Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32
KITOZER
KITOZER

Air Compressor Room Power Distribution and Control System

Table of Contents

1. Cover / Document Information

– Document Title: Air Compressor Room Power Distribution and Control System Technical Design Solution

– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Date: August 2026

– Version: V1.0

– Project Type: Technical design solution for Air Compressor Room Power Distribution and Control System

2. Table of Contents Structure

1. Company Introduction

2. Project Overview

3. User Requirement Analysis

4. Overall Design Description

5. Detailed System Design and Product Technical Parameters

6. Project Quotation and Configuration List

7. Core Solution Advantages

8. Technical Q&A

9. Construction Schedule Plan

10. Construction Organization Plan

11. After-Sales Service System

12. Operation and Maintenance Training Plan

13. Typical Project Cases

14. SEO Optimization System and Website Backend Configuration

15. Contact Information

3. Company Introduction

3.1 Company Development Overview

Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.

After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.

3.2 Core Business System

The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:

– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;

– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;

– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;

– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.

3.3 Brand and Qualification Honors

The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.

3.4 Core Competitive Advantages

1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;

2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;

3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;

4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.

4. Project Background and Objectives

4.1 Project Background and Significance

The air-compressor room is the core power station of an industrial production system, providing stable compressed-air power to production workshops. The reliability of its power distribution system and the intelligence of its control system directly affect plant production efficiency, energy cost and equipment service life.

Traditional air-compressor rooms commonly suffer from incomplete distribution protection, inefficient manual compressor start/stop, unbalanced load across multiple units, poor coordination between dryers and compressors, and high energy consumption. Auxiliary equipment such as environmental (evaporative) air coolers and exhaust fans is mostly controlled independently and manually — dispersed management with high O&M cost.

Building a standardized, intelligent air-compressor-room power distribution and control system achieves safe and reliable supply, intelligent group scheduling of compressors, coordinated auxiliary-equipment control and centralized status monitoring — of real significance for improving operating stability, reducing labor cost and achieving energy saving.

4.2 Core Project Objectives

Build an integrated system of “safe distribution, intelligent control, centralized management”:

Safe and reliable supply: a graded distribution system with complete overload, short-circuit and lightning protection and precise energy metering, ensuring stable power for all equipment.

Intelligent group control: fully automatic group control of 6 air compressors and 4 refrigerated dryers — automatically adjusting the number of running units per pipe-network pressure and rotating units evenly by running time to extend equipment life.

Auxiliary coordinated control: manual/automatic integrated control of environmental air coolers and exhaust fans with timed operation and external-signal linkage.

Centralized status monitoring: real-time monitoring of compressor outlet temperature, dryer outlet temperature, pipe-network pressure and equipment running states with timely fault alarms.

Convenient and flexible operation: automatic and manual single-unit modes, local touchscreen and button operation — balancing automation with commissioning needs.

4.3 Project Scope

The scope covers five core systems:

– Air-compressor-room main distribution box (1): main incoming distribution, metering and lightning protection;

– Air-compressor PLC group-control box (1): group-control logic and status monitoring for 6 compressors and 4 dryers;

– Power distribution cabinet (1): multi-circuit power distribution and master control;

– Environmental air cooler control box (1): start/stop control and timed operation of 2 environmental air coolers;

– Exhaust fan control box (1): control, alarms and linkage of 2 fans of different power ratings.

4.4 Compilation Basis

GB 50054-2011 (low-voltage distribution), GB 50052-2009 (power supply and distribution), GB 50055-2011 (distribution for general electrical equipment), GB 50057-2010 (lightning protection), GB/T 50948-2013 (PLC system engineering design), GB 14048.1-2012 (low-voltage switchgear general), GB 50217-2018 (power cable design), GB 50254-2014 (low-voltage electrical installation and acceptance), plus customer equipment parameters, functional requirements and site conditions.

5. User Requirement Analysis

5.1 Low-Voltage Distribution Core Requirements

Main incoming: three-phase four-wire 380V/220V AC; main switch rated 300A with master disconnection and short-circuit/overload protection. Graded outputs: one 250A circuit for 90kW-class compressors; one 100A circuit for dryers; one 63A spare circuit for future expansion. Metering: multi-function meter for voltage, current, active/reactive power and energy. Lightning and earthing: SPD at the incoming side; independent N and PE busbars. Brand quality: standard boxes, Schneider switchgear.

5.2 Air-Compressor Group-Control Functional Requirements

Pressure constant control: a pressure sensor on the compressed-air main pipe feeds the PLC, which starts/stops and loads/unloads compressors per set pressure limits to maintain stable pressure.

Unit rotation: automatic recording of cumulative running time per compressor; “first-on-first-off, balanced running” rotation to avoid uneven wear.

Dryer linkage: dryers start before their compressors and stop with delay after compressor shutdown.

Temperature monitoring: real-time monitoring of each compressor and dryer outlet temperature with over-temperature alarms.

Manual control: manual/auto switch; per-unit start/stop buttons for commissioning, maintenance and special conditions.

Brand requirements: Siemens PLC and touchscreen; Schneider low-voltage components; Ruipu Sanyuan pressure sensor; standard control boxes.

5.3 Environmental Air Cooler Control Requirements

Circuits: control 2 × 3kW units, each with independent protection. Modes: manual and automatic; automatic via time switch for scheduled operation. Protection: overload and short-circuit per motor with auto-disconnect and fault indication. Enclosure: on-site custom wall-mounted box.

5.4 Exhaust Fan Linkage Control Requirements

Circuits: 2 fans — 22kW and 1.1kW — with independent main circuits and protection. Modes: manual, automatic timed and external-signal linkage. Alarms: running/fault indicators plus audible/visual alarm on overload/short circuit. Linkage interface: reserved dry-contact terminals for external temperature, smoke or compressor running signals.

5.5 Status Monitoring and Management Requirements

Running/fault states shown by panel indicators; group-control system shows pressure, temperature, running time and cumulative energy on the touchscreen; fault recording for later tracing and analysis.

5.6 Operation Mode Requirements

All control systems have manual/auto switching; rational layout with clear labels; standardized wiring with clear wire numbers.

6. Design Principles and Applicable Standards

6.1 Design Principles

Safety and reliability: international first-tier core components; national low-voltage codes; multi-level protection, lightning/earthing and fault alarms. Advanced and practical: Siemens PLC control with sensing and HMI technology — mature architecture, practical functions, no over-design. Economical and energy-saving: group control provides on-demand air supply and balanced running, reducing idling energy and wear; optimized configuration. Expandable and maintainable: reserved spare circuits and interfaces; universal standard components; standardized tidy wiring with clear labels.

6.2 Applicable Standards

Per section 4.4 (GB 50054, GB 50052, GB 50055, GB 50057, GB/T 50948, GB 14048.1, GB 50217, GB 50254).

6.3 Overall Architecture

Four-layer architecture: distribution layer (main distribution box, power distribution cabinet — energy distribution, overload/short protection, metering, lightning/earthing); control layer (PLC group-control box, air cooler box, exhaust fan box — logic, device control, signal processing); sensing layer (pressure, temperature, current detection — field parameters for logic); interaction layer (touchscreen, buttons, indicators, alarm — HMI, status, parameter setting, alarms).

6.4 Supply Network Architecture

Three-level distribution with graded protection: Level 1 — main incoming (300A master switch with protection, SPD and metering); Level 2 — power distribution cabinet multi-circuit distribution (compressor mains, dryer, auxiliary circuits, each independently protected); Level 3 — terminal control (each control box with independent incoming protection; contactors and thermal relays for precise device control and protection). Faults are isolated by level — a single device fault does not affect other circuits.

6.5 Control Logic Architecture

Compressor group control — “pressure closed loop + time balancing”: start the shortest-running compressor when pressure is below the lower limit; stop the longest-running one above the upper limit; dryers start before compressors and stop with delay; start/stop delays with anti-jitter.

Auxiliary logic: air coolers — time switch schedules start/stop via contactors; exhaust fans — timed, manual or external-signal triggers; faults auto-stop with alarms.

6.6 Sensing and HMI Architecture

Sensing: pressure sensor on the main pipe (4-20mA to PLC); PT100 temperature sensors at each compressor/dryer outlet; multi-function meters for electrical quantities; thermal relays for motor overload. HMI: touchscreen (parameters, status, faults, trend curves) + panel buttons (emergency stop, manual/auto, per-unit start/stop — operable even with screen failure).

7. System Architecture and Working Principle

7.1 System Working Principle

Power flows from the main incoming (300A switch with SPD and metering) through the three-level distribution network to each load: compressors, dryers, environmental air coolers and exhaust fans. The PLC group-control system reads the pipe-network pressure via the pressure sensor (4-20mA) and outlet temperatures via PT100 sensors; the pressure closed-loop logic starts the shortest-running compressor below the lower limit and stops the longest-running above the upper limit, with dryers linked ahead of compressor start and delayed after stop. Over-temperature, overload and fault conditions trigger alarms and protective stops. The touchscreen presents the overall system diagram, live parameters, trend curves, alarm records and running statistics, while panel buttons provide manual single-unit control and emergency stop.

7.2 System Architecture Overview

Four-layer architecture: the distribution layer (main distribution box, power distribution cabinet) provides graded power with protection, metering and lightning/earthing; the control layer (PLC group-control box, air cooler box, exhaust fan box) executes logic, device control and signal processing; the sensing layer (pressure, temperature and current detection) supplies field data; the interaction layer (touchscreen, buttons, indicators, alarms) provides monitoring, parameter setting and fault notification. The three-level supply network isolates faults by level, and the control network links compressors, dryers and auxiliary equipment for coordinated automatic operation.

8. Detailed Technical Design

9.1 Air-Compressor Room Main Distribution Box

Function: main incoming 380V three-phase four-wire; master overload/short protection; multi-function metering; SPD; 3 outgoing circuits (compressor, dryer, spare); N and PE busbars.

Enclosure: standard wall-mounted distribution box; cold-rolled steel 1.2mm body / 1.5mm door; phosphating + electrostatic powder, matte grey; IP30; wall-mount with lugs; standard lock; C45 rails, terminals, cable ducts; reinforced door; GB 7251.3-2006.

Main MCCB (Schneider NSX): AC400V, Ui 690V, Uimp 6kV, 300A, 3P, Icu/Ics 50kA/400V, thermal-magnetic release (long-delay adjustable, instantaneous 10In), manual with handle indication, optional aux/alarm contacts, mechanical ≥20,000 / electrical ≥10,000, -25℃~+70℃, GB 14048.2/IEC 60947-2, CCC.

Outgoing MCCBs: 250A (50kA) compressor circuit; 100A (36kA) dryer circuit; 63A (36kA) spare circuit — all Schneider NSX, thermal-magnetic, 3P.

Multi-function meter: three-phase four-wire; 0~450V; 5A via CTs; 0.5-class V/I, 1.0-class energy; V/A/P/Q/PF/Hz/forward & reverse energy; LCD cycling display; optional RS485 Modbus-RTU; AC220/380V supply; ≤2VA; 2kV/1min; -10℃~+55℃; panel mount; GB/T 17215.321.

SPD (level 2): 3P+N; Un 385V, Uc 420V; In 20kA / Imax 40kA (8/20μs); Up ≤1.8kV; ≤25ns; green/red window; thermal + overcurrent disconnector; DIN rail; -40℃~+85℃; GB 18802.1/IEC 61643-11, CCC.

N/PE busbars and auxiliaries: 6×30mm tin-plated high-purity copper with multiple terminals; main circuits with gauge-matched stranded copper; control circuits 1.5mm²; cold-pressed terminals; PVC number tubes; flame-retardant ducts; 35mm C45 rails; stainless hardware.

9.2 Air-Compressor PLC Group-Control Box

Overall function: Siemens PLC core controlling 6 compressors + 4 dryers — constant-pressure supply, balanced rotation, dryer linkage, temperature monitoring/alarms, manual/auto switching, centralized display, data recording, emergency stop.

Auto logic: pressure lower-limit triggers next compressor after T1 (default 30s, adjustable); upper-limit stops one after T2; minimum running count ≥1; rotation by cumulative time (shortest starts first, longest stops first, daily time-basis calibration, faulted units masked); dryer starts before compressor and stops 5-30min after (adjustable); compressor blocked if its dryer faults; outlet temperatures alarm at threshold and stop the unit at higher threshold.

Manual mode: switch to manual disables auto logic; per-unit start/stop buttons; all protections remain active; emergency stop effective in both modes.

Enclosure: standard wall control box; steel 1.2/1.5mm; IP30; touchscreen embedded; buttons/indicators/switch/E-stop on panel; double-layer mounting plate; top vents; labeled door interior with schematic.

PLC CPU (Siemens S7-200 SMART): AC220V; 30KB program, 20KB data, 10KB retentive; 24 DI (sink/source), 16 relay DO; 0.15μs/inst; 256 timers/counters; 1 Ethernet (S7, Modbus TCP) + 1 RS485 (PPI, Modbus RTU); up to 6 expansion modules; 4 high-speed counters 100kHz; 3 pulse outputs 100kHz; RTC with 7-day retention; 0~55℃; IP20; DIN rail; STEP 7-MicroWIN SMART.

DI module: 32 points DC24V, 4~30V, ~7mA/point, opto-isolated, ≤0.2ms on / ≤0.4ms off, 8-point commons. DO module: 32 relay outputs, AC250V/DC30V, 2A/point, 10ms on / 5ms off, driving intermediate relays. AI module: 4 channels, voltage/current/RTD configurable (4-20mA, 0-10V, PT100/Cu50), 12-bit + sign, 0.5%FS, ≤2ms/channel, opto-isolated.

Touchscreen (Siemens SMART LINE 10″): TFT 1024×600, 16M colors, LED backlight ≥50,000h, resistive touch; ARM; 128MB Flash + 64MB DDR; Ethernet + RS485/422; S7/Modbus protocols; WinCC Flexible SMART; data/trends/alarms/parameters/permissions; DC24V ≤10W; front IP65; 0℃~50℃; CE/CCC.

DC power supply: AC100~240V in; DC24V/5A/120W; regulation ≤±0.5%; ripple ≤100mVpp; ≥90%; OVP/OCP/SCP auto recovery; 2.5kV insulation; -20℃~+60℃; DIN rail; CE/CCC.

Intermediate relays (Schneider RXM): DC24V coil, DPDT, 5A/AC250V, silver alloy, mechanical ≥10M / electrical ≥100k, ≤15ms operate / ≤10ms release, 4kV coil-contact isolation, LED, DIN base. Buttons/indicators (Schneider, 22mm): green start (NO), red stop (NC), red mushroom E-stop (twist reset), 3-position manual-stop-auto switch; green run / red fault / green power LEDs DC24V; ≥100,000h; front IP65; -25℃~+70℃; CCC/CE.

Pressure sensor (Ruipu Sanyuan): diffused silicon; 0~1.6MPa (adjustable); 0.5 class; 4-20mA two-wire; DC24V; 2× overload; ≤100ms response; ≤0.02%FS/℃ drift; ≤0.2%FS/year; G1/2; aluminum die-cast housing; 316L diaphragm; IP65; -20℃~+80℃; CE; main-pipe mount.

Temperature sensors: armored PT100, class A; -50℃~+200℃; ±0.15℃+0.002|t|; ≤3s; φ6mm probe, 100mm insertion (custom); M16×1.5 thread; 304 stainless; 2m shielded lead; IP65; compressor/dryer outlet measurement.

Program and HMI software: structured programming (main, pressure control, rotation, fault handling, communication subroutines); power-off retention; fault self-diagnosis (sensor disconnection, contactor feedback); expansion interface; screens — main overview, parameter setting (password protected), trend curves, alarm records, running statistics, manual operation.

9.3 Power Distribution Cabinet

Function: floor-standing secondary master unit — main incoming and protection, multi-circuit distribution with independent protection, full electrical metering, level-1 lightning protection, panel operation and indication, standardized N/PE.

Enclosure: 1800×1400×500mm floor-standing (XL-21 improved); steel frame 2.0mm / door 1.5mm / sides 1.2mm; pickling-phosphating + powder, computer grey; IP30; single front door with window; instrument/busbar chamber top, switch chamber middle, outgoing chamber bottom; tin-plated copper busbars; three-point lock; ventilation with dust screens; labels; GB 7251.1-2013.

Main MCCB (Schneider NSX): 400A, 3P, Icu/Ics 65kA/400V, electronic release with long (0.4-1In, inverse), short (3-10In, definite) and instantaneous (10-20In) stages; manual with stored-energy mechanism; open/closed/fault indication; optional shunt/undervoltage releases; mechanical ≥15,000 / electrical ≥8,000; GB 14048.2, CCC.

Outgoing breakers: 2×250A (50kA) large circuits; 4×100A (36kA) medium circuits (dryers, large fans, auxiliary); 4×63A (36kA) small circuits (small loads, lighting, sockets, spare).

Network meter: three-phase multi-function; 0~500V; 5A via CTs; 0.5-class; phase/line voltages, currents, P/Q/S, PF, Hz, four-quadrant energy, optional harmonics; large LCD Chinese menu; RS485 Modbus-RTU; optional 4DI/2DO, 4-20mA output; AC/DC85~265V; ≤3W; 2kV/1min; GB/T 17215, DL/T 614.

Level-1 SPD (T1): 3P+N; Un 385V, Uc 420V; In 50kA / Imax 100kA (10/350μs); Up ≤2.5kV; ≤100ns; status window; thermal + overcurrent disconnector; optional dry-contact telemetry; DIN rail; -40℃~+85℃; GB 18802.1/IEC 61643-11, CCC.

Main copper busbar: T2 copper ≥99.95%, 60×6mm, tin-plated, ≥1000A at 25℃, bolted with washers, epoxy insulators ≤500mm spacing, phase-color sleeves (yellow/green/red, blue N, green-yellow PE).

Secondary elements: universal transfer switch (local/remote); green close / red open buttons; power (green), close (red), fault (yellow) LEDs AC220V; 2P 6A miniature breaker for control circuit; terminal blocks.

9.4 Environmental Air Cooler Control Box

Function: control 2 × 3kW coolers — start/stop, protection, timed operation: main incoming and protection; per-motor overload/short protection; manual/auto modes; programmable timing (16 groups); run/fault indication; per-unit start/stop.

Enclosure: custom wall box, steel 1.2mm, powder coated grey, IP30; panel with indicators, buttons, switch and time-switch window.

Motor protection breaker (Schneider GV2): AC400V, 6~10A, 3P, thermal-magnetic (inverse-time overload, 13In instantaneous), 15kA/400V, knob with stop-start-reset, optional 1NO+1NC aux, ≥100,000 mechanical, DIN rail, CCC. Contactor (Schneider LC1D): AC400V, 9A, 3P + 1NO+1NC, AC220V coil, 3kW motor, ≥10M mechanical / ≥1M electrical, ≤15ms/≤10ms, DIN rail, GB 14048.4, CCC. Thermal relay (Schneider LRD): 6~10A, class 10A, 3-pole, overload + phase-loss, manual/auto reset, 1NO+1NC, -20℃~+60℃ compensation, CCC. Time switch: AC220V, 16A, 16 groups, ±1s/day, LCD, daily/weekly cycles, battery retention, manual/auto, DIN rail, CCC. Elements: 3-position switch, green/red buttons, green run/red fault LEDs AC220V, 2P 6A control breaker, 1.5mm² control wiring with number tubes.

9.5 Exhaust Fan Control Box

Function: control 2 fans (22kW + 1.1kW) — independent main circuits and protection, manual/auto modes, programmable timing, external linkage, audible/visual alarms, per-unit operation.

Enclosure: standard wall control box, steel 1.2mm, IP30; power/run/fault LEDs, alarm, buttons, switch, timer window.

22kW circuit: Schneider NSX MCCB 63A 3P 36kA; contactor 50A AC220V (≥10M mechanical, 22kW/380V); thermal relay 30~50A class 10A. 1.1kW circuit: Schneider GV2 2.5~4A; contactor 9A AC220V; thermal relay 2.5~4A.

Audible/visual alarm: AC220V; high-brightness LED strobe (red); buzzer/siren ≥100dB; ~1Hz; IP54; panel mount; -30℃~+70℃; ≥50,000h.

External linkage interface: 2 dry-contact inputs (one per fan), DC24V/100mA capacity, opto-isolated, terminal wiring, close-to-start/open-to-stop; accepts thermostat, fire signal or compressor interlock signals.

9. Recommended Configuration and Preliminary Budget

9.1 Quotation Notes

The quotation is ex-factory price including production, component procurement, assembly/wiring, factory commissioning and packaging; excludes on-site installation, cables/auxiliaries and transport (quoted separately); all core components per agreed brands, genuine new; 12-month warranty with free repair/replacement of non-human faults. All prices are indicative and quoted in RMB (CNY) only — no foreign-currency conversion is provided.

9.2 Main Distribution Box

Box (standard wall type); NSX 3P 300A main; NSX 3P 250A / 100A / 63A outgoing; multi-function meter (RS485 optional); SPD 3P+N 40kA; N/PE busbars; 2P 10A control breaker; in-box auxiliaries and assembly labor.

9.3 PLC Group-Control Box

Box (double-layer); 2P 16A control breaker; DC24V 5A 120W power; Siemens S7-200 SMART CPU (40-point); 32-point DI module; 32-point DO relay module; 4-channel AI module; SMART LINE 10″ touchscreen; PLC program + HMI configuration (custom group logic); 16 Schneider RXM relays with bases; 10 green run + 10 red fault LEDs; 3-position switch; mushroom E-stop; 20 start/stop buttons; Ruipu Sanyuan 0-1.6MPa pressure sensor; 10 PT100 sensors (6 compressors + 4 dryers); in-box auxiliaries and labor.

9.4 Power Distribution Cabinet

XL-21 cabinet 1800×1400×500mm; NSX 3P 400A main with electronic release; 2×250A, 4×100A, 4×63A outgoing; network meter with communication; T1 SPD 100kA; 60×6mm copper busbars; secondary elements (buttons, LEDs, mini breaker); in-cabinet auxiliaries and labor.

9.5 Environmental Air Cooler Control Box

Custom wall box; 3P 32A incoming breaker; 2× GV2 6-10A; 2× LC1D 9A contactors; 2× LRD 6-10A thermal relays; programmable time switch; 3-position switch; 2 green run + 2 red fault LEDs; 4 start/stop buttons; 2P 6A control breaker; auxiliaries and labor.

9.6 Exhaust Fan Control Box

Standard control box; 3P 100A incoming; 3P 63A breaker + 50A contactor + 30-50A thermal relay (22kW); 3P 6A breaker + 9A contactor + 2.5-4A thermal relay (1.1kW); time switch; 3-position switch; 2 run + 2 fault LEDs; audible/visual alarm; 4 buttons; 10-way linkage terminal block; 2P 10A control breaker; auxiliaries and labor.

9.7 Total Summary

Main distribution box ×1; PLC group-control system ×1 (incl. sensors and program); power distribution cabinet ×1; environmental air cooler control box ×1; exhaust fan control box ×1; technical service (on-site commissioning guidance) ×1 — total tax-inclusive.

10. Technical Specifications

10.1 System Specification Summary

System Key Specifications
Main distribution box 300A main MCCB (NSX, 50kA); 250A/100A/63A outgoing; multi-function meter; level-2 SPD 40kA; N/PE busbars; IP30 wall box
PLC group-control box Siemens S7-200 SMART CPU (24DI/16DO) + 32DI + 32DO + 4AI modules; SMART LINE 10-inch touchscreen; 0-1.6MPa pressure sensor; 10x PT100 sensors; 16 relays; 6 compressors + 4 dryers group control
Power distribution cabinet 400A main MCCB (NSX, 65kA, electronic release); 2x250A + 4x100A + 4x63A outgoing; network meter; T1 SPD 100kA; 60x6mm copper busbar; XL-21 floor cabinet
Air cooler control box 2 x 3kW; GV2 motor breakers; LC1D 9A contactors; LRD thermal relays; 16-group time switch; manual/auto
Exhaust fan control box 22kW (63A MCCB + 50A contactor + 30-50A thermal) + 1.1kW (GV2 + 9A contactor + 2.5-4A thermal); time switch; audible/visual alarm; 2 dry-contact linkage inputs
Control supply DC24V/5A/120W DIN-rail power for PLC/HMI/sensors/relays; 2P control-circuit breakers

10.2 Component Standards and Certification

All Schneider low-voltage components comply with GB 14048.2 / IEC 60947-2 / GB 14048.4 with CCC certification; the Siemens PLC complies with GB/T 15969 / IEC 61131-2; SPDs comply with GB 18802.1 / IEC 61643-11; meters comply with GB/T 17215 / DL/T 614; enclosures comply with GB 7251.1-2013 / GB 7251.3-2006. Factory tests include full-function simulation, insulation and continuity checks, and protection-parameter verification before shipment.

11. Key Advantages and Customer Value

11.1 Advanced Technical Architecture

The layered distributed architecture — distribution, control, sensing and interaction — keeps power supply independent and safe while achieving intelligent, centralized control. The mature Siemens S7-200 SMART PLC delivers fast computation, strong anti-interference and stable operation; the industrial touchscreen provides friendly HMI with convenient parameter setting — mainstream advanced industrial control architecture.

11.2 Core Component Quality

All core electrical components are international first-tier brands: Schneider low-voltage components (breakers, contactors, relays), Siemens PLC and touchscreen, Ruipu Sanyuan pressure sensors, standard enclosures. First-tier brands offer complete certification, stable performance and longer life — greatly reducing fault rates, improving overall reliability and lowering later O&M cost.

11.3 Energy-Saving Economy

Group control with pipe-network pressure closed-loop achieves “on-demand air supply”, eliminating idling energy waste; balanced rotation evens running time across units, avoiding single-unit over-wear and extending overall life, reducing replacement and repair cost. Measured results: intelligent group control reduces compressor energy consumption 10%~20% versus manual control.

11.4 Multi-Level Safety Protection

Distribution side: three-level breaker protection, surge/lightning protection, earthing — full protection against overload, short circuit and lightning. Control side: emergency stop, fault stop, over-temperature protection, sensor-disconnection detection — auto stop with alarms on abnormality. Structure side: rated enclosures with reliable mechanical strength — protecting equipment and operators.

11.5 Convenient O&M Management

Complete status monitoring and fault alarms; running parameters, states and fault information viewable on the touchscreen with easy fault location; universal standard components for easy procurement; standardized wiring with clear labels; manual/auto seamless switching — unattended automatic operation daily, manual single-unit control for commissioning.

11.6 Customization Adaptability

Flexible customization per site conditions, equipment parameters and functional needs: circuit counts, switch ratings, sensor ranges, control logic; box size, installation and panel layout per space; future expansion (remote monitoring, data upload, multi-station interlock).

12. Technical Q&A (50+ Items)

12.1 Distribution System

Q1: Why configure an SPD in the main distribution box?

A: Air-compressor rooms are industrial power scenes with long supply lines prone to induced lightning surges; large equipment start/stop also creates switching overvoltages. The SPD instantly discharges surge current and clamps voltage, protecting downstream breakers, meters and control equipment — improving supply safety and equipment life.

Q2: Why is the copper busbar 60×6mm?

A: Selection is based on total calculated current and temperature rise. With 400A incoming and coincidence factor plus expansion margin, the 60×6mm tin-plated copper bar carries over 1000A at 25℃ — fully meeting current demand with ample margin, plus mechanical strength and short-circuit thermal stability.

Q3: Why three-level distribution instead of direct one-level supply?

A: Three-level distribution is standard industrial practice with the core advantage of fault isolation and graded protection. Each level (main incoming, distribution, terminal control) has its own protection — a single device fault trips only its own level, not affecting others; also convenient for staged maintenance and switching.

Q4: Is the multi-function meter necessary?

A: Yes — it monitors voltage, current, power and energy in real time: for energy statistics and saving management, and for early fault detection via abnormal readings (e.g. phase loss, overload).

Q5: Why 300A main switch for this room?

A: Calculated from total load: 90kW-class compressors plus dryers and auxiliaries give a calculated current around 180-250A; 300A provides protection coordination and overload margin for starting surges.

Q6: What is the difference between level-1 and level-2 SPDs?

A: Level-1 (T1, 10/350μs, 50kA/100kA) at the main incoming handles direct/induced lightning energy; level-2 (T2, 8/20μs, 20kA/40kA) at downstream distribution further clamps residual voltage — coordinated two-stage protection.

Q7: Why separate N and PE busbars?

A: TN-S system requirement — neutral and protective earth strictly separated prevents earth-current circulation, keeps PE near-zero potential and ensures correct leakage protection operation.

Q8: What are the breaker protection characteristics?

A: Main breakers have thermal-magnetic or electronic releases — long-delay inverse-time overload plus instantaneous (and optional short-delay) short-circuit protection; the 400A main uses electronic three-stage (L/S/I) protection with adjustable settings.

12.2 Group-Control System

Q9: How does the rotation logic work?

A: The system records each compressor’s cumulative running time. When pressure falls below the lower limit, the shortest-running unit starts first; when above the upper limit, the longest-running stops first — keeping running time balanced, avoiding over-wear of some units and idle degradation of others, extending overall life.

Q10: Where is the pressure sensor installed and what matters?

A: On the straight section of the compressor outlet main pipe, at least 5× pipe diameter from elbows/valves to avoid turbulence; seal against leaks; shielded cable with single-end earthing; range selected at 1.5-2× normal working pressure for accuracy and overload margin.

Q11: Why link dryers with compressors?

A: The dryer removes moisture from compressed air. If the dryer keeps running after compressor stop, energy is wasted; if it doesn’t start before the compressor, output humidity fails quality. Linkage starts the dryer before the compressor and stops it with delay — quality supply without waste.

Q12: Will PLC data be lost on power failure?

A: No — the S7-200 SMART has retentive memory holding cumulative running time, parameters and fault records; the touchscreen also retains data; the built-in RTC runs on capacitor backup for accurate time records.

Q13: Does the group-control system support remote monitoring?

A: The base configuration is local touchscreen; the Ethernet interface supports optional remote monitoring — PC/mobile viewing of pressure, temperature and device status with fault push, without visiting the site.

Q14: How are start/stop delays set?

A: T1/T2 delays are adjustable on the touchscreen (default 30s) to prevent frequent start/stop from pressure fluctuation; anti-jitter logic is built in.

Q15: What if a compressor faults?

A: The faulted unit is automatically masked from rotation logic and the standby unit takes over; fault indication appears on the panel and touchscreen alarm records.

Q16: How does temperature protection work?

A: Outlet temperatures are monitored in real time; above the alarm threshold — touchscreen popup and flashing fault LED; above the stop threshold — automatic unit stop to prevent damage.

Q17: Can the PLC expand for more units later?

A: Yes — up to 6 expansion modules; the program reserves expansion interfaces for additional units and functions.

Q18: What happens on sensor disconnection?

A: The program’s fault self-diagnosis detects sensor disconnection or abnormal feedback and alarms, preventing control decisions based on wrong data.

12.3 Installation and Commissioning

Q19: What are the environmental requirements for control boxes?

A: Indoor wall mounting in well-ventilated positions without corrosive gas, strong vibration or strong EMI; 0~45℃; humidity ≤90% non-condensing; box bottom 1.2-1.5m above floor for operation.

Q20: How long does commissioning take?

A: Systems are factory-tested and logic-simulated; on site — wiring check, no-load commissioning, loaded linkage tests, parameter setting and training take about 1-2 working days depending on scale.

Q21: How is the external linkage signal wired?

A: Dry-contact terminals are reserved on the fan and group-control boxes; external signals (thermostat, fire system, DCS) connect directly without extra supply; internal opto-isolation prevents mutual interference.

Q22: What insulation tests are required?

A: After wiring, disconnect weak-current modules and test with a 500V megger: main and control circuits ≥0.5MΩ; earthing resistance per design and code.

Q23: What is the sequence of energization?

A: Control power first (indicators, PLC, touchscreen), then main power per circuit testing breakers/contactors; manual single-unit tests; automatic simulated tests; record data and optimize parameters.

Q24: How is the cabinet installed?

A: Wall boxes via expansion bolts, level within 3°; floor cabinets on leveled foundations, firmly fixed and earthed; appearance checked — no deformation or paint damage; doors open/close smoothly.

Q25: What wiring standards apply?

A: Main circuits gauge-matched with copper lugs; phase colors (A yellow, B green, C red, N blue, PE green-yellow); firm terminations with correct torque; horizontal/vertical dressing; strong/weak separation; control circuits 1.5mm² with consistent number tubes.

Q26: What if the site has no 380V?

A: The system requires 380V/220V three-phase four-wire; if only single-phase exists, a transformer is required — this is assessed at survey and quoted separately.

Q27: How are touchscreen parameters protected?

A: Parameter-setting screens have password protection with multi-level user permissions.

Q28: What are the acceptance criteria?

A: Per GB 50254 and design: appearance intact, firm installation, standardized wiring, clear labels; insulation and earthing tests pass; all functions tested and meeting design; complete technical documentation.

12.4 O&M and After-Sales

Q29: What is the warranty period and scope?

A: 12 months from acceptance; non-human faults — free repair and free component replacement; free technical consultation, software upgrades and parameter optimization in warranty; human damage and force majeure excluded (paid repair available).

Q30: What daily maintenance is needed?

A: Periodic checks for abnormal sound, smell and heating; dusting for ventilation; terminal tightness; touchscreen fault records review; annual calibration of pressure and temperature sensors.

Q31: How fast is fault response?

A: 7×24 technical support; general issues answered immediately by phone; on-site within 4h urban, 8h suburban, 24h in-province.

Q32: Are spare parts available?

A: All components are universal standard models from mature channels; wear parts (fuses, indicators, buttons) recommended as local stock; core parts (PLC, contactors, breakers) stocked by us for rapid dispatch.

Q33: How often are inspections performed?

A: Two free on-site inspections in warranty (month 6 and month 12) — appearance, terminal tightening, dusting, parameter calibration, function tests, hidden-hazard check with reports; annual maintenance agreements after warranty.

Q34: Can the system be upgraded later?

A: Yes — remote monitoring, data upload, multi-station interlock and capacity expansion supported; lifetime technical support with upgrade services at cost.

Q35: What if the touchscreen fails?

A: Panel buttons remain fully functional for manual operation (start/stop, mode switch, E-stop); the failed screen is replaced as a standard modular part.

Q36: How is energy consumption measured?

A: The multi-function meter records kWh; group-control statistics compare before/after energy for saving verification.

Q37: What training is provided?

A: One-day training at acceptance (theory half day + practice half day) — operation, touchscreen, inspection, fault handling; certificates issued on passing; free retraining.

Q38: Why choose the KITOZER/Lain solution?

A: 20 years of industrial control and room engineering experience, source-factory production with three-level quality control, first-tier components, fast delivery (3-7 days standard), free three design options and full-cycle after-sales.

12.5 Auxiliary Equipment

Q39: How does the environmental air cooler time control work?

A: The programmable time switch outputs start/stop signals per set schedules (up to 16 groups, daily/weekly cycles); the contactor executes; manual mode overrides anytime.

Q40: Why a motor protection breaker plus thermal relay?

A: The GV2 breaker combines overload and short-circuit in one device with higher breaking capacity for compact motor circuits; the thermal relay adds precise overload/phase-loss protection — together giving reliable motor protection.

Q41: How does the 22kW fan circuit differ from the 1.1kW?

A: Separate main circuits with appropriately sized components — 63A MCCB + 50A contactor + 30-50A thermal relay for 22kW; GV2 2.5-4A + 9A contactor + 2.5-4A thermal relay for 1.1kW.

Q42: What triggers the audible/visual alarm?

A: Fan overload or short-circuit faults — the alarm sounds (≥100dB) with red strobe until reset, in addition to fault indicators.

Q43: Can the exhaust fans interlock with the air conditioners?

A: Yes — external dry contacts accept temperature, smoke or compressor signals; e.g. high temperature auto-starts fans; smoke signal forces ventilation.

Q44: Why are contactor coils AC220V?

A: The control circuits share the 220V control supply from the distribution, simplifying wiring and component standardization; DC24V versions are optional per site preference.

Q45: How many air coolers can one box control?

A: The standard box controls 2 × 3kW units; larger counts use additional boxes or expanded circuits per project needs.

Q46: What protection exists for the control circuit itself?

A: A 2P miniature breaker (6A/10A) protects the control circuit; the DC power supply has OVP/OCP/SCP with auto recovery.

Q47: Can the system integrate with an existing DCS/SCADA?

A: Yes — Modbus RTU/TCP via the PLC’s RS485/Ethernet interfaces; protocol mapping customized per the upper system.

Q48: What documentation is delivered?

A: Electrical schematics, wiring diagrams, component lists, factory test reports, certificates, operation manual, maintenance manual, HMI configuration files and acceptance reports.

Q49: How is the system verified at acceptance?

A: Function-by-function testing — breakers, meters, SPD, PLC logic (pressure control, rotation, dryer linkage, temperature alarms), manual/auto modes, interlocks, E-stop and communication — per design requirements.

Q50: What is the delivery period?

A: Standard systems 3-7 days (stock components); customized configurations 10-15 days; total project including on-site installation and commissioning about 25 days, compressible by parallel work.

13. Construction Schedule

15.1 Stage Division

Five stages: preparation, manufacturing, on-site installation, commissioning/acceptance, training/delivery.

15.2 Detailed Schedule

Stage No. Work Days Responsible
Preparation 1 Solution confirmation and contract 1 Commercial + technical
2 Component procurement and stocking 3 Procurement
Manufacturing 3 Enclosure fabrication and coating 3 Production
4 Component assembly and wiring 4 Electrical workshop
5 Factory energization test and QC 2 QC
6 Packaging and shipment 1 Logistics
On-site 7 Site survey and positioning 1 Construction crew
8 Enclosure fixing 1 Construction crew
9 Main and control circuit wiring 3 Electricians
10 Wiring check and insulation test 1 Technical
Commissioning 11 No-load energization commissioning 1 Commissioning engineer
12 Loaded linkage commissioning 1 Commissioning engineer
13 Parameter setting and optimization 1 Commissioning engineer
14 Acceptance 1 Both parties
Training 15 Operation and maintenance training 1 Technical engineer
16 Documentation delivery 1 Project dept
Total 25

Note: manufacturing and site preparation partially parallel; total compressible per urgency.

14. Construction Organization and Quality/Safety Measures

16.1 Organization

Project manager (1): schedule, quality, cost, safety; resource coordination; overall responsibility. Technical lead (1): design, disclosure, commissioning guidance, problem solving. Construction lead (1): on-site organization, personnel dispatch, process execution. Electricians (2, certified): wiring, installation, cable laying. Safety officer (1): safety management, civilized construction, inspection. QC (1): process acceptance, factory inspection.

16.2 Pre-Construction Preparation

Technical: disclosure of drawings, craft standards, quality requirements and safety points; device list, component models and cable specs verified; process and quality cards prepared. Materials: components, enclosures, cables and auxiliaries stocked with incoming certificates and test reports; tools and meters (multimeter, megger, crimpers) calibrated; PPE (helmets, insulating shoes/gloves). Site: installation positions, incoming power and routing confirmed; power, lighting and cleared space; permits (construction, hot work) obtained.

16.3 Core Construction Processes

Enclosure installation: position per drawings; wall boxes via expansion bolts, level within 3°; floor cabinets leveled and firmly fixed with reliable earthing; appearance check.

Main circuit wiring: gauge-matched cables with copper lugs; phase colors (A yellow, B green, C red, N blue, PE green-yellow); firm terminations with correct torque, no loose joints; horizontal/vertical dressing; strong/weak separation.

Control circuit wiring: 1.5mm² stranded copper; shielded signal cables; uniform number tubes with consistent orientation; ≤2 wires per terminal; shield single-end earthed.

Insulation test: disconnect weak modules; 500V megger — main and control circuits ≥0.5MΩ; earthing test per code.

Energization and commissioning: control power first (indicators, PLC, touchscreen), then main power per circuit; manual single-unit start/stop with protection verification; automatic simulated tests (group logic, linkage, alarms); record data and optimize parameters.

16.4 Quality Assurance

Certified staff with pre-job training; incoming materials with certificates — unqualified prohibited; strict GB 50254 construction with three-inspection system (self, mutual, special); key control points (insulation, earthing, energization) signed by QC; synchronized documentation — complete, accurate, traceable.

14.5 Safety and Civilized Construction

Safety: full disclosure before entry; code-compliant temporary power with leakage protection, wiring by certified electricians, no random wiring; “no closing” tags during de-energized work; helmets, insulating shoes, harnesses for high work; fire extinguishers, hot-work permits with supervision. Civilized: neat material/tool stacking; daily cleanup — work finished, site clean; noise control avoiding rest periods.

Emergency: safety emergency plan with supplies; on incident, activate plan and report immediately.

14.6 Acceptance Standards and Flow

Standards: per GB 50254; per design drawings and solution; intact appearance, firm installation, standardized wiring, clear labels; insulation and earthing tests pass; all functions pass; complete documentation. Flow: self-inspection → acceptance application with as-built documents → joint on-site acceptance (appearance, function tests, documentation check) → sign acceptance report → warranty period; non-conforming items rectified and re-accepted.

15. After-Sales Service

15.1 Warranty Commitment

12-month free warranty from acceptance; faults from quality, process or design defects — free repair and free part replacement; free technical consultation, software upgrades and parameter optimization in warranty; human damage and force majeure excluded — paid repair available.

15.2 Graded Fault Response

General faults (non-critical, remote-resolvable): immediate response, solution within 30 minutes. Important faults (partial function loss, on-site needed): on-site within 4h urban, 8h suburban. Emergency faults (system down, production affected): 7×24 standby, engineer dispatched immediately at fastest speed.

15.3 Periodic Inspection

Two free on-site inspections in warranty (month 6 and month 12): appearance, terminal tightening, dusting, parameter calibration, function tests, hidden-hazard check — with inspection reports and optimization suggestions; annual maintenance agreements after warranty (full periodic inspection, maintenance and repair).

15.4 Spare Parts Supply

Spare-parts stock of core components and wear parts; original genuine parts; same-day courier or next-day express for urgent spares; cost-price supply after warranty with long-term guarantee.

15.5 Lifetime Maintenance

Lifetime technical support at cost after warranty; system upgrade, function expansion and capacity retrofit services; customer archives tracking the full lifecycle; free long-term technical consultation.

16. Training Plan

16.1 Objectives and Audience

Objectives: trainees master operation, daily inspection, common fault finding and handling — independent O&M for long-term stable operation. Audience: operation/O&M staff (daily operation, inspection, simple faults); technical managers (parameter setting, fault analysis, system management).

16.2 Graded Training Content

Basic operation (O&M staff): system composition and functions; panel operation (buttons, switches, indicators, manual start/stop, mode switching); touchscreen operation (interface, status, parameters, alarms); inspection content/methods and normal/abnormal identification; simple fault handling (identification, reset, power restoration flow); safety codes, electric-shock first aid, emergency stop.

Advanced management (technical managers): parameter setting (pressure limits, start/stop delays, timing, temperature thresholds) and principles; fault code meanings, cause analysis and finding flow; data management (running data, history alarms, energy statistics); maintenance (periodic items, component replacement, calibration); emergency handling (sudden faults, emergency stop, backup scheme switching).

16.3 Methods and Schedule

Methods: theory (PPT) + engineer demonstration + hands-on practice with guidance + Q&A; documentation — operation manual, maintenance manual, courseware. Schedule: one working day at acceptance (half theory, half practice), adjustable.

16.4 Assessment and Certification

Theory written test + practical assessment; passing trainees receive the operation qualification certificate before duty; free retraining for failures; free refresher training for new staff.

16. Training Plan

16.1 Training Objectives and Audience

Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.

Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.

16.2 Tiered Training Content System

Level 1: Basic operation training (1 day)

– Basic principles: system concepts, structure composition, performance indicators;

– Daily operation standards: correct operation of equipment, control and safety systems;

– Daily inspection contents: daily/weekly/monthly check items;

– Safety precautions: usage prohibitions and emergency handling procedures.

Level 2: Maintenance training (1 day)

– Detailed structure of each subsystem and working principles;

– Daily maintenance methods: cleaning, fastening checks, routine care;

– Common fault identification and simple handling;

– Emergency handling procedures for power failure, fire and equipment faults.

Level 3: Advanced management training (as needed)

– Performance influencing factors and how to avoid degradation;

– Upgrade and expansion knowledge and specification requirements;

– Relevant national standards interpretation.

16.3 Training Methods and Schedule

– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;

– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.

16.4 Training Assessment and Documentation Delivery

– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;

– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.

17. Anonymous Typical Project Scenarios

All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.

17.1 Large Equipment Manufacturing Enterprise Compressor-Room Group-Control Retrofit Project

Project background. The enterprise’s compressor room had 6 air compressors and 4 dryers with manual start/stop — large supply-pressure fluctuation, high idling energy, unbalanced unit operation and high O&M cost; intelligent upgrade was urgently needed.

Implementation. One PLC group-control system with Siemens PLC + 10″ touchscreen; pressure sensor on the main pipe; temperature sensors at each unit outlet; constant-pressure supply, automatic rotation, dryer linkage and temperature alarms; upgraded main distribution with energy metering and lightning protection.

Results. Unattended automatic operation with pressure fluctuation controlled within ±0.02MPa and greatly improved supply stability; compressor energy consumption down ~15% (about 180,000 CNY saved annually); unit running-time balance improved with average life extended ~20%; timely accurate fault alarms, 50% fewer O&M staff and much lower O&M cost.

17.2 Auto Parts Industrial Park Power Distribution and Control Project

Project background. A newly built air-compressor station in the park needed complete low-voltage distribution and control — safe, reliable, advanced and expandable for 5 years of capacity growth.

Implementation. Two floor-standing power distribution cabinets (630A incoming, multi-circuit, Schneider components, multi-function metering, level-1 lightning protection); one group-control cabinet for 8 compressors + 6 dryers with remote monitoring; three environmental air cooler boxes and two exhaust fan boxes for automated auxiliary control; reserved expansion interfaces for seamless future integration.

Results. Stable graded distribution with zero electrical faults since commissioning; group control with high constant-pressure accuracy meeting production demand; standardized construction with clear labels passed acceptance in one go; remote monitoring enabled centralized management at the duty office.

17.3 Electronics Company Workshop Air Cooler and Exhaust Linkage Control Project

Project background. The production workshop’s environmental air coolers and exhaust fans were manually controlled — untimely start/stop, unstable workshop temperature/humidity, and energy waste from forgotten shutdown.

Implementation. Four air cooler control boxes (2 × 3kW each) with timed and manual control; two exhaust fan control boxes with audible/visual alarms and temperature-linkage interfaces; temperature linkage — coolers and fans auto-start above the set value and auto-stop below; workday schedules with holiday auto-stop.

Results. Stable comfortable workshop temperature improving the working environment and production efficiency; timed + temperature linkage eliminated idling when unattended — monthly power consumption down ~22%; stable, simple operation without dedicated management.

18. SEO Optimization Section

All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.

18.1 Keyword System

– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;

– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;

– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;

– Brand keywords: KITOZER, Guangzhou Lain.

18.2 SEO Tag System

– Title tag: the article title — Guangzhou Lain KITOZER;

– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;

– H1 tag: the article title;

– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.

18.3 Internal Link Anchor Text

– Core anchor text: technical design solution, system construction;

– Long-tail anchor text: configuration list, technical parameters, construction plan;

– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.

19. Official Contact Information

– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Official Website: https://gdlain.com

– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)

– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China

For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.

Shopping Cart