KITOZER
KITOZER

45kW Liquid-Cooled Server Rack

Table of Contents

1. Cover / Document Information

– Document Title: 45kW Liquid-Cooled Server Rack Technical Design Solution

– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Date: August 2026

– Version: V1.0

– Project Type: Technical design solution for 45kW Liquid-Cooled Server Rack

2. Table of Contents Structure

1. Company Introduction

2. Project Overview

3. User Requirement Analysis

4. Overall Design Description

5. Detailed System Design and Product Technical Parameters

6. Project Quotation and Configuration List

7. Core Solution Advantages

8. Technical Q&A

9. Construction Schedule Plan

10. Construction Organization Plan

11. After-Sales Service System

12. Operation and Maintenance Training Plan

13. Typical Project Cases

14. SEO Optimization System and Website Backend Configuration

15. Contact Information

3. Company Introduction

3.1 Company Development Overview

Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.

After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.

3.2 Core Business System

The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:

– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;

– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;

– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;

– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.

3.3 Brand and Qualification Honors

The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.

3.4 Core Competitive Advantages

1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;

2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;

3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;

4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.

4. Project Background and Objectives

4.1 Industry Background and Development Trends

With the rapid development of AI, big data, cloud computing and high-performance computing, the computing power demand of data centers is growing explosively. Meanwhile, the power density of single servers continues to rise: traditional general-purpose servers consume 300-500W per unit with 5-10kW per cabinet, while current AI training and HPC servers have broken through 3kW, even reaching 5-8kW per unit, pushing single-cabinet power requirements to 30kW, 45kW and beyond.

Traditional air cooling relies on air convection, limited by air specific heat capacity, fan static pressure and cabinet ventilation rate — the single-cabinet heat dissipation ceiling is about 15-20kW, with high fan noise, high energy consumption and prominent local hot spots under high load. Liquid cooling, with the significant advantages of high liquid specific heat, high heat exchange efficiency, low noise and excellent energy efficiency, has become the mainstream technical route for high-density data center cooling. Cold plate liquid cooling — the most mature and widely deployed liquid cooling solution — installs cold plates on server core chips, circulates coolant through the plates to remove heat, and forms a loop with the external heat source through the cabinet manifold, easily achieving 45kW+ per cabinet while retaining rack-mount server deployment and good compatibility with existing infrastructure.

4.2 Project Objectives

This solution designs a dedicated 45kW liquid-cooled server cabinet for single-cabinet 45kW power density scenarios, aiming to create a structurally reliable, efficiently cooled, conveniently maintained and safe high-density liquid-cooled cabinet:

– Cooling capacity: stable 45kW heat dissipation per cabinet, meeting mainstream high-density liquid-cooled server needs, chip temperatures in a reasonable range without local overheating;

– Structural safety: adequate load capacity and structural strength; liquid cooling system reliably sealed without leakage risk;

– O&M convenience: standardized modular design, quick server insertion/removal, simple pipe connection operations;

– Standard compatibility: 19-inch standard rack size compatible with mainstream rack-mount liquid-cooled servers and existing cold aisles, floors and power systems;

– Scalability and customization: adjustable port count, interface specifications and additional functions for different server brands and project needs.

4.3 Applicable Scenarios

– AI computing centers, large-model training clusters;

– University and research institute high-performance computing (HPC) centers;

– Internet enterprise high-density computing nodes and edge data centers;

– Financial/securities quantitative trading computing rooms;

– Government/enterprise confidential high-density data rooms (with optional shielding structure);

– Liquid cooling technology testing and verification platforms.

The product adapts to cold plate liquid-cooled servers and is compatible with ethylene glycol water solution, deionized water, mineral oil, fluorinated liquid and other common coolants, and with closed cooling towers, chillers, dry coolers and other external heat sources.

4.4 Design Basis and Standards

– 《Data Center Design Specification》GB 50174-2017

– 《Code for Construction and Acceptance of Electronic Information System Rooms》GB 50462-2016

– 《Technical Requirements for Computer Room Cabinets》GB/T 2887-2011

– 《Industrial Enclosures – General Requirements》GB/T 30094-2013

– 《Technical Specification for Liquid Cooling Data Centers》T/CCSA 377-2021

– 《Technical Requirements for Data Center Liquid Cooling Systems》T/CDCC 22-2022

– 《Degrees of Protection Provided by Enclosures (IP Code)》GB 4208-2017

– 《Seamless Stainless Steel Pipes for Fluid Transport》GB/T 14976-2012

– 《Code for Seismic Design of Electrical Installations》GB 50260-2013

– 《Corrosion Tests in Artificial Atmospheres – Salt Spray Tests》GB/T 10125-2012

– 《Safety of Information Technology Equipment Part 1: General Requirements》GB 4943.1-2022

– 《Code for Design of Low-Voltage Electrical Installations》GB 50054-2011

5. User Requirement Analysis

5.1 Basic Functional Requirements

– Rack mounting: standard 42U rack space, 19-inch standard, compatible with mainstream rack-mount liquid-cooled servers, with sufficient rack screws and mounting accessories;

– Cable management: vertical cable managers at the rear with ample cable space and tie points, layered management of power and signal cables;

– Physical protection: reliable mechanical locks on front/rear doors for enclosed management; basic dust and foreign-object protection;

– Auxiliary ventilation: mesh front/rear doors with certain ventilation rate for remaining air-cooled components and observation of internal status;

– Equipment carrying: fixed trays and sliding rails for switches, storage and auxiliary equipment.

5.2 Performance Indicator Requirements

– Heat dissipation: max 45kW cold plate cooling load per cabinet; at 25℃ inlet water and 120L/min flow, outlet temperature rise ≤5℃;

– Load capacity: static uniform load ≥1600kg, dynamic ≥1000kg;

– Pressure resistance: rated working pressure ≥1.6MPa, test pressure ≥2.4MPa, safety factor ≥3;

– Sealing: all pipe connections, welds and quick couplings meet high industry standards — no visible leakage in normal operation, no coolant drip during quick coupling insertion/removal;

– Environment adaptation: long-term operation at 5℃-40℃, 30%-80%RH; metal parts corrosion-resistant, non-metal parts flame-retardant.

5.3 Liquid Cooling System Specific Requirements

– Manifold configuration: 1 manifold per cabinet with 2 vertical distribution columns at the rear left/right; 9 ports per column, 18 total branch outputs for 9 dual-loop liquid-cooled servers;

– Quick connection: drip-free quick couplings on server hoses, single-hand operation, quick insertion/removal without draining the system and without affecting other servers;

– Leakage protection: stainless steel drip tray at the cabinet bottom covering all piping areas, with drain interface and leakage sensor mounting position;

– Pipe access: bottom underfloor main supply/return connection supported, top routing also available;

– Flow uniformity: flow deviation between ports ≤±10% for even cooling distribution.

5.4 Structure and Installation Requirements

– Dimensions: 600mm (W) × 1400mm (D) × 2200mm (H), standard 600mm cabinet layout, mixable with air-cooled cabinets;

– Side-by-side installation: multiple cabinets can be joined with even gaps and neat appearance, compatible with cold aisle containment;

– On-site assembly: factory-assembled, only positioning, main pipe connection and power connection needed on site;

– Grounding: complete grounding system with reliable electrical connection and grounding terminals on posts, doors and panels;

– Transport: packaged size fits standard containers and trucks with adequate protection for long-distance transport.

5.5 O&M and Management Requirements

– Easy maintenance without special tools; quick replacement of wearing parts; large-angle door opening with fully exposed interior;

– Complete documentation: product manual, O&M manual, test reports and certificates delivered at handover.

6. Design Principles and Applicable Standards

6.1 Overall Design Principles

– Reliability first: stability of data center core equipment is paramount; all designs prioritize reliability with sufficient structural safety margins and multiple sealing protections, eliminating single-point failure risks;

– Standardized compatibility: strict adherence to 19-inch rack standards, pipe interface standards and electrical grounding standards for compatibility with mainstream servers and room infrastructure;

– O&M friendly: optimize structure layout and connections for daily operation scenarios, reducing steps and difficulty;

– Modular design: core components modular (manifolds, cable managers, locks, trays) for separate replacement and upgrades;

– Safety redundancy: multiple protection layers for leakage and overload risks — drip tray + leakage detection dual protection, thickened plates + reinforcing ribs dual load-bearing;

– Green low-carbon: optimize pipe flow resistance to reduce pump energy; improve heat dissipation efficiency to reduce heat source energy, helping lower data center PUE.

7. System Architecture and Working Principle

7.1 System Composition

The 45kW liquid-cooled server cabinet consists of five major subsystems:

– Mechanical load-bearing subsystem: main frame, front/rear doors, side panels and base — the physical load-bearing foundation;

– Liquid cooling distribution subsystem: vertical distribution columns, hoses, quick couplings and drip tray — the core cooling pathway;

– Installation accessory subsystem: rack mounting rails, PDU mounts, fixed trays, sliding rails and rack screws;

– Cable management subsystem: rear vertical cable managers, rings and tie holes;

– Safety protection subsystem: mechanical locks, grounding system, drip tray and leak detection position — protecting physical, electrical and liquid cooling safety.

7.2 Internal Layout Design

The cabinet depth is divided into three functional zones front to back:

– Front operation zone: front ~800mm depth, server mounting area with 19-inch mounting rails, servers face front for operation, status viewing and disk insertion;

– Rear piping zone: one vertical distribution column on each rear side covering full 42U height, ports facing inward for server rear liquid cooling interfaces, with adequate working space;

– Middle cable zone: vertical cable managers in the rear middle for power and network cables, separating cables from liquid pipes.

The bottom houses the drip tray fully covering the rear piping area; the top has reserved pipe and cable openings for top routing.

7.3 Liquid Cooling Pipe Topology

The cabinet adopts a “dual vertical column parallel” topology: low-temperature coolant from the external heat source enters the left distribution column (supply riser) from the bottom, flows through branch hoses into server cold plates, and returns via the right column (return riser) to the external heat source — a complete loop. Each column has 9 ports at 200mm spacing (2U), branches are parallel for consistent inlet temperature, and the gradual flow channel design keeps flow deviation within ±10%. Both columns have vent and pressure test ports at the top; optional shutoff valves at main supply/return enable single-cabinet maintenance without affecting the cluster.

7.4 Safety Redundancy and Reliability Design

– Structural redundancy: 2.0mm main posts (0.5mm thicker than ordinary cabinets), reinforcing ribs on load beams, >30% static load margin;

– Pressure redundancy: rated 1.6MPa, design burst ≥4.8MPa (3× safety factor); all welds pass 2.4MPa hydrostatic hold test;

– Sealing redundancy: “welding + threaded seal” double sealing; quick couplings with bidirectional self-sealing — even accidental detachment does not cause massive leakage;

– Leakage protection redundancy: “drip-free couplings + bottom drip tray + leakage detection alarm” triple protection;

– Electrical safety redundancy: cabinet grounding resistance ≤0.1Ω, all metal parts equipotential, insulated mounting accessories.

8. Detailed Technical Design

8.1 Cabinet Main Frame System

#### 8.1.1 Dimensions and Mounting

Parameter Value
External size 600mm±1 (W) × 1400mm±1 (D) × 2200mm±2 (H)
Mounting height 42U, 44.45mm/U per IEC 60297
Rail center distance 465mm, standard 19-inch
Front/rear post spacing 1100mm, compatible with devices ≤900mm deep
Base height 100mm, with bottom cable/pipe openings
Side-by-side gap ≤1mm, flatness ≤0.5mm/m
Door opening angle ≥110° (front and each rear leaf)
Mounting holes 9×9mm square holes for M6 rack screws and cage nuts

#### 8.1.2 Material and Process

– Main load-bearing posts: SPCC quality cold-rolled steel ≥2.0mm, CNC-bent nine-fold profile with high section inertia;

– Top/bottom beams: SPCC ≥2.0mm welded to posts forming an integral frame;

– Side panels/roof: SPCC ≥1.2mm with reinforcing ribs;

– Mounting rails: SPCC ≥1.5mm, galvanized passivation;

– Surface pretreatment: alkaline degreasing → acid pickling → neutralization → phosphating → passivation (five steps);

– Coating: automatic electrostatic epoxy powder spraying, 60-80μm, adhesion GB/T 9286 class 1; standard color RAL7035, any RAL color customizable;

– Welding: CO₂ gas shielded welding at key load points, uniform full welds, ground smooth.

#### 8.1.3 Mechanical Performance

– Static uniform load ≥1600kg (full-U uniform, 24h, post deformation ≤1mm);

– Dynamic load ≥1000kg (loaded handling/forklift without permanent deformation);

– Concentrated load at tray positions ≥50kg;

– Seismic: GB 50260-2013, withstands intensity 8 earthquakes;

– Verticality ≤1.5mm/m after installation; neutral salt spray ≥480h no obvious corrosion;

– Coating pencil hardness ≥2H.

#### 8.1.4 Electrical and Safety Parameters

– Protection IP20; grounding resistance ≤0.1Ω between main terminal and any metal part;

– Main grounding terminal M8 copper bolt with copper bar ≥25mm²;

– Non-metal accessories UL94-V0; insulation resistance ≥100MΩ; GB 4943.1-2022 compliant.

8.2 Door and Lock System

#### 8.2.1 Mesh Doors

– Front: single leaf, left/right opening field-adjustable; rear: double-leaf symmetrical;

– Hexagonal punched mesh φ5mm aperture, 2mm spacing, ventilation ≥70%;

– Mesh plate ≥1.0mm cold-rolled steel; door frame ≥1.5mm SPCC bent;

– Flame-retardant PVC sealing strips around door frame; mesh allows direct observation of equipment status.

#### 8.2.2 Hinges and Hardware

– Detachable zinc alloy die-cast hinges, 3 per leaf, single hinge load ≥30kg, no sagging;

– Recessed zinc alloy handle flush with door; buffer pads on door edge; hinge opening limit.

#### 8.2.3 Mechanical Locks

– Cabinet flat mechanical locks with pin tumbler; Class A anti-pick core (≥5min resistance);

– Three-point linkage latch; 3 keys per lock, master-key option for batches;

– Life ≥10000 operations; copper core, zinc alloy shell chrome-plated; IP54.

8.3 Internal Mounting and Cable Management System

#### 8.3.1 Vertical Cable Managers

– Positioned at rear posts, 100×80×2000mm per unit, 42U height;

– Flame-retardant ABS (UL94-V0), 1.5mm steel mounting brackets;

– 42 cable rings (1 per U), tie holes every 50mm; load ≥20kg per unit; -10℃~60℃.

#### 8.3.2 PDU and Equipment Mounts

– Rear rail PDU mounts: 1.5mm SPCC, snap-on to square holes, no screws, ≤50mm PDUs, load ≥20kg, 2 per cabinet;

– Rear post VCDU/PDU mounts: 2.0mm SPCC reinforced, bolted to rear posts, for heavy PDUs/small CDUs/terminal blocks, load ≥50kg, multi-position adjustable.

#### 8.3.3 Trays and Rails

– Fixed tray: 19-inch, 1U, 482×1000mm, 1.2mm SPCC stamped with reinforcing edges, anti-slip surface, load ≥50kg; vented/baffled/keyboard options;

– Sliding rails: three-section ball bearing, full extension ≥700mm, galvanized, load ≥30kg/pair, ≥5000 cycles, self-locking when pushed in.

#### 8.3.4 Rack Screw Kit

– M6×16mm with cage nut, flat washer and spring washer per set; carbon steel zinc plated; salt spray ≥72h; grade 4.8; 40 sets per cabinet standard.

8.4 Manifold Liquid Cooling Distribution System

#### 8.4.1 Distribution Column Main Pipe

Parameter Value
Material 304 stainless seamless tube (GB/T 14976-2012), φ57mm OD, wall ≥3mm, ID 51mm
Length 2000mm, full 42U height
Ports 9× G1/2″ internal thread branch ports (200mm spacing, 2U), 1× G1-1/2″ main port (bottom), 1× G1/4″ vent/pressure port (top)
Pressure Rated 1.6MPa, max working 2.0MPa; 2.4MPa hydrostatic 30min factory test; burst ≥4.8MPa (3× safety)
Temperature -20℃~80℃ media
Media compatibility Deionized water, ethylene glycol solution, mineral oil, electronic fluorinated liquid
Surface Electro-polished inside (Ra≤0.8μm), brushed outside
Welding Argon arc, 100% penetration inspection
Weight ~8.5kg per column; stainless bracket with damping pads on rear posts

#### 8.4.2 Distribution Hoses

– Three-layer: inner coolant-resistant rubber (butyl/FKM), polyester fiber braid reinforcement, outer wear-resistant flame-retardant PVC (UL94-V0);

– ID φ10mm / OD φ17mm (custom φ8/φ12 available); rated 1.6MPa, burst ≥6.4MPa; -30℃~120℃;

– Min bend radius ≥5× OD (≥85mm); standard length 1500mm (custom 1000/2000/3000mm);

– Crimped end fittings integral with hose, pull-off resistance ≥500N; 1.6MPa hold test at crimp;

– Service life ≥5 years; 18 per cabinet.

#### 8.4.3 Drip-Free Quick Couplings

– Closed bidirectional self-sealing type — both male and female valve cores close simultaneously on disconnect;

– 304 stainless CNC-machined body, 304 valve cores with conical seal, FKM seals;

– Hose end barb/crimp, device end G1/2″ male thread (custom available); bore φ8mm;

– Leakage ≤0.05mL per insertion cycle (no visible drip); insertion force ≤30N, extraction ≤50N;

– Life ≥10000 cycles; rated 1.6MPa, surge 2.5MPa; -20℃~120℃;

– Push-in auto-lock, press release ring to disconnect; keyed options to prevent wrong connection;

– 18 sets per cabinet (male on hose end, female on manifold port, interchangeable).

#### 8.4.4 Stainless Steel Drip Tray

– 304 stainless ≥1.2mm, one-piece deep-drawn with 30mm turned-up edges, no welded seams;

– 1300×500mm, fully covering the rear piping area; G1/2″ drain at the lowest corner;

– Volume ~19.5L; placed at cabinet base under the liquid columns; reserved leakage sensor mounting; brushed finish.

8.5 Packaging and Transport Auxiliary Materials

– Packaging: honeycomb cardboard box + EPE corner protectors + strapping, moisture and dust proof;

– Transport: packaged size fits standard containers and trucks; shock and vibration protection for long-distance transport;

– Documentation: operation manual, inspection report and certificate included.

9. Recommended Configuration and Preliminary Budget

9.1 Standard Configuration per Cabinet

No. Component Specification Unit Qty Note
1 Main frame 42U, 600×1400×2200mm, quality cold-rolled steel, electrostatic powder coating, static load ≥1600kg set 1 With front/rear rails, base, roof
2 Single mesh front door 600×2200mm, hexagonal mesh ≥70% ventilation leaf 1 Recessed handle and hinges
3 Double mesh rear door 1400×2200mm pair, hexagonal mesh ≥70% set 1 Two leaves with hinges and handles
4 Mechanical lock set Anti-theft cabinet locks, universal key, anti-pry latch set 2 Front 1, rear linked 1
5 Rear vertical cable managers Full 42U, flame-retardant ABS + metal brackets pc 2 Left and right
6 Rear rail PDU mounts For 19-inch rails, sprayed steel set 2 For vertical PDUs
7 Rear post VCDU/PDU mounts Thickened steel, ≥50kg per set set 2 For CDU/PDU
8 Rack screw kit M6 standard, screw/nut/washers, zinc plated set 40 For equipment mounting
9 Fixed tray 19-inch, depth for 1400mm cabinet, ≥50kg pc 1 For auxiliary equipment
10 Sliding rails 19-inch three-section ball bearing, full extension, ≥30kg/pair pair 2 For drawer devices
11 Manifold distribution columns 304 stainless, vertical, 9 ports each, rated 1.6MPa pc 2 Supply + return, left/right
12 Server distribution hoses Coolant-resistant rubber + braid, 1.5m, rated 1.6MPa pc 18 One per port
13 Drip-free quick couplings 304 body, FKM seals, bidirectional self-sealing set 18 Male + female
14 Stainless drip tray 304 one-piece, with drain interface pc 1 At cabinet bottom
15 Packaging materials Honeycomb carton + EPE + strapping set 1 For all accessories

9.2 Optional Value-Added Accessories

No. Accessory Specification Unit Qty Note
1 Intelligent leak detection Positioning sensing cable + controller, DCIM alarm set 1 In drip tray
2 Rack intelligent PDU 16A/32A, 8/12 outlets, current/voltage monitoring, remote management pc 2 Optional power/outlets
3 Cabinet temp/humidity sensor High-accuracy digital, RS485 pc 2 Front and rear
4 Side-by-side join kit Galvanized steel plate set 4 Per cabinet
5 Removable side panels Sprayed steel, same color pc 2 Left and right
6 Main shutoff valves 304 stainless, threaded, 1.6MPa pc 2 Supply/return
7 Flow sensors Electronic flow meters with data upload pc 2 Supply/return
8 Extended hoses 2m/3m, same standard material pc as needed Special distances

9.3 Batch Quotation Notes

The above is the guidance price for single-cabinet standard configuration; batch purchases enjoy tiered discounts based on quantity, subject to the formal quotation. Optional accessories can be added or removed per project needs with corresponding price adjustment. The quotation covers production, testing and packaging costs, excluding transportation, on-site installation and tax, which can be calculated separately. Non-standard customized products are quoted separately per customization difficulty and material cost. Overall liquid-cooled computer room turnkey projects (including heat source, piping, monitoring and construction) can be quoted as an integrated package. All reference prices in this solution are in RMB (CNY) only and are for reference purposes.

10. Technical Specifications

10.1 Cabinet Overall Specifications

Item Specification
Model KITOZER-LC-45kW-42U
Dimensions 600×1400×2200mm, 42U, 19-inch
Static load ≥1600kg (uniform); dynamic ≥1000kg
Cooling capacity 45kW per cabinet (cold plate)
Inlet condition 25℃ inlet water, 120L/min, outlet rise ≤5℃
Manifold 2× 304 stainless columns, 9 ports each, 200mm spacing
Quick couplings 18 sets, drip-free bidirectional self-sealing, ≤0.05mL per cycle
Pressure Rated 1.6MPa, test 2.4MPa, burst ≥4.8MPa
Drip tray 304 stainless, ~19.5L, with drain
Doors Mesh front/rear, ventilation ≥70%
Coating Epoxy powder 60-80μm, RAL7035, salt spray ≥480h
Grounding ≤0.1Ω equipotential, M8 main terminal
Protection IP20; UL94-V0 non-metal parts
Standards GB 50174, GB/T 2887, T/CCSA 377, GB 4943.1

10.2 Key Component Specifications

Component Key Parameters
Distribution column φ57×3mm 304, G1/2″×9 ports + G1-1/2″ main + G1/4″ vent, Ra≤0.8μm internal
Hose ID10/OD17mm three-layer, 1.6MPa, burst ≥6.4MPa, life ≥5 years
Quick coupling 304/FKM, insertion ≤30N, life ≥10000 cycles, -20℃~120℃
Cable manager 100×80×2000mm ABS, 42 rings, ≥20kg
Hinges Zinc alloy, ≥30kg each, no sagging
Locks Class A core, three-point latch, ≥10000 operations

11. Key Advantages and Customer Value

11.1 High-Density Heat Dissipation Capability

The 45kW per cabinet cooling capacity is more than 3× that of traditional air-cooled cabinets (about 10-15kW), perfectly adapting to current AI high-density server cooling needs. Compared with air cooling, liquid cooling has high heat exchange efficiency, lowering chip operating temperature by 5-10℃ — improving server stability and extending electronic component life. Liquid cooling also eliminates dependence on high-speed fans, reducing cabinet operating noise to below 50dB and greatly improving the machine room O&M environment.

11.2 Structural Mechanical Reliability

The cabinet uses thickened cold-rolled steel plates and nine-fold profile posts with load capacity far exceeding ordinary industry standards, reserving ample safety margins — no structural deformation even with fully loaded heavy liquid-cooled servers. The liquid cooling system is all 304 stainless steel with 100% leak-tested welds and 3× pressure safety factor. Every delivered product passes strict multi-stage inspection including dimension, load, hydrostatic hold and salt spray tests.

11.3 Liquid Cooling System Safety

A triple leakage protection system prevents leaks at every layer: first, drip-free quick couplings with zero drip during insertion/removal and reliable sealing in operation; second, the full 304 stainless drip tray completely covering the piping area to catch any trace leakage without spreading to the floor; third, optional leakage detection sensors triggering sound/light and DCIM alarms immediately. With multiple protections, leakage risk is controllable and safety far exceeds industry convention.

11.4 O&M Operation Convenience

The design fully considers O&M scenarios: quick couplings enable single-hand server connection/disconnection — replacing a server takes only 1-2 minutes without special tools or draining the system; front/rear doors open at large angles exposing all pipes and cables for clear inspection; all wearing parts are standardized for easy procurement; the vertical cable managers and layered pipe layout keep cables and pipes separate for convenient management.

11.5 Customization Adaptation

With our own factory and R&D team, deep customization is available: port count, spacing and interface specifications per server model; different cabinet sizes, loads and colors; add-on intelligent monitoring, fire protection and distribution modules; special scenarios (shielding, explosion-proof, outdoor) customization — perfectly matching project needs without adaptation waste.

11.6 Green Low-Carbon Energy Efficiency

Liquid cooling has high heat exchange efficiency and high coolant specific heat — delivering the same cooling with far less energy than air systems; it also enables higher chiller supply temperatures and even natural cooling, significantly reducing heat source energy. PUE can drop below 1.15 versus 1.5-1.8 for traditional air-cooled data centers, saving substantial electricity annually and aligning with national dual-carbon and green data center strategies.

12. Technical Q&A (50+ Items)

12.1 Cabinet Basic Knowledge Questions

Q1: What are the dimensions of this 45kW liquid-cooled cabinet? Can it be installed side by side with ordinary air-cooled cabinets?

A: Standard dimensions are 600mm (W) × 1400mm (D) × 2200mm (H); the width matches standard server cabinets, so it can be joined side by side with air-cooled cabinets sharing the cold aisle layout — ideal for gradual room upgrades. The greater depth accommodates the rear liquid cooling piping and cable space.

Q2: What is the load capacity? Can it hold fully loaded liquid-cooled servers?

A: Static uniform load ≥1600kg, dynamic ≥1000kg. Current mainstream 2U liquid-cooled AI servers weigh about 100-150kg each; 42U cabinets deploying around 10 servers total about 1000-1500kg — well within capacity with ample margin.

Q3: What is the surface process? Will it chip or rust easily?

A: Steel parts undergo complete pretreatment (degreasing, pickling, phosphating, passivation) then epoxy powder electrostatic spraying at 60-80μm with class 1 adhesion. Neutral salt spray exceeds 480h without obvious corrosion; normal constant temperature/humidity room use for over ten years will not cause chipping or rust.

Q4: What is the protection rating? What environments suit it?

A: IP20 — prevents entry of solid objects ≥12.5mm; suitable for indoor data centers and clean rooms. For outdoor or dusty/wet workshops, our outdoor cabinets or higher protection custom solutions are available.

Q5: Can the color be customized?

A: Yes — standard RAL7035 light gray, or any RAL color (black, white, dark blue, etc.) per customer requirements; customization does not affect performance, only slightly extends production time.

Q6: Does the cabinet support both liquid and air cooling?

A: Yes — the mesh doors provide ≥70% ventilation for remaining air-cooled components (power supplies, network cards), forming a hybrid air-liquid cooling mode; liquid cooling handles the main chip heat while air assists auxiliary components.

Q7: What servers are compatible?

A: Any 19-inch rack-mount server with standard cold plate liquid cooling interfaces; the 9 ports per column at 2U spacing and adjustable rails accommodate mainstream liquid-cooled servers from major brands.

12.2 Liquid Cooling System Technical Questions

Q8: What coolants are supported? Can ethylene glycol be used?

A: The 304 stainless system with FKM seals has very wide compatibility: deionized water, ethylene glycol water solution (commonly 20%-50%), mineral oil, electronic fluorinated liquid and most common coolants — adaptable to the client’s heat source medium.

Q9: Are the quick couplings really drip-free?

A: Yes — bidirectional closed self-sealing couplings have independent valve cores in both male and female ends that close simultaneously during insertion/removal; neither end leaks when disconnected. Leakage per cycle ≤0.05mL — essentially invisible, safe for hot-swap maintenance.

Q10: Is flow uniform across the 9 ports?

A: Yes — the gradual flow channel design with main pipe diameter far larger than branches, optimized by fluid simulation, keeps flow deviation within ±10% across all ports, providing adequate coolant to every server without top/bottom imbalance.

Q11: What is the working pressure? Can it burst?

A: Rated working pressure 1.6MPa; typical operation runs at 0.3-0.8MPa, far below rating. Design burst ≥4.8MPa (3× safety factor) and every product passes 2.4MPa hydrostatic hold test — bursting cannot occur in normal use.

Q12: What is the drip tray for? Does it really prevent leaks?

A: The drip tray sits directly under the liquid piping like a catch pan — any pipe seepage or coupling drip is fully captured without reaching the floor to corrode flooring and cables. Its ~19.5L capacity provides ample emergency response time; an optional leak sensor adds automatic alarming.

Q13: What is the temperature rise at 45kW?

A: At 25℃ inlet water and 120L/min flow, outlet temperature rise ≤5℃, keeping chip temperatures within design thresholds even at full 45kW load — verified by factory heat load testing.

Q14: Can the manifold ports be adjusted?

A: Yes — port count (9 per column standard, 18 total), spacing and interface specifications can be customized to match the actual server deployment scheme.

Q15: Is the system compatible with different external heat sources?

A: Yes — the manifold main ports connect to CDUs, chillers, dry coolers or closed cooling towers; the client’s heat source type and temperature determine the primary-side design, and our full-range CDU products can also be supplied.

Q16: How is air removed from the system during filling?

A: Each distribution column has a G1/4″ vent port at the top; during system filling, air is expelled through the vent valves until coolant flows out continuously, then the valves are closed — standard filling procedure per the O&M manual.

Q17: What is the pressure drop of the cabinet?

A: The φ57mm columns with φ10mm branch hoses keep the cabinet pressure drop low (typical ≤0.05MPa at rated flow), minimizing pump energy and allowing multiple cabinets per CDU loop.

Q18: Can the cabinet be used for immersion cooling?

A: This cabinet is designed for cold plate cooling. For immersion cooling, our dedicated immersion cabinets are available; the manifold structure differs between the two technologies.

12.3 Installation and Construction Questions

Q19: Is installation complex? How long per cabinet?

A: The cabinet ships factory-assembled with frame, manifolds and cable managers pre-installed; on site only positioning/fixing, main supply/return pipe connection and power connection are needed. Skilled workers complete physical installation in 1-2 hours per cabinet, plus about 2 hours for pressure testing and commissioning — half a day per cabinet.

Q20: Do pipes route from the bottom or top?

A: Both — standard is bottom supply/return for underfloor piping layouts; top-routing versions with openings at the cabinet top can be customized per project site.

Q21: Does the cabinet need grounding? How?

A: Yes — connect the dedicated M8 grounding bolt and copper bar to the room’s equipotential terminal with ≥6mm² yellow-green wire. All metal parts are already equipotential; a single main grounding point suffices.

Q22: Are extra parts needed for side-by-side installation?

A: The join kit (optional) with bolts and washers — align adjacent posts and fasten with the join plates; gaps are even and appearance neat, with improved overall stability.

Q23: Is pressure testing required during installation?

A: Yes — after on-site pipe connection, hydrostatic test at 1.2MPa holding 30 minutes; pass criteria: pressure drop ≤0.05MPa with no visible leakage. We provide test tools and technical guidance, or arrange professional engineers on site.

Q24: What if the existing room has underfloor piping constraints?

A: The cabinet base height of 100mm and bottom openings accommodate standard underfloor trays; for special constraints, top-routing versions or extended hoses are available — consult our engineers during design.

Q25: Can cabinets be mixed with cold aisle containment?

A: Yes — standard 600mm width and mesh doors integrate with cold aisle containment systems; the liquid pipes route under the floor while the aisle manages airflow for remaining air-cooled components.

12.4 O&M and Maintenance Questions

Q26: What daily maintenance does the liquid-cooled cabinet need?

A: Very simple: daily inspection for leaks and normal pressure; monthly cleaning of surfaces and mesh dust; semi-annual check of quick coupling seals and pipe joint tightness; annual coolant replacement (per medium type). Overall maintenance workload is far less than air-cooled fan/filter replacement frequency.

Q27: How long do quick couplings last? Easy to replace?

A: Insertion life ≥10000 cycles — over twenty years at once-per-day usage; they practically never wear out at normal O&M frequency. If seals age, replacement is simple — unscrew the old coupling and install the new one without special tools.

Q28: Do hoses need periodic replacement?

A: Hoses are rubber components with an aging cycle; normal service life ≥5 years. Inspect appearance every 3-5 years; replace on cracking, bulging or hardening. Replacement is simple — close the branch valve, disconnect the coupling, replace — without affecting other servers.

Q29: How is the drip tray drained?

A: The tray has a dedicated drain interface connectable to a drain pipe leading to the room’s collection point or floor drain; normal trace condensate drains automatically without manual emptying. Without external drainage, periodic inspection and manual extraction suffice — the tray rarely accumulates much water in normal operation.

Q30: How often is coolant replaced?

A: Ethylene glycol solution every 2-3 years; deionized water every 1-2 years; fluorinated liquid over 5 years. Replacement is done via the external heat source filling port without disassembling cabinet internals.

Q31: What does a typical daily inspection cover?

A: Visual check of the drip tray for liquid, pressure gauge readings, alarm panel status, and cooling system supply/return temperature — about 5 minutes per cabinet row.

Q32: How is water quality maintained?

A: Use quality coolant, keep the system sealed, monitor conductivity/pH if equipped, and replace coolant per the schedule; the 304 stainless system resists corrosion with proper coolant maintenance.

Q33: What if a leak occurs during operation?

A: The drip tray catches it; if the optional leak sensor is installed, DCIM alarms immediately with location. Response: isolate the branch valve, disconnect the server coupling, replace the faulty component, refill coolant if needed — then resume.

12.5 Selection and Customization Questions

Q34: Are higher-capacity liquid-cooled cabinets available?

A: Yes — the full power range includes 60kW, 80kW and higher models, plus custom designs per actual heat load for different computing densities.

Q35: Can port count be changed? Need more interfaces?

A: Yes — custom port count per column, spacing and interface forms to perfectly match the specific server deployment.

Q36: Can shielding be added to make a shielded liquid-cooled cabinet?

A: Yes — mature shielding cabinet technology combined with liquid cooling creates shielded liquid-cooled cabinets for confidential rooms’ high-density computing needs, with shielding performance up to Class C standard and adapted waveguides and shielded connectors.

Q37: What intelligent monitoring can be added? Can it integrate with existing DCIM?

A: Optional modules include leak detection, temperature/humidity monitoring, pipe flow/pressure monitoring, access management and PDU power metering. All support standard Modbus/SNMP protocols for seamless integration with existing DCIM platforms without additional development.

Q38: Can you provide the complete liquid cooling solution, not just cabinets?

A: Yes — from cabinet to heat source: liquid-cooled cabinets, CDU units, outdoor precision AC/cooling towers, piping systems, intelligent monitoring, plus design, installation, construction and O&M services — one-stop procurement.

Q39: What is the lead time for standard cabinets?

A: Standard production about 20-25 working days (batch dependent); small quantities in stock can ship faster; custom configurations extend the cycle per complexity.

Q40: Can the cabinet depth be customized?

A: Yes — 1000mm, 1200mm, 1400mm and custom depths are available to match server depth and room layout.

12.6 General Project Questions

Q41: What is the warranty?

A: 3-year overall warranty, 5-year liquid cooling system warranty (pipes, columns, couplings), 1-year wearing parts warranty; free repair/replacement for quality problems during warranty.

Q42: What is the after-sales response time?

A: 7×24 hotline; remote support within 1 hour; on-site: city 2h response/4h arrival, provincial 4h/8h, out-of-province within 24h; general faults repaired within 4h on site, major faults basic function restored within 24h.

Q43: Are spare parts available?

A: Central spare parts warehouse with common structural, liquid cooling and electrical parts; regional spare points in major cities; emergency logistics delivers within 48 hours; all replacements are genuine factory parts with corresponding warranty.

Q44: What documentation is delivered?

A: Product manual, O&M manual, factory inspection report, pressure test report, quality certificate, wiring diagrams and after-sales service card.

Q45: Can old air-cooled cabinets be retrofitted to liquid cooling?

A: Our existing-cabinet liquid cooling retrofit service can convert suitable standard cabinets by adding manifolds, couplings and drip trays; depth and structure must be assessed — consult our engineers.

Q46: What is the noise level?

A: Below 50dB in normal operation — no high-speed fans for chip cooling; residual air-cooled components run at low speed. Far quieter than traditional air-cooled rooms.

Q47: How is PUE improved?

A: Liquid cooling handles chip heat efficiently, allowing higher chiller temperatures and natural cooling, plus reduced pump/fan energy — combined PUE below 1.15 versus 1.5-1.8 for air-cooled rooms.

Q48: What safety certifications apply?

A: GB 4943.1-2022 safety, UL94-V0 flame retardancy, GB/T 10125 salt spray, plus ISO9001 quality system; 3C/CE/ROHS for relevant products.

Q49: Is training provided?

A: Yes — operation and maintenance training at delivery covering cabinet, liquid cooling system, DCIM and emergency handling, with repeat training for new personnel and ongoing technical consultation.

Q50: How is the cabinet transported?

A: Factory-assembled with honeycomb carton + EPE protection, fits standard containers and trucks; leveling casters and support feet allow on-site positioning; crane/forklift handling per weight.

Q51: What is the design service life?

A: Cabinet frame ≥15 years, stainless manifold system ≥15 years, hoses ≥5 years per replacement, quick couplings ≥10000 cycles — long-term reliable operation with standard O&M.

Q52: Can pilot units be ordered before bulk deployment?

A: Yes — pilot orders of 1-4 units are welcome for validation before batch deployment; our engineers support the pilot commissioning and provide data for scaling decisions.

13. Construction Schedule

13.1 Overall Project Period

Taking a batch project of 50 units of standard 45kW liquid-cooled cabinets as an example, the overall project period is about 30 working days covering the full process from contract signing to completion acceptance. Larger batches or higher customization extend the period accordingly; small-batch stock products can be delivered much faster.

13.2 Stage Schedule

No. Stage Duration Core Work Deliverable Responsible
1 Solution confirmation and contract 3 workdays Requirements, solution refinement, parameter confirmation, contract signing, advance payment Final technical solution, contract Both parties
2 Raw material procurement and inspection 5 workdays Steel plate, stainless pipe, standard parts procurement; incoming inspection of material, dimension, performance Inspection report, warehouse receipt Production/QC
3 Sheet metal processing and surface treatment 8 workdays Laser cutting, CNC bending, welding, grinding; pretreatment, electrostatic spraying, curing Cabinet and door semi-finished Sheet metal/spraying workshop
4 Liquid cooling processing and pre-assembly 6 workdays Stainless pipe cutting/welding/pressure test; hose cutting and coupling crimping; internal pre-assembly Distribution columns, hose assemblies, pre-assembled cabinet Liquid cooling/assembly workshop
5 Finished product outgoing inspection 2 workdays Appearance, dimension, structural load sampling, liquid system pressure hold test, accessory count Outgoing inspection report, certificate QC
6 Packaging and logistics 3 workdays Packaging, loading, transit, on-site unloading acceptance Delivery note, arrival acceptance Logistics/client
7 On-site installation and commissioning 2 workdays Cabinet positioning, joining, main pipe connection, power connection, pressure test, trial run Installation records, pressure test report Construction dept
8 Completion acceptance and training 1 workday Overall performance acceptance, documentation handover, O&M training, acceptance signing Completion report, training records Both parties

13.3 Key Node Control

– Solution confirmation node: baseline for project start; all parameters, configurations and delivery requirements per this node; subsequent changes require formal change procedures;

– Raw material incoming node: strict quality control, all main materials require material certificates, unqualified materials prohibited from production;

– Outgoing inspection node: final gate before delivery — “one-vote veto” system, any failed item means no delivery;

– Arrival acceptance node: joint inspection of packaging and appearance at unloading; transport damage confirmed on the spot with prompt replacement;

– Completion acceptance node: after installation and commissioning, joint item-by-item acceptance per contract and technical agreement.

14. Construction Organization and Quality/Safety Measures

14.1 Organization Structure

– Project manager (1): overall responsibility for progress, quality, cost and communication;

– Technical leader (1): solution design, technical disclosure, on-site technical problem solving, technical documentation;

– Production supervisor (1): production scheduling, workshop dispatch, capacity and progress control;

– QC engineer (1): full-process quality inspection of raw materials, semi-finished and finished products;

– Site construction foreman (1): site personnel management, progress push, site safety management;

– Construction personnel: sheet metal workers, pipe fitters, electricians and helpers per project scale.

14.2 Core Position Responsibilities

– Project manager: overall plan, internal resource coordination, client interface, periodic progress reporting, major problem handling, on-time quality delivery;

– Technical leader: deepen design drawings, pre-construction technical disclosure, solve site technical problems, review technical documentation, participate in acceptance;

– Production supervisor: production work orders per plan, coordinate workshop rhythm, control production progress;

– QC engineer: inspection standards and plans, execute inspections at each stage, record data, issue reports, prevent non-conforming products from flowing;

– Construction foreman: implement site construction plan, lead standard operations, control safety and civilized construction, daily progress reporting.

14.3 Standard On-Site Construction Process

1. Preparation stage: technical and safety disclosure before entry; prepare tools, materials and PPE; survey site (floor load, access, power/water interfaces); material/equipment arrival acceptance and storage.

2. Cabinet installation: layout marking per room drawing; cabinet positioning with level calibration; side-by-side joining; grounding connection to equipotential bar with resistance test.

3. Liquid cooling installation: main supply/return pipe laying with supports; branch connection of manifold columns with valves and fittings; system flushing with clean water to remove weld slag and impurities; pressure test to 1.2MPa holding 30 minutes checking for leaks.

4. Distribution and commissioning: PDU power connection with wiring and insulation check; system coolant filling with air removal; trial run over 2 hours checking flow, temperature and pressure; function tests of locks, couplings and sensors.

5. Acceptance and finishing: site cleaning; organize records and test reports; joint completion acceptance, answer questions, rectify issues; sign acceptance documents and hand over.

14.4 Full-Process Quality Control System

– Three-inspection system: self-inspection, mutual inspection and dedicated inspection at each process; qualified before proceeding;

– Material control: all materials/equipment require certificates and inspection reports; unqualified materials rejected;

– Key process control: quality control points at welding, pressure testing and grounding — confirmed and signed by the QC engineer on site;

– Finished product protection: installed cabinets protected from scratching and pollution; connected pipes labeled, no stepping or pulling;

– Documentation management: timely recording of construction data; complete, true and traceable as-built documentation.

14.5 Safety Production Management

– Three-level safety education: company, project and team level education, qualified before work;

– PPE: safety helmets on site, safety belts for high-altitude work, insulated shoes for electricians, face shields and gloves for welding;

– Electrical safety: three-level distribution with two-level protection, locked boxes, certified electricians only, no unauthorized wiring, regular tool insulation checks;

– Hot work: flammable materials cleared before welding, fire extinguishers provided, dedicated fire watch, confirm no embers before leaving;

– High-altitude work: qualified scaffolding or lifting platforms above 2m, no climbing on cabinets, no throwing objects;

– Safety inspection: foreman daily inspection, project manager weekly safety inspection.

14.6 Civilized Construction Requirements

– Materials and tools stacked neatly with clear labels, fire and escape routes unobstructed;

– Construction waste removed daily to designated points;

– Reasonable work hours to reduce noise impact;

– Protect existing room facilities (floor, walls, ceiling);

– Uniform attire with work badges, compliance with client site management rules.

15. After-Sales Service

15.1 Warranty Commitment

The overall project warranty period is 2 years from the date of completion acceptance; core equipment has a 3-year warranty. During the warranty period, all failures and damage caused by product quality or construction process problems are repaired and parts replaced free of charge. After the warranty period, lifetime cost-price maintenance is provided, charging only parts cost and basic labor, ensuring long-term stable system operation.

15.2 After-Sales Response Mechanism

– A 7×24 after-sales hotline receives fault reports and technical consultations at any time;

– Within the urban area: respond within 2 hours, technicians on site within 4 hours;

– Suburban and surrounding areas: respond within 4 hours, personnel on site within 8 hours;

– General faults resolved on the spot; complex faults solved within 24 hours with a solution;

– Emergency faults get a green channel with priority dispatch of personnel and parts.

15.3 Periodic Inspection and Maintenance

During the warranty period, a free on-site inspection is provided every six months, with a comprehensive maintenance inspection annually. Inspection contents include equipment operating status, connection firmness, sealing and rust conditions, filtering/grounding performance and safety devices. After each inspection, a formal inspection report is issued recording equipment status and maintenance content with optimization suggestions.

15.4 Spare Parts Supply Guarantee

A local spare parts warehouse is established, stocking common wearing parts for quick replacement to shorten fault handling time. For uncommon special parts, a fast supply channel with the factory ensures availability within 48 hours. During warranty, non-artificial-damage spare parts are replaced free; after warranty, parts are charged at cost price without markup.

15.5 System Upgrade and Technical Support

– Free lifetime technical consultation services by phone or online at any time;

– If the customer later needs upgrades or expansions, preferential upgrade solutions and construction services are provided;

– Industry new technology and standard information is regularly pushed to customers.

16. Training Plan

16.1 Training Objectives and Audience

Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.

Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.

16.2 Tiered Training Content System

Level 1: Basic operation training (1 day)

– Basic principles: system concepts, structure composition, performance indicators;

– Daily operation standards: correct operation of equipment, control and safety systems;

– Daily inspection contents: daily/weekly/monthly check items;

– Safety precautions: usage prohibitions and emergency handling procedures.

Level 2: Maintenance training (1 day)

– Detailed structure of each subsystem and working principles;

– Daily maintenance methods: cleaning, fastening checks, routine care;

– Common fault identification and simple handling;

– Emergency handling procedures for power failure, fire and equipment faults.

Level 3: Advanced management training (as needed)

– Performance influencing factors and how to avoid degradation;

– Upgrade and expansion knowledge and specification requirements;

– Relevant national standards interpretation.

16.3 Training Methods and Schedule

– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;

– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.

16.4 Training Assessment and Documentation Delivery

– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;

– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.

17. Anonymous Typical Project Scenarios

All project scenarios below are anonymous, generalized examples compiled from typical industry deployments; no real customer names, addresses or confidential information are disclosed.

17.1 Computing Center Project for a Leading AI Technology Company

Project background: a well-known domestic AI enterprise building a large-model training computing cluster; single AI server power reached 4kW, traditional air-cooled cabinets could not meet heat dissipation needs, so the cold plate liquid cooling solution was selected.

Project scale: 120 units of 45kW liquid-cooled server cabinets, with CDU coolant distribution units, closed cooling tower heat source system and intelligent environment monitoring; overall computing scale reached 200PFlops.

Highlights: 45kW per cabinet stably carrying 10× 4kW liquid-cooled servers; natural cooling solution with annual PUE as low as 1.12; modular deployment delivered in only 45 days from entry.

Operating result: delivered and commissioned in 2025, stable and reliable operation, zero liquid cooling leakage, server chip temperatures controlled within 60℃, noise far below traditional air-cooled rooms — highly rated by the customer with subsequent phase-two cooperation.

17.2 Supercomputing Center Project for a 985 University

Project background: a national key laboratory upgrading its high-performance computing platform for scientific computing and simulation, requiring high density, low noise and high reliability with limited room space, needing increased computing per unit area.

Project scale: 32 units of 45kW liquid-cooled cabinets with precision chillers and intelligent monitoring; total computing power 50PFlops supporting multiple national-level research projects.

Highlights: customized port configuration adapting to heterogeneous server brands; full-chain leak monitoring with high safety level; low-noise design with room noise below 55dB improving the research environment.

Operating result: stable since 2024 delivery, computing density tripled, energy consumption reduced 30%, successfully supporting multiple major research projects with full university recognition.

17.3 Edge Data Center Project for a Large Internet Enterprise

Project background: an internet enterprise deploying edge computing nodes in first-tier cities with small rooms and high rent, requiring extremely high space utilization, high reliability and low maintenance with few O&M staff.

Project scale: 10 units of 45kW liquid-cooled cabinets per site, 5 edge sites totaling 50 units, with integrated heat sources and remote monitoring systems.

Highlights: high-density deployment saving 50% room space versus air cooling; unattended operation with remote monitoring; standardized products with unified configuration across sites for convenient management.

Operating result: delivered progressively in 2025, stable operation with low failure rate, greatly reducing edge node rent and O&M costs while meeting low-latency edge computing needs.

17.4 Liquid Cooling Test Platform Project for a National Research Institute

Project background: a research institute building a liquid cooling technology test and verification platform for testing different liquid cooling solutions and coolants, requiring flexibly configurable liquid-cooled cabinets with comprehensive monitoring capability.

Project scale: 4 customized 45kW liquid-cooled test cabinets with high-precision flow, temperature and pressure monitoring, adjustable flow/temperature/pressure parameters.

Highlights: highly customized with adjustable ports, piping and monitoring points; industrial-grade monitoring accuracy with real-time data collection and storage; compatible with multiple coolants and cold plate/immersion test schemes.

Operating result: delivered in 2024, stable platform operation with precise test data, providing reliable hardware support for the client’s liquid cooling technology R&D with continued follow-up customization cooperation.

18. SEO Optimization Section

All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.

18.1 Keyword System

– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;

– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;

– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;

– Brand keywords: KITOZER, Guangzhou Lain.

18.2 SEO Tag System

– Title tag: the article title — Guangzhou Lain KITOZER;

– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;

– H1 tag: the article title;

– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.

18.3 Internal Link Anchor Text

– Core anchor text: technical design solution, system construction;

– Long-tail anchor text: configuration list, technical parameters, construction plan;

– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.

19. Official Contact Information

– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Official Website: https://gdlain.com

– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)

– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China

For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.

Shopping Cart