KITOZER 200mm galvanized steel perforated cable tray provides a robust routing path for power, data, and fiber cables in commercial building risers, industrial plant cable tunnels, and data hall overhead paths. The perforated base reduces weight while maintaining load capacity, and the hot dip galvanized finish resists corrosion in humid plant environments and outdoor covered corridors. The tray is a standard component in KITOZER cabling infrastructure, shipped in 3 meter lengths with matched fittings for elbows, tees, and reducers.
Table of Contents
ToggleProduct Overview
The tray is manufactured from 1.5mm steel sheet with a hot dip galvanized coating of at least 65 microns. Side rails are 50mm high with rolled edges to protect cable jackets. The perforated base uses staggered round holes that reduce wind resistance in fire suppression air flow paths and allow cable ties to be secured directly to the tray. Standard 3 meter lengths join with couplers and bolts, and elbows, tees, and reducers are available as matched fittings for clean transitions around columns and equipment.
The rolled side edges prevent cable jacket cuts during installation, which is a common damage point in sharp edged budget trays. The staggered perforation pattern reduces weight by 25 percent compared with solid bottom trays while maintaining structural rigidity. Couplers are internal, so the tray surface stays smooth for cable sliding during long pulls. Matched elbows, tees, and reducers ensure clean transitions without field welding or cutting on site.
Technical Specifications
Hot dip galvanized steel, width 200mm, side rail height 50mm, sheet thickness 1.5mm, coating 65 micron, perforated base holes 9mm staggered, standard length 3m, maximum load 45kg per meter at 2m support spacing, working load deflection less than 1/200 span, operating temperature minus 20 to plus 120 C, couplers and bolts included, KITOZER, 10 year corrosion warranty.
Additional parameters include net weight 3.8kg per meter, coating thickness 65 micron minimum per ISO 1461, hole pattern 9mm staggered, support spacing 2m maximum, deflection limit L/200, and compatible with dividers for power and data separation. Fittings include 90 degree elbow, tee, cross, reducer, and end cap, all hot dip galvanized to match.
Applications
This 200mm tray is the standard choice for office building overhead cable routing between floor distribution rooms and telecom closets. It is also used in industrial plant cable tunnels for instrumentation and control cables, in data hall overhead paths for power and fiber separation, and in parking garage cable runs for lighting and surveillance. In hospital corridors, the tray carries nurse call and medical equipment power in separated compartments.
Other deployments include retail mall overhead power and data routes, school campus building risers, hotel back of house cable runs, and factory floor control cable tunnels. In data halls, the tray separates UPS power cables from fiber and Ethernet runs using grounded dividers. The 200mm width accommodates a mix of power, data, and fiber cables in a single run, reducing the number of trays required.
Advantages
Hot dip galvanized coating provides 10 year corrosion protection compared with pre galvanized alternatives that rust within 3 to 5 years in humid environments. Perforated base reduces weight by 25 percent compared with solid bottom trays, lowering support steel requirements. Rolled side edges prevent cable jacket cuts during installation. Standard 3 meter lengths and matched fittings allow fast on site assembly without custom fabrication. The tray supports separation of power, data, and fiber cables within the same run by using dividers, which reduces EMI coupling.
The 65 micron hot dip galvanized coating is 30 percent thicker than standard pre galvanized trays, delivering 10 year corrosion protection in humid plant environments. The perforated base reduces weight while maintaining rigidity, which lowers structural load on overhead supports. Rolled edges prevent cable damage during installation and future maintenance pulls. Matched fittings eliminate field welding, which saves installation time and ensures consistent finish. The divider compatibility allows power and data separation within a single tray.
Installation and Maintenance
Support the tray at maximum 2 meter intervals using hot dip galvanized cantilever brackets, and add an extra support at each coupling. Maintain a minimum 300mm separation from power cables above 1kVA, and use grounded dividers between power and data compartments. Do not exceed the 45kg per meter load, because overloaded trays deflect and pull coupler bolts loose. During annual inspection, tighten coupling bolts, check coating scratches and touch up with zinc rich paint, and verify support bracket tightness.
After installation, document the tray route in the as-built drawings, including support locations and divider placements. During annual inspection, torque all coupling bolts to the recommended value, inspect the hot dip galvanized coating for scratches, and touch up with zinc rich paint. Check support brackets for rust and replace if necessary. Never exceed the 45kg per meter load, because overloaded trays deflect and pull coupler bolts loose. Keep spare couplers and bolts on site for fast repair.
Package Contents and Support
Each 3m tray section ships with internal couplers and bolts. Fittings are ordered separately. KITOZER provides layout guidance, installation support, and 10 year corrosion warranty. Custom lengths and stainless steel variants are available for coastal or chemical environments.
Price
From $18/meter. Contact plus 86 13922289957 for tray and fitting pricing.
Guangzhou Laian Intelligent System Development Co., Ltd. | Tel/WeChat: +86 13922289957 / +86 18520668845 | WhatsApp: +86 19068534140 | www.gdlain.com