Table of Contents
Toggle1. Cover / Document Information
– Document Title: Integrated Power Distribution Cabinet and Cold Aisle Enclosure System Technical Design Solution
– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Date: August 2026
– Version: V1.0
– Project Type: Technical design solution for Integrated Power Distribution Cabinet and Cold Aisle Enclosure System
2. Table of Contents Structure
1. Company Introduction
2. Project Overview
3. User Requirement Analysis
4. Overall Design Description
5. Detailed System Design and Product Technical Parameters
6. Project Quotation and Configuration List
7. Core Solution Advantages
8. Technical Q&A
9. Construction Schedule Plan
10. Construction Organization Plan
11. After-Sales Service System
12. Operation and Maintenance Training Plan
13. Typical Project Cases
14. SEO Optimization System and Website Backend Configuration
15. Contact Information
3. Company Introduction
3.1 Company Development Overview
Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.
After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.
3.2 Core Business System
The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:
– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;
– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;
– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;
– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.
3.3 Brand and Qualification Honors
The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.
3.4 Core Competitive Advantages
1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;
2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;
3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;
4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.
4. Project Background and Objectives
4.1 Project Background
Data centers and machine rooms demand high supply reliability, energy efficiency and fast deployment. Traditional dispersed power distribution (separate ATS cabinet, UPS, battery racks, output panels) occupies excessive floor space, lengthens construction and complicates management; open-rack layouts mix cold and hot airflow, causing low cooling efficiency, hot spots and high PUE. This scheme delivers an integrated power distribution cabinet (dual mains + ATS + UPS + battery + output distribution in one body) plus a cold-aisle containment system (dual-row 14-rack) — combining reliability, energy saving and rapid deployment.
4.2 Objectives
Integrated deployment: one cabinet integrates dual-power switching, mains distribution, 60kVA UPS, 32 x 100Ah batteries and output distribution — floor space cut 40%+, site cycle cut 60%+. High reliability: dual mains + ATS (<=100ms) + online UPS (0ms transfer) + battery backup (~40min full load) — supply availability >=99.99%. Energy saving: cold-aisle containment raises cooling efficiency 30%+, lowers PUE 0.2-0.4; LED lighting saves 50%+ vs fluorescent. Safety: two-level surge protection, full electrical protections, sealed anti-leak batteries, fire-linked flip skylights per GB 50174. Intelligent O&M: UPS RS485/SNMP monitoring, cold-aisle T/H display, fault alarms; expandable: modular circuits, UPS parallel up to 8 units, rack-count expansion.
4.3 Scope
1 integrated power distribution cabinet (dual input, mains module, 60kVA UPS, battery, output module); cold-aisle containment for double-row 14 rack positions (1200mm net width, 2000mm height, 4200mm length): frames, manual doors, 7 double-flip skylights, lighting, 24″ display + T/H sensors, M-type separated cable troughs; installation, commissioning, training, after-sales.
4.4 Compilation Basis
GB 7251.1-2013 (low-voltage assemblies), GB/T 14048.11 (ATS), GB/T 14048.2 (breakers), GB/T 18802.1 (SPD), GB/T 7260.1/.3 (UPS), YD/T 1970 (telecom UPS), YD/T 799 (VRLA batteries), GB/T 19638.2 (fixed VRLA), DL/T 637 (power VRLA), GB 10963.1 (MCB), GB 4208 (IP), GB 50174 (data center design), GB 15763.2 (tempered glass), GB 7000.1 (luminaires), GB/T 9473 (lighting quality), GB/T 9286 (coating adhesion), plus customer requirements.
5. User Requirement Analysis
5.1 Power Distribution Requirements
Dual mains input with automatic transfer (<=100ms); integrated cabinet saving space; 60kVA UPS with pure sine output and 0ms battery transfer; ~40min backup at full load; circuit separation for power, auxiliary and expansion; overload/short/leakage/surge protection; clear status indication; remote monitoring.
5.2 Cold-Aisle Containment Requirements
Seal the rack intake side into an independent cold pool; force cold air through racks front-to-back eliminating mixing and hot spots; personnel passage (>=1100mm), manual doors with auto-close; fire-linked flip skylights releasing pressure and letting extinguishing gas enter; even LED lighting; temperature/humidity display; strong/weak current separation.
5.3 Installation and Expansion Requirements
Factory prefabrication with on-site bolt assembly (no welding); minimal impact on existing business (live retrofit possible); modular expansion of circuits, UPS parallel and rack positions; standard rack-top connection.
5.4 O&M and Service Requirements
Daily/monthly/quarterly maintenance guidance; spare parts; training; 12-month warranty with quarterly inspections; 7×24 support.
6. Design Principles and Applicable Standards
6.1 Design Principles
Reliability: dual mains + ATS + online UPS + battery multi-level redundancy; first-line components with full protections. Integration: one cabinet, three compartments (mains / UPS / battery), strong-weak separation. Energy saving: cold-aisle containment, ECO mode (>=98%), LED lighting, smart fans. Safety: SPD, sealed batteries, fire-linked skylights, tempered glass, code compliance. Flexibility: modular circuits, parallel UPS, rack expansion. Serviceability: modular quick-replacement components, clear labels, complete documentation.
6.2 Applicable Standards
Per section 4.4 (GB 7251.1, GB/T 14048.11/.2, GB/T 18802.1, GB/T 7260.1/.3, YD/T 1970, YD/T 799, GB/T 19638.2, DL/T 637, GB 10963.1, GB 4208, GB 50174, GB 15763.2, GB 7000.1, GB/T 9473, GB/T 9286).
7. System Architecture and Working Principle
7.1 Overall Architecture
Power chain: dual mains -> ATSE (PC class, <=100ms) -> main MCCB 200A + level-2 SPD -> mains distribution busbar -> UPS input + auxiliary circuits; UPS (60kVA three-in/three-out online double conversion) -> output distribution busbar -> load circuits; battery 32 x 12V/100Ah (384V DC) provides backup; output 3P+N+PE with 125A busbar and branch breakers. Cold aisle: dual rows of 7 racks face each other forming a 1200mm-wide contained aisle; top frames with 7 double-flip skylights; end doors; lighting, display, sensors; M-type troughs on top.
7.2 Working Principle
Normal: mains power supplies loads through the UPS inverter (pure sine, stable V/f); on mains anomaly the ATS transfers to the alternate source (<=100ms, seamless to the UPS); on total outage the battery inverts with 0ms transfer; on UPS failure static bypass or manual maintenance bypass keeps loads powered. Cold aisle: AC cold air is contained in the sealed aisle, forced through rack fronts, exhausting hot air at the back to the return — no mixing; skylights close for sealing, open automatically on fire signal (power-off release) for pressure relief and extinguishing-gas ingress.
7.3 Integrated Cabinet Layout
2200x1200x800mm floor cabinet with three physically separated compartments — mains distribution, UPS host, battery (strong-weak separated, EMI minimized); front tempered glass door (>=5mm, >=85% transmittance), rear steel door with louvers (>=30% opening) and dust screen; IP30; static load >=800kg (battery tier >=500kg).
8. Detailed Technical Design
8.1 Dual-Power Input Unit
ATSE: PC-class one-piece, 3P, AC400V/50Hz, 200A, insulation 690V, impulse 8kV, short-circuit make >=50kA; auto transfer <=100ms, manual <=3s; self-restoring / no-restoring / mutual-backup modes; over/under voltage, phase-loss and loss-of-supply detection; LED status; electric auto + manual with forced handle; -15~+40 degC; GB/T 14048.11. Main MCCB: 3P 200A, C-curve 5-10In, 800V insulation, AC400V, Icu >=35kA, overload long-delay + short instantaneous, manual, life 20k/10k mechanical/electrical, GB/T 14048.2. Level-2 SPD: 3P+N, In 40kA / Imax 80kA (8/20us), Up <=2.5kV, <=25ns, AC385V, thermal disconnector with failure window, DIN, GB/T 18802.1.
8.2 Mains Distribution Module
T2 copper busbar 30x3mm phase/neutral/earth, tinned, >=200A, temperature rise <=50K, B-class insulation supports; feeder breakers: power 3P/32A MCCB C-curve >=6kA, auxiliary 1P+N/16A MCB >=4.5kA, per GB 10963.1; modular galvanized mounting rails.
8.3 60kVA UPS Host
Three-in/three-out high-frequency online double conversion, 60kVA/54kW, IGBT rectifier + inverter with active PFC, 3Ph+N+PE, DC bus 384V. Input 380/400V (208-478V wide range), 40-70Hz (generator compatible), PF >=0.99, THDi <=3%; output 380/220V, +-1% linear / +-2% nonlinear, pure sine, THDu <=2%/5%, overload 110% continuous / 125% 10min / 150% 1min / >150% 200ms then bypass; PF 0.9; 100% unbalanced load with output unbalance <=1%. Battery: 32 x 12V lead-acid, three-stage charging, float 2.25V/cell, boost 2.30-2.35V/cell, max charge 0.1-0.15C, temperature compensation -3mV/degC/cell, full battery protections. Efficiency double conversion >=94%, ECO >=98%, standby loss <=1%; smart fan speed control. Static bypass (+-10% adjustable) + manual maintenance bypass; parallel up to 8 units (N+X); cold start; fire-linkage dry contact; full alarms; RS232/RS485/dry contacts, optional SNMP/Modbus/TCP; LCD bilingual; 0~+40 degC no derating (55 degC derated), <=1000m no derating, <=55dB, IP20, 1900x600x800mm, ~280kg; GB/T 7260, YD/T 1970.
8.4 Output Distribution Module
T2 copper busbar 3P+N+PE >=125A, <=50K rise, insulated supports; power circuits 3P/32A MCCB, terminal circuits 1P+N/16A MCB; red/green status lamps per key circuit; reserved expansion positions.
8.5 VRLA Battery
Valve-regulated sealed lead-acid, AGM, 12V/100Ah (10h rate, 10.8V cutoff), internal resistance <=5.0m ohm, float life >=10 years (25 degC), self-discharge <=3%/month; discharge: 10h 10A 100Ah, 3h 28A 84Ah, 1h 60A 60Ah, 15min 160A 40Ah; float 13.5-13.8V, boost 14.1-14.4V, max charge <=0.25C, -3mV/degC/cell compensation; high-purity lead-calcium-tin-aluminum plates, AGM separators (any-angle installation), gel-free absorbed electrolyte, one-way pressure valve 10-49kPa with acid filtration, copper-tinned terminals, ABS UL94-V0 housing; discharge -15~+45 degC, charge -10~+40 degC, optimum 20-25 degC (life halves every +10 degC); sealed, explosion-proof, RoHS; YD/T 799, GB/T 19638.2, DL/T 637.
8.6 Cabinet Auxiliaries
Flame-retardant PVC trunking UL94 V-0 with separate strong/weak compartments; T2 copper earthing busbar 30×3 tinned (ground resistance <=0.1 ohm); ZR-BV/ZR-RVV cables per GB/T 5023; axial fans AC220V >=200 m3/h with temperature switch (40 degC on / 30 degC off).
8.7 Cold-Aisle Main Frame
Support columns: cold-rolled steel >=2.0mm, one-piece folded, electrostatic RAL7035, 50x50mm, 2000mm high, single >=200kg, verticality <=1mm/m. Cross main beams: >=2.0mm with ribs, 1200mm (60x40mm), single uniform load >=150kg, level <=1mm/m. Rack-top connectors: galvanized steel >=2.0mm L-type for standard 19″ rack tops (custom for non-standard), M8 stainless hardware.
8.8 Door System
Manual swing door 1200x2000mm (custom); steel frame >=2.0mm electrostatic; aluminum frame + tempered glass >=5mm (>=85% transmittance, GB 15763.2 granulated on break); 3 x 304 hinges (>=80kg each); fire-rated handle lock, openable from both sides with key (quick escape); hydraulic closing damper (auto-close, adjustable speed, leakage <=1%); EPDM foam gaskets (leakage <=1%); opening >=110°; optional access control/electromagnetic lock/auto lighting.
8.9 Double-Flip Skylight System
Unit 600x1200mm, two-leaf symmetric upward flip; steel frame >=1.5mm electrostatic; tempered glass >=5mm >=85%; flip >=90° (ventilation >=80% when open); flame-retardant sealing gaskets (leakage <=2% closed); mechanical life >=10,000 cycles. Electromagnetic actuator: DC24V, <=15W, full open <=3s on signal, manual reset (electric optional), overcurrent/overheat protection, fire-linkage dry contact (power-off release), -10~+60 degC, IP40. Hinges: 304 stainless damping; gaskets: flame-retardant PVC UL94 V-0 foam, life >=5 years, slot mount. 7 units (one per rack position).
8.10 Lighting and Ambience
LED flat light: embedded 18W AC220V, >=1800lm (>=100lm/W), 6500K, Ra>=80, 300x300mm (fits skylight frame), aluminum + acrylic diffuser, no flicker, life >=50,000h (L70), GB 7000.1. LED strip: DC12V <=12W/m, SMD2835 60/m, >=800lm/m, flame-retardant PVC, life >=30,000h, on column inner sides (8.4m total). Power: 2 x 60W adapters (AC100-240V -> DC12V, >=85%, full protection; 1+1/zoned); 86-type master switch 10A near the door.
8.11 Monitoring Display Unit
24″ industrial LCD: >=24″, LED backlight, 1920×1080, >=300cd/m2, >=1000:1, 178°/178°, <=5ms, HDMI/VGA/USB, AC100-240V, 0~+50 degC, metal housing, embedded in door/column — shows aisle T/H, rack load, AC status, skylight state, alarms. T/H sensors: -20~+80 degC +-0.5, 0-100%RH +-3%, RS485 Modbus-RTU, DC12-24V, <=10s, drift <=0.1 degC/yr / 1%RH/yr, wall mount, one per aisle end (2 total).
8.12 Cable Troughs and Supports
M-type strong/weak separated trough: cold-rolled steel >=1.2mm electrostatic RAL7035, 100x50mm, integral metal divider (two compartments, shielding >=20dB), M-bottom stable mounting, snap covers, IP30, full fittings (straights, elbows, tees, clips). Skylight reinforcing support: >=2.0mm steel, 4200mm continuous (60x40mm ribbed), bolted to cross beams.
9. Recommended Configuration and Preliminary Budget
9.1 Configuration Summary
Integrated cabinet: 1 x cabinet body (three compartments); dual-input unit (ATSE 200A PC, main MCCB 200A, SPD 40kA); mains module (busbar + breakers); 60kVA UPS host; output module (125A busbar + breakers); 32 x 12V100Ah VRLA batteries with racks/bars; auxiliary (trunking, earth busbar, cables, fans). Cold aisle (14 positions): 16 columns, 8 beams, 14 rack-top connectors; 1 manual door set; 7 skylight units with actuators/hinges/gaskets; 7 LED flat lights + 8.4m strip + 2 adapters + switch; 1 display + 2 T/H sensors; 8.4m M-type trough + supports + clips; hardware, wiring, signage.
9.2 Budget Notes
Quoted per confirmed configuration and rack count; optional items (top sealing plates, access control, SNMP cards, extended warranty) itemized; tax-inclusive in RMB (CNY) only; 31-day total schedule; 12-month warranty with quarterly inspections and 7×24 support.
10. Technical Specifications
10.1 System Specification Summary
| Item | Specification |
|---|---|
| Integrated cabinet | 2200x1200x800mm; three compartments (mains/UPS/battery); door >=2.0mm, sides >=1.5mm, rails >=2.5mm; coating 60-80um adhesion 0; IP30; static >=800kg (battery tier >=500kg); front glass door >=5mm >=85%; rear louver door >=30% + dust screen; GB 7251.1 |
| Dual input | ATSE PC-class 3P 200A, transfer <=100ms (auto) / <=3s (manual), 50kA make, 3 modes, GB/T 14048.11; main MCCB 3P 200A C-curve Icu>=35kA; SPD 3P+N In40kA/Imax80kA Up<=2.5kV <=25ns |
| Mains/output modules | T2 tinned busbar 30×3 (>=200A) and 3P+N+PE >=125A, rise <=50K; power 3P/32A + terminal 1P+N/16A breakers; red/green status lamps; expansion positions |
| UPS | 60kVA/54kW three-in/three-out online double conversion; input 208-478V, 40-70Hz, PF>=0.99, THDi<=3%; output 380/220V +-1%, pure sine, THDu<=2%; overload 110% cont/125% 10min/150% 1min; PF 0.9; efficiency >=94% (ECO >=98%); parallel to 8; static + manual bypass; cold start; fire linkage; RS232/485/dry contacts + SNMP option; LCD; <=55dB; GB/T 7260, YD/T 1970 |
| Battery | 32 x 12V/100Ah VRLA AGM; 384V DC; float life >=10yr (25 degC); self-discharge <=3%/mo; ~40min full load backup (80min half); sealed any-angle; YD/T 799, GB/T 19638.2, DL/T 637 |
| Cold aisle | 14 positions (2×7), 1200mm wide, 2000mm high, 4200mm long; columns 2.0mm 50×50 >=200kg; beams 60×40 >=150kg; L-connectors; manual door 1200×2000 glass >=5mm, 304 hinges, fire handle lock, hydraulic closer, EPDM (leakage <=1%); 7 double-flip skylights DC24V actuator, fire power-off release <=3s, flip >=90 deg, leakage <=2%, life >=10,000 cycles |
| Lighting/monitoring | 7 x 18W LED flat lights (>=1800lm, 6500K, >=50,000h) + 8.4m DC12V strip + 2x60W adapters; 24″ industrial LCD 1080P metal housing; 2 T/H sensors +-0.5 degC/+-3%RH RS485 |
| Troughs | M-type steel 100×50 strong/weak separated (shielding >=20dB), 8.4m + fittings; skylight reinforcing support 4200mm >=2.0mm |
| Performance | Supply availability >=99.99%; cooling efficiency +30%; PUE -0.2~-0.4; LED energy -50% vs fluorescent; floor space -40%; site cycle -60% |
| Schedule/service | 31 days (prep 10, arrival 2, foundation 3, cabinet 4, cold aisle 5, integration 4, acceptance 3); 12-month warranty; quarterly inspections; 1h response, 4h/8h on-site; 2-day training |
10.2 Standards Compliance
GB 7251.1, GB/T 14048.11/.2, GB/T 18802.1, GB/T 7260.1/.3, YD/T 1970, YD/T 799, GB/T 19638.2, DL/T 637, GB 10963.1, GB 4208, GB 50174, GB 15763.2, GB 7000.1, GB/T 9473, GB/T 9286; factory tests and documentation per project.
11. Key Advantages and Customer Value
11.1 Integrated Design — Efficient Deployment
One cabinet integrates ATS, mains distribution, UPS, batteries and output distribution — floor space cut 40%+; factory prefabricated with on-site cable connection only — site cycle cut 60%+; modular cold aisle with bolt assembly, no welding — minimal impact on existing rooms.
11.2 Highly Reliable Supply Architecture
“Dual mains + ATS + online UPS + battery” multi-level redundancy — availability >=99.99%; ATS <=100ms seamless; UPS 0ms battery transfer with stable pure sine; 32 x 100Ah batteries ~40min full load; first-line components with complete protections.
11.3 Cold-Aisle Containment — Energy Saving
Contained cold pool forces all AC cold air through racks front-to-back — cooling efficiency +30%, PUE -0.2~-0.4; fire-linked flip skylights satisfy safety while sealing; LED lighting saves 50%+ energy.
11.4 Comprehensive Safety
Level-2 SPD against surges; full electrical protections; sealed anti-leak batteries; flame-retardant materials; fire-linkage skylights per GB 50174; dual-side escape doors; high-strength frames.
11.5 Intelligent Monitoring
UPS RS485/SNMP to power-environment systems; aisle T/H display with rack load, AC status, skylight state and alarms; proactive fault alarms, fast location, modular replacement.
11.6 Flexible Expansion
Modular circuits, UPS parallel (up to 8), rack-count expansion without major rework; full customization per space/load/function; one-stop service.
11.7 Source-Factory Quality
Own R&D/production, strict factory tests, national-standard compliance; 7×24 support, 4h on-site urban; in-warranty free inspection/repair; lifetime cost-price maintenance.
12. Technical Q&A (50+ Items)
12.1 Integrated Cabinet
Q1: Advantages over dispersed distribution?
A: Integration saves 40%+ space; factory prefab cuts site cycle 60%+; strong-weak separation reduces EMI; unified appearance; centralized management and maintenance.
Q2: PC vs CB ATS — why PC?
A: PC-class makes/breaks no short-circuit current — one-piece transfer, faster (<=100ms), longer mechanical life; the main MCCB provides overload/short protection upstream, so PC-class maximizes switching speed for data-center reliability. CB-class (two breakers + interlock) is slower.
Q3: What load can the 200A main carry?
A: P = 1.732 x 380 x 200 x 0.9 ≈ 118kW; with 80% derating ~95kW long-term — far above the 54kW UPS + auxiliary load; ample margin for safety and breaker life.
Q4: Why breakers on both UPS input and output?
A: Input breaker isolates the UPS for maintenance/fault isolation; output breaker protects distribution and loads, preventing damage to the UPS and enabling per-circuit maintenance — double protection.
Q5: Is IP30 enough?
A: Yes — IP30 blocks objects >2.5mm (tools, wires, fingers) with no water ingress rating; indoor machine rooms are dry — standard for LV cabinets with better ventilation.
Q6: Grounding requirements?
A: Cabinet earthing busbar bonds all metal/equipment/screens; dedicated cable to the room main earth bus; resistance <=4 ohm — protects personnel, enables SPD and anti-interference functions.
Q7: Can the cabinet be placed outside the room?
A: Designed indoor (IP30): 0~+40 degC, <=95% RH no condensation, no corrosive gas/dust/vibration; outdoor placement needs environment compliance or a higher-IP custom body.
Q8: What are the cabinet dimensions and load?
A: 2200x1200x800mm; static >=800kg (battery tier >=500kg); RAL7035 or custom; expansion-bolt or channel-base mounting.
12.2 UPS and Battery
Q9: Online vs standby UPS?
A: Online double conversion always powers loads from the inverter — pure sine, stable V/f, 0ms battery transfer; standby has ms-level transfer and poorer waveform — unsuitable for data centers.
Q10: What load can 60kVA carry?
A: Active power = kVA x PF = 60 x 0.9 = 54kW; recommended load 40-80% (21.6-43.2kW) for best efficiency, stability and reserve.
Q11: How is backup time calculated?
A: T = (battery capacity x battery voltage x inverter efficiency) / load = (100Ah x 384V x 0.94) / 54kW ≈ 0.67h ≈ 40min; aging/temperature derating → count >=30min full load.
Q12: Why 32 cells, not 30?
A: Cell count is set by the UPS DC bus: 384V / 12V = 32. Too many cells overvolt the charger; too few fail to invert and shorten backup at end of discharge.
Q13: Are VRLA batteries truly maintenance-free?
A: “Low-maintenance” — no water refilling, but still: keep 20-25 degC; check terminals (tightness/oxidation/heat); measure float voltage and internal resistance; avoid prolonged undercharge; keep clean and dry.
Q14: Can batteries be laid flat?
A: Yes — AGM absorbs electrolyte (no free liquid, fully sealed), any-angle installation; secure firmly and keep terminals reliable.
Q15: Can the UPS run on a generator?
A: Yes — 40-70Hz input and wide voltage range; generator rated 1.5-2x UPS (rectifier nonlinear load); common earthing; avoid frequent start/stop; optional output filtering.
Q16: What is ECO mode?
A: Bypass supply at >=98% efficiency when mains is stable, auto-transfer to double conversion on disturbance — energy saving with maintained protection.
Q17: Can multiple UPS units parallel?
A: Yes — up to 8 units for N+X redundancy or capacity expansion.
Q18: What happens on UPS failure?
A: Static bypass (or manual maintenance bypass) keeps loads powered; alarm notification; modular repair.
Q19: How is battery life affected by temperature?
A: Life halves per +10 degC above 25 degC — keep the battery compartment at 20-25 degC; temperature compensation adjusts charging voltage.
Q20: What protections does the UPS have?
A: Input/output over/under voltage, overload, short circuit, battery overcharge/overdischarge/overcurrent, over-temperature, plus fire-linkage shutdown.
12.3 Cold Aisle
Q21: How does containment save energy?
A: Sealing the intake side forms a cold pool — all cold air enters rack fronts and exhausts at the back; no cold/hot mixing, no bypass airflow; higher supply temperature and efficiency — PUE -0.2~-0.4.
Q22: What does “dual-row 14 positions” mean?
A: Two rows of 7 standard 600mm racks facing each other — aisle 4200mm long, 1200mm net width, 2000mm high.
Q23: Why flip skylights?
A: Closed for sealing in normal operation; on fire, power-off release flips them open <=3s — pressure relief (extinguishing gas injection) and gas ingress for effective suppression, per fire codes; also usable for manual ventilation/maintenance.
Q24: How is fire linkage wired?
A: Electromagnetic actuators receive the fire system’s dry contact (DC24V) — the signal cuts actuator power and gravity opens the skylights; simple and reliable.
Q25: What is the M-type trough for?
A: An integral metal divider separates strong and weak current into two compartments — shields EMI (>=20dB), keeps signals stable, tidy and maintainable.
Q26: Why a door closer? Is it mandatory?
A: Auto-close maintains sealing (no cold-air loss when someone forgets); adjustable speed prevents slamming; recommended standard — optional for very frequent access at higher leakage.
Q27: What if top sealing plates are absent?
A: For uniform rack heights with tight top gaps the effect is minor; uneven racks or large gaps should add custom top plates to avoid leakage.
Q28: Why LED flat lights and where?
A: Thin profile embeds in the skylight frame — no space/airflow/sealing impact; even glare-free light; one per two positions for uniform illumination.
Q29: What does the 24″ display show?
A: Aisle temperature/humidity, rack load rates, AC status, skylight state and alarms — embedded in the door or column.
Q30: How are the T/H sensors deployed?
A: One at each aisle end (2 total), RS485 Modbus-RTU — balanced aisle environment data.
12.4 Construction and O&M
Q31: Foundation needed for the cabinet?
A: Channel-steel base recommended (leveling, load spreading, moisture protection); install per standard process with certified electricians.
Q32: Does cold-aisle installation interrupt business?
A: New rooms — no; retrofit — live installation above racks without touching equipment/cables; finished-product protection, off-peak scheduling, on-site supervision.
Q33: Warranty and included services?
A: 12 months (extendable); 7×24 hotline; 1h response; 4h urban on-site; free repair/parts for quality faults; quarterly free inspections with reports; free software upgrades; free consultation.
Q34: Daily/monthly/quarterly maintenance?
A: Daily: UPS panel status/alarms, door closed, lighting, T/H log. Monthly: breaker states, terminal heat, battery appearance/terminals, dusting. Quarterly: cell voltage/resistance, ATS switching test, skylight fire-linkage test, earth resistance, deep cleaning. Annual: battery discharge capacity test.
Q35: Emergency handling?
A: UPS fault → bypass mode keeps load; single battery fault → isolate; skylight stuck → manual reset; lighting fault → later replacement; all per safety codes with certified electricians for live work.
Q36: How is the 72h trial conducted?
A: Continuous operation recording parameters; ATS transfer drills, battery transfer, fire linkage, temperature uniformity checks — no abnormal alarms/heating before acceptance.
Q37: What training is provided?
A: 2 days — theory (architecture, UPS/battery/cold-aisle principles, safety) + practice (breaker operation, UPS control, battery checks, door/skylight, displays, fault drills) with assessment and certificates.
Q38: What documentation is delivered?
A: Drawings (foundation, electrical, layout), certificates and test reports, operation/maintenance manuals, training courseware, acceptance records.
Q39: Are spare parts available?
A: Stocked breakers, fans, lamps, actuators, sensors; 48h dispatch; original quality with warranty; life-cycle supply.
Q40: Can the system be expanded?
A: Yes — spare circuits, UPS parallel, additional rack positions/aisle units; no major rework.
Q41: How is the cold aisle sized for non-standard racks?
A: Custom column height, aisle width and top plates per rack dimensions.
Q42: Why choose the KITOZER/Lain solution?
A: Source factory with 20+ years; integrated design expertise; strict QC and third-party tests; full customization; proven data-center/government/education/medical projects.
Q43: What is the expected PUE improvement?
A: 0.2-0.4 reduction with containment plus optimized AC settings (proven case: 1.8 → 1.5).
Q44: How is the fire safety ensured in the aisle?
A: Flame-retardant materials; fire-linked skylights; dual-side escape doors; per GB 50174.
Q45: What are the environmental requirements?
A: UPS 0~+40 degC no derating (55 degC derated), <=1000m altitude; cabinet/battery optimum 20-25 degC; RH <=95% no condensation.
Q46: Can the UPS be monitored remotely?
A: RS485/SNMP/Modbus/TCP to power-environment platforms with history and alarm export.
Q47: What is the noise level?
A: UPS <=55dB at 1m; smart fans reduce noise at light load.
Q48: How are batteries protected against overcharge?
A: Three-stage charging with temperature compensation and overcharge/overcurrent/short protections.
Q49: What about the auxiliary power circuits?
A: Separate 1P+N/16A circuits for lighting/fans/monitoring with independent protection.
Q50: What makes it cost-effective?
A: 40% space saving, 60% faster deployment, 30%+ cooling efficiency, PUE reduction, 50% lighting savings, high availability avoiding outage losses, and lifecycle service.
13. Construction Schedule
13.1 Overall Schedule (31 Calendar Days)
| No. | Stage | Main work | Days | Responsible | Deliverable |
|---|---|---|---|---|---|
| 1 | Preparation | Site survey (dimensions, power, rack layout); design deepening and drawing disclosure; equipment/material production; personnel/tools/PPE; entry procedures | 10 | PM, technical lead | Survey report, drawings, stock list, organization plan |
| 2 | Arrival acceptance | Cabinet, cold-aisle components and auxiliaries arrival; unpack check (model/spec/qty); appearance, accessories, certificates; joint sign-off | 2 | QC, customer | Arrival acceptance, certificates, test reports |
| 3 | Foundation | Cabinet position marking; channel-steel base fabrication/leveling/fixing; earthing construction and resistance test; site cleanup | 3 | Crew lead, electrician | Foundation records, earth test report |
| 4 | Cabinet installation | Hoist and position; level/vertical adjustment and fixing; earthing; mains/load cable connection; control/comm wiring; wiring check, insulation test, phase sequence | 4 | Electrician lead | Electrical records, insulation/phase tests |
| 5 | Cold aisle | Rack-top connectors; columns and beams; door installation/debug; skylight units; M-type trough, lighting, display, sensors; gaskets and appearance check | 5 | Installation lead | Cold-aisle records, appearance check |
| 6 | Integration | Single-unit tests (breakers, UPS, lighting, skylights); ATS transfer test; UPS commissioning, battery charging, parameters; skylight fire-linkage test; T/H display and comm; loaded trial | 4 | Technical engineer | Debug records, test reports, trial records |
| 7 | Acceptance | 72h trial with parameter records; as-built documentation; customer acceptance; operator training; handover | 3 | PM, technical lead | Trial report, as-built docs, acceptance report, training records |
13.2 Schedule Assurance
Detailed daily plan with morning meetings correcting deviation; phased material arrival per schedule; parallel/flow operations; sufficient certified crew and tools; close customer coordination; contingency buffer.
14. Construction Organization and Quality/Safety Measures
14.1 Organization
PM (1): overall management, coordination, progress/quality/cost, customer liaison. Technical lead (1): design deepening, disclosure, technical guidance, commissioning, problem solving. Crew lead (1): site personnel, scheduling, safety, progress. QC (1): inspection, equipment acceptance, tests, records. Safety officer (1): safety management, training, inspections. Crew: certified electricians, installers and debuggers with machine-room experience.
14.2 Preparation
Technical: drawing/scheme review and disclosure (requirements, standards, safety); verify installation conditions (cabinet position, rack layout, power, earthing, fire signal); calibrated instruments; special process plans. Materials: full inventory check; certificates/test reports required; tools ready; protected storage. Site: cleared area; temporary power/lighting per code; fire equipment and warning signs; finished-product protection.
14.3 Core Processes
Cabinet installation: position marking; channel base level <=1mm/m with anti-corrosion; hoist/place; level and verticality <=1.5mm/m; firm fixing; color-coded cable connection with torque-wrench terminations; earthing <=4 ohm; insulation >=0.5M ohm; phase sequence verified. Cold aisle: rack-top connectors aligned (straightness <=2mm/m); column/beam frame level and plumb; door gap/smoothness and seal adjustment; skylight flip smooth with even closed gaps; trough/lighting/display/sensor installation neat and labeled; full gasket sealing. Commissioning: single-unit power-on tests; ATS transfer; UPS start, battery charge, parameter setting; fire-linkage drill; T/H display and communication; 72h loaded trial with records.
14.4 Quality Assurance
National codes and company standards; three-inspection (self/recheck/final) with no pass-through of unqualified work; materials with certificates only; special plans for key processes; professional tools/instruments; complete records for traceability; final quality acceptance per design.
14.5 Safety and Civilized Construction
Machine-room safety rules; certified operators with helmets and harnesses; temporary power per code with RCDs; hot-work permits with extinguishers and supervision; live work by certified electricians with insulation tools; daily patrols and training; tidy site with daily cleanup; finished-product protection; respect for existing facilities.
14.6 Finished-Product Protection
Protected storage (moisture/dust/impact); protective film on panels/glass until acceptance; terminal covers after wiring; system restored and secured after debugging; watch personnel before handover.
15. After-Sales Service
15.1 Warranty Commitment
12-month free warranty from acceptance (extendable); free repair/parts for product/installation quality faults; human/force-majeure excluded; free technical support and optimization.
15.2 Response
7×24 hotline; 1h response; remote-first; 4h urban / 8h suburban on-site; general faults within 24h; major faults solution within 72h with expedited restoration.
15.3 Routine Services
Quarterly free inspection in warranty (full check, cleaning, terminal tightening, hidden-risk removal) with formal reports; customer service archives; free software upgrades; lifetime free technical consultation.
15.4 Post-Warranty
Annual maintenance agreements at preferential rates; lifetime repair at parts cost only; long-term preferential spares; system upgrade/expansion services.
15.5 Flow
Report -> register -> remote diagnosis -> on-site repair (with common spares) -> customer confirmation -> 3-day follow-up.
16. Training Plan
16.1 Training Objectives and Audience
Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.
Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.
16.2 Tiered Training Content System
Level 1: Basic operation training (1 day)
– Basic principles: system concepts, structure composition, performance indicators;
– Daily operation standards: correct operation of equipment, control and safety systems;
– Daily inspection contents: daily/weekly/monthly check items;
– Safety precautions: usage prohibitions and emergency handling procedures.
Level 2: Maintenance training (1 day)
– Detailed structure of each subsystem and working principles;
– Daily maintenance methods: cleaning, fastening checks, routine care;
– Common fault identification and simple handling;
– Emergency handling procedures for power failure, fire and equipment faults.
Level 3: Advanced management training (as needed)
– Performance influencing factors and how to avoid degradation;
– Upgrade and expansion knowledge and specification requirements;
– Relevant national standards interpretation.
16.3 Training Methods and Schedule
– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;
– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.
16.4 Training Assessment and Documentation Delivery
– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;
– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.
17. Anonymous Typical Project Scenarios
All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.
17.1 Technology Company Data Center Project
Background. A new data center with 20 server racks needed a high-reliability power system and cold-aisle containment to raise efficiency and reliability.
Solution. 2 integrated power cabinets (each: ATS, 80kVA UPS, 40 x 100Ah batteries, output module); double-row 20-position cold aisle with fire-linked skylights, environment display and LED lighting.
Results. Stable operation with supply availability 99.99%; PUE dropped from 1.8 to 1.5; significant energy savings; convenient O&M — highly recognized.
17.2 Government Unit Machine-Room Upgrade Project
Background. Dispersed power distribution and low cooling efficiency; upgrade required without business interruption.
Solution. 2 integrated cabinets replacing dispersed equipment, new double-row 14-position cold aisle with intelligent lighting and environment monitoring; reused sound existing equipment.
Results. Smooth cutover with zero business interruption; tidy room, 30% cooling efficiency gain, greatly improved supply reliability — meeting high government security requirements.
17.3 University Information Machine Room Project
Background. A new campus information room serving academic systems, campus network and one-card services — safe, reliable and energy-efficient for a green campus.
Solution. 1 integrated cabinet (60kVA UPS + 32 x 100Ah batteries); double-row 12-position cold aisle with energy-saving lighting and environment monitoring.
Results. Stable operation under peak loads; energy indicators met expectations; simple O&M — praised by the university.
17.4 Medical Institution Machine Room Project
Background. A hospital information room running HIS/LIS core systems demanded 7×24 supply continuity.
Solution. 2 integrated cabinets in 1+1 redundancy (60kVA each, battery backup >=1h); double-row 16-position cold aisle with complete fire linkage.
Results. No supply interruptions ever; excellent cooling with no hot spots — meeting medical high-reliability requirements.
18. SEO Optimization Section
All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.
18.1 Keyword System
– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;
– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;
– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;
– Brand keywords: KITOZER, Guangzhou Lain.
18.2 SEO Tag System
– Title tag: the article title — Guangzhou Lain KITOZER;
– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;
– H1 tag: the article title;
– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.
18.3 Internal Link Anchor Text
– Core anchor text: technical design solution, system construction;
– Long-tail anchor text: configuration list, technical parameters, construction plan;
– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.
19. Official Contact Information
– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Official Website: https://gdlain.com
– Tel: +86 13538869979 (Tel / WhatsApp)
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China
For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.