KITOZER
KITOZER

KITOZER Primary Loop: Chilled Water Piping Kit For CDU Plant

Product Overview

The KITOZER primary loop piping kit is a pre-fabricated stainless steel assembly that connects facility chillers or dry coolers to CDU heat exchangers, isolating the IT-side secondary loop from the building water. The kit includes supply and return headers, isolation ball valves, Y-strainers, pressure relief valves, pressure gauges, vent and drain points, and flange connections sized to match the CDU. Pre-fabrication reduces on-site welding and pressure testing, and each kit is engineered to the project layout with custom lengths, elbows, and tees.

Technical Specifications

Pipe: 316L stainless steel, seamless, DN50 to DN200, design pressure 10 bar. Isolation valves: ball valve PN16, DN50 to DN200. Y-strainer: 316L stainless, 20 mesh. Pressure relief valve: set 6 bar, DN25. Gauges: 0 to 10 bar, glycerin filled. Flanges: PN16, 316L. Insulation: 19 mm closed-cell elastomer, 32 mm on cold pipes. Pressure tested at 15 bar for 30 minutes before shipment. KITOZER, CE, 10 year material warranty, 2 year valve warranty.

Applications

The primary loop kit serves any liquid-cooled data hall where facility chilled water or a dry cooler supplies the CDU. Typical deployments include HPC data centers, AI training halls, immersion cooling bays, and industrial process cooling plants. The kit also supports retrofit projects where a new CDU row is added to an existing chiller plant, with custom headers sized to the available chiller capacity.

Key Advantages

Pre-fabricated sections cut on-site welding by up to 70 percent. Integrated Y-strainer protects the CDU heat exchanger from pipe debris. Isolation valves allow individual CDU service without loop shutdown. Pressure relief valve protects against thermal expansion over-pressure. Closed-cell insulation prevents condensation on cold pipes. Factory pressure-tested to 15 bar. Custom lengths and bends match the project layout exactly.

Installation and Maintenance

Route the primary loop through the plant room or overhead tray using pipe supports every 2 m. Connect to chiller and CDU flanges with PN16 gaskets. Pressure-test the loop at 1.5 times working pressure before filling. Monthly: inspect flange joints, gauges, and insulation. Quarterly: clean Y-strainer basket. Annually: test pressure relief valve and inspect flange gaskets. The pipe itself requires no internal maintenance.

Price

From $12,000 per CDU primary loop kit. Custom layouts quoted on request. Contact +86 13922289957 for project pricing.

Guangzhou Laian Intelligent System Development Co., Ltd. | Tel/WeChat: +86 13922289957 / +86 18520668845 | WhatsApp: +86 19068534140 | www.gdlain.com

Shopping Cart