KITOZER
KITOZER

KITOZER AC Voltage And Current Sensor Transducer RS485

The KITOZER AC voltage and current sensor transducer measures mains voltage and load current and reports them as Modbus RTU registers over RS485. Instead of wiring analog 4 to 20mA loops back to the BMS, integrators daisy-chain voltage and current transducers on a single twisted pair, cutting wiring cost by 70 percent. The transducer covers 0 to 300V AC and 0 to 100A AC, suiting most single-phase and three-phase distribution feeds in small data centers and commercial buildings.

Product Overview

The transducer uses a true-RMS measurement IC and an external current transformer. Voltage connects directly across the phase and neutral, while current passes through a split-core CT that clamps around the cable without disconnecting it. Onboard calibration trim pots and Modbus scaling make setup fast. A 4 to 20mA dual-channel output version is also available for legacy analog BMS inputs.

True RMS measurement is essential because modern loads from UPS servers and LED drivers produce non-sinusoidal waveforms. A rectifying average-responding meter would read low by 10 to 20 percent on such loads, which distorts energy management. The split-core CT clamps around a live cable, so installation does not require a power shutdown. The transducer mounts on DIN rail, and the Modbus address is set by DIP switch, so no laptop is needed on site.

Technical Specifications

Voltage range: 0-300V AC, accuracy plus or minus 0.5 percent. Current range: 0-100A AC via split-core CT, accuracy plus or minus 1 percent. True RMS. Output: RS485 Modbus RTU, optional 4-20mA. Power: 12-24V DC. CT: split-core 100A, 10mm cable. Enclosure: DIN rail module, 45mm width. Operating: -10 to 60 degrees. Certifications: CE, RoHS. Warranty: 3 years.

The transducer measures V, A, and derived kW on a single-phase input. A three-phase variant reads all three phases and sums power. The 4-20mA version uses one loop for voltage and one for current, matching analog BMS cards. The split-core CT opens and snaps around the conductor, with a 10mm jaw that fits most single-phase cables. Modbus registers hold instantaneous V, A, and kW, with a 1 second update rate.

Application Scenarios

Voltage and current transducers monitor UPS input and output feeds, generator output, branch circuit load in PDU, and sub-main distribution in commercial buildings. In colocation, each tenant feed gets a transducer so billing data comes from a single Modbus network. In manufacturing, current monitoring on motor feeders detects overload before the breaker trips. Voltage sag detection triggers alarms before IT equipment browns out.

In retail stores, transducers sit on the main distribution to trend energy use per square meter. In office towers, they feed the energy management system for demand response. In hospitals, they monitor backup generator output during monthly test runs. In schools, they identify classrooms with abnormal load after hours. The Modbus output means every reading lands in the central DCIM without analog conversion hardware.

Key Advantages

Modbus output eliminates analog wiring and scaling work. Split-core CT clamps on live cable, so installation does not require power shutdown. True RMS handles distorted waveforms from UPS and VFD loads. DIN rail packaging fits into existing distribution cabinets. Dual output options support both new digital and legacy analog BMS. Low cost per channel makes dense branch monitoring affordable.

The split-core CT is the biggest installation advantage: no shutdown, no disconnection, no rewiring. True RMS means readings stay accurate on non-linear loads. Modbus daisy-chain replaces dozens of analog loops with one twisted pair. DIN rail packaging fits into the existing distribution cabinet. The 4-20mA fallback means the same hardware works on legacy BMS. The low channel cost lets integrators put a transducer on every branch circuit instead of just the main feed. For three-phase loads, the three-phase variant measures each phase and sums the power, which is essential for billing and load balancing. The transducer pairs with KITOZER monitoring hosts on the same RS485 bus, and the Modbus register map is public so any SCADA vendor integrates without a special driver. Split-core CT sizes from 50A to 250A cover most branch circuits in a data center PDU.

Installation and Maintenance

Mount the transducer on DIN rail in the distribution cabinet. Clamp the split-core CT around one phase conductor only; never loop both phase and neutral through the same CT. Connect voltage across phase and neutral with a fuse. Set Modbus address and baud rate before connecting to the bus. Calibrate annually against a reference power quality analyzer. Inspect CT tightness after six months, as vibration can loosen the jaw. For three-phase feeds, use one CT per phase and set the meter to sum the three. Keep the CT ratio and address table in the project handover folder so future maintenance staff can interpret readings without re-commissioning.

Price

From $65 per transducer including 100A split-core CT. Contact +86 13922289957 for three-phase versions.

Guangzhou Laian Intelligent System Development Co., Ltd. | Tel/WeChat: +86 13922289957 / +86 18520668845 | WhatsApp: +86 19068534140 | www.gdlain.com

Shopping Cart