– Document Title: Intelligent Electromagnetic Shielding Cabinet Technical Design Solution
– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Date: August 2026
– Version: V1.0
– Project Type: Technical design solution for Intelligent Electromagnetic Shielding Cabinet
2. Table of Contents Structure
1. Company Introduction
2. Project Overview
3. User Requirement Analysis
4. Overall Design Description
5. Detailed System Design and Product Technical Parameters
6. Project Quotation and Configuration List
7. Core Solution Advantages
8. Technical Q&A
9. Construction Schedule Plan
10. Construction Organization Plan
11. After-Sales Service System
12. Operation and Maintenance Training Plan
13. Typical Project Cases
14. SEO Optimization System and Website Backend Configuration
15. Contact Information
3. Company Introduction
3.1 Company Development Overview
Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.
After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.
3.2 Core Business System
The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:
– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;
– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;
– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;
– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.
3.3 Brand and Qualification Honors
The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.
3.4 Core Competitive Advantages
1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;
2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;
3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;
4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.
4. Project Background and Objectives
4.1 Project Background
Electronic information equipment leaks classified data via power lines, signal lines and space radiation; external EMI also disrupts precision devices. In classified machine rooms, data centers, military R&D and financial settlement centers, electromagnetic security is essential. The shielding cabinet — a modular, flexibly deployable protection device — provides an independent shielded space without altering the room structure: the most cost-effective and flexible electromagnetic protection solution.
4.2 Project Objectives
Electromagnetic protection: a shielded space meeting national confidentiality standards — preventing internal leakage and external interference. Equipment carrying: 19″ standard rack with 42U and >=800kg load. Physical security: multi-factor access control with graded permissions. Flexible deployment: mobile yet stable, easy maintenance and expansion. Compliance: GJB 5792-2006 B-class and relevant standards, meeting assessment requirements.
4.3 Applicable Scenarios
Party/government classified machine rooms and confidential meeting rooms; military R&D labs and test rooms; financial data centers and settlement terminals; operator core equipment rooms; enterprise classified information rooms; research precision-instrument protection.
5. User Requirement Analysis
5.1 Electromagnetic Shielding
Full-band shielding (low-frequency magnetic to high-frequency microwave) at national standard B-class or above; all seams (doors, cable entries, vents) shielded with electrical continuity, no leakage points; stable long-term performance without significant decay over the service life.
5.2 Equipment Carrying
19″ standard rack, >=42U; multiple adjustable shelves with adequate load; precision mounting rails; total static load >=800kg.
5.3 Physical Security
Multi-factor identity access control with graded permissions preventing unauthorized opening; C-class mechanical locks with redundancy; emergency unlocking without power.
5.4 Deployment and O&M
Castors for mobility plus stability; convenient maintenance and equipment expansion; compact footprint suitable for room layout.
5.5 Compliance
GJB 5792-2006 B-class (or higher per classification), national confidentiality and data-center standards; third-party test report; 36-month warranty with inspections.
6. Design Principles and Applicable Standards
6.1 Design Principles
Full-band shielding: fully welded steel body + beryllium-copper spring sealing + cutoff waveguide cable entries — from low-frequency magnetic to microwave. Continuity: every seam conductively sealed; no leakage. Stability: QBe2 springs with long elastic life; no aging shortcuts (no conductive rubber substitution). Safety: C-class locks, multi-factor access, emergency power-free opening. Quality: full-process QC with third-party testing. Customization: sizes, functions, appearance and configuration per needs.
6.2 Applicable Standards
GJB 5792-2006 (B-class shielding), GB/T 711-2017 (steel), GB/T 5231-2022 (beryllium copper), IEC 60297 (19″ racks), GB/T 9286-1998 (adhesion), GB/T 1732-1993 (impact), GB/T 5023-2008 (cables), GB/T 17626 (EMC), relevant confidentiality and data-center codes.
7. System Architecture and Working Principle
7.1 Shielding Principle
Three effects attenuate electromagnetic waves: absorption (eddy currents converting energy to heat — thicker steel absorbs more at mid/high frequency), reflection (large wave-impedance mismatch between air and metal — dominant for low-frequency fields), and multiple-reflection loss between surfaces. The fully welded steel cavity with conductively sealed door seams and cutoff waveguides forms a Faraday cage blocking signals in and out; the “short-board effect” means every seam must be sealed.
7.2 Cabinet Structure
2000x700x700mm; SPCC steel 1.5mm panels (2.0mm door, 2.0mm rails); CO2 full welding, ground smooth; pretreatment (alkaline degrease -> rinse -> acid pickle -> rinse -> neutralize -> surface adjust -> zinc phosphating 5-15um -> pure rinse) then electrostatic epoxy-polyester powder 60-80um cured 180-200 degC 15-20min; adhesion 0, hardness >=2H, impact >=50kg-cm, salt spray >=48h; verticality <=1.5mm/m, flatness <=1mm/m2, door gap <=0.5mm, closed compression 2-3mm.
7.3 Shielding System
Effectiveness (GJB 5792-2006 B-class, tested values): magnetic 14k-100kHz >=60dB (>=65 actual); magnetic 100k-1MHz >=80 (>=85); electric 10k-1GHz >=100 (>=105); plane wave 30M-1GHz >=100 (>=105); microwave 1-10GHz >=90 (>=95). Door: single-leaf knife-edge insertion door — 304 stainless polished knife edge (2mm) compressing full-perimeter QBe2 beryllium-copper finger springs (HV350-400, conductivity >=22% IACS, contact pressure >=3N/point, contact resistance <=2.5m ohm, insertion life >=10,000 with decay <=2dB, salt spray >=1,000h); 2 heavy zinc-alloy damping hinges (>=150kg each). Cable entries: 6 x H62 brass waveguides (inner phi50mm, 150mm long, cutoff >=10GHz, shielding >=100dB@1GHz, Ra<=1.6um, welded sealed); vents/observations: honeycomb waveguide windows and shielded glass per options.
7.4 Access Control and Locks
Smart fingerprint/password lock: semiconductor capacitive sensor 508DPI, >=200 fingerprints, >=100 passwords (6-12 digits), fingerprint/password/dual verification, <=0.5s, FAR <=0.001%, FRR <=0.1%; DC12V, standby <=30uA, work <=200mA; built-in Li battery >=12 months + Type-C emergency power; OLED display; 5-error 3-min lock with alarm; IP54. Mechanical: 2 x C-class pure-copper cylinders (interchange <=0.0001%, anti-technical >=270min, anti-force >=30min), double-lock redundancy, 2 keys each. Three-point linkage: gear-rack driven 3 latch points (15mm travel, <=5N·m, >=10,000 cycles) — uniform door compression for seal consistency. Handle: 304 stainless lever 120mm, pull >=500N, salt spray >=200h.
7.5 Internal Carrying
4 mounting rails (2.0mm, square+round holes, 1U=44.45mm, hole accuracy +-0.1mm, IEC 60297, U-section, >=200kg each, welded to top/base); 3 shelves (1.2mm, 482x650mm, 450x620mm effective, >=80kg each, two reinforcing ribs, tool-free snap at any U, flanged edges); U-scale strips (1-42U, +-0.1mm, 3M adhesive) x4.
7.6 Power Distribution
PDU: 19″ 1U aluminum, AC220-250V 50Hz, 16A, 8 x 10A national 5-hole sockets (42mm spacing), bottom entry through waveguide, 16A MCB master with overload, C-class surge (In 10kA / Imax 20kA, Up <=1500V), contact <=0.5 ohm, insulation >=100M ohm, withstand 2000V/1min, >=10,000 insertions. Cable: RVV 3×1.5mm2 3m 10A 3-pin 3C (GB 5023).
7.7 Mobility and Grounding
4 x PU castors (100mm dia, 32mm wide, >=200kg each, >=800kg total, 360° swivel, dual-brake locking wheel + swivel, double ball bearings, <=45dB, >=10km wear, 120mm height); 2 x M8 nickel-plated brass earth terminals (upper/lower, contact <=1m ohm); BVR 6mm2 yellow-green 2m with OT lugs; earth resistance <=4 ohm (classified <=1 ohm); 50-set M6x16 rack screws (4.8 grade).
8. Detailed Technical Design
8.1 Configuration List
Body: main cabinet (2000x700x700, RAL9005 matte black); shielding: full-perimeter QBe2 springs, knife-edge door, 6 waveguides; locks: smart fingerprint/password lock + 2 C-class cylinders + three-point linkage + handle; internal: 4 rails, 3 shelves, 4 U-scale strips; power: 16A 8-position PDU + cable; mobility/earthing: 4 castors, 2 earth terminals, ground wire, screw kit; documents: test report, certificate, manual.
8.2 Optional Modules
Honeycomb ventilation waveguide windows (natural convection); shielded cabinet AC (constant temperature for servers); signal filters (power/network/RF interfaces); shielded observation window; environment monitoring; fire suppression; sizes 18U-47U, widths 600-800mm, depths 600-1000mm; colors and silk-screen logos.
8.3 Quality Control
Incoming material verification (steel, springs, locks with certificates); process patrols (welding, phosphating, coating, assembly with parameter records); 100% factory full-band shielding test and function test per unit with report; optional third-party test report.
9. Recommended Configuration and Preliminary Budget
9.1 Configuration Summary
Single 42U B-class intelligent shielding cabinet (standard): full body and shielding system, smart lock + dual C-class mechanical locks + three-point linkage, 4 rails + 3 shelves + U scales, 16A PDU + power cable, 4 castors, grounding set, rack screws, factory shielding test report, certificate, manual, packing/transport, on-site installation/commissioning with grounding and shielding spot test, training.
9.2 Budget Notes
Price per confirmed configuration (B/A/C class, size, options); tax-inclusive in RMB (CNY) only; 23 working days standard (15 expedited); 36-month warranty, half-yearly inspections, 7×24 support, 4h/8h/24h on-site; lifetime cost-price maintenance.
10. Technical Specifications
10.1 System Specification Summary
| Item | Specification |
|---|---|
| Body | 2000x700x700mm (+-2); 19″ 42U; SPCC 1.5mm panels / 2.0mm door and rails; CO2 full welding; zinc phosphating 5-15um; powder 60-80um (adhesion 0, >=2H, impact >=50kg-cm, salt spray >=48h); verticality <=1.5mm/m; flatness <=1mm/m2; door gap <=0.5mm; compression 2-3mm; static >=800kg, dynamic >=500kg; door >=110°; RAL9005 (custom) |
| Shielding | GJB 5792-2006 B-class (tested): magnetic 14k-100kHz >=60 (65); 100k-1MHz >=80 (85); electric 10k-1GHz >=100 (105); plane wave 30M-1GHz >=100 (105); microwave 1-10GHz >=90 (95); QBe2 finger springs (HV350-400, >=3N, <=2.5m ohm, >=10,000 insertions, >=1,000h salt spray); knife-edge door (304, 2mm); 6 x H62 brass waveguides phi50 (cutoff >=10GHz, >=100dB@1GHz) |
| Access | Smart fingerprint/password lock (capacitive 508DPI, >=200 prints, FAR <=0.001%, FRR <=0.1%, <=0.5s, Li battery >=12 months, Type-C emergency, OLED, 5-error lock); 2 x C-class cylinders (interchange <=0.0001%, anti-technical >=270min); three-point linkage (15mm, <=5N·m, >=10,000 cycles); 304 handle >=500N |
| Internal | 4 rails (2.0mm, IEC 60297, +-0.1mm, >=200kg each); 3 shelves (1.2mm, >=80kg, tool-free U adjustment); U-scale strips 1-42U |
| Power | 19″ 1U PDU: AC220-250V 16A, 8 x 10A sockets (42mm spacing), 16A MCB, C-class SPD In10/Imax20kA Up<=1500V, >=10,000 insertions; RVV 3×1.5 3m 3C cable; bottom entry via waveguide |
| Mobility/earth | 4 PU castors (100mm, >=200kg each, >=800kg total, dual brake, 360°); 2 M8 brass terminals (<=1m ohm); BVR 6mm2 ground wire; resistance <=4 ohm (classified <=1 ohm) |
| Options | Honeycomb waveguide vents; shielded AC; signal filters; shielded window; environment monitoring; fire; sizes 18-47U/600-800mm/600-1000mm; colors/logos |
| Delivery | 23 working days (15 expedited); 36-month warranty; half-yearly free inspections; 7×24 support, 30min response, 4h/8h/24h on-site; lifetime cost-price maintenance; third-party test report available |
10.2 Standards Compliance
GJB 5792-2006 (B-class), GB/T 711-2017, GB/T 5231-2022, IEC 60297, GB/T 9286-1998, GB/T 1732-1993, GB/T 5023-2008, GB/T 17626; per-unit factory full-band test with report; optional third-party test.
11. Key Advantages and Customer Value
11.1 Full-Band Stable Shielding
Fully welded body + beryllium-copper springs + cutoff waveguides — tested 5-10dB above the national standard with margin for long-term use; no conductive-rubber or spot-weld shortcuts that age or leak — stable for 10+ years.
11.2 Full-Process Quality
Incoming material verification, process patrols, 100% factory full-band test per unit, third-party test reports — passing project acceptance and confidentiality assessments.
11.3 Flexible Customization
Sizes (18U-47U, 600-1000mm depth), functions (AC, fire, environment monitoring, signal filters, observation window), appearance (colors/logo), configuration (shelves, PDU, locks, castors) — free three-scheme design.
11.4 Full-Cycle Service
Free survey/design/consultation; tracked production and on-site installation with one-pass acceptance; 7×24 support with 4h/8h/24h on-site; in-warranty free repair and periodic inspection; lifetime cost-price maintenance.
11.5 Multi-Layer Physical Security
Fingerprint + password + C-class dual mechanical locks + three-point linkage — graded permissions and power-free emergency opening.
12. Technical Q&A (50+ Items)
12.1 Fundamentals
Q1: Shielding cabinet vs ordinary server rack?
A: Ordinary racks carry/cable/ventilate only; shielding cabinets add electromagnetic protection — fully welded body with conductively sealed seams, shielded vents/cables, higher physical security and several times the price.
Q2: Grades per GJB 5792-2006?
A: A (highest: magnetic 10k-100kHz >=80dB, electric 10k-1GHz >=120dB — top-secret/labs), B (magnetic 14k-100kHz >=60, electric >=100 — classified mainstream), C (magnetic >=40, electric >=80 — commercial/anti-interference).
Q3: Why does a metal box block waves?
A: Absorption (eddy-current heat), reflection (impedance mismatch) and multiple-reflection loss — a sealed conductive cavity blocks both directions; seams must be conductively closed.
Q4: Does thicker steel always mean better?
A: Not linearly — thickness helps mid/high frequency absorption, but low-frequency magnetic fields rely on reflection; overall performance follows the short-board rule — seams dominate, so balanced design with sealed gaps matters more than blind thickening.
Q5: What are the main applications?
A: Government classified rooms, military R&D, financial data centers, operator core rooms, enterprise classified systems, precision-instrument labs.
Q6: Cabinet vs shielded room?
A: Cabinet — single-unit protection, low cost, flexible, movable, no room changes (best for few devices); shielded room — whole-room protection with in-room operation (best for dozens/hundreds of devices); we provide both.
12.2 Product and Technology
Q7: Why beryllium-copper springs instead of rubber?
A: Electromagnetic sealing must be conductive — BeCu provides low contact resistance, high elasticity/hardness (stable for tens of thousands of cycles) and corrosion resistance; ordinary rubber is insulating (no shielding); conductive rubber ages/cracks quickly — a cost-cutting trap.
Q8: What are the tested shielding values?
A: Magnetic 14k-100kHz >=65dB, 100k-1MHz >=85, electric/plane wave 10k-1GHz >=105, microwave 1-10GHz >=95 — 5-10dB above B-class.
Q9: What is the knife-edge door?
A: A 304 stainless polished knife edge inserts into full-perimeter BeCu springs on closure — uniform compression creating a continuous conductive seal; heavy damping hinges ensure alignment.
Q10: What are the waveguides for?
A: Cutoff waveguides let cables pass while blocking waves (when bore << wavelength); cables go through the center; fill voids with conductive foam/mesh; no oversized cables.
Q11: Heat dissipation in a sealed cabinet?
A: Standard closed model suits low-heat devices; options: honeycomb waveguide vents for natural convection (medium heat) or shielded cabinet AC for constant temperature (servers/high heat).
Q12: Power lockout?
A: Triple guarantee: Type-C emergency power on the lock (any power bank), two independent C-class mechanical locks (no power needed), and a 12-month Li battery with low-battery warning.
Q13: Service life?
A: Body 15+ years (shielding stable 10 years); springs ~5 years at 5 opens/day (replaceable); electronics 3-5 years (repairable); regular care extends life.
Q14: Why three-point linkage?
A: Gear-rack drive extends three latches simultaneously — uniform door compression, consistent spring sealing, anti-warp.
12.3 Installation and Use
Q15: Grounding requirements?
A: M8 terminals with >=6mm2 copper wire to the dedicated ground bus; remove paint at contacts (<=1m ohm); resistance <=4 ohm (classified <=1 ohm); upper + lower points for high-frequency; never to water/heat pipes or lightning bus.
Q16: Installation notes?
A: Level firm floor, lock brakes; reliable grounding; avoid hitting springs/door frame; all cables via waveguides (never drill); verify door closure and compression after installation.
Q17: Can it move?
A: Yes — castors; secure/remove heavy equipment, disconnect cables, move slowly avoiding bumps, re-lock brakes; professional handling for long transport.
Q18: Can ordinary PCs go inside?
A: Yes — mind heat (choose vent/AC option), all external cables via filters/waveguides, respect shelf load; classified computers require compliant cabinets with standard wiring/grounding.
Q19: Daily maintenance?
A: Wipe surfaces; dry-brush springs; monthly lock/spring/terminal check; half-yearly seal check; annual (or half-yearly for classified) shielding test; free annual inspection for warranty customers.
Q20: What if fingerprints fail?
A: Clean the sensor, re-enroll, check battery; use password or mechanical key; contact support.
12.4 Selection and Purchase
Q21: How to choose size — what is 42U?
A: 1U = 44.45mm; 42U ≈ 2m — most common; sum device U + 10-20% reserve; depth = device + ~100mm; verify room clearance and door swing.
Q22: How to pick a reliable manufacturer?
A: Professional credentials (patents, test reports, ISO, GJB/confidentiality compliance), own production (not OEM), real government/military/finance cases, complete after-sales.
Q23: Why the price range?
A: Grade (A>B>C), size/config (42U vs 22U, smart lock/PDU/AC), materials/process (full-weld + BeCu vs assembled + conductive rubber), brand service — don’t buy on price alone for classified use.
Q24: Local manufacturer advantages (Guangzhou)?
A: Faster delivery (stock + short custom cycles), rapid service (4h urban), factory visits and samples, stable after-sales team.
Q25: Certifications available?
A: Third-party shielding test report, high-tech enterprise, patents, ISO — provided for acceptance.
12.5 Service
Q26: Warranty?
A: 36 months whole unit from final acceptance; free repair/parts for non-human faults; lifetime cost-price maintenance; human/force-majeure/modification excluded.
Q27: Response?
A: 7×24 hotline, 30min initial solution; 4h Guangzhou, 8h Pearl River Delta, 24h province, <=48h nationwide; general faults within 2h on site, major with solution in 24h and backup equipment.
Q28: Inspections?
A: Free half-yearly (2/year): shielding test, structure/hinge/spring check, lock and battery check, electrical/grounding check, cleaning — formal reports.
Q29: Spares?
A: Stocked springs, locks, PDU, castors; 48h dispatch; original parts only.
Q30: Training?
A: ~2.5h at delivery: theory (shielding principle, safety), operation (smart/mechanical locks, door, shelves, equipment, waveguide cabling, PDU), maintenance (cleaning, checks, simple faults), assessment with retraining; manuals delivered.
Q31: What documentation is delivered?
A: Factory shielding test report, certificates, operation/maintenance manuals, acceptance records, training confirmation.
Q32: Upgrade/relocation services?
A: Add AC/environment/fire modules; discounted relocation with re-testing; trade-in for old cabinets.
Q33: Why choose KITOZER/Lain?
A: 20+ years, own factory, verified performance, full customization, complete service, proven government/military/finance/university cases.
Q34: Batch orders?
A: Yes — production-line capability with consistent factory testing per unit (e.g. 25-unit project delivered and accepted).
Q35: What makes it cost-effective?
A: 10+ year stable performance avoids re-purchase; 36-month warranty; flexible customization; compliance avoiding confidentiality risk.
Q36: How is the smart lock battery managed?
A: Built-in Li battery lasts >=12 months normal use; OLED shows charge; low-battery warning prompts replacement; Type-C port accepts any power bank for emergency power — no lockout risk.
Q37: Can multiple administrators be enrolled?
A: Yes — up to 200 fingerprints and 100 passwords; graded enrollment lets different users have open/operate-only rights; management via the lock menu.
Q38: What happens on 5 failed attempts?
A: The lock locks for 3 minutes with an alarm prompt, preventing brute-force attempts; admin can clear via password or mechanical key.
Q39: How are waveguides sized for cables?
A: Inner phi50mm each, 6 in total — bundles of power/signal cables pass through the center; voids filled with conductive foam; do not overfill or damage the bore.
Q40: Can the cabinet be upgraded from B to A class?
A: Not by retrofit — A-class needs thicker/multi-layer structures designed from the start; we recommend ordering the required class initially; retrofits add cost without guaranteed compliance.
Q41: Is the cabinet suitable for 7×24 continuous operation?
A: Yes — welded steel structure with stable seals; with the ventilation/AC option per heat load, internal equipment runs 7×24 reliably.
Q42: What are the environmental ratings?
A: Indoor use: -10~+55 degC working (smart lock), RH 20-90% no condensation; body corrosion-resistant per coating specs; avoid outdoor/damp installations.
Q43: How is the cabinet shipped safely?
A: Dust cover + foam + wood frame with corner protection; upright transport; arrival joint inspection against damage; professional lifting for heavy units.
Q44: Can existing equipment be installed immediately?
A: Yes — standard 19-inch rails with 1U holes accept all rack-mount servers, switches and terminals; shelves for non-rack units; U-scale strips aid planning.
Q45: What maintenance extends spring life?
A: Dry-brush dust monthly (dust raises contact resistance), avoid impacts on the door frame, keep compression uniform, and replace springs after ~10,000 cycles or on visible wear.
Q46: How is shielding verified after relocation?
A: Re-test per GJB 5792-2006 on site after any move; our relocation service includes re-commissioning and testing to restore performance.
Q47: Are there models for small spaces?
A: Yes — 18U/22U/27U/32U heights and 600-800mm widths/depths; compact C-class models suit office rooms.
Q48: What payment and delivery terms apply?
A: Deposit to order; balance before shipment for standard units; custom units per contract; standard stock ships in days; 23 working days standard production.
Q49: How does the cabinet protect against internal data leakage?
A: Shielding blocks electromagnetic emissions from power/signal/space paths; signal filters on cable entries prevent conducted leakage — compliant for classified devices.
Q50: What is the environmental impact?
A: RoHS-compliant materials, recyclable steel, long service life reducing replacement; powder coating is solvent-free and environmentally friendly.
13. Construction Schedule
13.1 Overall Schedule (Single 42U Cabinet, 23 Working Days)
| No. | Stage | Days | Main work | Responsible | Deliverable |
|---|---|---|---|---|---|
| 1 | Preparation/confirmation | 3 | Site survey (position, earthing, power); requirement detailing; contract and deposit; production order and disclosure | PM, sales | Survey report, final scheme, order |
| 2 | Material procurement/inspection | 2 | Steel, springs, locks procurement; incoming material verification | Procurement, QC | Incoming records/report |
| 3 | Body production | 5 | NC cutting/folding; welding and grinding; door/rail fabrication; dimension and tolerance checks | Production (sheet-metal), QC | Body blanks, inspection records |
| 4 | Surface treatment | 3 | Degrease/acid/phosphating; electrostatic powder coating; curing; coating thickness/adhesion tests | Surface shop, QC | Finished body, coating report |
| 5 | Assembly and debug | 4 | Springs, hinges, locks; rails, shelves, PDU; castors, earth terminals; access system power-on; factory full-band shielding test | Assembly, QC, test engineer | Finished cabinet, assembly records, shielding report |
| 6 | Packing/transport | 2 | Dust packing + wood frame; accessories/documentation packing; delivery and arrival inspection | Logistics | Delivery note, arrival acceptance |
| 7 | Site installation/debug | 1 | Position and level; grounding and resistance test; power connection and test; access debug with admin enrollment; on-site shielding spot test | Installer, test engineer | Installation records, site test report |
| 8 | Acceptance/training | 1 | Joint acceptance; documentation/keys/accessories handover; operation and maintenance training; sign-off | PM, training engineer | Acceptance report, docs, training records |
| 9 | After-sales | 36 months | Periodic calls; half-yearly inspections; fault response; lifetime support | After-sales | Visit/inspection/repair records |
13.2 Schedule Assurance
ERP production planning with 10% capacity buffer; skilled two-shift key positions; safety stock of materials with supplier agreements; PM daily tracking; expedited lanes to 15 days.
14. Construction Organization and Quality/Safety Measures
14.1 Organization
PM (1): overall progress/quality/cost, customer communication. Technical lead (1): scheme, disclosure, on-site problem solving, standards compliance. Installation engineers (2): installation and commissioning per codes with records. Test engineer (1): factory and site shielding/electrical tests with reports. After-sales specialist (1): follow-up, inspection scheduling, fault response.
14.2 Preparation
Technical: disclosure of scheme/standards/quality/safety; drawing and configuration check; risk pre-assessment. Site: level firm floor with clearance; grounding bus position and resistance; power interface; cleared area and unobstructed fire routes. Materials/tools: model/config/accessory check with factory report and certificates; level, multimeter, earth-resistance tester, wrenches, drill, strippers; calibrated shielding test instrument; PPE.
14.3 Core Processes
Arrival inspection: joint unpack — packaging, appearance (scratches/deformation/paint), configuration, accessories count, signed arrival record. Positioning/leveling: push carefully; level via castors/supports (verticality <=1.5mm/m); lock brakes; verify door operation. Earthing: strip oxide/paint at the ground bus; crimp OT lug, tighten M8 terminal; test <=4 ohm (classified <=1 ohm); tidy routing. Power: route PDU cable through the waveguide center; breaker off before plugging; verify each socket voltage/polarity; test overload/surge protection; dress cables. Access debug: power-on and display check; enroll admin fingerprint/password; test all opening methods and speed/accuracy; mechanical keys on both cylinders; three-point linkage closure and uniform compression. Internal check: rail alignment and U scales; shelf installation/leveling; demonstrate adjustment; deliver screw kits. On-site shielding test: spot test per GJB 5792-2006 (magnetic/electric/plane-wave bands), record and report; rectify if below standard.
14.4 Quality Control
Three-inspection (self/mutual/special) per process; standards-first with no arbitrary process changes; complete signed records traceable; key processes (earthing, shielding seal) supervised by the technical lead.
14.5 Safety and Civilized Construction
Helmets and safety shoes; certified electricians for live work; no smoking/hot work; compliant temporary power; daily power-off and cleanup; protect surfaces during handling; emergency kit and fire equipment on site; tidy materials; noise control; site restored and cleaned after completion.
15. After-Sales Service
15.1 Warranty Commitment
36-month whole-unit warranty from final acceptance; free repair/parts for normal-use quality faults; excluded: human damage, force majeure, unauthorized modification, misuse (paid service); lifetime cost-price maintenance with free technical consultation.
15.2 Response
7×24 hotline with 30min initial solution; on-site: 4h Guangzhou, 8h Pearl River Delta, 24h province, <=48h nationwide (negotiated for remote); general faults within 2h on site; major faults solution within 24h with backup equipment.
15.3 Periodic Inspection
Half-yearly free on-site inspection (2/year) in warranty: shielding effectiveness test; structure/hinge/spring check; lock function and battery; electrical/grounding safety; cleaning — formal reports with recommendations.
15.4 Spares
Stocked springs, locks, PDU, castors, earth hardware; 48h dispatch (custom 7 working days); original genuine parts.
15.5 Value-Added
Lifetime free technical consultation; discounted relocation/recommissioning; upgrades (AC, environment monitoring, fire); trade-in program for old cabinets.
15.6 Complaint Handling
Dedicated hotline with 24h reply; investigation, rectification and follow-up; process review preventing recurrence.
16. Training Plan
16.1 Training Objectives and Audience
Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.
Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.
16.2 Tiered Training Content System
Level 1: Basic operation training (1 day)
– Basic principles: system concepts, structure composition, performance indicators;
– Daily operation standards: correct operation of equipment, control and safety systems;
– Daily inspection contents: daily/weekly/monthly check items;
– Safety precautions: usage prohibitions and emergency handling procedures.
Level 2: Maintenance training (1 day)
– Detailed structure of each subsystem and working principles;
– Daily maintenance methods: cleaning, fastening checks, routine care;
– Common fault identification and simple handling;
– Emergency handling procedures for power failure, fire and equipment faults.
Level 3: Advanced management training (as needed)
– Performance influencing factors and how to avoid degradation;
– Upgrade and expansion knowledge and specification requirements;
– Relevant national standards interpretation.
16.3 Training Methods and Schedule
– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;
– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.
16.4 Training Assessment and Documentation Delivery
– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;
– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.
17. Anonymous Typical Project Scenarios
All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.
17.1 Provincial Government Classified Machine-Room Shielding Cabinet Project
Background. A provincial government agency’s classified room upgrade needed shielding cabinets for classified servers and terminals, requiring national confidentiality-system assessment.
Solution. 25 x 42U B-class cabinets (matte black matching the room), fingerprint + password smart locks with dual mechanical redundancy, 16A surge-protected PDUs, on-site installation/testing with third-party full-band report, 3-year warranty with quarterly inspections.
Results. Passed the national confidentiality assessment with all performance and security requirements met; stable operation, convenient access, timely service — highly rated, with a follow-on phase-2 contract.
17.2 Military Research Institute Laboratory Custom Cabinet Project
Background. A military electronics R&D institute building an EMC test lab needed high-performance cabinets for precision instruments and classified R&D equipment with A-class shielding and constant temperature.
Solution. 8 custom cabinets (800mm deep), dual-layer reinforced structure for A-class low-frequency magnetic performance, integrated shielded constant-temperature AC (23+-2 degC), signal filter banks, shielded observation windows, reinforced shelves (150kg).
Results. Third-party verified A-class full-band performance; precise temperature control; customized structure perfectly matched the test scenario — research work proceeded smoothly.
17.3 State Bank Data Center Confidential Equipment Cabinet Project
Background. A major state bank’s core classified zone needed small shielding cabinets for key-management terminals and encryptors — high physical security, no power dependency, compact for office machine rooms.
Solution. 12 x 27U C-class floor cabinets with mechanical combination locks + C-class key locks (fully electronic-free, outage-proof), compact 600×600 footprint, swivel castors, unified delivery in 7 days.
Results. On-time delivery and installation; passed internal security audit; purely mechanical design eliminated power-failure risks; simple O&M — recognized by the maintenance department.
17.4 University Research Institute Precision-Instrument Shielding Cabinet Project
Background. A university’s precision physics lab faced complex external EMI degrading instrument accuracy; cabinets needed anti-static and anti-vibration features.
Solution. 6 x 32U cabinets with electric-field shielding >=110dB, anti-static coating and pads with optimized earthing, heavy damping support feet, honeycomb waveguide vents for natural convection, on-site before/after electromagnetic environment comparison.
Results. Greatly improved in-cabinet electromagnetic environment with significantly more stable instrument data; vibration isolated; fully meeting research requirements.
18. SEO Optimization Section
All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.
18.1 Keyword System
– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;
– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;
– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;
– Brand keywords: KITOZER, Guangzhou Lain.
18.2 SEO Tag System
– Title tag: the article title — Guangzhou Lain KITOZER;
– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;
– H1 tag: the article title;
– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.
18.3 Internal Link Anchor Text
– Core anchor text: technical design solution, system construction;
– Long-tail anchor text: configuration list, technical parameters, construction plan;
– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.
19. Official Contact Information
– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Official Website: https://gdlain.com
– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China
For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.