Warning: Attempt to read property "slug" on null in /www/wwwroot/gdlain.com/public_html/wp-includes/taxonomy.php on line 4763
KITOZER
KITOZER

KITOZER KTR-BIC-610 All-in-One Integrated Outdoor Base Station Cabinet

Product Overview

The KITOZER KTR-BIC-610 is an all-in-one integrated outdoor base station cabinet that pre-fabricates the power system, battery, cooling, monitoring and radio mounting in a single factory-tested unit. On site, the operator only needs to connect fiber, mains and antenna feeders, dramatically reducing installation time. It is a complete, plug-and-play base station integrated cabinet for fast 5G rollout.

Technical Features

  • Pre-integrated rectifier, battery and monitoring
  • 48V 60A rectifier with 100Ah LiFePO4 battery
  • Integrated 1500W DC air conditioner
  • Built-in environmental and security sensors
  • Factory FAT tested before shipment
  • Single-point cable entry and grounding

Specifications

Parameter Value
Model KTR-BIC-610
Dimensions 1600x800x600 mm
Rectifier 48V 60A
Battery 48V 100Ah LiFePO4
Cooling 1500W DC AC
Monitoring Door/temp/smoke/leak
Protection IP55
Power Input 230V AC / -48V DC
Rack Space 12U for BBU/radio
Weight ~280 kg loaded

Reference Price

Reference price: USD 3,500 – 6,500 per integrated cabinet (1 USD ≈ 7.2 CNY). Custom configurations quoted on request.

Application Scenarios

  • Fast 5G macro site rollout
  • Temporary event and recovery sites
  • Rapid rural coverage expansion
  • Tower-sharing neutral host cabinets
  • Disaster recovery temporary shelters

Installation & Maintenance

  • Place on prepared concrete plinth
  • Connect mains, fiber and antenna feeders
  • Ground cabinet to site earth
  • Power on and verify self-test
  • Register in remote monitoring platform

FAQ

How much faster is an integrated cabinet vs. on-site build?

Pre-integrated cabinets cut on-site installation from days to hours, as power, battery, cooling and monitoring are already wired and tested at the factory.

Industry Trends

Operators are shifting toward factory-integrated cabinets to compress rollout schedules and reduce field error. Modular, containerized and prefab solutions are standard for rapid 5G expansion.

Delivery & Service

Lead time 25-40 working days. KITOZER provides factory FAT reports and on-site commissioning support.

Additional Notes

Site preparation (plinth, grounding, power feed) must be ready before cabinet delivery.

Scroll to Top