nuts.
  • All electrical installation work must be performed with power disconnected, following electrical safety regulations to prevent electric shock.
  • Wear safety harness when working at heights and implement appropriate safety protection measures.
  • Clean up metal shavings and debris generated during installation promptly to prevent short circuits from material left inside the cabinet.
  • Close and lock the cabinet door at the end of each workday to prevent access by unauthorized personnel.

8.7 Post-Installation Preliminary Inspection

After installation is complete, conduct a preliminary inspection according to the following items. Proceed to the wiring and commissioning phase only after passing:

Inspection Item Requirement
Cabinet Position Correct position, levelness and verticality compliant, stable placement
Cabinet Appearance No obvious deformation, paint peeling, or damage
Shielded Door Smooth open/close, reliable locking, good contact strip contact, no deformation or detachment
Waveguide Vents and Filters Securely installed, no damage
Internal Trays and Rails Securely installed, correct positions
Grounding System Reliable connections, grounding resistance compliant
Installation Accessories Complete, none missing
Cabinet Cleanliness No debris or metal shavings inside

After passing the preliminary inspection, complete the installation process acceptance record and proceed to the next phase.

Wiring directly affects product shielding performance, electrical safety, and system functionality. All wiring must be performed by certified electricians in strict accordance with the electrical schematic diagram and these specifications.

9.1 General Wiring Principles

  • Safety First: All wiring operations must be performed with power disconnected, with warning signs posted to prevent accidental switch-on.
  • Standardized Routing: Separate high-voltage/low-voltage circuits and AC/DC circuits to reduce mutual interference. Route cables neatly and secure them firmly.
  • Shielding Continuity: Shielded cable shield layers must be properly grounded. Any cable crossing the shielding barrier must pass through filters or shielded interfaces.
  • Clear Labeling: All cables must have clear wire number labels at both ends, with clear terminal numbering for easy maintenance.
  • Reliable Contact: Terminals must be securely crimped, bolts tightened to specified torque, with no loose connections, poor contact, or burrs.

9.2 Power System Wiring

9.2.1 Power Input Wiring

  • Verify that the site power supply voltage, frequency, and capacity match the equipment rated parameters and total power requirements of the cabinet.
  • Route the power input cable through the power entry point at the bottom of the cabinet into the input terminals of the power filter. Important: The power filter input terminals are located on the outside of the shielding barrier, and the output terminals on the inside. Reverse connection is strictly prohibited.
  • Input cable cross-sectional area is selected based on total current: 4mm² copper wire for ≤32A, 10mm² copper wire for ≤63A, 16mm² copper wire for ≤100A.
  • Connection sequence: Connect ground (PE) first, then neutral (N), and finally phase wires (L/L1/L2/L3).
  • Tighten terminal bolts to specified torque. Multi-strand wires must be terminated with crimped lugs before connection. Direct connection of bare stranded wire is strictly prohibited.
  • Install waterproof sealed cable glands at power cable entry points. Secure cables firmly to prevent tensile forces from transmitting to terminals.

9.2.2 Filter Output Wiring

  • Connect the power filter output terminals to the intelligent PDU input terminals using flame-retardant multi-strand copper-core cables.
  • Filter output and input cables must be routed separately with a spacing of ≥20cm. Parallel bundling is strictly prohibited to prevent input-output coupling that would render filtering ineffective.
  • Connect the filter grounding terminal separately to the cabinet grounding copper busbar using copper wire of at least 4mm², keeping the connection as short and direct as possible.
  • The filter housing must maintain good contact with the cabinet body to ensure consistent ground potential on the housing.

9.2.3 PDU Output Wiring

  • Connect equipment power cords to PDU output receptacles, inserting fully and securing anti-disconnect mechanisms (if provided).
  • Organize equipment power cords neatly along cable management racks with appropriate bundling tension, avoiding cable compression.
  • Allocate dedicated circuits for high-power equipment to avoid excessive load on a single circuit.
  • Separate power cables and signal cables with spacing ≥10cm. Cross at right angles where intersection is unavoidable.

9.2.4 Surge Protector Wiring

  • The surge protector is connected in parallel at the power input end, with phase, neutral, and ground wires connected correspondingly.
  • Connection wires should be as short and direct as possible, with length ≤0.5m, to minimize lead inductance that affects discharge performance.
  • Connect the ground terminal directly to the grounding copper busbar with minimum impedance.

9.3 Signal Cable Wiring

9.3.1 Network Signal Wiring

  • Connect the external network cable to the input of the RJ45 signal filter, and the internal network cable to the output. Direct bypass connection is strictly prohibited.
  • Use shielded Cat5e or Cat6 network cable with complete shield layers.
  • RJ45 connectors must be crimped according to specifications with correct pin assignments, and the shield layer must make reliable contact with the connector metal housing.
  • The filter is installed on the shielding shell wall with the housing securely connected to the cabinet body to maintain shielding continuity.
  • Internal network cables should be routed along cable management racks, separated from power cables and bundled neatly.

9.3.2 Fiber Optic Cable Wiring

  • Fiber optic cables pass through the shielding cabinet body via dedicated fiber optic waveguide tubes. Both ends of the waveguide tubes must be securely fixed with good contact to the cabinet body.
  • Fiber splicing (fusion or mechanical) must follow specifications, with fusion splice loss ≤0.3dB.
  • Fiber bending radius ≥30mm, avoiding sharp bends and tensile stress.
  • Label both ends of fiber cables clearly and reserve appropriate slack length.
  • Fill waveguide tube openings with sealing compound to prevent electromagnetic leakage.

9.3.3 Serial Port and Control Signal Wiring

  • RS232/RS485 and other control signals must be connected through dedicated signal filters with correct pin assignments.
  • Shielded cable shield layers are grounded at one end only. The grounding end is at the cabinet side; the signal source side remains floating.
  • Signal cables should be routed away from power cables, avoiding parallel routing to reduce interference coupling.
  • Terminal connections must be secure, with no cold solder joints or loose connections.

9.3.4 Sensor and Monitoring Wiring

  • Sensor signal cables for temperature/humidity, smoke, water leakage, etc., must use RVVP shielded cables with single-ended shield grounding.
  • Connect terminals to the correct positive/negative and signal pins to avoid reverse connection that could damage sensors.
  • All sensor cables connect to the corresponding terminals on the monitoring host, with terminal numbers matching the drawings.
  • Route cables along the cabinet interior walls, securing them neatly without affecting equipment installation or door operation.

9.4 Shielded Cable Grounding Specifications

The grounding method of shielded cables directly affects shielding effectiveness. Different cable types require different grounding methods; random grounding is strictly prohibited.

9.4.1 Low-Frequency Analog Signal Cables

  • Low-frequency signals below 1MHz use single-ended grounding.
  • The shield layer is grounded at the cabinet side (receiving end); the signal source side remains floating to avoid ground loops.
  • The grounded shield layer must make reliable connection to the grounding copper busbar with low contact resistance.

9.4.2 High-Frequency Digital Signal Cables

  • High-frequency signals above 1MHz use double-ended grounding.
  • The shield layer is grounded at both ends — one end to the equipment shell and the other to the cabinet grounding copper busbar — to reduce high-frequency impedance.
  • Both grounding ends must maintain equipotentiality, with ground potential difference not exceeding 1V; otherwise, circulating currents may occur.

9.4.3 Double-Layer Shielded Cables

  • The outer shield layer is grounded at both ends for electric field shielding; the inner shield layer is grounded at one end for magnetic field shielding.
  • The inner and outer shield layers must be insulated from each other and must not be short-circuited together.

9.4.4 Power Cable Shield Layers

  • Power cable shield layers are grounded at both ends — one end to the power supply side ground and the other to the cabinet ground.
  • Armored cable steel tape must be grounded at both ends. The armor layer and shield layer are grounded separately.

9.4.5 Shield Layer Installation Key Points

  • When stripping cable ends, preserve the shield layer intact, gather it into a bundle, and crimp a terminal for grounding.
  • Keep shield layer grounding lengths as short as possible to avoid “antenna effect.”
  • The shield layer must not be interrupted in the middle; continuity must be maintained at splices.
  • Insulate the floating end of the shield layer to prevent contact with metal shells.

9.5 Internal Cable Routing Process Requirements

  • High/Low Voltage Separation: AC power cables must be separated from DC signal and network cables, routed on separate cable management racks on different sides, with spacing ≥100mm.
  • Neat Routing: Cables must be routed neatly, straight and level, with no twisting or tangling.
  • Bundling Standards: Use nylon cable ties with uniform spacing and appropriate tension, without damaging cable insulation. Trim cable tie tails flush with no sharp burrs.
  • Clear Labeling: Each cable must have clear wire number labels at both ends indicating circuit, number, and destination, with legible, durable markings.
  • Reserve Slack: Reserve 10~20cm slack at equipment ends for convenient plugging/unplugging and maintenance.
  • Keep Away from Heat Sources: Route cables away from fans, heaters, and other heat sources to prevent high-temperature aging.
  • Abrasion Protection: Add protective grommets or corrugated conduit where cables pass over edges or through openings to prevent insulation damage.

9.6 Post-Wiring Inspection

After wiring is complete, perform the following inspections item by item. Proceed to commissioning only after passing:

Inspection Item Requirement
Wiring Correctness Verify each circuit against the electrical schematic diagram, confirming no wrong, missing, or reversed connections
Fastener Tightness Re-tighten all terminals and bolts individually; no looseness or poor contact
Insulation Resistance Test Disconnect all sensitive electronic devices; measure power circuit-to-ground insulation resistance with 500V megger — ≥0.5MΩ for power circuits, ≥1MΩ for control circuits
Continuity Test Test circuit continuity with multimeter continuity mode, confirming no short or open circuits
Ground Continuity Check Measure resistance between cabinet metal components and grounding copper busbar — ≤0.1Ω is acceptable
Routing Quality Check Verify neat routing, clear labeling, high/low voltage separation, and compliant shield grounding
Cleanliness Check Remove all leftover wire trimmings, cable ties, tools, and debris from the cabinet

After passing inspections, complete the wiring process acceptance record and proceed to the commissioning phase.

9.7 Wiring Safety Precautions

  • Strictly observe the power-off work system. Confirm power is disconnected and verify with a voltage tester before any operation.
  • Operators must wear insulated gloves and use insulated tools to prevent electric shock.
  • Apply insulation protection to exposed live parts to prevent accidental contact.
  • Hot-plugging of active components such as filters and sensors is strictly prohibited to prevent equipment damage and electric shock.
  • Temporary power-on testing requires a designated person to monitor, with immediate power-off upon any abnormality.
  • After wiring is complete, all live parts must be protected with no exposed conductors.

Commissioning is the critical phase for verifying installation and wiring quality and validating all functions and performance. It must be carried out in an orderly step-by-step manner: inspect before power-on, no-load before loaded operation, and local before overall testing.

10.1 Pre-Commissioning Preparation

10.1.1 Technical Preparation

  • Commissioning personnel must be familiar with product principles, functions, and commissioning methods, and have mastered the contents of this manual.
  • Prepare technical documentation including product electrical schematic diagrams, wiring diagrams, and factory parameter tables.
  • Define commissioning items and acceptance criteria, and develop a commissioning plan.

10.1.2 Instruments and Tools Preparation

Instrument Specification
Multimeter Digital, accuracy class 0.5
Clamp Meter For current measurement
Ground Resistance Tester As required
Temperature/Humidity Meter Calibrated
Tachometer/Anemometer Optional
Laptop Computer and Debug Cables For system configuration
Voltage Tester, Insulated Gloves Safety tools

10.1.3 Safety Confirmation

  • Confirm that installation and wiring work is fully complete and has passed acceptance.
  • Confirm no tools or debris are left inside the cabinet and that the cabinet door opens/closes properly.
  • Confirm all air circuit breakers are in the OFF position and equipment power switches are OFF.
  • Confirm the grounding system is reliably connected and grounding resistance meets specifications.
  • Ensure fire extinguishing equipment is available on site with safety protection in place.

Chapter 10 System Commissioning

10.2 Special Inspection Before Power-On

The following checks must be completed before powering on. Only after confirming all items are correct may power be applied:

  • Visual Inspection: Cabinet body, doors, and all components are intact, free of damage or looseness.
  • Wiring Inspection: All wiring is correct and secure, with no misconnections or short circuits, and no exposed terminals.
  • Switch Status: The main power switch, branch switches, and PDU switches are all in the OFF position.
  • Load Inspection: No high-power equipment shall be temporarily connected inside the cabinet; commission with no load first.
  • Grounding Inspection: Re-measure the grounding resistance to confirm it meets requirements.
  • Insulation Inspection: Re-measure the insulation resistance of the main circuit to confirm there are no short circuits or ground faults.

10.3 No-Load Power-On Commissioning

10.3.1 Main Power Supply Energization

Close the upstream main power switch of the cabinet. Use a multimeter to measure the voltage at the power input terminal, confirming the voltage is normal with a deviation within ±10% of the rated value.

Observe for any abnormal phenomena such as unusual sounds, odors, or smoke. If any occur, immediately cut off power and inspect.

Measure the voltage at the input terminal of the power filter to confirm normal input.

10.3.2 Power Distribution System Testing

Close the air switch on the output side of the filter and measure the output voltage; it should be normal with no abnormalities.

Close the PDU input switch and measure the PDU output voltage; the voltage at each outlet socket should be normal.

Test the PDU metering function: verify that the voltage, current, and power displayed on the screen are accurate, comparing them with multimeter readings; the error should be within the permissible range.

Test overload protection: simulate an overload condition to verify that the overload protection activates (optional).

Test surge protection: check that the surge protector status indicator is normal and free of damage.

10.3.3 Monitoring System Power-On Commissioning

Power on the environmental monitoring (Donghuan) host and observe the startup process. The system should start normally with no error messages.

The touchscreen should illuminate and enter the main interface, displaying operating parameters.

Sensor Testing:

  • Temperature/Humidity: Check the displayed temperature and humidity values, comparing them with a standard hygrometer/thermometer; the error should meet the accuracy requirements. Use hot air or humidification to simulate changes; the values should change accordingly.
  • Smoke: Press the test button on the smoke detector; a smoke alarm should be triggered, audible and visual alarms should activate, and the interface should display the alarm message.
  • Water Leakage: Touch the water leak sensor probe with a damp cotton swab; a water immersion alarm should be triggered.
  • Door Magnetic Contact: Open and close the cabinet door; the door status display should change accordingly, and the door-open alarm function should operate normally.

Alarm Function Testing:

  • Manually set temperature/humidity thresholds and simulate exceeding limits to verify whether audible/visual alarms and information push notifications function properly.
  • Test alarm grading; different alarm levels should correspond to different notification methods.

Data Storage Testing: Check historical data to confirm records are being written normally and the sampling interval is correct.

Communication Testing:

  • Connect the network cable, test that the network connection is normal, and access the monitoring interface via a computer.
  • Test remote data upload and remote parameter setting functions.
  • Test SMS/email alarm functions to confirm alarm messages are sent normally.

10.3.4 Air Cooling System Commissioning

  • Manually start the fan and check that the rotation direction is correct, that it runs smoothly, and that there are no abnormal sounds or vibrations.
  • Measure the fan current; it should be within the rated range.
  • Test the temperature control function: set the temperature threshold, simulate temperature changes, and observe whether the fan start/stop and speed changes conform to the set logic.
  • Test the fan fault alarm: disconnect the fan power supply and verify that the fault alarm triggers.
  • Measure the airflow speed and volume inside the cabinet to confirm the cooling capacity meets the design requirements.

10.3.5 Access Control System Commissioning

  • Test the mechanical key lock/unlock function; operation should be smooth and reliable.
  • Test the password unlock function: enter a test password, verify normal unlocking, and confirm that incorrect passwords cannot open the lock.
  • Test the fingerprint unlock function: enroll a test fingerprint, and verify the recognition success rate and response speed.
  • Test the electromagnetic lock: suction should be firm, unlock response timely, with no sticking.
  • Test the door opening record: check the access control log; door opening events should be recorded accurately and completely.
  • Test the tamper alarm: simulate removal of the card reader to trigger the alarm.

10.3.6 Lighting System Testing

  • The LED light should automatically turn on when the door opens, with sufficient brightness.
  • The light should automatically turn off after the door closes, with a reasonable delay time.
  • The manual switch should operate normally.

10.4 Commissioning Under Load

After no-load commissioning passes, connect actual load equipment for load commissioning.

10.4.1 Equipment Power-On

  • Following the equipment operating procedures, power on the equipment inside the cabinet one by one, starting with peripheral devices followed by core equipment.
  • Observe the equipment startup process for any abnormalities; the PDU current and power readings should be normal.
  • Monitor the temperature changes inside the cabinet; the temperature rise should be within a reasonable range.

10.4.2 Load Cooling Test

  • Run the equipment at full load for more than 1 hour, monitoring the temperature at various points inside the cabinet. The maximum temperature must not exceed the equipment’s allowable operating temperature.
  • Test the intelligent temperature control effect; the fan should automatically adjust based on temperature, and the temperature should stabilize within the set range.
  • Check for any local hot spots; if present, optimize the equipment layout and airflow channels.

10.4.3 Electromagnetic Compatibility Verification

  • During normal equipment operation, observe for any interference phenomena. Equipment should operate stably with no data errors, crashes, or other issues.
  • If conditions permit, test the electromagnetic environment inside the cabinet to confirm interference levels are within equipment tolerance.
  • Verify there is no abnormal electromagnetic leakage to the outside and that nearby sensitive equipment is unaffected.

10.4.4 Full-Load Stability Test

  • Run the entire system continuously at full load for no less than 24 hours. During this period, conduct regular inspections and record operating parameters.
  • There should be no alarms, faults, or abnormal temperature rises during operation; all functions should operate normally.
  • During the test, simulate operations such as opening/closing the door and plugging/unplugging cables to verify that shielding performance and system stability are not affected.

10.5 Preliminary Shielding Effectiveness Inspection

Formal acceptance testing shall be conducted by a third-party organization. During the commissioning phase, a simple shielding effectiveness test may be performed to preliminarily verify shielding performance.

10.5.1 Simple Test Methods

  • Place a mobile phone inside the cabinet, close and lock the door, then call the phone to observe whether it can connect. If it cannot connect, the basic shielding effectiveness is good.
  • Use a small signal source to transmit inside the cabinet, and measure signal strength outside the cabinet with a field strength meter. Compare with the unshielded condition to estimate shielding effectiveness.
  • Check for obvious signal leakage at door gaps and interface points; field strength should not show abnormal increases at critical locations.

10.5.2 Common Leakage Point Troubleshooting

If the preliminary shielding test shows poor results, troubleshoot in the following order:

1. Check whether the cabinet door is closed and locked tightly, whether the contact spring leaves are making good contact, and whether any foreign objects are caught in the door gap.

2. Check whether the waveguide windows are blocked, deformed, or loosely installed.

3. Check whether the filter is connected in reverse and whether input/output coupling exists.

4. Check whether any cables pass directly through without going through the filter.

5. Check whether grounding is good and whether the grounding resistance exceeds the standard.

6. Check the enclosure for any unsealed holes or gaps.

After identifying the problem, rectify it and re-test until the effect is satisfactory.

10.6 System Parameter Optimization and Settings

After commissioning is complete, optimize system parameters based on the actual site conditions and set reasonable thresholds:

  • Temperature/Humidity Alarm Thresholds: Set high-temperature, low-temperature, high-humidity, and low-humidity alarm values according to equipment requirements. Typically, the high-temperature alarm is set at 35°C and the low-temperature at 5°C.
  • Temperature Control Parameters: Set the fan start temperature, stop temperature, and speed control curve, balancing cooling and energy efficiency.
  • Access Control Parameters: Enroll user fingerprints, passwords, and cards; set permissions and door access time periods.
  • Alarm Parameters: Set alarm notification methods, contacts, alarm levels, and delay times.
  • Communication Parameters: Configure IP addresses, ports, platform addresses, and other network parameters.
  • Time Calibration: Calibrate the system time to ensure accurate records.

After all parameters are set, save the configuration and export a backup.

10.7 Commissioning Completion Confirmation

After all commissioning items are completed and pass inspection, organize the commissioning records and fill out the commissioning report, including:

  • Commissioning time, location, and personnel
  • Test results for each function
  • Measured values of performance parameters
  • Problems identified and rectification status
  • Parameter settings list
  • Commissioning conclusion

After commissioning passes, proceed to the trial operation and final acceptance phase.

Chapter 11 Product Usage Precautions

11.1 Daily Operation Specifications

  • Door Operation: Open and close the shielding door smoothly, avoiding forceful impacts. When closing, confirm the lock is fully engaged and all three-point locks are secured. It is strictly prohibited to use the cabinet with the door ajar, as this will severely degrade shielding effectiveness.
  • Key Management: Mechanical keys shall be kept by designated personnel and used according to authorization levels. Private duplication of keys is strictly prohibited. Spare keys shall be sealed and stored according to regulations, only to be used in emergencies.
  • Equipment Handling: When installing or removing equipment inside the cabinet, handle with care to avoid collisions with the cabinet interior walls and mounting rails, preventing damage to the shielding layer and conductive gaskets. Equipment must be securely mounted to prevent tipping.
  • Cable Plug/Unplug: When plugging or unplugging cables, grip the connector body; pulling on the cable itself is strictly prohibited. All external cables must be connected through dedicated filters or shielded interfaces. Passing cables through door gaps or unsealed openings is strictly prohibited.
  • Cleaning and Maintenance: For routine cleaning, use a dry cloth or neutral detergent to wipe the cabinet surface. The use of corrosive cleaners such as strong acids or alkalis is strictly prohibited. When cleaning conductive contact surfaces, use anhydrous ethanol and a dedicated cleaning cloth.

11.2 Shielding Performance Protection Precautions

The shielding performance is the core value of this product. During use, special attention must be paid to protection to avoid human-induced degradation of shielding effectiveness.

  • No Arbitrary Drilling: Drilling, cutting, or welding on the shielding enclosure is strictly prohibited. Any action that compromises the integrity of the enclosure will cause electromagnetic leakage. If additional interfaces are needed, the manufacturer must be contacted to implement a dedicated shielding solution.
  • Keep Door Gaps Clean: The beryllium copper spring leaves on the door gap and the knife edge are critical sealing components. Applying tape, painting, or allowing paper, dust, or oil to become trapped in the gap is prohibited. Clean regularly to prevent oxidation and rust.
  • Avoid Scratches from Hard Objects: Scraping the interior surface of the enclosure or conductive contact surfaces with sharp hard objects is prohibited, as scratches will affect conductive continuity.
  • Filter Protection: Arbitrarily replacing the filter model is prohibited. Binding the filter input and output cables together is prohibited. Overloading the filter is prohibited to prevent damage.
  • Waveguide Window Protection: Blocking the waveguide windows with objects or inserting foreign objects into them is prohibited to prevent deformation or damage to the honeycomb structure. Clean dust from the waveguide windows regularly to maintain ventilation and shielding performance.
  • Standard Grounding: Disconnecting the grounding device or having loose grounding connections is prohibited. Check grounding connections regularly to ensure reliable grounding.
  • Shielding Blank Panels: Vacant installation positions and cable entry holes shall be sealed with shielding blank panels or sealing components. Use with open ports is prohibited.

11.3 Electrical Safety Precautions

  • Electrical Safety: The total load of the cabinet must not exceed the rated power. Overload operation is strictly prohibited to prevent overheating and fire hazards.
  • Live-Work Prohibition: Disassembling electrical components or repairing internal circuits while energized is strictly prohibited. Repairs must be performed with power disconnected, with warning signs posted, and after confirming zero voltage.
  • Wet Hands Prohibition: Operating switches or plugging/unplugging power cables with wet hands is prohibited to prevent electric shock.
  • Liquid Protection: Placing water cups or liquid containers on top of the cabinet or on equipment is prohibited to prevent liquid spills from entering the cabinet and causing short circuits.
  • Foreign Object Prohibition: Leaving metal tools, screws, or other debris inside the cabinet is prohibited to prevent short circuit faults.
  • Abnormal Condition Handling: If abnormal conditions such as unusual sounds, odors, smoke, or electrical leakage are detected during operation, immediately cut off the power supply, contact professional personnel for repair, and refrain from disassembling the unit independently.

11.4 Environmental Safety Precautions

  • Fire Safety: Stacking flammable or explosive materials near the cabinet is strictly prohibited. Open flames must be kept away. Storing flammable debris inside the cabinet is prohibited. Fire evacuation routes must remain clear.
  • Temperature Environment: The operating environment temperature of the cabinet must not exceed 45°C. Avoid direct sunlight on the cabinet and keep it away from heat sources.
  • Humidity Environment: Keep the environment dry, with relative humidity not exceeding 90% RH, and avoid condensation. In high-humidity environments, dehumidification measures must be taken to prevent corrosion of metal components and degradation of electrical insulation.
  • Dust Protection: Keep the environment clean and clean the dust filter screens regularly to prevent excessive dust from affecting heat dissipation and conductive contact.
  • Vibration Protection: Avoid strong vibrations and impacts. Forceful striking of the cabinet is prohibited. In vibrating environments, vibration damping measures must be adopted.

11.5 Intelligent System Usage Precautions

  • Parameter Settings: System parameters shall be set only by authorized administrators. Unauthorized personnel modifying parameters is strictly prohibited to prevent affecting normal system operation.
  • Password Management: The system administrator password shall be properly kept and changed regularly to prevent unauthorized operations.
  • Data Backup: Regularly export and back up system configurations and historical data to prevent data loss due to system faults.
  • Firmware Upgrades: Firmware upgrades must be performed by professional personnel. Back up data before upgrading. Power loss during the upgrade may cause system damage.
  • Alarm Handling: Alarm messages must be addressed promptly. Ignoring alarms and continuing operation is prohibited to avoid fault escalation.

11.6 Transportation and Storage Precautions

  • Transportation Requirements: Use the original packaging for transportation, secure the cabinet firmly, and prevent collisions. Maintain an upright position during transport, with a tilt angle not exceeding 15°. Avoid rain exposure and direct sunlight.
  • Lifting Requirements: Use dedicated lifting slings when hoisting. The lifting points are located at the lifting holes on the top of the cabinet. Attaching slings to the door, handles, or other parts is strictly prohibited. Lift smoothly to avoid swinging and impact.
  • Storage Environment: For long-term storage, place in a dry, ventilated warehouse free of corrosive gases, at a temperature of -20°C to 60°C and humidity of 5% to 95% RH. Elevate at least 10cm above the ground to prevent moisture.
  • Storage Protection: When in storage, close and lock the cabinet door and cover with a dust cover. Inspect regularly to prevent rust and mildew.
  • Storage Period: The storage period under original factory packaging is 1 year. If stored for more than 1 year, performance must be re-inspected.

11.7 Personnel Qualifications and Responsibilities

  • Cabinet operation and maintenance personnel must undergo professional training, be familiar with product performance and operating specifications, and pass assessments before being permitted to work.
  • Designate a responsible manager for daily inspections, maintenance, and safety management.
  • Establish an equipment operation ledger to record operation, maintenance, fault, and repair information.
  • Operation, disassembly, or modification of equipment by unauthorized personnel is strictly prohibited.

Chapter 12 Product Maintenance and Repair

Good maintenance is key to ensuring the long-term stable operation of the shielded cabinet, maintaining shielding effectiveness, and extending service life. A scheduled maintenance system must be established, and maintenance items must be performed on a periodic basis.

12.1 General Maintenance Principles

  • Prevention First: Adhere to the principle of prevention first. Conduct regular inspections and maintenance to identify hidden hazards in a timely manner and avoid fault occurrence.
  • Professional Operation: Maintenance shall be performed by trained professionals who strictly follow operating procedures and safety regulations.
  • Complete Records: Maintain detailed records for each maintenance activity, including time, personnel, items, results, and problem resolution, establishing an equipment health file.
  • Spare Parts Support: Stock common consumable parts such as conductive spring leaves, filters, sensors, and fans to ensure rapid replacement during faults.

12.2 Daily Inspection (Daily/Weekly)

Daily or weekly routine inspections shall be conducted by duty personnel, covering the following items:

  • Visual Inspection: Cabinet exterior is intact, free of deformation, damage, or paint loss. The surrounding environment is clean with no debris accumulation.
  • Door Inspection: Door is closed and locked securely, no foreign objects trapped in the sealing surfaces, and door lock functions normally.
  • Status Indication: Check the touchscreen operating status for any alarm messages. Voltage, temperature, and humidity displays are normal.
  • Fan Operation: Listen to fan operation for abnormal sounds or vibrations. Temperature-controlled start/stop is normal.
  • Environment Check: Machine room temperature and humidity are normal, with no water leakage or open fire hazards.
  • Access Control Check: Access control system is normal with no abnormal door opening records.

Any abnormalities found during inspection shall be recorded and addressed promptly. Major issues must be reported immediately and the manufacturer contacted.

12.3 Monthly Maintenance

Perform a comprehensive maintenance once per month, executed by operation and maintenance personnel.

12.3.1 Cleaning and Maintenance

  • Wipe dust from the exterior surface of the cabinet with a dry soft cloth to maintain appearance. For stubborn stains, use a neutral detergent and wipe dry afterward.
  • Clean the touchscreen surface with a dedicated screen cleaning cloth to avoid scratches.
  • Remove the intake dust filter screen, rinse with clean water, air dry, and reinstall. Replace promptly if severely clogged.
  • Clean dust inside the cabinet, especially on top of equipment, fans, and waveguide windows. Use a vacuum cleaner or soft brush, taking care to prevent static damage to equipment.
  • Clean dust and debris from the door gap to keep conductive contact surfaces clean.

12.3.2 Structural Inspection

  • Check whether door hinges are loose and whether opening/closing is smooth. Tighten hinge bolts if loose.
  • Check whether the door lock mechanism operates flexibly and the latch extends/retracts smoothly. Apply a small amount of lubricating grease if necessary.
  • Check whether cabinet mounting bolts are loose and whether the cabinet is stable.
  • Check whether internal trays and mounting rails are loose and whether equipment is securely mounted.
  • Check whether cable management bars and cable ties are secure and free of loosening.

12.3.3 Electrical Inspection

  • Check whether distribution circuits show signs of heating or aging, and whether terminals show discoloration or looseness.
  • Measure main circuit voltage and current to confirm they are within normal ranges.
  • Check whether grounding connections are loose or corroded. Measure grounding resistance to confirm compliance.
  • Check surge protector status indicators; replace promptly if failed.
  • Check whether PDU outlets are loose or burnt, and whether plugs are firmly inserted.

12.3.4 Functional Testing

  • Test audible/visual alarm functions to confirm proper operation.
  • Test access control unlock functions; fingerprint and password recognition should operate normally.
  • Manually start and stop the fan to check operating status.
  • Check whether system time is accurate and data recording is normal.

12.4 Quarterly Maintenance

Perform in-depth maintenance once per quarter, focusing on shielding-performance-related components and core functions.

12.4.1 Shielding Sealing Component Inspection

  • Open the cabinet door and thoroughly inspect the beryllium copper spring leaves on the door frame for deformation, fracture, detachment, or oxidation blackening.
  • Clean the spring leaf and knife edge contact surfaces with anhydrous ethanol to remove oil and oxidation layers.
  • Check whether spring leaf pressure is uniform; adjust spring leaf positions where local pressure is insufficient.
  • Check the waveguide window honeycomb structure for deformation, rust, or blockage. Clean accumulated dust from inside.
  • Check whether filter mounting bolts are loose and whether the housing makes good contact.
  • Check conductive gaskets at all removable seams; replace aged or detached ones promptly.

12.4.2 Cooling System Deep Maintenance

  • Remove the fan protective cover and clean dust from fan blades and airflow channels.
  • Check fan bearings for abnormal sounds; add dedicated lubricating oil.
  • Check temperature control sensor calibration; recalibrate those with large deviations.
  • Clear obstacles in the cooling airflow path to optimize airflow routing.

12.4.3 Monitoring System Maintenance

  • Restart the monitoring host, clear system cache, and check operating status.
  • Back up historical data and system configurations.
  • Check whether sensor wiring connections are loose and measure the supply voltage.
  • Calibrate temperature and humidity sensors to ensure measurement accuracy.
  • Check communication connection status and network transmission.

12.4.4 Grounding System Testing

  • Use a grounding resistance tester to accurately measure grounding resistance, record the values, and compare with historical data.
  • Check whether grounding cables are damaged or oxidized and whether connection terminals are corroded.
  • Check the equipotential bonding inside the cabinet to ensure all grounding points are conductive.

12.5 Annual Maintenance

Perform a comprehensive maintenance and performance test annually, which may be combined with the annual acceptance inspection.

12.5.1 Comprehensive Performance Testing

  • Shielding Effectiveness Test: Commission a qualified third-party organization to conduct a comprehensive shielding effectiveness test, issue a test report, and evaluate shielding performance degradation.
  • Electrical Performance Test: Comprehensively test electrical safety indicators including insulation resistance, withstand voltage, grounding resistance, and leakage current.
  • Fan Performance Test: Test fan airflow, static pressure, speed, and noise to evaluate performance degradation. Replace fans with significant performance decline.

12.5.2 Consumable Parts Replacement

  • Perform preventive replacement of consumable parts that have reached their service life, such as fans, sensors, and dust filter screens.
  • Check the elasticity and conductivity of conductive spring leaves; replace in full if in use for more than 3 years or if performance has degraded.
  • Check sealing strips and conductive foam; replace those that have aged and hardened.
  • Check door locks and hinges for wear; replace parts with severe wear.

12.5.3 System Upgrade and Optimization

  • Upgrade the monitoring system firmware to the latest stable version to fix known issues and improve performance.
  • Optimize system parameter configurations, adjusting alarm thresholds and temperature control strategies based on operating data.
  • Clean redundant system data to free up storage space.

12.5.4 Structural Anti-Corrosion Treatment

  • Inspect the cabinet surface coating; perform touch-up painting and anti-corrosion treatment on areas with paint loss or rust.
  • Inspect internal conductive surfaces; perform conductive repair treatment on severely oxidized areas.
  • Inspect grounding copper bars and terminals; grind and tin-plate oxidized areas.

12.6 Common Consumable Parts and Replacement Methods

12.6.1 Beryllium Copper Spring Leaf Replacement

Replacement Reasons: Spring leaf fracture, loss of elasticity, or severe oxidation that cannot be restored.

Replacement Procedure:

1. Cut off power, open the cabinet door, and use a screwdriver to remove the mounting screws of the old spring leaf.

2. Remove the old spring leaf and clean the mounting surface, ensuring it is flat, clean, and free of oil.

3. Verify the new spring leaf specifications match, install the new spring leaf along the door frame, and tighten screws evenly.

4. After installation, check that the spring leaf height is consistent and that joints are aligned with no gaps.

5. Close the door for testing, ensuring uniform contact with no local over-tightening or looseness.

6. Test the shielding effect to confirm performance is restored.

12.6.2 Fan Replacement

Replacement Reasons: Fan abnormal noise, insufficient speed, or burnout (not rotating).

Replacement Procedure:

1. Disconnect the fan power supply, remove the fan wiring, and mark the wire sequence.

2. Remove the fan mounting bolts and take out the old fan.

3. Clean the mounting surface, install vibration dampers on the new fan, and align with mounting holes.

4. Tighten bolts, connect wires according to the marks, and confirm correct polarity.

5. Power on for a test run; check rotation direction, sound, and vibration are normal.

6. Secure the protective cover and restore the airflow path.

12.6.3 Sensor Replacement

Replacement Reasons: Sensor damage or measurement deviation that is too large to calibrate.

Replacement Procedure:

1. Enter the system menu, disable the corresponding sensor, and disconnect the sensor power supply.

2. Remove the old sensor, unplug the wiring terminal, and record the pin definitions.

3. Install the new sensor and connect the wiring according to the pin definitions.

4. Power on for testing and check that the displayed values are normal.

5. Perform calibration according to the instruction manual.

6. Restore system settings and confirm the alarm functions operate normally.

12.6.4 Power Filter Replacement

Replacement Reasons: Filter damage or degraded filtering performance.

Replacement Procedure:

1. Disconnect the main power supply, and verify with a voltage tester that there is no live power.

2. Mark the input/output wiring, and remove the filter wiring terminals.

3. Remove the filter mounting bolts and take out the old filter.

4. Clean the mounting surface, ensuring good contact with the enclosure. Apply conductive grease if necessary.

5. Install the new filter, tighten the bolts, and ensure good housing grounding.

6. Connect the input/output wires according to the marks. Reverse connection is strictly prohibited.

7. After confirming correct wiring, power on to test functionality and shielding effectiveness.

12.7 Maintenance Safety Regulations

  • All maintenance operations must be performed with power disconnected, warning signs posted, and dedicated personnel supervising.
  • Maintenance personnel must wear anti-static wrist straps to prevent static damage to electronic components.
  • After replacing shielding components, the sealing performance must be inspected to ensure shielding effectiveness is not compromised.
  • After replacing electrical components, check insulation and grounding to confirm electrical safety.
  • After maintenance is completed, clean the site and inventory tools to prevent debris from being left inside the cabinet.
  • After major fault repairs, a trial run test must be conducted. The equipment may only be put into formal service after passing.

12.8 Warranty Service Description

  • The complete product is covered by a free warranty for 1 year, with core components warranted for 3 years, calculated from the date of acceptance.
  • Quality issues arising from normal use during the warranty period will be repaired or parts replaced free of charge.
  • Damage caused by human factors, improper operation, or force majeure is not covered by the warranty.
  • After the warranty period, lifetime paid repair services are available, with only cost fees charged.
  • Service Response: Response within 2 hours of receiving a repair request; on-site service within 24 hours in urban areas, and within 48 hours outside the province.

Chapter 13 Common Product Problems and Solutions

13.1 Shielding Effectiveness Degradation Faults

Fault 1: Overall shielding effectiveness reduced, mobile phone still has signal inside the cabinet

Cause Analysis:

  • Cabinet door not closed and locked tightly; excessive door gap leakage.
  • Beryllium copper spring leaves deformed, detached, or oxidized, causing poor contact.
  • Cables passing directly through the cabinet without going through filters.
  • Waveguide windows deformed, blocked, or loosely installed.
  • Unsealed holes or gaps in the enclosure.
  • Poor grounding, excessive grounding resistance.
  • Filter damaged or connected in reverse.

Troubleshooting and Solutions:

1. Check the cabinet door, confirm it is fully closed and locked. Open and close once more to ensure proper seating.

2. Open the cabinet door, check the beryllium copper spring leaves, clean dust and oil from contact surfaces; reshape deformed leaves, re-secure detached ones, and replace severely oxidized ones.

3. Check all incoming and outgoing cables, confirming all pass through dedicated filters or shielded interfaces. Direct wiring bypassing filters is strictly prohibited. Rectify any unauthorized cable runs immediately.

4. Check the waveguide windows, clear blockages, correct deformation, and tighten loose bolts.

5. Thoroughly inspect the enclosure; seal any excess holes with metal plates and conductive gaskets, and repair cracked welds by re-welding.

6. Measure grounding resistance; if it exceeds the standard, check the grounding circuit, treat rust and looseness, and modify the grounding system if necessary.

7. Check filter wiring to confirm input/output are not reversed; test filter performance and replace if damaged.

Fault 2: Obvious signal leakage at door gaps

Cause Analysis:

  • Foreign objects trapped in the door gap, preventing proper door closure.
  • Door deformation, causing excessive local gaps.
  • Missing or damaged spring leaves in local areas.
  • Insufficient door lock clamping force, uneven pressure.
  • Knife edge deformation, causing poor contact with spring leaves.

Troubleshooting and Solutions:

1. Clear foreign objects from the door gap, ensuring no debris on the sealing surfaces.

2. Use a feeler gauge to measure the gap around the door perimeter; adjust hinges and lock point positions if gaps are uneven.

3. Replace damaged or missing spring leaves to ensure circumferential continuity.

4. Adjust the locking mechanism to increase clamping force, ensuring uniform pressure around the perimeter.

5. Correct the deformed knife edge to ensure it is straight and makes full contact with the spring leaves.

Fault 3: Excessive conducted leakage on power lines

Cause Analysis:

  • Power filter damaged or failed.
  • Filter poor grounding.
  • Coupling between filter input and output lines.
  • Power cables connected directly without going through the filter.
  • Incorrectly selected filter, current rating mismatch.

Troubleshooting and Solutions:

1. Test filter insertion loss; replace damaged filters with the same model.

2. Check the filter ground terminal connection, ensuring good contact. Keep the ground wire as short and thick as possible.

3. Separate input and output cables by a spacing of ≥20cm, avoiding parallel bundling.

4. Standardize wiring; all power cables must be connected through the filter.

5. Replace with a filter with matching current rating. Using an undersized filter is prohibited.

13.2 Electrical System Faults

Fault 4: Entire unit has no power, display screen does not light up

Cause Analysis:

  • External power failure or upstream circuit breaker tripped.
  • Main power switch tripped or damaged.
  • Power input line open circuit or loose terminal.
  • Surge protector shorted.
  • Monitoring host power supply damaged.

Troubleshooting and Solutions:

1. Check upstream power supply, confirm utility power is normal, and reset the tripped circuit breaker.

2. Check the cabinet main air switch; if tripped, first troubleshoot the short circuit cause, then reset after clearing the fault. Replace the switch if damaged.

3. Check input terminals, tighten loose connections, and reconnect broken wires.

4. Check the surge protector; remove or replace if the status indicator shows failure.

5. Measure the monitoring host input voltage; if voltage is normal, replace the power module or host.

Fault 5: Circuit breaker trips after power-on, leakage protector activates

Cause Analysis:

  • Leakage in internal circuits or equipment.
  • Neutral and ground wires reversed.
  • Cumulative leakage current from filter Y-capacitors causing leakage protector nuisance tripping.
  • Reduced insulation due to moisture.
  • Cable insulation damage causing ground fault.

Troubleshooting and Solutions:

1. Disconnect all loads and turn on circuits one by one to locate the leaking circuit; treat the leakage point.

2. Check neutral and ground wiring to confirm correct connection.

3. If the cause is normal filter leakage current, replace with a leakage circuit breaker with a higher trip current, or use a main switch without leakage protection.

4. Dry the area, measure insulation resistance, and restore power only after it returns to normal.

5. Check cable insulation; repair or replace damaged cables.

Fault 6: PDU has no output or some sockets have no power

Cause Analysis:

  • PDU input switch tripped.
  • Input wiring loose or open circuit.
  • Loose or burnt socket contact springs inside.
  • Internal PDU circuit damage.
  • Overload protection activated.

Troubleshooting and Solutions:

1. Check the PDU switch; if tripped due to overload, reduce the load and reset.

2. Check input wiring, tighten loose terminals, and reconnect broken wires.

3. If a single socket has no power, check the internal contact springs; correct deformation and replace burnt sockets.

4. If an entire row has no power with normal input, replace the internal PDU module or the entire unit.

5. Calculate the total load to avoid overload operation.

Fault 7: Cabinet enclosure gives tingling sensation, electrical leakage

Cause Analysis:

  • Poor grounding or disconnected ground wire.
  • Equipment leakage, enclosure energized.
  • Induced voltage, more noticeable when grounding is poor.

Troubleshooting and Solutions:

1. Immediately cut off power, check the grounding system, reconnect disconnected ground wires, tighten loose terminals, and measure grounding resistance to confirm compliance.

2. Disconnect equipment one by one to identify the leaking device; repair or replace it.

3. After confirming reliable grounding, the induced voltage will disappear.

13.3 Intelligent Monitoring System Faults

Fault 8: Abnormal temperature/humidity display, inaccurate values, or no change

Cause Analysis:

  • Sensor wiring loose or reversed.
  • Sensor damaged.
  • Sensor blocked or located near heat/cold source.
  • Monitoring host channel fault.
  • Long-term lack of calibration, excessive drift.

Troubleshooting and Solutions:

1. Check sensor wiring, tighten terminals, and confirm correct polarity.

2. Replace with a spare sensor for testing to determine if the sensor is damaged; replace if damaged.

3. Adjust the sensor installation position, away from interference sources and in a well-ventilated location.

4. Test on a different channel; if the host channel is faulty, repair or replace the host.

5. Calibrate the sensor following the steps in the instruction manual.

Fault 9: Alarm function failure, no alarm for abnormalities

Cause Analysis:

  • Alarm threshold set too high or too low, not triggered.
  • Alarm function disabled.
  • Audible/visual alarm device damaged.
  • Communication failure, remote alarm cannot be sent.
  • Sensor failure, unable to detect abnormalities.

Troubleshooting and Solutions:

1. Check the alarm threshold settings and adjust to reasonable values.

2. Enable the corresponding alarm switches to activate the alarm function.

3. Manually test the alarm device; replace if damaged.

4. Check network connections and SMS/email configurations to confirm communication is normal.

5. Troubleshoot sensor faults using the methods in Fault 8.

Fault 10: Frequent nuisance alarms from the monitoring system

Cause Analysis:

  • Alarm thresholds set too strictly.
  • Sensor interference, large value fluctuations.
  • Large environmental fluctuations, such as frequent door openings or direct air conditioning airflow.
  • System malfunction, abnormal data.

Troubleshooting and Solutions:

1. Appropriately relax alarm thresholds and increase alarm delay to avoid false alarms from transient fluctuations.

2. Check the sensor installation position, avoid air vents and doorways, and add shielding to reduce interference.

3. Optimize the environment to avoid drastic temperature/humidity fluctuations and reduce frequent door openings.

4. Restart the system, restore factory settings, and reconfigure.

Fault 11: Unable to access remotely, data not uploading

Cause Analysis:

  • Network cable disconnected or IP address conflict.
  • Network parameter settings error.
  • Firewall or router blocking.
  • Platform server fault.
  • Monitoring host network port damaged.

Troubleshooting and Solutions:

1. Check the network cable connection, test network connectivity, and resolve IP conflicts.

2. Verify IP, subnet mask, gateway, and DNS settings to ensure correctness.

3. Open the corresponding ports and check firewall rules.

4. Confirm platform services are normal; contact the platform administrator.

5. If the network port hardware is damaged, repair or replace the host.

13.4 Cooling and Fan Faults

Fault 12: Fan does not rotate

Cause Analysis:

  • Fan power supply disconnected.
  • Fan motor burned out.
  • Temperature controller fault, no start signal output.
  • Fan bearing seized.
  • Loose wiring or reversed connection.

Troubleshooting and Solutions:

1. Check the fan power supply circuit and switches; restore power.

2. Measure fan resistance; if open circuit, the motor is burned out — replace the fan.

3. Test the temperature controller output; replace the temperature control module if there is no output.

4. Manually rotate the fan blades; if stuck, clean the bearings and add lubricating oil, or replace the fan for severe cases.

5. Check wiring, tighten loose terminals, and correct reversed connections.

Fault 13: Fan excessive noise and vibration

Cause Analysis:

  • Fan mounting bolts loose.
  • Blade dust accumulation causing imbalance.
  • Bearing wear or lack of lubrication.
  • Resonance between fan and enclosure.
  • Blocked airflow path, excessive air resistance.

Troubleshooting and Solutions:

1. Tighten the fan mounting bolts and check whether vibration dampers are intact.

2. Clean dust from fan blades to maintain dynamic balance.

3. Add lubricating oil to bearings; replace the fan if severely worn.

4. Add vibration dampers, adjust the mounting method, and avoid resonance points.

5. Clean the airflow path and dust filter screens to reduce air resistance.

Fault 14: Cabinet internal temperature too high, poor cooling effect

Cause Analysis:

  • Equipment load too large, heat generation exceeds cooling capacity.
  • Fan failure or insufficient speed.
  • Dust filter screen or waveguide window blocked, insufficient airflow.
  • Unreasonable equipment layout, airflow short-circuiting.
  • Ambient temperature too high.
  • Temperature control settings improper, fan starts too late.

Troubleshooting and Solutions:

1. Calculate the total equipment power consumption; if it exceeds cooling capacity, add cooling capacity or reduce the load.

2. Check the fan operating status; repair or replace faulty fans, and investigate causes of low speed.

3. Clean dust filter screens and waveguide windows to ensure smooth ventilation.

4. Adjust the equipment layout, add blank panels, and optimize airflow paths to avoid mixing of hot and cold air.

5. Lower the ambient temperature by adding room air conditioning.

6. Adjust temperature control parameters to lower the fan start temperature and increase speed.

13.5 Access Control and Door Faults

Fault 15: Shielding door opens/closes with difficulty, sticking

Cause Analysis:

  • Hinges loose or worn, door sagging.
  • Door lock mechanism sticking.
  • Door deformation, rubbing against the door frame.
  • Hinges dry and lacking lubrication.
  • Uneven floor, cabinet tilted.

Troubleshooting and Solutions:

1. Adjust hinge bolts, correct the door height, and replace hinges if severely worn.

2. Clean the door lock mechanism, add lubricating grease, and ensure smooth operation.

3. Correct the deformed door and sand down rubbing areas.

4. Add lubricating oil to hinge pins to reduce friction.

5. Re-level the cabinet to ensure it is vertical.

Fault 16: Access control cannot unlock, password/fingerprint invalid

Cause Analysis:

  • Access control power supply fault.
  • Card reader damaged.
  • Fingerprint/password not correctly enrolled or deleted.
  • Electromagnetic lock stuck.
  • Controller fault.

Troubleshooting and Solutions:

1. Check access control power supply, confirm the voltage is normal, and repair the power supply circuit.

2. Clean the card reader surface, test card swiping/fingerprint input, and replace the reader if damaged.

3. Re-enroll user information and confirm permissions are enabled.

4. Manually unlock the electromagnetic lock, check whether the latch is stuck, and adjust the position.

5. Reset the access control controller; replace the controller if it still does not work.

Fault 17: Door open alarm not triggered, or alarm continues after door closed

Cause Analysis:

  • Door magnetic switch installation position offset.
  • Door magnetic switch damaged.
  • Loose wiring or open circuit.
  • System settings error.

Troubleshooting and Solutions:

1. Adjust the position of the magnetic switch and magnet, ensuring proper alignment and gap.

2. Use a multimeter to test the magnetic switch continuity; replace if damaged.

3. Check the wiring and tighten loose terminals.

4. Check the system door magnetic contact settings to ensure normally-open (NO) / normally-closed (NC) types match.

13.6 Other Common Faults

Fault 18: Touchscreen unresponsive or inaccurate touch

Cause Analysis:

  • Dust or oil on the screen surface.
  • Touch driver fault.
  • Touchscreen hardware damage.
  • System crash.

Troubleshooting and Solutions:

1. Clean the screen surface with a dedicated soft cloth.

2. Restart the system and restore touch calibration.

3. If hardware is damaged, replace the touchscreen.

4. Restart the monitoring host and restore the system.

Fault 19: System crash or restart

Cause Analysis:

  • Unstable power supply voltage.
  • System software fault.
  • Host poor heat dissipation, overheating causing crash.
  • Hardware fault, such as memory or motherboard damage.

Troubleshooting and Solutions:

1. Stabilize the power supply voltage with a voltage regulator.

2. Restart the system, upgrade firmware, and restore factory settings.

3. Improve host heat dissipation and clean dust.

4. Repair or replace host hardware if faulty.

Chapter 14 Product QA

14.1 Basic Concepts

Q1: What is the difference between an intelligent shielded integrated cabinet and an ordinary server cabinet?

A: An ordinary server cabinet only provides equipment mounting, basic cabling, and simple protection functions, with no electromagnetic shielding capability. The intelligent shielded integrated cabinet adds a complete electromagnetic shielding system on this basis, including a fully welded shielding enclosure, conductive sealing doors, waveguide ventilation windows, and signal and power filters, which can effectively block electromagnetic leakage and external interference. Additionally, it integrates intelligent systems such as environmental monitoring, intelligent power distribution, and access control security, making it a high-end cabinet product that integrates information security, equipment protection, and intelligent management in one.

Q2: What does the shielding effectiveness dB mean for a shielded cabinet? Is a larger value always better?

A: Shielding Effectiveness (SE), expressed in decibels (dB), characterizes the attenuation capability of the shield against electromagnetic waves. The calculation formula is SE = 20lg(E0/E1), where E0 is the field strength without shielding and E1 is the field strength after shielding. A larger value indicates stronger attenuation capability and better shielding effect. For example, 60dB shielding effectiveness means the field strength is attenuated to one-thousandth of its original value, 80dB to one ten-thousandth, and 100dB to one hundred-thousandth. Typically, classified scenarios require ≥80dB, and high-level classified scenarios require ≥90dB.

Q3: Why must a shielded cabinet be grounded? Can it be used without grounding?

A: Grounding is an essential part of the shielding system. Not grounding will seriously affect shielding effectiveness and pose electrical safety hazards. On one hand, induced charges on the shielding enclosure need to be discharged through grounding; otherwise, charge accumulation will affect shielding effectiveness, especially significantly degrading low-frequency magnetic field shielding. On the other hand, filters require good grounding to function properly; poor grounding will greatly reduce filtering performance. Additionally, grounding prevents enclosure leakage and protects personal safety. Therefore, a shielded cabinet must be reliably grounded, and use without grounding is strictly prohibited.

Q4: Can a shielded cabinet block mobile phone signals? Can phones be placed inside to prevent leaks?

A: A qualified shielded cabinet can effectively shield mobile phone signals, including 2G/3G/4G/5G, WiFi, Bluetooth, and other wireless signals. When a phone is placed inside the cabinet and the door is closed, it will have no signal and cannot make or receive calls. Therefore, it can be used to store mobile phones and other wireless communication devices to prevent wireless signal leakage. However, note that the cabinet door must be closed and locked tightly; door gap leakage will degrade shielding effectiveness.

14.2 Selection and Procurement

Q5: How to choose the appropriate shielding level?

A: The shielding level must be determined based on the information classification level of the usage scenario and the electromagnetic environment:

  • General internal office, ordinary commercial confidentiality: Class C is sufficient, shielding effectiveness ≥60~80dB.
  • Classified information systems, important government/financial applications: Choose Class B, shielding effectiveness ≥70~90dB, conforming to BMB19 Class B requirements.
  • Military top secret, strong electromagnetic pulse environments: Choose Class A/military grade, shielding effectiveness ≥80~100dB, meeting military standards.

If uncertain, consult a professional manufacturer for recommendations based on actual needs.

Q6: What cabinet size should be chosen? How to determine the U number?

A: The U number is determined based on the total height of the equipment to be installed and the reserved space. 1U = 44.45mm. First, calculate the total U count of all equipment, then reserve 20%~30% redundant space for heat dissipation, cabling, and future expansion. For example, if the equipment total height is 25U, a 32U or 37U cabinet is recommended. The depth is determined by the deepest equipment, reserving front and rear cabling space. Typically, servers require cabinet depth of 900mm or more.

Q7: Does a shielded cabinet need an air conditioner? When is air cooling sufficient and when is air conditioning needed?

A: The cooling method is determined based on the total power consumption of the equipment inside the cabinet:

  • Total power ≤1kW: Natural heat dissipation is sufficient; no fan required.
  • Total power 1~3kW: Standard intelligent air cooling system is sufficient.
  • Total power above 3kW, or high temperature accuracy requirements: A rack-mounted precision air conditioner is recommended.
  • High ambient temperature or enclosed space scenarios: Appropriate upgrades to the cooling configuration are required.

Q8: Can a shielded cabinet be customized? For example, changing dimensions or adding special interfaces?

A: Customization services are supported, including non-standard dimensions, special materials, custom interfaces, and special functions. Examples include adding fiber optic interfaces, increasing serial port quantities, customizing wider/deeper cabinets, custom colors, and adding anti-vibration reinforcement. For specific requirements, please contact the manufacturer to discuss.

14.3 Installation & Construction

Q9: Is there a load-bearing requirement for the floor where a shielded cabinet is installed?

A: Yes. A standard 42U shielded cabinet weighs approximately 300kg by itself, and the total weight can reach 1000-1500kg when fully loaded with equipment. Therefore, the floor load-bearing capacity must exceed the total weight. Typically, the floor is required to support ≥500kg/m². For sites with raised access floors, the floor load-bearing capacity must be verified, and load-bearing support frames should be installed if necessary.

Q10: Can I install it myself, or is professional installation by the factory required?

A: If you have experience in electrical installation and shielded equipment construction, you may install and commission the system yourself following this manual. However, for first-time installations or higher-grade shielded models, it is recommended that professional engineers from the factory perform the installation and commissioning to ensure shielding performance and system functionality meet specifications. The factory provides one-stop services including on-site installation, commissioning, and training.

Q11: Can multiple shielded cabinets be installed side by side? Will side-by-side installation affect shielding performance?

A: Multiple cabinets can be installed side by side. Side-by-side installation itself does not affect the shielding performance of individual cabinets, as each cabinet is an independent shielding enclosure. When installing cabinets side by side, ensure they are firmly secured together and proper equipotential bonding is established for grounding.

Q12: What if the computer room has no dedicated grounding? Can the power supply earth wire be used?

A: No, the earth wire from a power outlet must not be used directly. The power supply earth wire typically has high impedance and may carry interference, which cannot meet the grounding requirements for a shielded cabinet. A dedicated grounding system must be constructed separately, using grounding electrodes or a grounding grid, ensuring the grounding resistance is ≤1Ω. You may contact a professional grounding construction company, or consult our company for grounding solutions.

14.4 Operation & Maintenance

Q13: What should be noted in daily use of the shielded cabinet? What is most easily overlooked?

A: The most critical aspect of daily use is protecting shielding performance. The most easily overlooked points are:

  • The door must be locked tightly when closed; leaving it ajar will cause shielding failure.
  • Unauthorized drilling or direct cable routing through the cabinet body is prohibited.
  • Clean the door contact spring fingers (EMI gaskets) regularly; dust and oil contamination can cause poor contact.
  • Ensure grounding is reliable; the grounding wire must not be disconnected.
  • All cables must be routed through filters — do not cut corners by feeding cables through directly.

Q14: How often should the beryllium copper spring fingers be replaced? What are the consequences of not replacing them?

A: Under normal conditions, silver-plated beryllium copper spring fingers have a service life of approximately 3-5 years. The specific replacement interval depends on the operating environment and opening/closing frequency. Service life will be shortened in high-humidity or high-salt-fog environments. Loss of spring tension and severe oxidation will increase contact resistance, degrade shielding effectiveness, and may even cause localized shielding leakage to exceed limits. It is recommended to test shielding performance annually and replace the spring fingers when noticeable degradation is observed.

Q15: Can the shielded cabinet door be opened and closed frequently? Will frequent opening/closing affect shielding?

A: Normal opening and closing does not affect shielding. The shielded door is designed for a mechanical life of ≥10,000 open/close cycles, and daily operation frequency is far below the design life. As long as the door is operated properly without slamming, shielding performance will not degrade significantly over long-term use. Regular inspection of the spring fingers is sufficient.

Q16: Can ordinary power strips be placed inside the cabinet? Will this affect shielding?

A: Ordinary PDU or power strips can be used inside the cabinet, but the power must be sourced from the output side of the filter. It is strictly prohibited to introduce power from outside directly. As long as the power cable passes through the filter, internal power distribution does not affect shielding performance. However, shielded smart PDUs are recommended for better performance and manageability.

14.5 Performance Testing

Q17: How can the shielding effectiveness of a shielded cabinet be verified?

A: A simple method is the mobile phone test: place a mobile phone inside the cabinet, close the door tightly, and call the phone number. If the call cannot connect, the basic shielding effectiveness is good; if the call connects, shielding effectiveness is inadequate. Professional testing must be performed by a qualified third-party testing institution in accordance with the GB/T 12190 standard, using professional field strength meters to test at multiple frequency points and issue an official test report. This is also the formal basis for confidentiality acceptance.

Q18: Will shielding effectiveness decrease after installing equipment? Why?

A: After installing equipment, the actual shielding effectiveness will typically be slightly lower than the empty cabinet test result, which is normal. Reasons include: conducted leakage through equipment cables, gaps formed at the contact points between equipment metal parts and the enclosure, and resonance effects of the equipment itself. However, as long as wiring is performed properly and grounding is reliable, the degree of degradation is limited and will still meet the corresponding grade requirements. Optimization will be performed during installation and commissioning to ensure final performance meets specifications.

Q19: Is shielding effectiveness testing required annually?

A: Confidentiality management requirements typically mandate annual shielding effectiveness testing to detect performance degradation in a timely manner. In daily use, if the cabinet body has not been modified or components replaced, performance will not suddenly degrade. Testing can be combined with annual maintenance. If modifications or repairs to shielding components have been performed, re-testing is required after repair.

14.6 Troubleshooting

Q20: Shielding degraded because paper got caught in the shield door. Will it recover after removal?

A: After removing the foreign object, if the spring fingers and knife-edge are not damaged, deformed, or dented, shielding performance will recover once the door is closed. If hard objects caused deformation of the spring fingers or indentation of the knife-edge, reshaping and repair are required to restore performance. It is recommended to regularly inspect the door gap to prevent foreign objects from being caught.

Q21: Can an ordinary filter replace a faulty filter?

A: No. Ordinary power filters are not optimized for electromagnetic shielding. Their insertion loss is insufficient, and the enclosure shielding structure does not meet requirements. Using an ordinary filter will cause conducted leakage to exceed limits and significantly degrade overall shielding performance. Only the original factory-specified shielded filter of the same specification, or a professional filter meeting the corresponding shielding grade, must be used as a replacement.

Q22: What can be done if the grounding resistance cannot be reduced?

A: If the grounding resistance exceeds the limit, the following measures can be taken:

  • Increase the number of grounding electrodes and expand the grounding grid area.
  • Relocate grounding electrodes to areas with moist soil and low resistivity.
  • Use ground resistance reducing agents to improve soil resistivity.
  • Employ deep well grounding methods to reach low-resistivity strata.
  • Inspect grounding connection points, polish and remove rust to reduce contact resistance.

It is recommended that a professional grounding construction company conduct a site survey and develop a solution.

Chapter 15 Product Acceptance Standards

Product acceptance is divided into three stages: incoming inspection, installation process inspection, and final completion acceptance. The acceptance work is jointly conducted by the construction unit, construction contractor, and supervision unit (if applicable), strictly in accordance with these standards and contract requirements.

15.1 Incoming Inspection

Upon delivery and before installation, an incoming inspection shall be conducted to confirm that the products meet procurement requirements.

15.1.1 Inspection Contents

Packaging and Appearance Inspection: Packaging is intact, without damage, water ingress, or impact marks; after unpacking, the cabinet body shows no deformation, paint peeling, scratches, rust, or other defects; fragile parts such as glass, doors, and displays are intact.

Specification and Model Verification: Product model, specification, and dimensions are consistent with the contract and order, and the grade meets requirements.

Configuration List Verification: Compare the contract configuration list with the product packing list, checking each item of the main unit, accessories, auxiliary materials, and accompanying documents for quantity and model to confirm completeness.

Qualification Document Check: Product certificate of conformity, factory inspection report, third-party shielding effectiveness test report, qualification certificates, and other documents are complete and valid.

Functional Pre-test: Where conditions permit, perform a basic power-on functional test to confirm there are no factory defects.

15.1.2 Acceptance Criteria

  • No obvious appearance damage; dimensions and models meet contract requirements.
  • Configuration matches the packing list; no missing or incorrect items.
  • Qualification documents are authentic and valid; test reports correspond to the product model.
  • All factory inspection items pass.

15.1.3 Inspection Records

Complete the “Equipment Incoming Inspection Form” with signatures from all participating parties for confirmation. Products that fail inspection shall be returned or exchanged until they pass.

15.2 Installation Process Inspection

During installation, phased inspections shall be conducted for key processes. Work on the next process shall not proceed until the previous process passes inspection.

15.2.1 Cabinet Positioning and Installation Inspection

  • Installation position meets design drawing requirements, deviation ≤10mm.
  • Cabinet levelness ≤2mm/m, verticality ≤3mm/m.
  • Cabinet is stable, with all four feet evenly loaded, no wobbling.
  • Floor anchoring (if applicable) is secure, and bolt specifications meet requirements.
  • Side-by-side cabinet installation has uniform gaps and proper alignment.

15.2.2 Grounding System Inspection

  • Grounding cable specification meets requirements, cross-sectional area ≥16mm².
  • Connections are secure with good contact, no oxidation or rust.
  • Grounding resistance measurement: Grade C ≤1Ω, Grade B ≤1Ω, Grade A ≤0.5Ω.
  • Grounding path is clear, no series connections, clear labeling.
  • Equipotential bonding is per code, no ground loops.

15.2.3 Wiring Process Inspection

  • Wiring is correct and matches drawings, no misconnections or missing connections.
  • Terminals are tightened to the required torque, no loose connections.
  • Wiring is neat, with separation of power and signal cables, clear labeling.
  • Shielded cable grounding method is correct, shielding continuity is maintained.
  • Insulation resistance test passes: power circuits ≥0.5MΩ.
  • Filter input/output wiring is correct, no coupling.

15.2.4 Inspection Method

After each process step, the contractor performs self-inspection. After passing self-inspection, the supervisor or construction unit is notified for inspection. Only after the inspection is passed and signed can the next process proceed. Concealed works must be inspected before being covered.

15.3 Final Completion Acceptance

After all installation and commissioning work is completed and trial operation passes, the final completion acceptance shall be conducted.

15.3.1 Preconditions for Acceptance

  • Installation, wiring, and commissioning are all complete, and self-inspection has passed.
  • Continuous trial operation of no less than 72 hours has been completed, with stable operation and no faults.
  • Completion documents are complete, including construction records, commissioning records, and test reports.
  • The site has been cleaned up and is in a tidy condition.

15.3.2 Functional Acceptance Items

Item Requirements
Shield Door Function Smooth opening and closing, reliable locking, synchronized three-point locking, no jamming or abnormal noise.
Access Control System Fingerprint, password, and mechanical key unlocking function normally; door opening records are accurate; tamper alarm functions normally.
Power Distribution System Switches at all levels operate normally; PDU metering is accurate; protection functions are reliable; voltage and current are normal.
Monitoring System Temperature/humidity, smoke, water leakage, door magnetic, and other sensors monitor accurately; data display is normal.
Alarm Functions All types of alarms trigger correctly; audible/visual, SMS, email, and other notification methods are effective.
Cooling System Fans operate smoothly; temperature control logic is correct; temperature remains stable under load.
Lighting System Door-activated lighting works normally; brightness meets requirements.
Remote Communication Network connection is normal; remote monitoring, data upload, and remote configuration functions work properly.

15.3.3 Performance Acceptance Items

Electrical Safety Performance

Test Item Acceptance Criteria
Insulation Resistance Main circuit to ground ≥0.5MΩ, control circuit ≥1MΩ.
Dielectric Strength AC 1500V/1min, no breakdown, no flashover.
Grounding Resistance Complies with corresponding grade requirements.
Leakage Current ≤3.5mA (safety code requirement).

Shielding Effectiveness Special Acceptance

  • Tested by a third-party testing institution with CMA/CNAS qualifications.
  • Test standards: GB/T 12190-2006, BMB19-2006.
  • Test frequency points: at minimum covering typical points of 14kHz, 100kHz, 1MHz, 10MHz, 100MHz, 1GHz, and 10GHz.
  • Acceptance criteria: shielding effectiveness at all frequency points meets the grade requirements specified in the contract.
  • An official test report shall be issued as the basis for acceptance.

Cooling Performance

  • At full load operation, maximum internal cabinet temperature ≤35°C (at 25°C ambient temperature).
  • Equipment intake air temperature meets equipment operating temperature requirements.
  • Fan noise ≤55dB (at 1 meter distance).

15.3.4 Documentation Acceptance

The completion delivery documentation shall include the following complete items:

  • Product manual, certificate of conformity, warranty card
  • Third-party shielding effectiveness test report
  • Electrical schematic diagrams, wiring diagrams, installation drawings
  • Incoming inspection records
  • Installation construction records
  • Commissioning records and test reports
  • Grounding resistance test records
  • Insulation resistance test records
  • Trial operation records
  • Spare parts list
  • Operation and maintenance manual

15.3.5 Acceptance Conclusion

If all acceptance items pass and documentation is complete, the completion acceptance report shall be signed and the system officially handed over for use. For minor issues, a deadline for rectification shall be set, and re-inspection shall be conducted after rectification. For major quality issues, acceptance shall be withheld, and the contractor and manufacturer shall be responsible for rectification.

15.4 Acceptance-Related Notes

  • If the contract specifies higher acceptance standards, the contract shall prevail.
  • Third-party testing costs shall be borne as specified in the contract.
  • If disputes arise between parties during acceptance, an authoritative institution may be commissioned for arbitration testing.
  • After acceptance, the warranty period begins.

Chapter 16 SEO Optimization System and Keywords

16.1 Keyword System

16.1.1 Core Primary Keywords

Intelligent shielded integrated cabinet, electromagnetic shielded cabinet, shielded cabinet, classified shielded cabinet, intelligent shielded cabinet

16.1.2 High-Conversion Long-Tail Keywords

Intelligent shielded integrated cabinet manufacturer, electromagnetic shielded cabinet manufacturer, confidential-grade shielded cabinet price, Grade B shielded cabinet installation, shielded cabinet for classified information systems, equipment room electromagnetic shielded cabinet, 42U shielded cabinet, military-grade electromagnetic shielded cabinet, shielded cabinet installation and commissioning, custom intelligent shielded cabinet

16.1.3 Industry Traffic Keywords

Electromagnetic shielding equipment, information security shielding equipment, Faraday cage cabinet, server shielded cabinet, network shielded cabinet, electromagnetic leakage protection cabinet, anti-electromagnetic interference cabinet, classified room shielded cabinet, shielded computer room cabinet, electromagnetic compatibility cabinet

16.1.4 Brand-Specific Keywords

LAIN shielded cabinet, Guangdong LAIN intelligent shielded integrated cabinet, LA-PB shielded cabinet, LAIN smart computer room shielding equipment, Guangzhou shielded cabinet manufacturer, LAIN electromagnetic shielding cabinet

16.1.5 Drop-Down/Related Search Keywords

Shielded cabinet working principle, shielded cabinet grounding requirements, shielded cabinet shielding effectiveness standard, shielded cabinet installation specification, how to wire a shielded cabinet, shielded cabinet commissioning method, shielded cabinet maintenance, common shielded cabinet faults, shielded cabinet acceptance standards, difference between shielded cabinet and ordinary cabinet

16.2 SEO Optimization Tag System

16.2.1 Core Page Optimization Tags

  • Page Theme: Intelligent Shielded Integrated Cabinet Installation, Wiring, and Commissioning Manual — Guangdong LAIN Smart Computer Room Equipment Co., Ltd.
  • Core Keyword Placement: Core keywords naturally embedded in the first paragraph of the title, beginning and end of the body text, and chapter headings; keyword density controlled at 2%-3%.
  • Semantic Related Terms: Industry terms such as electromagnetic shielding, shielding effectiveness, Faraday cage, beryllium copper spring fingers, power filter, waveguide vent, grounding resistance, BMB19 standard, naturally distributed to enhance topic relevance.

16.2.2 Title Tag

Intelligent Shielded Integrated Cabinet Installation Wiring Commissioning Manual_Electromagnetic Shielded Cabinet Manufacturer-Guangdong LAIN Smart Computer Room Equipment Co., Ltd.

16.2.3 Meta Keywords

Intelligent shielded integrated cabinet, electromagnetic shielded cabinet, shielded cabinet installation and commissioning, classified shielded cabinet, intelligent shielded cabinet manufacturer, Guangdong LAIN shielded cabinet, shielded cabinet wiring specification, shielded cabinet acceptance standard

16.2.4 Meta Description

Guangdong LAIN Smart Computer Room Equipment Co., Ltd. specializes in manufacturing intelligent shielded integrated cabinets, providing a complete installation, wiring, and commissioning manual for electromagnetic shielded cabinets, covering product principles, technical parameters, installation specifications, troubleshooting, acceptance standards, and more. Products comply with the BMB19 confidentiality standard and are suitable for government, military, financial, and other classified scenarios. Service hotline: +86 13538869979.

16.2.5 H1 Tag

Intelligent Shielded Integrated Cabinet Installation Wiring Commissioning Manual

16.2.6 H2 Tags

Product Introduction, Product Composition, Product List, Product Working Principle, Product Technical Parameters, Product Functions and Features, Product Application Scenarios, Product Installation Specification, Product Wiring Specification, Product Commissioning Process, Product Usage Precautions, Product Repair and Maintenance, Product Common Problems and Solutions, Product QA, Product Acceptance Standards

16.3 Internal Link Optimization Tags (Natural Anchor Text Placement)

16.3.1 Core Anchor Text

  • Intelligent shielded integrated cabinet (linking to product homepage)
  • Electromagnetic shielded cabinet (linking to product category page)
  • Shielded cabinet manufacturer (linking to About Us/manufacturer introduction page)

16.3.2 Long-Tail Anchor Text

  • Shielded cabinet installation and commissioning (linking to this manual page)
  • Classified shielded cabinet solution (linking to solutions page)
  • Military-grade shielded cabinet parameters (linking to technical parameters page)

16.3.3 Related Anchor Text

  • Environment monitoring system (linking to related environment monitoring product page)
  • Smart PDU (linking to power distribution product page)
  • Shielded computer room construction (linking to shielded computer room solutions page)

Chapter 17 Copyright Statement and Contact Information

17.1 Copyright Statement

This manual is copyrighted by Guangdong LAIN Smart Computer Room Equipment Co., Ltd. and is protected by the Copyright Law of the People’s Republic of China.

No individual or organization may copy, reproduce, excerpt, modify, compile, distribute, or use this manual for commercial purposes without the written authorization of our company.

Any authorized reproduction or citation must indicate the source “Source: Guangdong LAIN Smart Computer Room Equipment Co., Ltd.” and maintain the content’s integrity without distortion or alteration.

Our company reserves the right to pursue legal liability for infringement.

As the product technology is continuously upgraded, the content of this manual is subject to change without prior notice. The latest version published by our company shall prevail.

17.2 Contact Information

  • Manufacturer: Guangdong LAIN Smart Computer Room Equipment Co., Ltd.
  • Service Hotline: +86 13538869979 (WhatsApp available)
  • Technical Support: +86 13538869979
  • Company Address: Zhongrun Industrial Park, No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China
  • Official Website: gdlain.com
Scroll to Top