Table of Contents
Toggle1. Cover / Document Information
– Document Title: SJCB18 Series Silicone Rubber Dry-Type Transformer Technical Design Solution
– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Date: August 2026
– Version: V1.0
– Project Type: Technical design solution for SJCB18 Series Silicone Rubber Dry-Type Transformer
2. Table of Contents Structure
1. Company Introduction
2. Project Overview
3. User Requirement Analysis
4. Overall Design Description
5. Detailed System Design and Product Technical Parameters
6. Project Quotation and Configuration List
7. Core Solution Advantages
8. Technical Q&A
9. Construction Schedule Plan
10. Construction Organization Plan
11. After-Sales Service System
12. Operation and Maintenance Training Plan
13. Typical Project Cases
14. SEO Optimization System and Website Backend Configuration
15. Contact Information
3. Company Introduction
3.1 Company Development Overview
Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.
After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.
3.2 Core Business System
The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:
– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;
– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;
– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;
– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.
3.3 Brand and Qualification Honors
The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.
3.4 Core Competitive Advantages
1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;
2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;
3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;
4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.
4. Project Background and Objectives
4.1 Project Background
With the power industry’s rising requirements for energy saving, safety and reliability, and the full implementation of GB 20052-2020 (energy-efficiency limit values and grades for power transformers), high-efficiency, high-reliability, low-loss dry-type transformers have become the core selection direction for distribution upgrades and new projects. Silicone-rubber-insulated dry-type transformers — with excellent moisture-proof, fire-proof, explosion-proof and weatherproof performance and low whole-life O&M cost — are widely applied in data centers, commercial buildings, industrial plants, metro tunnels and outdoor compact substations.
4.2 Project Scope
Supply and installation guidance for 12 SJCB18-series silicone-rubber dry-type transformers (NX1 level-1 energy efficiency), including bodies, standard accessories, on-site auxiliary materials, optional monitoring equipment, spare parts, technical services and documentation; full installation guidance, commissioning, acceptance support, training and after-sales.
4.3 Construction Objectives
Deliver NX1 level-1 energy-efficient, low-loss, high-reliability dry-type transformers: silicone-rubber full insulation for moisture/fire/weather adaptation; H-class insulation with high over-load margin; strong short-circuit withstand; low noise; intelligent temperature control; optional online monitoring; complete one-stop service from design to after-sales.
5. User Requirement Analysis
5.1 Energy Efficiency
NX1 (level-1) energy efficiency per GB 20052-2020: no-load loss ~45% lower and load loss ~25% lower than level-3 products — long-term energy savings (per 1250kVA unit ~4,200 yuan/year at 50% load, ~1.5 million yuan over 30 years for 12 units).
5.2 Environmental Adaptation
High humidity, coastal salt spray, outdoor/semi-outdoor, large temperature differences and personnel-dense sites; silicone-rubber insulation resists cracking, moisture, pollution and salt; FV-0 flame retardant with no toxic gas.
5.3 Reliability and Safety
High short-circuit withstand; three-level temperature protection (fan start, over-temperature alarm, over-temperature trip); partial discharge <=5pC; oil-free dry design eliminating leakage and explosion risk.
5.4 Maintenance
Maintenance-free daily operation (no oil sampling, minimal cleaning); intelligent monitoring for proactive maintenance; low whole-life cost.
5.5 Customization
Capacity 30-2500kVA; voltage 6/10/20kV; protection IP20-IP54; outdoor/corrosion-proof/explosion-proof variants; function and size customization for retrofit projects.
5.6 Service
Installation guidance, commissioning and acceptance support, operator training, 2-year warranty, 7×24 support and lifetime maintenance.
6. Design Principles and Applicable Standards
6.1 Design Principles
Level-1 energy efficiency: high-permeability grain-oriented silicon steel, full miter joint stepped stacking, optimized windings — NX1 standard losses. Silicone full insulation: high-temperature vulcanized silicone rubber integral casting — elastic, crack-free under thermal cycling, moisture/pollution resistant. High short-circuit strength: optimized ampere-turn balance, cured winding structure, rigid clamping — passing sudden-short-circuit tests. Low noise: multi-step joints, hole-free binding, pull-plate clamping with damping. Fire and environment: FV-0 flame retardant, halogen-free, no toxic smoke. Long life: ozone/UV/temperature aging resistance — 30+ years.
6.2 Applicable Standards
GB 1094.11 (dry-type transformers), GB 20052-2020 (energy efficiency NX1), GB/T 10228, GB 1094.3 (insulation tests), GB 50148 (acceptance tests), plus national machine-room and electrical codes; normal use conditions: altitude <=1000m, -30~+45 degC, monthly RH <=90%, daily RH <=95%.
7. System Architecture and Working Principle
7.1 Overall Architecture
SJCB18 series silicone-rubber dry-type transformer: high-voltage winding (multi-layer cylindrical, oxygen-free copper magnet wire, H-class varnish, silicone-rubber integral casting, 5 tapping positions +-2×2.5%), low-voltage winding (foil type, T2 copper foil >=99.95%, H-class film + silicone-rubber encapsulation, copper-bar tinned outlet), core (30Q120 grain-oriented silicon steel, three-phase three-column, 45-degree full miter stepped stacking, fill factor >=0.95, single-point earthing), clamping frame (hot-dip galvanized steel), cooling system (AN natural air + AF forced-air with GFDD cross-flow fans), intelligent temperature control (BWDK with 3 x PT100), off-circuit tap changer (WSL disc type, 5 positions), protective enclosure (IP20 standard, IP30/40 upgrade), optional online monitoring system.
7.2 Working Principle
Primary power enters the HV winding via bushings and the tap changer; electromagnetic induction transfers energy to the LV foil winding; the Dyn11 connection provides 400/230V with neutral for single-phase loads; losses heat the windings; the BWDK temperature controller reads the three-phase winding temperatures via embedded PT100 sensors and automatically starts/stops the AF cooling fans (100 degC start / 80 degC stop, adjustable), alarms at 130 degC and trips at 150 degC; the silicone-rubber encapsulation provides full insulation, moisture protection and heat conduction; the enclosure (IP20+) protects against foreign objects with ventilated louvers.
8. Detailed Technical Design
8.1 Overall Technical Specifications
Silicone-rubber insulation material: high-temperature vulcanized methyl-vinyl silicone rubber; dielectric strength >=20kV/mm; volume resistivity >=1×10^14 ohm·cm; relative permittivity 3.0-3.5 (50Hz); tan delta <=0.003; FV-0 flame retardant (self-extinguishing); -60~+200 degC; Shore A 60+-5; elongation >=300%; tear strength >=15kN/m; 180 degC x 1000h heat aging retention >=85%; halogen-free, RoHS, no toxic smoke. Core technology: NX1 level-1 losses; high short-circuit withstand; low noise; 30+ year life.
8.2 SJCB18-1250/10-NX1
Rated 1250kVA; HV 10kV / LV 0.4kV; tapping +-2×2.5% (5 positions); Dyn11; 50Hz; no-load loss <=1205W; load loss (75 degC) <=9335W; total <=10540W; no-load current <=0.6%; impedance 6% (+-7.5%); efficiency >=99.16% (cos phi=1); H-class insulation; winding average temperature rise <=100K; core surface <=80K; HV power-frequency withstand 35kV/1min; LV 5kV/1min; induced 28kV/100Hz 60s; partial discharge <=5pC (at 1.5x rated); cooling AN/AF — AN 1250kVA, AF 1560kVA; temp control power AC220V; noise <=52dB (1m); HV winding multi-layer cylindrical oxygen-free copper; LV foil T2 copper; core 30Q120; dimensions approx. 1600x1000x1850mm (with IP20 enclosure); base hole spacing ~750x600mm; total weight ~2200kg; top lifting space >=500mm; inspection front >=1000mm, side >=800mm.
8.3 SJCB18-1600/10-NX1
Rated 1600kVA; HV 10kV / LV 0.4kV; tapping +-2×2.5%; Dyn11; 50Hz; no-load loss <=1415W; load loss (75 degC) <=11320W; total <=12735W; no-load current <=0.55%; impedance 6% (+-7.5%); efficiency >=99.21%; H-class; winding rise <=100K; core <=80K; HV 35kV/1min; LV 5kV/1min; induced 28kV/100Hz 60s; PD <=5pC; AN 1600kVA / AF 2000kVA; noise <=54dB; multi-strand parallel LV foil; dimensions approx. 1700x1100x1900mm; base spacing ~800x650mm; weight ~2800kg.
8.4 Intelligent Temperature Control System
BWDK controller: 3 x PT100 inputs (A/B/C phases); 0-200 degC; +-1 degC; LED cyclic display; fan start/stop defaults 100/80 degC (adjustable); over-temperature alarm 130 degC (relay); over-temperature trip 150 degC (relay); sensor open/short fault alarm; output contacts AC220V/10A (fan), AC220V/5A (alarm/trip); RS485 Modbus-RTU for backstage; optional 4-20mA (0-200 degC); AC220V +-10%; -10~+55 degC; panel embedded. GFDD cross-flow fans: single-phase AC220V; >=800m3/h per fan; >=60Pa; <=45dB(A); B-class insulation; oil-bearing bearings maintenance-free; galvanized/aluminum housing; mounted at winding top/bottom ends. PT100 sensors: platinum A-class; silicone high-temperature encapsulation, embedded; -50~+200 degC; accuracy +-0.15 degC + 0.002|t|; shielded leads; embedded at the hottest winding points.
8.5 Off-Circuit Tap Changer
WSL disc type; 10kV; rated current matching HV winding; 5 positions (105/102.5/100/97.5/95% rated voltage); manual off-power rotary adjustment; insulation power-frequency 35kV/1min, impulse 75kV; contact resistance <=500 micro-ohm; mechanical life >=10,000 operations; IP20; mounted on the transformer top with handle outside the enclosure, position indication and lock.
8.6 Protective Enclosure
Cold-rolled steel >=1.5mm; electrostatic powder coating (default light grey); IP20 standard, IP30/IP40 upgrade; assembled structure, front/rear double doors with locks; upper/lower ventilation louvers sized for heat dissipation; optional tempered-glass observation window; cutouts for temperature controller, cable entries and grounding; mechanical strength for lifting/transport; anti-corrosion coating.
8.7 Optional Online Monitoring System
Acquisition: three-phase winding/core/environment temperatures; HV/LV voltage and current, power, energy, power factor; fan status, tap position, door status; core earthing current; partial discharge (high-end). Communication: RS485 wired or 4G/NB-IoT wireless; Modbus-RTU/MQTT; real-time upload to cloud or local system; alarms (over-temperature, overload, abnormal state, communication fault); analysis (loss analysis, load trend, life prediction, energy-efficiency assessment); mobile APP/Web remote viewing with history curves. Performance: AC/DC 85-265V; -20~+70 degC; V/I accuracy 0.5 class, temperature +-1 degC; >=30 days local history; IP30.
9. Recommended Configuration and Preliminary Budget
9.1 Configuration Summary
Main equipment: 12 x SJCB18 transformers (1250/1600kVA per project need) with HV silicone-rubber bushings (36), LV tinned copper bars (12 sets: 1250kVA 4x60x6mm/phase, 1600kVA 4x80x8mm/phase), off-circuit tap changers (12), HV/LV terminals (36/48), grounding terminal sets (24); structure/protection: IP20 enclosures (12), core clamping sets, bases, 4 lifting rings each, nameplate sets, epoxy anti-vibration pads (48); on-site auxiliaries: HV busbars, LV busbars, insulators, M16 galvanized bolts (96), earth flat steel, heat-shrink tubing, phase labels, fire-stop materials; options: online monitoring (12), smoke detectors, door limit switches (24), core earthing current sensors, anti-condensation heaters, IP30/40 enclosures; spares: 6 fans, fuse boxes, 3 PT100, bolts, labels; services: certificates, type-test/energy-efficiency reports, manuals, factory test reports, drawings, installation guidance, commissioning/acceptance, training.
9.2 Budget Notes
Price includes transformers, standard accessories, documentation, installation guidance, commissioning and training; options and on-site materials per actual quantities. Tax-inclusive in RMB (CNY) only — no foreign-currency conversion. Schedule 30 calendar days for 12 units; 2-year warranty with 7×24 support.
10. Technical Specifications
10.1 Product Family Summary
| Item | 1250kVA (SJCB18-1250/10-NX1) | 1600kVA (SJCB18-1600/10-NX1) |
|---|---|---|
| HV / LV | 10kV / 0.4kV | 10kV / 0.4kV |
| Tapping | +-2×2.5% (5 positions) | +-2×2.5% (5 positions) |
| Connection | Dyn11 | Dyn11 |
| No-load loss | <=1205W | <=1415W |
| Load loss (75 degC) | <=9335W | <=11320W |
| Total loss | <=10540W | <=12735W |
| No-load current | <=0.6% | <=0.55% |
| Impedance | 6% (+-7.5%) | 6% (+-7.5%) |
| Efficiency | >=99.16% | >=99.21% |
| Insulation | H-class; winding rise <=100K; core <=80K | H-class; winding rise <=100K; core <=80K |
| Withstand | HV 35kV/1min; LV 5kV/1min; induced 28kV/100Hz 60s | Same |
| Partial discharge | <=5pC @1.5x rated | <=5pC @1.5x rated |
| Cooling | AN 1250 / AF 1560kVA | AN 1600 / AF 2000kVA |
| Noise | <=52dB | <=54dB |
| Dimensions | ~1600x1000x1850mm | ~1700x1100x1900mm |
| Weight | ~2200kg | ~2800kg |
10.2 Core Components
Windings: HV multi-layer cylindrical oxygen-free copper magnet wire (H-class varnish, silicone casting); LV foil T2 copper (>=99.95%) with H-class film + silicone encapsulation; copper-bar tinned outlets. Core: 30Q120 grain-oriented silicon steel, three-phase three-column, 45-degree full miter stepped stacking, fill factor >=0.95, single-point earthing. Temp control: BWDK 3 x PT100 (A-class, embedded, -50~+200 degC), +-1 degC, fan 100/80 degC, alarm 130 degC, trip 150 degC, RS485 Modbus, optional 4-20mA. Fans: GFDD cross-flow AC220V >=800m3/h >=60Pa <=45dB, maintenance-free bearings. Tap changer: WSL disc, 5 positions, contact <=500 micro-ohm, >=10,000 operations, impulse 75kV. Enclosure: steel >=1.5mm, powder coated, IP20 (IP30/40 option), double doors, louvers, optional window. Monitoring (optional): 3-phase/core/environment temps, V/I/P/E/PF, fan/tap/door status, core earth current, PD (high-end); RS485/4G/NB-IoT, Modbus/MQTT, cloud/APP, 0.5 class, AC/DC 85-265V.
10.3 Standards Compliance
GB 1094.11, GB 20052-2020 (NX1), GB/T 10228, GB 1094.3, GB 50148; type-test and energy-efficiency reports from authorized bodies; per-unit factory test reports with raw data; silicone material RoHS, FV-0.
11. Key Advantages and Customer Value
11.1 Energy Efficiency — NX1 Level-1, Significant Long-Term Savings
No-load loss ~45% and load loss ~25% lower than level-3 products; per 1250kVA unit at 8,000h/year, 50% load, 0.8 yuan/kWh — saves ~4,200 yuan/year; 12 units ~50,400 yuan/year; ~1.5 million yuan over 30 years — supporting the national dual-carbon strategy.
11.2 Insulation — Silicone Full Insulation, Strong Environmental Adaptation
Elastic, crack-free under thermal cycling (solving the epoxy cracking pain point); excellent hydrophobicity — stable above 95% RH without dehumidifiers; FV-0 flame retardant with no toxic halogen gas and low smoke density — suitable for personnel-dense buildings; ozone/UV/temperature aging resistance — 30+ year life vs epoxy’s ~20 years.
11.3 Safety — Multiple Protection, Stable and Reliable
Passed sudden-short-circuit tests (ampere-turn balance, cured windings, rigid clamps); three-level temperature protection (fan start -> alarm -> trip); high insulation margin with PD <=5pC (standard <=10pC); oil-free dry design eliminating leakage/explosion risk and oil pits/fire facilities.
11.4 O&M — Maintenance-Free, Extremely Low Cost
Hydrophobic windings need no regular cleaning or oil testing — minimal routine work; self-diagnosing temperature control locates sensor/fan faults; modular consumables replaced without disassembling the body; optional online monitoring converts passive repair into proactive maintenance; lowest whole-life cost.
11.5 Customization — Flexible for Diverse Needs
Capacity 30-2500kVA; voltage 6/10/20kV; IP20-IP54 enclosures; outdoor/corrosion-proof/explosion-proof variants; flexible temperature/monitoring/incoming-outgoing configurations; size customization for retrofit projects.
11.6 Service — One-Stop Full-Process
Survey -> custom design -> strict production -> on-time delivery -> free installation guidance -> commissioning -> training -> 2-year warranty -> lifetime support with 24h fast response.
12. Technical Q&A (50+ Items)
12.1 Principle and Basics
Q1: Silicone vs epoxy dry-type transformers?
A: Different main insulation materials: silicone is an elastomer (high elongation, crack-resistant); epoxy is rigid (cracks under large temperature swings). Silicone offers better hydrophobicity, weather and salt-spray resistance (humid/outdoor/coastal); FV-0 flame retardant with no toxic smoke; ~30-year life vs ~20; slightly higher initial cost but lower whole-life cost.
Q2: What does NX1 level-1 energy efficiency mean?
A: GB 20052-2020 defines three dry-type grades: level 1 (NX1, lowest loss, most advanced), level 2 (NX2, energy-saving evaluation value), level 3 (NX3, minimum market access — below is prohibited). This series is fully NX1.
Q3: AN/AF cooling modes?
A: AN = natural air convection (rated capacity, quiet); AF = forced air via cooling fans boosting heat dissipation — raising capacity ~20-25% for short-term overload without extra capacity purchase. Default AN/AF dual mode: fans off at normal load, auto-start at set temperature.
Q4: What is Dyn11 and its advantages?
A: HV delta (D) suppresses third harmonics improving waveform; LV star with neutral (yn) provides 220V phase voltage for single-phase loads; low zero-sequence impedance gives large single-phase short-circuit current aiding relay protection; strong unbalanced-load tolerance — the most common distribution connection.
Q5: Why silicone rubber insulation?
A: Elasticity (no cracking), hydrophobicity (moisture/salt/pollution resistance), FV-0 fire safety, ozone/UV/temperature aging resistance (30+ years), halogen-free — ideal for humid, coastal, personnel-dense and high-temperature-differential sites.
Q6: Is the transformer oil-free?
A: Yes — fully dry with no insulating oil, eliminating leakage and explosion risk; no oil pit or fire-fighting facilities needed; flexible installation.
12.2 Parameters and Performance
Q7: What is 6% short-circuit impedance?
A: The percentage of rated voltage causing rated current under short circuit. 6% is the standard for 10kV distribution: balances short-circuit current magnitude (downstream breaker requirements), voltage regulation and load loss — optimal for most systems.
Q8: H-class insulation vs B/F?
A: B-class 130 degC max (80K rise); F-class 155 degC (100K); H-class 180 degC (100K). H gives larger thermal margin, stronger overload capability and longer life — reliable even in high ambient temperatures.
Q9: What does PD <=5pC mean?
A: Partial discharge indicates tiny discharges in internal voids that gradually degrade insulation. National standard requires <=10pC; this product controls to <=5pC — industry-excellent, meaning few internal defects, uniform field, slow aging and longer life.
Q10: How is short-circuit withstand ensured?
A: Design: optimized ampere-turn balance reducing short-circuit forces, reinforced radial/axial winding supports, force-checked structure; process: integral high-temperature curing, rigid clamps/ties; test: passed authorized sudden-short-circuit tests — no winding deformation or insulation damage.
Q11: Noise level?
A: <=52dB (1250kVA) / <=54dB (1600kVA) at 1m — far below the national standard, from multi-step joints, hole-free binding and pull-plate clamping.
Q12: Overload capability?
A: AN: 1.2x continuous, 1.3x for 2h, 1.5x for 30min; AF (fans on): 1.25x continuous, 1.5x for 2h, 1.6x for 30min — subject to ambient/initial load; avoid sustained overload and monitor temperature.
Q13: Efficiency?
A: >=99.16% (1250kVA) and >=99.21% (1600kVA) at cos phi=1 — NX1 losses minimize annual energy cost.
Q14: Temperature rise limits?
A: Winding average <=100K, core surface <=80K (H-class); with 40 degC ambient, winding max ~140 degC is normal.
12.3 Installation and Commissioning
Q15: Installation environment requirements?
A: Altitude <=1000m (derate above); -30~+45 degC; good ventilation; no severe vibration/corrosive/explosive atmosphere; inspection space front >=1000mm, side >=800mm; level foundation meeting weight; special environments via protection upgrades.
Q16: Grounding requirements?
A: Two grounds: core single-point earthing (<=4 ohm, avoiding circulating currents) and enclosure protective earthing (<=4 ohm); TN-S neutral connected to the earth system; adequate cross-section, secure connections, clear labels.
Q17: Tests before commissioning?
A: Insulation resistance (HV/LV to earth and between), DC resistance (balance/connection), ratio and group test, power-frequency withstand, temperature control function (fans/alarm/trip), phase sequence check; then no-load run 24h before load.
Q18: Hoisting and transport?
A: 4 x alloy lifting rings rated for total weight; top lifting space >=500mm; dedicated slings with supervised lifting; careful handling to avoid impact.
Q19: Can it be installed outdoors?
A: Yes — outdoor variants with upgraded enclosure (IP30-54) and corrosion-proof/weatherproof options for compact substations and open yards.
Q20: Clearance requirements?
A: Front >=1000mm, side >=800mm inspection space; top >=500mm lifting space; enclosure louvers unobstructed.
12.4 O&M
Q21: Daily maintenance?
A: Minimal: visual check (enclosure/insulators, abnormal sound/smell), temperature display check (three-phase balance), fan start/stop test, terminal/earthing tightness, internal cleaning every 1-3 years per pollution level — no oil changes or frequent winding cleaning.
Q22: Normal temperature and over-temperature handling?
A: Winding max ~140 degC normal (H-class); defaults: fan 100 degC start / 80 degC stop, alarm 130 degC, trip 150 degC; on alarm check load, ventilation and fans; if rising to trip — auto trip, investigate (overload, poor heat dissipation, internal fault), fix before re-energizing.
Q23: Cleaning the silicone windings?
A: Dry compressed air <=0.2MPa; stubborn stains with anhydrous alcohol then fully dry; power off with safety measures; hydrophobic surface resists soiling — longer cleaning cycles than epoxy.
Q24: Fan replacement?
A: GFDD fans are modular with maintenance-free bearings; replace without disassembling the body; 6 spare fans included per project (5% ratio).
Q25: Tap changer operation?
A: Off-power manual rotary adjustment to 5 positions (105/102.5/100/97.5/95%); handle outside the enclosure with position indication and lock; contact resistance <=500 micro-ohm; >=10,000 operations.
Q26: Sensor failure?
A: BWDK self-diagnostics alarm on PT100 open/short; 3 spare PT100 sensors supplied; embedded sensors replaceable per manual.
Q27: Does it need regular insulation testing?
A: Recommend insulation resistance and PD checks per preventive-test schedule (e.g. every 3-5 years or per site rules); silicone insulation maintains stable performance in humid environments.
Q28: Energy monitoring?
A: Optional online monitoring provides loss analysis, load trend, life prediction and energy-efficiency assessment via cloud/APP.
12.5 Selection and Procurement
Q29: How to select capacity?
A: Total active load with simultaneity factor and power factor -> apparent power S = P/(cos phi x simultaneity) -> reserve 20-30% -> nearest standard capacity; enlarge for impact loads/motor starts; best operating load 40-70% for maximum efficiency.
Q30: When to prefer silicone-rubber transformers?
A: Humid (underground substations, basements, southern high-humidity), outdoor/semi-outdoor (compact substations, platforms), coastal salt spray, personnel-dense (malls, hospitals, schools, offices), poor-O&M (remote, unattended), large temperature differences.
Q31: Is level-1 worth the higher price?
A: Yes — initial cost ~10-15% higher than level-3 but losses much lower; payback in 3-5 years via electricity savings; 20-30 year life is pure net gain; dual-carbon policy support, possible subsidies and tariff preferences.
Q32: Which capacities are available?
A: 30-2500kVA full series; 6/10/20kV voltage; IP20-54 enclosures; custom sizes for retrofit.
Q33: Delivery cycle?
A: 30 calendar days for 12 units (supply + installation guidance); adjustable per project urgency.
Q34: What documents are provided?
A: Certificate of conformity, type-test and energy-efficiency reports (authorized body), installation/use manual, per-unit factory test report with raw data, outline and foundation drawings (paper + CAD), as-built records.
12.6 Service and Cases
Q35: Warranty?
A: 2-year free warranty from acceptance (body, windings, core, insulation, clamps, standard accessories, installation quality); exclusions: misuse, unauthorized modification, force majeure, improper maintenance, consumable normal wear.
Q36: Response time?
A: 7×24 hotline; initial solution within 30 minutes; on-site: urban 4h, suburban 8h, remote 24h; general faults restored within 8h; major within 24h with spare-device interim plan.
Q37: Inspection service?
A: Free on-site inspection every 6 months in warranty with formal reports; lifetime preferential maintenance; annual maintenance agreement option.
Q38: Training?
A: 7-hour on-site training (theory 2h + demo 2h + practice 2h + assessment 1h) covering principle, parameters, inspection, temperature control, tap changer, fault finding and emergency handling; manuals and courseware delivered; online Q&A after.
Q39: Reference projects?
A: Commercial complex (8 x 1600kVA, ~350,000 yuan/year savings, 3-year stable), Tier III data center (12 x 2000kVA, PUE <1.3), coastal factory (10 x 1250kVA, 3-year payback), metro (15 x 800kVA, 5-year near-zero faults).
Q40: Upgrade services?
A: Add online monitoring, upgrade protection level, equipment relocation/re-installation, smart platform integration.
Q41: Why choose KITOZER/Lain?
A: NX1 level-1 energy efficiency with 30-year life, silicone insulation solving cracking/moisture pain points, FV-0 fire safety, strong short-circuit withstand, maintenance-free design, full customization and one-stop service.
Q42: Can multiple transformers share one monitoring platform?
A: Yes — each unit’s online monitor (RS485/4G/NB-IoT) uploads to the same cloud or local platform; the platform displays all units on one dashboard with alarm aggregation and comparison.
Q43: How is the enclosure ventilation designed?
A: Upper/lower louvers create natural convection through the enclosure; when AF cooling is active the cross-flow fans force air through the winding ducts; ventilation area is sized for full-rated heat dissipation.
Q44: Are the bushings replaceable?
A: Yes — HV silicone-rubber bushings (full-insulation shed structure) are standard accessories; replacement follows the manual with the unit de-energized; 3 per unit supplied with terminals.
Q45: What are the LV outlet bars?
A: T2 tinned copper bars — 1250kVA: 4x60x6mm per phase; 1600kVA: 4x80x8mm per phase; pre-fitted at the factory with phase-sequence labels; connections sized for rated and overload current.
Q46: How is the transformer transported?
A: Lifting rings at four corners rated for total weight; dedicated slings with supervised lifting; avoid impact and tilt; top lifting space >=500mm; transport records checked at arrival acceptance.
Q47: Does the temperature controller store history?
A: The BWDK controller provides real-time three-phase display and relay outputs; historical trends are available when the optional online monitoring system (>=30 days local storage, cloud curves) is fitted.
Q48: What about condensation in humid sites?
A: Silicone insulation is hydrophobic so surface moisture does not adhere; optional PTC anti-condensation heating with temperature/humidity auto control and IP30/40 enclosures are available for high-humidity sites.
Q49: Can the transformer operate at high altitude?
A: Rated for <=1000m; above that, derating per standard or special design applies (consult for >1000m sites).
Q50: What is the recommended routine check frequency?
A: Daily visual/temperature check via the controller; quarterly terminal/earthing tightness; semi-annual fan function test; annual full inspection (cleaning per pollution, insulation/earthing tests); online monitoring continuously if fitted.
13. Construction Schedule
13.1 Overall Schedule (30 Calendar Days for 12 Units)
| Stage | Work | Duration | Responsibility | Notes |
|---|---|---|---|---|
| 1 Preparation | Drawing review and disclosure; site survey (foundation, access path); materials/tools/personnel in; safety training | 3 days | PM, technical lead | Entry procedures with owner |
| 2 Arrival acceptance | Unloading/count; appearance check; model/spec/quantity verification; factory documents/certificates/test reports; storage handover | 2 days | Materials officer, field engineer | Lifting safety, no impact |
| 3 Foundation & earthing | Foundation embedment check/correction; earth flat steel laying/welding; earth resistance test <=4 ohm; busbar supports/insulators | 5 days | Crew, QC | Shortened if foundation ready |
| 4 Transformer installation | Hoisting/placement; leveling; base fixing with anti-vibration pads; HV/LV busbar connection; earthing terminals; phase labels/nameplates | 5 days | Installation crew, electrician | Supervised lifting per safety rules |
| 5 Accessories & wiring | Temperature control wiring/commissioning; fan check/wiring; optional monitoring install; secondary control wiring; fire-stop and cable dressing | 5 days | Electrical crew, debug engineer | Secure wiring, clear labels |
| 6 Commissioning & tests | Acceptance tests (insulation, DC resistance, ratio, withstand); temperature control function tests (fan/alarm/trip); no-load run (sound/temperature); linkage with HV/LV cabinets; records | 5 days | Test engineer | Owner witness required |
| 7 Acceptance | Site cleanup; as-built documents; joint acceptance; signed acceptance; O&M training | 3 days | PM, technical lead | Warranty starts after acceptance |
| 8 Handover | Remaining materials/tools out; after-sales contact; service interface | 2 days | Project team | Periodic follow-up |
13.2 Schedule Assurance
Daily morning meetings tracking progress with deviation correction; pre-stocked materials avoiding waiting; adequate crew and tools with parallel processes; early coordination with owner/civil/other trades; contingency plan for weather and equipment issues.
14. Construction Organization and Quality/Safety Measures
14.1 Organization
Project manager (overall schedule/quality/safety/cost, owner interface); technical lead (scheme, drawing review, disclosure, quality control, tests); site supervisor (arrangement, dispatch, progress, safety); materials officer (procurement, transport, count, storage); crews (installation/electrical/debugging); safety officer (training, inspection, hazard control).
14.2 Staffing
PM 1, technical lead 1, safety officer 1, site supervisor 1, electricians/installers 4, debugging engineers 2, materials officer 1 — total 11, dynamically adjusted.
14.3 Main Tools and Test Instruments
25t truck crane (1), manual hydraulic pallet trucks (2), slings/shackles (4 sets); torque wrenches (2), socket/wrench sets (4), drills/cutters (2); insulation resistance tester, DC resistance tester, ratio/group tester, power-frequency withstand set, earth resistance tester (1 each), multimeters/clamp meters (4); PPE (helmets, insulated shoes), insulated gloves/voltage detectors (2 sets), warning signs/fences.
14.4 Quality Control
Material/equipment control: certificates and test reports required; strict arrival inspection — unqualified never used; per-unit body/accessory check against model/parameters. Process control: three-inspection system (self, mutual, handover) with gating; key processes (lifting, wiring, withstand test) supervised by the technical lead. Test control: acceptance tests strictly per GB 50148 with truthful records; nonconformities rectified and re-tested; signed records archived. Finished-product protection: protect installed equipment from collision/contamination; dress and secure wiring.
14.5 Safety Management
Safety responsibility system with signed commitments; daily disclosure and weekly safety meetings. Lifting: certified supervisor; sling inspection before each lift; warning zone; no lifting above wind 5. Electrical: lockout-tagout (power off, test, tag, lock); HV tests with safety fence and supervision; live commissioning in pairs with insulation protection. Fire: adequate extinguishers; hot-work permits with supervision; flammable materials stored separately. Emergency plans for electric shock, fall and mechanical injury with drills.
14.6 Civilized Construction and Environment
Tidy storage with labels; daily garbage removal; noise control avoiding night disturbance; dust/smoke measures for welding; water/electricity saving; full cleanup at completion (work-clean-restore).
15. After-Sales Service
15.1 Warranty
2-year free warranty from acceptance for non-human, non-force-majeure faults — free repair and parts (body: windings, core, insulation, clamps, base; standard accessories: temperature controller, fans, tap changer, bushings, terminals; installation quality). Exclusions: misuse, unauthorized modification, force majeure, improper maintenance, normal consumable wear. Optional equipment per its own warranty terms.
15.2 Response
7×24 hotline; initial solution within 30 minutes; on-site: urban 4h, suburban 8h, remote 24h; general faults restored within 8h; major within 24h with spare-device interim scheme.
15.3 In-Warranty Services
Free phone consultation; free on-site repair/parts; free inspection every 6 months with formal reports; free software upgrades (monitoring system); free technical document updates.
15.4 Lifetime Maintenance
After warranty: 7×24 consultation continues; on-site repair at cost; parts at preferential factory prices; annual maintenance agreement (inspection, servicing, fault handling all-inclusive); upgrade/retrofit services (monitoring addition, protection upgrade); relocation and re-installation service.
15.5 Service Supervision
Supervision hotline for complaints and suggestions; satisfaction follow-up after every service; continuous quality improvement.
16. Training Plan
16.1 Training Objectives and Audience
Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.
Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.
16.2 Tiered Training Content System
Level 1: Basic operation training (1 day)
– Basic principles: system concepts, structure composition, performance indicators;
– Daily operation standards: correct operation of equipment, control and safety systems;
– Daily inspection contents: daily/weekly/monthly check items;
– Safety precautions: usage prohibitions and emergency handling procedures.
Level 2: Maintenance training (1 day)
– Detailed structure of each subsystem and working principles;
– Daily maintenance methods: cleaning, fastening checks, routine care;
– Common fault identification and simple handling;
– Emergency handling procedures for power failure, fire and equipment faults.
Level 3: Advanced management training (as needed)
– Performance influencing factors and how to avoid degradation;
– Upgrade and expansion knowledge and specification requirements;
– Relevant national standards interpretation.
16.3 Training Methods and Schedule
– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;
– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.
16.4 Training Assessment and Documentation Delivery
– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;
– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.
17. Anonymous Typical Project Scenarios
All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.
17.1 Commercial Center Power Distribution Project
Background. A 250,000m2 commercial complex (mall, offices, hotel) in a provincial capital required reliable, low-loss distribution transformers for its underground substation with high humidity and strict fire requirements.
Solution. 8 x 1600kVA NX1 level-1 silicone-rubber dry-type transformers; silicone insulation adapted to the damp underground environment with no cracking risk; low-noise design per commercial environmental requirements; intelligent online monitoring integrated into the mall’s smart distribution platform.
Results. ~350,000 yuan/year electricity savings from level-1 efficiency; 3 years stable fault-free operation; energy savings beyond expectations; high customer satisfaction.
17.2 Data Center Power Distribution Project
Background. A Tier III data center with 1,200 racks demanded extremely high supply reliability and low losses to meet green-data-center targets.
Solution. 12 x 2000kVA NX1 level-1 silicone-rubber dry-type transformers with N+1 redundant configuration; low losses reducing the data center PUE; intelligent temperature control plus online monitoring for real-time status; flame-retardant and environment-friendly per data-center fire codes.
Results. 2 years stable operation with temperature rise, noise and losses all meeting design values; helped achieve data center PUE below 1.3.
17.3 Coastal Factory Power Retrofit Project
Background. A large electronics factory in a coastal industrial park suffered insulation problems on epoxy transformers from salt-spray corrosion, with short equipment life.
Solution. 10 x 1250kVA silicone-rubber dry-type transformers with IP30 upgraded enclosures: silicone insulation resisting salt spray and moisture; much less maintenance without frequent cleaning; level-1 energy savings.
Results. 4 years of operation with stable insulation — no cracking or corrosion; significantly reduced O&M workload; retrofit investment recovered within 3 years via energy savings.
17.4 Metro Station Power Distribution Project
Background. A metro line’s 15 stations required transformers for underground stations with limited ventilation, high humidity and unattended operation.
Solution. 15 x 800kVA silicone-rubber dry-type transformers: maintenance-free design for unattended duty; excellent moisture resistance for underground operation; low noise preserving passenger experience; fire-safe per metro standards.
Results. 5 years of line-wide operation with reliable performance and extremely low fault rate — highly rated by the metro operator.
18. SEO Optimization Section
All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.
18.1 Keyword System
– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;
– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;
– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;
– Brand keywords: KITOZER, Guangzhou Lain.
18.2 SEO Tag System
– Title tag: the article title — Guangzhou Lain KITOZER;
– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;
– H1 tag: the article title;
– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.
18.3 Internal Link Anchor Text
– Core anchor text: technical design solution, system construction;
– Long-tail anchor text: configuration list, technical parameters, construction plan;
– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.
19. Official Contact Information
– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Official Website: https://gdlain.com
– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China
For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.