Table of Contents
Toggle1. Cover / Document Information
– Document Title: Container-Type Fully Immersion Liquid-Cooled Server Computer Cabinet Technical Design Solution
– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Date: August 2026
– Version: V1.0
– Project Type: Technical design solution for Container-Type Fully Immersion Liquid-Cooled Server Computer Cabinet
2. Table of Contents Structure
1. Company Introduction
2. Project Overview
3. User Requirement Analysis
4. Overall Design Description
5. Detailed System Design and Product Technical Parameters
6. Project Quotation and Configuration List
7. Core Solution Advantages
8. Technical Q&A
9. Construction Schedule Plan
10. Construction Organization Plan
11. After-Sales Service System
12. Operation and Maintenance Training Plan
13. Typical Project Cases
14. SEO Optimization System and Website Backend Configuration
15. Contact Information
3. Company Introduction
3.1 Company Development Overview
Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.
After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.
3.2 Core Business System
The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:
– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;
– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;
– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;
– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.
3.3 Brand and Qualification Honors
The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.
3.4 Core Competitive Advantages
1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;
2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;
3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;
4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.
4. Project Background and Objectives
4.1 Project Background
With the rapid development of AI, big data, cloud and edge computing, demand for computing power is exploding. Server density keeps rising — single-cabinet power from the traditional 3-5 kW climbing above 20 kW, and beyond 60-100 kW in AI training scenarios. Traditional air cooling can no longer meet high-density server heat dissipation — low efficiency, high energy, loud noise and shortened server life — becoming the core bottleneck to computing density.
Liquid cooling, with ultra-high heat-dissipation efficiency and extremely low energy consumption, has become the mainstream direction of next-generation data center cooling. Full-immersion liquid cooling completely submerges servers in insulating coolant, with liquid directly contacting and removing heat — efficiency far exceeding air cooling and cold-plate liquid cooling — the optimal solution for ultra-high-density computing.
Meanwhile, edge computing, distributed computing and temporary deployment demand faster deployment, better environmental adaptation and mobility. Traditional civil-construction rooms take long, cost much and cannot move. The containerized data center integrates all room systems in a standard container — factory prefabricated, plug-and-use on site, deployment shortened to one-tenth of traditional rooms, overall relocatable and reusable — perfectly suiting distributed, temporary and outdoor computing deployment.
This solution combines full-immersion liquid cooling with containerized data centers — solving high-density heat dissipation while achieving rapid deployment, flexible migration and outdoor adaptation for AI computing centers, edge nodes, research platforms and temporary computing deployment.
4.2 Industry Trends
Global liquid-cooling data centers are rapidly proliferating — by 2028 the market is expected to exceed 100 billion CNY, with full-immersion shares rising as the standard for ultra-high-density scenarios. Containerized data centers spread with 5G and edge computing for edge nodes, outdoor sites, emergency communications, mining and oilfields; the fusion of containers with liquid cooling is a new trend. Policy: the dual-carbon goal requires new data center PUE below 1.3 (key regions below 1.25); full-immersion liquid cooling reaches PUE below 1.1, far below national requirements and policy-supported; the “East-Data-West-Computing” project drives western node construction where liquid-cooled containers are a key choice.
4.3 Project Objectives
Ultra-high-density computing: up to 60 kW per cabinet supporting AI servers and GPU servers for large-scale training and inference.
Extreme energy saving: annual average PUE ≤1.1 — greatly reducing cooling energy per green data center requirements.
Rapid deployment: factory prefabrication — on site only power and network connection; overall deployment ≤30 days.
Full-scenario adaptation: IP54 shell with insulation, lightning, rain and dust protection — stable at -20℃ to 45℃ outdoors, adapting to plateau, high-temperature, high-humidity and other complex environments.
Full-dimension safety: complete electrical safety, fire protection, leak detection and environment monitoring — 7×24 stable operation.
Intelligent simple O&M: integrated management platform with visualized monitoring, automatic alarms and remote control — lower difficulty and cost.
Flexible expansion and reuse: modular design for capacity growth; overall migration and reuse — high asset utilization.
4.4 Applicable Scenarios
AI training (large-model training, deep learning, graphics rendering — GPU heat); edge computing nodes (5G base stations, park edge computing, traffic edge nodes); outdoor special scenarios (mines, oilfields, ports, remote areas without standard rooms); temporary computing (event live streaming, temporary research, emergency command); university research (laboratories and institutes — rapid flexible platforms); enterprise data center expansion (quick capacity growth without modifying existing rooms).
4.5 Compilation Basis
GB 50174-2017, GB 50462-2016, GB/T 51314-2018, GB/T 2887-2011, GB 50052-2009, GB 50054-2011, GB 50057-2010, GB 50116-2013, GB 50370-2005, YD/T 3986-2021 (immersion liquid-cooled server system requirements), YD/T 3751-2020 (containerized data center general requirements), plus customer requirements and site conditions.
5. User Requirement Analysis
5.1 Core Functional Requirements
A complete, independently operating server computing infrastructure covering five dimensions — computing housing, cooling, power, environment monitoring and safety protection; fully autonomous without additional room facilities (external power and network only); standard rack-mount server deployment and replacement for daily O&M.
5.2 Performance Requirements
Cooling: ≥60 kW per cabinet for full-load GPU servers; core component temperatures within manufacturer safe thresholds; coolant supply/return temperature difference 8-12℃. Power: dual mains access with capacity for full load; distribution conversion efficiency ≥99%. Energy: annual average PUE ≤1.1 — significant energy saving versus air cooling.
5.3 Environment Adaptation
Outdoor independent operation in unshielded environments; -20℃ to 45℃ range with high/low temperature, rain, sand and salt; good insulation preventing external fluctuation impact and interior condensation at low temperature.
5.4 Safety Protection
Electrical: complete overload, short, leakage and surge protection. Fire: automatic detection and gas suppression for unattended operation. Liquid cooling: multi-level leak detection with rapid location and alarms. Physical: anti-theft/anti-vandalism with access control at the entrance.
5.5 Intelligent O&M
Unattended operation with a unified management platform monitoring all equipment in real time; automatic alarms (local audible/visual, remote SMS, platform push); history storage/query and automatic reports; remote management via WEB and mobile.
5.6 Expansion and Upgrade
Modular design with independent functional units — flexible addition of cabinets and expansion of cooling/power capacity; online software upgrades (energy analysis, AI predictive maintenance); reserved interfaces and space.
5.7 Cost Control
Low initial and operating cost: factory prefabrication reducing site work; high-efficiency liquid cooling lowering electricity; high reliability reducing maintenance; core equipment life ≥10 years — optimal lifecycle cost.
6. Design Principles and Applicable Standards
6.1 Applicable Standards
Per section 4.5 (GB 50174, GB 50462, GB/T 51314, GB/T 2887, GB 50052, GB 50054, GB 50057, GB 50116, GB 50370, YD/T 3986, YD/T 3751).
6.2 Design Principles
Reliability first: redundant core components (one-use-one-standby), mature verified technology and brands. Advancement with practicality: industry-leading full-immersion liquid cooling with lifecycle applicability; economical without over-configuration. Standardization with customization: standard core components for maintenance; customized per customer needs. Green and energy-saving: full-chain efficiency optimization (cooling, power, control) per dual-carbon policy. Easy O&M: rational layout, ample operation space, complete monitoring/alarm. Safety compliance: electrical, fire and lightning per national standards.
6.3 System Architecture
“One shell, six systems” in a 40-foot standard container: shell housing system (protection, insulation, structure); immersion computing system (immersion liquid-cooled cabinets and servers — core business); circulation cooling system (coolant circulation and external heat rejection — core cooling); power distribution system (distribution, conversion, protection); intelligent monitoring system (data acquisition, status monitoring, intelligent control); safety protection system (fire, lightning, grounding, access control, leak detection).
6.4 Core Technical Route
Single-phase full-immersion liquid cooling (direct-contact): insulating synthetic hydrocarbon coolant — non-conductive, non-corrosive, high flash point; entire servers submerged with all heat-generating components directly contacting the liquid — minimal heat-exchange resistance and maximum efficiency; closed circulation with annual coolant loss below 5%; air-cooled dry coolers for outdoor heat rejection — no cooling tower, no water consumption; variable-frequency control adjusting pump and fan speeds per load and ambient temperature — ultimate energy saving.
6.5 Overall Design Indicators
Single-cabinet heat dissipation 60 kW (customizable to 100 kW); 6 cabinets per 40-ft container; total 360 kW heat load; annual average PUE ≤1.1; IP54; -20℃ to 45℃; 380V three-phase five-wire 50Hz; total distribution capacity 400 kVA; MTBF ≥100,000 h; fire response ≤3 s; leak location error ≤1 m; design life ≥10 years.
6.6 Internal Layout
The 40-foot container is divided into three functional zones along the length: main equipment zone (center) — 6 immersion cabinets in a row facing the operation aisle with main piping and power busbars at the rear; power auxiliary zone (one end) — circulation pump sets, plate heat exchanger, expansion tank, distribution cabinets and monitoring host, physically separated from the cabinet zone reducing noise impact; operation aisle (front of cabinets, ≥1.2 m) with full steel anti-static flooring, cables and branch piping beneath.
7. System Architecture and Working Principle
7.1 Container Shell System
40-foot custom container: external 12192×2438×2896 mm, internal 12032×2280×2680 mm; Q235B steel frame with 2 mm corrugated roof, 1.8 mm corrugated sides, 3 mm patterned floor with reinforcing beams; standard ISO 6346 corner castings; full welds with rust treatment; 9-level seismic; IP54; shot-blast Sa2.5 with epoxy zinc-rich primer ≥60 μm, epoxy mica intermediate ≥80 μm, polyurethane outdoor topcoat ≥60 μm — total ≥200 μm, outdoor corrosion life ≥10 years; working -40℃ to 60℃, storage -50℃ to 70℃, ≤3000 m altitude, wind ≥12 levels, seismic ≥8; side main door (900×2100 mm class A fire door with seals, closer, fire lock), remote emergency escape door with push bar; 4 rain/dust louver vents (600×600 mm, aluminum, G4 filters); 4 cable entry holes with waterproof glands and fire-stop; 4 pipe interface holes; full steel anti-static floor (600×600, ≥1000 kg/m², 10⁶-10⁹ Ω); 8 explosion-proof LED panel lights (18 W, ≥300 lux); ground bus 40×4 mm copper with galvanized connections and equipotential terminal box (≤4 Ω); safety signs.
Six-face insulation: 50 mm high-density rock wool, class A non-combustible, inner/outer color steel encapsulation, λ ≤0.04 W/(m·K), B1 — preventing condensation and reducing energy.
7.2 Immersion Computing Cabinet System
Cabinet body: 600×1200×2000 mm, 304 stainless steel integral welding, sealed structure, static load ≥1500 kg, pressure 0.1 MPa — single-phase immersion, 60 kW design cooling per cabinet. Sealed top cover: matching 304 steel with food-grade silicone seal ring, quick-release latches, observation window — sealing against evaporation. Server shelves: 42U standard positions, 304 steel, adjustable spacing for 1U/2U servers, fixing clips. Internal liquid distribution module: bottom uniform distribution with flow-regulating valves ensuring even in-cabinet flow. Level sensors: submersible, dual high/low thresholds, ±1 mm, 4-20 mA, one per cabinet. PT100 sensors: 0-80℃ ±0.1℃, 304 housing, supply/return per cabinet (12 total). Point leak probes: sensitivity ≤10 kΩ, relay output, one per cabinet base. Self-sealing quick couplings: DN25, 304, 1.6 MPa, auto-seal on disconnect (12 sets). Ground terminals: M8 copper tin-plated, 2 per cabinet to the equipotential system.
7.3 Coolant
Synthetic hydrocarbon insulating immersion coolant: dielectric strength ≥35 kV, flash point ≥160℃, kinematic viscosity 15 mm²/s (40℃); 2000 L total (about 300 L per cabinet plus piping margin); non-toxic, non-corrosive, compatible with metals, PCB, rubber and plastics; biodegradable, not a hazardous chemical; dedicated 20 L food-grade refill kits.
7.4 Circulation and External Cooling System
Variable-frequency main circulation pumps (2, one-use-one-standby): 50 m³/h, 25 m head, 380V three-phase, cast-iron body, mechanical seal; automatic switchover <10 s on failure. Air-cooled dry coolers (2): 400 kW total heat rejection, EC variable-frequency axial fans, outdoor type, aluminum fins + copper tubes, container-top mounted. Plate heat exchanger (1): 316L plates, 40 m², 1.6 MPa — isolating cabinet-side and external-side loops. Expansion/pressurization tank (1): 500 L, 304 steel, level gauge, pressure gauge, vent — stabilizing pressure and compensating expansion. Auto refill pump (1): 5 m³/h, 15 m head, 220V, level-linked automatic. Precision filters (2, one-use-one-standby): 10 μm, 304 housing, cleanable elements, flange connections. Pressure transmitters (4): 0-1.6 MPa, 0.5 class, 4-20 mA, on supply/return mains. Electric proportional valves (2): DN50, 4-20 mA control, ±5% accuracy, 304 — auto-regulating flow and return temperature. Check valves (4): DN50 swing type, 304, anti-backflow at pump outlets and main circuits. Manual ball valve sets: DN15-DN80 full range, 304, two-piece — branch, drain and vent valves.
7.5 Power Distribution System
Main incoming cabinet: 400A three-phase main breaker, multiple branches, energy meter, indicators, surge protection — 380V three-phase five-wire. Cooling power cabinet: 250A main breaker with branch control of pumps, dry coolers and auxiliary equipment. Smart rack PDUs (12, 2 per cabinet): three-phase 32A input, 24 × C13 outputs, current/voltage monitoring, serial communication — A/B dual-path redundancy. T2 surge protectors (2): three-phase 4P, In 40 kA, ≤25 ns. Cables: YJV-0.6/1kV 3×185+2×95 main (50 m), 3×6+2×4 cabinet feeds (120 m), RVV/RVVP control/signal cables and CAT5e. Terminals and auxiliaries: copper lugs, terminal blocks, ties, number tubes.
7.6 Intelligent Monitoring and Management System
Embedded monitoring host: industrial PC, i5, 8 GB, 256 GB SSD, DIN-rail. 10-inch industrial touchscreen: 1024×600, capacitive, embedded. Environment T/H sensors (8): 0-50℃ / 0-95% RH, ±0.5℃/±3% RH, RS485. Locating leak detection cable (80 m): 4-core sensing, location error ≤1 m, RS485 — under cabinets and main piping. Photoelectric smoke sensors (4): relay output, per GB 4715, at the top. Network HD cameras (4): 2 MP, IR night vision, wide angle, POE — equipment zone and aisle. Access control (1): card + password, entry records, relay output. Audible/visual alarms (2): 220V, red flash + 85 dB siren, two levels (fault/fire), inside + outside. Liquid-cooling management platform software: B/S architecture — remote monitoring, alarm push, data reports, history query; WEB and mobile. Gigabit industrial switch (1): 8-port, DIN-rail, industrial wide temperature.
7.7 Fire and Safety Protection System
Cabinet-type heptafluoropropane devices (2): 70 L, pipeless, electromagnetic start, 50 kg charge — gas suppression for the core equipment zone. Manual fire alarm buttons (2): manual reset, fire phone jack, waterproof — at main and escape doors. Emergency lighting (4): LED, ≥90 min endurance, auto-on on power loss. Evacuation signs (3): electroluminescent + phosphorescent backup. CO₂ extinguishers (4): 5 kg, for electrical fires — inside and outside. Fire-stop materials: putty, boards, sealant, fire collars at all penetrations.
7.8 Piping and Auxiliary Materials
304 stainless seamless pipes (DN80/50/25, 2 mm wall, polished); stainless braided flexible hoses (DN25, 1.6 MPa, 1 m, quick connections, 12 pcs); rubber-plastic insulation (20 mm, B1, λ ≤0.038); adjustable pipe supports with vibration pads (30 sets); seal spare kits (EPDM gaskets, FKM O-rings); quick-clamp couplings with silicone seals; wiring/labeling auxiliaries.
8. Detailed Technical Design
8.1 Cooling System Design
Closed single-phase immersion loop: coolant flows through each cabinet’s distribution module, absorbs server heat directly, returns to the plate heat exchanger transferring heat to the external loop, rejected by air-cooled dry coolers; variable-frequency pumps and EC fans adjust per load and ambient; expansion tank stabilizes pressure; auto refill linked to level; filters and proportional valves maintain quality and temperature; one-use-one-standby pumps/filters with <10 s switchover.
8.2 Electrical Design
380V three-phase five-wire dual mains with ATS (optional); main 400 kVA capacity (360 kW IT + ~36 kW cooling/auxiliary); A/B dual-path PDUs for IT with UPS support; complete protections (overload, short, leakage, T2 surge); equipotential grounding ≤4 Ω; per-circuit breakers.
8.3 Monitoring and Management Design
Unified platform collecting all parameters (coolant temperature/pressure/flow/level, cabinet temperatures, environment, power, fire, access, video); auto alarms with local/remote push; Modbus-RTU/SNMP/API integration with customer DCIM; B/S WEB + mobile APP; data storage, reports and energy analysis; unattended 7×24 operation.
8.4 Safety Design
Leak protection: point probes per cabinet + locating cable under cabinets/piping — leak located within 1 m and alarmed in seconds; insulated coolant (≥35 kV) prevents shorting on contact; fire: smoke detection (≤3 s response) + heptafluoropropane automatic gas suppression + CO₂ extinguishers; physical: access control, video, anti-vandalism shell; grounding and lightning per codes.
8.5 Commissioning Design
Filling and leak testing; circulation commissioning; temperature-field testing; full-system linkage tests; loaded performance verification; PUE measurement; fire system tests; documentation and training.
9. Recommended Configuration and Preliminary Budget
9.1 Configuration Summary (40-Foot, 6 × 60 kW)
Shell: 40-ft custom container (IP54, reinforced); six-face rock-wool insulation; class A fire main door + escape door; 4 rain/dust louvers; full steel anti-static floor; 8 explosion-proof LED lights; lightning/grounding; safety signs.
Immersion computing: 6 × 60 kW immersion cabinets (304 stainless, sealed, 42U shelves, distribution modules); 6 sealed covers; 6 level sensors; 12 PT100 sensors; 6 point leak probes; 12 self-sealing couplings; 12 ground terminals.
Coolant: 2000 L insulating immersion coolant; refill kits.
Circulation/cooling: 2 variable-frequency pumps (one-use-one-standby); 2 air-cooled dry coolers (400 kW); 1 plate heat exchanger; 1 expansion tank; 1 auto refill pump; 2 precision filters; 4 pressure transmitters; 2 electric proportional valves; 4 check valves; manual ball valve sets.
Power: 1 main incoming cabinet (400A); 1 cooling power cabinet (250A); 12 smart PDUs; 2 T2 surge protectors; power/control cables and terminals.
Monitoring: monitoring host; 10-inch touchscreen; 8 T/H sensors; 80 m locating leak cable; 4 smoke sensors; 4 HD cameras; access control; 2 audible/visual alarms; liquid-cooling platform software; gigabit switch.
Fire/safety: 2 × 70 L heptafluoropropane devices; 2 manual alarm buttons; 4 emergency lights; 3 evacuation signs; 4 CO₂ extinguishers; fire-stop materials.
Piping/auxiliaries: 304 stainless pipes; flexible hoses; insulation; supports; seal kits; couplings; wiring auxiliaries.
Services: on-site installation; joint commissioning and testing (fill/leak, circulation, temperature field, linkage); optional third-party acceptance; training (2 persons).
9.2 Quotation Notes
The list is the standard-configuration reference for one 40-foot unit; the final quotation is calculated per final configuration, quantities and services, and is tax-inclusive. All prices are indicative and quoted in RMB (CNY) only — no foreign-currency conversion is provided. Warranty: 1 year whole system (2 years core equipment, 3 years coolant) with free repair/replacement of non-artificial faults, one free annual patrol and 7×24 support; lifetime maintenance and preferential spare parts after warranty.
10. Technical Specifications
10.1 System Performance Summary
| Item | Specification |
|---|---|
| Technology | Single-phase full-immersion liquid cooling (direct contact) |
| Cooling per cabinet | 60 kW (customizable to 100 kW) |
| Cabinets / total load | 6 per 40-ft container / 360 kW |
| Coolant | Synthetic hydrocarbon, ≥35 kV dielectric, flash point ≥160℃ |
| Coolant loss | ≤5%/year; life ≥5 years |
| PUE | Annual average ≤1.1 |
| Container | 40-ft, IP54, -20℃ to 45℃, 12-level wind, seismic 8 |
| Insulation | 50 mm rock wool, class A, six faces |
| Power | 380V three-phase five-wire, 400 kVA, dual mains + A/B PDU |
| Circulation | 2 pumps one-use-one-standby (50 m³/h, 25 m), switchover <10 s |
| Heat rejection | 2 air-cooled dry coolers, 400 kW, EC fans, no water consumption |
| Cooling path | Cabinet → plate exchanger → dry cooler (closed loops) |
| Leak detection | Point probes + locating cable (error ≤1 m), seconds-level alarm |
| Fire protection | Smoke (≤3 s) + heptafluoropropane gas suppression + CO₂ |
| Monitoring | B/S platform, WEB + mobile, Modbus/SNMP/API, unattended |
| MTBF / life | ≥100,000 h / ≥10 years |
| Deployment | ≤30 days (on site 7-10 days) |
| Warranty | 1 year system / 2 years core / 3 years coolant |
10.2 Key Component Specifications
| Component | Key Parameters |
|---|---|
| Container | 12192×2438×2896 mm, Q235B, ≥200 μm coating, ISO corner castings |
| Immersion cabinet | 600×1200×2000 mm, 304 integral welded, 60 kW, 1500 kg |
| Sealed cover | 304 + silicone seal, quick-release, observation window |
| Server shelves | 42U, 304, adjustable, 1U/2U compatible |
| Coolant | ≥35 kV, flash ≥160℃, 15 mm²/s, 2000 L |
| Circulation pump | 50 m³/h, 25 m, 380V, redundant pair |
| Dry cooler | 400 kW total, EC fans, outdoor |
| Plate exchanger | 316L, 40 m², 1.6 MPa |
| Expansion tank | 500 L, 304, level + pressure + vent |
| Smart PDU | 32A three-phase in, 24 × C13, monitoring, A/B |
| Monitoring host | i5, 8 GB, 256 GB SSD, DIN rail |
| Touchscreen | 10-in 1024×600 capacitive |
| Locating leak cable | 80 m, error ≤1 m, RS485 |
| Smoke sensor | Photoelectric, relay, GB 4715 |
| Fire suppression | 2 × 70 L heptafluoropropane, 50 kg charge |
| Piping | 304 stainless, DN25-80, 2 mm wall |
11. Key Advantages and Customer Value
11.1 Cooling Technology — Ultra-High Density, Ultimate Heat Exchange
Single-phase full-immersion cooling submerges entire servers in insulating coolant — CPU, GPU and memory directly contact the liquid with heat-exchange efficiency over 1000× air cooling; 60 kW per cabinet (5-10× air-cooled cabinets) — perfectly suiting AI large-model training and HPC. Server fans are eliminated — much lower noise; stable component temperatures reduce thermal stress, extending server life over 30% and lowering hardware failure rates.
11.2 Deployment Efficiency — Factory Prefabrication, Plug-and-Use
All equipment factory-installed, commissioned and tested with full-function testing and 72-hour full-load trial runs; on site only positioning, mains and network connection — deployment ≤30 days, over 80% faster than traditional rooms. The container is relocatable and redeployable per computing needs — high asset utilization for edge nodes, temporary needs and no-fixed-room scenarios.
11.3 Energy Cost — Extreme Saving, Low Carbon
Annual average PUE below 1.1 versus 1.5-2.0 for air-cooled data centers — cooling energy reduced over 50%; variable-frequency control adjusting pump and fan speeds per load and ambient for on-demand cooling; no precision AC, no raised floor, no air-filter loss, no high-power fans — a 60 kW cabinet running full load saves about 200,000 CNY of electricity per year; the incremental liquid-cooling cost recovers in 3-5 years.
11.4 Environment Adaptation — Outdoor Deployment, Full Temperature Range
Outdoor-grade anti-corrosion shell (IP54, rain/dust); six-face insulation isolating external temperature and preventing condensation; lightning/grounding per outdoor electrical safety; stable at -20℃ to 45℃ including plateau, high-temperature, high-humidity and sandy environments. Air-cooled dry coolers need no cooling tower and no water — suitable for water-scarce regions, avoiding legionella and scale issues.
11.5 Safety and Reliability — Multiple Redundancy and Protection
Core parts fully redundant (pumps one-use-one-standby, dry coolers redundant, dual-path power) eliminating single points of failure; industrial-grade market-verified products with long MTBF. Safety: electrical (overload/short/leakage/surge); liquid cooling (point + locating dual leak detection with seconds-level alarms); fire (heptafluoropropane automatic gas suppression); physical (access control, video) — 7×24 unattended stable operation.
11.6 O&M Management — Intelligent Control, Minimal Maintenance
Professional liquid-cooling management platform with full-system visualized monitoring; automatic alarms, remote control, data reports and energy analysis via computer or phone — no on-site patrol; daily O&M is only level checks, coolant top-up and filter cleaning — no professional liquid-cooling team; coolant loss <5%/year (annual top-up); server installation/removal is simple — easier than cold-plate liquid cooling.
11.7 Customization — On-Demand Design, High Matching
Full customization per computing needs, site conditions, environment and budget — container size, cabinet count, cooling power, distribution capacity and monitoring functions; three free design options; one-stop full-process service with dedicated follow-up.
11.8 Lifecycle Cost — Long-Term Value, Investment Return
Although initial cost is slightly higher than air cooling, lifecycle cost is lower: significant electricity savings; extended server life reducing hardware replacement; reusable container structure with high residual value; compliance with dual-carbon policy with green certification and potential subsidies — social and brand value.
12. Technical Q&A (50+ Items)
12.1 Shell and Foundation
Q1: Does the container liquid-cooling room need a special foundation?
A: Normally only a leveled hardened concrete surface with ≥5 t/m² load capacity; outdoor soil needs a concrete platform slightly larger than the container for drainage; standard corner castings allow direct crane positioning — very simple installation.
Q2: Can the shell be placed outdoors? Is it rain/sun protected?
A: Yes — outdoor-grade anti-corrosion (total coating ≥200 μm, UV/acid/alkali resistant); sealed joints and openings with IP54 rain/dust protection; corrugated roof drains without ponding; outdoor corrosion life ≥10 years.
Q3: How many immersion cabinets fit in a 40-foot container?
A: A standard 40-ft container (internal ~12 m) with single-row front-operation layout holds 6 standard-width immersion cabinets plus the operation aisle and power auxiliary zone; double-row layouts fit more but sacrifice operation space; custom capacities available.
Q4: What does the insulation do? Will it condense?
A: Six-face insulation isolates external heat (lower cooling energy) and keeps the interior uniform, preventing condensation on interior walls; 50 mm rock wool with color-steel encapsulation and interior ventilation — no condensation even in high-temperature high-humidity environments.
Q5: Can the container be stacked or shipped by sea?
A: Yes — standard ISO corner castings and structure meet marine standards for stacking, sea and road transport; top-mounted equipment (dry coolers) needs protection or temporary removal when stacking.
12.2 Immersion Cabinet Core
Q6: Full-immersion vs. cold-plate liquid cooling — which is better?
A: Cold-plate attaches plates to major heat sources (indirect, other components still air-cooled); full-immersion submerges the whole server (direct contact). Full-immersion: stronger cooling (100 kW+ vs. 30-40 kW), minimal server modification (remove fans only), simpler insertion/removal with lower leak risk; cold-plate needs custom plates per server. Full-immersion suits ultra-high-density and mixed-model scenarios; initial cost slightly higher but simpler O&M.
Q7: Can ordinary servers go directly into the immersion cabinet? What changes are needed?
A: Basically yes — remove fans and heat sinks, replace with dedicated immersion guide/fixing parts; seal mechanical hard disks if present; power supplies usually unchanged — simple, no hardware damage, warranty unaffected; modification service or guidance provided.
Q8: Does the coolant corrode server components?
A: No — the synthetic hydrocarbon coolant is chemically stable and fully compatible with copper, aluminum, stainless steel, PCB, capacitors, rubber and plastics — no corrosion, swelling or dissolution; widely field-verified for years; stable temperatures actually extend hardware life.
Q9: What if the immersion cabinet leaks?
A: Integral welded sealed structure with factory pressure testing — normal use almost never leaks; multi-level protection: point probes per cabinet base alarm on trace leakage; locating leak cable beneath detects the position; floor collection structure contains leakage; alarms (audible/visual + remote) notify O&M immediately.
Q10: How is a server removed for repair?
A: Very convenient — quick-release sealed cover opens by unlatching; servers on standard shelves lift out after cable disconnection, similar to traditional racks; surface coolant wiped or drained — no hardware damage; complete in under 5 minutes, comparable to air-cooled O&M after practice.
12.3 Coolant and Circulation
Q11: Is the coolant toxic? Is contact safe?
A: Very safe — non-toxic, no irritating odor, harmless on skin contact (rinse with water); halogen-free, heavy-metal-free, biodegradable and environmentally friendly — not a hazardous chemical, no special transport/storage/use restrictions.
Q12: Can the coolant burn? Is there fire risk?
A: Flash point ≥160℃ — combustible but not easily ignitable, far above the system’s maximum operating temperature (40-50℃); even extreme internal short circuits cannot ignite it — the liquid actually quenches arcs, making fire risk lower than air cooling; combined with the fire system, overall safety is very high.
Q13: How often is the coolant replaced? Is loss large?
A: Closed circulation without air contact — annual loss ≤5%, only a small yearly top-up; chemically stable with ≥5-year service life; sample testing every 1-2 years with filtration if impurities exceed limits — very low O&M cost.
Q14: Will the system fail if a circulation pump breaks?
A: No — one-use-one-standby redundant pumps; on working-pump failure the system switches to the standby in under 10 seconds without affecting cooling; a fault alarm notifies O&M for repair.
Q15: Will the coolant freeze in winter?
A: No — freezing point ≤-30℃, covering most regions; extreme cold areas can use lower-freezing-point coolant or piping trace heating for normal cold-start operation.
12.4 Power and Electrical
Q16: What power capacity is needed?
A: For a 6 × 60 kW 40-ft container: IT load 360 kW plus ~36 kW cooling/auxiliary — total ~400 kW input, configured with 400 kVA incoming capacity; actual power varies with server load rate — lower at light load.
Q17: Does it support dual mains and UPS?
A: Yes — dual mains input with ATS for redundancy; IT PDUs are A/B dual-path and accept UPS for uninterruptible server supply; cooling can run directly from mains or UPS per customer power design.
Q18: What electrical protections exist?
A: Main breaker with overload/short protection; independent branch breakers; T2 surge protectors against lightning; equipotential grounding with all enclosures grounded; leakage protection for personnel — full equipment and personnel safety.
12.5 Monitoring and O&M
Q19: Can the platform integrate with the customer’s environment-monitoring system?
A: Yes — Modbus-RTU, SNMP and open APIs integrate seamlessly with existing environment-monitoring and data center management platforms; custom protocol development available.
Q20: Can it run unattended? Is dedicated staffing needed?
A: Yes — 7×24 unattended with complete automatic control, alarms and self-protection; monthly patrol (level, filters, piping) without on-site staff — O&M workload reduced over 70% versus traditional rooms.
Q21: Is remote control supported? Can mobile view it?
A: Yes — B/S platform via browser for all parameters, alarms and history; a mobile APP provides real-time status and alarm notifications anywhere.
12.6 Fire and Safety
Q22: What fire protection does the liquid-cooling system use? Can water be used?
A: Never water — heptafluoropropane gas suppression is used, the standard clean-gas method for data centers with no residue and no secondary damage to servers or cooling equipment; photoelectric smoke detection gives early warning with automatic gas discharge and manual start; CO₂ extinguishers supplement initial small fires.
Q23: Would coolant leaking onto electricity short it?
A: No — the coolant is insulating with dielectric strength ≥35 kV (comparable to transformer oil); even leaking onto live parts causes no short or shock — a core safety property of immersion cooling.
12.7 Construction and Acceptance
Q24: How long does on-site installation take?
A: About 7-10 days after factory prefabrication — positioning, cabinet fixing, piping, wiring, filling/leak testing and joint commissioning; as fast as 5 days with ready conditions.
Q25: What are the acceptance standards?
A: Per national standards and contract: shell appearance/structure; electrical insulation and power-on tests; liquid-cooling pressure/leak tests; full-load temperature tests; PUE measurement; monitoring function tests; fire system tests — with an acceptance report and complete as-built drawings, operation and maintenance manuals.
12.8 After-Sales and Maintenance
Q26: What is the warranty and scope?
A: 1-year whole-system warranty (2 years core equipment, 3 years coolant); non-artificial faults repaired/replaced free with free technical support and one annual on-site patrol; coolant performance issues replaced free within warranty.
Q27: How are post-warranty services charged?
A: Annual maintenance agreements with graded options: basic (patrol, remote support, part discounts) and full-coverage (all non-artificial repairs/replacements); fees per configuration — cost-effective for long-term stability.
Q28: What is the fault response time?
A: 7×24 hotline with 30-minute response and remote guidance; on-site within 4 hours urban, 8 hours in-province, 24 hours nationwide (remote areas excepted); core spare parts in safety stock for fast replacement.
12.9 Comparative and Scenario
Q29: How does this compare with traditional air-cooled data centers?
A: 60 kW+ per cabinet vs. 3-10 kW; PUE ≤1.1 vs. 1.5-2.0; deployment ≤30 days vs. 6-18 months; outdoor deployable without civil rooms; relocatable and reusable; server life extended 30%+ with lower fault rates.
Q30: What are the results in AI computing node projects?
A: A 40-ft unit with 6 × 60 kW cabinets carrying 120 × 8-GPU servers achieved 28-day deployment, annual PUE ≤1.08, over 800,000 CNY annual electricity savings, 40% lower fault rate and unattended operation.
Q31: What about university research platforms?
A: Indoor customized immersion cabinets (4 × 50 kW) deployed in existing teaching-building space without modification — 3× space utilization, ≤55 dB noise, GPU temperatures stable within 60℃ at full load, plus teaching/training services.
Q32: What about outdoor edge computing sites?
A: A 20-ft outdoor unit with 3 × 40 kW cabinets deployed directly in an open area — 60% lower construction cost, stable at 40℃ summer, waterproof/dustproof/rodent-proof, remote monitoring without staffing.
Q33: What about industrial AI quality-inspection workshops?
A: 2 industrial immersion cabinets (30 kW each) in a workshop auxiliary room — immersion isolates dust (solving dust-induced failures), unaffected by high workshop temperature, cleaning workload reduced from monthly to annual, longer equipment life.
Q34: How is the solution scaled for multi-node deployment?
A: Parallel factory production; standardized identical configurations simplifying spares and O&M; batch training and on-site spare reserves; tiered pricing; each node plug-and-use after positioning.
Q35: How is the total cost controlled?
A: Factory prefabrication cuts site work; PUE ≤1.1 saves electricity; extended server life and low fault rates reduce hardware cost; reusable containers preserve asset value — optimal lifecycle cost.
Q36: What are the green credentials?
A: PUE ≤1.1 far below policy requirements; no water consumption (dry coolers); biodegradable non-hazardous coolant; recyclable steel structure — supporting green data center certification and dual-carbon goals.
Q37: How is service quality supervised?
A: Follow-up calls after each service; patrol reports; complaint hotline with 24-hour reply; dedicated service engineer per project; spare-part warehouses at multiple levels.
Q38: Why choose the KITOZER/Lain solution?
A: 20+ years of room/cabinet experience, source-factory immersion liquid-cooling technology with full-chain capability (cabinet design, coolant selection, circulation integration, management platform), strict factory testing, customization and complete after-sales — a reliable containerized immersion liquid-cooling solution.
12.10 Delivery and Compliance
Q39: What is the delivery period?
A: About 30 working days total: design/procurement ~10, factory integration and testing ~15 (incl. 72-h full-load trial), transport 2-3, site installation 7-10 days (parallel where possible).
Q40: What documentation supports acceptance?
A: Product certificates, type-test reports, factory inspection and trial-run reports, wiring/piping diagrams, acceptance test records (insulation, leak, temperature field, PUE, fire), as-built drawings, operation and maintenance manuals — complete for filing.
Q41: What standards apply?
A: GB 50174, GB 50462, GB/T 51314, GB/T 2887, GB 50052, GB 50054, GB 50057, GB 50116, GB 50370, YD/T 3986-2021 (immersion liquid-cooled server systems), YD/T 3751-2020 (containerized data centers).
Q42: How is the coolant managed during transport?
A: Coolant shipped in sealed food-grade containers; on-site filling with dedicated kits; closed-loop filling with leak testing; level monitoring after start-up; annual top-up per loss.
Q43: What happens on a mains failure?
A: With dual mains + ATS, supply switches seamlessly; with UPS on IT PDUs, servers continue; cooling may ride UPS per design; alarms notify O&M; recovery recharges automatically.
Q44: How is the temperature field verified?
A: Full-load temperature testing with PT100 sensors at cabinet supply/return and server-level monitoring — verifying supply/return difference of 8-12℃ and component temperatures within thresholds; documented in the acceptance report.
Q45: How is the environment monitored?
A: 8 T/H sensors across the interior; smoke sensors; cameras; access control; all integrated into the platform with alarms and video linkage.
Q46: How are cabinets added later?
A: Modular design with reserved power, piping and monitoring interfaces — additional cabinets connect to the loop and distribution without stopping existing operations; platform auto-discovers new units.
Q47: What are the noise levels?
A: Immersion removes server fans; main noise is the dry coolers and pumps outdoors — interior operation noise far below air-cooled rooms; suited to noise-sensitive teaching-building and office-adjacent deployments.
Q48: How is the coolant quality maintained?
A: 10 μm precision filters (one-use-one-standby) remove impurities; annual sampling testing; filtration and reuse when impurities exceed limits; performance verified before continued use.
Q49: What are the personnel safety measures?
A: Insulated coolant prevents shock; emergency stops; access control and video; fire system with evacuation signs and lighting; grounding ≤4 Ω; operating training and safety signs.
Q50: How is the solution delivered end to end?
A: Free survey and three design options → source-factory integration with 72-hour testing → whole delivery → 7-10-day site installation → commissioning and acceptance → training and documentation → 1/2/3-year warranty with annual patrol and lifetime support — one-stop service.
13. Construction Schedule
13.1 Stage Division
The project is divided into stages with factory prefabrication and site foundation work in parallel: solution confirmation and procurement; factory integration and testing; transport; on-site installation; joint commissioning; acceptance and handover. Total deployment ≤30 days (on site 7-10 days).
13.2 Detailed Schedule (Reference)
| Stage | Work | Duration | Responsible |
|---|---|---|---|
| 1. Confirmation and procurement | Solution finalization, drawings sign-off, component/material procurement | ~10 days | PM, procurement |
| 2. Factory integration | Container modification; immersion cabinets, piping, power, monitoring, fire systems installation; coolant filling and leak testing; full-function testing and 72-h full-load trial run | ~15 days | Production, electrical, QC |
| 3. Transport | Packing and fixing; transport to site; unloading and acceptance | 2-3 days | Logistics |
| 4. On-site installation | Container positioning and leveling; cabinet fixing; piping connection; electrical wiring; coolant filling and leak testing | 3-5 days | Site crew |
| 5. Commissioning | Circulation commissioning; temperature-field testing; linkage tests; loaded verification; PUE measurement | 2-3 days | Engineer |
| 6. Acceptance | Acceptance tests per standards; documentation; training; handover | 1-2 days | PM, customer |
13.3 Key Node Control
Drawing sign-off before production; factory inspection (appearance, structure, electrical, leak, full-load trial) before shipment; site acceptance after all tests (insulation, leak, temperature field, PUE, fire, monitoring) with documentation; 72-hour continuous trial run verification.
13.4 Schedule Assurance
Advance stocking of core components (pumps, dry coolers, cabinets, coolant) with stable suppliers; flexible production with priority scheduling; parallel factory and site preparation; dedicated experienced team; contingency plans for material/transport/weather; daily progress tracking and customer communication.
14. Construction Organization and Quality/Safety Measures
14.1 Organization Structure
Project manager (1): overall progress, quality, safety, resources, customer liaison. Technical lead (1): design, disclosure, commissioning guidance, technical quality. Site lead (1): site organization, personnel, safety, progress. Electrical workers (2-3, certified): wiring, distribution, commissioning. Piping/mechanical workers (2): piping, pumps, dry coolers, coolant filling. Safety officer (1, part-time): full-process safety supervision. QC (1): process acceptance, material checks.
14.2 Pre-Construction Preparation
Technical: drawings/codes/solution study with full disclosure; construction plan and work instructions; calibrated instruments (megger, withstand tester, pressure test pump, ground tester, thermal imager); site conditions confirmed (foundation load, power, network, lifting access). Materials: equipment/components/coolant counted and verified (certificates, test reports); tools (drill, wrenches, crimping pliers, lifting gear, filling kits); PPE (helmets, insulating shoes/gloves, harnesses, goggles, extinguishers). Personnel: certified electricians and welders; safety and technical training with assessment. Site: level the foundation (≥5 t/m²); confirm transport and lifting routes; warning zones; temporary power.
14.3 Core Construction Processes
Container positioning: crane positioning on the leveled foundation with direction accuracy; level with shims (≤2 mm/m); fix per design (ballast or bolts); verify appearance, seals and locks; connect grounding (≤4 Ω).
Immersion cabinet installation: position cabinets in the equipment zone, fix on bases; connect supply/return piping via flexible hoses and quick couplings; install level/PT100/leak sensors; connect ground terminals to the equipotential bus.
Piping: assemble 304 stainless piping per drawings with supports and vibration pads; weld/quick-clamp connections with seal verification; pressure test (1.6 MPa) and leak test; insulation on cold pipes; labels and flow direction marks.
Electrical: main and cooling distribution cabinets; A/B PDU feeds to cabinets; monitoring/control wiring; grounding and equipotential; insulation tests before power-on.
Coolant filling: fill via dedicated kits to the design level; bleed air; verify levels and pressures; leak check all joints.
Commissioning: circulation start and parameter setting; temperature-field testing; linkage tests (alarms, fire, access, video); loaded verification; PUE measurement; 72-hour trial run; documentation.
14.4 Quality Assurance
Standards per national codes and drawings; three-inspection system (self, mutual, special) per process; material incoming verification with certificates — unqualified rejected; key processes (piping pressure test, coolant filling, electrical insulation, commissioning) supervised with records; concealed works accepted before covering; complete synchronized documentation delivered at completion.
14.5 Safety and Civilized Construction
Safety: certified staff; disclosure before work; lifting with plans and command; electrical work de-energized with tags and supervision; coolant handling with goggles and gloves (non-toxic but clean); no smoking, extinguishers, hot-work permits with watchers; harnesses for high work; daily power cut and cleanup. Civilized: materials stacked neatly; site rules observed; noise control; waste removed — work finished, site clean; environment protection during works.
14.6 Site Management and Contingency
Dedicated coordination with the customer on power, network and site conditions. Contingency: coolant leak — isolate, contain, repair, refill; pump failure — standby switchover; electrical fault — power off, investigate, resume; weather — outdoor work rescheduled; injury — stop work, first aid, hospital if serious, investigate and rectify.
15. After-Sales Service
15.1 Service Commitment
1-year whole-system warranty (2 years core equipment, 3 years coolant) from acceptance: non-artificial faults repaired and parts replaced free; free technical support; one free annual on-site patrol; coolant performance issues replaced free within warranty; exclusions: misuse, private modification, external damage, force majeure, consumable wear.
15.2 In-Warranty Services
Free repair/replacement with on-site service; 7×24 hotline with 30-minute response and remote guidance; on-site within 4 hours urban, 8 hours in-province, 24 hours nationwide; free annual patrol (system check, coolant level/quality, filter cleaning, electrical/leak checks) with formal reports; software and platform upgrades free.
15.3 Post-Warranty Value-Added Services
Annual maintenance agreements with graded options (basic: patrol, remote support, part discounts; full: all non-artificial repairs/replacements); system upgrades (cabinet addition, capacity/power expansion, platform functions, AI predictive maintenance); coolant refill and quality testing services.
15.4 Fault Response Flow
Report (phone/WeChat/email) → registration → 30-minute remote diagnosis → on-site dispatch with parts → repair and verification → 24-hour follow-up with satisfaction archiving; core spare parts in safety stock for fast replacement.
15.5 Spare Parts Assurance
Three-level warehouses (headquarter, regional, site) stocking pumps, filters, sensors, seals and quick couplings; original genuine parts; lifetime preferential supply.
15.6 Service Quality Supervision
Follow-up calls after every service; patrol reports; complaint hotline with 24-hour reply; dedicated service engineer per project; service quality tied to engineer performance.
16. Training Plan
16.1 Objectives and Audience
Objectives: enable trainees to master the system architecture, principles, operation, daily maintenance, common fault finding and emergency handling — operators independently perform monitoring/start-stop/alarm handling; O&M staff perform patrol, coolant management, filter cleaning and simple faults; managers master architecture, energy management and scheduling.
Audience: operators/duty staff; O&M technicians; management and project leads; internal technical staff (advanced principles, coolant chemistry, deep diagnosis).
16.2 Training Content
Theory: immersion liquid-cooling principles and coolant properties (safety, compatibility); system architecture (immersion cabinets, circulation, dry coolers, power, monitoring, fire); standards and codes; safety management (electrical, coolant handling, fire, emergency flows).
Practice: platform operation (monitoring views, alarms, reports, remote control); cabinet operations (cover opening, server insertion/removal, cable connection); circulation system operation (pump switchover, valve operation, proportional valve setting); coolant management (level check, refill, sampling); power panel operation (breakers, PDUs, A/B paths); fire system operation (manual alarm, gas suppression start/stop).
Maintenance: daily/monthly patrol items and standards; filter cleaning and replacement; coolant level/quality checks; piping and seal inspection; leak detection system testing; running-state judgment via platform parameters.
Fault finding: common faults (alarm codes, temperature anomalies, pressure/flow deviations, level low, leak alarms, communication); layered troubleshooting (power → circulation → coolant → monitoring); simple on-site handling (pump switchover, filter cleaning, seal replacement, sensor check); emergency flows (leak, fire, mains failure, high temperature).
16.3 Methods and Schedule
“Theory + demonstration + hands-on + assessment” over 2 working days at acceptance: Day 1 — system overview, immersion/coolant principles, safety (AM); platform and cabinet practice (PM); Day 2 — maintenance and fault finding (AM); assessment, Q&A, documentation (PM). Adjustable; multi-node projects trained in batches; remote video training for refreshers and new staff.
16.4 Assessment and Documentation
Theory written test (100 points, 60 pass) + practical assessment (platform operation, server insertion/removal, patrol flow, simple fault handling); qualified trainees certified; free retraining for failures. Delivered: product user manual, O&M manual, coolant safety data sheet, common-fault handbook, training PPT, demo videos, factory inspection reports and certificates.
16. Training Plan
16.1 Training Objectives and Audience
Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.
Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.
16.2 Tiered Training Content System
Level 1: Basic operation training (1 day)
– Basic principles: system concepts, structure composition, performance indicators;
– Daily operation standards: correct operation of equipment, control and safety systems;
– Daily inspection contents: daily/weekly/monthly check items;
– Safety precautions: usage prohibitions and emergency handling procedures.
Level 2: Maintenance training (1 day)
– Detailed structure of each subsystem and working principles;
– Daily maintenance methods: cleaning, fastening checks, routine care;
– Common fault identification and simple handling;
– Emergency handling procedures for power failure, fire and equipment faults.
Level 3: Advanced management training (as needed)
– Performance influencing factors and how to avoid degradation;
– Upgrade and expansion knowledge and specification requirements;
– Relevant national standards interpretation.
16.3 Training Methods and Schedule
– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;
– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.
16.4 Training Assessment and Documentation Delivery
– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;
– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.
17. Anonymous Typical Project Scenarios
All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.
17.1 Computing Operator Containerized Liquid-Cooling Node Project
Project background. A well-known computing service company needed rapid deployment of high-density GPU computing nodes; traditional room construction was slow and local electricity costs were high with strict energy-efficiency requirements.
Implementation. A 40-foot container full-immersion liquid-cooling solution: 6 × 60 kW immersion cabinets carrying 120 × 8-GPU servers (360 kW total); variable-frequency circulation, air-cooled dry coolers and an intelligent monitoring platform.
Results. Deployment in just 28 days for fast market entry; measured annual PUE ≤1.08, saving over 800,000 CNY of electricity per year versus air-cooled rooms; stable server temperatures with 40% lower fault rate and extended hardware life; unattended operation with greatly reduced O&M workload — the customer continued with the solution for subsequent expansion.
17.2 University Research Platform Immersion Liquid-Cooling Project
Project background. A university AI institute needed a research computing platform for large-model training and experiments; the room was in a teaching building with limited space and strict noise requirements.
Implementation. A customized indoor immersion liquid-cooling solution: 4 × 50 kW immersion cabinets with an indoor cold-source system integrated into the existing power and environment-monitoring systems.
Results. Deployment in existing space without room modification — 3× space utilization; operating noise ≤55 dB without disturbing the office environment; precise temperature control keeping GPUs stable within 60℃ at full load for long research computations; training services helped faculty and students master liquid-cooling technology.
17.3 Edge Computing Outdoor Site Containerized Liquid-Cooling Project
Project background. A smart-city operator needed edge computing at urban edge nodes — open outdoor sites without supporting rooms, requiring adaptation to outdoor high-temperature and high-humidity environments.
Implementation. A 20-foot outdoor container liquid-cooling room: 3 × 40 kW immersion cabinets with outdoor protection, lightning/grounding, access control and video monitoring.
Results. Direct outdoor placement without civil rooms — 60% lower construction cost; stable operation at 40℃ summer ambient with unaffected cooling; waterproof, dustproof and rodent-proof for year-round fault-free outdoor operation; remote monitoring O&M without dedicated staffing — low O&M cost.
18. SEO Optimization Section
All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.
18.1 Keyword System
– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;
– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;
– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;
– Brand keywords: KITOZER, Guangzhou Lain.
18.2 SEO Tag System
– Title tag: the article title — Guangzhou Lain KITOZER;
– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;
– H1 tag: the article title;
– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.
18.3 Internal Link Anchor Text
– Core anchor text: technical design solution, system construction;
– Long-tail anchor text: configuration list, technical parameters, construction plan;
– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.
19. Official Contact Information
– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Official Website: https://gdlain.com
– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China
For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.