KITOZER
KITOZER

Cold-Plate Liquid Cooling Rack

Table of Contents

1. Cover / Document Information

– Document Title: Cold-Plate Liquid Cooling Rack Technical Design Solution

– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Date: August 2026

– Version: V1.0

– Project Type: Technical design solution for Cold-Plate Liquid Cooling Rack

2. Table of Contents Structure

1. Company Introduction

2. Project Overview

3. User Requirement Analysis

4. Overall Design Description

5. Detailed System Design and Product Technical Parameters

6. Project Quotation and Configuration List

7. Core Solution Advantages

8. Technical Q&A

9. Construction Schedule Plan

10. Construction Organization Plan

11. After-Sales Service System

12. Operation and Maintenance Training Plan

13. Typical Project Cases

14. SEO Optimization System and Website Backend Configuration

15. Contact Information

3. Company Introduction

3.1 Company Development Overview

Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.

After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.

3.2 Core Business System

The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:

– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;

– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;

– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;

– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.

3.3 Brand and Qualification Honors

The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.

3.4 Core Competitive Advantages

1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;

2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;

3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;

4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.

4. Project Background and Objectives

4.1 Project Background

With the rapid development of AI, big data, cloud computing and supercomputing, server computing density keeps rising — single-server power from hundreds of watts to thousands, with single-cabinet power density exceeding 20kW or even 30kW as the norm in high-density rooms. Traditional air cooling faces clear bottlenecks: limited heat dissipation, high energy consumption, noise pollution and low space utilization — unable to serve next-generation high-density computing.

Liquid cooling, with high heat-exchange efficiency, low energy, low noise and ultra-high power-density support, has become the mainstream direction of next-generation data-center cooling. Among its variants, cold-plate liquid cooling combines high efficiency, safety, compatibility and low retrofit cost — the most widely deployed, most mature commercial solution today.

4.2 Project Scope

This solution provides a complete cold-plate liquid-cooled cabinet system for high-density server cooling, covering design, supply, installation and commissioning, training and after-sales. The system comprises six parts: cabinet structure, cold-plate heat-exchange core, cabinet-level coolant distribution unit (CDU), intelligent monitoring and control, piping and valves, and power distribution with safety auxiliaries — a full-chain liquid-cooling solution from chip-level heat removal to room-level management.

4.3 Project Objectives

Cooling capacity: rated 30kW per cabinet, stably cooling 20 dual-socket high-power servers with CPU/GPU core temperatures within rated range.

Energy saving: system cooling efficiency significantly better than air cooling, helping room PUE below 1.2 and greatly reducing cooling operation cost — meeting green data-center requirements under the dual-carbon policy.

Safety and reliability: multi-layer leak protection and safety mechanisms throughout; redundant core components; year-round uninterrupted operation; MTBF ≥100,000h.

Intelligent O&M: full-parameter real-time monitoring, automatic fault warning and protection, integration with room environment-monitoring systems — unattended and centralized management.

Compatibility and expansion: compatible with standard 19″ rack servers and mainstream CPU/GPU platforms; flexible expansion and customized configuration for future computing upgrades.

5. User Requirement Analysis

5.1 High-Density Heat Dissipation

High-power AI and general computing servers at 1.5kW+ per server, up to 30kW per cabinet — traditional air cooling cannot remove chip heat effectively, causing CPU throttling and overheating crashes; liquid cooling must solve the chip-level bottleneck for stable full-load operation.

5.2 Energy Saving

Traditional air-cooled rooms run PUE above 1.5 with high cooling energy share. Liquid cooling should greatly cut cooling energy, reduce electricity cost and full-lifecycle operation cost, while meeting national green low-carbon policy.

5.3 Space Adaptation and Compatibility

Liquid cooling must fit existing standard room layouts without large-scale building modification; standard cabinet dimensions compatible with existing 19″ servers, protecting equipment investment; quick server install/removal without compromising daily O&M efficiency.

5.4 Intelligent Monitoring and Management

Full real-time monitoring of temperature, pressure, flow, liquid level and leakage; automatic fault alarms with linkage protection; integration with existing environment-monitoring platforms for unified management and remote O&M.

5.5 High Reliability and Safety

7×24 operation; redundant core components — single-point failure must not affect operation; complete leak-proof design and protection, eliminating coolant-leak damage risk; insulating, environmentally friendly coolant safe for electronics and personnel.

5.6 Easy O&M

Simple daily maintenance for ordinary room staff after training — no dedicated liquid-cooling team; server maintenance with liquid retained (no system drain); modular core components for quick replacement and short repair time.

5.7 Customization

Flexible adaptation to server models, chip types, power requirements and site conditions; customizable cabinet size, cooling power, interfaces and control modes.

6. Design Principles and Applicable Standards

6.1 Design Principles

Safety first: multi-layer leak prevention and protection; insulating coolant; redundant core components. Efficiency: cold-plate direct chip contact maximizing heat exchange; variable-frequency control for on-demand cooling. Compatibility: standard 19″ form factors; mainstream CPU/GPU platform support; no motherboard modification. Reliability: industrial-grade components, MTBF ≥100,000h, closed loop with no evaporation loss. Maintainability: quick-connect branch fittings for hot-swap server maintenance; modular core parts. Expandability: scalable from single cabinet to row-level and whole-room deployment.

6.2 Applicable Standards

GB 50174 (data center design), GB/T 14715 (interconnection), GB 50054 (low-voltage distribution), GB 4208 (IP codes), GB/T 2423 (environmental testing), YD/T 3986-2021 (immersion liquid-cooled server system requirements — referenced), pressure-vessel and piping standards, plus customer requirements.

7. System Architecture and Working Principle

7.1 Overall Architecture

Six subsystems:

Cabinet structure system: liquid-cooled cabinet body (42U, 600×1200×2000mm), glass front door, mesh rear door, removable side panels, top cover with piping/cable openings, heavy-duty base, equipment mounting rails, server dynamic rails, cable managers, earthing busbar.

Cold-plate heat-exchange core: CPU micro-channel cold plates, optional GPU cold plates, memory auxiliary heat sinks, cold-plate fixing kits, high-thermal-conductivity paste.

Cabinet-level CDU system: 3U rack CDU with variable-frequency circulation pumps (1+1 redundant), brazed plate heat exchanger, diaphragm expansion tank, Y-type precision filters, coolant, self-locking quick couplings, multi-path manifolds.

Intelligent monitoring and control: PLC control host, 7″ touchscreen, PT100 temperature sensors, pressure transmitters, turbine flow sensors, capacitive level sensors, locating leak-detection system, normally-closed shutoff solenoid valves, audible/visual alarm, communication module.

Piping and valve system: stainless steel hard pipes, flexible branch hoses, manual ball valves, check valves, safety valve, auto air vent, pipe clamps, sealing consumables.

Power and safety auxiliary system: metering PDUs, leakage-protection breakers, door-controlled LED lights, washable dust filters, organic fire-stop material.

7.2 Working Principle

Cold-plate liquid cooling uses a two-loop closed circulation principle:

Secondary loop (in-cabinet): low-temperature coolant is delivered by the circulation pump to the manifolds, split to each server’s CPU/GPU cold plate, absorbs chip heat and returns to the CDU’s plate heat exchanger, transferring heat to the primary-side cooling water; cooled coolant recirculates.

Primary loop (external): low-temperature cooling water from the room chilled-water system or dry cooler enters the CDU heat exchanger, absorbs the secondary-side heat, returns to the cold source for heat rejection.

The two loops are fully isolated, exchanging heat through the plate exchanger — keeping the in-cabinet loop clean and safe.

8. Detailed Technical Design

8.1 Cabinet Structure Design

42U liquid-cooled cabinet 600×1200×2000mm; 1.5mm cold-rolled steel frame, static load ≥1500kg; single tempered-glass front door with three-point lock and sealing gasket; double mesh rear door (ventilation ≥75%); removable side panels (1.2mm, clip-on); top cover with piping/cable openings and dust-filter slots; heavy-duty square-tube base (50×50×3mm, rated ≥2000kg, M16 leveling feet ±20mm, optional casters 500kg each with brakes); 2.0mm galvanized equipment rails (EIA-RS-310, 42U laser-marked, front/rear adjustable 700-900mm, 100 sets of M6 cage nuts); 20 pairs of 19″ three-section full-extension rails (≥50kg per pair, ≥600mm travel, pull-out limit and lock); 4× 1U metal cable managers (12-position, strong/weak separation); T2 copper earthing busbar (30×3mm, full height, 8× M6 terminals, 16mm² green-yellow lead 3m).

8.2 Cold-Plate Heat-Exchange Core

CPU micro-channel cold plate: 6061-T6 aluminum base (optional copper), vacuum-brazed; parallel micro-channels 0.3-0.8mm wide, ≥60 channels; base flatness ≤0.05mm, Ra ≤0.8μm; thermal resistance ≤0.15℃/W; rated pressure ≤1.6MPa, burst ≥4.8MPa; -20℃~120℃; flow 0.5-2L/min, pressure drop ≤30kPa; G1/4 ports (optional quick fittings); supports Intel LGA 1700/1200/2011/3647/4189 and AMD AM4/AM5/SP3/TR4/sWRX8; insulated fasteners; 100% helium mass-spectrometer leak test ≤1×10⁻⁹ Pa·m³/s.

GPU micro-channel cold plate (optional): copper base + aluminum cover vacuum-brazed; staggered micro-channels + turbulator columns; thermal resistance ≤0.12℃/W; flow 1-3L/min, drop ≤40kPa; dual G1/4 ports; supports NVIDIA A100/H100/A800/RTX 4090 etc.; flatness ≤0.03mm.

Memory auxiliary heat sinks: 6063 aluminum fin type (0.5mm fins, 1mm pitch) for DDR4/DDR5; clip-on with thermal pads; lowers memory temperature 5-8℃.

Fixing kits: insulating nylon+glass-fiber screws, 304 stainless clamps, spring washers, insulating washers — per-platform holes. Thermal paste: ≥8W/m·K, metal-oxide + silicone carrier, non-curing, volume resistivity ≥1×10¹⁴ Ω·cm, 5g syringe, stable 3+ years.

8.3 CDU System Design

CDU host rack: 3U 19″ (482.6×133.35×600mm), 1.5mm steel, IP20, ~80kg, factory pre-assembled and tested — pump, heat exchanger, expansion tank, filter, valves, sensors, controller all integrated; site connect-and-run.

Variable-frequency circulation pumps (2, 1+1 redundant): permanent-magnet synchronous, flow ≥50L/min, head ≥15m, 370W, AC220V±10%; 304 stainless body, PPS impeller, SiC-graphite mechanical seal; ≤55dB(A); IP54, class F; 0-10V/RS485 speed control by return temperature; life ≥50,000h; standby switchover ≤1s.

Brazed plate heat exchanger: 304 stainless (316L optional), CuNi brazing; rated 30kW (20/40/60kW custom); efficiency ≥95%; primary 1.0MPa, 5-35℃, 2m³/h; secondary 1.6MPa, 10-45℃, 3m³/h; drops ≤50kPa each; G1″ / G3/4″; 2.5MPa factory hydro test; no gaskets, maintenance-free.

Diaphragm expansion tank: 5L (8/12L custom); 1.6MPa rated, 2.4MPa test; 0.3MPa precharge; EPDM diaphragm; epoxy-coated carbon steel; G1/2; stabilizes pressure and compensates micro-leakage.

Y-type precision filters (2): 5μm, 304 body + 316 woven mesh; 1.6MPa; G3/4; supply and return; bottom drain; washable reusable element.

Coolant: deionized water + ethylene glycol (70/30 standard, ratio adjustable); resistivity ≥1MΩ·cm; freezing -15℃; boiling 108℃; corrosion inhibitors — no attack on copper/aluminum/stainless/rubber; non-toxic, non-flammable; ~50L first fill; replacement ≥2 years.

Self-locking quick couplings (42): double-ended shutoff, plug auto-seals; brass nickel body, 304 poppet, FKM seals; 10mm bore; 1.6MPa rated / 4.8MPa burst; -20℃~120℃; ≥1,000 matings no leak; insert ≤80N, pull ≤100N; 2 main + 40 branch — hot-swap server maintenance without draining.

Multi-path manifolds (2): 304 stainless one-piece, no welds; 1-in-20-out (custom); G3/4 main / G1/4 branches; per-branch micro shutoff valves; 1.6MPa; rack-mounted supply manifold + return collector.

8.4 Intelligent Monitoring and Control

PLC control host: embedded industrial; 32-bit ARM 1GHz; 128MB Flash/64MB RAM; 8 AI (4-20mA/0-10V), 16 DI, 8 DO relay; 2 RS485 + 1 Ethernet + 1 USB; Modbus RTU/TCP, SNMP, MQTT; pump start/stop and auto switchover, variable-frequency temperature closed-loop, pressure/level regulation, fault diagnosis and alarms, solenoid shutoff linkage; 0-50℃; DC24V; IP20; MTBF ≥100,000h.

7″ touchscreen: TFT 800×480; real-time supply/return temperature, pressure, flow, level; pump status; alarms; history curves; parameter setting, manual/auto switching, pump control, alarm reset; RS485/Ethernet; DC24V; front IP65.

PT100 sensors (6): class A ±0.1℃@0℃; -20℃~80℃; response τ0.5≤3s; 304 probe φ6mm; G1/2 thread; shielded 2m leads; at supply, return, cold-plate surface, cabinet environment, heat-exchanger primary in/out.

Pressure transmitters (4): 0-2MPa, 0.5 class, 4-20mA two-wire, DC24V, 1.5× overload, 316 diaphragm/304 body, G1/4; supply main, return main, pump inlet, pump outlet.

Turbine flow sensors (2): 5-80L/min, ±1%FS, pulse output (optional 4-20mA), DC24V, PPS impeller, 304 body, G3/4, ≤1.6MPa; main supply and return.

Capacitive level sensors (2): high/low dual-point alarm, ±2mm, relay output (optional 4-20mA), DC24V, 304 probe/PP housing; expansion tank and fill port.

Locating leak-detection system (1): controller + 5m locating cable (extendable); sensitivity ≤1mL; location accuracy ±0.5m; response ≤1s; relay + RS485; cable laid along cabinet base and CDU bottom; on leak — audible/visual alarm, solenoid shutoff, upload to environment-monitoring.

Normally-closed shutoff solenoid valves (2): DN15, brass nickel body/304 poppet, FKM seals, 0-1.6MPa, DC24V, open ≤0.5s / close ≤0.3s, IP65; main supply and return — auto-shut on leakage.

Audible/visual alarm (1): red LED strobe 1Hz, ≥85dB(A), DC24V, IP65, top-mounted; triggers on overtemperature, overpressure, low level, leakage, pump fault.

Communication module (1): industrial Ethernet (10/100Mbps TCP/IP) + RS485 (≤1200m, Modbus RTU); integrates with environment-monitoring and cloud platforms; compatible with mainstream protocols; secondary development supported.

8.5 Piping and Valve System

Main stainless hard pipes: 304 seamless, DN20 (φ25×1.5mm), 1.6MPa rated / 6.4MPa burst, ferrule connections (optional argon welding), polished internal/external, ~8m per cabinet. Branch flexible hoses: PFA inner + stainless braid + PVC outer, DN8, 1.6MPa/4.8MPa, -20℃~120℃, min bend ≥50mm, 1m per server per direction (40m total). Manual ball valves (4): DN20 two-piece floating ball, brass nickel (304 optional), stainless ball, PTFE seat zero-leak, 1.6MPa; supply, return, bypass, drain. Check valves (2): DN15 vertical spring, brass, open ≤0.03MPa, reverse zero-leak; at pump outlets. Safety valve (1): DN15 micro-lift spring, brass, set 1.6MPa, reseat ≥0.9× set; on return main. Auto air vents (2): DN15 float type, PP float, 0.05-1.6MPa; at supply/return high points. Pipe clamps (30): 304 rider type with rubber damping pads; DN20/DN8. Sealing kit: EPDM gaskets, PTFE tape (12mm×10m), anaerobic liquid sealant, spare O-rings.

8.6 Power and Safety Auxiliaries

Metering PDUs (2): 1U 19″; 32A 220V input with 16A plug; 12× 10A 5-pole + 4× 16A outputs (16 positions); real-time V/A/W/kWh ±1%; built-in class-C surge module 20kA; breaker overload protection; aluminum housing, flame-retardant PC sockets; A/B dual-path redundancy.

Leakage-protection breakers (2): 3P 32A, C-curve 5-10In, 30mA instant leakage, 6kA, GB 16917.1; dual input circuits.

Door-controlled LED cabinet lights (2): 12W, 1200lm, 6500K cold white; door-magnetic switch (on/off with door, optional always-on); DC12V adapter; magnetic mount; ≥50,000h; front/rear door.

Washable dust filters (2): G2 grade, ≥70% for ≥5μm, 10mm polyester, washable; at front/rear air inlets.

Organic fire-stop material (1kg): class A, fire resistance ≥3h; plastic, non-curing; seals cabinet top piping/cable openings per room fire codes.

9. Recommended Configuration and Preliminary Budget

9.1 Cabinet Structure System

No. Item Spec Qty
1 Liquid-cooled cabinet body 42U, 600×1200×2000mm, 1.5mm steel, ≥1500kg 1
2 Front door Single tempered glass, three-point lock, gasket 1
3 Rear door Double mesh, ≥75% ventilation 1
4 Side panels 1.2mm, clip-on 2
5 Top cover Piping/cable openings, dust-filter slots 1
6 Heavy-duty base Square tube, ≥2000kg, leveling feet 1
7 Equipment rails 2.0mm galvanized, 42U, adjustable 4
8 Server dynamic rails 19″ three-section, ≥50kg 20
9 1U cable managers 12-position 4
10 Earthing busbar 30×3mm copper + lead 1

9.2 Cold-Plate Core

No. Item Spec Qty
1 CPU micro-channel cold plate ≤0.15℃/W, mainstream CPUs 40
2 Memory auxiliary heat sinks DDR4/DDR5 20
3 Cold-plate fixing kits Insulating, per platform 40
4 Thermal paste ≥8W/m·K, 5g 10

9.3 CDU System

No. Item Spec Qty
1 CDU host rack 3U, factory pre-tested 1
2 Variable-frequency pumps ≥50L/min, ≥15m, 1+1 redundant 2
3 Brazed plate heat exchanger 30kW, isolated loops 1
4 Diaphragm expansion tank 5L, 1.6MPa 1
5 Y-type precision filters 5μm 2
6 Coolant Deionized water + glycol, ≥1MΩ·cm 50 L
7 Self-locking quick couplings 10mm, shutoff 42
8 Multi-path manifolds 1-in-20-out, per-branch valves 2

9.4 Monitoring and Control

No. Item Spec Qty
1 PLC control host 8AI/16DI/8DO, Ethernet/RS485 1
2 7″ touchscreen Color HMI 1
3 PT100 sensors Class A, G1/2 6
4 Pressure transmitters 0-2MPa, 4-20mA 4
5 Turbine flow sensors 5-80L/min 2
6 Capacitive level sensors High/low alarm 2
7 Locating leak detection Controller + 5m cable 1
8 Shutoff solenoid valves DN15, DC24V 2
9 Audible/visual alarm 85dB, DC24V 1
10 Communication module Ethernet + RS485 1

9.5 Piping and Valves

No. Item Spec Qty
1 Main stainless hard pipe 304, DN20, 1.5mm wall 8 m
2 Branch flexible hoses PFA + braid, DN8 40 m
3 Manual ball valves DN20, brass nickel 4
4 Check valves DN15, spring 2
5 Safety valve DN15, 1.6MPa 1
6 Auto air vents DN15 float 2
7 Pipe clamps 304 with pads 30
8 Sealing kit Gaskets, tape, sealant 1

9.6 Power and Safety Auxiliaries

No. Item Spec Qty
1 Metering PDU 32A in, 16 outlets, metering + surge 2
2 Leakage breaker 3P 32A, 30mA 2
3 Door-controlled LED light 12W, door magnetic 2
4 Washable dust filter G2 2
5 Fire-stop material Class A, 1kg 1

9.7 Quotation Notes

The above lists are the reference configuration for one standard 30kW liquid-cooled cabinet; the final quotation is calculated per confirmed configuration and quantities, tax-inclusive. All prices are indicative and quoted in RMB (CNY) only — no foreign-currency conversion is provided. Warranty: 2 years whole system (3 years core components — pumps, heat exchanger, controller), quarterly free inspections in warranty, 7×24 support; lifetime cost-price maintenance and preferential spares after warranty.

10. Technical Specifications

10.1 System Performance Summary

Item Specification
Cooling per cabinet 30kW rated (20/40/60/80kW custom)
Server capacity 20 × dual-socket servers (1.5kW+ each)
Cabinet 42U, 600×1200×2000mm, static ≥1500kg
CPU cold plate Thermal resistance ≤0.15℃/W, ≤1.6MPa, burst ≥4.8MPa
GPU cold plate (optional) ≤0.12℃/W, dual G1/4
CDU 3U rack; 2 pumps 1+1 redundant (≥50L/min, ≥15m, switchover ≤1s)
Heat exchanger 30kW brazed plate, ≥95% efficiency, isolated loops
Coolant Deionized water + glycol, ≥1MΩ·cm, freeze -15℃, fill ~50L
Filtration 5μm Y-type filters on supply and return
Manifolds 1-in-20-out, per-branch shutoff valves
Quick couplings Double shutoff, 10mm, ≥1,000 matings, hot-swap
Leak detection Locating cable, ≤1mL sensitivity, ±0.5m accuracy, ≤1s response
Shutoff DN15 solenoid valves, close ≤0.3s, leak linkage
Monitoring PLC (8AI/16DI/8DO) + 7″ touchscreen; Modbus/SNMP/MQTT
PUE impact Room PUE to 1.15-1.25 (≈1.1 north with natural cold source)
Noise Pump ≤55dB(A); room below 60dB
MTBF / life ≥100,000h / cabinet ≥15 years (CDU ≥10)
Warranty 2 years whole system, 3 years core components

10.2 Key Component Specifications

Component Key Parameters
Cold plate base 6061-T6 aluminum (copper optional), vacuum brazed, flatness ≤0.05mm, Ra ≤0.8μm
Micro channels Parallel, 0.3-0.8mm wide, ≥60 channels
Leak test 100% helium mass spectrometer ≤1×10⁻⁹ Pa·m³/s
Pump PMSM, 370W, AC220V, ≤55dB, IP54, 0-10V/RS485, ≥50,000h
Expansion tank 5L, EPDM diaphragm, 1.6MPa, 0.3MPa precharge
Coolant resistivity ≥1MΩ·cm (no short circuit on contact)
Touchscreen 7″ TFT 800×480, DC24V, front IP65
PT100 Class A ±0.1℃, response ≤3s, 304 probe
Pressure transmitter 0-2MPa, 0.5 class, 4-20mA, 1.5× overload
Flow sensor 5-80L/min, ±1%FS, pulse/4-20mA
Leak cable 5m, ≤1mL sensitivity, ±0.5m location
Solenoid valve DN15, DC24V, close ≤0.3s, IP65
PDU 32A in, 16 outlets, metering ±1%, class-C surge 20kA
Breaker 3P 32A, 30mA leakage, 6kA, GB 16917.1
Hard pipe 304, DN20, 1.6MPa/6.4MPa burst
Flex hose PFA+braid, DN8, 1.6MPa, min bend ≥50mm

11. Key Advantages and Customer Value

11.1 Extreme Cooling for High Power Density

Cold-plate liquid cooling exchanges heat directly between coolant and the cold plate on the chip — 5-10× the efficiency of air cooling; single-cabinet capacity 30kW+, up to 60kW+ customized, solving AI/HPC heat bottlenecks; CPU cores stable within 60℃, far below air-cooled 80℃+, improving chip stability and life.

11.2 Significant Energy Saving

Air-cooled rooms run PUE 1.5-1.8; cold-plate liquid cooling drops PUE below 1.2, and with natural cold-source utilization northern regions reach ~1.1 year-round — cooling energy down 40%+. Variable-frequency pumps adjust by load with greater part-load savings; incremental investment recovered in 2-3 years; full-lifecycle cost far below air cooling.

11.3 Multi-Layer Leak Protection

Source: all cold plates, fittings and valves pass 100% pressure and helium leak tests (≤10⁻⁹ Pa·m³/s); mature ferrule/welded connections. Detection: locating leak cable at cabinet base detects 1mL within 1s and locates precisely. Linkage: on leak — solenoid shutoff auto-closes; coolant is high-insulation deionized media (≥1MΩ·cm) — even micro-leakage causes no short circuit.

11.4 High Reliability, Uninterrupted Operation

Core pumps 1+1 redundant with 1s auto-switchover; industrial-grade components, MTBF ≥100,000h; design life ≥15 years versus 5-8 years for precision AC; closed loop with no evaporation loss — minimal daily maintenance.

11.5 Compatible and Flexible

Standard cabinet dimensions directly replace air-cooled cabinets without room layout modification; cold plates support Intel/AMD full CPU ranges and mainstream GPUs — most standard rack servers upgrade without motherboard modification; power, size, interfaces and control customizable; single-cabinet, row-level and whole-room deployment.

11.6 Intelligent O&M, Lower Labor

Full-parameter real-time monitoring (temperature, pressure, flow, level, leakage); 7″ touchscreen for parameter setting, mode switching and fault query; integration with room environment-monitoring platforms for remote centralized management; fault self-diagnosis and early warning reducing downtime and labor.

11.7 Low Noise, Better Environment

Air-cooled rooms run 75-85dB; liquid cooling allows server fans to slow or be removed — room noise below 60dB; silent pumps ≤55dB; door gaskets further isolate noise.

11.8 Modular, Fast Maintenance

Self-locking quick couplings let single-server maintenance plug/unplug without draining — 80% shorter operation time, no impact on other servers; modular core parts for quick replacement; routine maintenance is pressure checks and filter cleaning — ordinary staff after simple training.

12. Technical Q&A (50+ Items)

12.1 Basic Concepts

Q1: What is cold-plate liquid cooling vs. immersion?

A: Cold-plate is indirect — metal cold plates on CPU/GPU chips with coolant flowing through internal channels, coolant never touching components. Immersion is direct — whole servers submerged in insulating coolant. Differences: contact (indirect vs direct); retrofit cost (cold-plate only replaces heatsinks without motherboard changes vs. full-cabinet special treatment); maintenance (cold-plate quick plug/unplug vs. retrieving servers); power density (immersion 100kW+/cabinet vs. cold-plate 30-60kW — enough for most high-density scenes).

Q2: How does the cold-plate system work?

A: Two isolated closed loops. Secondary (in-cabinet): pump delivers coolant to manifolds → split to server cold plates → absorbs chip heat → returns to CDU plate exchanger → heat to primary side → cooled coolant recirculates. Primary (external): chilled water or dry-cooler water enters the exchanger, absorbs heat, returns to the cold source. Loops isolated via the exchanger for cleanliness and safety.

Q3: What PUE can cold-plate achieve?

A: Room PUE 1.15-1.25 versus 1.5-1.8 air-cooled; northern regions with natural cold source reach below 1.1 year-round; cooling energy down 40%+, saving tens of thousands of CNY per year per 30kW cabinet.

Q4: Is the coolant conductive or dangerous?

A: Standard coolant is deionized water + ethylene glycol — non-toxic, non-corrosive, non-flammable, resistivity ≥1MΩ·cm; even contact with a circuit board causes no short circuit; food-grade or fully synthetic insulating coolants available for higher requirements.

Q5: What is the temperature control result?

A: CPU cores stable within 60℃ (vs. 80℃+ air cooling), GPU within 65℃; with primary inlet ≤35℃ (30℃ summer), secondary supply ~32℃ and CPU still within 70℃ — far below thresholds, no throttling.

12.2 System Design

Q6: What power can one cabinet support? Can it be customized?

A: Standard 30kW for 20 × 1.5kW dual-socket servers; fully customizable — 20/40/60kW per server count, power and chip type, up to 80kW per cabinet; cabinet size, interfaces and control also customizable.

Q7: What room requirements exist — does the room need renovation?

A: Minimal: primary cold source (existing chilled-water/AC water system or dedicated dry cooler, supply 15-30℃); floor load for 1,200-1,500kg full cabinet (standard rooms satisfy); standard cabinet footprint, no extra space; regular mains power (CDU + monitoring ~500W). No large-scale renovation — only a cold-source water interface.

Q8: Can liquid cooling coexist with air cooling?

A: Yes — liquid-cooled and air-cooled cabinets deploy side by side sharing the room cold source without interference; ideal for partial high-density retrofit (e.g. only AI cabinets) with high cost-effectiveness.

Q9: How is the CDU sized and integrated?

A: 3U rack CDU integrates pump, exchanger, expansion tank, filters, valves, sensors and controller — factory pre-assembled and tested; rated 30kW matching the cabinet; site connect-and-run.

Q10: How are multiple cabinets scaled?

A: Row-level CDUs and dry coolers serve multiple cabinets; whole-room deployment with centralized cold source; monitoring integrates across cabinets into one environment-monitoring platform.

12.3 Safety and Reliability

Q11: Will it leak? What if it does?

A: Leak probability is very low — far below AC piping. Triple protection: 100% helium leak testing (10⁻⁹ Pa·m³/s) of all core parts; locating leak cable detecting 1mL within 1s; auto solenoid shutoff with high-insulation coolant preventing shorts. Even extreme leakage is minimal and harmless with timely handling.

Q12: What if the pump fails?

A: 1+1 redundant pumps; the standby auto-starts within 1s on main-pump fault or flow shortage — cooling never interrupted; over-temperature alarms and server throttling linkage add further protection.

Q13: Is the coolant harmful to people or equipment?

A: No — deionized water + glycol is non-toxic, non-corrosive and non-flammable; daily contact is safe; resistivity ≥1MΩ·cm protects electronics; higher-grade options available.

Q14: What protections does the system have?

A: Electrical: leakage breakers, metering PDUs with surge protection, earthing. Coolant: pressure safety valve, auto air vents, expansion tank, pressure/level monitoring. Leak: detection cable + solenoid shutoff + alarm. Thermal: over-temperature alarms and protective linkage.

Q15: What about power failure?

A: The CDU runs on mains with a breaker; short interruptions are bridged by system thermal mass (coolant holds temperature briefly); longer outages trigger monitoring alarms; optional UPS connection for critical operation.

12.4 Installation and Construction

Q16: How long does installation take? Does it affect business?

A: 2-3 working days per cabinet (positioning, piping, pressure test, coolant fill, commissioning); batch deployment pipelines efficiently; only brief shutdown when connecting the cold source — other cabinets unaffected; new rooms run in parallel with construction.

Q17: Can existing air-cooled servers be converted?

A: Yes — most standard rack servers: remove the CPU air heatsink; apply paste and install the matching cold plate; slide in and connect quick couplings. No motherboard damage, no seal-break, warranty intact; ~30 minutes per server.

Q18: How is leak testing done after installation?

A: Nitrogen pressure test at 1.2× working pressure, hold 2h with ≤1% drop; soap-solution check of all fittings and welds; then flush, fill coolant and commission — per industrial piping standards.

Q19: What tools and skills are needed on site?

A: Standard tools (wrenches, torque driver, megger, pressure gauge); the pipe/electrical crews follow the craft standards; no special liquid-cooling expertise beyond the provided training.

Q20: How is the system filled and degassed?

A: After flushing and vacuum, coolant is filled slowly with simultaneous air venting at high points until the standard level; auto air vents continue removing residual air during commissioning.

12.5 O&M and Maintenance

Q21: Is daily maintenance troublesome? Need dedicated staff?

A: Closed loop — minimal maintenance, simpler than AC systems: daily parameter viewing (temperature, pressure, level); monthly fitting leak checks; quarterly filter cleaning; semi-annual coolant top-up; 2-year coolant replacement. Ordinary staff after 1-2 days training.

Q22: How is a server repaired — will coolant leak?

A: No — each branch has a self-locking quick coupling that auto-shuts on unplug and opens on insert; single-server maintenance without draining; only trace surface residue wiped off; ~5 minutes, other servers unaffected.

Q23: How often is coolant replaced? Cost?

A: 2-year replacement cycle; annual loss ≤5% with small top-ups; full 50L refill costs only a few hundred CNY — very low operating cost.

Q24: What is the filter maintenance?

A: Y-type filters cleaned quarterly (washable 316 mesh); bottom drain flushes sediment; protects cold-plate micro-channels and pump impellers.

Q25: What if alarms trigger?

A: The touchscreen shows the alarm type and location; the manual covers reset and handling for each (over-temperature, overpressure, low level, leakage, pump fault); linkage actions (pump switchover, solenoid shutoff) occur automatically; remote support available.

Q26: How is the system winterized?

A: Coolant freezing point -15℃ (ratio adjustable for colder regions); indoor operation at room temperature; optional higher glycol ratio or heater for extreme cases.

12.6 Performance and Compatibility

Q27: Does liquid-cooling retrofit affect server warranty?

A: No — it only replaces the CPU heatsink as a normal upgrade, without touching motherboard or core chips or breaking seals; our cold plates carry their own warranty with liability for cold-plate-caused damage.

Q28: Which server brands and platforms are supported?

A: Dell, HP, Lenovo, Inspur, Huawei, Supermicro and other mainstream brands; Intel LGA115x/1200/1700/2011/3647/4189 and AMD AM4/AM5/SP3/TR4/sWRX8 — over 99% coverage; custom cold plates per board hole maps and chip dimensions for special servers.

Q29: Does hot weather degrade performance?

A: Minimal — primary inlet ≤35℃ guarantees stable cooling; even 30℃ summer inlets keep secondary supply ~32℃ and CPU within 70℃, far more stable than air cooling’s summer degradation and throttling.

Q30: Can memory and other components be cooled?

A: Memory auxiliary heat sinks lower DIMM temperature 5-8℃; SSD/VRM cooling available on request for fully optimized systems.

Q31: What power is needed for the CDU?

A: ~500W per cabinet (2×370W pumps at duty + control), standard single-phase AC220V.

Q32: What about noise levels?

A: Pumps ≤55dB(A); with server fans slowed/removed, room noise below 60dB — greatly improved working environment versus 75-85dB air-cooled rooms.

12.7 Cost and Value

Q33: How much more expensive than air cooling? Payback?

A: Initial investment 20%-30% higher per cabinet; at 1 CNY/kWh, 30kW full load, annual electricity saving 30,000-50,000 CNY — payback in 2-3 years; higher density shortens payback; longer life and lower maintenance make lifecycle cost far lower.

Q34: What is the system life and warranty?

A: Cabinet ≥15 years; CDU core ≥10 years; cold plates and piping (no moving parts) ≥15 years — versus 5-8 years for precision AC. Warranty: 2 years whole system, 3 years core components; lifetime cost-price maintenance after.

Q35: What is the return on PUE reduction?

A: PUE from 1.5+ to ~1.2 cuts cooling energy 40%+; at scale the electricity saving dwarfs the liquid-cooling premium — plus green certification and policy benefits.

Q36: Why choose the KITOZER/Lain solution?

A: Source-factory with full-chain capability (cabinet, cold plates, CDU, monitoring integration), factory pre-testing with helium leak inspection, customizable configurations, 20+ years of room engineering, and complete after-sales with quarterly inspections.

12.8 Delivery and Services

Q37: What is the delivery period?

A: Standard cabinets ~25 working days from confirmation (design, fabrication, integration, testing); batch orders pipelined; urgent orders express-lane.

Q38: What documentation is delivered?

A: Product certificates, helium leak test reports, pressure test records, wiring/piping diagrams, commissioning records, operation/maintenance manuals, training materials and acceptance reports.

Q39: What training is provided?

A: One-day on-site training at delivery (operation, monitoring, inspection, fault handling) + one-day advanced training (principles, complex fault finding, optimization); 2 free trainees, extra at cost; manuals provided.

Q40: How is after-sales response?

A: 7×24 hotline, 30-min phone response; on-site within 2h urban / 4h suburban; general faults fixed within 4h, major within 24h; spare stock of core parts.

Q41: Can the system integrate with existing environment monitoring?

A: Yes — Modbus-RTU/TCP, SNMP and MQTT with open interfaces; mainstream platform protocols supported; custom protocol development available.

Q42: How is the system verified at acceptance?

A: Full-function tests — pump start/stop and auto-switchover, sensor calibration, alarm and linkage functions, pressure hold, loaded trial run with parameter optimization; documented acceptance report.

Q43: What are the energy-monitoring functions?

A: PDU metering records cabinet power; the platform correlates with coolant temperatures for efficiency analysis; optional cloud energy dashboards.

Q44: Can the cabinet be used for storage or network equipment?

A: Yes — cold plates suit high-power CPU/GPU servers; storage and network cabinets can share the liquid-cooled cabinet with fan cooling retained, or use dedicated configurations.

Q45: What about future 60kW+ upgrades?

A: The modular CDU and manifold architecture supports heat-exchanger and pump upgrades; higher-capacity cold plates and branch hoses accommodate denser servers — planned for in design.

Q46: Is on-site survey included?

A: Yes — free survey covering room conditions, cold source, power, floor load and routing, with a tailored three-option design proposal.

Q47: How is the coolant quality monitored?

A: Periodic resistivity and pH sampling; filter maintenance; replacement per 2-year cycle or test results; optional quality sensors.

Q48: What safety certifications apply?

A: Components comply with GB 4208 (IP), GB 16917.1 (RCD), GB/T 2423 (environmental), pressure-piping codes; factory helium leak and pressure tests documented.

Q49: How is the system commissioned for high reliability?

A: Factory 72h trial run, on-site pressure hold, sensor calibration, pump switchover drills, alarm/linkage verification, and a loaded trial run before acceptance.

Q50: What makes the system maintenance-free in daily use?

A: Closed loop without evaporation, industrial pumps with 50,000h life, redundant design, self-locking couplings and modular parts — ordinary room staff handle all routine work after brief training.

13. Construction Schedule

13.1 Stage Division

Stage Work Duration Responsible Acceptance node
Preparation Site survey (positions, routing, interfaces); material/equipment incoming inspection; tools and PPE; technical disclosure 0.5 day PM Material acceptance form
Cabinet installation Base leveling/fixing; cabinet positioning and calibration (deviation ≤1‰); earthing and resistance test (≤4Ω); CDU and manifold rack mounting 0.5 day Construction lead Cabinet acceptance record
Piping installation Main pipe laying/fixing/connection; branch hoses and quick couplings; valves and sensors; dressing and labels 1 day Pipe crew Piping appearance acceptance
Pressure test Nitrogen test at 1.2× working pressure, 2h hold ≤1% drop; soap-solution check of fittings/welds; flushing and drain; vacuum 0.5 day Lead + QC Pressure test report
Commissioning Coolant fill and degassing; monitoring wiring and parameters; pump start/stop and auto-switchover tests; sensor calibration; alarm/linkage tests; loaded trial run and optimization 0.5 day Engineer Commissioning record
Acceptance Full-function joint acceptance; as-built documentation; O&M training; handover signature 0.5 day PM Acceptance form

Note: batch cabinets work in parallel — each additional 10 cabinets adds 3-5 days; server cold-plate conversion adds time per server count.

13.2 Schedule Assurance

Advance stocking of core components (pumps, exchanger, cold plates, coolant); parallel factory and site work; dedicated crew with certified personnel; daily progress tracking; weather/transport contingency; express lane for urgent projects.

14. Construction Organization and Quality/Safety Measures

14.1 Organization Structure

Project manager (1): overall coordination, schedule, quality, customer liaison. Technical lead (1): disclosure, on-site guidance, commissioning, problem solving. Construction lead (1): crew management, work sequencing, safety. Pipe crew (2-3): piping, connections, valves, pressure test. Electrician (1): power wiring, monitoring wiring, earthing. Safety/QC officer (1): safety supervision, quality inspection and acceptance.

14.2 Pre-Construction Preparation

Technical: crew familiarization with drawings and solution; technical and safety disclosure; site conditions confirmed (environment, cold source, power, floor load); tools, instruments and PPE prepared. Materials: incoming inspection of model/spec/quantity with certificates and test reports; classified storage with moisture/dust/collision protection; flammables stored separately with fire equipment. Site: cleaned area with floor protection; work zone marked with warning signs; temporary power/water points confirmed.

14.3 Core Construction Processes

Cabinet installation: position per drawings; level the base; calibrate level and verticality (≤1‰); connect earthing busbar to the room grid (≤4Ω); mount CDU and manifolds per U-position, firmly fixed.

Piping: main pipes along the rails, straight and evenly spaced, firmly clamped; ferrule connections with clean square cuts, no distortion or stress; hoses with slack, correct bend radius; clear labels with flow direction and circuit names.

Cold-plate installation: de-energize and remove the server; remove the air heatsink; clean the CPU surface; apply paste evenly; align holes, tighten screws diagonally and evenly; connect quick couplings, verify insertion and no leak.

Pressure test: close branch valves; charge nitrogen to 1.2× working pressure slowly; hold 2h with ≤1% drop; soap-solution check of all fittings/welds.

Flush and fill: circulate clean water to remove impurities; drain until clear; vacuum; fill coolant slowly with air venting to standard level.

Commissioning: jog test for correct pump rotation and no abnormal noise; start and pressurize gradually checking for leaks; calibrate temperature/pressure/flow sensors; test pump switchover, alarm linkage and remote communication; 2h loaded run with stable parameters.

14.4 Quality Assurance

National codes and drawings with three-inspection system (self, mutual, special) per process; all materials with certificates — unqualified prohibited; key processes (pressure test, welding, commissioning) by certified personnel with records; daily site inspection by PM; complete as-built documentation (records, test reports, acceptance forms).

14.5 Safety and Civilized Construction

Certified staff observing room security rules with badges; safety disclosure before work and daily pre-shift briefings; high-work, electrical and hot-work per codes with PPE; fire extinguishers, no smoking, no irregular electricity use; daily waste removal; protection of existing room equipment and facilities.

14.6 Product Protection

Careful handling against collision and scratches; dust covers on installed cabinets/equipment; no stepping on or hanging loads on installed pipes; system parameters password-protected after commissioning; final cleaning and tidy handover.

15. After-Sales Service

15.1 Warranty Commitment

2-year whole-system free warranty (3 years core components — pumps, heat exchanger, controller) from acceptance; non-human faults — free on-site repair and free part replacement; free quarterly inspection and 7×24 technical support in warranty.

15.2 Response Mechanism

7×24 hotline with 30-min phone response and remote guidance; on-site within 2h urban / 4h suburban; general faults within 4h, major faults within 24h; spare stock of core parts for fast replacement and short downtime.

15.3 Inspection Service

In-warranty free inspections: quarterly — running parameters, fitting leak checks, filter cleaning, sensor calibration, alarm function tests, cleaning; annual deep inspection — coolant testing, pump performance, earthing test, full control-system check with annual O&M report. Post-warranty: annual maintenance agreements with preferential periodic inspection.

15.4 Post-Warranty Services

Lifetime maintenance at cost only; extended warranty options; long-term preferential spares and consumables; system upgrade and expansion services protecting investment; regular follow-ups with optimization advice.

15.5 Service Guarantee

Dedicated project manager tracking service quality; per-project service archives recording inspections and repairs; satisfaction follow-ups; complaint channel with dedicated handling.

16. Training Plan

16.1 Training Objectives

Trainees master cold-plate liquid-cooling principles and system composition; operate the monitoring system, view parameters and handle common alarms; perform daily inspection and maintenance; independently handle common faults and emergencies; follow safety codes.

16.2 Training Audience

Room O&M staff (primary), room managers, other technical personnel.

16.3 Training Content

Theory: liquid-cooling overview and cold-plate principles; system composition and component functions; operating logic and control strategies; safety codes; common fault judgment and handling. Practice: monitoring operation (parameters, mode switching, alarm reset, history); daily inspection (pressure, level, temperature, leakage); routine maintenance (filter cleaning, coolant top-up, degassing); server plug/unplug with quick couplings and cold-plate maintenance; fault handling (alarm reset, pump switchover, emergency stop). Safety: coolant handling; leakage emergency flow; electrical codes; emergency shutdown procedure.

16.4 Training Arrangement

Delivery on-site training (1 day, practice-first with theory) and advanced training (1 day, deep principles, complex fault finding, optimization) at site or company; adjustable per needs; 2 free trainees, extra at cost.

16.5 Assessment and Documentation

Theory and practice assessment after training — passing required before independent operation; free operation/maintenance/emergency manuals (paper and electronic); long-term technical consultation.

16. Training Plan

16.1 Training Objectives and Audience

Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.

Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.

16.2 Tiered Training Content System

Level 1: Basic operation training (1 day)

– Basic principles: system concepts, structure composition, performance indicators;

– Daily operation standards: correct operation of equipment, control and safety systems;

– Daily inspection contents: daily/weekly/monthly check items;

– Safety precautions: usage prohibitions and emergency handling procedures.

Level 2: Maintenance training (1 day)

– Detailed structure of each subsystem and working principles;

– Daily maintenance methods: cleaning, fastening checks, routine care;

– Common fault identification and simple handling;

– Emergency handling procedures for power failure, fire and equipment faults.

Level 3: Advanced management training (as needed)

– Performance influencing factors and how to avoid degradation;

– Upgrade and expansion knowledge and specification requirements;

– Relevant national standards interpretation.

16.3 Training Methods and Schedule

– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;

– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.

16.4 Training Assessment and Documentation Delivery

– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;

– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.

17. Anonymous Typical Project Scenarios

All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.

17.1 Technology Company AI Computing Center Liquid-Cooling Project

Project background. A new AI computing room with 80 AI training servers at ~2kW each — 40kW per cabinet — beyond air-cooling capability; room PUE required ≤1.2.

Implementation. 10 × 42U cold-plate liquid-cooled cabinets, 8 AI servers each with CPU+GPU dual cold plates; row-level CDUs and dry coolers; intelligent monitoring integrated into the customer’s environment-monitoring platform.

Results. Stable operation with CPU cores within 58℃ and GPUs within 65℃; measured annual PUE 1.18; cooling energy down 45%; room noise from 78dB to 62dB; highly recognized by the customer.

17.2 University Supercomputing Center Liquid-Cooling Retrofit Project

Project background. The original supercomputing room used air cooling — frequent server throttling in summer heat, inability to deliver full computing power, and high electricity bills; liquid-cooling retrofit was needed for stability and energy saving.

Implementation. Cold-plate liquid-cooling retrofit of 120 dual-socket compute servers across 6 existing cabinets; reused the existing chilled-water system; added cabinet CDUs and piping; retained original server fans as emergency backup.

Results. Full-load year-round operation with no overheat throttling; per-cabinet cooling capacity doubled; room PUE from 1.6 to 1.22; annual electricity saving ~800,000 CNY; retrofit investment recovered in about 2 years.

17.3 Enterprise High-Density Data Center Liquid-Cooling Project

Project background. Space-limited data-center expansion required more servers in the same footprint with high power density, low energy and low noise.

Implementation. 15 standard cold-plate liquid-cooled cabinets, 20 × 2U servers each at 30kW per cabinet; existing precision-AC water system as the primary cold source; monitoring integrated into the enterprise environment-monitoring platform.

Results. Server density doubled in the same space with doubled computing power; stable and reliable with zero leak faults; PUE stable around 1.2 with much lower operating cost; low noise — the office on the same floor as the room was unaffected.

18. SEO Optimization Section

All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.

18.1 Keyword System

– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;

– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;

– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;

– Brand keywords: KITOZER, Guangzhou Lain.

18.2 SEO Tag System

– Title tag: the article title — Guangzhou Lain KITOZER;

– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;

– H1 tag: the article title;

– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.

18.3 Internal Link Anchor Text

– Core anchor text: technical design solution, system construction;

– Long-tail anchor text: configuration list, technical parameters, construction plan;

– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.

19. Official Contact Information

– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Official Website: https://gdlain.com

– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)

– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China

For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.

Shopping Cart