Warning: Attempt to read property "slug" on null in /www/wwwroot/gdlain.com/public_html/wp-includes/taxonomy.php on line 4763
KITOZER
KITOZER

KITOZER KTR-BPS-820 Hybrid Solar Power System for Off-Grid Base Stations

Product Overview

The KITOZER KTR-BPS-820 is a hybrid solar power system purpose-built for off-grid and weak-grid base stations. It combines a solar MPPT charge controller, LiFePO4 battery bank and a small DC generator interface to supply reliable -48V power with minimal diesel. The integrated controller optimizes solar use and schedules generator runtime, cutting fuel and maintenance costs at remote sites.

Technical Features

  • Dual MPPT solar controller up to 3000W
  • 48V 200Ah LiFePO4 battery integrated
  • DC generator auto-start interface
  • Solar-priority energy management
  • Remote monitoring via 4G/cloud
  • Scalable to add more PV and battery

Specifications

Parameter Value
Model KTR-BPS-820
Solar Input 2 x 1500W MPPT
Battery 48V 200Ah LiFePO4
DC Output -48V up to 100A
Generator DC 48V auto-start
Controller Solar + battery + genset logic
Monitoring 4G / Cloud / SNMP
Autonomy 8-24 h battery-only
Operating Temp -30°C to +60°C
Expansion Modular battery/PV

Reference Price

Reference price: USD 3,500 – 8,000 per hybrid system (1 USD ≈ 7.2 CNY). Solar panels and mounting hardware quoted separately.

Application Scenarios

  • Off-grid rural base stations
  • Diesel-reliant remote sites
  • Frequent-power-outage regions
  • Island and coastal sites
  • Sustainability-focused green sites

Installation & Maintenance

  • Mount PV panels with correct tilt and azimuth
  • Connect battery, solar and generator in order
  • Program solar priority and autonomy target
  • Commission and test generator auto-start
  • Monitor performance via cloud dashboard

FAQ

How much solar capacity does a base station need?

A typical 500W base station needs about 1.5-3 kW of solar plus 200-400 Ah battery, depending on local irradiance and desired autonomy. KITOZER provides site-specific sizing.

Industry Trends

Green energy and fuel cost reduction are driving rapid adoption of solar-hybrid power at off-grid towers. AI-driven energy management and remote monitoring are standard on new deployments.

Delivery & Service

Lead time 25-40 working days. KITOZER offers site energy audit and PV layout design.

Additional Notes

PV sizing depends on local solar irradiance and shading. Always include a genset for extended cloudy periods.

Scroll to Top