KITOZER
KITOZER

GIS Series General Protection Cover Products

Table of Contents

1. Cover / Document Information

– Document Title: GIS Series General Protection Cover Products Technical Design Solution

– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Date: August 2026

– Version: V1.0

– Project Type: Technical design solution for GIS Series General Protection Cover Products

2. Table of Contents Structure

1. Company Introduction

2. Project Overview

3. User Requirement Analysis

4. Overall Design Description

5. Detailed System Design and Product Technical Parameters

6. Project Quotation and Configuration List

7. Core Solution Advantages

8. Technical Q&A

9. Construction Schedule Plan

10. Construction Organization Plan

11. After-Sales Service System

12. Operation and Maintenance Training Plan

13. Typical Project Cases

14. SEO Optimization System and Website Backend Configuration

15. Contact Information

3. Company Introduction

3.1 Company Development Overview

Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.

After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.

3.2 Core Business System

The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:

– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;

– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;

– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;

– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.

3.3 Brand and Qualification Honors

The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.

3.4 Core Competitive Advantages

1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;

2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;

3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;

4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.

4. Project Background and Objectives

4.1 Project Background

GIS (gas-insulated switchgear) equipment in substations operates outdoors for years. Its exposed components — insulating basins, mechanism boxes and expansion joints — suffer rain erosion, moisture ingress, dust and salt-spray corrosion, causing flange rust, SF6 leakage, mechanism jamming and frequent faults. Traditional simple covers rust quickly and offer poor sealing. This project designs a full-series GIS protective cover system for four typical exposed component types, providing long-lasting, non-destructive, maintenance-friendly protection.

4.2 Project Scope

Four cover categories: mechanism box cover (inverted-box with inspection window), vertical insulating basin cover (arch type), horizontal insulating basin cover (annular full-wrap type), expansion joint cover (extended inverted-box with inspection window). Covers are custom-fitted per on-site survey, supplied with EPDM seals, stainless fasteners, grounding kits and full documentation, including installation guidance, training, warranty and long-term support.

4.3 Design Objectives

Safety and reliability first: structural strength against wind/snow/impact; compliant grounding; non-magnetic stainless steel not affecting the electric/magnetic field; damage-free installation preserving the original coating and sealing. Protection as core: rain/moisture/dust/salt-spray resistance — 45-degree inclined rain must not contact protected parts. Long service life: SUS304 + EPDM + same-material fasteners (no galvanic corrosion), minimized maintenance. O&M convenience: bolted quick assembly/disassembly, inspection windows without opening covers, easy consumable replacement. Custom fit: standard modules + one-to-one customization of internal dimensions, hole positions and sealing contours. Economical: optimized structure and materials for whole-life value. Neat appearance: matte finish conforming to substation standardization.

4.4 Design Basis

DL/T 639-1997 (SF6 equipment safety), GB 4208-2017 (IP), GB 7251.1-2013, GB/T 3280-2015 (stainless sheet), GB/T 50065-2011 (earthing design), DL/T 596-2021 (preventive tests), customer GIS drawings and on-site survey data, plus company standards.

5. User Requirement Analysis

5.1 Functional Protection Requirements

Cover mechanism boxes, vertical/horizontal insulating basins and expansion joints against rain (incl. 45-degree inclined rain), moisture, condensation, dust, sand and salt spray; allow normal operation and inspection; no effect on equipment field/operation.

5.2 Structural Requirements

Custom-fit to actual device dimensions with proper clearance; stable under wind (grade 12), snow load and minor impacts; bolts without drilling/welding on GIS bodies; no damage to original coating; support energized (live) installation.

5.3 Installation Requirements

Installation position error <= +-3mm; continuous seal with no gaps; SUS304 bolted fixing with 4 bolt sets per cover; damage-free, non-invasive; matte uniform appearance per substation standardization.

5.4 Environmental Requirements

-10 to +45 degC operation; RH <=75% with no internal condensation; altitude <=2000m (custom upgrade above); UV/aging resistant; grade-12 wind; conventional snow load without plastic deformation.

5.5 Standard Compliance

DL/T 639-1997, GB 4208-2017 (IP40), GB/T 3280, DL/T 621 earthing; latest editions apply.

5.6 Service and Training Requirements

Installation technical guidance and training; >=1-year warranty from acceptance with free replacement (warranty restarts for replaced items); 48h solution/on-site within warranty; >=3-year paid after-sales; >=10-year technical support; long-term spare parts (seals, fasteners); user training on use, maintenance and installation.

6. Design Principles and Applicable Standards

6.1 Design Principles

Safety first: structure satisfies wind/snow/impact; grounding per power safety codes; non-magnetic stainless; damage-free installation. Protection-oriented: optimized shape, sealing system and drainage create multi-layer barriers; 45-degree rain blocked. Durable, low-maintenance: SUS304 body, EPDM seals, same-material connections avoid galvanic corrosion. O&M-friendly: bolted assembly, transparent windows, easy replacement without special tools. Custom-adapted: standard modules + tailored internal dimensions/holes/sealing contours. Economical: optimal thickness (1.5mm) balancing strength, cost and weight. Standardized appearance: matte finish, uniform, compliant.

6.2 Applicable Standards

Per section 4.4 (DL/T 639, GB 4208, GB 7251.1, GB/T 3280, GB/T 50065, DL/T 596); 12-level wind and snow load verification; IP40; earthing per DL/T 621 with connection resistance <=0.5 ohm.

7. System Architecture and Working Principle

7.1 Product Family Architecture

Mechanism box cover: inverted-box full-wrap (with inspection window) — for disconnector/earthing-switch mechanism boxes; vertical installation. Vertical insulating basin cover: arch half-wrap — covers upper and both main rain-facing sides; lower open for ventilation and anti-condensation. Horizontal insulating basin cover: annular full-wrap — completely covers the upper flange face and basin. Expansion joint cover: extended inverted-box (with inspection window) — covers the joint and both flanges with axial displacement allowance.

7.2 Common Standards Across the Family

SUS304 1.5mm body; EPDM U-type/profile seals; SUS304 bolt system; IP40; matte surface; dedicated grounding terminal.

7.3 Working Principle

Covers are positioned over the exposed parts and fixed with stainless bolts through folded mounting flanges; EPDM seals compress 20-30% to form continuous sealing barriers; roof slopes and eaves drain rain outward; drainage notches prevent ponding; the arch/annular shapes shed water; the lower-open design of vertical covers provides natural ventilation against condensation; each cover is bonded via its M6 terminal with >=4mm2 copper wire to the GIS earth grid (<=0.5 ohm), discharging induced static charge for operator safety; inspection windows allow visual checks without removal.

8. Detailed Technical Design

8.1 Mechanism Box Cover (Inverted-Box with Window)

Box-shaped, opening downward; slightly arched top with eave overhanging the sides for rapid drainage; front panel with inspection window aligned to the open/close indicator; three enclosing sides plus back; bottom opening slightly larger than the mechanism box with seal compensation; external size approx. 600+-150 x 400+-100 x 350+-100mm; internal size custom with 5-10mm per-side clearance; 4 mounting holes at the bottom folded corners; position error <= +-3mm; top reinforcement ribs (horizontal + vertical) for wind/snow; double-layer folds at edges and mounting flanges; one-piece fold + weld construction; M6 grounding terminal at rear bottom.

8.2 Vertical Insulating Basin Cover (Arch Type)

Semi-circular arch mounted over the vertical circular flange and basin; arch radius matching the flange OD with protruding eave; two side plates extending radially with mounting ears and U-seal grooves; lower open for installation and natural ventilation; covers >=5/6 of the flange circumference — all main rain-facing surfaces; OD approx. 600+-150mm, depth 100+-50mm; 4 holes (2 per side); arch distributes load evenly; thickened folded ears; one-piece folding, no welds; grounding terminal near one ear.

8.3 Horizontal Insulating Basin Cover (Annular Full-Wrap)

Flat annular ring placed horizontally over the flange and basin; top ring plate is the main rain shield with slight outer-high slope draining outward; outer vertical rim wraps the flange outside with mounting folds and drain notches at the bottom; inner vertical rim inserts into the flange inner-tube gap forming an inner sealing barrier; OD approx. 600+-150mm, thickness 100+-50mm; 4 holes on the outer rim (M8, can use original flange holes); U-seal on the outer rim inner side (primary) + optional seal on the inner rim (secondary); dual sealing blocks ingress from both sides; grounding terminal on the outer fold.

8.4 Expansion Joint Cover (Extended Inverted-Box with Window)

Extended box covering the joint and both end flanges with axial displacement allowance; slightly arched top with eave; four side plates fully enclosing; inspection window(s) on one or both sides for bellows and displacement scale viewing; bottom folds with seal grooves bolted to the device cylinders/flange bases; length approx. 650+-150mm, width 500+-100mm, height 350+-100mm; radial clearance 10-15mm per side to avoid vibration contact; multiple top ribs; double-layer folds; M6 grounding terminal at rear bottom.

8.5 Material Selection — SUS304

Corrosion: ~18% Cr + 8% Ni forming a dense Cr2O3 passivation film — long-term outdoor use, good in mild coastal salt spray, far better than carbon steel/201. Mechanics/processing: proper strength, excellent plasticity/toughness, good folding/stamping/welding. Temperature: stable -270 to +800 degC — no brittle fracture or softening. Non-magnetic: austenitic, no effect on GIS fields; good conductivity for grounding. Maintenance: self-cleaning, >=20-year outdoor life. Chemistry (GB/T 3280): C <=0.08%, Si <=1.00%, Mn <=2.00%, P <=0.045%, S <=0.030%, Cr 18.00-20.00%, Ni 8.00-10.50%; mill certificates per batch. Mechanics: tensile >=520MPa, yield >=205MPa, elongation >=40%, reduction of area >=60%, HB <=187.

8.6 Plate Thickness Justification (1.5mm)

Meets grade-12 wind (32.7m/s) and 10cm snow without plastic deformation; handles minor impacts; single cover 5-15kg — two workers install without cranes (fits retrofit and live-work scenarios); good laser/NC-bend/weld processing; optimal economy vs 1.0mm (weak) and 2.0mm+ (overweight, overcost).

8.7 Sealing System

U-type seal: vertical/horizontal basin covers — clips onto the folded edge; lip compresses against the mounting face forming a continuous band. Profile seal: mechanism box and expansion joint covers — custom cross-section with mounting slot + sealing lip; embeds into the seal groove, compressed to fill all gaps. EPDM material: Shore 55+-5; tensile >=10MPa; elongation >=300%; compression set <=20% (70 degC x 22h); -40~+120 degC; ozone class 0; life >=5 years; weatherproof, elastic, water-resistant, non-toxic, electrically insulating. Installation: full-length cutting with 45-degree bevel joints glued; uniform embedment without twist/stretch; compression 20-30%; clean flat mounting face.

8.8 Fastener System

All SUS304 (bolts/nuts/flat/spring washers) — same material as body avoids galvanic corrosion; M8x30 hex bolt A2-70 (GB/T 5783), M8 nut A2-70 (GB/T 6170), matching washers; 4 complete sets per cover; tensile >=700MPa, yield >=450MPa; passivated; no galling.

8.9 Inspection Window

3mm PC (polycarbonate) sheet: transmittance >=85%; impact strength ~250x glass, 30x acrylic — no sharp shrapnel; co-extruded UV coating — no yellowing/cracking; -40~+120 degC; embedded sealed structure with watertight rubber ring + clamping bar and stainless screws; custom shapes/sizes, tempered-glass option, anti-fog/anti-static options.

8.10 Grounding System

M6 stainless terminal (bolt+nuts+washers) per cover at a visible side/bottom position; conductively connected to the body; connect with >=4mm2 stranded copper wire to the GIS earth main/base; connection resistance <=0.5 ohm; releases induced static charge; per DL/T 621.

8.11 Surface Treatment

Matte finish — brushing/passivation after forming; uniform color, no burrs/scratches/distortion; optional extra passivation strengthening for coastal salt-spray duty (1000h neutral salt spray no red rust per GB/T 10125).

9. Recommended Configuration and Preliminary Budget

9.1 Standard Kit (Per Cover)

Cover body x1 (custom per surveyed dimensions); EPDM seal (2m U-type or profile) x1 set; M8 stainless bolt assemblies x4 sets; M6 grounding kit x1; Chinese manual x1; certificate of conformity; material test report; pearl-cotton + carton packing labeled with the GIS point number.

9.2 Budget Notes

Quoted per category, quantity and customization level; includes design, production, inspection, packing and delivery; installation, training and after-sales per the service terms. Price is tax-inclusive in RMB (CNY) only — no foreign-currency conversion. Standard sizes reduce lead time; lead time: survey 3 working days, production 7-10 working days (standard 7 / full-custom 10), transport 2-4, installation 5-7 for 50 sets (2-person crew, 8-10 sets/day), acceptance 1 day.

10. Technical Specifications

10.1 Product Family Summary

Item Specification
Mechanism box cover Inverted-box full-wrap with inspection window; approx. 600x400x350mm; arched top with eave; ribs; 4 bottom holes; M6 grounding
Vertical basin cover Arch half-wrap; OD approx. 600mm, depth 100mm; covers >=5/6 circumference; lower open for ventilation; 4 ear holes
Horizontal basin cover Annular full-wrap; OD approx. 600mm, thickness 100mm; outer-high slope; outer/inner rims; dual seals; drain notches; 4 rim holes
Expansion joint cover Extended inverted-box with window; approx. 650x500x350mm; axial displacement allowance; 10-15mm radial clearance; ribs; M6 grounding
Body material SUS304 (06Cr19Ni10) 1.5mm cold-rolled; Cr 18-20%, Ni 8-10.5%; tensile >=520MPa, yield >=205MPa, elongation >=40%; matte finish; >=20-year life; 1000h salt spray option
Sealing EPDM U-type/profile; Shore 55+-5; -40~+120 degC; compression set <=20%; compression 20-30%; life >=5 years
Fasteners M8x30 A2-70 SUS304 x4 sets per cover; tensile >=700MPa; no galvanic corrosion
Window 3mm PC; transmittance >=85%; UV coating; impact ~250x glass; embedded sealed
Grounding M6 terminal; >=4mm2 copper wire; connection <=0.5 ohm; per DL/T 621
Protection IP40 (GB 4208-2017); grade-12 wind; 10cm snow; -10~+45 degC; RH <=75%; altitude <=2000m
Installation Damage-free, live-work capable; position error <= +-3mm; 2 workers, no crane; 8-10 sets/day/crew
Standards DL/T 639-1997, GB 4208-2017, GB/T 3280-2015, GB/T 50065-2011, DL/T 596-2021
Warranty >=1 year whole product + 3 years structure; 48h response; 3-year paid service; 10-year technical support; lifetime spares

10.2 Key Performance Verification

12-level wind (32.7m/s) with deflection far below limit, no plastic deformation; 10cm snow load with no top deformation; 45-degree simulated rain test — no water contact with protected surfaces; salt spray per GB/T 10125; UV/aging inherent to stainless; thermal expansion 17.3×10-6/degC — negligible in -10~+45 degC range.

11. Key Advantages and Customer Value

11.1 Source Factory, Strong Customization

Own production base and design team; one-to-one custom design per actual device size, site environment and protection needs; free multiple design options; highly matched fit and maximum protection.

11.2 Strict Quality, High Reliability

Full-process QC with first-line steel mill materials and batch mill certificates; multi-stage inspection; full key-process checks; final inspection of protection performance, dimensional accuracy and appearance; third-party test reports; performance above industry average.

11.3 Long-Life, Low-Maintenance

SUS304 (>=20 years) + EPDM (>=5 years) + same-material fasteners — minimal lifecycle cost vs painted carbon steel.

11.4 O&M-Friendly Design

Bolted quick assembly; inspection windows avoid cover removal; easy consumable replacement without special tools; lower-open ventilation prevents condensation.

11.5 Safe Live Installation

Damage-free non-invasive fixing using original bolt holes/clamps; no drilling/welding on GIS bodies; energized installation supported; dedicated grounding for operator safety.

11.6 Complete Service System

Three-level 7×24 response; 1+3-year warranty; 3-year paid service; 10-year free technical support; lifetime spare parts within 48h (standard) / 5 working days (custom).

12. Technical Q&A (50+ Items)

12.1 Product Basics

Q1: What does the GIS cover series include?

A: Four categories — mechanism box cover (inverted-box with window), vertical insulating basin cover (arch), horizontal insulating basin cover (annular), expansion joint cover (extended box with window), plus EPDM seals, bolts, grounding kits and manuals.

Q2: What voltage levels are supported?

A: Designed for 110kV and above GIS equipment; custom sizing adapts to any GIS brand and voltage class per on-site survey.

Q3: What material is used?

A: SUS304 (06Cr19Ni10) 1.5mm cold-rolled stainless — Cr 18-20%, Ni 8-10.5%, tensile >=520MPa, matte finish.

Q4: What is the protection rating?

A: IP40 per GB 4208-2017, with sealing designed against 45-degree inclined rain.

Q5: Can it be installed without power outage?

A: Yes — non-invasive bolt fixing using original holes/clamps; no drilling or welding; live installation supported with insulated tools and proper procedures.

Q6: Does stainless steel affect GIS operation?

A: No — SUS304 is austenitic and non-magnetic, with no effect on the electric/magnetic field; good conductivity aids grounding.

12.2 Structure and Fit

Q7: How is the fit customized?

A: Standard modules + one-to-one customization of internal dimensions, hole positions and seal contours per drawings or survey data — gaps controlled to prevent ingress.

Q8: Installation tolerance?

A: Position error <= +-3mm, verified with a spirit level; verticality and alignment checked per cover.

Q9: Wind and snow resistance?

A: Grade-12 wind (32.7m/s) and 10cm snow load with no plastic deformation thanks to ribs, arched tops and double-layer folds.

Q10: Why 1.5mm plate?

A: Optimal balance — 1.0mm deforms easily; 2.0mm+ adds cost/weight; 1.5mm meets all loads with best economy and 5-15kg weight for two-person installation.

Q11: Will the cover collide with the bellows during expansion?

A: No — expansion joint covers reserve 10-15mm radial clearance and axial displacement allowance; no interference with thermal movement.

Q12: Can the vertical cover cause condensation?

A: No — lower-open design provides natural ventilation; horizontal covers use outer-high slope and drain notches to prevent ponding.

Q13: How is the top water drained?

A: Arched/sloped tops with eaves shed water outward quickly; annular covers slope outward; drain notches release any seepage.

Q14: Inspection without removal?

A: Yes — mechanism box and expansion joint covers have PC windows aligned to indicators/scales for routine inspection.

12.3 Sealing and Materials

Q15: Seal types?

A: U-type (vertical/horizontal basin covers, clips onto the folded edge) and profile type (mechanism box/expansion joint covers, embedded in the groove) — both EPDM.

Q16: Seal performance?

A: Shore 55+-5, tensile >=10MPa, elongation >=300%, compression set <=20%, -40~+120 degC, ozone class 0, life >=5 years.

Q17: Compression ratio?

A: 20-30% after installation — too low leaks, too high causes permanent set; verified by uniform bolt tightening.

Q18: How are seal joints handled?

A: Full-length cutting with 45-degree bevel joints bonded with glue — continuous ring, no water path at joints.

Q19: Why EPDM?

A: Outstanding ozone/UV/temperature resistance (3-5x ordinary rubber life), elastic recovery, water resistance, non-toxic, electrically insulating.

Q20: Fastener material?

A: All SUS304 (M8x30 A2-70) — same material as the body avoids galvanic corrosion; tensile >=700MPa.

Q21: Window material?

A: 3mm PC — transmittance >=85%, impact ~250x glass, UV coating, -40~+120 degC; tempered glass optional.

Q22: Coastal salt-spray suitability?

A: Standard SUS304 passes 1000h neutral salt spray without red rust; heavy-coast sites can add passivation strengthening or 316L upgrade.

Q23: Temperature range?

A: -10~+45 degC operating (structural stable); material itself works -270~+800 degC; seals -40~+120 degC.

Q24: Service life?

A: Stainless body >=20 years; seals >=5 years; whole-life cost far below painted carbon steel.

12.4 Grounding and Safety

Q25: Grounding requirement?

A: M6 terminal per cover connected with >=4mm2 copper wire to the GIS earth grid; connection resistance <=0.5 ohm per DL/T 621.

Q26: Why grounding?

A: Discharges induced static charge, prevents touch voltage, ensures operator safety; verified by conductivity test after installation.

Q27: Safe for energized operation?

A: Insulated tools, full insulating PPE, work permits, no contact with HV bodies/conductive parts, warning guards — per substation live-work rules.

Q28: Does installation damage the original coating?

A: No — non-invasive clamping/original-hole fixing; careful handling protects the OEM anti-corrosion coating.

12.5 Installation and Schedule

Q29: Installation method?

A: Clean base -> fit seal into groove -> position cover over the device -> align 4 holes -> evenly tighten M8 bolts (seal compression 20-30%) -> connect grounding -> level check -> 45-degree spray test -> record point.

Q30: Crew and rate?

A: 2-person crew installs 8-10 covers/day; 50 sets in 5-7 working days; no crane needed.

Q31: Full schedule for 50 sets?

A: Survey 3 days + production 7-10 days + transport 2-4 + preparation 1 + installation 5-7 + acceptance 1; <=20 sets compress installation to 2-3 days; >=100 sets use two crews within 8 days.

Q32: Can installation be done at night?

A: Yes — night-window schedules supported; the schedule extends proportionally to shortened daily working hours.

Q33: Weather restrictions?

A: Outdoor installation pauses during rain, typhoon or high humidity; wind >=6 suspends work; schedule extends automatically.

Q34: What tools are needed?

A: Insulated wrenches, stainless sockets, spirit level, insulated tape, copper wire, cutter, tape measure, safety ladder, PPE — all provided by the installer.

Q35: Is a spray test performed?

A: Yes — 45-degree simulated rain test after each installation confirms no water contact with protected parts.

12.6 Warranty and Service

Q36: Warranty terms?

A: >=1 year from on-site acceptance; SUS304 structure adds 3 years; free replacement for material/process defects with new warranty period; 48h response within warranty.

Q37: What is excluded?

A: Human impact, unauthorized modification, natural disasters (flood/lightning/typhoon), non-compliant installation — cost-price repair available.

Q38: After warranty?

A: >=3 years paid service: cost-price parts, preferential on-site repair (labor/travel only), free fault diagnosis, retrofit service.

Q39: Long-term support?

A: 10 years free technical support — full drawings/parameters/reports, adaptation designs for equipment upgrades, bid/tender support, one-to-one engineer Q&A.

Q40: Spare parts availability?

A: EPDM seals, M8 bolt sets, PC windows, M6 terminals stocked; 48h dispatch; custom spares in 5 working days; 10-year stock guarantee after discontinuation.

Q41: Training?

A: Free online training (90min + 30min Q&A, recorded) for all; optional 8h on-site hands-on (4h theory + 4h practice) for batch orders with assessment and certificate.

Q42: What documents are delivered?

A: Manual (paper + electronic), step-by-step installation illustrated guide, recorded videos, fault quick-reference, material test reports, standard compilation, certificates.

Q43: Delivery and arrival support?

A: Door delivery with 24h advance notice; joint unpacking and count; damage/missing items re-supplied within 24h; double-layer pearl-cotton + carton packing.

12.7 Project-Specific

Q44: How are non-standard flanges handled?

A: On-site survey captures actual OD/contours; one-to-one custom drawings; production in the custom window (10 days).

Q45: Can covers be added to existing old covers?

A: Yes — retrofit service: size modification, window addition, thickened seal upgrade at basic processing cost.

Q46: Suitable for high-humidity stations?

A: Yes — ventilation slots for vertical covers, thickened/widened EPDM seals, no condensation or ponding in >70% RH environments.

Q47: Chemical/industrial areas?

A: 330kV chemical-park projects use widened seals, enlarged expansion allowance and third-party corrosion testing for corrosive-gas duty.

Q48: How does this reduce faults?

A: Prevents flange rust, SF6 leakage and mechanism moisture/jamming — e.g. an 86-set retrofit cut annual GIS emergency repairs by ~90%.

Q49: Is bidding documentation supported?

A: Yes — full technical parameters, standards compliance, test reports and tender support are provided free.

Q50: Why choose KITOZER/Lain?

A: 20+ years, source factory with full custom capability, strict QC with mill certificates, long-life SUS304/EPDM design, safe live installation, complete 1+3-year warranty and 10-year support.

13. Construction Schedule

13.1 Schedule Overview (Reference: 50 Sets, Medium Substation)

Five stages: survey/design, production/QC/packing, logistics, on-site installation, acceptance. Standard stock items compress the whole flow by ~30%.

Stage Work Duration Responsibility Deliverable
1 Survey & design All-point survey with photos; custom drawings; technical disclosure; client sign-off 3 working days Technical engineer Survey records, drawings, disclosure file
2 Production & QC Laser cutting, NC bending, welding; matte finishing; seal/bolt/window assembly; full waterproof/size/grounding check; pearl-cotton + carton packing with point labels 7-10 working days (7 standard / 10 full-custom) Production team, QC Full kits, factory test reports
3 Logistics Dedicated transport to substation; arrival notice; joint unpacking/count 2-4 working days Logistics Arrival list, unpacking record
4 Site prep Substation permits, height-work tickets; crew safety training; tools/PPE in; point recheck 1 working day PM, crew Permits, training records
5 Installation 2-person crew, 8-10 sets/day; spray test, grounding test, point records 5-7 working days Crew Per-set records, water tests
6 Acceptance Full-point recheck; joint acceptance; documentation handover; warranty archive 1 working day Engineer, after-sales Acceptance form, archives

13.2 Adjustment Rules

<=20 sets: installation 2-3 days; >=100 sets: two crews, within 8 days; all-standard stock: production 3 days; night-only windows extend proportionally; rain/typhoon/high humidity pauses outdoor work with automatic extension.

14. Construction Organization and Quality/Safety Measures

14.1 Organization

Project manager (overall), technical engineer (survey, drawings, disclosure), production team + QC (manufacturing), logistics coordinator (transport), on-site crew (2-person teams with insulated-tool certification), safety officer (permits and supervision).

14.2 Pre-Construction Preparation

Technical: survey all GIS points with dimensions/photos; custom drawings per actual contours; disclosure meeting; per-point installation records prepared. Materials/tools: covers, seals, M8 bolt sets, M6 grounding kits, manuals, certificates, material reports — individually packed in pearl cotton with point numbers; insulated wrenches, stainless sockets, spirit levels, insulated tape, copper wire, cutters, tape measures, safety ladders, insulated gloves, dust cloths. Safety: substation live-work permits and height-work tickets; crew study of substation safety rules; HV restricted zones and induced-voltage protection briefed; all personnel trained before entry.

14.3 Standard Installation Procedures (Per Category)

Vertical basin cover: clean flange surface -> fit U-seal into ear-plate grooves with 45-degree glued joints -> two workers lift and align over the flange, match 4 holes -> insert M8x30 bolts with washers, tighten evenly (seal compression 20-30%) -> connect M6 grounding with >=4mm2 wire -> level check (error <= +-3mm) -> 45-degree spray test -> record point. Horizontal basin cover: clean top/inner-outer surfaces -> U-seal into outer rim groove, continuous ring -> lower annular cover onto the flange, align 4 holes -> tighten evenly (avoid one-side compression) -> grounding wire with <=0.5 ohm test -> check drain notches unblocked, no ponding -> oblique spray test -> record. Mechanism box cover: clean box surfaces -> profile seal into bottom groove with bonded joints -> lower inverted box over the mechanism box -> align 4 corner holes -> tighten 4 bolt sets evenly, adjust uniform gaps -> check window aligns with the open/close indicator -> grounding -> 45-degree spray, no seepage -> wipe clean. Expansion joint cover: clean bellows/flanges -> profile seal into bottom groove -> lift extended cover over the joint with axial allowance -> align and tighten 4 bolts without squeezing the bellows -> window aligned to the bellows/scale -> grounding with pass test -> spray test -> record original displacement scale and photos.

14.4 On-Site Safety Control

Full insulating PPE throughout energized areas; no touching HV cylinders/conductive parts; certified ladders and safety ropes with warning guards; insulated tools only (no metallic bridging); careful handling to avoid scratching OEM coating; suspend outdoor work in rain or wind >=6; daily tool/part count — no bolts, rubber strips or metal debris left near GIS equipment (conductive debris risks short circuits).

14.5 Completion and Documentation

Clean fingerprints/stains per point; compile full as-built package (survey drawings, point records, grounding conductivity tests, spray tests, certificates, material reports, manuals); joint acceptance with substation O&M staff and contractor, signed acceptance form; project electronic archive with photos, point numbers, batch, warranty dates handed to the after-sales specialist.

14.6 Quality Control

Incoming: mill certificates per batch of SUS304; process: key checks on cutting/bending/welding dimensions and matte finish; final: per-unit waterproof test (45-degree spray), size inspection, grounding conductivity, accessory completeness; records retained per point for traceability.

15. After-Sales Service

15.1 Three-Level Response Mechanism

Level 1 (consultation): selection, sizing, tender parameter replies, installation queries — detailed text/video reply within 24h; free drawings and test documents. Level 2 (general fault): seal aging, minor scratches, missing parts (no outage risk) — solution within 48h with replacement parts and remote video guidance. Level 3 (emergency): deformation/leakage, large seal failure, grounding disconnection affecting GIS operation — technician on site within 48h plus expedited replacement product.

15.2 Warranty Terms

>=1 year from on-site acceptance; SUS304 structure +3 years; free full-set/part replacement for process or material defects (cracking, weld failure, seal failure, terminal detachment) with transport costs borne by the supplier and new warranty period for replacements; unlimited free technical guidance (installation, waterproofing, grounding testing), training courseware and videos within warranty; exclusions: human impact, unauthorized modification, natural disasters, non-compliant installation (cost-price repair available).

15.3 Three-Year Paid Service Period

Cost-price spare parts (seals, bolts, PC windows, grounding kits — no middleman markup); preferential on-site repair (basic labor + travel only); free fault diagnosis from photos/videos with repair plans; old-cover retrofit (size modification, window addition, thickened seals) at basic processing cost.

15.4 Ten-Year Technical Support

Free forever: full drawings, dimensions, material standards, test reports (electronic); adaptation design for GIS expansion/upgrade; tender/bid technical document support; one-to-one engineer Q&A all year; industry GIS anti-corrosion reference materials.

15.5 Logistics and Arrival Service

Door delivery with 24h advance notice; joint unpacking/count with on-the-spot records; missing/damaged items re-supplied within 24h; double-layer pearl-cotton + carton protection; transport damage fully compensated.

15.6 Lifetime Spare Parts

10-year stock guarantee after product discontinuation: standard spares (seals, M8 sets, PC windows, M6 terminals) dispatched within 48h; custom spares (special-size seals, custom parts) in 5 working days; illustrated replacement instructions with each part.

16. Training Plan

16.1 Training Objectives and Audience

Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.

Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.

16.2 Tiered Training Content System

Level 1: Basic operation training (1 day)

– Basic principles: system concepts, structure composition, performance indicators;

– Daily operation standards: correct operation of equipment, control and safety systems;

– Daily inspection contents: daily/weekly/monthly check items;

– Safety precautions: usage prohibitions and emergency handling procedures.

Level 2: Maintenance training (1 day)

– Detailed structure of each subsystem and working principles;

– Daily maintenance methods: cleaning, fastening checks, routine care;

– Common fault identification and simple handling;

– Emergency handling procedures for power failure, fire and equipment faults.

Level 3: Advanced management training (as needed)

– Performance influencing factors and how to avoid degradation;

– Upgrade and expansion knowledge and specification requirements;

– Relevant national standards interpretation.

16.3 Training Methods and Schedule

– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;

– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.

16.4 Training Assessment and Documentation Delivery

– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;

– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.

17. Anonymous Typical Project Scenarios

All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.

17.1 110kV Urban Substation GIS Protection Retrofit Project

Background. A 12-year-old urban 110kV substation retrofit: insulating-basin flanges widely rusted, mechanism boxes damp and jamming, repeated disconnector mis-operation. The owner procured 86 covers (32 vertical, 28 horizontal, 16 mechanism box, 10 expansion joint), all SUS304 1.5mm, installed live without outages.

Challenges. Dense equipment, narrow space, night-only windows; several non-standard flange sizes requiring one-to-one custom covers; >70% RH requiring strengthened anti-condensation sealing.

Solution. Engineers surveyed all points over 3 nights with custom drawings; 10-day production and delivery; two crews in two night shifts installed all 86 covers in 7 days without outages; ventilation slots added and EPDM seals thickened/widened for the humid environment.

Results. 3 years stable operation — no new flange rust, no damp/jamming faults; routine inspection through windows without cover removal; annual GIS emergency repairs down ~90%; passed lean-substation acceptance.

17.2 220kV Inland Renewable-Energy Booster Station Project

Background. A new 220kV booster station for a wind base required 62 standard covers matching the OEM GIS, in a sandy outdoor site with 43 degC summer and -8 degC winter.

Solution. All-standard stock sizes, 7-day production and shipping with full material and IP test documentation (passed bidding and factory acceptance); widened rain eaves and deepened seal grooves against sand ingress; thickened ribs against wind/sand impact; on-site hands-on training for the O&M crew.

Results. 2 years of operation — no deformation, no dust ingress or rain seepage; bellows and flanges rust-free; meets long-term unattended O&M needs of the renewable site.

17.3 500kV Mild-Coastal Substation Anti-Corrosion Upgrade Project

Background. A coastal 500kV hub station with chloride salt spray; original galvanized-iron covers rusted through within a year and SF6 flanges leaked repeatedly. The owner upgraded to 124 full SUS304 covers covering all exposed basins, mechanism boxes and busbar expansion joints.

Solution. Extra passivation strengthening for coastal duty; thickened salt-spray-resistant EPDM seals; anti-corrosion washers on grounding terminals; full set passed 1000h neutral salt spray with no red rust.

Results. 4-year follow-up inspection — no rust spots on covers or bolts; SF6 leakage defects cleared to zero; eliminated annual flange de-rusting and leak-repair work; significantly improved operational stability.

17.4 330kV Industrial Park Substation Custom Cover Project

Background. A 330kV substation in a chemical park with corrosive gases and non-standard GIS joint/mechanism-box dimensions; 47 covers all fully customized.

Solution. Three free exclusive design options for selection; enlarged internal expansion allowance on joint covers; widened sealing against chemical dust; 10-year technical support agreement with ample spare stock; third-party corrosion performance testing for the special industrial atmosphere.

Results. Covers matched all non-standard contours precisely; no corrosion or ingress in the chemical environment; long-term maintenance assured by the support agreement and spare inventory.

18. SEO Optimization Section

All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.

18.1 Keyword System

– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;

– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;

– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;

– Brand keywords: KITOZER, Guangzhou Lain.

18.2 SEO Tag System

– Title tag: the article title — Guangzhou Lain KITOZER;

– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;

– H1 tag: the article title;

– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.

18.3 Internal Link Anchor Text

– Core anchor text: technical design solution, system construction;

– Long-tail anchor text: configuration list, technical parameters, construction plan;

– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.

19. Official Contact Information

– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Official Website: https://gdlain.com

– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)

– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China

For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.

Shopping Cart