Table of Contents
ToggleProduct Overview
The KITOZER secondary loop piping kit connects the CDU secondary outlet to each rack manifold, distributing coolant to individual cold plates or rear-door heat exchangers. The kit includes supply and return stainless steel headers, rack-mounted manifold bars, drop hoses with no-spill quick disconnects, isolation ball valves, and test points. Pre-fabricated in standard lengths and bends, the kit reduces on-site fabrication and ensures consistent pressure drop across every rack in the row.
Technical Specifications
Header pipe: 316L stainless, DN32 to DN50, design pressure 10 bar. Manifold: aluminum extrusion, 18 to 24 drop ports, DN12 no-spill QD. Drop hoses: EPDM braided, DN12, length 1.5 m, 10 bar. Isolation valves: 1/4 turn ball valve per rack. Test points: G1/4 pressure gauge ports. Flange connections: PN16. Insulation optional on cold secondary loops. Pressure tested at 15 bar for 30 minutes. KITOZER, CE, 5 year pipe warranty, 2 year hose warranty.
Applications
The secondary loop kit serves every row with direct-to-chip cold plates or rear-door heat exchangers. Typical deployments include GPU training racks, CPU compute rows, storage shelves with liquid-cooled drives, and immersion tank feed lines. The kit also supports mixed rows where some racks use cold plates and others use rear-door exchangers, with drop ports configured per rack.
Key Advantages
Pre-fabricated headers and manifolds reduce on-site welding by up to 80 percent. No-spill quick disconnects allow hot-swap server removal. Per-rack isolation valves contain maintenance to a single rack. Test points enable commissioning and leak testing. EPDM braided hoses tolerate repeated flexing. Factory pressure-tested to 15 bar. Custom port spacing and side orientation available.
Installation and Maintenance
Mount the manifold on the rear rack rail. Run the supply and return headers along the row on pipe supports. Connect headers to the CDU secondary outlets with flanges. Pressure-test the secondary loop at 1.5 times working pressure before charging with glycol. Monthly: inspect drop hoses and quick disconnects for weepage. Quarterly: verify supply and return pressure differential. Annually: inspect hoses for cracking and replace O-rings on quick disconnects.
Price
From $3,500 per rack secondary loop kit. Contact +86 13922289957 for row-level pricing.
Guangzhou Laian Intelligent System Development Co., Ltd. | Tel/WeChat: +86 13922289957 / +86 18520668845 | WhatsApp: +86 19068534140 | www.gdlain.com