Container-Type 3000V High-Voltage Power Distribution Cabinet

Table of Contents

1. Cover / Document Information

– Document Title: Container-Type 3000V High-Voltage Power Distribution Cabinet Technical Design Solution

– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Date: August 2026

– Version: V1.0

– Project Type: Technical design solution for Container-Type 3000V High-Voltage Power Distribution Cabinet

2. Table of Contents Structure

1. Company Introduction

2. Project Overview

3. User Requirement Analysis

4. Overall Design Description

5. Detailed System Design and Product Technical Parameters

6. Project Quotation and Configuration List

7. Core Solution Advantages

8. Technical Q&A

9. Construction Schedule Plan

10. Construction Organization Plan

11. After-Sales Service System

12. Operation and Maintenance Training Plan

13. Typical Project Cases

14. SEO Optimization System and Website Backend Configuration

15. Contact Information

3. Company Introduction

3.1 Company Development Overview

Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.

After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.

3.2 Core Business System

The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:

– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;

– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;

– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;

– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.

3.3 Brand and Qualification Honors

The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.

3.4 Core Competitive Advantages

1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;

2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;

3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;

4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.

4. Project Background and Objectives

4.1 Project Background and Significance

With the rapid development of underwater engineering, outdoor operations, mining and emergency rescue, the power ratings of electrical equipment keep rising, placing higher demands on voltage levels, protection capability, mobility and deployment efficiency of distribution equipment. Traditional fixed distribution rooms take long to build, cannot move and carry high civil costs — failing to adapt to complex outdoor working environments; ordinary low-voltage cabinets have short transmission distances and large line losses — unable to meet long-distance underwater power unit supply.

The container-type 3000V high-voltage distribution cabinet integrates step-up distribution equipment, control systems, environment regulation and spare-part storage into a standard container shell — high protection, mobility, rapid deployment and plug-and-use — perfectly adapting to underwater power unit supply, outdoor temporary supply and remote fixed supply, effectively solving special-environment high-voltage supply problems.

4.2 Applicable Scenarios

Underwater engineering (submersibles, underwater power units, construction equipment, ROVs — ports, wharves, marine engineering, river management, underwater salvage); outdoor mining (excavation, conveying and exploration equipment — dusty, humid, wide-temperature, frequent-movement environments); emergency rescue (mobile distribution for rescue, disaster reconstruction and temporary power protection); remote temporary supply (remote sites, field stations and camps without fixed facilities); offshore platform auxiliary supply (high salt, humidity and corrosion); large-event temporary supply (outdoor events, shows, exhibitions, filming).

4.3 Overall Objectives

Electrical performance: three-phase 380V input, three-phase 3000V AC output, rated output ≥150 kW, insulation and withstand per standards, stable supply.

Structural safety: container load ≥5 t with strength for transport and lifting; overall IP65 protection; cabinet IP45.

Complete protection: overvoltage, undervoltage, overcurrent, short circuit, overheating, insulation monitoring and motor relay protection with fast fault removal.

Environment regulation: explosion-proof air conditioning and dehumidifier maintaining suitable temperature/humidity, preventing condensation and high-temperature impact on equipment life and insulation.

Convenient operation: panel control with LCD, multi-function meters and alarms; zoned design separating distribution and spares.

Standardized interfaces: standard industrial high-voltage plugs with 40+ m high-voltage cable — plug-and-use, rapid load connection.

4.4 Compilation Basis

GB 7251.1-2013, GB 3906-2020, GB 50054-2011, GB 50053-2013, GB 1094.11-2007, GB 4208-2017, GB/T 50065-2011, GB 50169-2016, GB 50171-2012, GB 3836.1-2010, GB 3836.2-2010, GB/T 1413-2008, GB 50055-2011, GB/T 50062-2008, GB 50217-2018, GB 11032-2020, GB 1208-2016, GB 1207-2017, GB 1984-2014, GB 15166.1-2015, user requirements and enterprise standards.

4.5 Design Principles

Safety and reliability: electrical and structural safety first — qualified components, insulation/withstand/protection per standards. Technical advancement: mature advanced technology with future expansion. Economy: optimized configuration with high cost-performance, no over-design. Operation convenience: clear HMI and simple O&M. Environmental adaptation: waterproof, dustproof, anti-corrosion, temperature and vibration resistance. Maintainability: modular independent replaceable units with common spares. Standardization: standard components and interfaces for commonality and low O&M cost.

5. User Requirement Analysis

5.1 Electrical Performance Requirements

Input: three-phase three-wire 380V and three-phase four-wire 380V, 50Hz — the low-voltage incoming side reserves the neutral interface for both systems; wide input range ±10%; frequency 50Hz ±5%.

Output: three-phase 3000V AC, power ≥150 kW for underwater power units; 200 kVA step-up transformer with rated output above 160 kW (about 27% margin); output accuracy ±2%.

Insulation/withstand: rated insulation 3500V; withstand test ≥7000V for ≥5 min; all high-voltage components rated ≥3.6 kV; online insulation monitoring with early warning.

5.2 Structural Load Requirements

Load capacity ≥5 t (equipment + components + cables + spares, plus lifting/transport dynamic loads): standard 20-foot high-cube container with reinforced bottom beams — rated static load over 10 t; internal equipment on channel bases evenly distributed; standard fork pockets and corner castings for handling.

5.3 Protection Rating Requirements

Cabinet IP45 (against dust and condensation inside the container, accidental touch of live parts); container overall IP65 (rain, dust, moisture outdoors): double-layer continuous EPDM foam seals with three-point pressure locks forming a labyrinth seal; waterproof glands + fire sealant at all wall openings; sloped roof with drainage channels; full-weld panel joints with anti-corrosion treatment; rain/dust tests before shipment.

5.4 Output Interface and Cable Requirements

Plug-type output for fast connect/disconnect; cable ≥40 m (configured 45 m, 5 m margin); industrial high-voltage quick plugs/sockets (IP67, anti-misinsertion, anti-loosening); flexible rubber-sheathed cable with bending, wear, oil and corrosion resistance; steel cable reel for storage and transport.

5.5 Environment Regulation Requirements

Cooling: ≥3 HP industrial explosion-proof air conditioner (cooling ≥7.5 kW) for transformer and equipment heat; heating function for winter; explosion-proof per Ex db ib mb IIB T4 Gb. Dehumidification: industrial dehumidifier ≥90 L/D (30℃/80% RH) controlling relative humidity at 40-60% RH, preventing condensation.

5.6 Control and Display Requirements

Panel control with multi-function meter, phase-sequence alarm and emergency stop; LCD display showing voltage, current, insulation, temperature and fault codes; audible/visual alarms for anomalies.

5.7 Protection Function Requirements

Overvoltage, undervoltage, overcurrent, output short circuit, overheating, insulation detection and motor relay protection (overload, phase loss, stall, unbalance).

5.8 Electrical Isolation Requirements

Built-in high-voltage PDU and low-voltage PDU with physical and electrical isolation: independent high/low-voltage compartments separated by insulation plate + metal shielding plate; isolation transformer for control power; high/low-voltage cables in separate trays.

5.9 Cabin Zoning and Spare-Parts Storage

Partition between the distribution area and spare-parts room with separate external doors; heavy-duty shelves and tool cabinets with fixing components for transport safety.

6. Design Principles and Applicable Standards

6.1 Applicable Standards

Per section 4.4: GB 7251.1, GB 3906, GB 50054, GB 50053, GB 1094.11, GB 4208, GB/T 50065, GB 50169, GB 50171, GB 3836.1/.2, GB/T 1413, GB 50055, GB/T 50062, GB 50217, GB 11032, GB 1208, GB 1207, GB 1984, GB 15166.1.

6.2 Design Principles

Per section 4.5 (safety, advancement, economy, convenience, environment adaptation, maintainability, standardization).

6.3 System Architecture

Six integrated functional systems in the standard container: main step-up distribution system; distribution cabinet operation/control system; high/low-voltage isolated distribution system; environment regulation system; safety protection and alarm system; spare-parts storage system. Main electrical chain: 380V input → step-up transformer → high-voltage distribution → protection control → 3000V output; all factory-assembled, wired and commissioned — one-stop delivery.

6.4 Cabin Layout

20-foot high-cube container (internal ~5898×2352×2698 mm) divided horizontally into the distribution cabin and spare-parts cabin at about 3:1. Distribution cabin: low-voltage incoming unit, step-up transformer, high-voltage cabinet, high-voltage PDU and output interface along the length, wall-mounted with ≥800 mm operation aisle; explosion-proof AC indoor unit wall-mounted at top, dehumidifier floor-mounted; temperature/humidity sensors at the cabin middle and near the transformer; ground flat steel along the perimeter; cable trays at the top with high/low-voltage separation; output cable through waterproof glands. Spare-parts cabin: three-layer heavy-duty shelf, double-door tool cabinet, ground bus, LED lighting, spare list and management chart on the door. Aisle widths: distribution ≥800 mm (operation face ≥1000 mm to the opposite wall, maintenance gaps ≥500 mm); spares ≥700 mm; rounded corners.

6.5 Electrical Main Wiring

Single-bus scheme: low-voltage incoming → step-up transformer → high-voltage vacuum breaker → high-voltage PDU → output socket. Low-voltage side: three-phase four-wire 380V into the incoming molded-case breaker, then to the transformer primary; auxiliary branches (AC, dehumidifier, control, lighting) with independent breakers. Transformer: three-phase dry-type 380V→3000V with primary breaker and secondary fuses + arresters + winding temperature sensors. High-voltage side: transformer output through the vacuum breaker to the high-voltage PDU, output circuits via sockets and cables to loads; VTs and CTs for protection and metering. Control/protection: high-voltage integrated protection device; insulation monitor; temperature/humidity sensors. Expansion interfaces reserved.

6.6 Grounding System

Joint grounding (working, protective, lightning) with resistance ≤4 Ω; internal ring ground bus of 40×4 mm hot-dip galvanized flat steel along the cabin perimeter; all metal parts (enclosures, cabinets, trays, pipes, container body) connected for equipotential; 4 external ground terminals at the container corners; high-voltage neutral ungrounded with insulation monitoring allowing continued operation on single-phase ground faults.

6.7 Cable Laying

Three categories — high-voltage, low-voltage power and control cables — following “high/low separation, power/weak separation”: high-voltage cables on dedicated covered trays (bend radius ≥15× diameter, crimped terminals); low-voltage power cables ≥200 mm from high-voltage trays; shielded control cables with single-end grounded shields; waterproof glands and fire-stop sealing at all penetrations; clear labels at both ends.

6.8 HMI Design

Concentrated on the cabinet door: LCD touchscreen + multi-function meter + buttons/indicators + emergency stop, ergonomically laid out at 1.2-1.5 m; primary interface shows core parameters (voltage, current, power, temperature, insulation), secondary menus show details and fault records; alarms via popup + audible/visual; color-coded buttons (green close, red open, yellow reset, red mushroom emergency stop); Chinese labels.

6.9 Safety Protection Concept

Four dimensions: electrical safety (insulation, withstand, grounding, protection, high/low isolation); structural safety (high-strength shell, reinforced base, firm fixing, protective sealing); operational safety (panel operation, door interlock, emergency stop, warning signs); environmental safety (explosion-proof AC, dehumidifier, fire partition, flame-retardant materials).

7. System Architecture and Working Principle

7.1 Container Cabin System

Standard 20-foot high-cube container: Q235B weather-resistant steel, side panels ≥2 mm, 5 mm patterned steel floor; IP65 outdoor protection; 80 mm polyurethane insulation (λ ≤0.024 W/(m·K)) with galvanized lining; No.10 channel reinforced base welded to the bottom beams; 40×4 mm galvanized ring ground bus with 4 external terminals; sloped roof with 304 stainless edging and drainage channels; galvanized steel interior lining with electrostatic powder coating (fire B1); LED explosion-proof lighting per cabin; double-layer EPDM seals and three-point explosion-proof pressure locks on doors; standard corner castings and fork pockets; static load ≥10 t.

7.2 Main Step-Up Distribution System

Transformer: 200 kVA three-phase dry-type epoxy cast resin, 380V/3000V, Dyn11, class F insulation, 7000V/5 min withstand, efficiency ≥98%, forced air cooling, PT100 temperature sensors. Low-voltage incoming breaker: three-phase four-wire 400A/400V, breaking ≥36 kA, overload/short protection. High-voltage vacuum breaker: 3.6 kV, 100A, short-circuit breaking 20 kA, spring mechanism, manual/electric. High-voltage fuses: 3.6 kV, 63A, high breaking capacity, transformer backup. Zinc-oxide arresters: 3.8 kV rated, station type, suppressing switching and lightning surges. CTs: 3 kV class, 50/5A, dual-winding 0.5/5P20. VTs: 3 kV class, 3000/100V, 0.5 class, dry-type. High-voltage busbars: T2 copper, 30×3 mm, tin-plated, 3500V insulation class.

7.3 Cabinet and Operation Panel System

Cabinet 2200×1000×800 mm, cold-rolled steel ≥2 mm, IP45, EPDM door seal with three-point lock, tempered-glass observation window; 7-inch industrial LCD touchscreen (voltage, current, insulation, temperature, fault codes); multi-function meter (three-phase V/A/W/VA/VAR/PF/Hz/energy, 0.5 class, RS485 Modbus-RTU, 91×91 mm cutout); control buttons (close green/open red/reset yellow/phase-test blue, metal, IP65, ≥1M mechanical cycles); status LEDs (power/run/fault/overvoltage/undervoltage/insulation, ≥100,000 h); 2 mushroom emergency stop buttons (panel + remote, 2 NC, rotation reset, IP65); phase-sequence protection relay (phase error/phase loss/over/undervoltage, action ≤0.1 s, auto reset); door seal (EPDM foam, 30-50% compression, continuous ring, -40℃ to 120℃).

7.4 High/Low-Voltage Isolation PDU System

High-voltage PDU: 3000V AC, 80A, 1 input / 2 outputs (40A each) with per-circuit high-voltage fuses, 3500V insulation, 7000V/5 min withstand, T2 tin-plated busbars, IP20, cabinet-fixed. Low-voltage auxiliary PDU: 380V/220V, 63A input, 6 outputs (3 three-phase power + 3 single-phase control) with miniature breakers (6 kA), DIN rail. Isolation partition: 5 mm epoxy insulation + 1.5 mm galvanized shielding plate, insulation ≥10¹² Ω, 10 kV/1 min withstand, creepage ≥125 mm, shielding ≥30 dB, UL94 V-0 — physically separating high/low compartments. Control isolation transformer: 1 kVA, 380V/220V, 3000V/1 min isolation, ≥95% efficiency.

7.5 Environment Regulation System

Explosion-proof AC: 3 HP wall-mounted, Ex db ib mb IIB T4 Gb, cooling ≥7.5 kW, heating ≥8.5 kW, EER ≥3.0, airflow ≥1100 m³/h, 16-32℃ ±1℃, indoor/outdoor IP54, -15℃ to 43℃, per GB 3836.1/.2; 304 stainless outdoor bracket (≥100 kg, anti-vibration); explosion-proof conduit and 20 mm insulation for line protection. Dehumidifier: freeze-type industrial, ≥90 L/D (30℃/80% RH), 20-40 m², 30-90% RH ±3%, 6 L tank or continuous drain, R134a, compressor protections, per GB/T 19411. Sensors: industrial T/H transmitters (T -20℃ to 80℃ ±0.5℃; H 0-100% RH ±3% RH; RS485 Modbus-RTU; IP65; long-term stability 0.1℃/yr, 1%RH/yr), one per cabin.

7.6 High-Voltage Output Cable and Connectors

Cable: UGF-3.6 kV rubber-sheathed soft cable, 3-core, 16 mm² oxygen-free copper (class 5 stranded), EPR insulation 1.8 mm, copper braid shield ≥80% coverage, CR sheath 2.0 mm, outer diameter ~28 mm, bend radius ≥10× diameter, -40℃ to 90℃, flame-retardant, oil/wear resistant, 7000V/5 min withstand, per GB/T 12972.1 — 45 m length. Quick plug (male): 3 kV, 125A, 3-core, silver-plated copper alloy contacts, epoxy + silicone insulation, anodized aluminum housing, IP67 mated, ≥500 cycles, contact resistance ≤0.5 mΩ, insulation ≥1000 MΩ, 7000V/1 min, keyed anti-misinsertion, bayonet locking, cable crimp, per GB/T 11918.1. Quick socket (female): panel-mount, same ratings, IP67 mated / IP54 unmated, φ65 mm cutout, silicone seal ring. Cable clamps: flame-retardant PA66, IP65, -40℃ to 120℃, pull strength ≥500 N. Cable reel: folding, braked casters, φ600 mm, ≥50 m capacity, ≥50 kg load.

7.7 Protection and Alarm System

High-voltage integrated protection: microprocessor unit for 3-10 kV — three-stage overcurrent (instantaneous, short-time, overcurrent), overvoltage, undervoltage, zero-sequence current, overload; 0.5-class measurement; RS485 Modbus-RTU; LCD Chinese menu; ≥100 timestamped fault records; instantaneous action ≤30 ms; per GB/T 14285. Insulation monitor: 3 kV ungrounded system, 0-10 MΩ, ±10%, default alarm 100 kΩ, relay + RS485, response ≤1 s. Motor relay protection: intelligent motor protector 0-100A — overload (inverse-time per IEC 60255-3), phase loss, stall, unbalance, underload, ground; 10 fault records; per GB 14048.6. Short-circuit module: high-speed, 3000V/80A, current-jump detection, 3-10× threshold, action ≤10 ms, relay output tripping the breaker, 7000V/1 min. Over-temperature module: 3 × PT100 inputs, -50℃ to 200℃ ±0.5℃, two-level alarms (warning/trip), 2 relay outputs, RS485, monitoring transformer windings and cabin temperature. Audible/visual alarms: industrial type, high-brightness red LED 1-2 Hz, buzzer/siren, ≥100 dB at 1 m, AC220V ≤10 W, IP65, life ≥50,000 h — one inside, one outside. Low-voltage surge protector: class C, 380V, In 40 kA / Imax 80 kA, Up ≤1.8 kV, ≤25 ns, 4P 3+1, window status, thermal/overcurrent disconnectors, per GB 18802.1.

7.8 Cabin Partition and Spare-Parts Storage

Fire partition wall: 50 mm rock-wool sandwich panels (0.5 mm color steel both sides, 100 kg/m³ class A rock wool), fire resistance ≥0.5 h, sound ≥20 dB, λ ≤0.043 W/(m·K), tongue-and-groove with sealant, connected to top/bottom with sealing. Independent external doors: 1800×800 mm per cabin, 2 mm cold-rolled steel, double EPDM seals, three-point explosion-proof pressure locks, heavy hinges (120° opening), tempered-glass observation window on the distribution door (300×400 mm), IP65, outward opening. Heavy shelf: 2000×1000×500 mm, 3 shelves × ≥200 kg (total ≥600 kg), 1.5 mm posts/1.0 mm plates with ribs, 50 mm adjustable, grounded, bolted assembly. Fixing components: nylon straps (25 mm, ≥200 kg), quick-release buckles, EVA foam, anti-slip pads. Tool cabinet: 1200×800×400 mm, double-door, 3 shelves × ≥50 kg, lockable.

7.9 Auxiliary Materials

Galvanized ladder trays (100×50×1.2 mm with fittings); 40×4 mm galvanized ground flat steel; DT tin-plated copper lugs (1.5-50 mm²); organic fire-stop putty and plates (class A, GB 23864); PVC circuit/warning/ground labels (bilingual); 8.8-grade galvanized fasteners; neutral silicone weather sealant; 10 kV insulation tape; nylon ties.

8. Detailed Technical Design

8.1 Electrical Performance Design

200 kVA dry-type transformer (380V→3000V) with 160 kW+ rated output (7%+ margin beyond 150 kW); output accuracy ±2%; 3500V insulation / 7000V/5 min withstand across all high-voltage parts; input compatible with three-phase three-wire and four-wire 380V via reserved neutral; ±10% voltage and ±5% frequency adaptation.

8.2 Protection Design

Multi-level protection: input over/undervoltage, phase sequence/loss, lightning surge; transformer overcurrent/instantaneous/over-temperature/fuse backup; output short circuit (≤30 ms total), overcurrent, insulation monitoring; motor-specific overload/phase-loss/stall/unbalance — layered from input to load.

8.3 Isolation Design

Independent high/low-voltage compartments with insulation + shielding partition (creepage ≥125 mm); isolation transformer for control power; high/low-voltage cables in separate trays; door interlock cutting high voltage on opening.

8.4 Environment Design

3 HP explosion-proof AC (7.5 kW cooling) + 90 L/D dehumidifier + 80 mm insulation keeping the cabin at 10-30℃ and 40-60% RH for -15℃ to 43℃ external conditions; T/H sensors linked for automatic operation; optional larger AC or heaters for extreme ranges.

8.5 Interface Design

IP67 quick plug/socket (125A, keyed, bayonet) with 45 m UGF-3.6 kV cable and steel reel — plug-and-use; standard accessories and spares in the spare-parts cabin.

8.6 Commissioning Design

Pre-power checks (wiring, insulation, grounding); low-voltage auxiliary power-on and control verification; high-voltage no-load tests (transformer, breaker, voltage); protection function simulations (over/under voltage, overcurrent, short, over-temperature); loaded trial run; 72-hour continuous trial run; documentation and training.

9. Recommended Configuration and Preliminary Budget

9.1 Configuration Summary (Single Set)

Cabin system: 20-foot high-cube container (IP65, insulation, reinforced base, ground bus, sloped roof, lining, lighting); sealing systems (2 doors); No.10 channel base.

Main step-up system: 200 kVA dry-type transformer; 400A low-voltage incoming breaker; 3.6 kV vacuum breaker; 3 × 63A fuses; 3 × zinc-oxide arresters; 3 × CTs; 1 × VT; ~8 m high-voltage busbars; transformer base.

Cabinet and panel: cabinet (IP45); 7-inch touchscreen; multi-function meter; button group; LED group; 2 emergency stops; phase-sequence relay; door seal and observation window.

Isolation PDU: high-voltage PDU (1 in / 2 out); low-voltage PDU (6 outputs); isolation partition; 1 kVA isolation transformer.

Environment: 3 HP explosion-proof AC + bracket; dehumidifier; 2 T/H sensors; conduit/insulation kit.

Output cable and connectors: 45 m UGF-3.6 kV cable; quick plug (male); quick socket (female); 4 cable clamps; cable reel.

Protection and alarms: integrated protection device; insulation monitor; motor protection module; short-circuit module; over-temperature module; 2 audible/visual alarms; class C surge protector.

Partition and storage: fire partition wall; 2 independent doors; heavy shelf; fixing components; tool cabinet.

Auxiliaries: trays, ground flat steel, lugs, fire-stop, labels, fasteners, sealant, tape, ties.

Engineering and services: factory integration and testing, transport, on-site installation/commissioning, training, warranty.

9.2 Quotation Notes

The list is the standard-configuration reference for one set; the final quotation is calculated per final configuration, quantities and services, and is tax-inclusive. All prices are indicative and quoted in RMB (CNY) only — no foreign-currency conversion is provided. Warranty: 12 months whole unit with free repair/replacement of non-artificial faults, quarterly patrol (optional), 7×24 support with 4-hour urban on-site response; lifetime technical support and preferential spare parts.

10. Technical Specifications

10.1 System Performance Summary

Item Specification
Input Three-phase 380V (three-wire or four-wire), 50Hz ±5%, ±10% range
Output Three-phase 3000V AC, rated ≥150 kW (160 kW+, ~7% margin)
Transformer 200 kVA dry-type cast resin, 380V/3000V, Dyn11, F class, ≥98%
Insulation / withstand 3500V rated / 7000V for 5 min
Output accuracy ±2%
Container 20-ft high cube, IP65, static load ≥10 t, 20 t-rated transport
Cabinet IP45, 2200×1000×800 mm, cold-rolled steel ≥2 mm
Protection Over/undervoltage, overcurrent, short (≤30 ms), over-temperature, insulation, motor relay
Isolation High/low compartments + partition (creepage ≥125 mm); isolation transformer
Environment Explosion-proof AC 3 HP (7.5 kW cooling); dehumidifier 90 L/D; 10-30℃, 40-60% RH
Output interface IP67 quick plug/socket 125A; 45 m UGF-3.6 kV cable; reel
Monitoring 7-in touchscreen, multi-function meter (0.5 class), RS485 Modbus
Alarms Audible/visual ≥100 dB, inside + outside; fault records ≥100
Surge protection Class C 40 kA (low); zinc-oxide arresters (high)
Factory testing Insulation, withstand, no-load, protection simulations, 72-h trial
Warranty 12 months, 7×24 support

10.2 Key Component Specifications

Component Key Parameters
Transformer 200 kVA, 380V/3000V, F class, PT100, forced air cooling
Vacuum breaker 3.6 kV, 100A, 20 kA breaking, spring mechanism
High-voltage fuse 3.6 kV, 63A, high breaking
Arrester 3.8 kV zinc-oxide, station type
CT / VT 50/5A dual-winding 0.5/5P20; 3000/100V 0.5 class
HV PDU 3000V, 80A, 1-in/2-out (40A each), per-circuit fuses
LV PDU 380V/220V, 63A, 6 outputs, miniature breakers
Explosion-proof AC 3 HP, Ex db ib mb IIB T4 Gb, 7.5 kW cooling / 8.5 kW heating
Dehumidifier ≥90 L/D @30℃/80%RH, 30-90% RH ±3%, continuous drain
Cable UGF-3.6 kV, 3×16 mm², EPR + CR, 45 m, 7000V/5 min
Quick plug/socket 3 kV, 125A, IP67, ≥500 cycles, ≤0.5 mΩ, keyed
Integrated protection 3-stage overcurrent, over/undervoltage, zero-sequence, overload; ≤30 ms
Insulation monitor 0-10 MΩ, ±10%, default 100 kΩ alarm, ≤1 s response
Motor protector 0-100A, overload/phase-loss/stall/unbalance/underload/ground
Short-circuit module 3-10× threshold, ≤10 ms, breaker trip
Over-temperature module 3 × PT100, two-level alarms, RS485
Surge protector Class C 380V, In 40 kA / Imax 80 kA, ≤25 ns, 4P 3+1

11. Key Advantages and Customer Value

11.1 Highly Integrated Containerized Design — Rapid Deployment

All functions (step-up distribution, control/protection, environment regulation, spare storage) integrated in a standard 20-ft container, factory-assembled, wired and commissioned, transported as a whole; on site only input power and output load connection — deployment shortened from weeks to days for temporary, emergency and field supply; standard size suits road, rail and sea transport with easy lifting and forklift handling and flexible relocation.

11.2 Full-Condition Outdoor Protection — Complex Environment Adaptation

Overall IP65 with complete dust sealing and low-pressure water resistance for rain, sand and humidity; weather-resistant steel with multi-layer anti-corrosion and salt-spray compliance for coastal, humid and corrosive environments; insulation + explosion-proof AC + dehumidifier maintaining suitable interior temperature/humidity at -15℃ to 43℃ ambient; high structural strength with dynamic load tolerance for mining and construction-site transport.

11.3 Stable High-Voltage Output — Ample Margin

200 kVA dry-type transformer with 3000V output at 160 kW+ (meeting ≥150 kW with margin for start-up surge and short-term overload); high-quality silicon steel and copper windings — high efficiency, low loss and temperature rise; output accuracy ±2% across input fluctuation and load changes; high-voltage transmission greatly reduces line loss and extends distance — ideal for long-distance underwater loads.

11.4 Multi-Level Safety Protection — High Reliability

Complete protection: over/undervoltage, overcurrent, short circuit, over-temperature, insulation monitoring and motor-specific protection; high-voltage vacuum breaker + fuses for fast short removal with current limiting; online insulation monitoring warning of degradation before ground faults; over-temperature monitoring of transformer windings and cabin with alarm-to-trip — layered defense minimizing fault risk.

11.5 Physical + Electrical Dual Isolation — High Safety

Independent high/low-voltage compartments fully separated by insulation + metal shielding plate — low-voltage operation cannot touch high-voltage parts; isolation transformer for control power preventing high-voltage intrusion; separate high/low-voltage cable paths; equipotential grounding eliminating potential differences.

11.6 Intelligent Monitoring and Audible/Visual Alarms — Efficient O&M

7-inch touchscreen and multi-function meter display all running parameters; every fault triggers audible/visual alarms with inside/outside dual alarmers; protection devices store 100+ fault records for tracing; RS485 remote monitoring without on-site duty; simple O&M without professional high-voltage staff for routine operation.

11.7 Explosion-Proof Environment Regulation — Precise Control

3 HP explosion-proof AC with sufficient cooling maintaining cabin temperature; explosion-proof design for hazardous areas; industrial dehumidifier automatically controlling humidity preventing condensation (insulation degradation, corrosion); T/H sensors linked for automatic unattended operation.

11.8 Zoned Cabin Design — Independent O&M and Storage

Fire partition separates distribution and spare-part cabins with independent external doors; spare retrieval without entering the distribution cabin (protecting the environment and reducing misoperation risk); shelves and tool cabinets with fixing components for transport; clear responsibilities and safe management.

11.9 Standardized Interfaces — Plug-and-Use

IP67 industrial high-voltage quick plug/socket with anti-misinsertion and anti-loosening; 45 m flexible rubber-sheathed cable for underwater distances; no on-site crimping — rapid deployment; standardized connectors compatible with same-spec loads.

11.10 Full-Lifecycle Service

Complete pre-sales (customized solutions), in-sales (progress tracking, strict factory testing) and after-sales (warranty repair, patrol, support); ample spare supply with on-site access; professional training; lifetime technical support and upgrades.

12. Technical Q&A (50+ Items)

12.1 Cabin Structure

Q1: What are the overall size and weight?

A: Standard 20-foot high-cube container: external 6058×2438×2896 mm, internal ~5898×2352×2698 mm; total weight ~4.5 t (≤5 t with spares); rated static load over 10 t with ample margin.

Q2: How is the IP65 rating achieved?

A: Multi-layer sealing: double-layer continuous EPDM foam seals with three-point pressure locks forming a labyrinth path; waterproof glands + fire sealant at all cable wall openings; sloped roof with drainage channels preventing ponding; full-weld panel joints with anti-corrosion treatment; rain and dust tests before shipment.

Q3: Can the load capacity meet equipment plus spares?

A: Yes — No.10 channel reinforced base welded to the bottom beams gives rated static load over 10 t (vs. 5 t required); internal equipment uniformly fixed on channel bases distributing load; standard corner castings and fork pockets with deformation far below standard limits.

Q4: Why is the interior insulated?

A: Outdoor diurnal temperature swings cause condensation on interior walls, degrading insulation and causing short circuits and corrosion; 80 mm polyurethane insulation isolates heat exchange, reducing fluctuation and condensation risk with the dehumidifier; also lowers AC energy consumption.

Q5: What does the partition do?

A: Separates distribution and spare-part cabins: safe isolation (no distribution-cabin entry for spares, protecting the environment and reducing high-voltage touch risk); functional zoning (clear responsibilities); fire separation (class A rock-wool sandwich panel delaying fire spread).

12.2 Electrical Performance

Q6: Can the input accept both three-phase three-wire and four-wire?

A: Yes — the low-voltage incoming side reserves the neutral interface; three-phase four-wire directly supplies 220V auxiliary loads (AC, dehumidifier, control, lighting); three-phase three-wire obtains auxiliary power via the control transformer; ±10% voltage adaptation.

Q7: What is the actual output power? Can it meet 150 kW?

A: 200 kVA transformer at PF 0.8 gives 160 kW rated output — fully meeting ≥150 kW with ~7% margin for start-up surge and short-term overload; class F insulation allows 120% short-time overload.

Q8: What are the insulation and withstand values?

A: Rated insulation voltage 3500V; withstand test 7000V for 5 min across all high-voltage parts to ground and low-voltage parts — no breakdown or flashover; all components rated ≥3.6 kV; online insulation monitoring with early warning.

Q9: Why 3000V output instead of low voltage?

A: For long-distance underwater supply: at the same power, higher voltage means lower current, and losses/voltage drop scale with current squared — high voltage greatly reduces cable loss and allows longer distance; at 380V, 150 kW would draw 228A with huge drops over 40 m.

Q10: What type of transformer is used?

A: Dry-type epoxy cast resin — oil-free, fire-proof, explosion-proof and maintenance-free for the enclosed container; high-purity copper windings and grain-oriented silicon steel — low loss, high efficiency, low noise; PT100 sensors with fan cooling; CCC certified.

12.3 Protection Functions

Q11: What protections does the system have?

A: Input side — overvoltage, undervoltage, phase sequence/loss, lightning surge; transformer side — overcurrent, instantaneous, over-temperature, fuse backup; output side — short circuit, overcurrent, insulation monitoring; load side — motor overload, phase loss, stall, unbalance — layered from input to load.

Q12: How fast is short-circuit protection?

A: High-speed detection + vacuum breaker with total action ≤30 ms (detection ≤10 ms, breaker ~20 ms) — quickly limiting short current to protect transformer, cable and loads; high-voltage fuses as backup double protection.

Q13: How does insulation detection work?

A: Online insulation monitor continuously measures the 3 kV system’s ground insulation resistance (ungrounded neutral allows continued single-phase-ground operation); early degradation alarms; dangerous levels trip the supply, preventing evolution into phase-to-phase faults.

Q14: What temperatures are monitored?

A: Transformer three-phase winding hot-spot temperatures via embedded PT100 elements plus cabin ambient temperature; two-level thresholds — warning alarm then trip; temperature also links the AC for automatic cooling.

Q15: What does the motor relay protection cover?

A: Motor-specific protection for underwater power units — overload, phase loss, stall, three-phase unbalance and underload, with inverse-time characteristics per IEC 60255-3 — protecting without nuisance trips.

12.4 Environment Regulation

Q16: Why explosion-proof AC instead of ordinary?

A: The enclosed container with high-voltage equipment requires explosion-safe cooling; the explosion-proof AC’s compressor, fans and electrical parts meet explosion standards (Ex db ib mb IIB T4 Gb) — safe in flammable atmospheres, suitable for power, chemical and mining scenarios.

Q17: Is 3 HP cooling enough?

A: Yes — 7.5 kW cooling vs. ~4 kW total heat (transformer loss ~3 kW plus breakers/busbars) — nearly double margin, keeping the cabin below 30℃ even in summer; heating function raises temperature in winter.

Q18: Is the dehumidifier mandatory?

A: Yes for outdoor container distribution — high outdoor humidity with large diurnal temperature swings causes condensation reaching the dew point; condensation degrades insulation, causes short circuits/flashover and corrodes metals; the dehumidifier maintains 40-60% RH preventing condensation.

Q19: Do the AC and dehumidifier run continuously?

A: No — both auto-run by setpoint: AC starts above the temperature threshold and stops below; dehumidifier starts above the humidity threshold and stops below — stable environment with energy saving and extended life; thresholds adjustable.

Q20: What cabin temperature range is maintained?

A: 10-30℃ with humidity 40-60% RH for -15℃ to 43℃ external conditions; larger AC or heaters customizable beyond this range.

12.5 Installation and O&M

Q21: What on-site work is needed?

A: Four items — position and level the container; connect the external ground network (≤4 Ω); connect 380V input; connect the output cable to the load. All equipment is factory-commissioned — 1-2 days to power on.

Q22: What daily O&M is required?

A: Minimal — periodic panel parameter review (voltage, current, temperature, insulation); audible/visual alarm checks; AC/dehumidifier filter cleaning; cabin seal checks; semi-annual tightening and cleaning; self-diagnostics with automatic alarms.

Q23: What spares are included?

A: Backup low-voltage breakers, high-voltage fuses, temperature sensors, seal strips, plug seal rings, special tools and an electrical components kit — covering common wear items; additional spares available with short supply.

Q24: What is the fault response time?

A: Fault codes guide initial diagnosis; 24-hour hotline with remote guidance; urban on-site within 4-hour response / 24-hour arrival; suburban 8-hour response / 48-hour arrival; free repair/replacement during warranty, cost-only after.

Q25: What qualifications do operators need?

A: High-voltage electrician certification for daily operation and maintenance of the 3000V system; panel operation is simple and quickly learned; complex maintenance by professionals.

12.6 Safety and Compliance

Q26: What national standards apply?

A: GB 7251.1-2013 (low-voltage assemblies), GB 3906-2020 (high-voltage switchgear), GB 1094.11-2007 (transformers), GB 4208-2017 (IP), GB/T 50065-2011 (grounding), GB 3836 series (explosion), GB/T 14285-2006 (relay protection); all key components with 3C or type-test reports.

Q27: What anti-electric-shock measures exist for high voltage?

A: High/low compartment separation (no high-voltage parts in the low-voltage operation area); door interlock cutting high voltage on opening; insulation and safety barriers on all live parts; reliable grounding ≤4 Ω; high-voltage warning signs; emergency stop for rapid power cut.

Q28: Is lightning grounding required?

A: Yes — the four corner ground terminals connect to the external ground network (≤4 Ω); class C surge protector on the low-voltage entry and zinc-oxide arresters on the high-voltage side suppress lightning and switching surges.

Q29: What transport precautions apply?

A: Spares firmly strapped; doors locked with seals checked; standard lifting gear with steady hoisting; road transport properly lashed at moderate speed; equipment de-energized during transport.

Q30: Can the equipment be customized?

A: Yes — input/output voltages, power ratings, container sizes, output circuits, communication functions, fire facilities and special anti-corrosion treatment per scenarios (underwater, mining, offshore platforms, emergency rescue).

12.7 Comparative and Scenario

Q31: How does this compare with a fixed distribution room?

A: Weeks-to-days deployment without civil works; mobile and relocatable; consistent factory quality; IP65 outdoor capability; complete integration (distribution, control, environment, spares) — while fixed rooms take long, cannot move and vary by site skill.

Q32: What are the results in port underwater projects?

A: The 3000V output with 45 m cable reliably powers underwater units over long distances with minimal loss; IP65 with anti-corrosion adapts to port humidity and salt; rapid deployment supports tide-window work (details in the case).

Q33: What about mining projects?

A: IP65 dust/water protection, wide temperature and vibration resistance suit mobile mining; explosion-proof AC adapts to hazardous areas; overall lifting allows frequent relocation between pits.

Q34: What about emergency rescue?

A: Fast transport and 1-2-day deployment provide temporary high-voltage supply at disaster sites; 45 m cable with plug-and-use connects loads quickly; spare-part cabin supports prolonged field operation.

Q35: What about offshore platforms?

A: Reinforced anti-corrosion and sealing for high salt/humidity; three-level lightning; explosion-proof environment equipment; stable high-voltage supply for platform auxiliary loads.

Q36: How is the solution scaled for multi-unit projects?

A: Parallel factory production; standardized identical configurations simplifying spares and O&M; batch training and on-site spare reserves; tiered pricing.

Q37: How is the total cost controlled?

A: Containerized integration cuts civil works and site labor; high efficiency and low loss reduce operation cost; modular components lower maintenance; long life and relocation reuse — optimal lifecycle cost.

Q38: What are the green credentials?

A: Dry-type oil-free transformer (no oil pollution), high efficiency ≥98%, energy-saving environment control with automatic operation, recyclable steel structure — supporting green operation.

Q39: How is service quality supervised?

A: Follow-up calls after each service; patrol reports; complaint hotline with 24-hour reply; three-level spare-part warehouses; dedicated service engineer per project.

Q40: Why choose the KITOZER/Lain solution?

A: 20+ years of cabinet/distribution experience, source-factory integrated manufacturing with strict factory testing, industrial-grade components, complete protection and isolation, explosion-proof environment control and full after-sales — a reliable container-type high-voltage distribution solution.

12.8 Delivery and Acceptance

Q41: What is the delivery period?

A: About 35 working days: confirmation/preparation 7, shell and assembly 10, factory wiring/commissioning 8, packing/transport 5, site installation/commissioning 3, acceptance 2.

Q42: What factory tests are performed?

A: Insulation resistance and 7000V/5 min withstand tests; no-load power-on and protection parameter setting; load simulation and function verification; rain/dust tests for IP ratings; full factory inspection report before shipment.

Q43: What acceptance items apply?

A: Appearance and structure; electrical performance (voltage, current, accuracy); protection functions (simulated faults); insulation and withstand; environment regulation (temperature/humidity); 72-hour continuous trial run; documentation (certificates, test reports, as-built drawings).

Q44: What documentation is delivered?

A: Product certificates, type-test reports, factory inspection reports, wiring diagrams, operation manual, maintenance manual, training records and as-built documentation — complete for filing.

Q45: How is the system monitored remotely?

A: RS485 Modbus-RTU interfaces on the meter, integrated protection and environment sensors — connectable to upper platforms for remote status, alarms and data.

Q46: How is the environment data used?

A: T/H sensors linked to the AC and dehumidifier for automatic regulation; data displayed on the touchscreen and available via RS485 for trend analysis and preventive O&M.

Q47: What happens on a mains failure?

A: This distribution system has no internal UPS for the 3000V output (grid-fed); the auxiliary control supply is protected by the isolation transformer and can accept UPS input if required by the customer.

Q48: How is the output cable managed?

A: 45 m cable with steel reel (≥50 m capacity, braked casters) for storage and transport; cable clamps at the cabin outlet and cabinet prevent drag loosening; bend radius ≥10× diameter.

Q49: What are the safety features of the quick connectors?

A: IP67 mated, keyed anti-misinsertion, bayonet locking against loosening, silver-plated contacts ≤0.5 mΩ, 7000V/1 min withstand — safe and reliable outdoor connection.

Q50: How is the solution delivered end to end?

A: Free survey and customized design → source-factory integration with strict tests → whole delivery → 1-2-day site installation → commissioning and 72-hour trial run → training and documentation → 12-month warranty with 7×24 support and lifetime service — one-stop supply.

13. Construction Schedule

13.1 Overall Period

About 35 working days from solution confirmation to final acceptance across six stages with acceptance points at key nodes.

13.2 Stage Schedule

Stage Work Days Responsible
1. Confirmation and preparation Technical solution finalization; drawing sign-off and disclosure; component/material procurement; production planning 7 PM, procurement
2. Shell and assembly Container modification/reinforcement; partition and insulation; equipment bases; transformer/cabinet/AC installation; trays and ground bus 10 Production, structure team
3. Factory wiring and commissioning High/low-voltage cabling and termination; control wiring and sensors; insulation and withstand tests; no-load commissioning and protection setting; load simulation; factory inspection 8 Electrical team, QC
4. Packing and transport Spares shelving and fixing; documentation/tools packing; dust/moisture protection; loading and dispatch; tracking and arrival confirmation 5 Logistics, PM
5. Site installation and commissioning Shell positioning/leveling/fixing; external ground connection and resistance test; input power connection; output cable and load connection; on-site commissioning and trial run 3 Site engineer, crew
6. Acceptance and handover Performance acceptance; as-built documentation; operation training; acceptance report signing 2 PM, customer

13.3 Key Node Acceptance

Drawing sign-off (start of production); factory inspection (appearance, structure, electrical, protection, IP tests — customer may attend); on-site acceptance after 72-hour continuous trial run (appearance, performance, functions, documentation).

13.4 Schedule Assurance

Plan control with daily tracking and weekly meetings; advance stocking of core components with stable procurement; flexible production with priority scheduling and expedited options; contingency plans for material/process delays; dedicated communication with timely progress feedback and rapid change response.

14. Construction Organization and Quality/Safety Measures

14.1 Organization Structure

Project manager (1): overall coordination, progress, resources, customer liaison. Technical lead (1): design, disclosure, commissioning guidance, technical quality. Site construction lead (1): site organization, personnel, safety, progress. Electrical workers (2): equipment installation, cabling, wiring, commissioning. Structural worker (1): shell positioning, fixing, grounding, auxiliaries. Safety officer (1, part-time): full-process safety supervision.

14.2 Pre-Construction Preparation

Technical: drawings/codes/solution study with disclosure; construction plan and work instructions; calibrated instruments (multimeter, megger, withstand tester, ground tester); site conditions confirmed (power, grounding, yard, lifting access). Materials: equipment/components/auxiliaries counted and verified; tools (drill, wrenches, crimping pliers, cutter, lifting gear); PPE (helmets, insulating shoes/gloves, harnesses, warning signs). Personnel: certified staff (electricians with special-operation certificates, height workers with certificates); safety and technical training with assessment; clear roles. Site: survey positions, transport routes, lifting conditions, temporary power; level the ground; warning zones; temporary power and lighting.

14.3 Core Construction Processes

Shell positioning and fixing: place the container on the foundation by crane/forklift with correct direction; level with shims (deviation ≤2 mm/m); fix by expansion bolts or ballast; check appearance, locks and seals.

Electrical installation: verify equipment appearance/model/spec; install firmly with verticality ≤1.5‰; order by large-first/primary-first; all metal enclosures grounded with yellow-green wires, firm and labeled.

Cable laying and termination: verify cable type/spec/voltage and insulation before laying; route along trays neatly tied with high/low separation; bend radius compliant (high-voltage ≥15× diameter); labels at both ends; crimped terminals with reliable insulation; waterproof glands and fire-stop at wall penetrations.

Grounding: external ground network by vertical electrodes + horizontal flat steel with resistance ≤4 Ω; four corner terminals connected reliably with anti-corrosion; internal ring bus and equipment terminals forming equipotential; measure and record resistance.

Environment equipment: AC indoor unit wall-mounted level with correct drain slope; outdoor unit on the bracket with vibration pads; conduits with insulation and sealed joints; dehumidifier level with continuous drain; sensors at representative positions away from heat sources and air outlets.

Commissioning: full pre-power checks; low-voltage auxiliary power-on and control/alarm verification; high-voltage no-load tests; protection simulations (over/undervoltage, overcurrent, short, over-temperature); loaded trial run; 72-hour continuous run with data recording.

14.4 Quality Assurance

Standards per national construction/acceptance codes and drawings; three-inspection system (self, mutual, special) with qualified handover per process; key processes (wiring, grounding, withstand tests) operated by certified staff with QC side-standing and records; timely complete documentation synchronized with progress; nonconformities stop work for rectification with corrective/preventive actions.

14.5 Safety Management

“Safety first, prevention, comprehensive control”: full safety disclosure before work; compliant temporary power with RCDs by certified electricians, no unauthorized wiring; high-voltage work with warning lines, “high voltage danger” signs and supervision — personnel clear with power-on tagging before energizing; harnesses and helmets for high work; hot-work permits with extinguishers and watchers; daily pre-shift briefings, mid-shift patrols and post-shift checks.

14.6 Civilized Construction and Contingency

Materials stacked neatly with labels; waste collected and disposed properly; noise controlled outside rest hours; environmental protection during works. Contingency: lifting/weather issues rescheduled with forecasts; equipment faults — stop, protect, report, repair or replace; personnel injury — stop work, first aid, hospital if serious, investigate and rectify.

15. After-Sales Service

15.1 Warranty Commitment

12-month free warranty from acceptance: non-artificial hardware/software/performance faults repaired and parts replaced free; software lifetime free upgrades; exclusions: misuse, private modification, water/impact/power anomalies, force majeure, consumable wear. Extended warranty options.

15.2 Response

7×24 hotline; 24-hour online technical guidance; urban on-site within 4-hour response / 24-hour arrival; suburban 8-hour response / 48-hour arrival; remote areas per distance. Fault grading: emergency (full outage) — senior engineers and priority resources; important — solution within 2 hours with priority on-site; general — solution within 4 hours, repair within 8; consultation — immediate, complex within 24 hours. Closed-loop: report → remote diagnosis → execution → on-site handling → follow-up with satisfaction archiving.

15.3 On-Site Repair and Patrol

On-site repair with spare-part replacement minimizing downtime; quarterly free patrol during warranty (optional): shell structure (seals, locks, corrosion, vent cleaning); power system (breaker status, terminal tightening, transformer temperature); environment (AC filter cleaning, dehumidifier, sensors); protection/alarm function tests; grounding resistance; data review — with formal reports and optimization recommendations.

15.4 Spare Parts and Upgrades

Three-level spare-part warehouses (headquarter, regional, site) with original genuine parts; common spares quickly available; lifetime preferential supply; technical upgrade services (software iteration, communication functions, capacity/power expansion, new output circuits, fire/accessory additions) by factory engineers with compatibility.

15.5 Lifetime Maintenance

Lifetime technical support and paid repair at cost-only parts and reasonable service fees with transparent pricing; annual maintenance agreements for multi-unit deployments (all patrols, repairs, parts, support, dedicated team, spare reserve).

15.6 Complaint Handling

Dedicated complaint hotline with 24-hour reply; satisfaction surveys after every service; service quality tied to engineer performance; continuous improvement.

16. Training Plan

16.1 Objectives and Audience

Objectives: enable trainees to master the system’s structure, principles, operation, daily maintenance and basic fault finding — operators independently perform monitoring/start-stop/alarm handling; maintenance staff perform patrol, cleaning, consumable replacement and simple faults; managers master architecture, safety management and scheduling.

Audience: operators/duty staff (hands-on and emergencies); O&M technicians; management and project leads; internal technical staff (advanced principles and diagnosis).

16.2 Training Content

Theory: system architecture and working principles; core equipment (transformer, breakers, protection device, insulation monitor, UPS-related control, AC, dehumidifier); codes and standards (electrical safety, grounding/lightning, explosion-proof); safety management (permissions, operation rules, emergency flows).

Practice: panel operation (start/stop sequence, parameter viewing, alarm handling, emergency stop, phase-sequence test); multi-function meter and touchscreen operation; protection setting review; environment equipment operation (AC/dehumidifier thresholds, filter cleaning); sensor checks.

Maintenance: daily/weekly/monthly patrol items and standards; cleaning and consumable replacement (filters, seals); terminal and cable checks; running-state judgment via indicators and parameters.

Fault finding: common fault recognition (alarm codes, abnormal parameters, communication); layered troubleshooting (power → wiring → device → software); simple on-site handling (breaker reset, seal replacement, sensor cleaning); emergency flows (fault alarms, high-voltage incidents, mains anomalies).

Safety: high-voltage operation rules, interlock and grounding principles, emergency stop usage, personnel protection and first aid basics.

16.3 Methods and Schedule

“Theory + demonstration + hands-on + assessment” over 2 working days at acceptance: Day 1 — system overview, core equipment principles, safety standards (AM); software/panel practice (PM); Day 2 — maintenance and fault finding (AM); assessment, Q&A, documentation (PM). Adjustable; multi-unit projects trained in batches; remote video training for refreshers and new staff.

16.4 Assessment and Documentation

Theory written test (100 points, 60 pass) + practical assessment (panel operation, patrol flow, simple fault handling); qualified trainees certified; free retraining for failures. Delivered: product user manual, O&M manual, common-fault handbook, training PPT, demo videos, factory inspection reports and certificates.

16. Training Plan

16.1 Training Objectives and Audience

Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.

Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.

16.2 Tiered Training Content System

Level 1: Basic operation training (1 day)

– Basic principles: system concepts, structure composition, performance indicators;

– Daily operation standards: correct operation of equipment, control and safety systems;

– Daily inspection contents: daily/weekly/monthly check items;

– Safety precautions: usage prohibitions and emergency handling procedures.

Level 2: Maintenance training (1 day)

– Detailed structure of each subsystem and working principles;

– Daily maintenance methods: cleaning, fastening checks, routine care;

– Common fault identification and simple handling;

– Emergency handling procedures for power failure, fire and equipment faults.

Level 3: Advanced management training (as needed)

– Performance influencing factors and how to avoid degradation;

– Upgrade and expansion knowledge and specification requirements;

– Relevant national standards interpretation.

16.3 Training Methods and Schedule

– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;

– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.

16.4 Training Assessment and Documentation Delivery

– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;

– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.

17. Anonymous Typical Project Scenarios

All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.

17.1 Port Underwater Operation Containerized High-Voltage Distribution Project

Project overview. A port’s underwater engineering operations required high-voltage supply to underwater power units over long distances — low-voltage supply suffered from excessive line loss and voltage drop, and on-site distribution rooms could not follow tide-window schedules.

Implementation. A container-type 3000V high-voltage distribution cabinet: 200 kVA dry-type step-up transformer with 160 kW+ output; 45 m UGF-3.6 kV rubber-sheathed cable with IP67 quick connectors for fast underwater load connection; IP65 container with anti-corrosion treatment for the port’s humid and salty environment; explosion-proof AC and dehumidifier maintaining the cabin environment; complete protection with insulation monitoring and motor relay protection.

Results. Stable 3000V supply to underwater units over the full cable length with minimal loss and compliant voltage; plug-and-use connection shortened deployment to one day per operation window; year-round stable operation in the port environment; spares in the separate cabin supported rapid on-site maintenance.

17.2 Outdoor Mining Engineering Containerized Distribution Project

Project overview. An outdoor mining project with dusty, humid, wide-temperature conditions and frequent equipment relocation required mobile high-voltage distribution for excavation and conveying equipment.

Implementation. A container-type 3000V distribution cabinet with IP65 dust/water protection, wide-temperature design and reinforced structure for transport over rough terrain; explosion-proof AC adapting to the hazardous-area environment; three-level lightning protection and insulation monitoring for grid fluctuation; overall lifting structure allowing fast relocation between working faces.

Results. Rapid relocation without re-construction; stable high-voltage supply with low fault rate in the harsh environment; explosion-proof environment equipment running safely; complete protection preventing equipment and load damage; deployment period shortened over 60% versus fixed distribution rooms.

17.3 Emergency Rescue Mobile High-Voltage Distribution Project

Project overview. An emergency rescue organization needed quickly deployable, transportable high-voltage distribution for disaster-site temporary power protection and reconstruction works.

Implementation. A container-type 3000V cabinet transported by truck to disaster sites: 1-2 day deployment (leveling, grounding, input connection, output connection); 45 m cable with quick plug-and-use for rapid load connection; spare-part cabin supporting prolonged field operation; explosion-proof environment regulation for varied site conditions.

Results. Rapid deployment within hours of arrival, providing temporary high-voltage supply ahead of reconstruction; quick connect/disconnect enabled fast relocation between sites; stable operation with complete protection ensured rescue power continuity; the integrated spares and tool cabinet reduced field support requirements.

18. SEO Optimization Section

All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.

18.1 Keyword System

– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;

– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;

– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;

– Brand keywords: KITOZER, Guangzhou Lain.

18.2 SEO Tag System

– Title tag: the article title — Guangzhou Lain KITOZER;

– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;

– H1 tag: the article title;

– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.

18.3 Internal Link Anchor Text

– Core anchor text: technical design solution, system construction;

– Long-tail anchor text: configuration list, technical parameters, construction plan;

– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.

19. Official Contact Information

– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Official Website: https://gdlain.com

– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)

– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China

For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.