Table of Contents
Toggle1. Cover / Document Information
– Document Title: High-Load Fast Charging Station Risk Prevention and Control System Technical Design Solution
– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Date: August 2026
– Version: V1.0
– Project Type: Technical design solution for High-Load Fast Charging Station Risk Prevention and Control System
2. Table of Contents Structure
1. Company Introduction
2. Project Overview
3. User Requirement Analysis
4. Overall Design Description
5. Detailed System Design and Product Technical Parameters
6. Project Quotation and Configuration List
7. Core Solution Advantages
8. Technical Q&A
9. Construction Schedule Plan
10. Construction Organization Plan
11. After-Sales Service System
12. Operation and Maintenance Training Plan
13. Typical Project Cases
14. SEO Optimization System and Website Backend Configuration
15. Contact Information
3. Company Introduction
3.1 Company Development Overview
Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.
After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.
3.2 Core Business System
The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:
– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;
– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;
– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;
– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.
3.3 Brand and Qualification Honors
The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.
3.4 Core Competitive Advantages
1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;
2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;
3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;
4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.
4. Project Background and Objectives
4.1 Project Background
With the rapid growth of new-energy vehicles, high-power fast-charging stations (120kW+) have become the mainstream in city cores, highway service areas and commercial complexes. High charging currents generate large heat at busbars, terminals and charging gun heads; aging stations (over 3 years) suffer oxidized contacts and degraded heat dissipation; unattended stations lack real-time inspection; extreme weather compounds the risk. Most stations still rely on manual periodic inspection — risk discovery lags and disposal efficiency is low. This project builds an intelligent, automated risk prevention and control system for high-load fast-charging stations.
4.2 Construction Objectives
Safety risk prevention: full-point real-time temperature monitoring with three-level alarms and temperature-rise-rate warning — moving from post-incident handling to pre-incident prevention. O&M efficiency: second-level alarm push, remote disposal and closed-loop work orders. Intelligent upgrade: AI load forecasting and cross-validation reducing false/missed alarms, adapting to large-scale cluster operation.
4.3 Project Scope
Two typical high-risk pilot stations: Pilot A — high-load unattended fast-charging station: 8 x 120kW dual-gun DC chargers with box transformer and LV distribution, 24h operation, no night staff. Pilot B — old existing fast-charging station: 6 x 60kW DC chargers, over 5 years in service with aging and contact oxidation. Coverage: perception layer deployment, edge control layer installation, linkage execution layer integration, cloud platform access and terminal application configuration.
4.4 Core Significance
Raise intrinsic safety (24h no-blind-spot control compensating manual inspection gaps and unattended blanks); cut whole-life O&M cost (remote control, precise dispatch, front-loaded intervention); extend equipment life 30%+ (temperature control avoids accelerated aging); provide a replicable standardized safety-control model for the industry.
5. User Requirement Analysis
5.1 High-Risk Scenario Coverage
High-load stations: high-frequency, high-precision monitoring of busbars, terminals, power modules and gun heads; capture rapid temperature rise before thresholds; no impact on charging operation; reliable long-term monitoring. Old stations: flexible sensor deployment without major retrofit; personalized thresholds and device-characteristic adaptation; cross-comparison identifying deteriorating devices for planned maintenance. Unattended stations: fully automatic monitor/alarm/dispose with offline autonomy; APP/SMS push with precise location; remote disposal. Load fluctuation and extreme weather: adapt from low to full load without false alarms; dynamic threshold correction with environmental data (e.g. pre-cooling above 40 degC).
5.2 Graded Alarm and Linkage
Three-level thresholds: blue 60 degC (cooling, attention), yellow 75 degC (power reduction, maintain service), red 85 degC (immediate power cut + fire suppression); temperature-rise-rate warning (>=5 degC/min sustained) for early intervention; cross-device verification (cluster deviation >20%) against false/missed alarms; configurable automatic linkage with manual override.
5.3 Intelligent Prediction and Proactive Control
AI load forecasting (24h ahead) based on historical data, weather and holidays; proactive intervention before high-load periods (advance cooling, pre-lowered baseline, dynamic power allocation).
5.4 Full-Chain O&M Closed Loop
Second-level alarm push with complete details; remote device control with permission and logs; automatic work-order generation, intelligent dispatch, disposal feedback and archive; data visualization and daily/weekly/monthly reports.
6. Design Principles and Applicable Standards
6.1 Design Principles
Safety and reliability first: industrial-grade wide-temperature devices; “fail-safe” logic (system faults never affect original charging equipment and trigger fault alarms); multi-verification linkage avoiding mis-operation; redundant power/communication. Advanced yet practical: mature IoT/edge/AI technologies solving real pain points with simple operation. Extensible and compatible: modular layered architecture; smooth expansion of stations/points/modules; multi-brand charger and third-party system integration. Easy O&M: standardized modular devices, self-diagnostics, online upgrade. Compliant: strict adherence to national/industry standards for electrical safety, fire protection, EMC and data security.
6.2 Applicable Standards
GB 50966 (charging station design), GB/T 29316 (DC charging stations), GB/T 36278 (charging facility O&M), GB 16895 series, GB 50116 (fire alarm design), DL/T 1498 (online monitoring), GB/T 36421 (industrial IoT instruments), GB 4943 series; local provincial charging-infrastructure regulations; company enterprise standards.
7. System Architecture and Working Principle
7.1 Four-Layer / Edge-Cloud Three-Level Architecture
Edge (perception + execution): temperature, electrical and environmental data collection plus linkage actions (cooling, power reduction, power cut, fire suppression). Edge control layer: local gateway aggregating all station data — local cleaning, logic judgment, alarm determination and linkage control with offline autonomy (sub-100ms local response). Cloud (platform + application): multi-station data aggregation, big-data analysis, AI model training, work-order management and visualization. Routine safety logic runs locally for speed; complex functions run in the cloud for global intelligence.
7.2 Perception Layer Design
Core heat-point temperature monitoring (DC busbars A/B/C, input/output terminals, gun heads); cabinet temperature/humidity sensors in charger cabinets, distribution cabinets and transformer rooms; three-phase electrical acquisition at main incoming and branch circuits for load analysis and temperature-load correlation; outdoor weather sensor for environmental correction and extreme-weather warning.
7.3 Edge Control Layer
One industrial edge gateway per station in a dedicated box (wired LAN + 4G dual-link); downlink LoRa wireless to passive sensors and RS485 to sensors/power modules/actuators; local data preprocessing (cleaning, filtering, calibration); complete offline autonomy with >=30 days local storage and auto-retransmission; visual rule engine (100+ rules) for threshold/linkage configuration without coding.
7.4 Linkage Execution Layer
Four classes: intelligent variable-speed fans (light anomalies); charger power control modules (moderate anomalies — stepless power reduction); smart breakers with shunt trip (severe anomalies — emergency power cut); in-cabinet clean-agent fire suppression (severe anomalies — initial fire fighting, linked with power cut).
7.5 Cloud Platform and Terminals
Microservices platform (data access/storage/alarm/work-order/AI/visualization/system management); 100+ stations and 10,000+ points; Web management terminal, mobile APP and local touchscreen for different roles.
7.6 Working Principle
Sensors collect temperature/electrical/environment data to the edge gateway; the gateway runs three-level temperature alarms, temperature-rise-rate detection and cross-validation, triggering fan speed-up, power reduction, breaker trip and fire suppression as graded; alarms and data upload to the cloud in real time (batch for routine data); the platform performs AI load forecasting, work-order closed-loop management, statistics and multi-station unified management; APP pushes alarms within 1 second and supports remote disposal.
8. Detailed Technical Design
8.1 Graded Alarm and Linkage Logic
Blue (60 degC, >=30s, multi-source verified): fan to max speed; blue alert pushed with point and temperature; auto-release below 55 degC for 3 min. Yellow (75 degC, >=10s, or rising from blue): fans full speed + power reduced to 50% rated; high-priority push with sound/light; auto work order; recover below 65 degC for 5 min with stepwise power recovery. Red (85 degC or predicted): immediate breaker trip of the circuit, fire suppression activation, site sound/light alarm, highest-priority push + phone call, emergency work order; state locked — manual on-site inspection and authorized reset only. Temperature-rise warning (>=5 degC/min for 2 cycles above normal range): early warning even below 60 degC, pre-cooling, denser sampling — catching contact-resistance/short-circuit fast rises early. Cross-validation: cluster average deviation >20% with no load difference flags suspected sensor/data anomaly (high -> verify, low -> sensor fault) — no severe linkage on single-point deviation.
8.2 Perception Devices (Pilot A)
Passive wireless temperature sensors (24, busbar): CT induction powered (start >=5A, 5-600A range, no battery); -40~+125 degC, +-0.5 degC (-20~80 degC); 0.1 degC resolution; default 1 sample/10s, 1/s on alarm; LoRa 433MHz <=17dBm, >=200m open / >=50m through walls; IP65; UL94-V0; clamp mounting, live installation; 45x35x20mm; AC10kV/1min insulation; MTBF >=50,000h. Patch PT100 (48): A-class Pt100, -50~+150 degC, +-0.15 degC (0-100 degC); 3-wire; Teflon shielded leads 2m; 10x10mm patch with thermal paste (>=10W/m·K); IP67; 304 stainless + silicone potting; response <=3s; drift <=0.1 degC/year. Cabinet temp/humidity (10): -20~+80 degC +-0.3 degC; 0-100%RH +-3%RH; RS485 Modbus-RTU; DC12-24V <=0.5W; IP30; DIN/wall mount. Gun-head NTC (16): 10k ohm @25 degC, B=3950K; -40~+120 degC +-0.5 degC; response <=2s; 1.5m silicone leads; IP67; AC3kV; >=10,000 plug cycles. Three-phase acquisition modules (2): 0.5 class V/I/P, 1.0 energy; 2-31 harmonic; RS485; AC/DC85-265V; 96x48x75mm. Outdoor weather sensor (1): temp/humidity/wind speed/light 4-in-1; -40~+80 degC, 0-30m/s, 0-200,000Lux; RS485; IP65; ASA housing; wind resistance <=75m/s; MTBF >=20,000h.
8.3 Edge Control Devices
Edge gateway (1): quad-core ARM Cortex-A53 1.2GHz; 2GB DDR4; 16GB eMMC (TF to 128GB); industrial embedded Linux; 2x GE + 4G full-netcom + LoRa RX (-140dBm) + 4x RS485 (15kV ESD) + 4DI/4DO (AC250V/5A); 200+ sensors; 100+ rules; >=30 days offline storage; DC9-36V <=10W; IP30; fanless metal; -40~+70 degC; GB/T 17626 level 4; MTBF >=50,000h; encrypted transmission, device authentication, remote firmware upgrade. 10″ touchscreen (1): 1280×800 TFT; resistive (glove-friendly, >=10M taps); quad-core 1GHz; 1GB/8GB; Linux; RS485 + Ethernet + USB; DC24V <=8W; IP65 front panel; embedded 260x178mm.
8.4 Linkage Execution Devices
Variable-speed fans (10): 120x120x38mm axial AC220V; 0-10V/PWM stepless 1000-3200rpm; >=120CFM; 110Pa; <=45dB; dual ball bearings; IP54; PBT UL94-V0 blades; life >=50,000h; guards and dampers included. Power control modules (8): for 120kW chargers; 0-100% stepless, +-5%, response <=1s; analog/digital compatible with mainstream protocols; RS485 Modbus; DC12V <=2W; opto-isolated; AC2.5kV; MTBF >=20,000h; fail-safe keeps current power on fault. Smart MCCBs (9): AC400V; branch 63A / main 400A; 3P; 25kA; C-curve; motorized remote operation; DC24V shunt trip <=50ms; 1NO+1NC aux; optional RS485; overload/short/phase-loss protection; mech >=10,000 / elec >=5,000 cycles; 3C, GB 14048.2. In-cabinet aerosol suppression (10): 100g S-type clean agent; total flooding <=1m3; efficiency >=95% (A/B/E); dual start — thermal 85 degC (<=3s) + electric DC24V (<=1s); insulation >=100kV/m; atmospheric pressure; life >=6 years; GB 50370 certified. Sound/light alarm (2): red LED strobe 1Hz >=1000cd; buzzer >=110dB @1m; AC220V <=15W; IP65; life >=50,000h.
8.5 Platform and Terminals
Cloud platform (1 set, SaaS): >=100 stations / 10,000 points; >=50 concurrent users; real-time refresh <=3s; alarm-to-APP <=1s; raw data >=1 year, alarms/work orders permanent; query <=2s; modules: real-time monitoring (map/topology), graded alarms, work orders, AI forecasting, data analysis, device management, system management; visualization (map, trends, bars/pies); daily/weekly/monthly reports (Excel/PDF); H5 mobile; standard API for third-party platforms; classified-protection 2.0 level-3; availability >=99.9%; lifetime free upgrades. APP accounts (10): Android 6+/iOS 12+; multi-level alarm push (lock-screen, sound+vibration); map navigation; remote control (graded permission); work-order handling; real-time/history data; QR inspection; offline cache; phone binding, fingerprint/face login. AI load forecasting (2 station-years): initial training + daily incremental iteration; 24h forecast average accuracy >=90%; hourly/daily forecasts; high-load periods marked red; annual evaluation report.
8.6 Pilot B Differences
Old-station variant: 18 passive wireless sensors, 36 patch PT100, 8 cabinet temp/humidity, 6 gun-head NTC (single-gun), 2 acquisition modules, 6 magnetic portable sensors (lithium battery >=3 years, LoRa, >=5kg magnet force); 7″ touchscreen (800×480, dual-core 800MHz); 8 fans, 6 power modules, 7 MCCBs, 8 x perfluorohexanone (FK-5-1-12) suppression units (500ml, electro 79 degC thermal start, response <=100ms, ODP=0, GWP extremely low, life >=10 years, IP65, fire-certified), 1 sound/light alarm; platform node license and AI model tailored for aged-device characteristics.
8.7 Auxiliaries
RVSP 2×1.0mm2 shielded signal cable (800m), RVV 3×1.5mm2 power cable (300m), LoRa + 4G antenna set (IP65), installation accessory pack, outdoor waterproof box (IP65, 400x300x200mm, W-class anti-corrosion), dual industrial switch-mode power supplies (AC85-265V, DC24V/12V dual output, 100W, +-1%, ripple <=100mV, >=88%, 3C/CE, MTBF >=100,000h).
9. Recommended Configuration and Preliminary Budget
9.1 Configuration Summary
Pilot A (unattended 120kW station): 24 passive wireless sensors, 48 patch PT100, 10 cabinet temp/humidity, 16 gun-head NTC, 2 three-phase modules, 1 weather sensor; 1 edge gateway, 1 10″ touchscreen; 10 fans, 8 power modules, 9 smart MCCBs, 10 aerosol units, 2 sound/light alarms; cloud platform 1 set, 10 APP accounts, AI forecasting 2 station-years; cables/antennas/boxes/PSUs/accessories. Pilot B (old station): 18/36/8/6/2/6 sensor set; 1 gateway + 7″ screen; 8 fans, 6 modules, 7 MCCBs, 8 perfluorohexanone units, 1 alarm; platform node license + AI 1 station-year; auxiliaries.
9.2 Budget Notes
Price includes equipment, platform access, installation, commissioning, training and 1-year warranty; optional extension warranty (2/3 years), additional stations/points, custom development and third-party integration quoted separately. Tax-inclusive in RMB (CNY) only — no foreign-currency conversion. Total schedule 15 calendar days for two pilot stations (parallel site work).
10. Technical Specifications
10.1 System Specification Summary
| Item | Specification |
|---|---|
| Architecture | Four-layer / edge-cloud three-level: perception + edge gateway (local sub-100ms, offline autonomy) + cloud platform + terminals |
| Alarms | Blue 60 degC (fan max), Yellow 75 degC (power 50%), Red 85 degC (trip + fire); rate warning >=5 degC/min; cross-validation cluster deviation >20% |
| Sensors | Passive wireless (CT 5-600A, LoRa 433MHz, IP65, +-0.5 degC, MTBF 50,000h); PT100 (A-class, 3-wire, IP67); cabinet TH (RS485, +-0.3 degC/+-3%RH); NTC gun (10k/3950K, IP67); 3-phase module (0.5 class); weather 4-in-1 (IP65) |
| Edge gateway | ARM A53 quad 1.2GHz; 2GB/16GB; 2 GE + 4G + LoRa (-140dBm) + 4 RS485 + 4DI/4DO; 200+ sensors; 100+ rules; 30-day offline; DC9-36V; -40~+70 degC; MTBF 50,000h |
| Actuators | Fans 120CFM AC220V 0-10V/PWM; power modules 0-100% +-5% <=1s; MCCB 25kA DC24V shunt <=50ms; aerosol 100g S-type (85 degC/DC24V, GB 50370); perfluorohexanone 500ml (79 degC, <=100ms, ODP=0); alarm 110dB IP65 |
| Platform | SaaS; 100+ stations/10,000+ points; 50 users; refresh <=3s; push <=1s; data >=1 year; classified protection 2.0 L3; 99.9% availability; API; lifetime upgrades |
| APP | 10 accounts; Android 6+/iOS 12+; push/map/remote control/work order/offline cache; fingerprint/face |
| AI forecast | LSTM + attention; 24h accuracy >=90%; daily incremental training; hourly/daily |
| Environment | Industrial wide-temp -40~+70 degC devices; GB/T 17626 EMC; IP65 outdoor |
| Warranty | 1 year (2/3-year extension); 7×24; emergency 30min response; lifetime maintenance |
10.2 Standards Compliance
GB 50966, GB/T 29316, GB/T 36278, GB 16895, GB 50116, DL/T 1498, GB/T 36421, GB 4943; 3C and fire certifications (GB 50370); classified-protection 2.0 level-3 platform security; per-project acceptance per national electrical and fire codes.
11. Key Advantages and Customer Value
11.1 Technical Advancement
Multi-dimensional perception fusion: temperature + current/voltage + environment “load-environment-temperature” baseline model distinguishes normal vs abnormal temperature rise (e.g. 60 degC normal at full load but abnormal at low load) — far fewer false alarms, no hidden faults missed; wireless + wired hybrid networking. Edge offline autonomy: all safety logic local — millisecond response, full protection even with complete network loss; auto retransmission on recovery. AI deep-learning forecasting: LSTM + attention predicts 24h load; proactive cooling and dynamic power allocation upgrade risk control from post-hoc to pre-emptive. Multi-level cross-validation: single-point self-check, same-device multi-point comparison, cluster horizontal comparison — zero missed alarms with minimized false alarms.
11.2 Safety and Reliability
Three-level progressive protection (warn -> reduce load -> cut power + extinguish) balancing safety with normal operation; industrial-grade wide-temperature devices (30000h+ MTBF); local + cloud dual guarantee with dual data backup.
11.3 O&M Efficiency
Full closed-loop work orders (auto generation, intelligent dispatch, disposal, archive, analysis); remote disposal handles 70%+ of temperature anomalies without field visits; data-driven precise maintenance identifying deteriorating devices and high-risk periods.
11.4 Cost Economy
Prevents major accident losses; extends equipment life 30%+ via intelligent temperature control; cuts manual inspection and staffing (unattended stations fully automated).
11.5 Expansion and Compatibility
Module-independent monitoring/power-control add-ons adapt to most charger brands without replacing equipment; microservices platform scales from single station to thousands; standard API/SDK integrates with existing platforms.
12. Technical Q&A (50+ Items)
12.1 System Principles
Q1: Core working principle?
A: Temperature sensors at core heat points plus current and weather data feed the edge gateway; built-in graded alarm rules and rate algorithms analyze in real time and automatically drive fans, power reduction, breakers and fire suppression; alarms and data upload to the cloud for multi-station monitoring, AI forecasting, work orders and analysis.
Q2: Why edge-cloud instead of pure cloud?
A: Overheat faults develop in seconds; pure cloud depends on network latency/reliability. Edge computing keeps core logic local — millisecond response and full protection offline; cloud adds big-data analysis, AI and global management. The combination is the optimal architecture for industrial safety.
Q3: Temperature-rise-rate vs threshold alarms?
A: Threshold alarms are “arrival-type” (trigger at absolute value); rate alarms are “trend-type” (>=5 degC/min) — catching contact-resistance/short-circuit fast rises 10s-60s earlier, compensating threshold lag.
Q4: How does cross-validation avoid false/missed alarms?
A: Same-model/same-condition devices form a cluster; a point deviating >20% from the cluster average with no load difference is flagged — high deviation triggers verification (not power cut), low deviation marks sensor fault; only multi-point rises matching load are treated as real anomalies.
Q5: How does AI achieve proactive control?
A: Learning historical data plus time/holiday/weather factors, it predicts 24h load; 1-2h before high load it pre-starts cooling, lowers baseline temperature, and dynamically caps per-charger power — preventing total overload and overheating at the source.
Q6: What happens on network loss?
A: All local monitoring, alarms and linkage continue normally (offline autonomy); data cached >=30 days and auto-uploaded on recovery — protection never depends on the network.
12.2 Product Parameters
Q7: Passive sensor power — battery change?
A: CT induction from busbar current (start >=5A, 5-600A) — no battery, no replacement, maintenance-free; battery-powered option (3-5 years) for low/no-current points.
Q8: PT100 vs NTC?
A: PT100: high accuracy/stability/linearity, wide range — terminals and busbars; NTC: small, fast, low cost — gun heads; selection per scenario.
Q9: Gateway capacity and expansion?
A: 200+ wireless sensors plus multiple RS485 channels per gateway; adding points only requires new sensors and simple gateway/platform configuration — no hardware change.
Q10: Do extinguishers damage chargers?
A: No — S-type aerosol and perfluorohexanone are clean agents: residue-free, non-corrosive, non-conductive; perfluorohexanone needs no cleanup — devices can be inspected and reused directly.
Q11: MTBF and warranty?
A: Core devices 30,000h+ (some 50,000h); 1-year free warranty with lifetime maintenance at cost.
Q12: Sensor accuracy?
A: Busbar +-0.5 degC; PT100 +-0.15 degC (0-100 degC); NTC +-0.5 degC (-20~80 degC); cabinet TH +-0.3 degC/+-3%RH.
Q13: Sampling frequency?
A: Default 1/10s; auto-accelerates to 1/s on alarm or fast-rise detection.
Q14: Radio range?
A: LoRa >=200m open field, >=50m through walls; 433MHz license-free ISM; <=17dBm compliant.
Q15: Fire suppression start modes?
A: Aerosol: thermal 85 degC (<=3s) + electric DC24V (<=1s); perfluorohexanone: thermal 79 degC + electric, response <=100ms.
12.3 Installation and Construction
Q16: Power outage needed?
A: Most installation is live-safe: clamp-on wireless sensors mount without de-energizing; patch sensors on terminals also live; only breaker retrofit and busbar wiring need short outages — scheduled at night low-load periods.
Q17: Construction period?
A: 3-5 days per station (install 2-3 + commissioning 1-2); two stations in parallel — total 15 calendar days.
Q18: Does installation affect insulation/safety?
A: No — all sensors insulated (>=10kV), flame-retardant housings, non-contact induction power, shielded insulated leads; insulation test and safety verification after completion.
Q19: Outdoor device durability?
A: IP65+ housings, weatherproof plastics/metal, UV-resistant — >=5-year design life.
Q20: Acceptance standards?
A: Three parts: installation acceptance (points, positions, wiring, firmness), function test (sensor accuracy, alarm logic, linkage actions), platform acceptance (upload, push, work orders, reports); formal report per national standards.
Q21: Live installation safety?
A: Only live-safe operations performed energized (clamp sensors); strong-current work strictly lockout-tagout with supervisor; insulated tools and PPE.
Q22: Wiring requirements?
A: Strong/weak separated >=20cm; shielded single-end grounding; labeled number sleeves matching drawings; outdoor conduits with waterproof bends and sealant.
12.4 O&M Management
Q23: Daily O&M complexity?
A: Maintenance-free design with self-diagnostics; online status and health visible on the platform; faults auto-alarm; simple training suffices — no dedicated administrator.
Q24: Sensor replacement?
A: Standardized plug-and-play: remove old, mount new, re-register ID on the platform; wired sensors re-connect; parameters pre-configured — minimal impact.
Q25: Remote control safety?
A: Role-based graded authorization; full operation logs (operator/time/content/result); critical operations require second confirmation and password; encrypted transmission and identity authentication.
Q26: Data storage and security?
A: Local (>=30 days) + cloud dual storage; encrypted transmission and storage; regular auto-backup; customer owns all data.
Q27: Alarm notification channels?
A: APP push (lock-screen/sound/vibration), SMS (works with APP closed), voice call for red alarms, platform popup + local sound/light — multi-layer guarantee.
Q28: False-alarm suppression?
A: Temporary point alarm shielding with time limit (auto-restore), threshold fine-tuning, all operations logged; false-alarm cases feed algorithm optimization.
12.5 Fault Troubleshooting
Q29: Network down — system works?
A: Yes — local protection fully functional; only remote viewing/upload affected; auto data retransmission after recovery.
Q30: Sensor offline — missed alarms?
A: Device online status monitored; offline beyond set time triggers device-fault alarm; cross-validation with other points and load keeps monitoring reliability.
Q31: Linkage device not acting?
A: Manual test on platform/touchscreen; check gateway-actuator wiring; verify rule configuration; linkage logs record every command and feedback for fast fault location.
Q32: Red-alarm power recovery?
A: State locked — no auto re-energizing; on-site inspection, fault confirmation and authorized manual re-closing only, preventing second accidents.
Q33: Mis-operation risk of breakers?
A: Multi-condition determination before trip; anti-misoperation interlock; emergency manual mechanical trip available.
Q34: How are fan failures detected?
A: Gateway monitors fan control feedback and temperature response; fault alarm raised; modular replacement without body disassembly.
12.6 Platform Functions
Q35: Platform capacity for chain operators?
A: Distributed microservices — theoretically unlimited stations; one map, unified alarms/work orders/reports for hundreds or thousands of stations.
Q36: Custom reports and export?
A: Built-in templates plus custom reports (dimensions/indicators/time range); Excel/PDF export; >=1 year history.
Q37: Integration with existing platforms?
A: Standard RESTful API — no extra cost for standard integration; custom development quoted per effort.
Q38: Mobile access without APP?
A: H5 web version via browser plus full-featured APP; data synchronized.
Q39: AI accuracy with insufficient data?
A: >=3 months history needed; >=90% after one year; generic pre-trained model adapts initially, improving with data accumulation.
Q40: Work-order flow?
A: Alarm -> auto work order -> intelligent dispatch (area/skill/load/distance) -> receive -> on-site disposal with photos/reason -> completion review -> archive -> statistics (frequency, duration, recurrence, efficiency).
12.7 Safety and Compliance
Q41: National standard compliance?
A: GB 50966, GB 50116, DL/T 1498 etc.; 3C and fire certifications; meets regulatory safety-control requirements for charging stations.
Q42: Effect on original charger warranty?
A: None — external add-on scheme: surface-mounted sensors, passive-contact power control, no circuit or core-part modification, no seal breaking.
Q43: Could the system itself cause electrical faults?
A: Full protection (over-voltage/current/short/reverse); opto/relay isolation between control and main circuits; fail-safe design — total system failure cannot endanger charging equipment.
Q44: Value for aged stations?
A: Aged devices have higher overheat risk and random faults — 24h monitoring catches anomalies early; temperature data guides equipment renewal planning.
Q45: Can unattended stations run fully unmanned?
A: Automated safety control removes daily on-site staffing; extreme faults still need mobile O&M crews; recommend a small roving team for multi-station coverage.
Q46: Extreme weather handling?
A: Weather-based threshold correction; pre-cooling above 40 degC; rain/lightning risk monitoring; per design.
Q47: Expansion to more stations?
A: Add edge nodes and point devices; access the same platform — no architecture rework; history data fully compatible.
Q48: Data ownership?
A: Customer owns all operational data; never collected, leaked or commercialized.
Q49: Training provided?
A: Free systematic training (management/operation/O&M roles), full manuals and videos, free refresher and lifetime Q&A.
Q50: Why choose KITOZER/Lain?
A: Edge-offline-autonomous safety architecture, three-level progressive protection, AI proactive control, 70%+ remote disposal, industrial-grade reliability, source-factory customization and full closed-loop service.
13. Construction Schedule
13.1 Overall Schedule (15 Calendar Days for Two Pilot Stations)
| Stage | Work | Duration | Start | End |
|---|---|---|---|---|
| 1 Preparation | Kickoff, survey, point confirmation, drawings, safety disclosure | 3 days | Day 1 | Day 3 |
| 2 Procurement/production | Core equipment production/QC/factory test; auxiliaries; platform initialization | 5 days | Day 3 | Day 7 |
| 3 On-site construction | Sensors, actuators, wiring, gateway/screen/box installation | 4 days | Day 8 | Day 11 |
| 4 Commissioning | Single-device, networking, linkage logic, platform/APP, 72h burn-in | 3 days | Day 11 | Day 13 |
| 5 Acceptance | Customer acceptance, handover, training, warranty start | 2 days | Day 14 | Day 15 |
Two stations constructed in parallel — total period does not scale linearly with station count.
13.2 Stage Details
Day 1-3: kickoff and team assignment; on-site survey (point positions, wiring paths, device mounting, original model/interface verification); deepening design (point layout, topology, wiring diagrams) and safety plan; material list confirmation; crew training and disclosure; tool/PPE preparation. Day 3-7: production/QC/factory tests; auxiliary procurement; platform initialization with station parameters and rules; pre-shipment integration test; packing and dispatch. Day 8-9 (Pilot A): cabinet openings and sensor installation (busbar wireless, patch terminals, gun-head, cabinet TH); actuator installation (fans, breaker retrofit, suppression, alarm); Day 9: wiring (signal + power), gateway/screen/box/PSU installation, terminal tightening, insulation and continuity tests. Day 10-11 (Pilot B): old-equipment dust cleaning, sensor installation, actuator retrofit, gateway installation; wiring, dressing, labeling, safety check. Strong-current work at night low-load periods; weak-current work by day. Day 11-13: single-device power-on tests; gateway networking; three-level alarm and linkage logic tests; rate warning and cross-validation tests; touchscreen functions; cloud platform integration (upload, push, work orders); APP commissioning; 72h continuous burn-in with records. Day 14-15: acceptance per standards; report; document/device handover; operation training; formal delivery; warranty start.
13.3 Key Node Control
Survey completion (point list and drawings signed); device arrival acceptance (quantity/model/appearance/reports); wiring completion (standard, labeled, insulation passed); per-station commissioning (all points normal, linkage accurate); platform integration (upload normal, push timely, functions complete); final acceptance (tests passed, report signed).
13.4 Resources
PM 1, technical lead 1, electrical engineers 2, weak-current workers 2, software engineer 1; tools: electrician kits x2, thermometer, multimeters x2, insulation tester, ladder, drill, cable tie gun.
14. Construction Organization and Quality/Safety Measures
14.1 Organization
Management: PM (first responsible person — progress/quality/safety/cost, client coordination), technical lead (scheme implementation, technical problems, commissioning guidance, process/standard review), quality/safety officer (inspection and supervision). Implementation: electrical crew leader (strong-current installation/wiring/debugging per drawings), weak-current leader (sensors, cabling, labeling), software debug engineer (gateway configuration, platform deployment, integration tests). Logistics: procurement officer (purchase/follow-up/arrival acceptance), warehouse officer (storage and issue control).
14.2 Pre-Construction Preparation
Technical: familiarization with drawings/scheme/standards; disclosure covering every point’s installation method, wiring standard and cautions (especially live-work rules); outage time/area coordination with the operator; special scheme and emergency plan. Materials: check models/quantities/accessories, appearance and basic function; prepare all auxiliaries; verify tool/instrument calibration; PPE (helmets, insulated gloves/shoes, warning signs, extinguishers). Site: mark work area with warnings; verify power/earthing; clean installation positions; confirm as-built vs drawing consistency to avoid rework. Personnel: certified electricians; safety education and disclosure emphasizing lockout-tagout (power off, test, tag, lock); clear division of responsibilities.
14.3 Main Processes and Workmanship
Sensor installation: busbar wireless sensors — clean surface, clamp firmly for reliable induction, antenna toward gateway, uniform three-phase spacing with phase labels; patch PT100 — thermal paste, tight mounting with high-temp ties, leads routed with margin and numbered; gun-head NTC — probe against the terminal carrier, leads fixed along existing channels, shell re-sealed. Gateway/control devices: box mounted firmly (vertical deviation <=3 degrees, waterproof seal outdoors); DIN-rail modules locked, neat spacing; terminals torqued, strong/weak separated; antennas at good signal positions, sealed; touchscreen embedded with sealed frame. Actuators: fans at vents with correct airflow, guards and dampers, shielded speed signal single-end grounded; breakers matched to circuit current, shunt-trip wiring correct, aux contacts reliable; suppression units top-mounted with nozzle downward covering the cabinet, electric wiring polarity correct, thermal probe positioned well. Wiring: check integrity before laying; strong/weak separated >=20cm, perpendicular crossings; duct/ties with margin at bends; crimped terminals with number sleeves matching drawings; shielded single-end grounding; outdoor conduits with waterproof bends and sealant. Commissioning: single-device power-on and accuracy checks; network stability; simulated temperature tests of three-level alarms and linkage timing; cloud/APP integration; 72h continuous run with no drops, no false alarms, no linkage failure.
14.4 Quality Control
Targets: 100% installation pass, 100% wiring correctness, 100% function compliance, 100% first-pass acceptance, zero safety incidents. Three-inspection system (self, mutual, special) gating each process; first-point/first-device samples set the standard before full rollout; technical lead and safety officer supervise key processes (live work, breaker retrofit, fire wiring); records synchronized and traceable; finished-product protection.
14.5 Safety and Civilized Construction
Zero-incident target (no casualties, no equipment damage, no fire, no electric shock). Power-off discipline with lockout-tagout and supervision; temporary power with RCD, one machine one switch one protection; height work with belts and attended ladders; fire extinguishers, no smoking, hot-work permits; PPE (helmets, insulated shoes/gloves); daily safety morning meetings. Tidy material stacking, daily cleanup (work-clean-restore), uniform dress and badges, minimal noise, protection of site facilities.
14.6 Schedule Assurance
Dedicated project team with clear responsibilities and daily progress checks; early technical preparation and confirmed adaptation schemes avoiding on-site redesign; pre-stocked key materials; dedicated material management; contingency plan with 1-day buffer for weather/equipment issues.
15. After-Sales Service
15.1 Warranty Commitment
12-month free warranty from final acceptance (free repair/replacement/commissioning for non-human, non-force-majeure faults — no equipment/labor/travel fees); 2/3-year extension options; exclusions: human damage, unauthorized modification, water/dust ingress, external force, force majeure — paid repair available.
15.2 Graded Fault Response
Level 1 (emergency — system down, core function failure): 30-minute response with phone/remote guidance; on-site urban 2h / suburban 4h; restored within 24h. Level 2 (important — partial device/function failure): 2h response; on-site within 48h if needed. Level 3 (general — minor functions, questions, parameter adjustment): 4h response on workdays; remote resolution within 3 working days.
15.3 On-Site Service Standards
Badge and uniform; advance call confirming fault and arrival; standardized repair with site protection and cleanup; fault cause/result/cautions explained with service form signed by customer; follow-up call within 3 days.
15.4 Spare Parts
Local stock of core devices (gateways, sensors, power modules); >=5-year parts support after model discontinuation; spare-device replacement priority in warranty to minimize downtime.
15.5 Lifetime Maintenance
Lifetime paid maintenance at parts cost + reasonable labor only; free lifetime phone/remote consultation; free minor firmware/platform upgrades.
15.6 Upgrades and Expansion
Platform feature upgrades free for existing customers; AI model and alarm algorithm continuous optimization with periodic updates; custom development quoted per requirements; seamless expansion of stations/points/modules with full history compatibility — no architecture change, no data islands.
15.7 Dedicated Service System
Fixed project contact specialist, O&M engineer and support team with contact info filed; service ledger tracking every request (time, process, solution, result, feedback) with periodic service reports.
15.8 Routine Inspection and O&M
Daily online monitoring by the O&M team (platform status, server load, transmission, online rate, alarm functions); quarterly on-site inspection (equipment, wiring, sensing points, cleaning, calibration, report with findings and suggestions); non-hardware issues fixed on the spot, hardware wear advised per lifetime-maintenance terms.
15.9 Data Security and Backup
Auto scheduled backup (daily/weekly) + manual one-key backup; encrypted transmission; strict role-based access for query/export; no collection, leakage or commercial use of customer data.
15.10 Emergency Support
Customized emergency plans for extreme weather, power loss, network failure and sudden equipment faults; standby duty during holidays/major events; ample spare devices/parts for rapid replacement.
16. Training Plan
16.1 Training Objectives and Audience
Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.
Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.
16.2 Tiered Training Content System
Level 1: Basic operation training (1 day)
– Basic principles: system concepts, structure composition, performance indicators;
– Daily operation standards: correct operation of equipment, control and safety systems;
– Daily inspection contents: daily/weekly/monthly check items;
– Safety precautions: usage prohibitions and emergency handling procedures.
Level 2: Maintenance training (1 day)
– Detailed structure of each subsystem and working principles;
– Daily maintenance methods: cleaning, fastening checks, routine care;
– Common fault identification and simple handling;
– Emergency handling procedures for power failure, fire and equipment faults.
Level 3: Advanced management training (as needed)
– Performance influencing factors and how to avoid degradation;
– Upgrade and expansion knowledge and specification requirements;
– Relevant national standards interpretation.
16.3 Training Methods and Schedule
– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;
– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.
16.4 Training Assessment and Documentation Delivery
– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;
– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.
17. Anonymous Typical Project Scenarios
All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.
17.1 Highway Service Area 120kW Fast-Charging Station Risk Control Project
Background. A highway service area fast-charging station with high turnover and continuous high-load charging faced overheating risks at busbars and gun heads; manual inspection could not keep pace with the 24h operation.
Solution. Full perception deployment (busbar wireless sensors, patch PT100, gun-head NTC, cabinet temperature/humidity, three-phase acquisition, weather sensor), edge gateway with three-level alarms and rate warning, variable-speed fans and power control modules, cloud platform with APP push and work orders.
Results. Abnormal temperature rises detected seconds after onset with early fan/power intervention; no overheating incidents during peak holiday traffic; remote monitoring cut field visits significantly; equipment operated continuously at stable temperatures.
17.2 City-Core Old Charging Station Intelligent Retrofit Project
Background. A 5+ year old station in a city core had oxidized contacts, clogged cooling channels and rising overheat risk; full replacement was costly and disruptive.
Solution. Old-station retrofit kit: clamp-on wireless sensors and patch PT100 at oxidation-prone terminals, magnetic portable sensors for spot checks, perfluorohexanone suppression units protecting aging devices, tailored thresholds and cluster cross-comparison identifying deteriorating units; platform node access.
Results. Aging devices monitored 24h with early anomaly detection; several deteriorating units identified from temperature data and replaced on plan before failure; retrofit investment far below replacement; station safety significantly improved.
17.3 Industrial Park Unattended Fast-Charging Station Project
Background. An industrial park station operated fully unattended at night and holidays — no on-site staff to catch faults; operators needed automated protection with remote management.
Solution. Complete automated monitor-alarm-dispose chain with offline autonomy: local gateway executes all safety logic even without network; red-alarm breaker trip + aerosol suppression; alarm push (APP/SMS/call) with precise location; remote fan/power control; AI load forecasting for proactive cooling before high-load shifts.
Results. Fully unattended safe operation; multiple potential faults auto-handled without staff on site; O&M costs sharply reduced; operators managed the whole station remotely with high confidence.
17.4 Commercial Complex Ultra-Fast Charging Station Risk Management Project
Background. A commercial complex ultra-fast charging station with 120kW+ chargers in a basement environment required strict fire safety and minimal disruption to commercial operations.
Solution. Three-level progressive protection with per-circuit smart breakers and in-cabinet clean-agent suppression; cross-validation minimizing false trips that would interrupt charging revenue; environmental threshold correction for the basement’s higher ambient temperature; platform integration with the complex’s fire and property management systems.
Results. Safety and business balance achieved — no unnecessary power cuts while full protection active; passed fire-safety inspection; station availability remained high; management obtained real-time risk visibility.
18. SEO Optimization Section
All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.
18.1 Keyword System
– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;
– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;
– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;
– Brand keywords: KITOZER, Guangzhou Lain.
18.2 SEO Tag System
– Title tag: the article title — Guangzhou Lain KITOZER;
– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;
– H1 tag: the article title;
– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.
18.3 Internal Link Anchor Text
– Core anchor text: technical design solution, system construction;
– Long-tail anchor text: configuration list, technical parameters, construction plan;
– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.
19. Official Contact Information
– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Official Website: https://gdlain.com
– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China
For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.