1. Cover / Document Information
– Project No.: LA-PD-2026-0802
– Document Title: AP1 Distribution Box System Technical Design Solution
– Designed by: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Version: V1.0
– Date: August 2026
2. Table of Contents Structure
1. Company Introduction
2. Project Overview
3. User Requirement Analysis
4. System Design Description
5. Project Quotation and Configuration List
6. Detailed Technical Parameters of Each System
7. Core Advantages of the Solution
8. Technical Q&A
9. Construction Schedule Plan
10. Construction Organization Plan
11. After-Sales Service System
12. Technical Training Plan
13. Typical Project Cases
14. SEO Optimization System and Keyword Matrix
15. Website Backend Publishing Configuration
3. Company Introduction
3.1 Enterprise Overview
Founded in 2002 and headquartered at No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou (Chaotian Park, Zhongrun Industrial Park), Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise integrating computer room construction, low-voltage power distribution systems and intelligent cabinet R&D, production and sales. With more than 20 years of industry experience, the company has always adhered to the product philosophy of “efficient, green, innovative, safe and convenient”, committed to providing customers in all industries with full-chain power distribution and computer room overall solutions from solution design, product customization, construction and installation to after-sales O&M.
The company owns the core independent brand KITOZER (Pioneer). Products cover dozens of categories including modular cold aisles, indoor integrated cabinets, outdoor cabinets, shielded computer rooms, containerized computer rooms, intelligent shielding cabinets and low-voltage distribution boxes/cabinets, widely used in data centers, industrial manufacturing, medical research, communication base stations, commercial buildings, transportation hubs and other fields. With excellent product quality and professional technical services, the company has provided customized solutions for thousands of domestic and foreign enterprise customers, gaining wide market recognition and customer praise.
As a professional computer room construction and power distribution equipment manufacturer, Guangzhou Lain has its own production base and flexible production lines, able to provide one-to-one exclusive customization according to customer on-site working conditions, functional needs and dimension specifications, with multiple design solutions provided free of charge, truly realizing full-process service from demand to implementation.
3.2 Development History
– 2002: Guangzhou Lain Intelligent System Development Co., Ltd. was officially established, initially focusing on computer room supporting product R&D and sales;
– 2008: launched the core independent brand KITOZER (Pioneer), formally laying out intelligent cabinet and shielding product production lines;
– 2012: expanded the Panyu production base, introduced CNC sheet metal processing equipment and automated spraying production lines, realizing full-process independent mass production of core cabinet products;
– 2016: rated as a national high-tech enterprise, obtained multiple utility model patents and design patents, business scope expanded to all provinces and cities;
– 2020: launched integrated low-voltage power distribution solutions, forming the dual-core product line of computer room construction + power distribution systems;
– Present: developed into a professional computer room and power distribution equipment supplier with more than 20 years of industry experience, flexible customized production capability and full-chain service system.
3.3 Core Business and Product System
The company’s core business revolves around the two major segments of computer room construction and low-voltage power distribution, forming a complete product matrix and service system:
– Computer room engineering segment: covering IDC data center construction, shielded computer room construction, containerized computer room construction, micro-module cold aisle solutions, computer room environmental monitoring systems, UPS power supply systems, etc., providing EPC general contracting services from planning and design, product supply to construction and installation, acceptance and delivery;
– Intelligent cabinet segment: including indoor integrated cabinets, outdoor rainproof cabinets, intelligent shielding cabinets, shielded operation desks, shielded desks, power distribution boxes, lighting distribution boxes, metering cabinets and other full-series cabinet products, supporting non-standard customization;
– Power distribution system segment: providing low-voltage distribution boxes, distribution cabinets, power cabinets, dual-power switching cabinets, reactive power compensation cabinets and other complete power distribution equipment, as well as supporting power cables, protective conduits, electrical components and auxiliary materials supply and installation construction services;
– O&M service segment: providing regular inspection, fault repair, upgrade and transformation, technical training and other after-sales O&M services for computer rooms and power distribution systems.
3.4 Enterprise Qualifications and Honors
– National high-tech enterprise certification; multiple utility model and design patents;
– ISO9001 quality management system certification;
– 3C compulsory certification for low-voltage complete switchgear;
– Shielding product authoritative testing certification;
– Computer room engineering professional contracting qualification;
– Safety production license; multiple industry excellent supplier honors.
All factory-delivered products pass third-party authoritative testing, with all performance indicators conforming to national and industry standards.
3.5 Core Competitive Advantages
– Original factory with strong customization capability: own production base and flexible production lines, one-to-one exclusive customization, three design solutions free of charge;
– Strict quality control and on-time delivery: complete quality standard system from raw material procurement, production processing to finished product delivery, third-party testing escort, mature production scheduling and supply chain management;
– Professional technical team with high solution matching: senior electrical engineers and computer room designers with average industry experience of over 10 years;
– Complete after-sales service with rapid response: 24-hour professional online service system, dedicated personnel following each project.
4. Project Background and Objectives

4.1 Project Background
With the continuous advancement of modern industrial production, commercial operation and informatization construction, the low-voltage power distribution system, as the core link at the end of power transmission, has its safety, reliability and intelligence level directly affecting the stable operation of the entire power supply system, and also related to personnel and equipment safety. In various factories, computer rooms and park buildings, the floor-standing power distribution box, as the key equipment for distributing electrical energy and protecting downstream loads, needs complete protection functions, accurate metering capability, reliable structural protection and convenient O&M performance to adapt to complex on-site use environments.
This project designs and configures the AP1 floor-standing power distribution box system based on the electrical system drawings provided by the customer, covering the full process of cabinet production, component supply, installation construction, commissioning and acceptance, building a low-voltage power distribution solution that conforms to national specifications, adapts to on-site needs and is safe, stable and reliable, meeting the power distribution needs of two 50kW working loads plus one spare circuit.
4.2 Project Construction Objectives
The core construction objectives of this solution revolve around five dimensions: safety, reliability, practicality, economy and scalability:
– Safe and reliable: build a multi-level protection system of overload, short-circuit, leakage and surge to guarantee personnel and equipment safety, reduce power supply fault risk, and improve system anti-interference capability and fault isolation capability;
– Accurate metering: configure high-precision transformer-type energy metering devices to realize accurate collection of total inlet energy, meeting electricity management, energy statistics and cost accounting needs, supporting later expansion of remote meter reading;
– Structural adaptation: adopt the 800mm×600mm×2000mm floor-standing cabinet structure to match on-site installation conditions; the bottom uses a C20 concrete foundation raised 50mm for moisture-proofing and stability; the cabinet has sufficient mechanical strength and protection level for normal indoor environments;
– Convenient O&M: reasonable in-box component layout, sufficient operation space, complete and clear labels, convenient for daily inspection, operation and fault troubleshooting;
– Expansion reservation: configure 1 spare outlet circuit, reserve installation space inside the cabinet, and leave sufficient margin in main switch and busbar capacity to meet future load increase and function upgrade needs;
– Compliance: all design, equipment and construction strictly follow national and industry standards, pass formal acceptance with complete documentation.
4.3 Applicable Scenarios
This AP1 floor-standing power distribution box system solution has strong adaptability and can be widely used in various indoor power distribution scenarios:
– Power equipment distribution in industrial production workshops and factories;
– Auxiliary power and supporting equipment distribution in data centers and computer rooms;
– Floor and regional power distribution in commercial buildings and industrial parks;
– Equipment and lighting distribution in warehousing and logistics centers;
– Indoor supporting distribution in communication base stations and substations;
– Power distribution in public buildings such as schools and hospitals.
4.4 Solution Compilation Scope
This technical solution covers the full-process content of the AP1 distribution box system from design to delivery, including:
– Overall system solution design, component selection and electrical parameter verification;
– Distribution box cabinet production and supply of all internal electrical components;
– Supply of inlet/outlet power cables, protective conduits and supporting auxiliary materials;
– On-site construction services such as concrete foundation construction, box installation, component assembly, cable laying, wiring and cable management;
– System insulation testing, protection function testing, power-on commissioning, acceptance and delivery;
– Operation O&M technical training and after-sales warranty services.
Note: the solution does not include upstream power access point modification, load-side equipment wiring and commissioning, or civil excavation beyond the conventional scope; these can be negotiated separately as needed.
5. User Requirement Analysis
5.1 Power Supply Capacity Requirements
According to the system drawing parameters, this project has a total installed capacity of Pn=100kW, power factor Cosφ=0.80, demand factor Kd=0.70, calculated capacity Pc=70kW, and calculated current Ic≈132.95A. The system needs to realize the distribution output of total inlet energy, configuring 3 three-phase outlet circuits, of which 2 are working circuits with rated capacity of 50kW each, corresponding to AC01 and AC02 loads; 1 is a spare circuit reserved for future expansion.
The total inlet switch rated current must meet the calculated current requirement with reasonable margin, the outlet switch rated current must match the corresponding circuit load capacity, the cable ampacity must meet the circuit current requirement, and the overall power supply capacity must be sufficient to cope with short-term overload and startup impact.
5.2 Safety Protection Requirements
The power distribution system is directly related to personnel and equipment safety and is the core focus of project requirements:
– Leakage protection: the total inlet side configures leakage protection with adjustable leakage action current, combining the dual functions of preventing personal electric shock and electrical fires, meeting the leakage protection specification requirements of the terminal main distribution box;
– Short-circuit and overload protection: both the total inlet and each outlet circuit configure complete overload long-delay protection and short-circuit instantaneous protection, quickly cutting off power on fault to avoid fault expansion, with selectivity between upper and lower protection so that a single circuit fault does not affect other circuits;
– Lightning surge protection: the inlet side configures a T1-class surge protective device to resist lightning overvoltage and switching overvoltage impacts on in-box components and downstream equipment;
– Isolation function: the main switch has obvious disconnection point isolation function, reliably cutting off power during maintenance to guarantee O&M personnel operation safety;
– Grounding protection: build a complete grounding system, reliably grounding the cabinet and all electrical equipment shells, with an independent PE line, guaranteeing personal safety during leakage and providing a discharge path for surge current.
5.3 Metering Management Requirements
To meet electricity management, energy statistics and cost accounting needs, the system needs three-phase energy metering devices at the inlet side:
– Transformer-connected metering scheme adapted to high-current circuits with high metering accuracy and stable performance;
– The energy meter has active energy metering function with clear display, convenient reading and accurate data;
– The metering circuit is independently set with wiring conforming to energy metering specifications, unaffected by protection circuits, guaranteeing metering accuracy;
– Expansion space reserved for later upgrade to multifunctional smart meters supporting remote meter reading, voltage/current monitoring and other functions.
5.4 Structure and Installation Requirements
According to on-site installation conditions and drawing requirements, the distribution box adopts floor-standing installation:
– Cabinet dimensions: reference size width 800mm × depth 600mm × height 2000mm, internal space meeting all component installation, heat dissipation and operation needs with reasonable layout;
– Foundation: C20 plain concrete foundation raised 50mm, extending 100mm beyond the cabinet on all sides, for moisture-proofing, leveling and cabinet fixing;
– Material protection: high-quality cold-rolled steel plate with electrostatic powder coating, corrosion-resistant and wear-resistant; protection level not lower than IP30;
– Structure configuration: door locks, hinges, mounting rails, grounding terminals and other standard accessories, with adjustable internal mounting rails.
5.5 O&M Management Requirements
– Reasonable layout: in-box components arranged by functional zones with strong/weak current separation, sufficient operation space, handle operation height conforming to ergonomics;
– Clear labels: all circuits, cables and components set with clear labels marking circuit number, purpose and rated parameters for quick fault location;
– Convenient maintenance: components adopt standard installation with strong universality and convenient replacement;
– Visual status: main protection components have status indication windows for intuitive judgment of operating status and fault type.
5.6 Expansion Reservation Requirements
– Circuit reservation: 1 spare outlet circuit breaker configured, allowing a new load to be added without modifying the cabinet structure;
– Capacity reservation: total inlet switch, main busbar and inlet cable all reserve sufficient capacity margin;
– Function reservation: installation space reserved inside the cabinet for later addition of fire linkage, remote monitoring, intelligent measurement and control modules.
6. Design Principles and Applicable Standards
6.1 Design Basis Standards
This solution strictly follows current national laws, regulations, design specifications and industry standards, mainly including:
– GB 50054-2011 Code for Design of Low Voltage Electrical Installations
– GB 50052-2009 Code for Design of Electric Power Supply and Distribution Systems
– GB 50303-2015 Code for Acceptance of Construction Quality of Building Electrical Engineering
– GB 7251.1-2013 Low-Voltage Switchgear and Controlgear Assemblies – Part 1: General Rules
– GB 50057-2010 Code for Design Protection of Structures Against Lightning (2022 edition)
– GB 13955-2017 Installation and Operation of Residual Current Operated Protective Devices
– GB 50217-2018 Code for Design of Cables of Electric Power Engineering
– DL/T 448-2016 Technical Administrative Code of Electric Energy Metering Devices
– GB/T 50065-2011 Code for Design of AC Electrical Installations Earthing
– GB/T 18802.1-2011 Low-Voltage Surge Protective Devices – Part 1: Performance Requirements and Test Methods
– Customer-provided AP1 distribution box electrical system diagram
– On-site actual working conditions and relevant technical requirements
6.2 Design Basic Principles
– Safety first: put power supply safety and personal safety first, configure various protection devices strictly per specification;
– Reliability and applicability: fully match actual project load needs and on-site environment with reasonable selection margins;
– Economy and reasonableness: optimize solution configuration, control project cost, avoid over-design, maximize cost-effectiveness;
– Technical advancement: select mature and advanced electrical products, balancing current needs and future development;
– O&M convenience: clear layout, complete labels, simple operation, convenient maintenance;
– Green and environmental protection: select low-loss, high-efficiency products, use environmentally friendly materials.
6.3 Overall System Architecture Design
This AP1 distribution box system adopts a single-power inlet, radial outlet architecture, divided into five functional modules: inlet unit, metering unit, protection unit, outlet unit and grounding unit:
Overall topology: nearby power point → inlet armored cable → total inlet leakage circuit breaker → current transformers → main busbar → T1 surge protective device → each outlet MCCB → outlet cables → terminal loads.
– Inlet unit: the total power inlet of the system, undertaking power access, total on/off control, total leakage protection, total overload and short-circuit protection, and isolation function;
– Metering unit: connected in series in the inlet main circuit, converting large current to standard small current through current transformers, connected to the energy meter for accurate metering of total inlet active energy;
– Surge protection unit: connected in parallel between the main busbar and PE busbar to suppress transient overvoltage and discharge surge current;
– Outlet unit: composed of multiple outlet MCCBs, distributing total energy to downstream load circuits with independent overload and short-circuit protection per circuit;
– Grounding unit: composed of dedicated PE grounding busbar, grounding connection wires and foundation grounding electrodes, providing reference ground potential and discharge paths.
6.4 Main Wiring Scheme Design
The system adopts the TN-S grounding system of three-phase four-wire + PE, with single busbar main wiring:
– Inlet side: YJV23-0.6/1kV 4×70+1×35 copper armored power cable introduced buried, through PC80 rigid PVC conduit, connected to the total inlet leakage MCCB. The main switch is an isolating NM1LE-160 series 4P leakage circuit breaker, rated 160A, with four functions of isolation, overload long-delay protection, short-circuit instantaneous protection and leakage protection; leakage action current adjustable in three levels of 30mA/50mA/100mA;
– Metering circuit: three-phase lines pass through three LMK-0.66 current transformers (ratio 200/5A, 0.5 class), connected to the three-phase four-wire active energy meter. The metering circuit is independent, conforming to energy metering specifications;
– Main busbar: TMY-40×4 copper busbars, L1/L2/L3 three phases + N line four busbars arranged in parallel with insulating supports; PE line uses an independent TMY-30×3 copper grounding busbar;
– Surge protection: T1-class SPD connected in parallel between the three-phase main busbar and N line in 3P+N connection, grounded nearby to the PE busbar with connection length not exceeding 0.5m, with a dedicated backup protection device in front;
– Outlet side: 3 outlet circuits, each configured with an NM1-100 series 3P MCCB rated 80A; two working circuits led out with YJV23-0.6/1kV 4×35+1×16 armored cables through PC50 rigid PVC conduit to AC01 and AC02 loads; the third is a spare circuit with reserved outlet terminals and installation position.
6.5 Short-Circuit Current and Protection Coordination Verification
– Short-circuit current calculation: assuming inlet short-circuit capacity of 15MVA and LV rated voltage of 0.4kV, the three-phase short-circuit current periodic component RMS is about 21.65kA;
– Breaking capacity verification: total inlet MCCB Ics ≥25kA, greater than the system short-circuit current; outlet MCCB Ics ≥20kA;
– Protection selectivity verification: trip curves of main and outlet switches are reasonably matched; on downstream overload or short-circuit faults, the outlet breaker operates first, isolating the fault within the single circuit.
6.6 Cable Selection Verification
– Inlet cable (4×70+1×35): buried ampacity about 205A vs calculated current 132.95A, margin about 54%; voltage loss at 30m about 0.25% (limit 5%); thermal stability meets requirements;
– Outlet cable (4×35+1×16): per circuit load 50kW, calculated current about 95A; buried ampacity about 138A, margin about 45%; voltage loss and thermal stability conform to national specifications.
6.7 Grounding System Design
TN-S grounding system with N and PE completely separated: dedicated PE grounding busbar (TMY-30×3 copper) fixed at the cabinet bottom; cabinet grounded through ≥10mm² stranded copper wire and connected to the external grounding grid through pre-embedded hot-dip galvanized flat steel; all equipment grounding terminals connected to the PE busbar; total grounding resistance ≤4Ω.
6.8 Lightning Surge Protection Design
– Protection class selection: T1-class (Class I test) SPD suitable for building inlet main distribution boxes, discharging large-energy surge current from direct and induced lightning;
– Parameter matching: impulse current Iimp ≥12.5kA (10/350μs), voltage protection level Up ≤1.8kV, max continuous operating voltage Uc ≥385V;
– Connection method: 3P+N, protecting L1-PE, L2-PE, L3-PE, N-PE, with both common-mode and differential-mode protection;
– Installation: near the main busbar, grounded nearby to the PE busbar with short and straight grounding wire ≤0.5m;
– Failure protection: built-in thermal disconnector with status indication window (green normal, red failed).
7. System Architecture and Working Principle
7.1 System Architecture
The AP1 distribution box system is composed of the cabinet body (800×600×2000mm floor-standing, cold-rolled steel, IP30), inlet unit (160A isolating leakage MCCB + T1 SPD + metering CTs + energy meter), main busbar (TMY-40×4 + PE TMY-30×3), outlet unit (3× 80A 3P MCCBs), and grounding unit (PE busbar + foundation grounding).
7.2 Working Principle
– Power flow: nearby power point → inlet armored cable (buried, PC80 conduit) → total inlet leakage MCCB (160A, isolation + overload + short-circuit + leakage) → CTs (200/5A) → energy meter → main busbar → T1 SPD (parallel, 3P+N) → outlet MCCBs (80A) → outlet cables (buried, PC50 conduit) → AC01/AC02 loads;
– Fault isolation: on a single circuit overload/short-circuit, the outlet MCCB trips first, isolating the fault without affecting other circuits; on leakage, the total inlet breaker trips; on lightning/surge, the T1 SPD discharges to the PE busbar;
– Metering: CTs step down the large current to 5A, the transformer-type meter calculates actual energy = meter reading × CT ratio (40×);
– Grounding: TN-S system with independent PE busbar; all shells and SPD grounded to PE; grounding resistance ≤4Ω.
8. Detailed Technical Design
8.1 Cabinet Body Design
– Dimensions: 800×600×2000mm (tolerance ±2mm);
– Material: high-quality cold-rolled steel, main body ≥1.5mm, door ≥2.0mm, mounting rails ≥2.5mm;
– Surface: pickling/phosphating pretreatment, electrostatic powder coating 60-80μm, adhesion ≥1 class, default RAL7035 gray, colors customizable;
– Protection: IP30, suitable for indoor dry environments;
– Structure: floor-standing single door, opening ≥120°, 3 horizontal adjustable mounting rails with M6 nuts;
– Lock: cylindrical universal lock with anti-prying, ≥10000 operations; heavy carbon steel hidden hinges;
– Grounding: dedicated PE busbar 600mm with 10 grounding posts; M8 grounding bolts at four corners;
– Cable entry: bottom knockout holes for PC50/PC80 conduits;
– Mechanical strength: cabinet load ≥500kg; insulation resistance ≥10MΩ; withstand 2500V/1min; salt spray ≥48h; per GB 7251.1-2013.
8.2 Inlet Side Design
– NM1LE-160/4300B isolating leakage MCCB: 4P, 160A, Ue AC400V, Ui AC800V, Uimp 6kV, thermal-magnetic trip (overload 1.05In no action / 1.3In action within 1h; short-circuit 10In instantaneous), Icu 35kA, Ics 25kA, leakage 30/50/100mA adjustable, leakage action ≤0.1s, isolation function with obvious break, mechanical life 20000, electrical life 10000, front wiring, per GB 14048.2 & GB 16917.1;
– T1-class SPD (TUR T1-25/4P): Un AC230/400V, Uc AC385V, In 25kA (8/20μs), Iimp 12.5kA (10/350μs), Up ≤1.8kV, response ≤25ns, 3P+N parallel connection, thermal disconnector, status window, backup fuse, DIN rail, -40°C~+85°C, per GB/T 18802.1;
– Current transformers (LMK-0.66): 0.66kV, 200/5A, 0.5 class, 5VA, 1-turn through-core, class B insulation, 3kV/1min withstand, epoxy cast, per GB 1208;
– Three-phase four-wire active energy meter: 3×220/380V, 1.5(6)A, 1.0 class, forward active energy, mechanical/LCD display, 0.8Un~1.1Un working range, ≤1.5W/phase, per GB/T 17215.321;
– Main busbar: TMY-40×4 T2 copper (≥99.9% Cu, ≥97% IACS, resistivity ≤0.017241Ω·mm²/m, ampacity ~500A, ≥65HV, bare or tin-plated, per GB/T 5585.1), with 12 insulating support posts.
8.3 Outlet Side Design
– NM1-100/3300 MCCBs (×3): 3P, 100A frame, 80A rated, Ue AC400V, Ui AC800V, thermal-magnetic trip, Ics 20kA, mechanical life 20000, electrical life 10000, per GB 14048.2;
– Outlet branch busbar: TMY-30×3, 1.5m;
– High-current outlet terminal sets: for 35mm² cables with insulators, 2 sets;
– Spare circuit cover plate: insulating, 1 pc.
8.4 Cables and Conduits Design
– YJV23-0.6/1kV 4×70+1×35 armored cable (30m): copper conductor, XLPE insulation, double steel tape armor, PVC sheath, continuous working temperature 90°C, short-circuit 250°C (max 5s), buried ampacity ~205A, bending radius ≥15× OD, per GB/T 12706.1;
– YJV23-0.6/1kV 4×35+1×16 armored cable (50m, 25m/circuit): buried ampacity ~138A;
– PC80 rigid PVC conduit (28m): for inlet cable; PC50 (46m): for two outlet circuits;
– Heat-shrink cable terminations: indoor 5-core, 70mm²×2 sets, 35mm²×4 sets, shrink temp 110-140°C, withstand 3kV/1min;
– DT copper terminals: DT-70×8, DT-35×16, DT-16×6, T2 copper tin-plated, per GB/T 14315;
– Conduit mouth guards: 12 pcs.
8.5 Installation and Grounding Design
– C20 plain concrete foundation: 1000×800×50mm, extending 100mm beyond the cabinet, with 40×4 hot-dip galvanized flat steel embedded in a ring (ends exposed ≥100mm);
– Box installation: expansion bolt fixing (≥4 points), verticality deviation ≤1.5‰;
– Cabinet grounding: BVR-10mm² yellow-green stranded copper wire from the cabinet grounding terminal to the foundation flat steel, with spring washers;
– PE busbar grounding: all equipment grounding terminals, cable PE wires connected to the PE busbar, grounding resistance tested ≤4Ω;
– In-box wiring: main circuit by phase sequence with firm crimping; secondary circuit BV-2.5mm² with neat bundles and clear wire numbers; strong/weak current separation; all circuits labeled.
9. Recommended Configuration and Preliminary Budget
9.1 Compilation Notes
This list is strictly compiled according to the AP1 distribution box electrical system diagram, with all component models, specifications and quantities corresponding to the drawing one-to-one. Cable and conduit lengths are conventional estimates without a planar route drawing; actual quantities are subject to on-site measurement. The list includes full-process costs of main materials, auxiliary materials, labor, construction and commissioning with no hidden charges.
9.2 Cabinet Body and Foundation Component List
| No. | Name | Specification | Unit | Qty | Remarks |
|---|---|---|---|---|---|
| 1 | Floor-standing power distribution box body | 800×600×2000mm, cold-rolled steel, electrostatic spraying, IP30 | set | 1 | With door lock, hinges, mounting rails, grounding bolts |
| 2 | C20 plain concrete foundation | 1000×800×50mm, extending 100mm beyond cabinet | m³ | 0.04 | With formwork, pouring, curing |
| 3 | Hot-dip galvanized grounding flat steel | 40×4mm, ring layout + cabinet jumper | m | 3 | Foundation pre-embedded, connects grounding grid |
9.3 Inlet Side Electrical Equipment List
| No. | Name | Specification | Unit | Qty | Remarks |
|---|---|---|---|---|---|
| 1 | 4P isolating leakage MCCB | NM1LE-160/4300B, 160A, leakage 30/50/100mA adjustable | set | 1 | Main inlet switch, overload+short-circuit+leakage+isolation |
| 2 | T1-class SPD | TUR T1-25/4P, Iimp ≥12.5kA, Up ≤1.8kV, with backup protection | set | 1 | Inlet surge protection |
| 3 | Current transformer | LMK-0.66, 200/5A, 0.5 class, through-core | pcs | 3 | One for A/B/C phases, with energy meter |
| 4 | Three-phase four-wire active energy meter | Transformer type, 1.5(6)A, 1.0 class | pcs | 1 | Total inlet energy metering |
| 5 | Main busbar (L1/L2/L3/N) | TMY copper, 40×4mm | m | 2.4 | Main switch inlet/outlet connection |
| 6 | PE grounding busbar | TMY copper, 30×3mm | m | 1.8 | Dedicated grounding busbar |
| 7 | Busbar insulating support posts | High-strength insulating material | pcs | 12 | Fixes busbars, insulation isolation |
9.4 Outlet Side Electrical Equipment List
| No. | Name | Specification | Unit | Qty | Remarks |
|---|---|---|---|---|---|
| 1 | 3P MCCB | NM1-100/3300, 80A | set | 3 | One for AC01, AC02, spare |
| 2 | Outlet branch busbar | TMY copper, 30×3mm | m | 1.5 | Main switch to outlet switches |
| 3 | High-current outlet terminal set | For 35mm² cables, with insulators | set | 2 | AC01/AC02 working circuits |
| 4 | Spare circuit cover plate | Insulating | pcs | 1 | Spare circuit outlet protection |
9.5 Power Cables and Protective Conduits List
| No. | Name | Specification | Unit | Qty | Remarks |
|---|---|---|---|---|---|
| 1 | Armored power cable | YJV23-0.6/1kV 4×70+1×35 | m | 30 | Total inlet cable, buried |
| 2 | Armored power cable | YJV23-0.6/1kV 4×35+1×16 | m | 50 | AC01/AC02, 25m each |
| 3 | Rigid PVC conduit | PC80 | m | 28 | Inlet cable protection, buried |
| 4 | Rigid PVC conduit | PC50 | m | 46 | Two outlet cables, 23m each |
| 5 | Indoor heat-shrink cable termination | 70mm², 5-core | set | 2 | Both ends of inlet cable |
| 6 | Indoor heat-shrink cable termination | 35mm², 5-core | set | 4 | Both ends of two outlet cables |
| 7 | Copper terminal (DT type) | DT-70mm² | pcs | 8 | Inlet cable termination |
| 8 | Copper terminal (DT type) | DT-35mm² | pcs | 16 | Outlet cable termination |
| 9 | Copper terminal (DT type) | DT-16mm² | pcs | 6 | PE wires termination |
| 10 | Conduit mouth guard | For corresponding conduit | pcs | 12 | Protects cable insulation |
9.6 Installation Construction and Labor Cost List
| No. | Item | Construction content | Unit | Qty | Remarks |
|---|---|---|---|---|---|
| 1 | Concrete foundation construction | Positioning, formwork, pouring, leveling, curing, flat steel embedding | item | 1 | With materials and labor |
| 2 | Distribution box floor installation | Box positioning, leveling, expansion bolt fixing, grounding jumper | set | 1 | Per electrical installation spec |
| 3 | In-box component assembly | Installation of breakers, SPD, meter, CTs, busbars | set | 1 | Alignment, tightening, spacing |
| 4 | Conduit laying | Grooving, pipe laying, bend making, mouth protection, pull wire | m | 74 | Inlet + outlet total |
| 5 | Cable laying | Cable unwinding, pipe threading, route arrangement, protection | m | 80 | Inlet + two outlets total |
| 6 | Cable termination production | Heat-shrink termination, lug crimping, phase sequence labels | set | 6 | Inlet 2 + outlet 4 |
| 7 | Grounding system construction | PE busbar installation, grounding jumpers, grounding resistance test | item | 1 | Ensure ≤4Ω |
| 8 | Electrical system commissioning | Insulation test, circuit continuity, leakage function, phase verification, power-on trial | set | 1 | Item-by-item testing of all circuits |
9.7 Cable Management, Labels and General Auxiliary Materials List
| No. | Name | Specification | Unit | Qty | Remarks |
|---|---|---|---|---|---|
| 1 | In-box standardized cable management | Main/secondary circuits classified, horizontal/vertical, uniform binding | set | 1 | Strong/weak separation |
| 2 | Wire number tubes | For 1.5-10mm² | set | 1 | All inlet/outlet and secondary wires |
| 3 | Circuit label plates | Plastic, circuit number, purpose, rated capacity | pcs | 5 | Main inlet, AC01, AC02, spare, SPD |
| 4 | Self-locking nylon ties | 4×200mm | pack | 1 | Cable binding |
| 5 | Secondary control wiring | BV-2.5mm² copper PVC insulated | m | 20 | Meter, CT, SPD secondary wiring |
| 6 | Grounding flexible copper wire | BVR-10mm², stranded yellow-green | m | 8 | Component and door grounding |
| 7 | General electrical auxiliary kit | Electrical tape, heat-shrink tube, petroleum jelly, screws, expansion tubes, sandpaper | lot | 1 | General consumables |
9.8 Total Project Quotation Summary
The total project cost includes equipment and material fees, construction labor fees, commissioning fees, transportation fees, taxes and all other costs. A formal quotation can be issued according to actual needs and configuration.
Reference estimate note: The configuration list above is provided for engineering planning purposes. The final quotation is a reference estimate in RMB (CNY) and does not constitute a formal commercial quotation from Guangzhou Lain; final pricing depends on actual requirements, quantities and site conditions.
10. Technical Specifications
Reference estimate note: All specifications below are reference estimates in RMB (CNY) and do not constitute a formal commercial quotation from Guangzhou Lain. Final pricing depends on actual requirements, quantity and site conditions.
10.1 Floor-Standing Power Distribution Box Body
| Item | Parameter |
|---|---|
| Dimensions | 800mm (W) × 600mm (D) × 2000mm (H), tolerance ±2mm |
| Material | High-quality cold-rolled steel; main body ≥1.5mm, door ≥2.0mm, mounting rails ≥2.5mm |
| Surface | Pickling/phosphating, electrostatic powder coating 60-80μm, adhesion ≥1 class, RAL7035 default |
| Protection level | IP30 |
| Structure | Floor-standing single door, opening ≥120°, 3 adjustable mounting rails |
| Lock | Cylindrical universal lock, anti-prying, ≥10000 operations |
| Hinges | Heavy carbon steel hidden, no sagging deformation |
| Grounding | PE busbar 600mm with 10 posts; M8 bolts at four corners |
| Cable entry | Bottom knockout holes for PC50/PC80 |
| Mechanical strength | Cabinet load ≥500kg |
| Insulation | Main circuit to earth ≥10MΩ |
| Withstand voltage | 2500V/1min no breakdown, no flashover |
| Salt spray | ≥48h no rust |
| Environment | -10°C~+40°C working, -25°C~+55°C storage |
| Standard | GB 7251.1-2013 |
10.2 Inlet Isolating Leakage MCCB (NM1LE-160/4300B)
| Item | Parameter |
|---|---|
| Frame rated current | 160A |
| Rated working voltage | AC400V |
| Rated insulation voltage | AC800V |
| Rated impulse withstand | 6kV |
| Poles | 4P |
| Trip unit | Thermal-magnetic |
| Overload protection | 1.05In no action, 1.3In action within 1h |
| Short-circuit protection | 10In instantaneous |
| Icu | 35kA |
| Ics | 25kA |
| Leakage action current | 30/50/100mA three levels adjustable |
| Leakage non-action current | 0.5IΔn |
| Leakage action time | ≤0.1s |
| Isolation | Yes, obvious break |
| Mechanical life | 20000 operations |
| Electrical life | 10000 operations |
| Standards | GB 14048.2, GB 16917.1 |
10.3 T1-Class Surge Protective Device (TUR T1-25/4P)
| Item | Parameter |
|---|---|
| Protection class | T1 (Class I test) |
| Un | AC230/400V |
| Uc | AC385V |
| In | 25kA (8/20μs) |
| Iimp | 12.5kA (10/350μs) |
| Up | ≤1.8kV |
| Response time | ≤25ns |
| Poles | 3P+N, parallel connection |
| Failure protection | Built-in thermal disconnector, status window (green/red) |
| Backup protection | Dedicated fuse |
| Installation | 35mm DIN rail |
| Temperature | -40°C~+85°C |
| Standard | GB/T 18802.1 |
10.4 Current Transformer (LMK-0.66)
– Rated voltage 0.66kV; ratio 200/5A; accuracy 0.5 class (error ≤±0.5%); rated capacity 5VA;
– 1-turn through-core; class B insulation (130°C); withstand 3kV/1min;
– Epoxy resin cast, busbar/cable through-core installation, per GB 1208.
10.5 Three-Phase Four-Wire Active Energy Meter
– Transformer type; 3×220/380V; 1.5(6)A; 1.0 class;
– Forward active energy metering; mechanical/LCD display;
– Working voltage 0.8Un~1.1Un; power consumption ≤1.5W/phase;
– Temperature -10°C~+45°C; DIN-rail/bolt mounting; per GB/T 17215.321.
10.6 Outlet MCCB (NM1-100/3300)
– Frame 100A; rated 80A (matching 50kW load); Ue AC400V; Ui AC800V; 3P;
– Thermal-magnetic trip; overload 1.05In no action / 1.3In within 1h; short-circuit 10In instantaneous;
– Ics 20kA; mechanical life 20000; electrical life 10000; per GB 14048.2.
10.7 Copper Busbar
– T2 copper, purity ≥99.9%; main busbar 40×4mm, PE busbar 30×3mm;
– Conductivity ≥97% IACS; DC resistivity ≤0.017241Ω·mm²/m @25°C;
– Ampacity: 40×4 ≈500A, 30×3 ≈300A; hardness ≥65HV; per GB/T 5585.1.
10.8 Armored Power Cable (YJV23-0.6/1kV)
| Item | 4×70+1×35 | 4×35+1×16 |
|---|---|---|
| Conductor | 70mm²×4 + 35mm²×1 copper | 35mm²×4 + 16mm²×1 copper |
| Insulation | XLPE | XLPE |
| Armor | Double steel tape | Double steel tape |
| Sheath | PVC | PVC |
| Continuous temp | 90°C | 90°C |
| Short-circuit temp | 250°C (max 5s) | 250°C (max 5s) |
| Buried ampacity | ≈205A | ≈138A |
| Bending radius | ≥15× OD | ≥15× OD |
| Standard | GB/T 12706.1 | GB/T 12706.1 |
10.9 PVC Conduit
– Rigid PVC-U; PC50/PC80 (OD 50mm/80mm); wall ≥2.0mm (medium duty);
– Flame retardancy B1; breakdown voltage ≥25kV; compressive strength ≥250N;
– Temperature -5°C~+65°C; acid/alkali/salt resistant; per GB/T 14823.2.
10.10 Cable Terminations and Terminals
– Heat-shrink termination: indoor 5-core, 1kV, for 35/70mm², cross-linked polyolefin, shrink 110-140°C, withstand 3kV/1min, with phase sequence labels;
– DT copper terminal: T2 copper tin-plated, DT-16/35/70, tubular crimp, per GB/T 14315.
10.11 Auxiliary Materials
– Nylon ties 4×200mm, tensile ≥10kg, self-locking flame-retardant nylon;
– Wire number tubes for 1.5-10mm², PVC wear-resistant;
– BV-2.5mm² secondary wiring, 450/750V;
– BVR-10mm² yellow-green grounding wire;
– Electrical tape 18mm×0.13mm, 600V insulation.
11. Key Advantages and Customer Value
11.1 Multi-Level Protection, Safe and Reliable
This solution builds a four-level three-dimensional protection system of “overload + short-circuit + leakage + surge”, comprehensively guaranteeing distribution safety: the total inlet leakage circuit breaker effectively prevents personal electric shock and electrical fire risks; each outlet circuit independently configures an MCCB for fault isolation, so a single circuit fault does not affect overall power supply; the T1-class surge protective device resists lightning and switching overvoltage, protecting in-box components and downstream equipment; the complete grounding system provides reliable discharge paths for fault current and surge current, further improving safety redundancy. All components are national-standard products with 3C certification, fully tested for electrical performance before delivery, eliminating safety hazards from the source.
11.2 Precise Selection, Economical and Reasonable
All parameters of the solution have undergone strict electrical calculation verification, from circuit breaker rated current and breaking capacity to cable ampacity and thermal stability, from busbar specifications to CT ratios, all matching actual load needs with margins controlled in a reasonable range, avoiding both the overload risk of insufficient configuration and the cost waste of over-design. At the same time, the solution reserves spare circuits and function expansion space, adapting to future load increase and intelligent upgrade needs, extending system life and reducing long-term comprehensive cost.
11.3 Original Production, Controllable Quality
As a professional manufacturer with its own production base, full-process quality control is implemented for the production of the distribution box cabinet: from plate cutting, bending and welding to pickling/phosphating, electrostatic spraying, assembly and testing, each process has clear process standards and quality inspection requirements, ensuring firm cabinet structure, flat appearance, uniform coating and qualified electrical performance. Compared with scattered procurement and assembly products, integrated production and supply effectively guarantees dimensional accuracy, structural strength and appearance consistency, reducing adaptation problems.
11.4 Standardized Construction, Fine Workmanship
The construction team all holds electrician special operation certificates with years of low-voltage power distribution engineering experience, strictly operating per the “Code for Acceptance of Construction Quality of Building Electrical Engineering”. In-box wiring adopts standardized technology with horizontal/vertical layout, strong/weak current separation, neat cable bundles and clear wire number labels; all wiring terminals are firmly crimped with contact resistance meeting requirements. Cable laying, grounding construction, system commissioning and other processes all implement the three-level quality inspection system, ensuring qualified construction quality and stable operation upon delivery.
11.5 Convenient O&M, Easy Management
The system design fully considers later O&M needs: reasonable component layout with sufficient operation space, ergonomic handle heights; all circuits have clear label plates marking circuit number, purpose and rated parameters for quick fault location; core components are universal models with convenient market procurement and low replacement cost; status indication is intuitive, allowing component operating status judgment without special tools. Complete as-built drawings and operation maintenance manuals are provided for the convenience of Party A’s O&M personnel.
11.6 Customization Service, Flexible Adaptation
Full-dimension customization services are supported: cabinet dimensions and structure can be adjusted according to on-site installation space; circuit quantity, switch parameters and protection configuration can be adjusted according to load changes; smart meters, fire linkage, remote monitoring and other functional modules can be added; cabinet color, door lock type, protection level and other details can be customized. Multiple design solutions are provided free of charge for comparison and selection, highly matching the personalized needs of different scenarios and budgets.
12. Technical Q&A (50+ Items)
12.1 Product Selection
Q1: Why is the 160A specification selected for the main switch of this distribution box?
A: According to the system drawing parameters, the total installed capacity is 100kW, power factor 0.8, demand factor 0.7, and the calculated current is about 132.95A. The circuit breaker rated current must be greater than the calculated current with a 1.1-1.3× safety margin reserved. The 160A specification both meets the ampacity requirement and leaves reasonable overload and startup impact margin; it is the standard frame specification adapted to this capacity.
Q2: Why use a 4-pole leakage circuit breaker for the main switch but 3-pole for outlets?
A: The main switch configures leakage protection, which requires simultaneous detection of the current vector sum of the three-phase lines and neutral line; therefore, a 4-pole structure is necessary, and the N line can be completely disconnected during maintenance for operation safety. The outlet circuits are three-phase power loads with minimal N-line current under normal operation and do not need separate leakage protection; therefore, 3-pole breakers suffice for overload and short-circuit protection while controlling cost.
Q3: Why choose T1-class instead of T2-class SPD?
A: T1 and T2 class SPDs have different applicable positions: T1 is a Class I test product for the 10/350μs lightning current waveform with large discharge capacity, suitable for building inlet main distribution boxes as the first lightning protection barrier; T2 is a Class II test product for the 8/20μs waveform with smaller discharge capacity, suitable for downstream sub-distribution boxes. This distribution box is the inlet main box, so a T1-class SPD is necessary to effectively resist the lightning surge energy transmitted from the inlet side.
Q4: Why use a transformer-connected energy meter instead of direct-connected?
A: The maximum rated current of direct-connected energy meters generally does not exceed 100A. The calculated current of this system exceeds 130A, beyond the range of direct-connected meters. Therefore, current transformers must be used to convert the large current to a standard 5A small current, then connect to the transformer-type meter for metering. This is also the standard metering method for industrial high-current distribution systems, with high metering accuracy and flexible expansion.
Q5: Why choose YJV23 armored cable instead of ordinary YJV?
A: According to the drawing, the cables are laid buried. Armored cables have a double steel tape armor layer with high mechanical strength, able to withstand soil pressure and external force impact, and prevent rodent and ant gnawing, adapting to complex underground environments; ordinary YJV cables have no armor layer and are only suitable for indoor tray and conduit exposed laying without external force; buried laying is easily damaged by external force, shortening service life. Therefore, armored cables must be selected for buried scenarios.
Q6: Why install a circuit breaker on the spare circuit? Can’t it be left empty?
A: Pre-installing a circuit breaker on the spare circuit has multiple advantages: first, later load addition requires no power-off cabinet modification – direct wiring is ready to use, convenient for expansion; second, long-term exposed busbar interfaces on the main busbar are a safety hazard, and the pre-installed breaker seals the interface, improving safety; third, the breaker cost share is extremely low, and pre-installation is cost-effective. If the customer has special needs, reserved installation positions and busbar interfaces can be provided instead.
Q7: What is the difference between NM1LE and NM1 circuit breakers?
A: The NM1LE series adds a leakage protection module on the basis of NM1, capable of detecting leakage current and tripping, with 4P structure to disconnect the N line; the NM1 series is a pure thermal-magnetic MCCB without leakage protection. This solution uses NM1LE for the total inlet (leakage protection at the box inlet) and NM1 for outlet circuits (overload and short-circuit only).
Q8: What is the meaning of the 4300B in NM1LE-160/4300B?
A: In the model, 4 indicates 4 poles, 3 indicates the type of trip unit (thermal-magnetic), 00 indicates no auxiliary contacts, and B indicates the leakage protection version with adjustable action current. This model is the standard isolating leakage MCCB configuration for the inlet main switch.
12.2 System Design
Q9: What is the grounding system of this system? What are its advantages?
A: This system adopts the TN-S grounding system, i.e., the neutral line N and protective earth line PE are completely separated; under normal operation, the PE line has no current and equipment shells are not live. Its advantages: high safety – the PE line has no voltage under normal conditions, so touching equipment shells has no electric shock risk; strong anti-interference – the PE line has no current voltage drop and does not interfere with sensitive equipment; good fault characteristics – single-phase grounding faults have large fault current, allowing protection devices to act quickly.
Q10: How is the selectivity of upper and lower circuit breakers guaranteed?
A: Both upper and lower breakers use thermal-magnetic trip units, and selectivity is realized through reasonable matching of trip curves: for overload protection, the upper breaker’s long-delay action current and time are both greater than the lower, so the lower operates first on overload; for short-circuit protection, the upper breaker’s instantaneous trip current setting is greater than the lower, so on downstream outlet short-circuit, the lower acts instantaneously and the upper does not. Through this coordination, faults are isolated only in the smallest range without expanding the power outage area.
Q11: Under what environment is the cable ampacity calculated? What if the actual environment differs?
A: The cable ampacity in this solution is calculated for the standard environment of soil temperature 25°C and burial depth 0.7m. If the actual on-site ambient temperature is higher, soil thermal conductivity is poor, or multiple cables are laid side by side, the ampacity will be derated. More than 30% margin has been reserved in selection, covering conventional environment fluctuations; if the on-site environment is extremely harsh, the cable specification can be recalculated and adjusted according to actual working conditions.
Q12: Why is the leakage action current set with three adjustable levels? Which level is generally used?
A: Different scenarios have different leakage protection needs: the 30mA level is mainly for preventing direct personal electric shock with the highest sensitivity; the 50mA and 100mA levels are mainly for electrical fire prevention and equipment insulation fault monitoring with moderate sensitivity and fewer nuisance trips. This distribution box is the total inlet box with many downstream loads and larger normal leakage current; generally, the 50mA or 100mA level is recommended, providing leakage protection while avoiding frequent nuisance tripping; if downstream equipment is frequently touched by personnel, adjust to the 30mA level.
Q13: What is the calculated short-circuit current of this system? Is the breaking capacity sufficient?
A: Assuming an inlet short-circuit capacity of 15MVA, the three-phase short-circuit current periodic component RMS is about 21.65kA. The total inlet MCCB Ics is 25kA and outlet MCCBs Ics is 20kA, both greater than the system short-circuit current, meeting the breaking requirements; after breaking, the breakers can continue to be used normally.
Q14: How is the main busbar capacity verified?
A: The TMY-40×4 copper busbar has an ampacity of about 500A, far greater than the system calculated current of 132.95A, with a margin of more than 200%, fully meeting the requirements of large current transmission, temperature rise and mechanical strength under fault conditions. The PE busbar TMY-30×3 has an ampacity of about 300A, meeting the grounding current requirements.
12.3 Installation and Construction
Q15: Why raise the foundation by 50mm? What is its function?
A: The concrete foundation raised by 50mm has three main functions: first, moisture-proofing – preventing ground water and moisture from directly invading the cabinet bottom, extending cabinet and component life; second, leveling – on-site ground may be uneven, and the concrete foundation provides a level installation surface; third, fixing – expansion bolts can be firmly fixed in the concrete foundation, more stable than direct ground fixing. The drawing also requires extending 100mm beyond the cabinet on all sides, further improving foundation stability and moisture-proofing.
Q16: What are the requirements for buried conduit laying?
A: Buried conduits must meet the following requirements: sufficient mechanical strength to withstand soil pressure and ground loads (this solution uses rigid PVC conduit with medium-duty or above wall thickness); good anti-corrosion performance (PVC resists acid, alkali and salt corrosion); flame retardancy (self-extinguishing after flame removal); and conduit mouths must be fitted with guards to avoid scratching cable insulation during threading.
Q17: What is the grounding resistance requirement? What if it does not meet the requirement?
A: The protective grounding resistance of low-voltage distribution systems is required to be ≤4Ω. After construction, a dedicated grounding resistance tester is used for testing; if not met, measures such as adding grounding electrodes, replacing grounding soil and adding resistance-reducing agents are taken until the grounding resistance meets the specification, ensuring the grounding system is safe and reliable.
Q18: Why use heat-shrink cable terminations? What are the benefits?
A: Heat-shrink cable terminations are the standard technology for low-voltage cable termination, with obvious advantages over traditional wrapping: good sealing performance – tightly wrapping the cable end after heat shrinking, effectively moisture-proof, dust-proof and corrosion-proof; excellent insulation performance – high insulation strength of the heat-shrink material; clear phase sequence labels – each phase has a different colored heat-shrink tube for identification and O&M; neat and standardized appearance with good workmanship.
Q19: What are the requirements for the concrete foundation construction process?
A: Positioning and setting out; compacting the original soil at the foundation bottom (flatness error ≤5mm); erecting formwork; pre-embedding the 40×4 hot-dip galvanized flat steel in a ring (both ends exposed ≥100mm); pouring C20 plain concrete with vibration compaction and surface leveling; water curing for not less than 7 days; box installation only after strength reaches above 70%.
Q20: What should be noted during in-box wiring?
A: Main circuit wiring by phase sequence with firm terminal crimping, flat contact surfaces and proper bolt tightening torque; multi-strand wires must be crimped with terminals before connection; secondary circuit wiring with BV-2.5mm² copper wire, neat bundles with wire numbers, no more than 2 wires per terminal; all grounding terminals and cable PE wires connected to the PE busbar; cables horizontal/vertical with strong/weak current separation, uniform binding, wire number tubes at both ends, and label plates on each circuit.
12.4 Operation and Maintenance
Q21: What should be checked in daily inspection?
A: Appearance check (box intact, door lock normal, no water/moisture marks); status check (breakers in normal closed position, SPD indicator window green); temperature check (abnormal heating or odor, use infrared thermometer to check busbar and terminal temperatures); label check (circuit labels and wire numbers clear and complete); grounding check (grounding connections firm, no loosening or rust).
Q22: How to handle after the circuit breaker trips?
A: First confirm whether it is overload tripping or short-circuit/leakage tripping by observing the breaker status indication; disconnect all downstream loads, try to close; if it closes, start loads one by one to investigate the faulty circuit; if it cannot close, there is a continuous short-circuit or leakage fault, requiring power-off troubleshooting of lines and equipment; only restore power after the fault is eliminated; forcibly closing is strictly prohibited; if frequent unexplained tripping occurs, check whether the breaker is damaged and replace it promptly.
Q23: How to judge whether the SPD has failed?
A: The SPD has a status indication window on the front: green for normal; when the SPD fails due to lightning or aging, the window turns red. Observe the window color during daily inspection for quick judgment; replace with the same model SPD promptly when red, avoiding loss of lightning protection.
Q24: How to convert the energy meter reading to actual electricity consumption?
A: This system uses transformer-type metering: actual electricity = energy meter reading difference × current transformer ratio. The CT ratio of this solution is 200/5 = 40 times, i.e., when the meter shows 1 kWh, the actual consumption is 40 kWh.
Q25: What is the inspection cycle of the distribution box?
A: It is recommended to conduct a daily patrol inspection (appearance, status indicators, temperature), a monthly detailed inspection (terminals, grounding, labels), and an annual comprehensive maintenance (power-off cleaning, insulation test, tightening). Special inspections should be added after lightning, floods and other extreme weather.
Q26: What should be done if the cabinet is abnormally hot?
A: Stop the load and check: use an infrared thermometer to measure the temperature of the busbar, terminals and switch contacts; check whether the connection terminals are loose and crimping is poor; check whether the load exceeds the rated capacity; check whether the ambient temperature is too high and ventilation is poor. Handle the cause (tighten, replace, reduce load, improve ventilation) and restore power after confirming the temperature is normal.
12.5 Safety Specifications
Q27: What safety matters should be noted during distribution box maintenance?
A: Strictly implement the power-off, voltage verification, grounding and tag-hanging system: first disconnect the total inlet breaker and confirm the open position; use a voltage tester to verify no voltage at inlet/outlet terminals; hang temporary grounding wire if necessary; hang the “Do Not Close, Work in Progress” sign; only certified electricians operate with dedicated supervision; live maintenance of the main circuit is strictly prohibited.
Q28: What safety requirements are there around the distribution box?
A: The operation channel in front of the distribution box should be not less than 0.8m wide; no flammable, explosive or corrosive items or water accumulation around; the box must not be blocked or covered, and no items hung on it; keep the environment dry and ventilated, avoiding excessive humidity and dust; non-professionals must not open the box for operation.
Q29: What is the “power-off, verification, grounding, tagging” system?
A: It is the four-step safety operation system for electrical maintenance: power off (disconnect the switch and confirm), verify voltage (use a voltage tester to confirm no voltage), ground (hang temporary grounding wires to discharge residual charge), and tag (hang warning signs such as “Do Not Close”). This is a mandatory safety requirement for maintenance work to prevent electric shock accidents.
Q30: Why must the N line be disconnected during maintenance?
A: In the TN-S system, although the N line carries no current under balanced three-phase conditions, in the case of three-phase imbalance, the N line carries current and has voltage; if the N line is not disconnected, the “neutral point drift” can cause equipment damage and even electric shock when touching the neutral line. The 4P breaker completely disconnects the N line, ensuring complete safety isolation during maintenance.
12.6 Fault Troubleshooting
Q31: A certain circuit has no power output. How to troubleshoot?
A: Check the corresponding outlet MCCB status: if tripped, check the downstream load for overload, short-circuit or leakage; if the breaker is closed but no output, use a multimeter to verify the voltage at the breaker outlet and busbar; check whether the terminal connection is loose or burned; check whether the upstream total breaker and busbar are normal.
Q32: The total inlet breaker trips frequently for no apparent reason. What could be the cause?
A: Possible causes: downstream circuit insulation aging causing leakage current increase; the leakage action current setting is too low relative to the system’s normal leakage current; downstream equipment (e.g., frequency converters, motors) generates leakage current during operation; the breaker itself is aging or damaged. Handle by: measure the leakage current of each circuit separately, find the abnormal circuit; appropriately adjust the leakage action level; replace the breaker if damaged.
Q33: The energy meter reading is abnormal or stops. What to do?
A: Check whether the CT secondary wiring is loose or open (open circuit of the CT secondary is dangerous and strictly prohibited); check whether the voltage wiring of the meter is correct and the voltage is normal; check whether the meter display is normal; verify the wiring against the meter wiring diagram; if the meter is damaged, replace it after verification.
Q34: The SPD indicator window is red. What should be done?
A: The red window indicates the SPD has failed (damaged by lightning or aging). Replace it promptly with the same model: disconnect the power, remove the failed SPD, install the new one, restore power and check the window is green. Meanwhile, check whether the backup fuse in front of the SPD has blown and replace if necessary.
Q35: There is a burning smell in the cabinet. What should be done?
A: Immediately cut off the total power, do not touch the cabinet directly; use an infrared thermometer or after power-off, check the busbar connections, terminal crimping points and switch contacts for overheating, burning or discoloration; find the overheated point, tighten or replace the corresponding parts; check whether the load exceeds capacity; restore power after troubleshooting.
12.7 Metering and Energy Management
Q36: What is the difference between direct-connected and transformer-connected metering?
A: Direct-connected metering connects the load current directly through the meter, suitable for currents below 100A; transformer-connected metering converts the large current to 5A through CTs, suitable for high-current circuits, with the advantage of high accuracy, flexible expansion and remote meter reading support. This system uses transformer-connected metering because the calculated current exceeds 130A.
Q37: Can remote meter reading be supported?
A: The current configuration uses a mechanical/LCD meter without communication function, but the metering circuit reserves expansion space; later it can be upgraded to a multifunctional smart meter supporting RS485 communication for remote meter reading, voltage/current monitoring and energy statistics.
Q38: How is the metering accuracy guaranteed?
A: The CTs are 0.5-class and the meter is 1.0-class; the metering circuit is independently wired, unaffected by protection circuits; the CT ratio matches the load current range; wiring conforms to energy metering specifications; the metering accuracy meets the electricity management and cost accounting requirements.
Q39: What is the load calculation process of this system?
A: Total installed capacity Pn=100kW, power factor 0.8, demand factor 0.7: calculated capacity Pc=100×0.7=70kW; calculated current Ic=70/(1.732×0.38×0.8)≈132.95A. This is the basis for the selection of the main switch (160A), cable (4×70+1×35) and CT ratio (200/5).
12.8 Standards and Quality
Q40: What standards does this distribution box comply with?
A: GB 7251.1-2013, GB 50054-2011, GB 50052-2009, GB 50303-2015, GB 14048.2, GB 16917.1, GB/T 18802.1, GB 1208, GB/T 17215.321, GB/T 12706.1, GB/T 14823.2 and other national standards; core components have 3C certification.
Q41: What is the protection level of the cabinet? What does it mean?
A: IP30: the first digit 3 prevents solid foreign objects larger than 2.5mm from entering; the second digit 0 has no water protection rating. It is suitable for indoor dry environments, preventing finger contact with live parts inside. For outdoor or wet environments, IP54 or above cabinets can be customized.
Q42: How is the product quality controlled before delivery?
A: Raw material incoming inspection, production process control (cutting, bending, welding, spraying), assembly inspection, and full electrical performance testing (insulation resistance, withstand voltage, protection function) before delivery; all products pass 3C-certified component selection and third-party testing, with factory certificate and test reports delivered.
Q43: What are the insulation performance requirements?
A: Main circuit to earth insulation resistance ≥10MΩ; power-frequency withstand voltage 2500V/1min no breakdown, no flashover; meeting the insulation requirements of low-voltage complete switchgear.
Q44: What is the service life of the distribution box?
A: Under normal indoor use environments, the cabinet body service life is more than 20 years; core electrical components (breakers, meters) have a life of 10-20 years according to manufacturer specifications; wearing parts such as contacts can be replaced; regular maintenance can effectively extend the overall service life.
12.9 Procurement and Service
Q45: What is the delivery cycle?
A: The total project period is 15 calendar days, including a production stocking period (7 days for cabinet production, component procurement and assembly testing after contract signing) and an on-site construction period (8 days for foundation, box installation, cable laying, wiring, commissioning and acceptance after arrival).
Q46: What documents are delivered with acceptance?
A: Complete as-built documents: completion drawings (electrical system diagram, wiring diagram), product certificates and test reports of all components, commissioning records, insulation and grounding resistance test reports, operation maintenance manual, and training confirmation form.
Q47: Can the distribution box be customized?
A: Yes: dimensions and structure, circuit quantity and switch parameters, protection configuration, metering type (smart meter, remote metering), cabinet color, door lock type, protection level, and additional function modules (fire linkage, remote monitoring) can all be customized.
Q48: What is the warranty period?
A: The overall warranty period is 2 years from the date of completion acceptance; core electrical components follow the manufacturer’s warranty policy, not less than 1 year; within the warranty period, faults caused by product or construction quality are repaired, parts replaced and on-site service provided free of charge; 2 free on-site inspections are provided (at month 6 and month 18).
Q49: What is the response time for after-sales service?
A: 7×24-hour hotline; phone response within 30 minutes; on-site arrival within 4 hours in urban areas, 8 hours in suburbs, 24 hours in remote areas; general faults repaired on the spot, major faults within 24 hours; temporary power supply solutions provided for unrepairable faults.
Q50: What training is provided?
A: On-site training at completion acceptance, about 4 hours (1.5h theory + 2.5h practice), covering operation procedures, inspection methods, fault troubleshooting and safety specifications, with assessment; “System Operation and Maintenance Manual” provided in paper and electronic versions.
Q51: Why choose Guangzhou Lain?
A: Source factory with more than 20 years of experience, own production base and flexible customization, strict quality control with third-party testing, professional construction team with certificates, complete after-sales service, one-stop services from design, production, construction to O&M, providing reliable guarantees for the project.
13. Construction Schedule
13.1 Total Construction Period Description
The total project period is expected to be 15 calendar days, divided into two stages: production stocking period and on-site construction period.
– Production stocking period: complete cabinet production, component procurement and assembly testing within 7 days after contract signing;
– On-site construction period: complete foundation construction, box installation, cable laying, wiring, commissioning, acceptance and delivery within 8 days after goods arrival.
In case of force majeure (extreme weather, Party A reasons for work stoppage, site conditions not suitable, etc.), the construction period is extended accordingly.
13.2 Phased Construction Schedule
| Stage | No. | Work contents | Duration | Start | Finish | Responsible | Remarks |
|---|---|---|---|---|---|---|---|
| Preliminary preparation | 1 | Solution confirmation and contract signing | 1 day | Day 1 | Day 1 | Project manager | Both parties confirm technical solution and contract terms |
| 2 | Material procurement and production order | 1 day | Day 2 | Day 2 | Procurement specialist | Place cabinet production and component procurement orders | |
| Production stocking | 3 | Cabinet production and processing | 4 days | Day 3 | Day 6 | Production supervisor | Complete cabinet bending, welding, spraying |
| 4 | In-box component assembly and wiring | 2 days | Day 7 | Day 8 | Assembly electrician | Component installation, busbar connection, secondary wiring, cable management | |
| 5 | Factory testing, stocking and shipment | 1 day | Day 8 | Day 8 | Quality inspector | Electrical performance test, qualified delivery, logistics arrangement | |
| On-site construction | 6 | On-site survey and technical disclosure | 0.5 day | Day 9 AM | Day 9 AM | Construction team leader | Verify positions, power points, routes; safety disclosure |
| 7 | Concrete foundation pouring | 1.5 days | Day 9 PM | Day 10 | Civil team | Positioning, formwork, flat steel embedding, pouring, curing | |
| 8 | Conduit laying | 2 days | Day 9 | Day 10 | Electrician team | Grooving, pipe laying, fixing, pull wire, mouth protection | |
| 9 | Box positioning and fixing | 0.5 day | Day 11 AM | Day 11 AM | Electrician team | After foundation strength reached, leveling, expansion bolt fixing, grounding | |
| 10 | Cable laying | 1.5 days | Day 11 PM | Day 12 | Electrician team | Cable unwinding, pipe threading, margin at both ends | |
| 11 | Cable termination and wiring | 2 days | Day 13 | Day 14 | Electrician team | Terminal crimping, heat-shrink termination, in-box wiring, phase verification | |
| 12 | Grounding system construction and testing | 0.5 day | Day 14 PM | Day 14 PM | Electrician team | Grounding electrode connection, resistance test ≤4Ω | |
| Commissioning and acceptance | 13 | System commissioning | 0.5 day | Day 15 AM | Day 15 AM | Technical engineer | Insulation test, continuity, leakage function, power-on trial |
| 14 | Completion acceptance and document delivery | 0.5 day | Day 15 PM | Day 15 PM | Project manager | Joint acceptance, as-built documents, operation training, acceptance form |
13.3 Schedule Guarantee Measures
– Stocking guarantee: common breakers, meters, SPDs and other components have safety stock; cabinet production line capacity is reserved, prioritizing this project;
– Personnel guarantee: dedicated construction team with stable personnel and tacit cooperation, avoiding mid-project personnel changes; project manager follows the whole process;
– Material guarantee: prepare all materials, auxiliary materials and tools completely before construction with detailed checklists;
– Plan control: strictly follow the schedule, daily on-site short meetings to check progress, timely catch-up measures for delays;
– Coordination guarantee: communicate with Party A in advance on construction conditions, temporary power and site access to reduce waiting time.
14. Construction Organization and Quality/Safety Measures

14.1 Construction Organization Structure
This project implements a project manager responsibility system with a dedicated project team:
– Project manager: 1 person, overall control of progress, quality, cost and safety, liaising with Party A;
– Technical director: 1 person, responsible for solution design, technical disclosure, on-site technical problem solving, system commissioning and document compilation;
– Construction team leader: 1 person, responsible for on-site construction organization, personnel arrangement, process connection and on-site management;
– Electrician team: 3 persons, certified, responsible for electrical installation, wiring, cable laying, commissioning and other professional operations;
– Safety officer (part-time): 1 person, responsible for on-site safety management, safety education, safety inspection and hazard rectification;
– Quality inspector (part-time): 1 person, responsible for material entry inspection, process quality inspection, test records and acceptance cooperation.
14.2 Position Responsibilities
– Project manager: overall responsibility for the whole project process, ensuring on-time, quality delivery per contract; formulating progress, resource and quality plans; coordinating communication with Party A and supervision; controlling project cost; organizing phased and completion acceptance;
– Technical director: drawing review, construction plan compilation, technical disclosure; solving technical difficulties; system commissioning and performance testing with test reports; compiling as-built technical documents; technical training and after-sales support;
– Construction team leader: organizing on-site construction strictly per drawings and specifications; arranging team work with daily assignment and summary; supervising quality and safety; finished product protection; filling construction logs;
– Electrician team: electrical installation, wiring and cable laying strictly per operating procedures; self-inspection cooperation; correct use of tools and protective equipment; participating in commissioning and acceptance; civilized construction;
– Safety officer: implementing safety rules, entry safety education and disclosure; daily safety inspections and hazard rectification; managing temporary power; reporting and handling accidents;
– Quality inspector: incoming material and equipment quality inspection; process quality inspection with three-inspection system; filling quality and electrical test records; participating in completion acceptance.
14.3 Pre-Construction Preparation
#### 14.3.1 Technical Preparation
– Organize construction personnel to familiarize themselves with system drawings and construction plan; clarify construction requirements and quality standards;
– Conduct technical and safety disclosure, explaining construction difficulties, key processes and safety precautions;
– Verify drawings against actual site conditions, confirming power access points, cable routes, installation positions and foundation dimensions; adjust the plan if deviations exist;
– Compile detailed material lists, tool lists and construction progress plans.
#### 14.3.2 Material Preparation
– Procure all materials and equipment per the configuration list with accurate models, specifications and quantities;
– Appearance inspection and document verification on entry (product certificates, 3C certification, test reports); unqualified materials strictly prohibited from entry;
– Classified storage with moisture, fire and theft prevention; wearing parts stored separately;
– Verify component installation dimensions against cabinet openings in advance.
#### 14.3.3 Tool Preparation
– Prepare impact drill, cutting machine, crimping pliers, wire strippers, wrenches, screwdrivers, electric drills, etc.;
– Prepare multimeter, megger (insulation resistance tester), grounding resistance tester, clamp ammeter, etc.; calibrate testing instruments;
– Insulation check of electric tools; prepare safety helmets, insulating gloves, insulating shoes and other protective equipment.
#### 14.3.4 On-Site Preparation
– Clean the installation site, ensuring the construction area is level and clean;
– Arrange temporary construction power conforming to three-level distribution and two-level protection requirements;
– Verify on-site elevation and positioning dimensions with marks;
– Protect finished products to avoid damage to surrounding buildings and equipment.
14.4 Core Construction Technology and Process
#### 14.4.1 Concrete Foundation Construction Technology
– Positioning and setting out: foundation 1000×800×50mm, extending 100mm beyond the cabinet;
– Foundation treatment: compact the original soil, flatness error ≤5mm;
– Formwork: wood or steel formwork, firm and accurate;
– Grounding flat steel embedding: 40×4 hot-dip galvanized flat steel in a ring, both ends exposed ≥100mm;
– Pouring: C20 plain concrete, vibrated compact, surface leveled;
– Curing: water curing for not less than 7 days; box installation after strength ≥70%.
#### 14.4.2 Distribution Box Installation Technology
– Foundation acceptance: check dimensions, elevation and flatness; confirm flat steel position;
– Box positioning: move to the foundation, adjust levelness and verticality (deviation ≤1.5‰);
– Fixing: expansion bolts fixing the box base to the foundation, not less than 4 points, firm without shaking;
– Grounding connection: connect the box grounding terminal to the foundation flat steel with BVR-10mm² yellow-green wire, with spring washers.
#### 14.4.3 In-Box Component Installation Technology
– Position components per design drawings with neat arrangement and uniform spacing;
– Install busbar support insulators and busbars first, then main switch, outlet switches, SPD, meter and CTs;
– Firm component fixing, flexible operating handles, clear open/close positions;
– Verify phase sequence and terminal positions conform to wiring requirements.
#### 14.4.4 Wiring Construction Technology
– Main circuit wiring by phase sequence with firm terminal crimping, flat contact surfaces, proper torque; multi-strand wires crimped with terminals first;
– Secondary circuit wiring with BV-2.5mm² copper wire, neat bundles, wire numbers, no more than 2 wires per terminal;
– All grounding terminals and cable PE wires connected to the PE busbar;
– Cables horizontal/vertical, strong/weak separation, uniform binding, wire number tubes at both ends, label plates on each circuit.
#### 14.4.5 Cable Laying Technology
– Check model, specification and appearance before laying; test insulation resistance before laying;
– Conduit mouths fitted with guards to avoid scratching cable insulation; no joints or twists in the conduit;
– Reserve sufficient margin at both ends (half the box perimeter inside the box);
– Make heat-shrink terminations after laying with clear phase sequence labels.
#### 14.4.6 Grounding System Construction Technology
– PE busbar firmly fixed in the box;
– All grounding wires yellow-green, firm connections, clear labels;
– Box reliably connected to the external grounding grid; grounding resistance tested ≤4Ω; add grounding electrodes if not met.
14.5 Quality Assurance System and Measures
– Quality objective: engineering quality reaches qualified standards, 100% first-time acceptance pass rate, all electrical performance indicators conform to national specifications and design requirements;
– Quality assurance system: three-level quality management of company, project department and team, with quality responsibility implemented at all levels;
– Material quality control: all incoming materials must have certificates and test reports; core components have 3C certification; item-by-item appearance/specification/model inspection on entry; unqualified materials returned;
– Process quality control: strict implementation of the three-inspection system (self, mutual, special); unqualified previous processes cannot enter the next; key processes supervised by the technical director;
– Key process control: special operation instructions for wiring, cable termination, grounding construction and system commissioning;
– Test inspection control: insulation resistance, grounding resistance and leakage action tests truthfully recorded; unqualified items rectified until compliant;
– Finished product protection: protective film on the box after installation; door closed and locked after commissioning.
14.6 Safety Production and Civilized Construction Management
– Safety objective: zero safety accidents, zero casualties, zero fire accidents;
– Safety education system: all personnel receive safety education and technical disclosure before entry; special operation personnel hold certificates;
– Safety inspection system: daily on-site inspections by the safety officer, immediate hazard rectification;
– Safety electricity system: temporary power conforms to three-level distribution and two-level protection; one machine, one switch, one protection;
– Fire operation system: fire operation approval, fire extinguishers, dedicated supervision;
– Civilized construction: neat material stacking with clear labels; daily waste cleaning; noise reduction measures; compliance with Party A site management.
14.7 Finished Product Protection Measures
– Handle the cabinet carefully during transport and installation to avoid collision, deformation and paint loss; wrap the door and cabinet with protective film until acceptance;
– Close and lock the door after component installation to prevent unauthorized operation and component loss;
– Seal conduit mouths after cable laying to prevent debris and water entry; protect cable ends from moisture and mechanical damage;
– Prohibit stepping on or stacking heavy items on the foundation before concrete strength is reached;
– Restore all switches to normal state after commissioning and post warning labels.
14.8 Construction Emergency Plans
– Electric shock emergency: immediately cut off power or use dry insulating objects to separate the victim; never rescue with bare hands; move to a ventilated area, check breathing and pulse, perform CPR if necessary; call 120; protect the scene and investigate the cause;
– Fire emergency: immediately cut off power, use dry powder extinguishers (never water on electrical fires); call 119, evacuate personnel; cooperate with fire department;
– Mechanical injury emergency: stop work immediately, stop bleeding and bandage; call 120 for serious injuries; protect the scene and investigate equipment hazards.
15. After-Sales Service
15.1 Warranty Service Commitment
– Warranty period: overall warranty of 2 years from the date of completion acceptance; core electrical components follow the manufacturer’s warranty policy, not less than 1 year;
– Warranty scope: within the warranty period, faults caused by product quality or construction quality are repaired, parts replaced and on-site service provided free of charge; faults caused by human damage, force majeure, improper use or self-modification are charged at cost;
– Regular inspection: 2 free on-site inspections within the warranty period (month 6 and month 18), with comprehensive inspection, cleaning, tightening and testing.
15.2 After-Sales Service Response Mechanism
– Service hotline: 7×24-hour technical service hotline;
– Response time: phone response within 30 minutes; on-site arrival within 4 hours in urban areas, 8 hours in suburbs, 24 hours in remote areas;
– Fault handling: general faults repaired on the spot; major faults within 24 hours; temporary power supply solutions for unrepairable faults;
– Dedicated follow-up: dedicated after-sales specialist per project, satisfaction return visits after service.
15.3 Daily O&M Service Contents
– Technical consultation: free consultation on system operation, maintenance and fault troubleshooting;
– Fault repair: timely on-site troubleshooting and repair, replacing damaged parts and restoring normal operation;
– Upgrade and transformation: customized transformation plans and construction services for expansion, circuit addition and function upgrades, with preferential prices for old customers;
– Parts supply: long-term preferential supply of original parts and wearing parts.
15.4 Post-Warranty Value-Added Services
– Annual maintenance service: annual maintenance agreements with regular inspection, priority on-site service and parts discounts;
– Lifetime technical support: free lifetime technical consultation;
– System upgrade service: solution design and implementation for power distribution intelligence and energy management upgrades.
15.5 Service Supervision and Complaint Mechanism
– Service records with customer signature for traceability;
– Dedicated complaint hotline and email;
– Handling plan within 24 hours, problem solved within 72 hours;
– Regular satisfaction return visits for continuous service improvement.
16. Training Plan
16.1 Training Objectives and Targets
– Objectives: enable Party A’s O&M personnel to master the basic principles, operation methods, daily maintenance knowledge and common fault troubleshooting of the distribution box system through theory and practice training;
– Targets: Party A’s designated electrical O&M personnel, electricians and managers, 2-3 people recommended, with basic electrical knowledge and safety awareness.
16.2 Training Contents
#### 16.2.1 Theoretical Knowledge Training
– Basic principles of low-voltage distribution systems, architecture, composition and functions of this system;
– Functions, working principles, parameter meanings and status identification of each electrical component;
– System protection principles: functions and action logic of overload, short-circuit, leakage and surge protection;
– Electrical safety basics: power on/off safety specifications, electric shock first aid, safety protection requirements.
#### 16.2.2 Practical Skill Training
– Normal operation: power-on procedure, power-off procedure, single-circuit open/close operation;
– Daily inspection methods: inspection contents, cycles, abnormal status identification (tripping, failure, heating);
– Common fault troubleshooting: tripping, leakage and metering abnormality troubleshooting steps;
– Daily maintenance: cleaning, tightening, insulation testing and other basic maintenance operations.
#### 16.2.3 Safety Precautions Training
– Power on/off safety operation procedures: power-off, verification, tagging, locking system;
– Correct use of personal protective equipment;
– Electric shock first aid and emergency handling procedures;
– Prohibited behaviors and dangerous operation warnings.
16.3 Training Methods and Arrangement
– Training method: combination of “on-site theory explanation + practical demonstration + trainee hands-on operation”, emphasizing practicality;
– Training time: scheduled on the day of completion acceptance, about 4 hours (1.5h theory + 2.5h practice), flexibly adjustable;
– Training materials: free paper and electronic “System Operation and Maintenance Manual” including schematics, component lists, operation instructions, maintenance guides and fault troubleshooting.
16.4 Training Assessment and Acceptance
– After training, verify training results through theory questions and practical assessment, covering daily operation, inspection maintenance, fault handling and safety specifications;
– Qualified means training completed; unqualified receive free secondary training until mastery;
– Both parties sign the “Training Confirmation Form” as part of the project acceptance documents.
17. Anonymous Typical Project Scenarios
The following cases are anonymous, generalized examples based on typical project implementations; no real customer names or locations are disclosed.
17.1 Power Distribution Project of an Auto Parts Factory Workshop
Project Overview
Located in Panyu, Guangzhou, this was the power distribution renovation project of an auto parts production workshop, configuring 12 floor-standing power distribution boxes with a total installed capacity of 1500kW, powering production line equipment, air compressors, fans and water pumps. The customer required high power supply reliability, complete protection, accurate metering and adaptability to the dusty, vibrating workshop environment.
Solution Configuration
– Each distribution box uses a cold-rolled steel cabinet with thickened plates and electrostatic spraying, protection level IP40;
– The main switch adopts an isolating leakage MCCB with the four functions of overload, short-circuit, leakage and isolation, with adjustable leakage action current;
– T1-class SPDs at the inlet side resist lightning and switching overvoltage;
– Transformer-type three-phase energy meters realize zoned energy metering with remote meter reading support;
– Outlet circuits customized per load capacity with 20% spare circuits reserved;
– YJV22 armored cables laid buried in conduits, adapting to the underground workshop environment.
Operation Effect
Since commissioning in 2023, the system has operated stably and reliably with accurate protection actions and no power supply safety accidents; accurate metering helped the customer realize per-workshop energy statistics and cost accounting; the complete protection functions repeatedly detected equipment leakage and short-circuit hazards in time, avoiding greater losses. The customer highly recognized the product quality and service, and continued cooperation in the second-phase expansion project.
17.2 Supporting Power Distribution Box Project of a Data Center

Project Overview
This was the auxiliary power distribution system of an IDC data center, configuring 8 power distribution boxes and 4 lighting distribution boxes for air conditioning, fresh air, fire protection, lighting and O&M power auxiliary loads. The data center has extremely high requirements for power supply reliability and anti-interference capability.
Solution Configuration
– High-quality cold-rolled steel cabinets with anti-static spraying, IP40, reasonable internal layout and good heat dissipation;
– Dual power automatic switching switches for the main switch with two mutually backup inlet circuits;
– T1+T2 two-level surge protection effectively suppressing lightning and switching overvoltage;
– First-line brand core components with stable performance and low failure rate;
– Intelligent power distribution monitoring modules for remote monitoring and fault alarms of voltage, current, power and energy.
Operation Effect
The system has been in operation for more than two years with stable power supply and reliable switching, without unexpected power outages; good surge protection effect with no overvoltage damage during the thunderstorm season; the intelligent monitoring function greatly reduced the inspection workload of O&M personnel and improved management efficiency.
17.3 Power Distribution Renovation Project of a Commercial Industrial Park
Project Overview
The original power distribution system of the commercial industrial park was aging with incomplete protection and extensive energy management, requiring overall power distribution renovation with 25 distribution boxes of various types replaced, covering factories, office buildings, dormitories and public areas.
Solution Configuration
– Customized configurations per load characteristics: MCCB leakage protection for power areas, miniature circuit breaker leakage protection for office areas;
– All smart energy meters with an energy management platform for per-household, per-zone and per-category energy statistics;
– Unified cabinet appearance and dimensions, improving the overall image of park power distribution facilities;
– Optimized circuit design with clear functional zones for convenient O&M management and fault troubleshooting.
Operation Effect
After renovation, the park power distribution system safety greatly improved with complete leakage and overload protection, effectively reducing electrical safety hazards; the energy management system helped the customer clearly grasp the electricity usage of each area, reducing electricity loss by about 10% through management optimization; standardized configuration and clear labels shortened O&M fault troubleshooting time by more than 60%.
17.4 Indoor Distribution Box Project of a Communication Base Station
Project Overview
Batch supply of base station indoor power distribution boxes for a communication operator, 30 units in the first batch, applied to multiple outdoor base station computer rooms in Guangdong, powering base station equipment, air conditioning, batteries and lighting. The boxes were required to adapt to wide temperature environments, have strong lightning resistance and stable operation with minimal maintenance.
Solution Configuration
– Thickened cold-rolled steel cabinets with anti-corrosion spraying, adapting to the humid environment with large temperature differences;
– Main switch with leakage protection and isolation functions;
– High-specification T1-class SPDs with large discharge capacity for the lightning-prone outdoor base station environment;
– Wide-temperature components adapting to -10°C~+55°C;
– Simple and reliable structure with reserved intelligent monitoring interfaces for later upgrades.
Operation Effect
The batch of distribution boxes has been in operation for 3 years with extremely low failure rate, adapting to the climate environments of different regions; no surge damage occurred during the thunderstorm season, greatly reducing base station O&M frequency and cost, highly recognized by the customer with continued batch procurement.
18. SEO Optimization Section
18.1 Full-Dimension Search Keyword Matrix
Core primary keywords
AP1 distribution box system, floor-standing power distribution box, low-voltage distribution box design solution, power distribution box configuration list
High-conversion long-tail keywords
800×600×2000 floor-standing distribution box, leakage-protected metering distribution box, industrial factory distribution box customization, low-voltage power distribution box quotation, floor-standing distribution box construction plan
Industry traffic keywords
low-voltage power distribution system design, power distribution box technical parameters, distribution box system configuration, electrical system diagram distribution box, factory power distribution solution
Brand-specific keywords
Lain distribution box, KITOZER Pioneer distribution box, Guangzhou Lain power distribution system
SEM search keywords
AP1 distribution box quotation, floor-standing distribution box manufacturer, industrial distribution box customization, low-voltage distribution box manufacturer, power distribution box wholesale
GEO search keywords
Guangzhou distribution box manufacturer, Panyu distribution box customization, Guangdong low-voltage distribution solution, Guangzhou floor-standing distribution box, Foshan power distribution box
Dropdown/related search keywords
how to read the AP1 distribution box system diagram, how to make the floor-standing distribution box foundation, distribution box SPD selection, how to choose a leakage circuit breaker, distribution box grounding specification
Site-wide layout keywords
computer room distribution box, shielded computer room power distribution, integrated cabinet power distribution, containerized computer room power distribution, micro-module cold aisle power distribution
18.2 SEO Page Optimization Tags
– Title tag: AP1 Distribution Box System Technical Design Solution_Floor-Standing Power Distribution Box Configuration List_Guangzhou Lain Intelligent
– Meta Keywords: AP1 distribution box, floor-standing power distribution box, low-voltage distribution box design solution, power distribution box configuration list, industrial distribution box customization, Guangzhou distribution box manufacturer
– Meta Description: Guangzhou Lain Intelligent professionally provides the AP1 floor-standing power distribution box system design solution, including a complete configuration list, full-series product technical parameters, construction organization plan and after-sales guarantee; non-standard customization supported, direct supply from the original factory.
– H1 tag: AP1 Distribution Box System Technical Design Solution
– H2 tags: Company Introduction, Project Overview, User Requirement Analysis, System Design Description, Quotation and Configuration List, Product Technical Parameters, Solution Advantages, Technical Q&A, Construction Schedule, Construction Organization Plan, After-Sales Service, Training Plan, Project Cases
18.3 Internal Link Anchor Text Layout
– Core anchor text: low-voltage distribution box, power distribution box, floor-standing distribution box, distribution box system solution
– Long-tail anchor text: distribution box with leakage protection, power distribution box with metering, floor-standing distribution box for industrial factories, T1-class surge protection distribution box
– Related anchor text: computer room construction, micro-module cold aisle, integrated cabinet, outdoor cabinet, shielded computer room, low-voltage power distribution system
19. Official Contact Information
– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Website: https://gdlain.com
– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China