Table of Contents
Toggle1. Cover / Document Information
– Document Title: Integrated Shelter (with Additional Ventilation) Technical Design Solution
– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Date: August 2026
– Version: V1.0
– Project Type: Technical design solution for Integrated Shelter (with Additional Ventilation)
2. Table of Contents Structure
1. Company Introduction
2. Project Overview
3. User Requirement Analysis
4. Overall Design Description
5. Detailed System Design and Product Technical Parameters
6. Project Quotation and Configuration List
7. Core Solution Advantages
8. Technical Q&A
9. Construction Schedule Plan
10. Construction Organization Plan
11. After-Sales Service System
12. Operation and Maintenance Training Plan
13. Typical Project Cases
14. SEO Optimization System and Website Backend Configuration
15. Contact Information
3. Company Introduction
3.1 Company Development Overview
Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.
After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.
3.2 Core Business System
The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:
– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;
– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;
– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;
– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.
3.3 Brand and Qualification Honors
The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.
3.4 Core Competitive Advantages
1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;
2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;
3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;
4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.
4. Project Background and Objectives
4.1 Project Background and Significance
With 5G, edge computing and IoT growth, outdoor communication stations, edge data nodes and monitoring sites are expanding rapidly. The integrated shelter — housing communication, transmission, power and battery equipment in a sealed body — shortens site construction and cuts civil cost. Traditional shelters rely heavily on air conditioning, wasting energy in mild seasons; older shelters have weak ventilation, poor airflow and local hotspots raising equipment fault rates. The new-ventilation integrated shelter combines natural and mechanical ventilation to strengthen airflow and heat rejection while maintaining protection rating — replacing AC operation in transition seasons, cutting energy significantly and improving the internal environment and equipment life.
4.2 Project Objectives
Reliable protection: IP55 waterproof/dust/insect/corrosion/seismic capability for harsh outdoor environments. Efficient ventilation: natural + mechanical combination with rational airflow to meet heat rejection, shorten AC runtime and save energy. Complete systems: power distribution, cabling, earthing/lightning, access control, fire and lighting integrated — ready for use on delivery. Intelligent linkage: ventilation linked to temperature control — fans auto start/stop and modes switch unattended. Easy O&M: modular quick-service equipment with full documentation.
4.3 Applicable Scenarios
Operator outdoor base stations, edge computing sites, transmission nodes; power distribution/equipment shelters and smart-grid nodes; transport monitoring and ETC gantry shelters; park/plant security shelters; water/environment monitoring shelters; temporary emergency communication and command shelters.
4.4 Compilation Basis
YD/T 1537 (outdoor cabinets for communication stations), YD/T 2768 (heat exchange), GB 50054 (distribution), GB 50057 (lightning), GB 50689 (communication station earthing), GB 50243 (ventilation acceptance), GB 50174 (electronic information system room), GB 15630 (fire signs), GA/T 394 (access control), GB 51158 (communication line engineering), GB 50205 (steel structure acceptance), plus customer requirements.
5. User Requirement Analysis
5.1 Shelter Basic Protection
Structural strength/stiffness for snow, hail and impact; seismic and wind-pressure resistance; IP55+ with rain/dust/insect protection; corrosion resistance for coastal/industrial areas; thermal insulation reducing temperature swings and condensation; standard enterprise signage and clean appearance; condensate drainage.
5.2 Ventilation and Heat Dissipation
Heat rejection matching internal equipment; fresh-air supply for maintenance personnel; strong exhaust for stable convection; low noise for residential/office-adjacent sites; vibration damping; intelligent temperature linkage with auto mode switching.
5.3 Power Supply
Three-phase AC supply with capacity margin; independent circuits for fans, AC, equipment and lighting with independent protection; wall-mounted distribution box; overload/short/leakage/surge protection; reserved spare circuits for expansion.
5.4 Cabling
Dedicated steel cable tray for power; flame-retardant ABS fiber trough for weak current (physically separated, no EMI); integrated composite feed-through window for mains/fiber/RF cables with sealing; full fittings (connectors, supports, bends, end caps, outlets).
5.5 Earthing and Lightning
T2 copper main earthing busbar; full earthing accessories covering shelter, equipment, distribution box and trays; per communication-station earthing standards.
5.6 Access Control
Smart electromagnetic access system; card + password dual verification; reliable lock with emergency release on power loss; full kit (magnetic lock, reader, keypad, controller, power, exit button).
5.7 Fire Protection
Hand-held clean-agent extinguishers suitable for electrical fires, residue-free; sufficient quantity per codes; convenient access with clear signs.
5.8 Lighting
Explosion-proof LED fixtures; even illumination for maintenance; convenient switch; energy-saving long-life.
5.9 Documentation and Acceptance
Factory test reports, 3C certificates, certificates of conformity, installation drawings, temperature-linkage logic documentation, remote operation and O&M manuals.
6. Design Principles and Applicable Standards
6.1 Design Principles
Reliability first: mature technology and quality components; outdoor harsh-environment adaptation; year-round uninterrupted operation. Advanced: ventilation, intelligent linkage and modular structure technologies with lifecycle currency. Economy: optimized configuration; energy-saving design lowering lifecycle cost. Safety and compliance: electrical, fire, lightning and personnel safety per codes. Expandable: reserved capacity and interfaces for future expansion. Easy maintenance: modular universal components; complete documentation and labels.
6.2 Applicable Standards
Per section 4.4 (YD/T 1537, YD/T 2768, GB 50054, GB 50057, GB 50689, GB 50243, GB 50174, GB 15630, GA/T 394, GB 51158, GB 50205).
7. System Architecture and Working Principle
7.1 Three-Layer Architecture
Foundation layer: the shelter body — structure, rain louvers, filter screens, drainage — the physical base. Function system layer: seven subsystems — power distribution, ventilation, cabling, earthing/lightning, access control, fire, lighting — independent yet coordinated. Intelligent control layer: distribution-box control module with temperature-linkage logic — fan/lighting control, parameter setting, status monitoring, auto running, linkage — unattended intelligent operation. Standard interfaces; independent maintenance and upgrades per system.
7.2 Ventilation System Design
Principle: natural + mechanical with automatic mode switching by internal temperature: natural mode (low ambient, small heat load) — convection through side rain louvers, zero energy; mechanical mode (temperature rising) — fresh-air axial fan + industrial exhaust fans force airflow, rapid heat rejection; mixed mode — fan count/speed adjusted dynamically for efficiency. Dust/water protection: multi-stage filtration and water-blocking at intake; rain-proof check louvers at exhaust — protection rating maintained. Airflow organization: “low intake, high exhaust, one-side intake opposite-side exhaust”: fresh air enters low on one side through louvers/filters, spreads along the floor absorbing heat and rising; two industrial exhaust fans at the opposite upper side discharge hot air — complete circulation, no dead zones; 15-30 air changes/hour. Temperature linkage: thresholds configurable — >=25 degC: one exhaust fan on; >=30 degC: fresh-air fan + all exhaust fans (full mechanical); >=35 degC: AC starts with ventilation assisting; 2 degC hysteresis for staged shutdown preventing fan cycling; fan fault raises AC priority with remote alarm; auto/manual modes; RS485 remote interface. Dust/water: intake three layers (45° rain louvers -> 18-mesh stainless insect screen -> medium filter); exhaust with rain louvers + gravity check valves; fan-body double sealing with rubber + sealant; all openings water-dam-flanged.
7.3 Shelter Structure
Standardized container-type modular structure: Q235B steel frame (100x100x3mm columns, 80x60x2.5mm beams), shot-blasted with epoxy zinc-rich primer + outdoor polyester topcoat (>=10 years); composite wall panels — 1.5mm galvanized outer panel with outdoor weather-resistant powder coating (60-80um), 50mm flame-retardant centrifugal glass wool (48kg/m3, <=0.034W/mK), 1.0mm galvanized inner panel with matte white electrostatic coating; tongue-and-groove joints + EPDM gaskets + neutral sealant (triple seal); 2.0mm top plate with 1.5% drainage slope and water dams; 2.5mm patterned steel floor with steel base beams and anti-corrosion bitumen; wide single door 900x2100mm with three-point anti-theft lock; humanized interior with equipment racks and cable channels.
8. Detailed Technical Design
8.1 Shelter Body
2500x6000x3200mm (+-5), internal ~2300x5800x2500mm; weight ~2800kg; life >=20 years; IP55; seismic 8; wind >=1.0kPa; snow >=0.5kN/m2; floor uniform load >=5kN/m2; U-value <=0.5W/(m2K); B1 fire rating; 4-point top lifting + fork pockets; door 900x2100mm. Frame Q235B shot-blasted, epoxy zinc + polyester; welding CO2 with sound beads. Rain louvers: 6063-T5 aluminum anodized, 45° blades with gutters and drip edges, ventilation area >=60%, rain-proof, built-in 18-mesh 304 screen, 1200x600mm, 2 intake + 2 exhaust, flush embedded sealed. Multi-stage filters: level 1 — 18-mesh 304 stainless woven (insects/leaves/fluff/coarse dust, washable); level 2 — polyester non-woven medium filter (>=80% at >=5um, <=30Pa, replaceable); level 3 — 60-mesh nylon fine screen; ABS frames, drawer-type with handles, sponge gaskets preventing bypass. Condensate drainage: U-shaped collection trough at the wall base; phi25mm UPVC drain with water seal; 2 outlets with stainless filters; optional electric trace heating for cold regions. Signage: silk-screen per VI; reflective hazard/fire/operation signs; salt spray >=1000h; anti-pry three-point locks.
8.2 Wall-Mounted Three-Phase Integrated Distribution Box
AC380V/220V three-phase five-wire, 50Hz; main 100A; Icw 6kA/1s; IP40; 1.2mm cold-rolled steel electrostatic coating; wall mount M8; 600x800x200mm. Circuits: main 100A 3P; AC 32A 3P; fresh-air fan 16A 1P; exhaust fan 1 16A; exhaust fan 2 16A; equipment main 1 20A; equipment main 2 20A; lighting 10A; spare 16A. Protection: thermal-magnetic breakers all circuits (overload trip); short-circuit instantaneous <=0.1s; RCD main 30mA <=0.1s; level-2 SPD 20kA; optional undervoltage release. Structure/accessories: locking door; terminal blocks; clear labels + wiring diagram; built-in temperature-linkage control module (fan control); power/run/fault indicators; RS485 remote interface.
8.3 Clean-Agent Extinguisher
Heptafluoropropane, 2kg charge; rating 1A 21B C E; 1.2MPa (20 degC); discharge >=8s, distance >=2.5m; -10~+55 degC; nitrogen drive; steel bottle; brass valve; ~4.5kg; cylinder 10 years, agent 5 years; GB 4351 + 3C; gasifies completely — no residue, non-conductive, safe for electronics.
8.4 Cabling System
Steel cable tray: mesh double-layer ladder type, 400mm wide, 100mm high, 200mm layer spacing; Q235 steel, sides 2.0mm, rungs 1.5mm; hot-dip galvanized >=65um; uniform load >=200kg/m, deflection <=1/200; 50x20mm elongated holes; bolted joints; full fittings (connectors, end caps, hangers, earth bonds, tie rings); top suspension adjustable; non-combustible. Flame-retardant ABS fiber trough: tail-fiber trough 240x100mm, UL94 V-0, wall 3.5mm, blue, -20~+60 degC, load >=50kg/m, snap covers, full fittings (straights, 90° bends, outlet points, end caps, supports); smooth no-burr, insulating, lightweight. Integrated composite feed-through window: 1.5mm 304 stainless panel 400x300mm (opening 360x260mm); EPDM seals; 2 x phi50 mains holes, 4 x phi20 fiber holes, 6 x phi16 RF holes, 2 x phi30 spare with plugs; IP65; expansion-seal rings (tighten nut after cable entry); flanged bolted + sealant; 2 M8 earth terminals; corrosion-resistant.
8.5 Earthing System
Main busbar: T2 copper >=99.9%, 40x4x300mm, tinned, >=98% IACS, >=400A, 10 x phi9 holes with M8 copper bolts, insulated support mounting. Accessories: 16mm2 main earth wire 10m; 6mm2 equipment wires 20m; DT-16 x5 and DT-6 x15 copper lugs; 4 epoxy insulators; M8 stainless bolts/washers/nuts; 2 earth labels. Grounding per GB 50689; resistance <=4 ohm with the site grid.
8.6 Access Control System
Magnetic lock: 280kg (600lb) single-door, DC12V (static 380mA / action 500mA), aluminum housing + silicon-steel core, IP54, door-sensor output, 0/3/6/9s unlock delay, power-off release (fire escape) with residual-magnetism prevention, embedded frame mount. Reader: ID (or IC), 125kHz/13.56MHz, 3-8cm, DC12V <=100mA, ABS, IP65, Wiegand 26/34, dual-color LED + buzzer. Keypad: 12 keys, mechanical, DC12V <=80mA, 1,000 user codes 4-8 digits, Wiegand 26/34, IP65, card+password dual verification. Controller: single door; 2,000 cards; 10,000 events; DC12V <=200mA; door-sensor/exit-button/fire-linkage inputs; relay output; RS485 networking; time zones, holidays, always-open/closed modes, fire linkage. Kit: 1 lock, 1 reader, 1 keypad, 1 controller, DC12V/3A supply, 1 exit button, 10 cards, mounting accessories.
8.7 Ventilation Equipment
Fresh-air axial fan (SF3-4): low-noise duct axial, 300mm impeller, 5 aluminum blades dynamically balanced, galvanized housing coated; AC220V 120W 1450rpm; 1800 m3/h, 80Pa; <=52dB(A); IP54; B-class; oil-impregnated bearings maintenance-free; stainless inlet guard; rubber dampers + flexible canvas; wall flange mount. Industrial exhaust fans (FTA-400 x2): square negative-pressure, 400x400x200mm, 380mm 6-blade die-cast aluminum, 1.2mm galvanized housing; AC220V 180W 1400rpm; 3200 m3/h, 120Pa; <=60dB(A); IP55; F-class; motor life >=50,000h; built-in gravity rain-proof check louvers; rubber dampers + galvanized frame; wall-embedded.
8.8 Lighting and Accessories
LED explosion-proof flat light: Ex d IIC T6 Gb, IP65, AC220V 18W, 1800lm, 6000K, Ra>=80, 120°, 300x300mm, aluminum housing + tempered glass, life >=50,000h, -20~+55 degC, ceiling mount, explosion-proof certificate + 3C. Switch: 86-type rocker, AC250V 10A, PC flame-retardant, silver contacts >=40,000 cycles, white, PVC box. 304 stainless fasteners: per GB/T 3098; salt spray >=1000h; bolts M6/M8/M10, self-tapping ST4.2/ST5.5, expansion bolts, neutral silicone sealant, EPDM strip, stainless/nylon ties, lugs, tape, heat-shrink, anti-rust oil; 10% spare allowance.
8.9 Documentation
Paper + USB: factory test reports (structure, protection, electrical, ventilation); 3C/explosion-proof certificates; equipment certificates; construction drawings (foundation, layout, electrical, earthing, ventilation, conduit); temperature-linkage logic and parameter settings; remote operation and O&M manuals; maintenance guide with wear-part replacement; spares list.
9. Recommended Configuration and Preliminary Budget
9.1 Configuration Summary
Body: 1 x 2.5x6x3.2m integrated shelter (with rain louvers, multi-stage filters, drainage, signage). Power/fire: 1 x wall-mounted three-phase integrated distribution box (9 circuits); 2 x clean-agent extinguishers with brackets. Cabling: 1 steel cable tray set; 1 flame-retardant ABS fiber trough set; 1 integrated composite feed-through window. Earthing/access: 1 T2 copper main busbar kit with accessories; 1 smart electromagnetic access kit. Ventilation: 1 low-noise fresh-air fan; 2 industrial exhaust fans (with dampers and dampers). Lighting/auxiliaries: 1 explosion-proof LED light + switch; 1 batch of 304 stainless fasteners/sealants. Documentation: full technical data set.
9.2 Budget Notes
Standard configuration quoted; customization (size, configuration, appearance, functions) per request; tax-inclusive in RMB (CNY) only; factory production ~12 days, total ~25 working days; 12-month warranty, 2 free inspections, 7×24 support, lifetime maintenance.
10. Technical Specifications
10.1 System Specification Summary
| Item | Specification |
|---|---|
| Shelter body | 2500x6000x3200mm (+-5); internal ~2300x5800x2500; ~2800kg; life >=20 years; IP55; seismic 8; wind >=1.0kPa; snow >=0.5kN/m2; floor >=5kN/m2; U<=0.5W/m2K; B1; Q235B frame (100x100x3 / 80x60x2.5); 1.5mm galvanized outer + 50mm glass wool (48kg/m3) + 1.0mm inner; 2.0mm roof 1.5% slope; 2.5mm patterned floor; door 900×2100 three-point lock; 4-point lifting + fork pockets |
| Ventilation | Natural louvers (45°, >=60% area, 18-mesh screen) + 1 fresh-air fan 1800 m3/h <=52dB + 2 exhaust fans 3200 m3/h each <=60dB; total >=8000 m3/h (>20 changes/h); temperature linkage 25/30/35 degC with 2 degC hysteresis; fault -> AC priority + remote alarm; three-stage filtration (18-mesh SS, medium filter >=80% @5um, 60-mesh nylon), drawer-type; gravity check louvers on exhaust |
| Distribution box | AC380/220V 3-phase 5-wire; main 100A; 9 circuits (AC 32A, fans 3x16A, equipment 2x20A, lighting 10A, spare 16A); thermal-magnetic breakers; RCD 30mA <=0.1s; SPD 20kA; optional UV release; IP40; 600x800x200 wall mount; RS485 remote; temperature-linkage module built in |
| Fire | 2 x heptafluoropropane 2kg (1A 21B C E); >=8s discharge; no residue; non-conductive; GB 4351 + 3C |
| Cabling | Steel tray 400mm (2.0/1.5mm, galvanized >=65um, >=200kg/m); ABS fiber trough 240×100 UL94 V-0; composite feed-through window 304 SS IP65 (2xphi50 mains, 4xphi20 fiber, 6xphi16 RF, 2xphi30 spare) with expansion seals + 2 M8 earth terminals |
| Earthing | T2 copper busbar 40x4x300 tinned >=400A; 16mm2 main + 6mm2 equipment wires; full lugs/insulators; resistance <=4 ohm |
| Access | 280kg magnetic lock, power-off release; reader + keypad (card/password/dual); controller 2,000 cards / 10,000 events; fire linkage; RS485 |
| Lighting | Ex d IIC T6 Gb LED 18W 1800lm 6000K IP65 >=50,000h + 86-type switch |
| Environment | Fans/equipment wide-temperature; 304 fasteners salt spray >=1000h; low noise (shelter outside 1m <55dB(A)); -20~+60 degC adaptability |
| Schedule/service | 25 working days (prep 3, production 12, factory acceptance 2, site 5, final acceptance 3); 12-month warranty; 7×24 support, 30min response, 4h/8h on-site; 2 free inspections; lifetime maintenance |
10.2 Standards Compliance
YD/T 1537, YD/T 2768, GB 50054, GB 50057, GB 50689, GB 50243, GB 50174, GB 15630, GA/T 394, GB 51158, GB 50205, GB 4351 (extinguisher, 3C), explosion-proof certification (Ex d IIC T6 Gb).
11. Key Advantages and Customer Value
11.1 Advanced Technology
Three-level temperature control (natural ventilation -> mechanical ventilation -> AC): transition seasons run entirely on ventilation — site temperature-control energy down 40-60%; intelligent linkage with multi-level thresholds, fault auto-switch and remote monitoring — truly unattended; bottom-in/top-out convective airflow matches hot-air rise — high efficiency, uniform temperature, no hotspots; modular standardized design for lifecycle extension.
11.2 Operating Reliability
IP55 body with high structural strength, wind/snow/seismic/corrosion performance for -20~+60 degC nationwide; industrial-grade electrical and ventilation equipment with aging/environment tests and long MTBF; multi-layer protection (overload/short/leakage/surge), full equipotential earthing, dedicated fire equipment, access permissions; redundant twin exhaust fans and spare circuits — no single-point failure.
11.3 Environmental Adaptability
Wide-temperature operation; multi-stage intake filtration and multi-seal joints keep the interior clean and dry even in sandstorms and heavy rain; professional anti-corrosion on all metal (304 fasteners) for coastal/industrial sites; low-noise fans with dampers — no disturbance to residential/office areas.
11.4 Easy O&M
Quick-release filters, fans and lamps without special tools; clear distribution circuits and labels for fast fault finding; full documentation (drawings, manuals, maintenance guides) for quick onboarding; standard consumables cheap and available.
11.5 Cost Economy
Factory prefabrication — no heavy civil work, short cycle, low labor, lower than traditional rooms; smart ventilation cuts AC runtime and energy; LED and efficient fans reduce consumption further; relocatable and reusable — high asset reuse; low maintenance cost.
11.6 Customized Service
Size, configuration, appearance and function customization; free multi-scheme design; environment monitoring, battery compartment, AC and power-environment monitoring extensions.
12. Technical Q&A (50+ Items)
12.1 Shelter Structure
Q1: Protection rating? Can it withstand heavy rain?
A: IP55 — protected against water jets; no leakage even in heavy rain: sloped roof with dams, triple-sealed joints, rain-proof louvers and water-dam openings.
Q2: Service life?
A: Body >=20 years — Q235B welded frame with multi-layer anti-corrosion; galvanized outer panels with weather-resistant coating; stable with normal maintenance.
Q3: Lifting and relocation?
A: Yes — top lifting points and fork pockets; module can be lifted whole to a new site and reused without rebuilding — high asset value.
Q4: Insulation and condensation?
A: 50mm flame-retardant glass wool (U<=0.5W/m2K); bottom condensate drainage collects and drains any moisture — no water accumulation.
Q5: What environments can it handle?
A: -20~+60 degC, IP55, seismic 8, wind >=1.0kPa, snow >=0.5kN/m2; corrosion-resistant coatings and 304 fasteners for coastal/industrial sites.
Q6: Door and security?
A: 900x2100mm single door with three-point anti-theft lock; optional access control for electronic management.
12.2 Ventilation
Q7: Does added ventilation reduce dust protection?
A: No — three-stage intake filtration (18-mesh screen, medium filter, 60-mesh fine screen) plus exhaust check louvers and sealed fan joints keep IP55; drawer filters are easily cleaned.
Q8: Is heat rejection sufficient?
A: 1 fresh-air + 2 exhaust fans deliver >=8000 m3/h (>20 changes/hour) — sufficient for typical communication/power equipment; AC automatically assists when ventilation alone cannot meet demand.
Q9: Noise level?
A: Fresh-air fan <=52dB(A), exhaust <=60dB(A), plus dampers and flexible connections — <55dB(A) at 1m outside, like normal conversation.
Q10: Are temperature-linkage parameters adjustable?
A: Yes — start/stop thresholds and delays configurable locally via the distribution-box control module or remotely.
Q11: Filter cleaning cycle and cost?
A: 1-3 months urban (shorter in dusty areas); drawer removal, water rinse; stainless screen reusable long-term; non-woven medium filter cheap to replace.
Q12: What are the three operating modes?
A: Natural (convection, zero energy); mechanical (fans forced); mixed (fan count/speed modulated) — auto-selected by temperature.
Q13: What if a fan fails?
A: Redundant twin exhaust fans maintain basic ventilation; fault raises AC priority automatically and reports remotely.
Q14: Air change rate?
A: 15-30 changes/hour with bottom-in/top-out organization — no hot spots.
12.3 Power Supply
Q15: What protections does the box have?
A: Overload and short-circuit on all circuits; RCD 30mA <=0.1s on main; level-2 SPD 20kA; optional undervoltage release; locked door.
Q16: Spare circuits for later equipment?
A: 1 x 16A spare circuit plus main capacity margin; large additions can upgrade the box.
Q17: Remote monitoring?
A: RS485 interface to the power-environment system — remote voltage/current/state monitoring, remote switching and parameter setting.
Q18: What is the main capacity?
A: 100A main switch, 6kA/1s short-time withstand; nine circuits per the list.
12.4 Cabling and Earthing
Q19: Are power and weak current separated?
A: Yes — steel tray for power, ABS fiber trough for fiber/signal, layered and physically isolated — no EMI on signals.
Q20: Ground resistance?
A: System conduction is very low (tinned T2 copper); with a compliant site grid, combined resistance <=4 ohm per communication-station standards.
Q21: Does the feed-through window leak?
A: No — expansion sealing rings (tighten after cable entry) plus flanged mounting with sealant — IP65.
Q22: What cables go through the window?
A: 2 x phi50 mains, 4 x phi20 fiber, 6 x phi16 RF, 2 x phi30 spare with plugs.
Q23: How is the busbar mounted?
A: On epoxy insulators, insulated from the shelter; all housings/trays/frame bonded to it.
12.5 Access and Fire
Q24: Does the magnetic lock fail open on power loss?
A: Yes — power-off release design meets fire escape requirements; optional backup power keeps access control alive for hours.
Q25: Is the extinguisher safe for electronics?
A: Yes — heptafluoropropane gasifies completely: no residue, no pollution, non-conductive — the standard for communication rooms and data centers.
Q26: What opening methods?
A: Card, password, or card+password dual verification; interior exit button; fire-linkage input.
Q27: How many cards/records?
A: 2,000 cards, 10,000 events; time zones and holiday management; RS485 networking.
12.6 Construction and O&M
Q28: Site installation period?
A: Factory-prefabricated — foundation, hoisting, cable connection and commissioning: 3-5 days standard, far shorter than traditional rooms.
Q29: Daily O&M?
A: Periodic fan checks; filter cleaning every 1-3 months; earthing and extinguisher checks; lamp replacement — light workload, no dedicated staff.
Q30: Warranty and response?
A: 12 months; 7×24 hotline; 30min response; 2h solution; 4h urban / 8h suburban on-site; lifetime maintenance at cost.
Q31: How is hoisting performed safely?
A: Professional crane operators, certified slings at designated points, steady lift, aligned landing, level <=2mm/m, then bolted/welded fixing with damping pads.
Q32: What tests are done before delivery?
A: Structure, protection rating, electrical and ventilation performance tests with factory reports.
Q33: Can it be expanded later?
A: Yes — spare circuits, module slots and standard interfaces support equipment expansion and system upgrades.
Q34: Is the shelter relocatable?
A: Yes — whole-unit lifting; internal equipment secured before transport; reuse at new sites.
Q35: What training is provided?
A: 1 day at acceptance — theory (structure, ventilation logic, power, safety), hands-on (door/lock, fan control, filter cleaning, box operation, extinguisher drill, fault drills), assessment with certificates.
Q36: What documentation is delivered?
A: Factory reports, certificates, drawings (foundation/layout/electrical/earthing/ventilation/conduit), linkage logic, manuals, maintenance guide, spares list — paper + USB.
Q37: How is acceptance performed?
A: Full function tests, linkage verification (temperature simulation), door/lighting linkage, fault drills, documentation handover, signed acceptance.
Q38: Are spare parts available?
A: Stocked common wear parts (filters, fans, lamps, seals); 48h dispatch; original quality with warranty.
Q39: Why choose the KITOZER/Lain solution?
A: Source factory with 20+ years; strict QC and third-party testing; full customization; one-stop service; proven operator/edge/power deployments.
Q40: How much energy is saved?
A: Smart ventilation replaces AC in transition seasons — 40-60% temperature-control energy reduction in practice (a base-station case saved ~35% annually).
Q41: Can it run off-grid?
A: Yes — optional solar-power adaptation and low-power ventilation for remote off-grid sites.
Q42: Is explosion-proof lighting needed?
A: Yes — Ex d IIC T6 Gb certified LED for electrical equipment environments; 3C certified.
Q43: What is the shelter weight and transport?
A: ~2,800kg standard; rain/dust-proof transport vehicles with dedicated packing; single-unit logistics.
Q44: How are condensation and moisture handled?
A: U-shaped collection trough + water-sealed UPVC drains (2 outlets, anti-blocking filters); optional electric trace heating for freezing regions.
Q45: What is the corrosion protection?
A: Epoxy zinc primer + polyester topcoat (>=10 years), galvanized panels, 304 stainless fasteners, salt spray >=1000h.
Q46: Is remote control of fans possible?
A: Yes — RS485 to power-environment monitoring: remote status, parameter setting and control.
Q47: What are the fire provisions?
A: 2 clean-agent extinguishers per code with brackets; fire signage; ventilation auto-shutdown on fire alarm (per linkage design).
Q48: Can the shelter house batteries?
A: Yes — reinforced floor (>=5kN/m2) and optional battery compartment with ventilation per requirements.
Q49: What about lightning protection?
A: Full equipotential earthing, SPD in the distribution box, and site-level lightning rods/down conductors per GB 50689.
Q50: What makes it cost-effective?
A: Lower build cost than traditional rooms, 40-60% cooling energy savings, low maintenance, relocatable asset, 20-year life and customization protecting investment.
13. Construction Schedule
13.1 Stages (Total 25 Working Days)
| No. | Stage | Work | Days | Responsible |
|---|---|---|---|---|
| 1 | Production preparation | Scheme confirmation and drawing review; procurement and incoming QC; production plan and staffing | 3 | PM, procurement |
| 2 | Factory production | Sheet-metal and welding; coating; tray/trough pre-install; distribution box assembly/test; ventilation/access/lighting pre-install; assembly and initial debug | 12 | Production lead, technical lead |
| 3 | Factory acceptance | Full performance tests; appearance/config check; documentation; optional customer factory acceptance; packing/loading | 2 | QC lead, PM |
| 4 | Site installation | Unload and count; hoist and fix; power distribution installation; ventilation installation/commissioning; cabling and earthing; access/lighting; system integration | 5 | Crew lead, site engineer |
| 5 | Final acceptance | As-built documentation; customer acceptance; rectification; sign-off; handover and training | 3 | PM, after-sales engineer |
13.2 Key Node Control
Drawing confirmation: production starts only after customer approval — no rework. Factory inspection: full inspection before shipment; unqualified products never leave. Hoisting: certified operators; safety and positioning accuracy. Energization: wiring verified before staged power-on. Acceptance: all function tests passed and documentation complete before acceptance.
13.3 Schedule Assurance
Material pre-stocking with warning mechanism; dedicated team with two-shift capability for key processes; equipment maintenance with standby; daily progress meetings; contingency plans with buffer for material/weather delays.
14. Construction Organization and Quality/Safety Measures
14.1 Organization
PM (1): overall management, progress, quality, customer liaison. Technical lead (1): design, disclosure, on-site guidance, problem solving. Crew lead (1): site personnel, process, safety. Electricians (2): power distribution, earthing, lighting. Installers (2): ventilation, trays/troughs, access equipment. Safety officer (1): safety management and civilized construction. QC (1): per-process inspection and acceptance.
14.2 Preparation
Technical: drawing review and disclosure; work cards and instructions; record forms; site survey (foundation, power, earthing). Materials: full inventory and appearance check; tools (welder, drill, cutter, multimeter, megger, earth-resistance tester) calibrated; PPE complete; dedicated rain/dust-proof transport. Site: foundation level/capacity verified; area cleared; temporary power safe; warning zone marked.
14.3 Core Processes
Hoisting/positioning: crane with certified slings at design points; steady lift; level <=2mm/m; bolted/welded fixing with damping pads. Power: wall-mounted box at 1.4m; color-coded cables; firm tinned terminations; insulation test (>=0.5M ohm phase-earth); staged energization with per-circuit verification. Ventilation: fan inspection (free rotation); dampers and seals; correct rotation; reliable earthing; test run with no abnormal vibration/noise and rated airflow. Cabling: level tray/trough runs (<=2mm/m), smooth joints; neat cable dressing with slack at bends; fiber bend radius respected; sealed feed-through window with full sealant. Earthing: insulated busbar; all housings/trays/frame bonded; yellow-green wires labeled; resistance test per design. Access/lighting: accurate lock mounting with tight contact; reader/keypad at convenient height; centered even lighting; function and linkage tests. Integration: temperature-linkage simulation; door-lighting linkage; fault drills.
14.4 Quality Assurance
Three-inspection (self/mutual/special) per process; national codes and company standards; materials inspected at entry; finished-product protection; documentation synchronized with construction.
14.5 Safety and Civilized Construction
Helmets, harnesses for high work; certified special operators; code-compliant temporary power with RCDs and locked boxes; hot-work permits with extinguishers and supervision; supervised hoisting with exclusion zones; daily pre-shift safety meetings; tidy materials, daily cleanup, noise control; respectful conduct; full site restoration.
14.6 Coordination
PM coordinates with customer/supervision; daily site meetings; important/hidden work accepted by the customer before covering; changes strictly documented.
15. After-Sales Service
15.1 Warranty Commitment
12-month whole-project warranty from acceptance; free repair/parts for non-human faults; original spare parts with warranty; 7×24 hotline; 30min response, 2h solution; 4h urban / 8h suburban on-site.
15.2 In-Warranty Services
Free fault repair and parts; 2 free on-site inspections (full check, cleaning, hidden-risk removal) with reports; free phone/remote support; free control-software upgrades; free expansion/retrofit consultation.
15.3 Post-Warranty Services
Lifetime repair at parts cost only (no service fee); annual maintenance packages; long-term preferential spares (48h dispatch); system upgrade/expansion/retrofit services; lifetime free telephone consultation.
15.4 Spare Parts
Complete spares stock (filters, fans, lamps, seals, breakers); 48h dispatch standard, expedited for emergencies; original quality with warranty; transparent pricing.
15.5 Periodic Inspection
Quarterly/semi-annual/annual frequencies per customer needs: body (welds, seals, locks, hinges), ventilation (fans, filters, dampers), power (terminals, breakers, insulation), earthing (connections, resistance), access/lighting (functions, brightness), fire (pressure, validity) — detailed reports with recommendations.
15.6 Emergency Response
Three-level fault grading with matched response; 24h standby emergency team; backup equipment for critical devices; remote diagnosis for fast resolution.
16. Training Plan
16.1 Training Objectives and Audience
Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.
Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.
16.2 Tiered Training Content System
Level 1: Basic operation training (1 day)
– Basic principles: system concepts, structure composition, performance indicators;
– Daily operation standards: correct operation of equipment, control and safety systems;
– Daily inspection contents: daily/weekly/monthly check items;
– Safety precautions: usage prohibitions and emergency handling procedures.
Level 2: Maintenance training (1 day)
– Detailed structure of each subsystem and working principles;
– Daily maintenance methods: cleaning, fastening checks, routine care;
– Common fault identification and simple handling;
– Emergency handling procedures for power failure, fire and equipment faults.
Level 3: Advanced management training (as needed)
– Performance influencing factors and how to avoid degradation;
– Upgrade and expansion knowledge and specification requirements;
– Relevant national standards interpretation.
16.3 Training Methods and Schedule
– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;
– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.
16.4 Training Assessment and Documentation Delivery
– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;
– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.
17. Anonymous Typical Project Scenarios
All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.
17.1 Operator Outdoor Base-Station Shelter Project
Background. An operator’s urban-edge base station used a low-protection prefab room with poor environment, high AC energy and high O&M cost.
Solution. Standard 2.5x6m integrated shelter with intelligent ventilation + AC dual temperature control, three-phase integrated distribution box, double-layer tray + fiber trough cabling, smart access, explosion-proof LED lighting, copper earthing and clean-agent extinguishers.
Results. Factory prefabrication with 3-day on-site installation; smart ventilation cut AC runtime — ~35% annual energy saving at the site; clean stable interior with fewer equipment faults; IP55 handled heavy rain and sand well — adopted for subsequent sites in batches.
17.2 Edge Computing Node Integrated Shelter Project
Background. A tech park needed outdoor deployment of servers and network equipment with fast launch, reliability and remote management.
Solution. Custom insulated reinforced shelter, ventilation + AC dual control, high-spec distribution with UPS access reservation, separated power/weak-current cabling, smart access and power-environment remote integration.
Results. 20 days from order to delivery; stable internal temperature/humidity with reliable server operation; unattended remote monitoring cutting O&M cost; clean appearance matching the park.
17.3 Power Outdoor Equipment Shelter Project
Background. A power company’s outdoor distribution automation site (suburban, humid, mildly corrosive) needed anti-corrosion, anti-condensation and high reliability.
Solution. 304 stainless outer panel shelter, smart ventilation + dehumidification, power-specific distribution box, enhanced lightning earthing, industrial access control and wide-temperature lighting.
Results. No condensation in high humidity; excellent corrosion resistance without rust; stable equipment and reliable data transmission; greatly reduced field visit frequency and O&M cost.
17.4 Scenic Area Security Monitoring Shelter Project
Background. A mountainous scenic area needed outdoor placement of core security equipment — humid, foggy, cold winters, no mains supply — requiring solar power, low consumption and unattended operation.
Solution. Small insulated shelter with low-power ventilation, wide-temperature electrical equipment, solar adaptation interface and remote alarm system.
Results. Stable through cold wet seasons; low-power design enabled off-grid solar operation; remote monitoring with no on-site staff; no civil works — protected the scenic environment.
18. SEO Optimization Section
All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.
18.1 Keyword System
– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;
– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;
– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;
– Brand keywords: KITOZER, Guangzhou Lain.
18.2 SEO Tag System
– Title tag: the article title — Guangzhou Lain KITOZER;
– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;
– H1 tag: the article title;
– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.
18.3 Internal Link Anchor Text
– Core anchor text: technical design solution, system construction;
– Long-tail anchor text: configuration list, technical parameters, construction plan;
– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.
19. Official Contact Information
– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Official Website: https://gdlain.com
– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China
For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.