Table of Contents
Toggle1. Cover / Document Information
– Document Title: Electron Microscope Shielding Room Project Technical Design Solution
– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Date: August 2026
– Version: V1.0
– Project Type: Technical design solution for Electron Microscope Shielding Room Project
2. Table of Contents Structure
1. Company Introduction
2. Project Overview
3. User Requirement Analysis
4. Overall Design Description
5. Detailed System Design and Product Technical Parameters
6. Project Quotation and Configuration List
7. Core Solution Advantages
8. Technical Q&A
9. Construction Schedule Plan
10. Construction Organization Plan
11. After-Sales Service System
12. Operation and Maintenance Training Plan
13. Typical Project Cases
14. SEO Optimization System and Website Backend Configuration
15. Contact Information
3. Company Introduction
3.1 Company Development Overview
Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.
After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.
3.2 Core Business System
The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:
– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;
– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;
– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;
– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.
3.3 Brand and Qualification Honors
The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.
3.4 Core Competitive Advantages
1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;
2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;
3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;
4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.
4. Project Background and Objectives
4.1 Project Background
Electron microscopes are core precision analysis instruments in materials science, biomedicine, geology and semiconductor inspection; their imaging precision, resolution and stability depend heavily on the surrounding environment. Electromagnetic interference, temperature/humidity fluctuations, mechanical vibration, dust and static directly affect electron beam trajectory stability — causing blurred imaging, resolution loss, data deviation and even component damage. Dedicated shielding rooms controlling these factors are essential for electron microscope operation.
4.2 Construction Objectives
– Electromagnetic shielding: full closed shielding per national standards; the TEM room additionally meets low-magnetic requirements;
– Environment control: high-precision temperature/humidity control; vibration and cleanliness controlled within equipment limits;
– Power safety: safe, stable, reliable distribution and control with protection and linkage;
– Clean protection: anti-static, dust-proof, easy-clean professional decoration;
– Intelligent management: integrated monitoring with real-time parameters, alarms, data storage and remote access;
– Compliance delivery: per national codes with acceptance, after-sales and training.
4.3 Coverage
Two systems (SEM room and TEM room): electromagnetic shielding shell (walls, ceiling, floor, doors, observation window, filters, waveguide windows, grounding); distribution and automation control; clean decoration; core auxiliary equipment (vacuum pumps, water chillers, compressors, sample tables, acoustic enclosures, gas units, return-air units); environment monitoring and regulation (sensors, constant temperature/humidity AC, fresh air purification); display and monitoring software; cables/pipes/auxiliaries; installation, testing, acceptance and after-sales.
5. User Requirement Analysis
5.1 SEM Room Requirements
– Shielding effectiveness Class C standard; blocks low-frequency magnetic and high-frequency electromagnetic interference (imaging drift/noise);
– Layout accommodating 490×790mm vacuum pump, 600×600mm water chiller, 698×698mm compressor and 2 sample tables with maintenance aisles;
– Temperature ±0.5℃, humidity ±5%RH;
– Vibration damping for pumps/compressors within equipment limits;
– Independent main power box and environment control box with automated linkage;
– Real-time temperature/humidity and vibration monitoring with alarms;
– Anti-static, dust-proof, easy-clean decoration.
5.2 TEM Room Requirements (higher sensitivity)
– Shielding Class B standard plus power-frequency magnetic field attenuation (low-magnetic environment);
– 800×800mm shielding observation window;
– Dedicated gas-pressure unit with precise automatic regulation for the microscope’s gas circuits;
– Fresh air purification and return-air treatment maintaining positive pressure and cleanliness;
– Temperature ±0.2℃, humidity ±2%RH; micro-vibration and power-frequency magnetic field monitoring;
– Integrated environment/gas control box with multi-system linkage.
5.3 Common Requirements
Standard compliance; reliable mature equipment with redundancy; electrical/structural/fire safety; expandable interfaces; user-friendly control and monitoring; energy-saving devices and control.
6. Design Principles and Applicable Standards
6.1 Design Basis
GB 50174 (data center/electronic information system rooms), GB/T 50719 (electromagnetic shielding room engineering), GB 50343 (lightning protection), GB 50243 (ventilation/AC), GB 50303 (electrical installation acceptance), relevant EMC and clean-room standards, and the electron microscope manufacturers’ environmental requirements.
6.2 Design Principles
1. Advanced technology: mature proven shielding and environmental technologies;
2. Performance reliability: redundant critical links, industrial-grade equipment for continuous operation;
3. Parameter precision: environment parameters controlled within the tight ranges required by the microscopes;
4. Safety and compliance: electrical, structural, fire and personnel safety per codes;
5. Economical and practical: optimized configuration balancing performance and cost;
6. O&M convenience: user-friendly control and monitoring, expandable interfaces.
7. System Architecture and Working Principle
7.1 Overall Architecture
Six layers: shielding shell (welded six-sided steel enclosure with doors, window, filters, waveguides, grounding); power distribution and control (main power box + dedicated control boxes with PLC/IO); environment regulation (precision constant temperature/humidity AC + fresh air + water cooling + gas circuits, closed-loop control); monitoring perception (temperature/humidity, vibration, magnetic field sensors); intelligent management (B/S monitoring software, data analysis, alarms, remote access, dual-room networking); decoration (clean anti-static interior).
8. Detailed Technical Design
8.1 Shielding Shell System
Wall and ceiling shielding: Q235B cold-rolled steel plates, 2.0mm standard (3.0mm reinforced at door openings/corners for TEM); yield ≥235MPa, tensile 370-500MPa, conductivity ≥10MS/m, relative permeability ≥200; rust-removed/phosphated with epoxy primer; continuous full welding (weld height per spec, no breakpoints); shielding effectiveness: SEM Class C, TEM Class B with power-frequency magnetic attenuation.
Floor shielding: shielded steel plate laid over the structural floor with lapping/welding per spec, forming the six-sided enclosure with walls.
Manual shielding door: SEM room door and TEM room door with full-perimeter beryllium copper gasket sealing, consistent with wall shielding.
Shielding observation window (TEM): 800×800mm, copper mesh sandwich structure, shielding consistent with walls, light transmittance per spec.
Power filters: per room configuration (SEM/TEM), filtering incoming power lines with specified insertion loss.
Signal filters: for network/signal lines per room configuration.
Cutoff waveguide windows: ventilation waveguides per room configuration, allowing airflow while attenuating electromagnetic signals.
Equipotential grounding: grounding copper bars, down conductors, grounding resistance ≤1Ω per spec.
8.2 Power Distribution and Control System
– Main power control box per room (SEM/TEM): total breaker, branch circuits for power/environment equipment, protections (overload, short-circuit, leakage), SPD;
– Dedicated control boxes: SEM environment control box; TEM environment/gas integrated control box — with PLC, IO modules, contactors and protection components for automated linkage;
– Core components: controllers, acquisition modules, contactors, breakers — industrial-grade with common specifications.
8.3 Interior Decoration
– Anti-static raised floor (per room configuration); color steel panel wall finish; clean suspended ceiling; lighting and switches/sockets; skirting and trim — anti-static, dust-proof, easy-clean.
8.4 Core Auxiliary Equipment
– SEM room: vacuum mechanical pump; microscope-dedicated water chiller (600×600mm); refrigeration compressor (698×698mm); 2 all-steel vibration-damping sample tables; 2 equipment acoustic/vibration enclosures;
– TEM room: E-Cabinet microscope control cabinet; gas pressure unit (precise automatic regulation); return-air treatment unit.
8.5 Environment Monitoring and Regulation
– Sensors: temperature/humidity; vibration; power-frequency magnetic field (TEM room dedicated);
– Precision constant temperature/humidity AC per room (SEM ±0.5℃/±5%RH; TEM ±0.2℃/±2%RH);
– Fresh air purification system per room maintaining positive pressure and cleanliness.
8.6 Display and Monitoring Software
– Environment data touch screens per room;
– Monitoring software: B/S architecture, real-time display, data analysis, alarm management, remote access, dual-room networking; authorization per license.
8.7 Cables and Auxiliaries
Power cables, signal cables, pipes and installation auxiliaries per design.
9. Recommended Configuration and Preliminary Budget
9.1 Configuration Summary
| System | SEM Room | TEM Room |
|---|---|---|
| Shielding shell | Class C, 2.0mm welded, door, filters, waveguides, grounding | Class B, 2.0/3.0mm, observation window 800×800mm, low-magnetic |
| Power/control | Main power box + environment control box | Main power box + environment/gas integrated control box |
| Decoration | Raised floor, color steel walls, clean ceiling, lighting | Same (per TEM layout) |
| Auxiliary equipment | Vacuum pump, water chiller, compressor, 2 sample tables, 2 acoustic enclosures | E-Cabinet, gas pressure unit, return-air unit |
| Environment | ±0.5℃/±5%RH, fresh air, vibration monitoring | ±0.2℃/±2%RH, fresh air + return air, magnetic field monitoring |
| Monitoring | Touch screen + B/S software, dual-room networking | Same |
9.2 Quotation Notes
The list covers the complete SEM and TEM shielding room systems per the design; quantities per drawings. The quotation includes equipment, installation, commissioning, testing, acceptance, training and after-sales; transport and tax itemized. All reference prices in this solution are in RMB (CNY) only and are for reference purposes; a formal quotation is issued after configuration confirmation.
10. Technical Specifications
10.1 System Performance Summary
| Item | SEM Room | TEM Room |
|---|---|---|
| Shielding | Class C | Class B + low-magnetic (power-frequency attenuation) |
| Enclosure | Welded steel 2.0mm | Welded steel 2.0/3.0mm reinforced |
| Temperature | ±0.5℃ | ±0.2℃ |
| Humidity | ±5%RH | ±2%RH |
| Observation window | — | 800×800mm shielded |
| Vibration | Monitored, damped | Micro-vibration monitored |
| Magnetic field | — | Power-frequency monitored |
| Grounding | ≤1Ω | ≤1Ω |
| Monitoring | B/S software, dual-room networking | Same |
10.2 Key Component Specifications
| Component | Specification |
|---|---|
| Steel plate | Q235B, 2.0/3.0mm, ≥200 permeability, ≥10MS/m |
| Shielding door | Full-perimeter beryllium copper gasket |
| Power filter | Per room, specified insertion loss |
| Waveguide window | Cutoff type per airflow spec |
| Constant AC | ±0.2~0.5℃, ±2~5%RH |
| Sensors | Temperature/humidity, vibration, magnetic field |
11. Key Advantages and Customer Value
11.1 Professional Shielding Performance
Six-sided welded enclosure with Class B/C shielding and low-magnetic capability for TEM — stable imaging free from electromagnetic interference.
11.2 High-Precision Environment Control
Tight temperature/humidity control (±0.2℃/±2%RH for TEM), vibration damping and cleanliness — environmental parameters within microscope limits.
11.3 Safe and Reliable Power and Control
Graded distribution with protection and PLC-based linkage control — stable, safe power for the microscope and auxiliaries.
11.4 Clean Professional Interior
Anti-static, dust-proof, easy-clean decoration — protecting the microscope and samples.
11.5 Intelligent Unified Management
B/S monitoring with real-time parameters, alarms, data analysis and remote access — efficient dual-room management.
11.6 Full-Process Service
Design, construction, testing, acceptance, training and after-sales with 7×24 support — worry-free delivery and operation.
12. Technical Q&A (50+ Items)
12.1 Shielding Questions
Q1: Why does an electron microscope need a shielding room?
A: External electromagnetic fields, temperature/humidity fluctuations, vibration, dust and static affect electron beam trajectory — causing imaging drift, blur and resolution loss; the shielding room controls these factors within equipment limits.
Q2: What is the difference between Class B and Class C shielding?
A: Class B provides higher shielding effectiveness (required for TEM’s higher sensitivity); Class C is standard for SEM. The TEM room also attenuates power-frequency magnetic fields for low-magnetic operation.
Q3: How is the enclosure built?
A: Welded six-sided steel enclosure (walls, ceiling, floor) with continuous full welding — no breakpoints; doors, window, filters and waveguides complete the shielding.
Q4: Why is the floor also shielded?
A: Magnetic fields penetrate from below; the shielded floor completes the six-sided Faraday cage.
Q5: Why relative permeability ≥200?
A: High-permeability steel provides magnetic shielding for low-frequency fields — essential for the TEM’s low-magnetic requirement.
Q6: How is the door shielded?
A: Full-perimeter beryllium copper gaskets maintain electrical continuity when closed, matching wall shielding.
Q7: What is the observation window for?
A: The 800×800mm shielded window (copper mesh sandwich) allows observation while maintaining shielding.
Q8: How do power and signal lines enter without breaking shielding?
A: Through power and signal filters that pass the lines while attenuating conducted interference.
Q9: How is ventilation provided?
A: Cutoff waveguide windows allow airflow while attenuating electromagnetic signals above cutoff.
Q10: What is the grounding requirement?
A: Equipotential grounding with resistance ≤1Ω — essential for shielding effectiveness and electrical safety.
12.2 Environment Control Questions
Q11: Why tight temperature control?
A: Temperature fluctuations cause sample drift and optical path deviation in the microscope; ±0.2-0.5℃ control maintains stability.
Q12: Why humidity control?
A: Humidity affects sample integrity and electron optics; controlled within ±2-5%RH per room class.
Q13: How is vibration controlled?
A: Vibration-damping sample tables, acoustic/vibration enclosures for pumps/compressors and monitoring — within equipment limits.
Q14: Why fresh air positive pressure?
A: Positive pressure prevents unfiltered outside air and dust ingress, maintaining cleanliness.
Q15: What is the return-air unit for (TEM)?
A: It processes return air to maintain temperature/humidity uniformity and cleanliness per the room layout.
Q16: How is the gas circuit controlled (TEM)?
A: The gas pressure unit provides precise automatic regulation for the microscope’s pneumatic operations.
Q17: What sensors monitor the environment?
A: Temperature/humidity, vibration and (TEM) power-frequency magnetic field sensors feed the monitoring system.
Q18: How are anomalies alerted?
A: The monitoring software triggers alarms on out-of-range parameters with records and notifications.
12.3 Power and Control Questions
Q19: How is power distributed?
A: Main power box distributes and protects; dedicated control boxes (environment; environment/gas for TEM) provide automated linkage via PLC.
Q20: What protections exist?
A: Overload, short-circuit, leakage protection and SPD — safe power for the microscope and auxiliaries.
Q21: Why PLC-based control?
A: Reliable automated linkage of environment, gas and auxiliary equipment with expandable IO.
Q22: Is the power supply stable?
A: Graded distribution with protection and, where required, voltage stabilization considerations — stable for precision instruments.
Q23: Can the system integrate with building management?
A: Yes — monitoring interfaces support integration with BMS and remote platforms.
12.4 Auxiliary Equipment Questions
Q24: What does the vacuum pump do (SEM)?
A: Provides vacuum for the microscope column; mounted with vibration/acoustic enclosure.
Q25: Why a dedicated water chiller?
A: Cools the microscope’s internal components with precise water temperature control.
Q26: What is the compressor for (SEM)?
A: Supports cooling requirements per the room design; vibration-isolated.
Q27: What are the sample tables?
A: All-steel vibration-damping tables for stable sample preparation and microscope peripherals.
Q28: What is the E-Cabinet (TEM)?
A: The microscope control cabinet housing electronics per the TEM configuration.
12.5 Monitoring and Software Questions
Q29: What does the monitoring software show?
A: Real-time temperature, humidity, vibration, magnetic field and equipment status with historical data and alarms.
Q30: Is remote access supported?
A: Yes — B/S architecture enables remote viewing and management.
Q31: How is data stored?
A: Historical data stored with query and export for analysis.
Q32: Can both rooms be managed together?
A: Yes — dual-room networking provides unified management.
Q33: How are users authorized?
A: Per-license authorization with graded permissions.
12.6 Construction and Acceptance Questions
Q34: What is the construction period?
A: Typically 30-45 days per room (shell, decoration, equipment, commissioning); adjustable per site.
Q35: How is shielding verified?
A: Shielding effectiveness tested per standards (Class B/C) with third-party reports where required.
Q36: How is the environment verified?
A: Temperature/humidity stability, vibration and magnetic field measured per spec at acceptance.
Q37: What documentation is delivered?
A: As-built drawings, test reports, certificates, operation manuals and after-sales card.
Q38: Does construction affect surrounding areas?
A: Work is contained with protection and coordination; welding and noise controlled.
Q39: Who performs the installation?
A: Our professional teams with shielding room experience and certified personnel.
Q40: What is the warranty?
A: Typically 1-2 years with free repair of non-artificial faults; lifetime cost-price maintenance.
12.7 O&M Questions
Q41: What daily checks are needed?
A: Monitor parameters via software; check AC, sensors and alarms; periodic filter and gasket inspection.
Q42: How often is shielding retested?
A: Recommended periodically (e.g., annually) or after modifications — per customer requirements.
Q43: What spares are recommended?
A: Filters, gaskets, sensors, fuses and control components — stocked for fast replacement.
Q44: What is the response time?
A: 7×24 support; remote within 1 hour; on-site per region; urgent faults prioritized.
Q45: What training is provided?
A: Operation, monitoring software, maintenance and emergency handling with materials.
12.8 Additional Questions
Q46: Can the room be expanded?
A: Yes — reserved interfaces support adding equipment, sensors and functions.
Q47: Is the room suitable for other precision instruments?
A: The shielding and environment design suits other sensitive instruments (SEM/TEM, mass spectrometers, etc.) with configuration adaptation.
Q48: How is cleanliness maintained?
A: Positive pressure fresh air, clean decoration and dust control measures.
Q49: What are the power requirements?
A: Per design with dedicated circuits for the microscope and auxiliaries; stabilized supply per spec.
Q50: How does the room improve microscope performance?
A: Stable electromagnetic, thermal and vibration environment — sharper imaging, higher resolution and longer equipment life.
Q51: How is the project started?
A: Survey (room, equipment, drawings) → design → contract → construction → testing/acceptance → training; dedicated project manager.
Q52: What are the total costs?
A: Shielding + power/control + decoration + auxiliaries + environment + monitoring + services + transport/tax; final quotation after design confirmation.
13. Construction Schedule
13.1 Overall Period
Approximately 30-45 working days per room from mobilization to acceptance: preparation (3), shell construction (10-15), decoration (7-10), equipment installation (5-7), commissioning and testing (4-5), training and acceptance (2); dual-room projects can parallelize.
13.2 Stage Schedule
| Stage | Work | Days | Responsible |
|---|---|---|---|
| 1. Preparation | Survey, design, material incoming, disclosure | 3 | Engineer |
| 2. Shell construction | Walls/ceiling/floor welding, doors/window/filters/waveguides, grounding | 10-15 | Shell team |
| 3. Decoration | Raised floor, walls, ceiling, lighting | 7-10 | Decoration team |
| 4. Equipment installation | Power/control, auxiliaries, AC, fresh air, sensors | 5-7 | Teams |
| 5. Commissioning and testing | Environment control, alarms, shielding test, software | 4-5 | Engineers |
| 6. Training and acceptance | Training, acceptance with documentation | 2 | PM |
13.3 Schedule Assurance
Experienced shielding room teams; advance production of long-lead equipment; parallel work areas; daily plan review; coordination with the client; contingency arrangements.
14. Construction Organization and Quality/Safety Measures
14.1 Organization Structure
– Project manager: overall responsibility, client interface, progress/quality/safety;
– Technical leader: design, welding supervision, commissioning, testing;
– Teams: shell welding, decoration, electrical, HVAC, instrumentation;
– QC/safety officer: quality inspection, third-party testing coordination, safety supervision.
14.2 Pre-Construction Preparation
1. Technical: survey (room dimensions, equipment layout, power), design confirmation, disclosure;
2. Materials: incoming inspection (steel plates, doors, filters, equipment with certificates);
3. Site: coordinate access, power, work areas and protection of surrounding facilities.
14.3 Key Processes
– Shell: continuous full welding with weld quality inspection, no breakpoints; door/window/filter/waveguide installation with sealing; grounding with resistance test;
– Decoration per clean-room standards; equipment installation per drawings with protection;
– Commissioning: environment control verification, alarm tests, shielding effectiveness test, software configuration.
14.4 Quality Control
– Three-level inspection; key control points: weld continuity, door gasket contact, grounding resistance (≤1Ω), filter insertion loss, environment parameters, shielding test results;
– Third-party shielding/environment testing where required; as-built documentation.
14.5 Safety Management
– Welding safety (fire watch, permits, ventilation); electrical safety (lockout/tagout, certified work); high-altitude safety; PPE;
– Emergency plans for injury, fire and equipment damage.
14.6 Civilized Construction
– Clean site, finished product protection, noise control, compliance with site rules; coordination with other contractors.
15. After-Sales Service
15.1 Warranty Commitment
Typically 1-2 years with free repair/replacement of non-artificial quality problems; lifetime cost-price maintenance after warranty.
15.2 Response Mechanism
7×24 hotline; remote guidance within 1 hour; on-site per region (urban 4h); urgent faults prioritized.
15.3 Service Content
Periodic inspection (shielding, gaskets, AC, sensors, grounding), preventive maintenance, monitoring software support and training refreshers.
15.4 After-Warranty Services
Paid maintenance at cost, spare parts supply, expansion and upgrade services.
16. Training Plan
16.1 Audience and Objectives
Laboratory and O&M personnel: operate the environment system, use monitoring software, perform daily checks and handle common alarms.
16.2 Content
Room systems overview; environment control operation; monitoring software; alarm handling; maintenance essentials; safety procedures.
16.3 Methods and Materials
On-site training plus documentation and videos; Q&A; repeat sessions per request.
16.4 Assessment and Documentation
Practical assessment; qualified personnel certified; manuals, drawings, test reports and after-sales card delivered.
15. After-Sales Service
15.1 Warranty Commitment
The overall project warranty period is 2 years from the date of completion acceptance; core equipment has a 3-year warranty. During the warranty period, all failures and damage caused by product quality or construction process problems are repaired and parts replaced free of charge. After the warranty period, lifetime cost-price maintenance is provided, charging only parts cost and basic labor, ensuring long-term stable system operation.
15.2 After-Sales Response Mechanism
– A 7×24 after-sales hotline receives fault reports and technical consultations at any time;
– Within the urban area: respond within 2 hours, technicians on site within 4 hours;
– Suburban and surrounding areas: respond within 4 hours, personnel on site within 8 hours;
– General faults resolved on the spot; complex faults solved within 24 hours with a solution;
– Emergency faults get a green channel with priority dispatch of personnel and parts.
15.3 Periodic Inspection and Maintenance
During the warranty period, a free on-site inspection is provided every six months, with a comprehensive maintenance inspection annually. Inspection contents include equipment operating status, connection firmness, sealing and rust conditions, filtering/grounding performance and safety devices. After each inspection, a formal inspection report is issued recording equipment status and maintenance content with optimization suggestions.
15.4 Spare Parts Supply Guarantee
A local spare parts warehouse is established, stocking common wearing parts for quick replacement to shorten fault handling time. For uncommon special parts, a fast supply channel with the factory ensures availability within 48 hours. During warranty, non-artificial-damage spare parts are replaced free; after warranty, parts are charged at cost price without markup.
15.5 System Upgrade and Technical Support
– Free lifetime technical consultation services by phone or online at any time;
– If the customer later needs upgrades or expansions, preferential upgrade solutions and construction services are provided;
– Industry new technology and standard information is regularly pushed to customers.
16. Training Plan
16.1 Training Objectives and Audience
Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.
Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.
16.2 Tiered Training Content System
Level 1: Basic operation training (1 day)
– Basic principles: system concepts, structure composition, performance indicators;
– Daily operation standards: correct operation of equipment, control and safety systems;
– Daily inspection contents: daily/weekly/monthly check items;
– Safety precautions: usage prohibitions and emergency handling procedures.
Level 2: Maintenance training (1 day)
– Detailed structure of each subsystem and working principles;
– Daily maintenance methods: cleaning, fastening checks, routine care;
– Common fault identification and simple handling;
– Emergency handling procedures for power failure, fire and equipment faults.
Level 3: Advanced management training (as needed)
– Performance influencing factors and how to avoid degradation;
– Upgrade and expansion knowledge and specification requirements;
– Relevant national standards interpretation.
16.3 Training Methods and Schedule
– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;
– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.
16.4 Training Assessment and Documentation Delivery
– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;
– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.
17. Anonymous Typical Project Scenarios
All project scenarios below are anonymous, generalized examples compiled from typical industry deployments; no real customer names, addresses or confidential information are disclosed.
17.1 SEM Shielding Room for a Materials Research Institute
A materials research institute required a stable environment for its scanning electron microscope. The Class C shielding room with welded steel enclosure, vibration-damped pump and compressor installations, and precision temperature/humidity control eliminated imaging drift and noise; the monitoring software provided real-time parameters and alarms, supporting continuous high-quality imaging for research.
17.2 TEM Low-Magnetic Room for a University Laboratory
A university laboratory’s transmission electron microscope required a low-magnetic environment with Class B shielding. The room featured reinforced steel plates at openings, an 800×800mm shielded observation window, power-frequency magnetic field monitoring and a gas pressure unit for the microscope’s pneumatic circuits. Achieved stable high-resolution imaging with temperature held at ±0.2℃; the B/S monitoring system enabled remote management by the lab team.
17.3 Dual-Room Electron Microscopy Center for a Testing Institution
A testing institution built a dual-room electron microscopy center (SEM + TEM). The unified monitoring software managed both rooms with a single platform; shielding and environment testing passed per standards; training enabled the institution’s staff to operate and maintain the rooms independently, supporting commercial testing services.
18. SEO Optimization Section
All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.
18.1 Keyword System
– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;
– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;
– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;
– Brand keywords: KITOZER, Guangzhou Lain.
18.2 SEO Tag System
– Title tag: the article title — Guangzhou Lain KITOZER;
– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;
– H1 tag: the article title;
– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.
18.3 Internal Link Anchor Text
– Core anchor text: technical design solution, system construction;
– Long-tail anchor text: configuration list, technical parameters, construction plan;
– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.
19. Official Contact Information
– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Official Website: https://gdlain.com
– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China
For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.