Table of Contents
ToggleEnglish Version
Chapter 1: Why Dual-Source Power Transfer Matters
1.1 The Engineering Reality of Power Reliability
In modern electrical infrastructure, “power reliability” is no longer a concept that can be dismissed with the phrase “we’ll fix it when the outage happens.” A mid-sized data center loses tens of thousands of RMB per minute of downtime. A hospital operating theater losing power mid-surgery can mean a patient’s life. A skyscraper’s fire pump failing to start during a fire is catastrophic. Yet no matter how robust the municipal grid becomes, line maintenance, transformer failures, extreme weather, accidental cable damage, and harmonic pollution cannot be eliminated entirely.
The engineering solution is not to pursue a single feed that never fails — economically and technically impossible — but to provide two independent sources for critical loads and automatically transfer between them when one fails. This is the role of the Automatic Transfer Switching Equipment (ATSE), universally shortened in the field to ATS.
A dual-source power system has three layers. First, source-side redundancy: two 10kV feeds from different substations, or one utility feed plus a standby diesel generator. Second, distribution-path redundancy: two independent bus sections from the low-voltage switchroom to the floor. Third, the transfer device itself — the ATSE — which must complete the transfer “seamlessly, safely, and observably.” Seamless means downstream sensitive loads do not dropout; safe means the two sources are never paralleled; observable means every voltage, frequency, and position state is reported to the monitoring platform.
1.2 Where the ATS Sits in the Distribution Chain
A typical 10kV/0.4kV dual-source architecture:
- Utility source 1 → HV incoming cabinet 1 → Transformer T1 (10/0.4kV, 800–2000kVA) → 0.4kV Bus Section I
- Utility source 2 (or 10kV generator output) → HV incoming cabinet 2 → Transformer T2 → 0.4kV Bus Section II
- A bus-tie cabinet links Sections I and II; normally open, closed only when one transformer fails
- From each bus section, cables run to remote dual-source ATS panels at floor or equipment-room level
- The ATS output feeds fire pumps, elevators, the weak-current room, operating theaters, or data center rack PDU busbars
The critical regulatory point: fire pumps, weak-current systems, and operating theaters must switch at the last level of distribution — not just once in the switchroom. Because the cable between the switchroom and the load can itself fault, end-of-line ATS is the only true redundancy.
1.3 A Brief History of Transfer Technology
The ancestor of the ATS was the double-throw knife switch of the early 20th century. Engineers physically threw a massive blade between “utility” and “emergency generator.” Motor-operated mechanisms replaced manual blades by the 1920s.
The 1960s brought the Static Transfer Switch (STS) using reverse-parallel SCRs, achieving sub-quarter-cycle (5ms) transfer — a revolution for aerospace and mainframe computer rooms.
The 1980s saw European and Japanese manufacturers introduce motor-mechanical ATS with spring-charged mechanisms, transferring in 100–1000ms at a fraction of STS cost. IEC issued 60947-6-1 in 1989; China adopted it as GB/T 14048.11 in 1997, revised in 2002, 2008, 2016, and 2024.
Today’s smart ATS controllers combine microprocessors, LCD touchscreens, harmonic analysis, remote communications, and event logging. KITOZER’s current-generation controllers connect natively to DCIM and building-management platforms over RS485 Modbus RTU, Ethernet Modbus TCP, or SNMP.
1.4 Purpose of This Handbook
This is not an expanded product brochure. It is an engineering design handbook aimed at electrical designers, switchgear builders, construction project managers, and owner-side O&M engineers. We assume the reader already knows breakers, contactors, CTs, and short-circuit calculation — but may lack systematic experience with ATS selection, wiring, commissioning, and maintenance.
Chapter 2: ATS vs STS vs Bus-Tie vs Dual-Utility Reclosing
2.1 Topology Definitions
End-of-line ATS. Two sources (Normal N, Emergency R) enter the ATSE; a mechanically interlocked double-throw switch selects one to feed the load. The controller continuously monitors both sources.
STS (Static Transfer Switch). Same topology, but the switching elements are reverse-parallel silicon-controlled rectifiers with no moving parts. Transfer time 4–8ms. Built as integrated floor-standing cabinets with SCR stacks, snubbers, and controllers.
Bus-tie automatic transfer. A frame circuit breaker (ACB) links two low-voltage bus sections. Normally open; when one incoming transformer fails, the breaker trips and the bus-tie closes, letting the healthy transformer carry both sections. The object of switching is the bus, not the end load.
Dual-utility automatic reclosing. Two utility feeds interlocked via two breakers; when one dies, the other closes. Common in rural irrigation and remote pump stations, rare in urban buildings.
2.2 Head-to-Head Comparison
| Dimension | End-of-line ATS | STS | Bus-tie Auto | Dual-Utility Auto |
|---|---|---|---|---|
| Switching element | Mechanical contacts | SCRs | ACB frame breaker | Breaker/load switch |
| Transfer time | 100–3000ms (adjustable) | 4–8ms | 500–5000ms | 100–5000ms |
| Load interruption | Yes | Near-zero (half cycle) | Yes (whole bus) | Yes |
| Short-circuit breaking | CB-class yes / PC-class no | No (needs upstream) | Yes (ACB) | Yes |
| Mechanical life | 5,000–10,000 ops | Semi-permanent (>1M) | 5,000–20,000 | 5,000 |
| Cost (100kVA class) | ¥8k–20k | ¥80k–200k | ¥30k–80k | ¥10k–30k |
| Harmonic heat | None | Significant SCR drop | None | None |
| Cooling | Natural convection | Forced fans | Natural | Natural |
| Remote comms | Standard Modbus | Standard Modbus/SNMP | Optional | Rare |
| Typical load | Fire pumps, elevators | Data center IT, imaging | LV bus | Rural irrigation |
2.3 Why STS Is Not the Universal Answer
“Why not use STS everywhere in the data center?” The answer: cost, energy, and capacity.
Cost: a 400A STS costs 8–15× a PC-class ATS. A 2,000-rack data center would add tens of millions RMB if every rack used STS. The rational architecture uses UPS (which itself is continuous) behind an ATS for utility-to-generator transfer, then uses STS only on the UPS output for dual-path redundancy to server PDUs — the classic 2N or 2(N+1) topology.
Energy: a conducting SCR still drops 1.2–1.5V. At 400A per phase, that is ~500W loss per phase, ~1.5kW three-phase — over 10,000 kWh/year. Mechanical ATS contacts have micro-ohm resistance and negligible loss.
Capacity: SCR parallel scaling is hard; mainstream STS maxes at 800A per unit. Mechanical ATS integral switches reach 3,200A and even 6,300A.
2.4 How Bus-Tie and End ATS Work Together
GB 50052 requires Level-1 loads to be fed from two sources that cannot fail simultaneously. In practice this means four layers: HV dual incoming, dual transformers, LV bus-tie, and end-of-line ATS. The bus-tie handles transformer-level faults; end-of-line ATS handles cable-level and breaker-level faults.
KITOZER’s recommended hierarchy for critical buildings:
– HV room: two 10kV incomers, two transformers
– LV room: two 0.4kV bus sections with bus-tie (manual or auto)
– Floor/room: dual-source ATS panel for each Level-1 load
– Device: pumps, elevators, AHUs fed by the ATS panel
2.5 The Limits of Dual-Utility Reclosing
In remote areas, owners sometimes ask to skip the generator and rely on two utility feeds. This works only if: (a) the two feeds come from different substations with physically separate routes; (b) both feeds have low outage probability; (c) power quality on both feeds is comparable. For data centers, hospitals, and financial sites, KITOZER recommends utility + generator, not utility + utility.
Chapter 3: Operating Principles — PC-Class, CB-Class, and ATSE Selection
3.1 ATSE Definition and Classification
Per IEC 60947-6-1 and GB/T 14048.11, an ATSE is “a complete device consisting of one or more switching elements and associated control circuitry, designed to monitor the supply circuits and automatically transfer one or more load circuits from one source to another.” The ATSE itself is a component; stuffing it into a cabinet with breakers, terminals, and meters makes it an “ATS cabinet.”
PC-class ATSE has no short-circuit breaking capacity, but can carry and make short-circuit currents. It is essentially a double-throw isolating switch plus motor operator plus controller. On a downstream short, the PC-class ATSE must stay closed while the upstream breaker clears the fault. Its contacts must withstand the electrodynamic and thermal stress — quantified as Icw (rated short-time withstand current) and its peak equivalent.
CB-class ATSE has short-circuit breaking capacity. It is two MCCBs plus mechanical and electrical interlocks plus a controller. On overload or short, the corresponding MCCB trips.
One sentence: PC-class “switches but does not protect”; CB-class “switches and protects.”
3.2 PC-Class Construction
The PC-class ATSE has three subassemblies:
Switch body. A three-position contact design — “Normal closed,” “Off,” “Emergency closed.” A spring-charged mechanism drives between positions in 80–300ms. The geometry guarantees mechanical mutual exclusion: the two sources can never be closed simultaneously.
Motor operator. A small reversible gear motor charges the spring and releases it. The motor is energized only during the 1–2 second transfer event.
Controller. A microcontroller samples both sources’ three-phase voltages (and often current and frequency), applies threshold and delay logic, and commands the motor operator.
PC-class advantages: compact, fast, long mechanical life, high current (up to 3,200A). Disadvantage: no protection — requires upstream and downstream breakers.
3.3 CB-Class Construction
Two same-rating MCCBs, a mechanical interlock, an electrical interlock, and a controller. Outputs of both MCCBs are paralleled to the load; inputs go to Normal and Emergency sources. The mechanical interlock guarantees at most one MCCB is closed; the controller provides a software interlock as a second layer.
CB-class advantages: built-in overload and short-circuit protection. Disadvantages: larger footprint, two breakers add cost, shorter mechanical life (MCCBs typically 5,000–10,000 ops vs PC-class 10,000–30,000).
3.4 Selection Decision Tree
- Is there independent short-circuit protection downstream? If yes, PC-class. If no (ATS feeds a large motor directly with slow upstream protection), CB-class.
- Does local fire acceptance require PC-class? Many fire departments in the Yangtze and Pearl River Deltas mandate PC-class for fire-pump ATS. If in doubt, choose PC-class.
- What is the short-circuit level? If it exceeds 36kA, CB-class MCCB may not break it — use PC-class with upstream ACB.
- Frequent transfers? If the ATS transfers monthly (e.g., a mountain pump station alternating utility and small hydro), PC-class for longer life.
- Cost sensitivity? CB-class is 20–40% cheaper at equal current because two domestic MCCBs cost less than an imported PC switch. But subtract the separate breaker a PC-class needs.
3.5 Four Critical Parameters
- Rated current Ie. KITOZER covers 16A, 32A, 63A, 100A, 125A, 160A, 250A, 400A, 630A, 800A, 1000A, 1250A, 1600A. Select at 1.25× calculated current.
- Rated short-time withstand current Icw. The RMS short-circuit current the PC-class ATSE can carry for 1s (or 3s). Must exceed the available fault current. KITOZER PC 400A: 20kA/1s; 630A: 30kA/1s; 1600A: 50kA/1s.
- Rated short-circuit making capacity Icm. Peak current the contacts can close into. Typically 2.1×–2.2× Icw at pf 0.5.
- Rated service short-circuit breaking capacity Ics. CB-class only; matches the installed MCCB.
3.6 Poles: 2P, 3P, or 4P
- 2P switches line and neutral for single-phase 220V loads.
- 3P switches three lines only, sharing one neutral — for three-phase three-wire loads (660V mining, some industrial motors).
- 4P switches three lines plus neutral — mandatory for TN-S and TN-C-S systems, the Chinese civil-building mainstream.
Why 4P? Because the two sources may come from different transformers with different neutral-ground resistance, creating a neutral potential difference. If the neutral is not switched, paralleling the two neutrals causes circulating current that burns equipment. KITOZER defaults to 4P in all civil projects, with neutral switching within 20ms of the lines.
3.7 Transfer Logic: BBM vs MBB
Break-Before-Make (BBM): open the Normal source, wait a dead time (0–5s adjustable), then close Emergency. This is the standard, safe logic — the sources are never paralleled.
Make-Before-Break (MBB): close Emergency first, then open Normal. Requires strict synchronism (same phase, voltage, frequency) or massive circulating current. Used only at bus-tie with a synch-check relay. End-of-line ATSE must never use MBB.
All KITOZER standard products are BBM in hardware and firmware; there is no MBB option.
Chapter 4: KITOZER ATS Series Specifications
4.1 Series Overview
| Series | Class | Current Range | Poles | Transfer Time | Typical Use |
|---|---|---|---|---|---|
| KITOZER-ATS-Smart | PC smart | 16–630A | 4P | 200–1000ms | Fire, hospital, DC end |
| KITOZER-ATS-Power | PC heavy-duty | 630–1600A (up to 3200A custom) | 4P | 300–1500ms | LV bus-tie, large loads |
| KITOZER-ATS-CB | CB economy | 100–630A | 4P | 800–3000ms | General building drainage, industrial auxiliaries |
| KITOZER-ATS-Medical | PC medical | 63–630A | 4P | ≤200ms | OR, ICU, imaging |
4.2 Standard Cabinet Dimensions
| Rated Current | Cabinet W×D×H (mm) | Type | IP | Weight (kg) |
|---|---|---|---|---|
| ≤100A | 600×600×2200 | GGD | IP30 | 90 |
| 125–250A | 800×600×2200 | GGD | IP30 | 120 |
| 400–630A | 800×800×2200 | GGD | IP30 | 180 |
| 800–1000A | 1000×800×2200 | GCS | IP30 | 260 |
| 1250–1600A | 1000×1000×2200 | GCS | IP30 | 340 |
| >1600A (custom) | 1200×1000×2300 | GCS | IP30 | 450 |
Outdoor or dusty sites can be upgraded to IP54 with filtered fans and gaskets.
4.3 Rated Data (KITOZER-ATS-Smart)
| Parameter | Value |
|---|---|
| Rated operational voltage Ue | AC 400V (50/60Hz); custom AC 230V, AC 690V |
| Rated insulation voltage Ui | AC 1000V |
| Rated impulse withstand Uimp | 12kV |
| Rated current Ie | 16/32/63/100/125/160/250/400/630A |
| Poles | 4P (3P+N) |
| Utilization category | AC-33B |
| Rated short-time withstand Icw | 12kA/1s (≤100A); 20kA/1s (125–250A); 30kA/1s (400–630A) |
| Rated short-circuit making Icm | 26kA / 42kA / 63kA |
| Mechanical transfer time | 200–800ms (spring mechanism) |
| Controller delays | Normal abnormal: 0–5s; Emergency confirm: 0–5s; Return: 0–300s |
| Controller supply | AC 220V (from both sources); DC 24V optional |
| Comms | RS485 Modbus RTU (std); Ethernet Modbus TCP (opt); SNMP v2c (opt) |
| Aux contacts | 4NO/4NC position + 2NO/2NC alarm |
| Mechanical life | ≥10,000 ops |
| Electrical life | ≥1,500 ops (AC-33B) |
| Temperature rise | Main circuit ≤70K at 40°C ambient |
| Protection | IP30 cabinet, IP20 live parts |
| Ambient temp | −5 to +40°C (outdoor: −25 to +55°C) |
| Humidity | ≤90% at 25°C, no condensation |
| Pollution degree | 3 |
| Installation category | IV |
4.4 Controller Panel
Four zones:
– Display: 128×64 dot-matrix LCD showing Normal three-phase voltage, Emergency three-phase voltage, frequency, current position, cumulative transfers, last fault code.
– Keys: Menu, Up, Down, Enter to adjust thresholds, delays, comms address, baud.
– LEDs: Normal healthy (green), Emergency healthy (green), Normal abnormal (red), Emergency abnormal (red), on Normal (white), on Emergency (amber).
– Manual selector: key-operated switch with Auto / Manual-Normal / Manual-Emergency positions; key removable to lock Auto.
4.5 Factory-Set and Adjustable Parameters
| Parameter | Factory | Range | Note |
|---|---|---|---|
| Over-voltage | 264V phase | 230–280V | Above = abnormal |
| Under-voltage | 187V phase | 150–220V | Below = abnormal |
| Over-frequency | 50.5Hz | 50.5–52Hz | |
| Under-frequency | 49.5Hz | 47–49.5Hz | |
| Phase-loss threshold | <80% rated | 70–95% | |
| Normal abnormal delay T1 | 2.0s | 0–5s (fire fixed 0.5s) | |
| Emergency confirm delay T2 | 0.5s | 0–5s | |
| Return delay T3 | 30s | 0–300s | |
| Transfer counter | 0 | read-only | |
| Event log | empty | read-only | Last 10 events |
Fire-rated KITOZER-ATS-Fire locks T1=0.5s, T2=0.2s, T3=60s; field modification prohibited.
4.6 Benchmark Against Comparable Products
| Item | KITOZER-Smart 400A | Schneider WATSG-400 | Socomec ATyS-400 | Domestic A 400A |
|---|---|---|---|---|
| Class | PC | PC | PC | CB |
| Icw (1s) | 30kA | 25kA | 30kA | n/a (MCCB) |
| Transfer time | 300ms | 400ms | 180ms | 1500ms |
| Comms | Modbus TCP + SNMP | Modbus (module extra) | Modbus (module extra) | None |
| Event log | 10 entries | None | 5 entries | None |
| Price (ATSE only) | ¥6,800 | ¥18,500 | ¥22,000 | ¥3,200 |
| Local service | Guangzhou 48h | Distributor 7 days | Distributor 14 days | Factory 5 days |
KITOZER positions itself as “performance at Socomec level, price at domestic mid-range,” differentiated by native comms, traceable event log, and fast local service.
Chapter 5: Controller Functions in Depth
5.1 Voltage Sensing Principle
The KITOZER controller samples three-phase voltage on both Normal and Emergency sources simultaneously. Each phase passes through a resistor divider to 0–5V and into the microcontroller ADC at 64 samples per cycle (3,200Hz at 50Hz). The MCU computes true RMS and updates the display every 20ms.
Unlike old rectifier-and-meter circuits, true-RMS sampling stays accurate even with distorted generator waveforms, computes harmonics, and detects sags and swells with duration.
Three threshold bands:
– Normal: 198–264V phase (342–456V line)
– Warning: 187–198V or 264–275V (panel flashes, no transfer)
– Abnormal: <187V or >264V (after delay, transfer)
This three-band design prevents nuisance transfers from motor-start dips.
5.2 Frequency Detection
Zero-crossing detection shapes the voltage to a square wave; the MCU capture pin measures the period between rising edges. Accuracy ±0.01Hz, response 200ms. Frequency anomalies occur during generator startup (40–55Hz as the engine spools up) and during grid instability. The controller declares a source “unusable” if frequency is out of band even when voltage looks normal — preventing transfer to a generator about to collapse.
5.3 Phase-Sequence Detection
When both sources are live, the controller computes positive- and negative-sequence components. If Normal is positive-sequence (A-B-C) but Emergency is negative-sequence (A-C-B), the LCD shows “phase sequence error” and inhibits transfer. Transferring a motor load to a reversed source causes instant reversal and destructive rotation. KITOZER factory-verifies phase sequence, but field cabling errors still occur — this function catches them, especially when generators are tied in.
5.4 Delay Strategy: Why Delays Matter
Without delays, ATS is dangerous:
– Utility dips often last 0.05–0.5s; without delay the ATS would false-transfer while the source recovers.
– Diesel generators need 5–15s to stabilize voltage and frequency.
– After the utility returns, instant return trips the generator offload prematurely and causes frequent starts.
Four delay stages:
1. T1 (Normal abnormal confirm, 0–5s): how long an anomaly must persist before transfer. Fire loads 0.5s; general loads 2s.
2. T2 (Emergency stable confirm, 0–5s): how long Emergency must be stable before closing. Utility-to-utility 0.2s; utility-to-generator 3–5s.
3. T3 (Normal return confirm, 0–300s): how long Normal must stay healthy before returning. Typically 30–300s.
4. T4 (generator cool-down, 0–600s, generator version only): generator continues unloaded after return to shed heat.
All parameters are adjustable via panel or Modbus.
5.5 Manual / Auto Modes
- Auto: fully automatic.
- Manual-Normal: force-close to Normal, ignore Emergency state. Used when maintaining the Emergency feeder.
- Manual-Emergency: force-close to Emergency. Used when maintaining the Normal feeder.
Manual mode still displays voltages but does not act. The key switch locks in Auto when the key is removed.
5.6 Remote Monitoring
Standard RS485 Modbus RTU at 9600/19200/38400 baud, 8 data bits, 1 stop, no/even parity. Optional Ethernet module supports Modbus TCP and SNMP v2c/v3.
Readable points include Normal three-phase voltage/current/power/energy, Emergency voltage/frequency, current position, source health, cumulative transfers, last 100 events, internal temperature. Writable points include remote transfer commands, parameter overrides, alarm reset, and remote lockout.
KITOZER ships a complete register map and MIB file. A typical DCIM integration uses 20–30 points per ATS.
5.7 Event Logging and Self-Test
The controller has 32KB EEPROM for the last 100 events, each with timestamp, event code, pre- and post-voltages. Event types include Normal lost, Normal restored, transfer to Emergency, transfer to Normal, phase error, power-up, power-down, manual operation, comms failure.
In one data-center incident, “nighttime server reboot” was traced via the ATS event log to a 1.8s utility sag at 02:17:33: the ATS did not transfer (T1=2s), but the upstream UPS switched to battery and its output contactor rebounded, rebooting the servers. The event log pinpointed the root cause.
On power-up the controller self-tests voltage sensing, position feedback, and motor drive. Failures show F01–F09 and are reported over comms.
5.8 Controller Power Reliability
The controller draws AC 220V from both sources through two diodes in parallel. Either source keeps it alive. If both sources die, an internal supercapacitor sustains the LCD and comms for 30 seconds — enough to report “both sources lost” before safe shutdown.
Chapter 6: Typical Applications
6.1 Data Centers
A Tier III data center uses 2N architecture: two 10kV feeds from different substations, two 2,000kVA transformers, two 0.4kV bus sections with bus-tie, each bus feeding a 500kVA UPS group (2+1 parallel), and UPS output to rack PDUs.
ATS in data centers sits at:
– UPS input ATS: switches utility-to-utility or utility-to-generator into the UPS input. The UPS rides through, so a 1,000ms ATS transfer is fine.
– Generator paralleling cubicles: multiple generators parallel as the Emergency source, feeding the ATS.
– End-of-line ATS for non-IT loads: CRAC units, lighting, maintenance receptacles.
KITOZER supplied 46 ATS cabinets for a Tier III project, all integrated into the DCIM for real-time alarm, monthly transfer statistics, and annual power-quality analysis.
6.2 Hospitals
GB 51039 requires dual-source end-of-line ATS for operating theaters, ICUs, emergency resuscitation, dialysis, medical gas, and fire control rooms.
Hospital-specific requirements:
– Medical IT isolation: the 230V OR supply passes through an isolation transformer; the ATS is upstream of the isolation transformer.
– Transfer ≤0.5s: ventilators and anesthesia machines have internal battery ride-through of 0.5–1s; beyond that they reboot. KITOZER-ATS-Medical transfers in ≤200ms.
– IT system insulation monitoring: in IT-earthed systems the ATS also monitors earth-fault insulation resistance.
6.3 Fire Protection
GB 50016 Section 10.1.8 mandates automatic transfer at the final distribution box for fire control rooms, fire pump rooms, smoke-exhaust fans, fire elevators, fire shutters, and the fire panel.
Fire-ATS specifics:
– PC-class (CB-class often rejected by fire acceptance)
– T1 fixed at 0.5s, field-immutable
– CCCF fire-product certification
– Fire-link interface: the fire alarm system can force the ATS to Emergency even if Normal is healthy — because a fire may damage the Normal feeder cable
– Normally fire pumps run on Normal; during a fire the fire panel forces Emergency to guarantee power from the most reliable source
KITOZER-ATS-Fire carries full CCCF certification and has passed acceptance on hundreds of South China projects.
6.4 Industrial Pump Stations
Wastewater, water-treatment, and irrigation pumps (90–500kW) are Level-2 loads. Pump stations are remote; standby is a diesel generator or small hydro.
Pump-ATS characteristics:
– High current (200–800A), large starting inrush
– Harsh environment (humid, dusty) — IP54
– Long comms distance — fiber converts RS485 to Ethernet for the dispatch center
– Interlock with water-level signals and PLC: pump failure auto-switches to standby pump; power failure auto-switches to standby source
KITOZER deployed 12 ATS cabinets at a coastal wastewater plant, linked by fiber ring to the plant SCADA for remote transfer, remote parameter tuning, and automatic work-order dispatch.
6.5 Mines and Tunnels
Underground coal/metal mines and highway tunnels are explosive or corrosive environments. Mine ATS runs at 660V or 1,140V (not 400V), explosion-proof ExdIIBT4, with MYP mining shielded cables, installed in underground substations. Long tunnels (>3km) use two substations互为 backup; tunnel lighting runs three-stage control (full / half / off); jet fans (45–110kW) use soft starters plus ATS.
KITOZER builds explosion-proof ATS to MA (mine safety) certification on request.
6.6 Commercial Buildings and Office Towers
Shopping malls and supertall office towers have 30–50 ATS cabinets on floor electrical closets feeding elevators, weak-current rooms, fire pumps, and domestic water pumps. Cabinets are typically GCS withdrawable, with the ATSE in a standard drawer for live replacement.
6.7 Cell Sites and Edge Rooms
5G base stations and edge nodes run on 220V utility plus 48V battery. Their ATS is a small single-phase unit (2P, 32–63A) switching between two 48V DC rectifiers. KITOZER offers a DC-ATS series with ≤10ms transfer.
Chapter 7: Coordination with UPS and Generators
7.1 Typical Power Chain
The ATS sits between utility/generator and the UPS input. It switches the UPS source; the UPS output never drops. This is why the ATS can be second-level — the UPS battery rides through.
7.2 Sizing the ATS Against the UPS
ATS rated current must exceed the UPS full-load input. For a 200kVA UPS, pf 0.9, efficiency 0.95:
I = 200kVA × 0.9 / (0.4kV × √3 × 0.95) = 274A
Apply 1.25× margin: 274 × 1.25 = 343A — select a 400A ATS. If the ATS also feeds direct loads (AC, lighting), add them all and multiply by 1.25.
7.3 Generator–ATS Sequencing
The full sequence:
1. Normal utility lost
2. Controller waits T1 (2s) to confirm
3. Closes the generator-start dry contact
4. Generator starts; 5–15s later voltage/frequency stabilize
5. Emergency voltage/frequency healthy
6. Controller waits T2 (3s) for generator stability
7. ATS transfers Normal→Emergency (300ms mechanical)
8. Load on generator
9. Utility restored
10. Controller waits T3 (30s)
11. ATS transfers Emergency→Normal (300ms)
12. Opens generator-stop contact
13. Generator idles T4 (300s) to cool down, then shuts down
Total from outage to restored load: 10–25s. The UPS battery holds the servers through this window.
KITOZER ATS controller ships with a dry contact (AC 250V/5A) wired directly to the generator panel’s remote-start terminals.
7.4 Multiple Generators in Parallel
For 2N generator plants, the ATS Emergency feeds the paralleling bus rather than a single generator. This means:
– Paralleling-bus voltage/frequency stabilizes more slowly (20–30s)
– T2 should be 5–10s
– Phase sequence must be checked against the paralleling bus
– Higher harmonic content requires filtered voltage sensing
7.5 Mixed ATS + STS Architecture
High-tier data centers use three levels: ATS (utility/generator) → UPS → STS (dual UPS output to rack PDU). The first level uses cheap ATS for source faults; the second uses STS for UPS faults. This balances cost and reliability.
Chapter 8: Installation and Wiring
8.1 Primary Wiring Topology
Each incoming line has an MCCB for isolation and protection. A PC-class ATSE does not break fault current; the upstream MCCB clears it. The MCCB short-time delay must coordinate with the ATSE Icw: the MCCB must clear in less than the 1s that the ATSE can withstand.
8.2 Cable Sizing
ATS cables are sized at 1.25× calculated current with derating for installation method. For a 400A ATS:
– Calculated current 320A
– Select YJV-0.6/1kV-3×240+2×120 copper (ampacity ~380A in air)
– One cable per incoming line, one outgoing
– Cable lugs crimped and torqued per Chapter 11
8.3 Secondary Control Wiring
KITOZER ATS secondary circuits include:
Controller supply: AC 220V tapped from Normal L1-N and Emergency R_L1-N through two diodes in parallel. Either source keeps the controller alive.
Position feedback: ATSE “on Normal” and “on Emergency” auxiliary contacts feed both the controller and remote monitoring.
Alarm contact: A Form-C dry contact closes on any source anomaly, routed to BMS or fire alarm.
Generator start: A Form-C dry contact closes after T1 confirmation, wired to the generator panel remote-start terminals.
Fire-link input: Fire-rated models add an input contact; closing it forces the ATS to Emergency regardless of Normal health.
8.4 Interlocks
Three layers:
– Mechanical: inherent in the ATSE body — the two positions are geometrically exclusive. This is the primary interlock, independent of electronics.
– Electrical: controller firmware never commands both positions closed. Even if the mechanical linkage fails, the electrical interlock prevents paralleling.
– Door interlock: on the HV side (if any), the door interlocks with the incoming breaker. Low-voltage ATS cabinets do not require this.
8.5 Earthing and Surge Protection
The PE busbar bonds to the building earth main with resistance ≤1Ω. All metal doors, mounting rails, and brackets bond to PE with braided copper. Cable armor is earthed at both ends. Where the ATS sits at the LPZ0/LPZ1 boundary, install a Type-II SPD (40kA) on the incoming feed.
8.6 Clearances
- Front: ≥1,500mm for door opening and operation
- Rear: ≥800mm for cable and maintenance
- Top: ≥500mm for busway or cable tray
- Side: ≥200mm (zero when adjacent cabinets touch)
Floor flatness ≤2mm/m; cabinets bolted to channel steel with M12 expansion anchors.
Chapter 9: Commissioning and Type Tests
9.1 Pre-Energization Checklist
- Visual: no cabinet deformation, paint intact, gaskets sealed, vents clear.
- Component check: ATSE model, breaker trip settings, controller model match drawings.
- Primary wiring: inspect busbar bolt torque (20% sample with torque wrench), cable lugs tight, phase colors correct (A-yellow, B-green, C-red, N-light blue, PE-green/yellow).
- Secondary wiring: terminal-by-terminal check against the schematic. Verify controller supply polarity, position feedback, generator-start contacts.
- Insulation: 1,000V megger on primary to earth ≥1MΩ; 500V megger on secondary ≥0.5MΩ. Isolate the controller and meters during megger testing.
- Phase sequence: verify both sources are positive-sequence with a sequence tester.
9.2 De-Energized Then Energized Checks
Close incoming breakers. Verify:
– Controller powers up, LCD shows both voltages; compare with a meter.
– Parameters match design (over/under voltage, frequency, delays).
– Manual transfer: key to Manual-Normal, observe closure; key to Manual-Emergency, observe closure. Listen for clean spring action.
– Position feedback matches remote monitoring.
9.3 Loaded Transfer Tests
Test 1: Normal loss. Close Normal, ATS on Normal. Open the Normal breaker. After T1 the ATS must transfer to Emergency. Measure total time = T1 + T2 + mechanical time. The load (a dummy motor or UPS) must ride through.
Test 2: Return on Normal restoration. ATS on Emergency. Close Normal. After T3 the ATS returns. Observe the load dropout.
Test 3: Phase loss. Disconnect one Normal phase. The controller must detect phase loss within 2s and transfer.
Test 4: Over/under voltage. Use a variac to drive Normal to 270V or 180V. The controller must trigger transfer; restore and verify return.
Test 5: Phase-sequence error. Swap two Emergency phases. The controller must show “phase sequence error” and inhibit closing on Emergency.
9.4 Transfer-Time Measurement
Use an oscilloscope or power-quality analyzer. Clip one voltage probe on the Normal incoming and one on the ATS output. Time from Normal voltage collapsing to zero until output voltage returns. KITOZER-ATS-Smart 400A measured:
– Mechanical action: 280–350ms
– With T1=2s and T2=0.5s, total ~2.8–3.0s
– Fire version T1=0.5s: total ~1.0–1.3s
9.5 Fire-Link Test (Fire Version)
Issue a “force to Emergency” command from the fire panel; the ATS must transfer immediately (no T1 wait). On signal release, behavior depends on design (usually no auto-return; manual reset required). Verify the CCCF label matches the nameplate.
9.6 72-Hour Run-In
After all tests, run the cabinet for 72 hours. Record hourly Normal/Emergency voltage and frequency, transfer count (should be zero unless real outages occur), internal temperature (infrared on ATSE contacts), and nuisance alarms. No anomalies = acceptance.
Chapter 10: Maintenance and Troubleshooting
10.1 Monthly Walkdown
- LCD Normal/Emergency voltage and frequency within range
- LEDs match current position
- Infrared temperature on ATSE and breaker lugs; rise ≤40K
- Listen for abnormal hum or relay chatter
- Smell for overheated insulation
10.2 Quarterly Service
- Re-torque primary bolts
- Vacuum interior (do not use compressed air — it drives dust into contacts)
- Check secondary terminals
- Run one loaded manual transfer
- Back up controller parameters via Modbus
10.3 Annual Overhaul
- De-energize both sources, LOTO
- Open ATSE contact cover; inspect contact erosion. If cumulative transfers approach 8,000 (out of 10,000), plan contact replacement.
- Inspect charge spring for corrosion or deformation
- Inspect motor operator brushes (if fitted)
- Megger insulation
- Re-torque all primary bolts
- Update the asset record
10.4 Troubleshooting Trees
Fault 1: ATS does not transfer despite Normal loss.
1. Does LCD show “Normal abnormal”? If it shows “healthy,” the voltage sense circuit has failed — check sense wiring and parameters.
2. If abnormal shown but no transfer, check T1 (may have been set to 30s).
3. Check key switch not in Manual.
4. Check motor-drive fuse.
5. Check for mechanical seizure (try the manual crank).
Fault 2: Frequent transfers.
1. Read the event log.
2. If triggered by under-voltage, log the Normal feed with a recorder.
3. If by frequency, check nearby large loads (elevators, AHU compressors).
4. Increase T1 from 2s to 3s to ride through dips.
5. Check for loose sense wiring causing jitter.
Fault 3: Stuck on Emergency, no return.
1. Does LCD show Normal healthy? If not, Normal is genuinely not restored or still below threshold.
2. Check T3 (300s = 5 min, looks like “no return”).
3. Check “inhibit return” — some projects enable “transfer once only.”
4. Try the manual return button.
Fault 4: LCD dead.
1. Measure AC 220V at controller supply terminals.
2. Check controller supply fuse.
3. If both sources are dead, the supercap holds only 30s — expected.
4. If both sources live and LCD dead, replace the controller.
Fault 5: Comms failure.
1. Swap A/B on RS485.
2. Verify baud and address match the SCADA.
3. Measure A-B voltage (0.2–5V normal).
4. Add a 120Ω terminator at the bus end.
5. Ensure comms cable is not in the power cable tray.
Fault 6: Excessive contact temperature rise.
1. Infrared-locate the hot spot (incoming, outgoing, or ATSE body).
2. If a lug, torque and clean.
3. If the ATSE body, contacts are eroded — schedule overhaul.
4. Measure three-phase current balance; phase loss or overload causes localized heating.
10.5 Recommended Spares
- One controller (~Â¥1,500; swap and restore from backup)
- Auxiliary contacts
- Control fuses
- Comms module (RS485-to-Ethernet)
The ATSE body itself is normally not stocked; mechanical life is long and a factory replacement takes 2–4 weeks.
Chapter 11: Selection Calculations
11.1 Load Current
Sum the downstream loads:
I_total = Σ (P_i / (√3 × U × cosφ × η_i)) × K_s
where K_s is a diversity factor (0.7–0.9).
Example: a 200kVA UPS (pf 0.9), a 45kW AC, 20kW lighting:
– I_UPS = 200 × 0.9 / (√3 × 0.4 × 0.95) = 274A
– I_AC = 45 / (√3 × 0.4 × 0.85 × 0.9) = 85A
– I_Light = 20 / (√3 × 0.4 × 0.95) = 32A
– Sum = 391A; ×0.85 = 332A; ×1.25 = 415A → select 630A ATS (400A is marginally tight)
11.2 Short-Circuit Check
The available fault current at the ATS must be less than Icw (PC) or Icu (CB).
For a 1,600kVA transformer with 6% impedance:
I_sk = 1600 / (√3 × 0.4 × 0.06) = 38.5kA at the bus.
If the ATS is 50m from the bus with 4mΩ cable impedance, the fault current drops to ~30kA. Select a PC ATSE with Icw ≥30kA. KITOZER 400A PC: Icw=30kA — just right; 630A: Icw=50kA — comfortable margin.
11.3 Selectivity
- Downstream faults must be cleared by downstream breakers, not by the ATS transferring.
- Upstream faults (transformer loss) are detected as Normal loss by the ATS.
- The ATS itself must not break fault current (PC class).
The key is time grading: downstream breaker instantaneous trip ≤20ms; ATS T1 ≥500ms. This way a downstream short trips the breaker before the ATS even considers transferring.
11.4 Worked Examples
Example 1: Fire pump ATS, 90kW pump.
– I = 90 / (√3 × 0.38 × 0.85 × 0.9) = 179A
– Soft-start inrush 3× = 537A momentarily
– Select PC ATSE 250A, Icw=20kA/1s
– Cabinet GGD 800×600×2200
– Fire controller, T1=0.5s
– Reference price: Â¥12,800
Example 2: Data center UPS input ATS, 200kVA UPS.
– I = 274A
– Select PC ATSE 400A, Icw=30kA/1s
– Cabinet GGD 800×800×2200
– Smart controller, Modbus TCP
– Reference price: Â¥18,500
Example 3: Hospital OR end ATS, 100kVA isolation transformer.
– I = 144A
– Select medical PC ATSE 160A, transfer ≤200ms
– Cabinet GCS 800×600×2200, IP40
– Medical controller with insulation monitoring
– Reference price: Â¥22,000
Chapter 12: Standards and Codes
12.1 Product Standards
GB/T 14048.11 (Chinese adoption of IEC 60947-6-1): terminology, classification, ratings, performance, and tests for ATSE. The fundamental product standard.
IEC 60947-6-1: the international equivalent. Export projects reference this.
GB 14048.1: general low-voltage switchgear requirements (temperature rise, dielectric, IP).
12.2 Engineering Codes
- GB 50052 Code for Design of Power Supply Systems — load classification and dual-source requirements.
- GB 50054 Code for Design of Low-Voltage Electrical Installations.
- GB 50016 Code of Design on Building Fire Protection — Section 10.1: end-of-line automatic transfer for fire pumps, smoke fans, fire control rooms.
- GB 50116 Fire Automatic Alarm System Code — fire-link control.
- GB 51039 General Hospital Code — medical场所 supply classes.
- GB 50174 Data Center Design Code — Tier I-IV power topology.
12.3 Type Tests
ATSE type tests include temperature rise, dielectric (2.5kV/1min power frequency), short-circuit making/breaking (Icw for PC, Icu/Ics for CB), mechanical life (10,000 ops), electrical life (1,500 AC-33B ops), EMC, and environmental (cold, heat, damp heat). All KITOZER ATSEs pass national type testing; reports available on request.
Chapter 13: FAQ — 30 Questions
Q1: Are ATS and ATSE the same thing?
ATSE is the standards term for the component; ATS is the field term for the complete cabinet. In this handbook, “ATS cabinet” means the assembly; “ATSE” means the switch element.
Q2: PC or CB?
Fire, hospital, data center → PC. General industrial auxiliaries, budget-sensitive → CB. See Chapter 3.
Q3: Why switch the neutral in a 4P ATSE?
To prevent neutral circulating current between two transformer neutrals at different potentials. TN-S systems require 4P.
Q4: Why does my load reboot during an ATS transfer?
Mechanical ATS takes 100–300ms plus delays, total 1–3s. Loads without UPS ride through only if they have internal battery. Add a UPS upstream of sensitive loads.
Q5: Can STS replace ATS?
No. STS has no breaking capacity, costs 8–15× more, maxes at 800A. STS belongs on UPS output; ATS on utility/generator input.
Q6: Are two feeds from the same substation a true dual source?
No. Codes require sources that cannot fail simultaneously. Same-substation feeds often share upstream faults.
Q7: How do I wire the generator start signal?
Use the KITOZER dry contact (AC 250V/5A) on the controller; wire it to the generator panel’s remote-start terminals. Close to start, open to stop.
Q8: Can I back-feed through the ATS?
No. ATS is a one-way device; back-feeding endangers line workers.
Q9: Why is transfer time from ms to seconds?
Mechanical springs and contacts have physical limits; fastest is ~80ms. Faster requires STS (4–8ms). Engineering practice is that second-level transfers ride through via UPS and internal battery.
Q10: Can the ATS cabinet go outdoors?
Standard IP30 is indoor only. Outdoor requires IP54/55 with sun shade and fan/air-conditioning. KITOZER builds outdoor ATS cabinets.
Q11: How do I tell PC from CB?
PC is one integrated double-throw switch; CB is two side-by-side MCCBs. The nameplate shows Icw for PC, Icu/Ics for CB.
Q12: Should I manually transfer the ATS every quarter?
Yes, run a loaded manual transfer quarterly to prevent the mechanism from seizing. This is part of annual maintenance.
Q13: What does “phase sequence error” mean?
The two sources are sequenced opposite. Swap any two incoming phases (never PE) to correct.
Q14: MCCB or ACB upstream?
≤630A use MCCB; ≥800A use ACB. Coordinate with the ATSE Icw.
Q15: Why can’t I change fire-ATS delays on site?
Fire codes require ≤5s transfer and prohibit contractor tampering. KITOZER fire versions lock T1/T2/T3; only factory passwords unlock.
Q16: Must N and PE bars be separate in the ATS cabinet?
Yes. In TN-S, the N bar is insulated from the cabinet; the PE bar bonds to it. The two meet only at the transformer neutral.
Q17: Can comms cables share the power tray?
No. RS485/Ethernet should run in the weak-current tray, ≥200mm from power, crossing at 90°.
Q18: Will the generator trip on sudden load pickup?
Size the generator at 1.25–1.5× the ATS total load. If undersized, voltage will dip and T2 waits for recovery. Generator capacity margin is essential.
Q19: Can multiple ATS cabinets be installed side by side?
Yes, via top busway. Leave 50mm between adjacent cabinets for cooling.
Q20: How do I power the load if the ATS fails?
Use the supplied manual crank to operate the ATSE directly. PC ATSEs have a front-panel charging handle.
Q21: What is the KITOZER warranty?
18 months on the whole cabinet from shipment; 24 months on the ATSE body. Damage from misuse is excluded.
Q22: Can I build an ATS from two ordinary breakers?
No. Ordinary breakers lack mechanical interlock; electrical interlocks alone are not reliable. Use a certified ATSE.
Q23: Can I manually close the ATS under load?
PC ATSEs are rated AC-33B and allow loaded operation, but infrequently. CB MCCBs can make/break load normally.
Q24: How long does the supercapacitor last?
30 seconds — enough to report “both sources lost” and shut down safely. It recharges when power returns.
Q25: What happens at end of mechanical life?
PC life is 10,000 ops (~27 years at one transfer per day). Real projects transfer a few times a year — life is not the limiting factor. Near life, replace the ATSE body (not the whole cabinet).
Q26: How do I integrate the ATS with my DCIM?
KITOZER ships RS485 Modbus RTU. The DCIM integrator uses shielded twisted pair, sets 9600 baud and address 1 (default), and imports the register map.
Q27: How noisy is the ATS cabinet?
<40dB(A) idle. The spring mechanism clicks at ~60dB(A) for ~1 second during transfer.
Q28: Can one ATS feed two independent loads?
Standard ATS has one output. For two independent loads, use two ATS cabinets or a dual-ATSE panel.
Q29: What certifications for export?
KITOZER provides CE and CB test reports and can support destination-country certification (UL, SASO, etc.). Standard 400V/50Hz can be adapted to 380V/60Hz or other local voltages.
Q30: What is the lead time?
Standard domestic components: 15 business days. Imported ATSE (Socomec/Schneider): 25–35 business days. Custom cabinets: 40–50 business days. Express surcharge 15–20%.
Chapter 14: Packaging, Delivery, Warranty, and Company
14.1 Packaging
Export-standard packaging: pearl-cotton wrap, corner protectors, five-ply corrugated carton with strapping, internal components bagged and braced. Accompanied by certificate of conformity, operation manual, secondary schematic, factory test report, and packing list. Whole cabinets on wooden pallets in seaworthy crates.
14.2 Scope of Supply
Included: ATS cabinet (ATSE, incoming breakers, controller, meters, terminals), manual operating handle, two spare keys, technical documents, factory test report. Excluded: external cables, upstream HV equipment, special foundation bolts (available on request).
14.3 Warranty
- Whole cabinet: 18 months from shipment
- ATSE body: 24 months
- Non-warranty repairs: lifetime support at component cost
14.4 Service
- Guangzhou local: on-site within 48 hours
- Guangdong province: 72 hours
- Major cities nationwide via distributors: 5 business days
- Remote support: 24/7
14.5 About KITOZER / Guangzhou Laian
Guangzhou Laian Intelligent System Development Co., Ltd. (KITOZER brand)
- Tel / WeChat: +86 139-2228-9957
- Tel / WeChat: +86 185-2066-8845
- WhatsApp: +86 190-6853-4140
- Websites: www.lain.com.cn (domestic) / www.gdlain.com (international)
- Address: Chaotian Park, Zhongrun Industrial Zone, No. 5 Huashan Road, Shilou, Panyu, Guangzhou, China
KITOZER’s broader portfolio includes precision power control cabinets, MNS withdrawable switchgear, -48V DC distribution, LFP lithium battery systems, 4K video surveillance, smart electricity monitoring, outdoor integrated cabinets, modular data centers, and 170kW air-cooled computing containers. Send us your single-line diagram and load schedule for a tailored quotation.
SEO Meta — English Site (gdlain.com)
Title: KITOZER ATS Dual Power Transfer Switch Cabinet Engineering Manual | PC/CB-class ATSE 100A–1600A
Meta Description: KITOZER ATS automatic transfer switch engineering handbook: PC-class and CB-class ATSE principles, ATS vs STS vs bus-tie comparison, 100A–1600A parameters, controller voltage/frequency/phase detection, UPS coordination, primary and secondary wiring, transfer-time testing, selection calculation, and 30 FAQs. Per GB/T 14048.11 and IEC 60947-6-1.
Focus Keyword: ATS dual power transfer switch, automatic transfer switch, PC-class ATSE, CB-class ATS, dual power distribution cabinet, fire pump ATS, data center ATS, KITOZER
URL slug: /ats-dual-power-transfer-cabinet-engineering-manual/
Canonical: https://www.gdlain.com/ats-dual-power-transfer-cabinet-engineering-manual/
OG:Title: KITOZER ATS Dual Power Transfer Cabinet Engineering Manual
OG:Description: PC/CB ATSE principles, selection, wiring, commissioning, maintenance, and 30 FAQs
Twitter:Card: summary_large_image
© 2026 Guangzhou Laian Intelligent System Development Co., Ltd. KITOZER is a brand of Guangzhou Laian. This document is for engineering reference; actual specifications are governed by contract drawings.
Appendix A: Additional Engineering Calculations
A.1 Transformer Sizing and ATS Current
A common field question: “The ATS is selected, but do we need to upsize the transformer?” The scenario is the single-transformer carrying both bus sections after the bus-tie closes.
Consider a project with two 1,600kVA transformers, each carrying 800kVA in normal split operation. When one transformer fails and the bus-tie closes, the surviving transformer carries all 1,600kVA. Low-voltage current:
I = 1,600 / (√3 × 0.4) = 2,309 A
If each bus section has an ATS cabinet carrying 1,150A of end load, the ATS must be rated 1,250A or 1,600A — not 800A based on “normal 575A operation.” KITOZER’s first selection question is always: “How much load does this ATS carry after the bus-tie closes?” not “How much current flows normally?”
A.2 Voltage Drop Verification
After ATS transfer, the emergency source feeds the load. If the emergency source (e.g., a diesel generator in a separate outdoor plant room) is 80m from the basement ATS cabinet, verify the cable voltage drop.
ΔU% = √3 × I × L × (R cosφ + X sinφ) / U × 100%
For 400A over 80m of YJV-3×240+2×120:
R = 0.075mΩ/m, X = 0.08mΩ/m, cosφ = 0.85, sinφ = 0.53
ΔU = √3 × 400 × 80 × (0.075×0.85 + 0.08×0.53) / 400 = 14.7V
ΔU% = 3.7%
Codes allow 5% for motor circuits and 3% for lighting. The example is fine for motors but marginal for lighting. If the ATS feeds mostly lighting, upsize to 300mm².
A.3 Short-Circuit Current with Cable Impedance
Three-phase short-circuit at the transformer LV bus:
I_k3” = S_r / (√3 × U_n × u_k%)
For a 1,250kVA transformer at 6% impedance:
I_k3” = 1,250 / (√3 × 0.4 × 0.06) = 30.1 kA
Peak short-circuit (with κ=1.8):
i_p = 2.55 × I_k3” = 76.8 kA
This i_p is the Icm the PC ATSE must make. KITOZER 630A PC-class Icm = 63kA, which fits at 50m downstream where cable impedance limits the fault.
A.4 Busbar Sizing
| Rated Current | Busbar (mm) | Cross-section (mm²) | Ampacity (A) |
|---|---|---|---|
| 100A | 20×3 | 60 | 210 |
| 160A | 25×3 | 75 | 260 |
| 250A | 30×4 | 120 | 390 |
| 400A | 40×4 | 160 | 500 |
| 630A | 50×5 | 250 | 700 |
| 800A | 60×6 | 360 | 900 |
| 1000A | 80×6 | 480 | 1150 |
| 1250A | 2×60×6 (double) | 720 | 1500 |
| 1600A | 2×80×6 (double) | 960 | 1900 |
Contact surfaces must be tinned or silver-plated; bolt torques per Appendix A.8. Busbars passing through cabinet partitions must use insulating sleeves.
A.5 Earth Faults and Residual Current
In a TN-S system the PE line does not pass through the ATSE — PE is a safety conductor and must never be switched. The N line is switched in a 4P ATSE. Consequences:
– PE runs straight through the ATS cabinet with no switching device
– N switches in step with the lines
– RCDs cannot be installed on the ATS main output, because breaking N during transfer would nuisance-trip the RCD
Where downstream RCDs are needed (wet-area receptacles), install them on dedicated branch circuits after the ATS, not on the ATS main output.
A.6 Harmonics and Neutral Overload
Data center and UPS loads generate third harmonics (150Hz). Third harmonics do not cancel in three-phase systems; they add in the neutral. In severe nonlinear loads, neutral current can reach 1.5× phase current.
This demands that the 4P ATSE neutral pole carry the same rating as the phase poles — not the traditional “halve the neutral” practice. All KITOZER 4P ATSEs use equal cross-sections for N and phase poles, specifically for data center harmonic environments.
A.7 Altitude and Ambient Derating
ATSE ratings are defined at ≤2,000m altitude and 40°C ambient. Derate as follows:
| Condition | Factor |
|---|---|
| 40°C (reference) | 1.00 |
| 50°C | 0.91 |
| 60°C | 0.82 |
| 2,000m | 1.00 |
| 3,000m | 0.95 |
| 4,000m | 0.90 |
| Bundled cables | 0.80–0.90 |
| In conduit | 0.85–0.95 |
Multiply simultaneous factors. A 400A ATS at 50°C and 3,000m delivers 400 × 0.91 × 0.95 = 345A.
A.8 Torque Reference
| Terminal | Screw | Torque (N·m) |
|---|---|---|
| MCB line/load | M4 | 1.2–1.5 |
| Small MCCB (≤100A) | M5 | 2.0–2.5 |
| Medium MCCB (100–250A) | M6 | 4.0–4.5 |
| Large MCCB (250–630A) | M8 | 9–12 |
| ACB (≥630A) | M10 | 18–22 |
| CT secondary | M3 | 0.5–0.8 |
| PE terminal | M6–M8 | 4.0–12 |
Always defer to the component manufacturer’s installation instructions.
Appendix B: Real-World Case Studies
B.1 Tier III Data Center in South China
Background: A third-party operator in Guangzhou built a 2,000-rack Tier III facility requiring 2N topology.
KITOZER supply: 46 ATS cabinets (400A PC-class, Modbus TCP), 8 generator paralleling panels, 12 UPS input/output panels.
Challenges:
1. Two 10kV feeds from different substations enter the same switchroom; physical route independence had to be verified.
2. Four 1,800kW diesel generators parallel to feed the ATS emergency bus; T2 was set to 8 seconds to wait for paralleling stability.
3. All ATS panels report via SNMP v3 to the DCIM; event logs retained for 3 years.
Outcome: Delivered June 2025, passed Uptime Institute Tier III certification on the first attempt. In the following 12 months, three real transfers occurred during summer thunderstorms; all auto-recovered with zero server impact.
B.2 Tertiary Hospital Operating Department
Background: A hospital’s new inpatient tower with 20 operating theaters required end-of-line dual-source transfer within 200ms.
KITOZER supply: 8 KITOZER-ATS-Medical 160A PC-class cabinets, matched isolation-transformer cabinets (8kVA medical IT), insulation monitors.
Challenges:
1. The OR department uses IT earthing; the ATS output feeds an isolation transformer, and the secondary side is insulated from earth. The controller monitors primary phase voltage and secondary insulation resistance.
2. Transfer time ≤200ms was strict; measured KITOZER-ATS-Medical transfer was 160ms.
3. Fire acceptance required CCCF certification.
Outcome: Delivered 2025, passed hospital specialist acceptance and fire acceptance. No surgery interruption attributable to power in the first year.
B.3 Coastal Wastewater Treatment Plant
Background: A 200,000 m³/day wastewater plant with 12 large pumps (90–250kW) and a 1,000kW diesel generator as standby.
KITOZER supply: 12 ATS cabinets (400A PC-class, IP54), fiber-ring comms modules.
Challenges:
1. Humid, salt-laden air; cabinets in 304 stainless steel, IP54.
2. Two kilometers to the dispatch center; RS485 extended via fiber modems to Ethernet.
3. SCADA interlock: pump fault triggers standby-pump switchover independently of source fault, which triggers source switchover. The two logics must not interfere.
Outcome: Delivered 2024. During a 4-hour typhoon-induced utility outage in summer 2025, the generator started automatically and all pumps kept running, preserving the treatment process.
B.4 Highway Tunnel ATS
Background: An 8km tunnel in South China with two substations互为 backup; tunnel lighting and jet fans require dual-source transfer.
KITOZER supply: 4 ATS cabinets (250A PC-class), remote monitoring modules.
Challenges:
1. Vibration inside the tunnel; anti-loose washers on all internal components.
2. Dusty air; IP54 cabinets with filtered intakes.
3. Interlock with the tunnel lighting controller; ATS status uploaded to the tunnel management center.
Outcome: Tunnel opened 2024, stable operation since.
Appendix C: Packaging, Transport, and Site Unboxing
C.1 Packaging
KITOZER ATS cabinets follow export-standard packing:
1. EPE foam covers protruding items (pushbuttons, LEDs, door handles)
2. Four-corner corrugated protectors
3. Five-ply corrugated carton
4. PET strapping cross-bracing
5. Loose items (manuals, keys, spares) bagged and fixed to the inside of the door
6. Cabinet placed on a solid wood pallet, steel-banded
7. “This Way Up,” “Fragile,” and “Keep Dry” markings
C.2 Transport
- Local Guangzhou: dedicated truck
- Domestic: LTL freight with wood-frame crating
- Export: container ocean freight, fumigated pallets
C.3 Site Unboxing
Upon arrival, owner, supervisor, contractor, and supplier jointly unbox:
1. Inspect outer packing for impact or water damage
2. Verify packing list against actual units
3. Check cabinet paint and door alignment
4. Count documentation: certificate, manual, test report, schematics
5. Photograph any damage on the spot and notify the shipper
C.4 Storage
Cabinets awaiting installation should be stored indoors at -10°C to +40°C, ≤85% RH, non-condensing, not stacked, not inverted. Power on for 2 hours every 3 months to recharge the controller supercapacitor.
Appendix D: Drawing Symbols and How to Read ATS Schematics
D.1 Single-Line Diagram Symbols
- Box labeled “QF”: circuit breaker
- Box labeled “QAC”: contactor
- Box labeled “QAT”: ATSE
- Circle with slash: current transformer
- Circle with V: voltmeter
- Circle with A: ammeter
- Parallel bars: busbar
- Earth symbol: PE bar
D.2 Secondary Diagram Symbols
- “K”: relay
- “KA”: auxiliary relay
- “KT”: on-delay timer
- “S”: switch
- “SA”: cam switch
- “SB”: pushbutton
- “HL”: indicator light
- “FU”: fuse
- “XB”: terminal block
D.3 Reading Order for an ATS Secondary Schematic
- Trace the controller supply (should be two sources paralleled through diodes)
- Follow position feedback contacts
- Follow the generator-start contact
- Follow the alarm contact
- Finish with the manual/auto selector wiring
This order lets an engineer understand any ATS secondary diagram in about 30 minutes.
Appendix E: Additional FAQs (10 More)
Q31: Can an ATS cabinet go inside an outdoor enclosure?
Yes, choose an outdoor integrated cabinet with air conditioning or heat exchanger. KITOZER offers a compatible outdoor enclosure series.
Q32: Can a 4P ATS switch two 220V single-phase sources?
No need; single-phase loads use a 2P ATS, which is more economical.
Q33: Does ATS switching generate switching overvoltage?
Mechanical contacts breaking inductive loads (motors) generate overvoltage. KITOZER ships RC snubbers or varistors on contactor loads. Large motor loads should add surge suppression downstream of the ATS.
Q34: Can I use an ATS for elevator power?
Yes. Elevators are Level-1 loads requiring end-of-line dual-source transfer. Elevators are sensitive to outage time (the traction motor stops and the car drifts); keep transfer under 1 second. KITOZER recommends a PC-class elevator ATS with ≤500ms transfer.
Q35: Can I move an energized ATS cabinet?
Absolutely not. ATS cabinets are floor-fixed with no casters. De-energize, LOTO, and disconnect cables before any move.
Q36: Does the controller battery need replacement?
KITOZER controllers use supercapacitors, not batteries; life exceeds 10 years, no replacement needed.
Q37: What does IP30 mean?
IP30 prevents solid objects ≥2.5mm (fingers) from touching live parts; no water protection. Suitable for dry indoor electrical rooms.
Q38: What documents does fire acceptance require for the ATS?
CCCF certificate, type test report, factory inspection report, secondary schematic, product certificate. KITOZER ships all of these with fire-rated units.
Q39: Is the ATS cabinet noisy?
Idle <40dB(A), quieter than an office. Transfer event ~60dB(A) for 1 second; no nuisance.
Q40: Can KITOZER manufacture to our drawings?
Absolutely. KITOZER is a custom assembly shop; provide primary and secondary schematics and we build to them. Lead times differ between standard and custom products — see Q30.
Appendix F: Unit Conversion and International Project Notes
Export projects frequently involve imperial units and special voltage ratings. Common conversions:
- 1 inch = 25.4 mm
- 1 kVA ≈ 0.8 kW at pf 0.8
- 400V line corresponds to 230V phase (√3)
- US standard: 208Y/120V or 480Y/277V
- European standard: 400Y/230V
- Australian: 400Y/230V
- Southeast Asia: 380Y/220V or 415Y/240V
- Frequency: China/Europe/Australia 50Hz; US/Taiwan/Philippines 60Hz
KITOZER can customize 60Hz versions and alternate voltages; controller parameters adjust accordingly. For export, confirm in advance: voltage, frequency, phase count, earthing system (TN-S/TT/IT), and local certification requirements.
Appendix G: Deep Dive — Why Break-Before-Make Is Non-Negotiable
A recurring question from electrical engineers is: “Why can’t we briefly parallel the two sources to make the transfer seamless?” The answer is rooted in physics and protection coordination.
If two sources are briefly paralleled (even for 10ms), several things happen. First, if the two sources are not perfectly synchronized — same voltage magnitude, same frequency, same phase angle — a circulating current flows. The current is limited only by the source impedance and the cable impedance. For a typical 1,600kVA transformer with 6% impedance, even a 30° phase angle difference can produce a circulating current of several kiloamperes. This current does not feed any load; it just heats the transformers and trips upstream protection.
Second, even if the sources are synchronized, the protective devices on both sides are not designed to detect the resulting current as a fault. The overcurrent relays see a legitimate current and do not trip; the bus stays paralleled. Once paralleled, any subsequent source disturbance causes uncontrolled power flow between the two systems.
Third, two utility sources from different substations cannot be paralleled at all without utility company approval — and the utility will almost certainly refuse, because paralleling their feeders endangers their other customers and their line crews working on de-energized lines.
This is why every end-of-line ATSE in the world is BBM. The mechanical interlock is a physical barrier, not a software promise. KITOZER has never built and will never build an MBB end-of-line ATSE.
Appendix H: Deep Dive — Fire Pump ATS Special Requirements
Fire pump ATS deserves a separate discussion because it is the most heavily regulated ATS application in China.
GB 50016 and GB 27898 mandate:
1. Fire pumps must have dual power supplies, switched automatically at the final distribution box.
2. The transfer must occur within 5 seconds of the normal source loss.
3. The ATS must carry CCCF certification.
4. The ATS must not be reset automatically after transfer — a manual reset is required to ensure personnel investigate the cause.
5. The fire alarm system must be able to force the ATS to the emergency source even if the normal source is healthy.
6. The ATS must withstand short-circuit current without contact welding.
Requirement 6 is why PC-class is preferred for fire pumps. A CB-class ATS with MCCBs might trip on a downstream short, leaving the fire pump powerless during a fire. A PC-class ATS withstood the short-circuit current while the upstream breaker cleared it, keeping the pump connected.
KITOZER-ATS-Fire includes:
– Locked T1=0.5s, T2=0.2s, T3=60s (no field adjustment)
– Form-C fire-link input (force to emergency)
– Form-C manual-reset alarm output
– CCCF label on the door
– Red-painted cabinet door (fire-standard color)
Appendix I: Deep Dive — Generator Sizing for ATS Loads
When the ATS emergency source is a diesel generator, sizing the generator correctly is as important as sizing the ATS.
I.1 Steady-State Sizing
The generator rated power must exceed the total ATS load by 25–50%:
P_gen ≥ P_load × 1.25
For a UPS-heavy load, multiply by an additional 1.2 for UPS inrush and nonlinear derating:
P_gen ≥ P_UPS_total × 1.2 × 1.25 = P_UPS × 1.5
I.2 Transient Sizing
The generator must accept sudden load pickup without excessive voltage dip. When the ATS transfers, all loads (UPS, AC, pumps) come on at once. Generator manufacturers specify a “100% step load” capability: the generator should accept 100% of its rated load in one step with voltage dip ≤15% and recovery ≤3 seconds.
For motor loads, the starting kVA must be calculated. A 90kW direct-on-line motor draws ~600kVA starting. Soft starters reduce this to ~270kVA. The generator must handle this starting kVA without stalling.
I.3 Battery Charger and UPS Interaction
UPS rectifiers draw nonlinear current that causes generator voltage waveform distortion. Many generators have AVRs that cannot handle high harmonic content. Mitigation:
– Oversize the generator by 50%
– Install an input harmonic filter on the UPS
– Set the UPS rectifier to “generator mode” (higher current limit, softer start)
I.4 Exhaust, Fuel, and Cooling
Generator plant rooms require:
– Exhaust silencer and spark arrestor
– 8-hour fuel tank (minimum per fire code)
– Fresh air intake at ≥0.5 m² per 500kW
– Ventilation exhaust sized for heat rejection (roughly 30% of generator kW)
KITOZER coordinates with generator suppliers to ensure the ATS contacts, delays, and start signals match the generator’s capabilities.
Appendix J: Glossary
- ATSE: Automatic Transfer Switching Equipment (the component)
- ATS: Automatic Transfer Switch (colloquially the whole cabinet)
- PC-class: ATSE without short-circuit breaking capacity
- CB-class: ATSE with integrated MCCBs and breaking capacity
- Icw: Rated short-time withstand current (PC-class)
- Icm: Rated short-circuit making current
- Icu/Ics: Ultimate/service short-circuit breaking capacity (CB-class)
- BBM: Break-before-make transfer logic
- MBB: Make-before-break transfer logic (not used end-of-line)
- STS: Static Transfer Switch (SCR-based, 4–8ms transfer)
- Bus-tie: Bus-tie breaker linking two LV sections
- T1/T2/T3/T4: Normal-abnormal delay, emergency-confirm delay, return delay, generator cool-down
- N/E: Normal/Emergency sources
- CCCF: China Compulsory Certification for Fire products
- LOTO: Lockout/Tagout safety procedure
- RCD: Residual Current Device
- SPD: Surge Protective Device
- TN-S: Terre-Neuve-Separé (separate N and PE)
- IT system: Isolated terre (unearthed) system, used in hospitals
Appendix K: Recommended Reading and References
- GB/T 14048.11-2016 Low-voltage switchgear and controlgear — Part 6-1: Multiple function equipment — Transfer switching equipment
- IEC 60947-6-1:2021 (latest international edition)
- GB 50052-2009 Code for design of power supply systems
- GB 50054-2011 Code for design of low-voltage electrical installations
- GB 50016-2014 (2018 edition) Code of design on building fire protection and prevention
- GB 50116-2013 Fire automatic alarm system design code
- GB 51039-2014 Code for design of general hospital
- GB 50174-2017 Code for design of data centers
- NFPA 110 Standard for Emergency and Standby Power Systems (US reference)
- UL 1008 Standard for Safety Transfer Switch Equipment (US reference)
- Socomec ATyS technical catalog
- Schneider WATSEM/WATSG technical catalog
KITOZER publishes additional application notes and selection guides on www.lain.com.cn and www.gdlain.com.
This completes the KITOZER ATS Engineering Manual. For project-specific questions, send the single-line diagram, load schedule, and incoming power parameters to +86 185-2066-8845 or WhatsApp +86 190-6853-4140. KITOZER engineers typically respond within 2 business hours.
Appendix L: Controller Algorithm and Communication Register Map
L.1 Controller State Machine Pseudo-Code
The KITOZER smart ATS controller core state machine can be described as follows:
This state machine runs every 20ms. Commissioning engineers can watch the timers live on the LCD to diagnose “why hasn’t it transferred yet?”
L.2 Modbus RTU Register Map (Excerpt)
KITOZER ATS controllers use standard 4xxxx holding registers:
| Address | Name | Unit | R/W | Description |
|---|---|---|---|---|
| 40001 | Normal Ua | 0.1V | R | Phase A voltage |
| 40002 | Normal Ub | 0.1V | R | Phase B |
| 40003 | Normal Uc | 0.1V | R | Phase C |
| 40004 | Emergency Ua | 0.1V | R | Emergency A |
| 40005 | Emergency Ub | 0.1V | R | Emergency B |
| 40006 | Emergency Uc | 0.1V | R | Emergency C |
| 40007 | Normal frequency | 0.01Hz | R | |
| 40008 | Emergency frequency | 0.01Hz | R | |
| 40010 | ATS position | – | R | 0=off,1=Normal,2=Emergency |
| 40011 | Normal health | – | R | bit0=OV,bit1=UV,bit2=OF,bit3=UF,bit4=phase-loss |
| 40012 | Emergency health | – | R | same bits |
| 40013 | Transfer counter | ops | R | cumulative |
| 40020 | Over-voltage threshold | 1V | R/W | default 264 |
| 40021 | Under-voltage threshold | 1V | R/W | default 187 |
| 40022 | T1 delay | 0.1s | R/W | default 20 (=2.0s) |
| 40023 | T2 delay | 0.1s | R/W | default 5 (=0.5s) |
| 40024 | T3 delay | 1s | R/W | default 30 |
| 40030 | Remote command | – | W | 1=to Normal,2=to Emergency,3=alarm reset |
The full register map (~120 registers) ships with the unit and imports directly into major SCADA platforms (KingView, ForceControl, etc.).
L.3 SNMP MIB Objects
With the optional SNMP module, KITOZER provides a MIB including:
– kitozerATSNormalVoltageTable
– kitozerATSEmergencyVoltageTable
– kitozerATSPosition
– kitozerATSTransferCount
– kitozerATSEventLogTable (last 100)
– kitozerATSTrapNormalLost / kitozerATSTrapEmergencyLost
Traps fire within 1 second of an event, giving the DCIM sub-second alarm.
Appendix M: BOM by Current Rating
M.1 100A PC-class ATS Cabinet BOM
| # | Component | Spec | Qty |
|---|---|---|---|
| 1 | GGD cabinet | 600×600×2200 | 1 |
| 2 | PC-class ATSE | 100A 4P | 1 |
| 3 | Normal incoming MCCB | 3P 125A | 1 |
| 4 | Emergency incoming MCCB | 3P 125A | 1 |
| 5 | Smart controller | KITOZER LCD | 1 |
| 6 | CT | 100/5 | 3 |
| 7 | Ammeter | 100/5 | 1 |
| 8 | Key switch (hand/auto) | 16A | 1 |
| 9 | Indicator lights | 220V LED | 6 |
| 10 | Terminal block | 25A | 1 set |
| 11 | Main busbar | 20×3 | 1 set |
| 12 | Control wire | BVR 1.5mm² | 1 lot |
M.2 400A PC-class ATS Cabinet BOM
| # | Component | Spec | Qty |
|---|---|---|---|
| 1 | GGD cabinet | 800×800×2200 | 1 |
| 2 | PC-class ATSE | 400A 4P, Icw 30kA/1s | 1 |
| 3 | Normal MCCB | 3P 500A, 35kA | 1 |
| 4 | Emergency MCCB | 3P 500A, 35kA | 1 |
| 5 | Smart controller | LCD + Ethernet | 1 |
| 6 | CT | 400/5 | 3 |
| 7 | Ammeter | 400/5 | 1 |
| 8 | Key switch | 16A | 1 |
| 9 | Indicator lights | 220V LED | 6 |
| 10 | Terminal block | 25A | 1 set |
| 11 | Main busbar | 40×4 | 1 set |
| 12 | SPD | 40kA Type II | 2 |
| 13 | Control wire | BVR 1.5mm² | 1 lot |
M.3 1600A PC-class ATS Cabinet BOM
| # | Component | Spec | Qty |
|---|---|---|---|
| 1 | GCS cabinet | 1000×1000×2200 | 1 |
| 2 | PC-class ATSE | 1600A 4P, Icw 50kA/1s | 1 |
| 3 | Normal ACB | 1600A, 50kA | 1 |
| 4 | Emergency ACB | 1600A, 50kA | 1 |
| 5 | Smart controller | LCD + Ethernet + SNMP | 1 |
| 6 | CT | 1500/5 | 3 |
| 7 | Power meter | Class 1.0 | 1 |
| 8 | Key switch | 16A | 1 |
| 9 | Indicator lights | 220V LED | 6 |
| 10 | Terminal block | 40A | 1 set |
| 11 | Main busbar | 2×80×6 double | 1 set |
| 12 | SPD | 60kA Type I+II | 2 |
| 13 | ACB motor operators | 2 |
Appendix N: Acceptance Test Record Template
| Test Item | Criterion | Measured | Result |
|---|---|---|---|
| Visual | No damage, labels clear | ||
| Primary insulation | ≥1MΩ | ||
| Secondary insulation | ≥0.5MΩ | ||
| Normal voltage display | 400V±5% | ||
| Emergency voltage display | 400V±5% | ||
| Frequency display | 50Hz±0.2 | ||
| Manual close Normal | Smooth action | ||
| Manual close Emergency | Smooth action | ||
| Position feedback | Matches remote | ||
| Normal loss transfer | Total time ____s | ||
| Return on Normal restore | Total time ____s | ||
| Phase-loss transfer | Correct action | ||
| Over-voltage transfer | Triggers at 270V | ||
| Under-voltage transfer | Triggers at 180V | ||
| Phase-seq error alarm | Alarms, no action | ||
| Generator start contact | Closes on demand | ||
| Fire-link (if fitted) | Force to Emergency | ||
| Comms readback | Data correct | ||
| IR temperature | Rise ≤40K | ||
| 72h run-in | No anomalies |
Tester: __ Supervisor: _ Owner: Date: ___
Appendix O: Benchmark Against International Brands
O.1 Socomec ATyS
Socomec (France) is the originator of PC-class ATSE; the ATyS line covers 16A–6,300A. Strengths: fast transfer (180ms), global certifications, mature product. Weaknesses: price (400A body ~¥22,000), long lead time (4–6 weeks imported), local support via distributors. KITOZER-ATS-Smart 400A matches ATyS on Icw, comms, and event logging at one-third the price.
O.2 Schneider WATSG/WATSEM
Schneider ATS is dominated by CB-class products built on Compact NSX MCCBs; PC-class WATSG is newer. Strengths: brand recognition, wide parts channel. Weaknesses: comms module extra, simpler controller, mid-to-high price. KITOZER wins on native comms and local service.
O.3 North American Brands (ASCO/Zenith/GE)
The North American ATS market is dominated by ASCO (now Schneider), Zenith, and GE, built to UL 1008 at 60Hz/480V. KITOZER export projects to North America can specify UL-listed components but price at roughly one-quarter of ASCO.
O.4 Domestic Mid-Range Brands
Chint, Delixi, Tianzheng ATS cabinets are cheapest but offer simple controllers (no event log, no comms), short mechanical life. KITOZER positions at “domestic mid-range price, imported-brand features,” focused on intelligence and customization.
Appendix P: Delivery Package and Warranty Claims
P.1 Owner’s Document Package
- Product certificate (per cabinet)
- Factory test report (per cabinet)
- Type test report (stamped copy)
- Single-line diagram (PDF + blueprints)
- Secondary schematic + terminal drawings
- Component list (manufacturer, model, qty)
- Operation manual (Chinese)
- Modbus register map / MIB file
- CCCF certificate copy (fire version)
- Packing list
- Warranty certificate
P.2 Warranty Claim Process
- Within 24h of a fault, call KITOZER service hotline
- Provide: cabinet number, symptom, LCD readout, photos
- Remote diagnosis (response within 2 hours)
- If remote cannot resolve, dispatch engineer
- Warranty-covered faults get free parts
- Sign service report after repair
P.3 Lifetime Service
After warranty, KITOZER offers lifetime repair at component cost plus travel. Key spares (controllers, ATSE bodies, breakers) are stocked in the Guangzhou warehouse and ship within 48 hours.
Appendix Q: Common Misoperations and Incident Case Studies
Q.1 Energized Earth Switch
During commissioning, an electrician left an earth strap connected at the ATS output. A remote close command caused a three-phase short. The upstream MCCB cleared instantly; no injuries. Lesson: follow LOTO — verify earth straps removed before closing.
Q.2 Reversed N Lead Burns Equipment
At a hospital project, the N leads from the two sources were reversed in the ATS cabinet. After transfer, downstream enclosures became live. The contractor had ignored phase colors. Lesson: verify sequence with a tester, not just colors.
Q.3 Controller Delay Tampered
A shopping mall operator changed T1 from 2s to 60s. When the utility failed, the ATS took 60 seconds to transfer and trapped people in elevators. Lesson: lock controller parameters behind a password. KITOZER ships with default password 0000; owners should change it.
Q.4 Phase-Sequence Error Burns Pump
At a pump station, the backup diesel generator was wired with two phases reversed. An old firmware version failed to detect the sequence; after transfer the pump ran backwards and the impeller nut loosened. Lesson: measure sequence on site; do not rely solely on the controller.
Q.5 Comms Wired to Mains
A contractor wired the RS485 comms cable into a 220V terminal; the controller comms port burned out. Lesson: verify terminal voltage with a multimeter before plugging the comms connector.
Appendix R: Deep Dive — Selectivity Between ATS and Upstream Protection
Selectivity (discrimination) is the principle that only the closest upstream protective device trips for a fault, leaving everything else powered. In an ATS system, three levels must coordinate:
- Downstream branch breaker (e.g., a 32A MCB feeding a server rack)
- ATS incoming MCCB (e.g., 500A)
- Upstream main breaker or ACB in the LV switchroom (e.g., 2,500A)
For a short circuit at the server rack, the 32A MCB must trip in <20ms. The 500A ATS MCCB should not trip; it has a short-time delay of 100–300ms. The 2,500A upstream ACB has a short-time delay of 500ms. This time grading ensures only the MCB trips.
KITOZER provides selectivity coordination tables on request, showing which breaker pairs achieve full selectivity. For critical installations, owner’s engineers should request the coordination study as part of the contract.
Appendix S: Deep Dive — Prefabricated ATS Skids
For remote sites (oil fields, mining camps, solar farms), KITOZER offers prefabricated ATS skids: a weatherproof steel shelter containing the ATS cabinet, a 5kVA UPS for the controller, a small battery bank, and environmental controls. The skid ships complete, is lifted onto a concrete pad, and only needs external cables. This reduces site work from weeks to days.
Typical skid contents:
– 1 × 400A PC-class ATS cabinet
– 1 × 5kVA online UPS for controller and comms
– 100Ah battery bank (8h controller ride-through)
– Wall-mounted air conditioner (1.5kW)
– Smoke detector and siren
– Fiber termination box
Appendix T: Deep Dive — ATS Maintenance Contract Scope
A typical annual ATS maintenance contract with KITOZER includes:
- 4 quarterly on-site visits
- 1 annual deep overhaul
- Infrared thermography report
- Controller parameter backup
- Event log download and analysis
- 1 loaded manual transfer test per visit
- Spares at 10% discount
- 24/7 phone support
- 4-hour emergency response (Guangzhou metro)
Contract pricing scales with cabinet count. For a facility with 20 ATS cabinets, an annual contract is typically ¥18,000–¥25,000, far less than a single unplanned downtime event.
End of KITOZER ATS Engineering Manual — supplementary appendices.
Appendix U: Typical Single-Line Schematics (Text Descriptions)
U.1 Scheme 1: Single ATS Feeding One Fire Pump
- Normal utility → incoming MCCB 125A → ATSE Normal terminal
- Emergency generator → incoming MCCB 125A → ATSE Emergency terminal
- ATSE 4P 100A → outgoing MCCB 100A → soft starter → 90kW fire pump motor
The ATSE handles source transfer; motor protection is built into the soft starter.
U.2 Scheme 2: ATS Feeding Two Duty-Standby Pumps
- Two sources → incoming MCCBs 250A each → ATSE 250A 4P
- ATSE output → main MCCB 250A → two branches:
- Branch 1: MCCB 160A → contactor → overload relay → pump #1 75kW
- Branch 2: MCCB 160A → contactor → overload relay → pump #2 75kW
- Secondary: interlock logic; pump #1 fault auto-starts pump #2
The ATS is sized for the combined pump current times diversity.
U.3 Scheme 3: ATS Feeding UPS + Direct Loads
- Two utilities → incoming MCCBs 400A each → ATSE 400A
- ATSE output splits:
- Path 1: UPS input (200kVA)
- Path 2: direct MCCB 200A → AC, lighting
UPS input drops during transfer; the UPS battery holds IT loads. Direct loads dropout briefly.
U.4 Scheme 4: Two-Level ATS (UPS input) + STS (output)
- Two utilities → ATS #1 (400A) → UPS 1 input
- Two utilities → ATS #2 (400A) → UPS 2 input
- UPS 1 output + UPS 2 output → STS 400A → PDU → servers
Classic 2N architecture; ATS at the front, STS at the back.
U.5 Scheme 5: Bus-Tie + End ATS
- Two LV bus sections with bus-tie ACB 630A
- Section I → ATS-A Normal
- Section II → ATS-A Emergency
- ATS-A output → floor fire loads
Bus-tie handles transformer faults; end ATS handles cable faults.
Appendix V: Harmonics, Power Factor, and Power Quality
V.1 ATS Impact on Harmonics
The ATS is a passive switch and generates no harmonics. However, harmonic distortion at the installation point can affect controller voltage measurement. KITOZER controllers use true-RMS sampling; measurement error stays <2% even at 30% waveform distortion.
V.2 Power Factor and ATS Sizing
ATSE rated current is defined for any power factor (AC-33B); no extra derating is needed for low pf. But capacitor banks downstream can produce inrush during ATS transfer; add inrush current-limiting resistors in the capacitor bank feeder.
V.3 Sags and Short Interruptions
IEEE 1159 classifies:
– Momentary interruption: 0.5–30 cycles
– Sag: 10–90% voltage, 0.5 cycles to 1 min
– Swell: 110–180% voltage
The T1 delay (default 2s) rides through these disturbances. If a site has frequent sags, increase T1 from 2s to 3–5s to avoid nuisance generator starts.
V.4 Flicker
Elevators, arc furnaces, and rolling mills cause flicker. Flicker does not trigger ATS transfer, but annoys occupants. The KITOZER controller’s 200ms digital filter rejects flicker and prevents false transfers.
Appendix W: ATS Wiring for Different Earthing Systems
W.1 TN-S
Most common. N and PE are separate from the transformer neutral. Use a 4P ATSE (switches N); PE passes straight through.
W.2 TN-C-S
Transformer side is TN-C (combined PEN); after entering the building, PEN splits into N and PE. Install the ATS after the split, 4P. If the ATS is before the split, use 3P.
W.3 TT
Transformer neutral earthed; equipment enclosures earthed locally. Use 4P. Every branch needs an RCD; no main RCD on the ATS output (see A.5).
W.4 IT
Transformer neutral unearthed (or high-impedance). Typical in hospital operating theaters. The ATS is upstream of an isolation transformer; the secondary side is insulation-monitored. KITOZER still builds the 4P ATS for IT projects to accommodate future retrofits.
Appendix X: Project Schedule and Lead Times
X.1 Standard Production Flow
- Contract + 30% advance payment: D0
- Primary/secondary drawing sign-off: D5
- Component procurement: D5–D15
- Cabinet sheet-metal fabrication: D10–D20
- Assembly and wiring: D20–D30
- Factory test: D30–D32
- Packing: D32–D33
- Domestic shipment: D33–D35
Standard lead time: 35 days. Imported components (Socomec ATSE, Schneider ACB) add 15–20 days.
X.2 Expedited Flow
With a 15–20% expedite surcharge:
– Critical components ship from the Guangzhou spot warehouse
– Overtime sheet-metal work
– Testing overlaps production
– Compressed to 20–25 days
X.3 Site Support
KITOZER provides:
– Free on-site unboxing acceptance (1 visit)
– Free commissioning guidance (1 visit)
– Free fire-acceptance support (1 visit)
– Additional visits billed per day
Appendix Y: Procurement FAQ
Q: Are you a manufacturer or a trader?
KITOZER is Guangzhou Laian’s in-house brand. We are an assembly shop — we design, assemble, and commission. Core components (ATSEs, breakers) are sourced from Socomec, Schneider, Chint; cabinets and secondary wiring are done in-house.
Q: Can I buy just the ATSE body without the cabinet?
Yes. KITOZER sells ATSE bodies separately for owners with their own assembly shops. But whole-cabinet purchase is recommended for clear accountability.
Q: Payment terms?
Standard: 30% advance + 65% before shipment + 5% retention (paid 12 months after delivery). Strategic customers may negotiate.
Q: Delivery location?
Domestic: ex-works Guangzhou, or delivered to site (freight extra). Export: FOB Guangzhou, or CIF destination port.
Q: Can you issue a VAT special invoice?
Yes, 13% Chinese VAT special invoice.
Appendix Z: Final Notes
This engineering manual has grown from a 20k-character v1 comparison article into a 30,000-character reference spanning principles, selection, wiring, commissioning, maintenance, case studies, and 40 FAQs. It reflects KITOZER’s accumulated experience across hundreds of ATS installations in data centers, hospitals, pump stations, tunnels, and commercial buildings.
When planning your next dual-source project, remember that the ATS is not a commodity switch. It is the gatekeeper between your reliable upstream sources and your life-safety or business-critical loads. An incorrectly selected, poorly wired, or badly commissioned ATS can turn a routine source fault into a catastrophic outage. Invest in the right ATSE class, the right delays, the right interlocks, and the right commissioning — and the ATS will serve silently and reliably for 20+ years.
KITOZER’s engineering team is ready to review your single-line diagram, size your ATSE, coordinate with your generator and UPS vendors, and commission the installation. Send your load schedule and project location to +86 185-2066-8845 or WhatsApp +86 190-6853-4140.
KITOZER — Automatic transfer, automatic confidence.
End of document. © 2026 Guangzhou Laian Intelligent System Development Co., Ltd.
Appendix AA: Selection Quick-Reference Tables
AA.1 Motor Full-Load Current (380V, cosφ=0.85, η=0.9)
| Power (kW) | FLC (A) | DOL Start (A) | Soft Start 3× (A) |
|---|---|---|---|
| 5.5 | 11.6 | 70 | 35 |
| 7.5 | 15.8 | 95 | 48 |
| 11 | 23.2 | 140 | 70 |
| 15 | 31.6 | 190 | 95 |
| 18.5 | 39.0 | 234 | 117 |
| 22 | 46.3 | 278 | 139 |
| 30 | 63.1 | 379 | 190 |
| 37 | 77.8 | 467 | 233 |
| 45 | 94.7 | 568 | 284 |
| 55 | 115.8 | 695 | 347 |
| 75 | 157.5 | 945 | 472 |
| 90 | 189.0 | 1134 | 567 |
| 110 | 231.0 | 1386 | 693 |
| 132 | 277.0 | 1662 | 831 |
| 160 | 336.0 | 2016 | 1008 |
| 200 | 420.0 | 2520 | 1260 |
| 250 | 525.0 | 3150 | 1575 |
AA.2 Transformer Sizing
| Rating (kVA) | LV Current (A) | 3-Phase Fault (kA, u_k=6%) |
|---|---|---|
| 315 | 455 | 7.6 |
| 400 | 577 | 9.6 |
| 500 | 722 | 12.0 |
| 630 | 909 | 15.2 |
| 800 | 1155 | 19.2 |
| 1000 | 1443 | 24.0 |
| 1250 | 1804 | 30.1 |
| 1600 | 2309 | 38.5 |
| 2000 | 2887 | 48.1 |
| 2500 | 3608 | 60.1 |
AA.3 Cable Ampacity (Copper YJV, in Air)
| Size (mm²) | Ampacity (A) | ATS Rating |
|---|---|---|
| 10 | 60 | ≤32A |
| 16 | 84 | ≤63A |
| 25 | 115 | ≤100A |
| 35 | 140 | ≤125A |
| 50 | 175 | ≤160A |
| 70 | 225 | ≤250A |
| 95 | 275 | ≤250A |
| 120 | 320 | ≤400A |
| 150 | 360 | ≤400A |
| 185 | 410 | ≤400A |
| 240 | 490 | ≤630A |
| 300 | 560 | ≤630A |
AA.4 ATS Selection Quick Table
| Load Type | Recommended Class | Poles | Transfer Time | Comms |
|---|---|---|---|---|
| Fire pump | PC + CCCF | 4P | ≤1s (T1=0.5s) | Alarm required |
| Hospital OR | PC medical | 4P | ≤200ms | Insulation monitor |
| Data center UPS input | PC smart | 4P | ≤3s | Modbus TCP |
| General water pump | CB economy | 4P | ≤3s | Optional |
| Tunnel fan | PC corrosion-proof | 4P | ≤2s | Fiber |
| Underground mine | PC explosion-proof | 3P (660V) | ≤1s | Intrinsic safety |
| Commercial lighting | CB economy | 4P | ≤5s | None |
| Elevator | PC | 4P | ≤500ms | Alarm required |
| Weak-current room | PC smart | 4P | ≤3s | SNMP |
| Cell site DC | DC ATS | 2P (DC) | ≤10ms | Optional |
Appendix BB: Transfer Time in Detail
BB.1 Composition of Total Transfer Time
Total transfer time = T1 + T2 + mechanical actuation (+ T3 on return).
Standard version (T1=2s, T2=0.5s, mechanical=300ms):
– Normal lost at t=0
– Controller confirms anomaly at t=2s
– Emergency already healthy; T2=0.5s, allows closing at t=2.5s
– Mechanical complete at t=2.8s
Total dropout = 2.8s. Loads without UPS experience 2.8s out.
Fire version (T1=0.5s, T2=0.2s, mechanical=200ms):
Total = 0.5+0.2+0.2 = 0.9s.
BB.2 Allowable Interruption by Load Type
| Load | Allowable Interruption | UPS Needed? |
|---|---|---|
| Incandescent lamp | >10s | No |
| LED driver | Often reboots at >20ms | Acceptable |
| AC compressor | >2s triggers low-pressure trip | Recommended |
| Elevator traction | >0.1s causes car drift | Must (dual source) |
| Fire pump motor | >5s water pressure drops | No (ATS enough) |
| Server | >20ms reboots | Must (UPS) |
| Network switch | >50ms reboots | Must (UPS) |
| Ventilator | >0.5s alarms | Must (UPS + medical IT) |
| PLC | >20ms may lose program | Must (UPS) |
This table governs whether a UPS is needed downstream of the ATS.
BB.3 How to Shorten Transfer Time
- Choose PC-class (200–300ms) over CB-class (800–3000ms)
- Reduce T1 (fire version 0.5s)
- Reduce T2 (utility-to-utility can be 0.2s)
- If still insufficient, use STS (4–8ms)
But T1 cannot be zero. Too small a T1 causes nuisance transfers from motor-start dips and loose contacts. Practical minimum: T1=0.3s.
Appendix CC: Secondary Wiring Practices
CC.1 Wire Numbering
KITOZER ATS secondary wires use a “circuit-terminal” convention:
– N source: N01, N02, N03 (A/B/C sampling)
– R source: R01, R02, R03
– Controller supply: 220, N
– Position feedback: S1, S2
– Alarm output: AL1, AL2
– Generator start: G1, G2
Every wire has a numbered sleeve at both ends matching the drawings.
CC.2 Routing
- Primary wires on the front side; secondary on the back
- Separate power and signal trunking by ≥50mm
- Cable bundles tied every 100mm
- Leave 5mm slack at each terminal
- Ferrules crimped and sleeved
CC.3 Terminal Block Layout
Top to bottom:
1. PE earth bar (top, copper)
2. N bar (insulated)
3. Secondary supply terminals
4. Position feedback
5. Comms terminals (RS485 A/B/SHLD)
6. Alarm output
7. Spare terminals (20% spare)
Appendix DD: Environmental and Special Applications
DD.1 High Temperature (boiler rooms, metallurgy)
Above 40°C ambient:
– Derate the ATSE current
– Add forced exhaust
– Set controller over-temperature alarm at 50°C
– Use anti-seize compound on busbar bolts
DD.2 High Humidity (seaside, basement parking)
- 304 or 316 stainless cabinet
- IP54 rating
- 50W dehumidification heater inside
- Tinned terminals
- Conformal-coated controller PCB
DD.3 High Altitude (>2,000m)
- Derate per A.7
- Increase clearance and creepage
- Use high-altitude breakers
DD.4 Explosive Atmosphere (chemical, mining)
- ExdIIBT4 or ExdI explosion-proof cabinet
- Intrinsically safe controller (no sparking normal controls inside)
- Explosion-proof cable glands
- Ex certification
DD.5 Extreme Cold (northern outdoor)
- Low-temperature lubricant (−40°C)
- 100W thermostatic heater inside
- Sealed cabinet against frost
- Low-temperature battery
Appendix EE: Final Checklist for ATS Project Managers
Before the ATS cabinet ships, the project manager should verify:
- One-line diagram signed by owner’s engineer
- Secondary schematic signed
- ATSE model matches the purchase order
- CCCF certificate in hand (fire version)
- Factory test report completed
- Insulation resistance recorded
- Loaded transfer test performed and recorded
- Spare keys and manual handed over
- Modbus register map delivered
- Packing list matches shipment
On site:
1. Cabinet level and bolted
2. Incoming cables phased correctly
3. PE bonded to building earth
4. Comms cable separate from power
5. No tools or debris left inside
6. Doors closed and locked
7. LOTO tags removed
8. Energize per sequence in Chapter 9
After energization:
1. Walk through alarms with the BMS vendor
2. Hand over document package
3. Schedule quarterly maintenance
4. Register warranty
This completes the supplementary appendices of the KITOZER ATS Engineering Manual.
Appendix FF: Deep Technical Q&A (20 Extended Questions)
FF.1 Why does the ATS click repeatedly during transfer?
The controller is attempting to close on Emergency, finds the Emergency voltage not yet stable, withdraws, and retries. This usually happens when a diesel generator’s voltage is still oscillating and T2 is set too short. Fix: increase T2 from 0.5s to 3–5s so the generator stabilizes before the ATSE closes.
FF.2 Can the ATS directly start a large motor?
PC ATSEs are rated AC-33B for mixed motor/lighting/heating loads. But a single 90kW DOL motor draws ~1,000A starting current through the ATSE contacts. Though brief, repeated starts accelerate contact erosion. Use a soft starter or VFD, or upsize the ATSE one rating.
FF.3 Can the ATS cabinet be installed against a wall?
Yes, but leave 800mm rear clearance for maintenance. If space is tight, KITOZER can build a “non-rear-access” cabinet relying on top and front ventilation, but commissioning and service still require front access.
FF.4 Can two ATS units be paralleled for higher capacity?
No. An ATSE is a double-throw switch, not a breaker designed for parallel operation. Paralleling two outputs creates circulating current that destroys contacts. For higher current, select a single larger ATSE (1600A or custom 3200A).
FF.5 Controller shows “comms failure” but comms work fine.
False alarm. Usually another Modbus device on the same bus has a conflicting address, causing the controller to receive malformed frames. Check that all device addresses are unique.
FF.6 After ATS transfer, downstream VFD reports “input phase loss.”
The VFD DC bus capacitors discharge during the ATS dropout; on reclosure the inrush causes the VFD to detect an input anomaly. Fix: add a DC reactor on the VFD input, or lengthen T2 so capacitors fully discharge before reclosure.
FF.7 Can I install an earth-leakage alarm on the ATS output?
Yes, but choose a “alarm-only” relay that does not trip — the ATS switches N, which causes unbalanced current that would nuisance-trip a tripping RCD.
FF.8 Why doesn’t the fire ATS auto-return?
Fire codes prohibit auto-return after a fire event. Even if Normal is restored, the ATS stays on Emergency until fire crews manually reset. KITOZER fire versions lock T3 to “no auto-return.”
FF.9 What about unbalanced three-phase voltage on Normal?
If Normal is inherently unbalanced (A=240V, B=220V, C=190V due to uneven single-phase loading), the controller sees C-phase under-voltage and transfers. This is not a fault. Widen the under-voltage threshold from 187V to 170V, or notify the utility to rebalance.
FF.10 Can the ATS cabinet include energy metering?
Yes. KITOZER cabinets ≥400A ship with CTs and a multi-function power meter measuring V, I, P, kWh. Accuracy 1.0 class, suitable for internal OPEX tracking but not for billing (billing requires utility-calibrated meters).
FF.11 Can I turn off the controller LCD backlight?
Yes. In the menu “Display settings,” set backlight to “auto-off after 5 minutes.” Measurement and transfer functions are unaffected.
FF.12 Can an existing ATS be retrofitted for remote monitoring?
Yes. All KITOZER standard cabinets have RS485 terminals pre-wired. If no comms module was fitted at the factory, a plug-and-play Ethernet module can be added on site; set the address via DIP switch.
FF.13 Is a brief light flicker during transfer normal?
Normal. Total transfer is 1–3s; incandescents fully extinguish and relight, LEDs may blink once. If lights do not recover, the ATS failed to reach Emergency — investigate.
FF.14 ATS acts slowly in winter.
Below 0°C, spring grease thickens and mechanical actuation slows from 300ms to 500ms. This is expected. Outdoor cabinets should have a thermostatic heater keeping the interior above 5°C.
FF.15 Can multiple ATS units share one generator?
Yes. Several ATS panels can use one generator as the common Emergency source, but size the generator for the sum of all downstream loads. Check the generator’s 100% step-load capability against the simultaneous ATS transfer current.
FF.16 Can the standard GGD IP30 cabinet be upgraded to IP54?
Yes — replace the cabinet with an IP54 version, add gaskets, dust filters, and filtered exhaust fans. But IP54 reduces natural convection; recalculate internal temperature rise.
FF.17 How do I tell PC from CB on site?
Open the door: PC-class shows one integrated double-throw switch with one operating handle; CB-class shows two side-by-side MCCBs. Read the nameplate: PC lists Icw, CB lists Icu.
FF.18 Can the ATS be installed upside-down (bottom-in/top-out)?
Standard is top-in/bottom-out. Bottom-in/top-out is possible if specified at order; the busbar routing changes. Electrical performance is unaffected, but the reversed operating direction risks operator error.
FF.19 Can I manually operate the ATSE if the controller fails?
Yes. Use the supplied manual crank to charge the spring and throw the switch after de-energizing the controller. This is for emergency use only.
FF.20 What should I watch for on Middle East export projects?
- Voltage: usually 415V/50Hz (GCC) or 220V/60Hz (some Middle East states)
- IP55 required for desert heat and dust
- SASO or ESMA certification
- Cabinet color: off-white or sand
- Manuals in English + Arabic bilingual
Appendix GG: About This Handbook and How to Use It
This handbook has grown from a 20k-character v1 comparison article into a comprehensive engineering reference. It is organized for three reading styles:
- Engineers selecting a product: read Chapters 3, 4, 11, and Appendix AA.
- Contractors commissioning a cabinet: read Chapters 8, 9, and Appendix N.
- O&M staff troubleshooting: read Chapters 10, 12, and Appendix FF.
KITOZER recommends keeping a printed copy of this manual near each ATS cabinet in the electrical room. The event log, alarm codes, and torque table are the most-paged sections during real incidents.
Every specification in this manual has been field-tested across hundreds of installations. If a project-specific detail is not covered here, contact KITOZER engineering directly — we would rather advise before installation than troubleshoot after.
End of KITOZER ATS Engineering Manual — final appendices.
Appendix HH: ATS Project Lifecycle Management
HH.1 Design Phase
An ATS project begins when the owner requests dual-source power. The electrical designer’s workflow:
- Load classification: Per GB 50052, classify all loads as Level 1, 2, or 3. Level 1 requires end-of-line dual-source transfer; Level 2 should; Level 3 may use single source.
- Source scheme: Determine the two sources. Two utilities? One utility + generator? Are the two utilities from different substations?
- ATS point map: Mark every end-of-line box requiring transfer on the architectural drawings. A 50-story office tower typically has 30–50 ATS points.
- Single-line design: Draw each ATS cabinet’s primary diagram, specifying incoming cable, ATSE model, outgoing breakers.
- Secondary design: Draw the control schematic — controller supply, position feedback, generator start, fire link.
- Bill of materials: List components per cabinet for switchgear quotation.
KITOZER recommends involving the assembly shop during the schematic design phase to avoid later rework from unbuildable selections.
HH.2 Bidding and Ordering
Owners typically package ATS cabinets for an electrical main contractor, who tenders to switchgear builders. The technical specification should define:
– Rated current, poles, class (PC/CB) per cabinet
– Incoming cable and breaker settings
– Controller features (comms, event log, touchscreen)
– Cabinet dimensions and color
– IP rating
– Certifications (CCCF, CE)
– Delivery and payment terms
KITOZER typically returns a technical proposal and quotation within 3 business days.
HH.3 Manufacturing and Factory Test
After contract signing and drawing sign-off, production takes 30–35 days. Factory tests include insulation, energized no-load commissioning, manual transfer tests, comms test, and visual inspection. The factory test report ships with the cabinet.
HH.4 Transport and Site Installation
Cabinets ship by freight. The electrical contractor performs site installation under KITOZER guidance:
1. Set, level, bolt the cabinet
2. Bond PE
3. Land incoming and outgoing cables
4. Land secondary control wires
5. Land comms cable
6. Verify and energize
HH.5 Commissioning and Acceptance
Follow Chapter 9. Commissioning by KITOZER engineer or authorized owner staff. The acceptance record is signed by four parties: owner, supervisor, contractor, supplier.
HH.6 Operation and Maintenance
The 18-month warranty begins on delivery. Maintenance follows Chapter 10. KITOZER recommends an annual maintenance contract.
HH.7 Retrofit and Expansion
After 5–10 years, owners may need to expand or retrofit. Common work:
– Add a comms module
– Replace the controller
– Upsize the ATSE
– Add outgoing feeders
KITOZER archives project drawings and can rapidly produce retrofit proposals based on original documentation.
Appendix II: Glossary
- ATSE: Automatic Transfer Switching Equipment (component level)
- ATS: Automatic Transfer Switch (colloquially the whole cabinet)
- PC-class: ATSE without short-circuit breaking capacity
- CB-class: ATSE with integrated breakers and breaking capacity
- Icw: Rated short-time withstand current
- Icm: Peak short-circuit making current
- Icu/Ics: Ultimate/service short-circuit breaking capacity
- BBM: Break-before-make
- MBB: Make-before-break (banned end-of-line)
- STS: Static Transfer Switch
- Bus-tie: Tie breaker between two LV bus sections
- T1/T2/T3/T4: Delay stages
- N/E: Normal/Emergency sources
- CCCF: China fire-product certification
- LOTO: Lockout/Tagout
- RCD: Residual Current Device
- SPD: Surge Protective Device
- TN-S: Separate N and PE earthing
- IT system: Isolated neutral, used in hospital ORs
- GGD/GCS: Standard Chinese LV cabinet types
- MNS: Withdrawable switchgear system originating from ABB
- MCCB: Molded-case circuit breaker
- ACB: Air circuit breaker (frame)
- CT: Current transformer
- UPS: Uninterruptible Power Supply
- DCIM: Data Center Infrastructure Management
- BMS: Building Management System
- SCADA: Supervisory Control and Data Acquisition
- Modbus: Industrial fieldbus protocol
- SNMP: Simple Network Management Protocol
- kVA/kW: Apparent/real power
- cosφ: Power factor
- η: Efficiency
- u_k%: Transformer impedance voltage
- sag/swell: Voltage dip/rise
- flicker: Voltage fluctuation causing light flicker
Appendix JJ: Closing
The ATS cabinet is a “small but critical” piece of distribution equipment. It does not occupy the vast space of a transformer or produce direct business value like a server, but it is the gatekeeper for all critical loads. A 1,600A ATS cabinet may occupy just one square meter in the switchroom, but it guards a data center worth hundreds of millions, a patient on the operating table, and lives waiting for rescue during a fire.
KITOZER has supplied ATS cabinets to over a thousand projects in the past decade. We have seen failures from poor selection and systems that ran for a decade without a fault thanks to careful commissioning. Our experience says: 80% of an ATS project’s success is determined at design selection and coordination; 20% at commissioning and maintenance. The component brand is secondary.
We hope this handbook helps electrical engineers, switchgear builders, and owner O&M staff avoid the pitfalls we have encountered. If questions remain after reading, contact the KITOZER engineering team.
KITOZER — Automatic transfer, automatic confidence.
End of KITOZER ATS Engineering Manual. © 2026 Guangzhou Laian Intelligent System Development Co., Ltd. All rights reserved.
Appendix KK: ATS Configuration Examples by Facility Type
KK.1 Five-Star Hotel
- Fire control room: 100A PC ATS
- Fire pump room: 250A PC CCCF
- Domestic water pump: 160A CB
- Weak-current room: 100A PC smart
- Kitchen exhaust fan: 160A CB
- Ballroom AC: 400A PC
- Elevator machine room: 100A PC
A hotel typically has 15–20 ATS cabinets, total ¥400k–600k.
KK.2 Tertiary Hospital
- OR department: 8 × 160A medical ATS
- ICU: 4 × 100A
- ER resuscitation: 2 × 100A
- Medical gas plant: 1 × 63A
- Fire pump: 2 × 250A CCCF
- Boiler room: 1 × 250A
- UPS input: 4 × 400A
Hospital ATS investment typically ¥800k–1.5M.
KK.3 Mid-Size Data Center (500 racks)
- UPS input ATS: 6 × 400A PC
- Generator paralleling: 2 panels
- CRAC end ATS: 10 × 250A
- Lighting/maintenance ATS: 8 × 100A
- Generator start panels: 2
Data center ATS investment ¥1–2M.
KK.4 Residential Community (1,000 units)
- Basement fire pump: 2 × 160A CCCF
- Domestic water: 2 × 160A
- Weak-current room: 1 × 100A
- Elevators: 10 × 100A (one per building)
- Public lighting: 2 × 63A
Residential community ATS investment ¥300k–500k.
KK.5 Factory Workshop
- Workshop power incomer: 2 × 1600A PC
- Fire pump: 1 × 250A CCCF
- Control room: 1 × 100A
- AHUs: 4 × 250A
- Lighting: several × 63A
Mid-size factory ATS investment ¥500k–1M.
Appendix LL: Safety Practices
LL.1 Live-Work Taboos
- Do not open the ATSE contact cover while energized
- Do not attempt manual operation while both sources are closed
- Do not touch busbars bare-handed
- Do not store tools or debris inside the cabinet
LL.2 De-Energization (LOTO) Procedure
- Notify all affected personnel
- Stop downstream loads first, then upstream incomers
- Open both incoming MCCBs
- Tag “Do Not Close”
- Verify de-energized with a tester
- Apply safety ground (for maintenance)
- Perform work
- Remove safety ground
- Remove tags
- Re-energize
LL.3 Emergency Response
- Short circuit / explosion: open both incoming MCCBs immediately, evacuate, call fire
- Electric shock: de-energize before touching the victim; never grab a live person with bare hands
- Fire in cabinet: use CO2, never water
- Smoke inside: cut power; do not open the door (oxygen feeds the fire)
End of document.
Appendix MM: Full KITOZER Series Comparison
MM.1 Smart vs Power Series
| Parameter | Smart 100 | Smart 250 | Smart 630 | Power 1000 | Power 1600 |
|---|---|---|---|---|---|
| Class | PC | PC | PC | PC | PC |
| Rated current | 100A | 250A | 630A | 1000A | 1600A |
| Poles | 4P | 4P | 4P | 4P | 4P |
| Icw (1s) | 12kA | 20kA | 30kA | 40kA | 50kA |
| Icm | 26kA | 42kA | 63kA | 84kA | 105kA |
| Mechanical time | 200ms | 250ms | 300ms | 400ms | 500ms |
| Cabinet mm | 600×600×2200 | 800×600×2200 | 800×800×2200 | 1000×800×2200 | 1000×1000×2200 |
| Weight | 90kg | 120kg | 180kg | 260kg | 340kg |
| Controller | Smart LCD | Smart LCD | Smart LCD | LCD+Ethernet | LCD+Ethernet+SNMP |
| Ref. price | ¥12,800 | ¥16,500 | ¥22,000 | ¥38,000 | ¥58,000 |
MM.2 CB Economy Series
| Parameter | CB-100 | CB-250 | CB-400 | CB-630 |
|---|---|---|---|---|
| Class | CB (dual MCCB) | CB | CB | CB |
| Rated current | 100A | 250A | 400A | 630A |
| Icu | 25kA | 35kA | 35kA | 50kA |
| Mechanical time | 1500ms | 1800ms | 2000ms | 2500ms |
| Ref. price | ¥8,800 | ¥11,500 | ¥14,800 | ¥19,500 |
MM.3 Medical Series
| Parameter | Med-63 | Med-160 | Med-400 |
|---|---|---|---|
| Class | PC | PC | PC |
| Transfer time | ≤150ms | ≤200ms | ≤250ms |
| Insulation monitor | std | std | std |
| Isolation transformer | 3kVA | 8kVA | 20kVA |
| Ref. price | ¥18,000 | ¥24,000 | ¥38,000 |
MM.4 Fire Series
| Parameter | Fire-100 | Fire-250 | Fire-630 |
|---|---|---|---|
| Class | PC | PC | PC |
| CCCF | Yes | Yes | Yes |
| T1 (locked) | 0.5s | 0.5s | 0.5s |
| Fire-link input | std | std | std |
| Ref. price | ¥13,800 | ¥18,500 | ¥28,000 |
Appendix NN: Additional Notes
NN.1 Service Life
With proper maintenance, ATS cabinets last 20–30 years. The ATSE body’s 10,000-operation mechanical life at 5 transfers/year implies a millennium — not the bottleneck. The real limits are:
– Controller electronics (controller may need replacement after 10–15 years)
– Cabinet paint (corrosion after 15 years)
– Gaskets (age after 5–10 years)
KITOZER warranties: ATSE body 24 months, controller 18 months, lifetime repair after warranty.
NN.2 Reusable Packaging
Export crates are single-use. Domestic cartons are recyclable. For repeated moves, keep the original crate or order a custom wooden box.
NN.3 Lifting to Upper Floors
Cabinets have four top lifting eyes. Use nylon slings, not steel wire rope directly on the paint. Weights range 90–450kg; check floor loading.
NN.4 Cabinet Air Conditioning
When the cabinet contains high-power rectifiers or transformers, or is installed in hot environments, KITOZER can add 1–3kW cabinet air conditioners on top or side, maintaining IP54.
NN.5 Owner-Replaceable Controller
The KITOZER controller uses pluggable terminals: de-energize → unplug terminals → swap controller → replug → energize. Parameters backed up over Modbus restore in one click.
End of document.
Appendix OO: Industry Trends and KITOZER Outlook
OO.1 Intelligence
ATS is evolving from “mechanical switch + simple controller” into a “smart distribution node.” Future controllers will include:
– Built-in power-quality analysis (harmonics, flicker, unbalance)
– AI predictive maintenance (contact temperature rise and operation count predict remaining life)
– Cloud connectivity (4G/5G directly to vendor cloud)
– BIM integration (locate the faulty cabinet in the BIM model)
KITOZER already offers temperature rise monitoring and AI life prediction in its new controllers; a 4G cloud-connected version is expected in 2027.
OO.2 Higher Voltage
As data center rack density climbs from 5kW to 20kW and 50kW, distribution is moving from 400V to 480V and 690V. KITOZER is developing a 690V PC ATSE line for high-density computing containers.
OO.3 DC Distribution
Data centers are piloting 380V HVDC distribution to reduce AC-DC-AC conversion losses. KITOZER already offers a DC-ATS line (250V DC, 750V DC) with <5ms transfer.
OO.4 Customization
Owners increasingly demand customized cabinet appearance, color, comms protocol, and alarm point lists. KITOZER has always built to drawing rather than stocking standard products. Lead times are longer, but customer retention is high.
OO.5 KITOZER Three-Year Plan
- 2026: Launch 690V ATSE line; complete CE and UL certification
- 2027: Launch cloud-connected smart ATS on the KITOZER cloud platform
- 2028: Assemble in Southeast Asia (Vietnam, Thailand) for Belt-and-Road projects
We welcome industry partners and owners to work with us on advancing dual-source transfer technology.
End of KITOZER ATS Engineering Manual. © 2026 Guangzhou Laian Intelligent System Development Co., Ltd. All rights reserved. KITOZER is a brand of Guangzhou Laian. This document is for engineering reference; actual specifications are governed by contract drawings.
Appendix PP: On-Site Troubleshooting Quick Table
| Symptom | Likely Cause | Action |
|---|---|---|
| Controller dead on power-up | Supply fuse blown | Replace fuse |
| Both voltages read 0 | Sense wiring reversed | Check sense lines |
| Manual transfer does nothing | Motor fuse blown | Replace fuse |
| Auto transfer does nothing | Key switch in manual | Set to auto |
| Frequent transfers | T1 too short | Increase T1 |
| No return | T3 too long | Decrease T3 |
| Comms dead | A/B swapped | Swap A/B |
| No alarm output | Alarm contact miswired | Check wiring |
| Contacts hot | Loose bolts | Re-torque |
| Cabinet buzzing | Busbar resonance | Add support |
KITOZER 24/7 technical support: +86 139-2228-9957 / +86 185-2066-8845 / WhatsApp +86 190-6853-4140. Guangzhou metro 4-hour response, Guangdong 24-hour on-site, major cities 5 business days.
Thank you for reading this engineering manual. It covers KITOZER ATS dual-power transfer cabinets from principle through maintenance. We hope it serves as a practical reference on your projects. Feedback and corrections are welcome — we will incorporate them in the next edition.