The KITOZER 500 cubic meter welded steel fire water storage tank provides a dedicated, readily available water reserve for sprinkler, hydrant, and spray systems where municipal water supply is insufficient or unreliable. The tank is built from 6 mm Q235B steel plates welded on site, internally coated with food-grade epoxy to prevent corrosion and external reinforced with steel stiffeners to withstand earth pressure when buried. The tank includes a manhole, inlet overflow, drain, vent, and level gauge, all engineered to GB 50974 fire code. KITOZER supplies design drawings, on-site supervision, and hydrostatic testing commissioning as a complete package.
Technical Specifications
Nominal volume 500 cubic meters, usable volume 480 cubic meters, plate thickness 6 mm side wall, 8 mm bottom, material Q235B carbon steel, internal coating epoxy coal tar pitch 400 microns, external coating two-pack epoxy zinc-rich primer plus polyurethane topcoat, design temperature minus 10 to 60 degrees Celsius, inlet DN100, outlet DN150 to fire pump suction, overflow DN150, drain DN100, vent DN50 with insect screen, manhole DN600, level gauge magnetic float type, ladder and safety cage included. Hydrostatic test at 1.5 m water head for 24 hours.
Application Scenarios
This 500 cubic meter tank is sized for mid-size industrial parks, logistics warehouses, shopping malls, hospitals, and office complexes where the fire code requires at least 2 hours of independent water supply. Typical configurations include a rectangular underground tank under the landscape area, a covered above-ground tank on a concrete plinth, or a split tank built in two chambers so one side can be drained and cleaned while the other remains in service. KITOZER also offers bolted panel tanks in stainless steel 304 for projects preferring modular construction and shorter on-site erection time.
Key Advantages
The welded steel construction tolerates earth and traffic loads better than plastic or concrete alternatives in shallow burial applications. The internal epoxy coating keeps water clean and reduces sediment formation, extending the interval between tank cleaning cycles. The two-chamber design allows maintenance without losing the entire fire water reserve, which is a key code requirement in many jurisdictions. KITOZER provides shop-fabricated panels and on-site welding supervision, so the tank can be erected in about 30 working days regardless of site weather.
Installation and Maintenance Recommendations
Place the tank on a reinforced concrete slab 200 mm thick with a 100 mm sand bedding layer to level the base. Backfill symmetrically around the tank with non-cohesive gravel, compacted in 300 mm lifts, and avoid placing rocks directly against the wall. Keep the tank full at all times during service to prevent flotation during high groundwater periods. Inspect internal coating annually by sending a confined-space entry crew, and clean sediment from the bottom every three years. Test the level gauge and overflow alarm quarterly, and keep a record of water level readings in the pump room log.
Price
From $28,500 per tank including plates, coating, fittings, and supervision. Contact +86 13922289957 for tank quotation and site survey.